Download as pdf
Download as pdf
You are on page 1of 2
INSPECTION REPORT (To be issued before installation of bi-directional and, __ gross energy meter) StNo. | PARTICULARS REMARKS ‘| |, _| Reaistration No of consumer (orRtS)and | vy 9n03/ margteaata - Consumer Electricity Contract A/C No.(With PSPCL) 2 | Subsidy or Non-Subsidy application ~ | Non-subsidy [U3 ‘Consumer Name and Photograph President Gopal 21, Cow shalla ropar, 4g | Ste/Location (with Complete Address) mobile | Rupnagar, Rupnagar 140001 number, e-mail (M)-9646110902 (Email)- advanceelectronics25@grnail.com = _| Sanctioned Load of Consumer (in KW) 10.88 % | Total Capacity of Rooftop Solar installed (KWp) _|_10.000 [- PV MODULE : 7__| Name of Manufacturer of Solar Panel 8 | Model of Solar Panel 9 __| Totalno of Solar Panels installed Sr. no. of each Solar Panel/Module (as per Module 10 |

You might also like