ASME BPVC.VIII.

1-2015 UG-42

Figure UG-41.1 ð15Þ


Nozzle Attachment Weld Loads and Weld Strength Paths to Be Considered

49
UG-42 – UG-43 ASME BPVC.VIII.1-2015

Figure UG-41.1
Nozzle Attachment Weld Loads and Weld Strength Paths to Be Considered (Cont'd)

GENERAL NOTES:
(a) Areas A 1 , A 2 , A 3 , A 5 , and A 4 i are modified by f r x factors.
(b) Nomenclature is the same as in UG-37 and Figure UG-37.1.

is less than 11/3 times their average diameter, no credit for (e) When a series of two or more openings in a cylind-
reinforcement shall be taken for any of the material be- rical or conical shell are arranged in a regular pattern, re-
tween these openings. Such openings must be reinforced inforcement of the openings may be provided per the
as described in (c) below. rules of ligaments in UG-53.
(c) Alternatively, any number of adjacent openings, in
any arrangement, may be reinforced by using an assumed
opening enclosing all such openings. The limits for rein- UG-43 METHODS OF ATTACHMENT OF PIPE
forcement of the assumed opening shall be those given AND NOZZLE NECKS TO VESSEL WALLS
in UG-40(b)(1) and UG-40(c)(1). The nozzle walls of the
actual openings shall not be considered to have reinfor- (a) General. Nozzles may be attached to the shell or
cing value. For cylinders and cones, when the diameter head of a vessel by any of the methods of attachment gi-
of the assumed opening exceeds the limits in ven in this paragraph, except as limited in UG-36.
UG-36(b)(1), the supplemental rules of 1-7(a) and (b) Welded Connections. Attachment by welding shall
1-7(c) shall also be used. be in accordance with the requirements of UW-15 and
(d) When a group of openings is reinforced by a thicker UW-16.
section butt welded into the shell or head, the edges of the (c) Brazed Connections. Attachment by brazing shall be
inserted section shall be tapered as prescribed in in accordance with the requirements of UB-17 through
UW-9(c). UB-19.