Professional Documents
Culture Documents
Petroleum Field Equipments Group C
Petroleum Field Equipments Group C
1
b. Rotary system
c. Circulation system
6. It is a solids removal equipment
a. Mud Tanks
b. Desander
c. Derrick
7. The end of the drilling line that is attached to Anchor is
a. Dead line
b. Travelling block
c. Fast line
8. The fluid enters in the drillstring through a special piece of equipment called ……..
located at the top of the Kelly.
a. Mud pits
b. Swivel
c. Shale shaker
_____________________________________________________________________________
Question 3:-
A rig must hoist a load of 200,000 lbf. The drawworks can provide a maximum input
power of 800 hp. Eight lines are strung between the crown block and the traveling block
and the dead line is anchored to a derrick leg on one side of the v-door. (E = 0.874)
a) Calculate the static tension in the fast line when upward motion is impending
b) Calculate the maximum hook horsepower available
c) Calculate the maximum hoisting speed
d) Calculate the derrick load when upward motion is impending
e) Calculate the maximum equivalent derrick load
f) Calculate the derrick efficiency factor
______________________________________________________________________________
2
Question 4:-
Write the correct name of the equipment
………………………………………….
______________________________________________________________________________