Download as pdf
Download as pdf
You are on page 1of 2
lites Capital Development Authori wl ae Office ofthe Member Planning & Design No: CDA/M(PRD) /Guidelines /2017/ OBS dated YZAugust,2017 4 oe, ye ay Subject: Guidelines for Approval /completion of building plan of private v housing societies/Scheme ane” ‘As per notification dated 03 July 2017 whereby the work has been distributed between Director BCS-I bid BCS-II,the following working methodology of Directorate BCS-II is hereby devised. Procedure for seelsing approval/completion of building plan of private Housing Societies /Scheme () The Owner will submit building plan at One Window Operation (OWO) CDA along with following documents (@\ Form A1 in case of approval and Form B-1 in case of Completion of building plan . (b) Form A2 in case of approval and Form 8-2 in case of * Completion of building plan (© Proposed Architectural Design ofthe building Gsets (@__Stmetural Design 6fthe building ésets (©) Certificate of Engineer regarding soundness and stability ofthe structure (0 Certificate of vetting Consultants Indemnity bond from owner and Engineer Indemnity bond from owner of the societies/Scheme (i) Copy of allotment letter, posse Copy of owners and CINC copy of witness to indemnity bond (0 Sfiee and other applicable fees as per CDA building regulations 2005. (i) NOC/Clearance trom Concerned Housing Society Scheme as per specimen ay (i) The request will be ‘examined in the Building Control Section as, per building bye-laws of CDA. 2 Distributions @ DDGLaw “ti (i) DG Finanace ii) Director BCS-I CDA (iv) _ Director BCS-I1 CDA (v) Director UP CDA (vi) Director RR CDA (vii) Director Master Planning CDA (vii) Director T&P CDA (ix) Director Estate management -11 CDA () _AILDD’S BCS be) Dir HS, CDA Copy for info please. “> (0) Chairman CDA (ii) Member F/A CDA (il) Member Admin CDA (iv) Member Esate CDA, Wwune (Asad MehbooD ra Member Planning &Design CDA

You might also like