Table of Qualitative Measures: A B C D E
Table of Qualitative Measures: A B C D E
B Likely The event will probably occur in most circumstances Will occur once per year 55% - 90%
The event will probably occur in some Will occur once every 3
C Moderate circumstances years
20% - 55%
Table 2 : Consequence
Level Impact Explanation of Consequence
1 Insignificant Minor Injuries; plant damage $1-10K US; minor loss of productivity
2 Minor First Aid Treatment; plant damage $10K – 50K; interruption to productivity
Medical treatment required; plant damage $50-100K $US; loss of productivity 1 to 5 days; loss of
3 Moderate production
CONSEQUENCES
LIKELIHOOD 1 2 3 4 5
INSIGNIFICANT MINOR MODERATE MAJOR CATASTROPHIC
A
H H E E E
ALMOST CERTAIN
B
M H H E E
LIKELY
C
L M H E E
MEDERATE
D
L L M H E
UNLIKELY
E
L L M H H
RARE
MATRIKS PENILAIAN RISIKO
Risk Assessment Matrix
Rev. Issued Date Page Document No.
PT. NAVIGAT Energy 000 2/2 NE-P-HSE-xxxx
INTOLERABLE
EXTREME Immediate action required, activity must not start or be shall stopped if started. Highest level of Project
Management needs to be involved, to determine whether to accept risk or implement further controls
using hierarchy of controls.
REDUCE TO AS LOW AS REASONABLE ACCEPTABLE
HIGH
Department Management attention needed to control the risk. Elimination, Substitution, Isolation,
Engineering controls shall be implemented.
TOLERABLE:
MEDIUM
Risk can be managed by moderate level risk management including HSE System Controls (Work
Instructions, JSA, BEHAVIOUR PROGRAMS)
TOLERABLE:
LOW