Method Statement
fi. Subject Description
[Method statement for Slab Shoring Using Easy Deck System
[type of Document:
References:
fe. Transmittal Details
Trem Reference Rev, Date__[ Copies Description
(80025. MST-CWV-060-0015, o | 2eun20] 2 Method Statement fr Slab Shoring Using Easy Deck System
[These are transmitted for:
a Yur information 2 rpproval 1D checking D teview and comment
[ve ceity thatthe above Transmittal of Documents have been coordinated,
submited by: [SAMER ALOREIBI Signature
SSR STE
Kelis be tommnk aad ET Mars cand
HSE Giakeaten thal, oid gf
antes
[signature
Dal ant ioe Conn TT Sao ae ahrnion Sn age ona ESdar
Yasmeen City, Lusll Qatar
Solaiman K. Ayunan
Method Statement for Slab Shoring Using Easy Deck System
07/07/2020
(Q800025-F-MST-
civ.060-0015
RISK ASSESSMENT-METHOD STATEMENT (RAMS)
10-POINT EVALUATION
Harinsa Qatar
PKIa
{Company Details- Address, Tel & Fax No's; E-mail, Web?
[litle - what tasks)? and Ref No.
Project Contact Detalls
{Location of Works - General & Specific
[Name of Company Contact + Phone No.
Itart Date and Duration of Works
‘Section 70 and 8.0 as mentioned on table of
Feet acerca ene Ean contents not found on the attachments.
General Scope of Works new bul refurbishment
Jnrliaton method Yor GuardvaiTeage
| protection not mention
Sequence Explanation of Operations) / Processes)
postallation method for for flies partof
ll protecton not mention.
Io orPersonnel-for Task) / Operation / Process
Pent/ Equipment Tools tobe used
Hensportation, Delivery & Collection, Tic Management Arangements
ater - Delivery to ret) of Worl) & Storage and Management
[nduction Taring, Task Speci, Specased
emits-Hot Works, Areas oF High Rik ee
[exo Signage Appropriate to tats
cco & gress Security Measures Signing & Out
Hype) of PE tobe used PART __|Tobe mentioned |
lofice if required, Canteen, Rest Area, Sanitation, Water, ec.
First Aider- Name, Postion & Contact Detalls
First Aid Kit- Avalability & Location
{special / Specific Rescue Procedures required / Emergency Planning
[Temporary Systems What / Who provided by? (Fire Points, Electrica, Water)
{safeguards -Bariers, Fencing, Screens ete
PMC-OHSAF-15 REVO?
Page 1of2d RISK ASSESSMENT-METHOD STATEMENT (RAMS)
or 10-POINT EVALUATION
Yasmeen iy, Luss Qatar Guanes
[Others Site Personnel /Occupiers/ Visitors /Public/ Young Persons
lanned security arangements, if applicable. Nightshift security|
fesponsible person for installation of guard-
individual Task() + Related Hazards ils and lifelines must be mentioned
including their competency.
[pstected Stakeholders identified, Subcontractor involvement [To be included
[Rsk Rating and methodology Probability x Consequence, Residual Rsk Ratings
trol Measures hierarchy of controls in evidence, POW, LOTO
[Assessors Name, Position + Signed & Dated
inspection Monitoring requirements and arrangements
1ccupational Health Monitoring requirements / arrangements
lan Sas Sheth Sterns Rok Aste
[Hazardous Substances / Materials / Liquids / Gases
Pesosed Storage for COShiRens end os Gnd
‘ae Maragenert rangers and Earomen PCN
Supervisor -Name, Position + Contact Details
[Reference to specific standards relevant to the task
The Contractor shall comply with comments and cell that are highlighted AMBER and RED
fame Poeome Bola man seri
PMC-ONSA-15 REVO Page 20f2yasmeencity fe ARIANE dar
Tocation: fogcine Dacian No
LUSAIL, FOX HILLS QATAR / QATAR 2
Ties TETHOD STATEMENT FOR SIAB SHORING
Page RevNo,
USING EASY DECK SYSTEM
a Rev.
Povelt Code
YASMEEN CITY:LUSAIL, FOX HILLS QATAR
PK14 - BAYTI COMPLEX
2B+G+7
LUSAIL, FOX HILLS QATAR
DOHA, STATE OF QATAR
| METHOD STATEMENT
FOR
SLAB SHORING USING EASY DECK SYSTEM
+ LTE mteg )
| + HSE samt Meszant- (nis. fe Bb
Samet g
| co | issueDroRAPPRovaL | 722% | omartajchehade | Odo Simon Agbo | AmrAla | Samer Al Ori
| Yassin
| Rev. Description Date Prepared ‘Checked Reviewed Approved
l en
HARINSA CONTRACTING COMPANY "METHOD STATEMENTFOR SLAB SHORING.
P.O. 8ox24174, Doha, Qatar
Tel. Nos +974 44686420 / 44502107
Foxno. 1974 44684140Buus yasmeencity fe ARIANE dar
INTERNATIONAL GROUP Se:
ecatlon: LUSAIL, FOX HILLS QATAR / QATAR Saas | “GROnaE CAST one OO TOTS
a METHOD STATEMENT FOR SIAB SHORING | Poe evo
USING EASY DECK SYSTEM PoP TT.
poses Cade
TABLE OF CONTENTS
1.0 PURPOSE
2.0 SCOPE
3.0 REFERENCES
4.0 MANPOWER & RESPONSIBILITIES.
5.0 MATERIAL CHARACTERISTICS
6.0 INSTALLATION AND USE
[70 HEALTH, SAFETY & eNiRONMENT, oo.
) 8.0 WASTE MANAGEMENT J mas
8 a
9.0 RISK MATRIX
10.0 ATTACHMENTS
1. RISK ASSESSMENT MATRIX
2, SAFETY FORMATS
WARINSA CONTRACTING COMPANY TEOD STATONENTFOR SAB SHORING
P.O, Box 24174, Doha, Got
Tel, No. #974 44688420 / 445
Faxno +974 44684)40,Fane yasmeencity fe ARIANE dar
Location: Project No. ‘Document No.
LUSAIL, FOX HILLS QATAR / QATAR ‘@B0025 “QB0025-F-MST-CIV-060-0015
Te: METHOD STATEMENT FOR SLAB SHOWING [Fons evi,
. USING EASY DECK SYSTEM o Rev.
bose a ta
E)
After having positioned the first panel, complete the first rectangle from underneath using @
rolling tower. Then, secure the structure making a trestle block (using frames or ia & fittings)
in order to avoid moving the EASY DECK SYSTEM. W 2) te yon Le Lecen Paw!
Then, remove the tripods.
Li
ae AT 7229
Le ZA ELA
BY; BAO
PEE
YZ
| SNL
Never erect one isolated part of formwork without trestle block or anchor point.
Trestle block, anchor point quantity and positioning must be in accordance “ layout
ti ag nti hy
ih aden se
ne: sire and then the next hy
repeating the actions described above
and until the prnfixnd stab snctinn is
completed,
ee
HARINSA CONTRACTING COMPANY METHOD STATEMENT FOR SLAB SHORING.
P.O, Box 24174, Doha, Gator
Tel. Nox #974 44688420 / 44502107
Foxno #974 44684140yasmeencity fs peor dar
Figec Document no
LUSAIL, FOX HILLS QATAR / QATAR ces | erases. cw ans
Title: "METHOD STATEMENT FOR SLAB SHORING Fooe
: USING EASY DECK SYSTEM o few,
Pose |m code
2. INSERTING THE PANEL
Position the panel along the halfway line of the girder passing through the slots on the wings
eee.
AVI Ae
Be VA e
"METHOD STATEMENTFOR SLAB SHORINGyasmeencity aniane dar
wsal-roxmusaxtan/axtan |S [aa
= HOD STATEMENT FOR IAB HORNE | —F ca
: USING EASY DECK SYSTEM 0 f Rew.
; rove i
parra:pismantung “/@* 20/27 Yt POS ee
Hammer the wedge positioned under the rapid drop head to release it and lower the head of 9cm.
2. SLIDING OUT THE PANELS AND GIRDERS
The next step is to slide out the panels followed by the dented girders.
HARINSA CONTRACTING COMPANY "METHOD STATEMENTFOR SIAB SHORING
P.0. 80x 24174, Doha, Gator
Tel. Nos +974 44688420 / 44502107
Foxno: +974 44684140ysmeencty fe amane dar
es
LUSAIL, FOX HILLS QATAR / QATAR Reet fant
ae (METHOD STATEMENT FOR SLAB SHORING Pooe ReW No.
. USING EASY DECK SYSTEM. 0 Rev.
3.
HARINSA CONTRACTING COMPANY "METHOD STATEMENTFOR SLAB SHORING
P.O. Box 24174, Doha, Gatar
Tel. Now +974 44686420 / 44502107
Foxno. +974 44664140