Sheet List
Sheet
Number Sheet Name
RENDER
RENDER. ONE STUDIOS DESIGN WORK
1 2 3 4 5 6 7 8 9 10 11
KRAN AIR BATHUP JET-SPRAY - Do Not Scale. Use Propered Units Only
L PVC ∅3/4" L
PVC ∅3/4"
- All Dimension on this drawing must be checked on site
- All Drawings to be read in conjunction with structural
engineers drawings
K K - The Work Package contractors normal health and
KRAN AIR DAPUR WATER FLUSH
KRAN AIR safety obligations still apply when undertaking
4925
J JET-SPRAY J constructional operation both on and off sitr
KRAN AIR
PVC ∅3/4" PVC ∅3/4" NOTES
PVC ∅3/4"
SHOWER KRAN FFL = FINISH FLOOR LEVEL
I I
1850 1150
FCH = FINISH CEILING HEIGHT
H H NO REVISION DATE
KRAN AIR
G' G'
G G
3000
F F
PVC ∅3/4"
PROJECT TITLE
7326
KRAN AIR
WATER CLOSET
Rumah Kawi Semarang
JET-SPRAY PVC ∅3/4"
OWNER
JET SPRAY
E' PVC ∅3/4" E'
2324
B B
DRAWN BY
A A
APPROVED
23500 MEP346
DENAH RENCANA INSTALASI AIR
1
REVISION DATE
BERSIH
1 : 150
15/07/2022 18:31:18
1 2 3 4 5 6 7 8 9 10 11
1 2 3 4 5 6 7 8 9 10 11
- Do Not Scale. Use Propered Units Only
L L - All Dimension on this drawing must be checked on site
- All Drawings to be read in conjunction with structural
engineers drawings
K PIPA PVC 4"ø K - The Work Package contractors normal health and
PIPA PVC 3"ø FD safety obligations still apply when undertaking
4925
J PIPA PVC 3"ø J constructional operation both on and off sitr
FD
PIPA PVC 3"ø NOTES
PIPA DARI ROOFTOP DAK FFL = FINISH FLOOR LEVEL
I I
1850 1150
FCH = FINISH CEILING HEIGHT
H H NO REVISION DATE
G' G'
G G
3000
ARCHITECT/DRAWN BY
PIPA PVC 3"ø
E PIPA PVC 3"ø E
850
DRAWING TITLE
4675
C C
550
B B
PIPA PVC 4"ø
PIPA PVC 4"ø
GUTTER/PARIT
5850
DRAWN BY
A A
APPROVED
23500 MEP347
DENAH RENCANA INSTALASI AIR REVISION DATE
1 KOTOR
1 : 150
15/07/2022 18:31:20
1 2 3 4 5 6 7 8 9 10 11
1 2 3 4 5 6 7 8 9 10 11
- Do Not Scale. Use Propered Units Only
L L - All Dimension on this drawing must be checked on site
- All Drawings to be read in conjunction with structural
engineers drawings
K K - The Work Package contractors normal health and
PIPA PVC 4"ø safety obligations still apply when undertaking
4925
J J constructional operation both on and off sitr
SEPTICTANK NOTES
1850 1150
FCH = FINISH CEILING HEIGHT
H H NO REVISION DATE
3000
F F
SEPTICTANK
7326
PROJECT TITLE
E' E'
PIPA PVC 4"ø
2324
ARCHITECT/DRAWN BY
E E
850
B B
5850
DRAWN BY
A A
APPROVED
23500 MEP348
DENAH RENCANA INSTALASI AIR REVISION DATE
1 KOTOR WC
1 : 150
15/07/2022 18:31:22
1 2 3 4 5 6 7 8 9 10 11
- Do Not Scale. Use Propered Units Only
- All Dimension on this drawing must be checked on site
- All Drawings to be read in conjunction with structural
engineers drawings
ISOMETRI PLUMBING WC-1 - The Work Package contractors normal health and
2
safety obligations still apply when undertaking
constructional operation both on and off sitr
NOTES
KRAN WASTAFEL
JET SPRAY
WATER FLUSH CLOSET
KRAN SHOWER
PVC ∅3/4"
PROJECT TITLE
PVC ∅3/4"
PVC ∅3/4" DENAH DAN ISOMETRI
2990
PLUMBING WC-1
PIPA PVC 4"ø
MENUJU GUTTER
2715
KAMAR MANDI MASTER
BEDROOM
DRAWN BY
MEP349
914
3140
DETAIL WC-1 REVISION DATE
1 1 : 50
2
A309
15/07/2022 18:31:22
1 2
- Do Not Scale. Use Propered Units Only
- All Dimension on this drawing must be checked on site
- All Drawings to be read in conjunction with structural
engineers drawings
- The Work Package contractors normal health and
safety obligations still apply when undertaking
ISOMETRI PLUMBING WC-2
2
constructional operation both on and off sitr
NOTES
NO REVISION DATE
JET SPRAY
1 2
KRAN AIR
WATER CLOSET
L
WATER SHOWER
PROJECT TITLE
PV
C∅
3/4 DRAWING TITLE
"
PIPA PVC 4"ø
DENAH DAN ISOMETRI
PIPA PVC 3"ø 2 PLUMBING WC-2
A310
"
3/4 PIPA PVC 4"ø
C∅
PV
I
3
A310
PIPA PVC 4"ø
DRAWN BY
1 2 APPROVED
15/07/2022 18:31:22
- Do Not Scale. Use Propered Units Only
- All Dimension on this drawing must be checked on site
- All Drawings to be read in conjunction with structural
engineers drawings
- The Work Package contractors normal health and
safety obligations still apply when undertaking
constructional operation both on and off sitr
KRAN AIR DAPUR
NOTES
PIPA MENUJU WC.2
PIPA PVC 3"ø FFL = FINISH FLOOR LEVEL
FCH = FINISH CEILING HEIGHT
NO REVISION DATE
FLOORDRAIN
9 10
JET SPRAY
WATER CLOSET PROJECT TITLE
ARCHITECT/DRAWN BY
2
A311
PIPA AIR KOTOR MENUJU GUTTER
810
DRAWN BY
1500 0 AKSES AIR DARI METERAN
PDAM APPROVED
LANTAI KERAMIK 300x300mm 3 FOR SCALE SHEET NUMBER
A311
9 10 MEP351
ISOMETRI PLUMBING WC ART &
DETAIL WC-ART REVISION DATE
1 1 : 25
2 DAPUR
15/07/2022 18:31:22
- Do Not Scale. Use Propered Units Only
- All Dimension on this drawing must be checked on site
- All Drawings to be read in conjunction with structural
engineers drawings
- The Work Package contractors normal health and
safety obligations still apply when undertaking
constructional operation both on and off sitr
DETAIL POWDER ROOM
2179
KERAMIK 300x300mm
1 1 : 25
NOTES
NO REVISION DATE
2
A312
POWDER ROOM
1502
1327
PROJECT TITLE
E'
PAS. TRASRAM 150mm Rumah Kawi Semarang
OWNER
3
A312
ARCHITECT/DRAWN BY
DRAWING TITLE
APPROVED
JET SPRAY FOR SCALE SHEET NUMBER
WATER CLOSET
KRAN AIR MEP352
REVISION DATE
15/07/2022 18:31:23
- Do Not Scale. Use Propered Units Only
- All Dimension on this drawing must be checked on site
- All Drawings to be read in conjunction with structural
engineers drawings
- The Work Package contractors normal health and
safety obligations still apply when undertaking
constructional operation both on and off sitr
NOTES
NO REVISION DATE
80 200 80
80
48
VARIAN
∅12-150
253
PIPA PVC ∅4"
205
∅12-150
PROJECT TITLE
120
Rumah Kawi Semarang
80
40 120
PERMUKAAN AIR
OWNER
DINDING BATA
120
ARCHITECT/DRAWN BY
LUBANG
360
1500
PVC ∅4"
40 280 40 PIPA VENT.GLP RENDER.ONE STUDIOS DESIGN WORK
1340
∅50 mm
1200
960
A
40
DRAWING TITLE
360
400
DIPLESTER KEDAP AIR
DOP PIPA PVC 4" DIPLESTER KEDAP AIR
SLOPE
LUBANG KONTROL
25x25 cm
40 120
120
∅12-150
120 800 120 800 120 120 800 120 800 120
1960 1960
DRAWN BY
APPROVED
NTS MEP353
REVISION DATE
15/07/2022 18:31:23