LENGTH (L)

* DO NOT SCALE THE DRAWING, ONLY WRITTEN


DIMENSION SHOULD BE FOLLOWED.
* ALL DIMENSIONS ARE IN MM
UNLESS AND OTHERWISE SPECIFIED
* HEIGHT, LEVELS AND FOUNDING STRATA SHOULD
BE CONFIRMED AT SITE BEFORE CONSTRUCTION
* CHANGE IN FILLING HEIGHTS, LEVELS, STRATA ETC.
TO BE CONVEYED TO DESIGN TEAM IMMEDIATELY
* GRADE OF CONCRETE - M20 UNLESS & UNTIL NOTED
PCC -M15
EQUIPMENT LINE
* MIN. SBC OF SOIL 75KN/M2 CONSIDERED
BREADTH (B)

* DESIGN LOAD CONSIDERED IS 2850KG MAX.


* GRADE OF STEEL - Fe-500
* CLEAR COVER - 50MM
* ALL LAPS (LD) SHALL BE STAGGERED & NOT MORE
THAN 50% BARS TO BE LAPPED AT ANY GIVEN
SECTION.
A A * GRADE OF REINF. M20 M25 M30 M35 M40 &
ABOVE
Fe415 55XD 47XD 44XD 39xD 35xD
Fe500 (TMT) 66XD 56XD 53XD 46xD 42xD
EXISTING RCC SLAB
FOUNDATION PLAN SPECIAL NOTE:-
*THE DIMENSIONS AND LOCATIONS OF DG SET TO BE
CONFIRM AS PER GA & ARCHITECTURAL DRAWINGS
*THE FOUNDATION SHOULD NOT BE REST ON BLACK
COTTON SOIL
*DG OF SIZE(2500MMX1150MM) TO BE
D1

CHECK & CONFIRM BY SITE & ELECTRICAL TEAM .


*IF ANY DISCREPANCY FOUND PLEASE REVERT
PRIOR TO THE CONSTRUCTION.
LAYER -1
R0 ------ FOR CONSTRUCTION AP SB JG
REV. DATE DRN CHCK APPR
DESCRIPTION
NO BY BY BY
SECTION - AA
RELIANCE RETAIL LTD
TABLE:
NOCIL COMPOUND GATE A, RCP
TABLE: THANE BELAPUR ROAD, GHANSOLI,
MAKE EQUIPMENT DIMENSION SIZE FOUNDATION SIZE REINFORCEMENT LAYER BELOW DG FOUNDATION NAVI MUMBAI 400 701.
LENGTH BREADTH LENGTH (L) BREADTH(B) DEPTH (D1) DEPTH (D2)
SR NO. DG SET MODEL TOP REINF. (A) BOTTOM REINF. (B) LAYER -1 LAYER -2 LAYER -3 PROJECT TITLE
-------------- (KVA) (mm) (mm) (mm) (mm) (ABOVE FGL) (BELOW FGL)
(BOTHWAY) (BOTHWAY)
1. ----- 2500 1150 3000 1650 100 0 --- --- EXISTING RCC SLAB NA NA SMART POINT
CITY LOCATION
SPECIAL NOTE : ---------- ----------
*SILENT TYPE DG SET OF COTTN GROVE IS CONSIDERED.
UNIQUE ID : -------------
*DG SET TO BE CHECK AND CONFIRM BY ELECTRICAL & SITE TEAM
*EQUIPMENT LOCATION TO BE CHECK AS PER EQUIPMENT GA. DRAWING TITLE:
*BASE PLATE LOCATION TO BE CHECK AS PER EQUIPMENT GA.
*DG SET DIMENSIONS TO BE CHECK AND CONFIRM AS PER GA. STD DG SET RCC FOUNDATION DETAILS
*TRENCHES DIMENSION & LOCATION TO BE CONFIRM AS PER
EQUIPMENT GA DRAWING
DRAWN BY AP CHECK BY SB
*LEVEL OF TOP OF FOUNDATION FROM FGL TO BE CHECK AND
CONFIRM BY ELECTRICAL & SITE TEAM.
*FOUNDATION SHOULD NOT BE LAIED ON MARSHY LAND
AND BLACK COTTON SOIL. APPR BY JG SHEET 1 OF 1
*IF ANY DISCREPANCY FOUND IN DRAWING KINDLY
CHECK / INFORM PRIOR TO THE CONSTRUCTION SCALE NTS
*THE STRATA BENEATH THE FOUNDATION SHOULD BE WELL DATE R0
COMPACTED BY MANUAL/ MECHANICAL MEANS