This Supplemental Bulletin No. 1 is issued to amend the Bill of Quantities and Schedule of
Dropping and Opening of Bids of the above stated Contract posted at PhilGEPS and DPWH
Website dated November 30, 2019 to December 06, 2019, as follows :
Current Provision of BDs(including Previous Amended Provision of BDs under this Supplemental Bulletin
Amendments)
Dropping of Bids : December 20, 2019 until Dropping of Bids : December 30, 2019 until 10:00 A.M
10:00 A.M
Opening of Bids : December 30, 2019 @ 10:15 A.M.
Opening of Bids : December 20, 2019 @
10:15 A.M.
Provision of
Furniture/Fixtures & Additional
A.1.1(13) l.s. 1.00 Item
- - - - Appliances for the Living
Quarters for the Engineer
Project Billboard / No
B.5 Ea. 1.00 - - - -
Signboard Change
----------------------------------------------------------------------------------------------------------------------
DPWH-INFR-27-2016 Page 1 of 2
Obstruction - - - - Deleted Item
Embankment from
804(1)a Cu.m. 200.00
Structure Excavation - - - - Deleted Item
318.90 Change in
804(1)b Embankment from Borrow Cu.m. 230.00 804(1)b Embankment from Borrow Cu.m.
Quantity
804(4) Gravel Fill Cu.m. 60.00 804(4) Gravel Fill Cu.m. 73.00 Change in
Quantity
PART B PLAIN AND REINFORCED CONCRETE WORKS PART B PLAIN AND REINFORCED CONCRETE WORKS
Change in
1000(1) Soil Poisoning li 80.00 1000(1) Soil Poisoning L 34.00 Quantity
CHB Non-Load-Bearing CHB Non-Load-Bearing Change in
1046(2) 1046(2)a
(including Reinforcing Sq.m. 250.00 (including Reinforcing Sq.m. 189.35 Quantity
a1 1
Steel),100mm thk. Steel),100mm thk.
CHB Non-Load Bearing CHB Non-Load Bearing Change in
1046(2) 1046(2)
(including Reinforcing Sq.m. 1,800.00 (including Reinforcing Sq.m. 231.51 Quantity
a2 a2
Steel), 150mm Steel), 150mm
- No
1004(2) Finishing Hardware l.s. 1.00 - - -
Change
- No
1008(2) Aluminum Glass Windows l.s. 30.00 - - -
Change
----------------------------------------------------------------------------------------------------------------------
DPWH-INFR-27-2016 Page 4 of 4
Change in
1010(2)b Doors, Wood Panel Sq.m. 80.00 1010(2)b Doors, Wood Panel Sq.m. 50.19
Quantity
1011(1)b Roll-up Door, Aluminum set 1.00 - - - - Deleted Item
Cement Floor Finish with Cement Floor Finish with
1021(1)c Sq.m. 500.00 1021(1)c Sq.m. 750.79 Change in
Floor Hardener Floor Hardener Quantity
1027(1) Cement Plaster Finish Sq.m. 6,000.00 1027(1) Cement Plaster Finish Sq.m. 841.72 Change in
Quantity
Additional
1027(3) Decorative Stone Sq.m. 25.17
- - - - Item
No
105(1)6 Railing l.s 1.00 - - - - Change
1003(1) Ceiling, 4.5mm, Metal 1003(1) Ceiling, 4.5mm, Metal Change in
Sq.m. 1,109.00 Sq.m. 1,398.06
b1 Frame, Marine Plywood b1 Frame, Marine Plywood Quantity
Change in
1018(1) Glazed Tiles and Trims Sq.m. 1,400.00 1018(1) Glazed Tiles and Trims Sq.m. 930.00 Quantity
Change in
1018(2) Unglazed Tiles Sq.m. 100.00 1018(2) Unglazed Tiles Sq.m. 118.34 Quantity
Additional
1018(3) Granite Tiles Sq.m. 18.72 Item
- - - -
Waterproofing, Cement- Waterproofing, Cement- Change in
1016(1)a Sq.m. 600.00 1016(1)a Sq.m. 711.97
Base Base Quantity
Built-Up and Preformed Built-Up and Preformed Change in
1016(2) Sq.m. 700.00 1016(2) Sq.m. 711.97
Membrane Membrane Quantity
Painting Works, Masonry/ Painting Works, Masonry/ Change in
1032(1)a Sq.m. 7,000.00 1032(1)a Sq.m. 2,244.08
Concrete Concrete Quantity
Change in
1032(1)c Painting Works, Steel Sq.m. 800.00 1032(1)c Painting Works, Steel Sq.m. 18.00 Quantity
Additional
1047(2)a Structural Steel, Rafter Kg. 557.84
- - - - Item
Deleted
1032(1)a Painting Works, Wood Sq.m. 1,400.00 - - - - Item
Fabricated Metal Roofing Deleted
1013(2) -
Accessory, Gauge 24, l.m. 100.00 - - - Item
b1
Gutters
Deleted
1047(1) Structural Steel l.s. 1.00 - - - - Item
----------------------------------------------------------------------------------------------------------------------
DPWH-INFR-27-2016 Page 4 of 4
- - - - Item
No
1200(1) Ventilating Equipment l.s. 1.00 - - - - Change
No
1201(1) Water-Pumping System l.s. 1.00 - - - - Change
Deleted
1201(8) Water Tank set 1.00 - - - - Item
No
1208(1) Fire Alarm System l.s. 1.00 - - - - Change
Deleted
1201(9a) Overhead Tank Stainless set 4.00 - - - - Item
Automatic Fire Sprinkle Deleted
1202(1) l.s. 1.00 - - - -
System ( AFSS) Item
Jockey Pump Complete Deleted
1208(1) with Control and Standard set 1.00 - Item
- - -
Accessories
Fire Hose Cabinet Deleted
1202(5) set 2.00 - - - -
Assembly Item
1202(6)a Fire Extinguisher, 10lbs, Deleted
set 1.00 - - - -
1 ABC with Bracket Item
This Supplemental Bulletin No. 1 shall form an integral part of the said Bidding Documents.
(SGD.)WILFREDO L. METUCUA
Engineer III
BAC-Chairperson
----------------------------------------------------------------------------------------------------------------------
DPWH-INFR-27-2016 Page 4 of 4