DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA
No. URAIAN KO HP KAP. HARGA SEWA KET.
DE ALAT ALAT/JAM
(di luar PPN)

1. ASPHALT MIXING PLANT E01 125.0 50.0 T/Jam 3,000,000,000 5,080,316.71 Alat Baru
2. ASPHALT FINISHER E02 30.0 5.0 Ton 1,200,000,000 367,452.29 Usia 1 th.
3. ASPHALT SPRAYER E03 15.0 800.0 Liter 550,000,000 198,391.11 Alat Baru
4. BULLDOZER 100-150 HP E04 100.0 - - 2,000,000,000 663,476.53 Alat Baru
5. COMPRESSOR 4000-6500 L\M E05 70.0 - - 100,000,000 163,763.11 Alat Baru
6. CONCRETE MIXER 0.3-0.6 M3 E06 30.0 500.0 Liter 15,000,000 76,523.56 Alat Baru
7. CRANE 10-15 TON E07 150.0 25.0 Ton 950,000,000 447,205.57 Alat Baru
8. DUMP TRUCK 3-4 M3 E08 115.0 6.0 Ton 200,000,000 255,519.74 Alat Baru
9. DUMP TRUCK E09 145.0 8.0 Ton 300,000,000 325,788.54 Alat Baru
10. EXCAVATOR 80-140 HP E10 80.0 0.5 M3 1,200,000,000 375,507.78 Alat Baru
11. FLAT BED TRUCK 3-4 M3 E11 115.0 4.0 M3 200,000,000 255,519.74 Alat Baru
12. GENERATOR SET E12 220.0 180.0 KVA 175,000,000 423,243.69 Alat Baru
13. MOTOR GRADER >100 HP E13 115.0 - - 1,300,000,000 523,009.74 Alat Baru
14. TRACK LOADER 75-100 HP E14 95.0 1.5 M3 1,200,000,000 400,632.78 Alat Baru
15. WHEEL LOADER 1.0-1.6 M3 E15 115.0 1.5 M3 1,250,000,000 511,181.76 Alat Baru
16. THREE WHEEL ROLLER 6-8 T E16 60.0 8.0 Ton 850,000,000 355,807.37 Alat Baru
17. TANDEM ROLLER 6-8 T. E17 40.0 8.0 Ton 850,000,000 322,307.37 Alat Baru
18. TIRE ROLLER 8-10 T. E18 60.0 10.0 Ton 1,000,000,000 325,811.44 Alat Baru
19. VIBRATORY ROLLER 5-8 T. E19 60.0 8.0 Ton 600,000,000 246,634.26 Alat Baru
20. CONCRETE VIBRATOR E20 1.0 - - 7,500,000 27,614.07 Alat Baru
21. STONE CRUSHER E21 220.0 50.0 T/Jam 1,800,000,000 727,904.53 Alat Baru
22. WATER PUMP 70-100 mm E22 8.0 - - 7,000,000 39,133.61 Alat Baru
23. WATER TANKER 3000-4500 L. E23 115.0 4,000.0 Liter 225,000,000 268,708.07 Alat Baru
24. PEDESTRIAN ROLLER E24 4.0 1.00 Ton 70,000,000 51,130.64 Alat Baru
25. TAMPER E25 4.0 0.20 Ton 35,000,000 47,073.59 Alat Baru
26. JACK HAMMER E26 3.0 - - 12,500,000 33,018.69 Alat Baru
27. FULVI MIXER E27 75.0 - - 50,000,000 157,592.59 Alat Baru
28. CONCRETE PUMP E28 100.0 8.00 M3 100,000,000 207,039.47 Alat Baru
29. TRAILER 20 TON E29 175.0 20.00 Ton 550,000,000 407,734.97 Alat Baru
30. PILE DRIVER + HAMMER E30 25.0 2.50 Ton 200,000,000 101,173.92 Alat Baru
31. CRANE ON TRACK 35 TON E31 125.0 35.0 Ton 1,000,000,000 399,055.46 Alat Baru
32. WELDING SET E32 40.0 250.0 Amp 25,000,000 94,412.36 Alat Baru
33. BORE PILE MACHINE E33 150.0 2,000.0 Meter 2,250,000,000 649,459.62 Alat Baru
34. ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 15,000,000 34,314.07 Alat Baru
35. TRAILLER 15 TON E35 150.0 15.0 Ton 115,000,000 295,073.24 Alat Baru
36. ROCK DRILL BREAKER E36
37. COLD MILLING E37
38. PONTON 520,833.33
39. TAKBOOT 733333.33
40.

File : 606275408.xls
URAIAN ANALISA ALAT

Tabel-tabel di ba
No. URAIAN KODE KOEF. SATUAN KET.
Merupakan acua
HARGA
A. URAIAN PERALATAN ALAT
1. Jenis Peralatan TRAILLER 15 TON E35
2. Tenaga Pw 150.0 HP UE'
3. Kapasitas Cp 15.0 Ton ###
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun E35
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ###
c. Harga Alat B 115,000,000 Rupiah ###
5. Alat Yang Dipakai a. Umur Ekonomis A' 10.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru
c. Harga Alat (*) B' 115,000,000 Rupiah Alat Baru
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 11,500,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.16275 - ###
(1 + i)^A' - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = ( B' - C ) x D E 11,229.43 Rupiah ###
W' ###
###
b. Asuransi, dll = 0.002 x B' F 153.33 Rupiah ###
W' ###
###
Biaya Pasti per Jam = (E+F) G 11,382.77 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 191,250.00 Rupiah ###
###
###
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 60,000.00 Rupiah ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 9,583.33 Rupiah ###
perbaikan W' ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator= ( 1 Orang / Jam ) x U2 M 25,714.29 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 300,833.33 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 312,216.10 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 10.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 8,571.43 Rp./Jam ###
4. Bahan Bakar Bensin Mb 10,750.00 Liter ###
5. Bahan Bakar Solar Ms 10,200.00 Liter ###
6. Minyak Pelumas Mp 40,000.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
###

File : 606275408.xls
###
URAIAN ANALISA ALAT

Tabel-tabel di ba
No. URAIAN KODE KOEF. SATUAN KET.
Merupakan acua
HARGA
A. URAIAN PERALATAN ALAT
1. Jenis Peralatan COLD MILLING (WINGET) E36
2. Tenaga Pw 125.0 HP UE'
3. Kapasitas Cp - - ###
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun E35
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ###
c. Harga Alat B 474,750,000 Rupiah ###
5. Alat Yang Dipakai a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru
c. Harga Alat (*) B' 474,750,000 Rupiah Alat Baru
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 47,475,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 - ###
(1 + i)^A' - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = ( B' - C ) x D E 75,142.71 Rupiah ###
W' ###
###
b. Asuransi, dll = 0.002 x B' F 633.00 Rupiah ###
W' ###
###
Biaya Pasti per Jam = (E+F) G 75,775.71 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 159,375.00 Rupiah ###
###
###
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 50,000.00 Rupiah ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B' K 39,562.50 Rupiah ###
perbaikan W' ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator= ( 1 Orang / Jam ) x U2 M 25,714.29 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 288,937.50 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 364,713.21 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 10.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 8,571.43 Rp./Jam ###
4. Bahan Bakar Bensin Mb 10,750.00 Liter ###
5. Bahan Bakar Solar Ms 10,200.00 Liter ###
6. Minyak Pelumas Mp 40,000.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
###

File : 606275408.xls
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
> 15th ?
Kon
A. URAIAN PERALATAN Nila
1. Jenis Peralatan ROCK DRILL BREAKER E37
2. Tenaga Pw 3.0 HP
3. Kapasitas Cp - - ###
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun E38
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ###
c. Harga Alat B 27,721,250 Rupiah ###
5. Alat Yang Dipakai a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru
c. Harga Alat (*) B' 27,721,250 Rupiah Alat Baru
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 2,772,125 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 - ###
(1 + i)^A' - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = ( B' - C ) x D E 4,387.68 Rupiah ###
W' > 15th ?
Kon
b. Asuransi, dll = 0.002 x B' F 36.96 Rupiah Nila
W' Depr

Biaya Pasti per Jam = (E+F) G 4,424.64 Rupiah ###


E39
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 3,825.00 Rupiah ###
###
###
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 1,200.00 Rupiah ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 2,310.10 Rupiah ###
perbaikan W' ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator= ( 1 Orang / Jam ) x U2 M 25,714.29 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 47,335.10 Rupiah ###
> 15th ?
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 51,759.74 Rupiah Kon
Nila
Depr
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam E40
3. Upah Pembantu Operator / Pmb.Sopir U2 8,571.43 Rp./Jam ###
4. Bahan Bakar Bensin Mb 10,750.00 Liter ###
5. Bahan Bakar Solar Ms 10,200.00 Liter ###
6. Minyak Pelumas Mp 40,000.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
###

File : 606275408.xls