Four Laning of Munger to Mirzachauki (NH-80)-Start From Kharia Village Junction to the Exisiting Bhagalpur Bypass (PKG-2-CH: KM 95+580 to

KM 125+000) on Hybrid Annuity Mode in the State of Bihar

Client:
Concessionaire: Independent Engineer:
Contractor: Apco Infratech Pvt. Ltd. National Highway Authority of India
Apco Magadh Expressway Pvt. Ltd. Lea Associates South Asia Pvt. Ltd.
(NHAI)

FIELD DRY DENSITY OF SOILS IN PLACE (SAND REPLACEMENT METHOD) IS: 2720 (Part 28)1974

RFI No. : Tested By :

Type of Material : Date of Testing :

Chainage : Cylinder No. :

Side : Rapid Moisture metre No :

Layer : Source of material :

Width : Lab. MDD in gm/cc :

Area (sqm) : Lab. OMC in % :

Wt.of sand in cone(W2) : Bulk density of sand (γs) :

Description Test 1 Test 2 Test 3 Test 4 Test 5 Test 6 Test 7 Test 8 Test 9 Test 10

Representing test chainage

Offsets from center line (m )

Weight of material from hole ( Ww ) gms

Weight of sand + cylinder before pouring ( W1 ) gms

Weight of sand + cylinder after pouring (WF ) gms

Weight of sand in hole Wb=W1-WF-W2

Volume of hole Wv= (Wb/Ys)

Bulk density of materials γ b =(Ww/Wb) x γs gm/cc

Moisture meter reading in %

Corrected moisture content/Moisture content (drying)

Field Dry Density r γ d= γ b / (1+ W/100 )

%Compaction obtained

Avg. compaction obtained (%) :

Compaction Required As per specification :

Standard Deviation (SD) :

Mean Density = Specified Density +[1.65-1.65/(No. of samples)x0.5]Times the SD :

Required Compaction As per Specification: Exis.Ground 95%, Emb. 95%, SGD 97% (L&R 95%), GSB&WMM 98%

Remarks :

Contractor's Representative Concessionaire's Representative IE's Representative