WBS element Description

INSTALLATION WORKS
Construction
Route Alignment, Detailed Survey
Check Survey
Soil Investigation
Access Road
Access Road for Maintenance Purposes
Access Road for Construction Purposes
In normal soil (type 4)
In poor soil - (type 5)
In poor soil - (type 5) - piled
Piled foundation
Pile Caps
Platforms
Foundation Protection
Foundation
In deleterious rock (type 2)
In good soil condition (type 3)
Foundations for type tests
Anchor Rock foundation
In sound rock (type 1)
Reinforce Concrete for additional works
Uplilft routine tests
Pad and Chimney foundation
Tower Earthing
Sup & Inst of add deep bore grd rods
Sup & Inst of add earthing grading rings
Erection of towers and gantries
Tower assembly
Conductor Stringing
Conductor Stringing site works
OPGW / Earthwire Stringing
OPGW /Earthwire Stringing site works
Laying of FOC
Painting works at site
Removal of trees and replantation
Modification of Street Light poles
Rectification of tower desig. plates
Testing & Commissioning
OPGW / Communication testing
OHTL testing
Installation of Aircraft warning lights
Installation of Aircraft warning spheres
Painting of Towers and Gantries
400 kV OHTL
Construction
INSTALLATION WORKS
Route Alignment, Detailed Survey
Check Survey
Soil Investigation
Access Road
Access Road for Maintenance Purposes
Access Road for Construction Purposes
Platforms
Foundation Protection
Foundation
In sound rock (type 1)
In deleterious rock (type 2)
In good soil condition (type 3)
In normal soil (type 4)
In poor soil - (type 5)
In poor soil - (type 5) - piled
Reinforce Concrete for additional works
Uplilft routine tests
Foundations for type tests
Pad and Chimney foundation
Anchor Rock foundation
Piled foundation
Pile Caps
Erection of towers and gantries
Tower assembly
OPGW /Earthwire Stringing site works
Installation of Aircraft warning spheres
Painting of Towers and Gantries
Painting works at site
Sign boards for Road Crossings
Removal of trees and replantation
Tower and gantry Erection
Conductor Stringing
OPGW / Earthwire Stringing
Laying of FOC & Earthwire
Modification of Street Light poles
Testing & Commissioning
OPGW / Communication testing
OHTL testing
Conductor Stringing site works
Installation of Aircraft warning lights
Rectification of tower desig. plates
Tower and gantry Erection
Sign boards for Road Crossings
Tower Design
Tower Earthing
Sup & Inst of add deep bore grd rods
Sup & Inst of add earthing grading rings
500 kV OHTL

You might also like