Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

East India Udyog Limited

(Discrepancy Report For 1st stage RQM)

REC Quality Monitoring (RQM)


Of

Village Electrification works under

RE-DDUGJY-New Project

In State Jharkhand

Location:

Name of Village : Nawadih

Census Code No. : 370141

Name of Block : Ramgarh

Name of District : Dumka

Rural Electrification Corporation Limited A


Government of India Enterprise
Page 1
Annexure-II
Quality of Installation (workmanship) Showing type of defect, category, their location in
photograph & SLD

S. No.
Description of Defects Picture Location as per Remarks
No. SLD
Distribution Transformer
1. Substation numbering not done Photo 1 DTR 1 Rectification Done
2. Stay found lose Photo 1 DTR 1 Rectification Done
3 DO fuse not proper Photo 1 DTR 1 Rectification Done
4 Oil not found in breather cup Photo 1 DTR 1 Rectification Done
5 Hammering done on Pipe earthing Photo 2 DTR 1 Rectification Done
11 KV Line
6 Stay angle and winding not proper Photo 3 Tapping pole Rectification Done
LT line
7 Pole numbering not done Photo 4 All LT Pole Rectification Done
8 Stay found loose Photo 5 LT 09 Rectification Done
9 Pole found tilted Photo 6 LT 13 Rectification Done
BPL Connection
10 Meter cover not found Photo 7 Meter no. 734547 Rectification Done
11 PVC clamp not found Photo 7 Meter no. 734547 Rectification Done
Total 11

Rural Electrification Corporation Limited A


Government of India Enterprise
Page 2
Annexure-XII
Photographs (with good resolution and zoom) with underlying text
describing defects
SOR: DTR Photo No 1

Photo No. 1 Substation numbering not done, Stay found loose, Arc horn alignment not proper, oil not
found in breather cup, HG fuse set not proper

3
Compliance: After Rectification of Photo No 1, Substation No done, stay
tightening done, arcing horn alignment fixed Oil filled in breather cup, DO fuse set
properly. (Note: HG is not our scope).

4
SOR: Photo No 2

Photo No. 2 Hammering done on Pipe earthing

Compliance: After Rectification of Photo No 2 New Pipe Earthing Is


installed in replace of damage pipe earthing.

5
SOR: HT Line Before Photo No 3

Photo No. 3 Stay angle and winding not proper.

Compliance: After rectification of Photo No 3, Stay angle and winding Done properly.

6
SOR: LINE (Before)

Photo No. 4 Pole numbering not done.

Compliance: After rectification of Photo No 4 LT pole numbering Done.

7
SOR: LT Line Photo No 5 before

Photo No. 5 LT Stay found loose at LT-09.

Compliance: After rectification of Photo No 5 LT stay tightening done.


NOTE: Pole No is done as per revised SLD.
8
SOR: Photo No 6

Photo No. 6 LT Pole found tilted at LT-13

Compliance: After rectification LT 13 tilted pole leveled.


9
BPL (Meter no. 734547)

Photo No. 7 LED bulb not found; meter cover not found.

Compliance: Meter cover placed on meter; LED bulb placed.


Note: Given SOR meter no, in not found in the mentioned location. Observation is
rectified by the meter sl no. Meter board and LED bulb install inside consumer house.

10
11

You might also like