Professional Documents
Culture Documents
A Project Report Cerificate
A Project Report Cerificate
on
Date: Name:
Place: Signature:
ACKNOWLEDGEMENT
First and Foremost I would like to thank my “Parents” who are the
first God and who has given blessings, strength, and stayed with me
throughout the successful completion of the project.
Finally, I thank all the staffs of BCA department who have been a
source of inspiration for accomplishing the project successfully.
Name:
Register Number:
CONTENTS
Sl.No TITLE Page No.
Abstract
1 Introduction
Description of the Project
2 Literature Survey
Existing and Proposed System
Feasibility Study
Tools and Technologies used
Hardware and Software Requirements
3 Software Requirement Specification
Admin and Users
Functional Requirements
Non-Functional Requirements
4 System Design
System Perspective
Context Diagram
5 Detailed Design
Use Case Diagram
Sequence Diagram
Collaboration Diagram
Activity Diagram
Data Flow Diagram
Database Design
Architecture Design
ER Diagram
6 Implementation
6.1 Screen Shots
7 Software Testing
Levels of Testing
Test Cases
8 Conclusion
9 Future Enhancements
10 Bibliography