H.06 H.05 H.04 H.03 H.02 H.01 H.07: 1 Elevation-1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

LAND KEY
CONTRACTOR'S VERIFICATION STAMP

A WE, [ALI & SONS], VERIFY THAT THIS CONTRACTOR'S A


DOCUMENT

· HAS BEEN PRODUCED AND CHECKED IN ACCORDANCE


WITH CONTRACTOR'S QUALITY ASSURANCE PLAN
· IS OF A STANDARD THAT WILL ENABLE THE EMPLOYER
TO ACCEPT IT IN ACCORDANCE WITH THE CONTRACT
· COMPLIES WITH ALL REQUIREMENTS OF THE CONTRACT

FOLLOWING DEVIATIONS TO CONTRACT ARE REFERENCED


FOR WHICH A DISPENSATION HAS BEEN ACCEPTED BY THE
EMPLOYER:
B [NIL] B
OTHER RELATED LETTERS / RFI WHICH DOCUMENT
CLARIFICATIONS ASSOCIATED WITH THIS DOCUMENT ARE
LISTED BELOW:
1. IFC-PODIUM GROUND FLOOR FRAMING PLAN
2500-108-VS-5210-21000 & 21001_C00
2. IFC-OFFICE -BEAM SCHEDULE -2500-108-VS-5999-21700_C00
3. GROUND FLOOR SLAB REINFORCEMENT DETAILS (SD)
2201-246-VS-5300-01001 TO 01006_C00
4.GROUND FLOOR BEAMS REINFORCEMENT DETAILS (SD)
2201-246-VS-5700-01001 & 01002_C00
CONTRACTOR'S PROJECT MANAGER:
FIRAS
C __________ __________ ________ C
PRINT NAME SIGNATURE DATE

DOCUMENT STATUS STAMP

H.07 H.06 H.05 H.04 H.03 H.02 H.01 GRC CODE 1 WORK MAY PROCEED

MONORAIL
CODE 2 REVISE & RESUBMIT. WORK MAY PROCEED
WINCH
SUBJECT TO INCORPORATION OF
+56.65 m 12445
COMMENTS INDICATED

CODE 3 REVISE & RESUBMIT. WORK MAY NOT

2250
42500
AL-C1 1161 2428 2428 2428 2428 876 696

D AL-C1 PROCEED D

5250

2000
CODE 4 REVIEW NOT REQUIRED. WORK MAY
PROCEED

8850
+51.40 m

2000
+51.40 m THE STATEMENT "WORK MAY PROCEED" APPLIES TO THE

7351
FOLLOWING WORK ACTIVITIES ASSOCIATED WITH THE

1100
12450

AL-C3 MATTERS CONTAINED WITHIN THE CONTRACTOR'S

2000
DOCUMENT:
REFER TO THE DESIGN / PROCUREMENT / CONSTRUCTION / ALL * ACTIVITIES

1000
SIGNAGE DESIGN (*DELETE/AMEND/ADD AS APPLICABLE)

1351
3000

7200
ANY REVIEW, COMMENT OR ACCEPTANCE BY EMPLOYER

5420
2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500
UNDER THIS CONTRACT WITH RESPECT TO ANY OF
CONTRACTOR'S DOCUMENTS SHALL NOT IN ANY WAY BE, OR
E E

3600
+45.40 m 35000
+45.40 m DEEMED TO BE, AN APPROVAL OF ANY WORKS OR AN
+44.88 m ACCEPTANCE THAT THE CONTRACTOR'S DOCUMENTS MEET
GRA +44.20 m GV1 THE REQUIREMENTS OF THE CONTACT, AS CONTRACTOR HAS

1350
THE SOLE RESPONSIBILITY FOR PERFORMING THE WORKS IN
AL-C3 ACCORDANCE WITH THE REQUIREMENTS OF THIS CONTRACT.
2500 2500 2500
3600

3600
E1-12 7500
E1-12

AL-C2
E1-21 E1-21 E1-21 E1-21
GSP1 ----------------------------- --------------- ------------------
AL-P2 AD PORTS GROUP APPROVAL CODE DATE
3600

3600
E1-12 E1-12

F F
41050

AL-C3
3600

3600
GV1
C00 03/08/2022 Issued For Approval/SD KAM PBU KSM

Rev Date Description Drawn Chkd Appr


GV1
3600

3600
Drawn by / Date Checked by / Date Approved by / Date
AL-P2
28600

KAM/03/08/2022 PBU/03/08/2022 KSM/03/08/2022

28165

56550
G G
56550

Client
3600

3600
AL-P2

GSP1
3600

3600
Contract No. & Project Title
3600

3600
AL-P2 2201-246
H H
+19.00 m CONSTRUCTION OF KIZAD HQ OFFICES
GSP1 Abu Dhabi, KIZAD AREA B, Plot:C1
AL-P3 AL-P3
A1920
3600

3600
+16.20 m +14.98 m +16.10 m
AL-C3 GV1
+15.60 m +15.60 m Sub Contractor

1350
AL-C3
4300

4300
+12.30 m +12.30 m

2920
GRA
J J
AL-P1
3400

3400
Contractor
AL-C3
3500

3500
11000

GV1
+4.17 m

AL-C3 Consultant
K
4100

4100
AL-C3
K
PAVEMENT PAVEMENT
+0.10 m +0.10 m
LEVEL LEVEL

P.O.BOX 2967, ABU DHABI, UNITED


ARAB EMIRATES
TEL + 971 2 681 5777
FAX + 971 2 681 5776
EMAIL abudhabi@dewan-architects.com

ELEVATION-1 AL-C3 AL-P3 GV2 GV2 AL-P1 AL-P1 www.dewan-architects.com

1 SCALE: 1:150 Drawing Title

L SCAFFOLDING, MONORAIL L
& WINCH DESIGN
Sheet Scale Paper Size

01 OF 08 As Shown A1
Drawing Status
DESIGN DRAWING
QR CODE
M Drawing No. Revision M
UNCONTROLLED IF PRINTED 2201-246-VA-6800-01200 C0-1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like