LANDS AND SURVEYS DEPARTMENT

SABAH MALAYSIA

Data Integration
for Land Acquisition of
Pan Borneo Highway

DATUK HJ SAFAR B UNTONG


Director of Lands and Surveys
Sabah, Malaysia
SABAH : LAND PROFILE

AREA
LAND TYPE Percentage
(Hectares)
Titled Land 2,136,249.80 29 %
Reserves 4,858,590.36 66 %
Others 365,158.83 5%
TOTAL 7,360,000.00

1
DIGITAL LAND RELATED RECORDS
LAND TITLE INFORMATION SYSTEM LAND REVENUE INFORMATION SYSTEM
Land Title records Receipt transactions
Subsidiary title records Quit rent transactions
Land owners records Title records
Land Dealings records
Quit Rent payment & outstanding records LAND APPLICATION MIS
Title conditions
Land Application
Land applicants
SURVEY OFFICE MIS Approval records
Survey Papers(SP) Land status
Registered SP
Survey Plans DIGITAL CADESTRAL DATABASE
Land Applications
Cadastral Parcels
Boundary Marks
LAND ACQ PARCEL DEV SYSTEM Boundary Lines
Land Acquisition parcels Survey Plan information
Land offer records
Payment vouchers LAND DEALING E-SUBMISSION SYSTEM
Land Acquisition amount Land Dealings Records
Transactions records
GAZMIS Legal Firms
Reserved Land Parcels
Gazette Notification records 2
PAN BORNEO HIGHWAY PROJECT - PHASE 1
14 Simpang Mengayau

13

12
Bingolon PAN BORNEO HIGHWAY PROJECT - PHASE 1
11 Temuno

10 Sarang PACKA DIST.*


SECTION
Rampayan Laut
GE
WP 1 Sindumin - Kg Melalia
(KM)
28.49
Project cost:
9

8
Tuaran
Pituru WP 2
WP 3
Kg Melalia - Beaufort
Beaufort - Bongawan
34.7
22.4 RM12.86 B
7 Bulatan Berunggis WP 4 Bongawan - Papar 22.72
WP 5 Papar - Donggongon 11.7
6 Sepanggar
Inanam WP 6 Putatan - Inanam 19.6

5
Donggongon
35 Kg. Nabutan
29
28
Sandakan
M32
WP 7
WP 8
Inanam - Sepangar
Sepangar - Bulatan Berungis
9.9
11.7
Land Acq
4
34 Kg. Toupos
Kg. Lumou
Baru
Sg. Baoto
Sapi
Nagoh
Moynod Kg. Lot
M
WP 9
WP 10
Serusup - Pituru
Pituru – Rampayan Laut
20.8
32.2
Cost:
Telupid WP 11 Rampayan Laut – Sarang 7.3
3
Bongawan
33

32
31
30
27

26
Sukau
Kg.
Perpanduan
WP 12 Sarang - Temuno 14.7 RM 2.5B
Datuk Moh WP 13 Temuno – Bingolon 20.3
25
2 WP 14 Bingolon – Simpang Mengayau 28.1
Beaufort Sg.
24 Takala
Tawau – Semporna Package 1 –
WP 15 5

1
Kg. Melalia
23
Kg. Sandau
21
WP 16
Phase 2
Kampung Checkpoint – Sg
19.1
Total length:
22 Kalumpang

Sindumin
Agri Harvest
19
Sepagaya
20
WP 17
WP 18
Sg Kalumpang – Madai
Madai – IGN Estate
19.0
13.8
704 Km

SOUTH EAST
WP 15 - 21
IGN Estate WP 19 IGN Estate – Agri Harvest 18.5
18 Madai WP 20 Agri Harvest - Sapagaya 17.9
17
Sg. Kalumpang
WP 21
WP 22
Lahad Datu Bypass
Lahad Datu Bypass – Kg Sandau
7
23.8 Duration:
16 Kg Sandau – Sg Takala

2016 – 2021
WP 23 25.0
Sg Takala – Kg Perpaduan Datuk
WP 24 15.9
15 Moh
Tawau Kg Perpaduan Datuk Moh –
WP 25 15.0
Airport Sukau
WP 26 Sukau – Kg. Lot M 18.1

LEGEND :
WP 27
WP 28
Kg Lot M – Sandakan Mile 32
Sandakan Mile 32 – Moynod
18.13
21.7
Divided into:
Widening of Existing Road Already tendered / awarded
WP 29
WP 30
Moynod – Sapi Nangoh
Sapi Nangoh – Sg Baoto
20.4
22.1
35 packages
WP 31 Sg Baoto – Telupid 14.3
Remaining Tender Via Pre-Qualification No. Telupid – Kg Lumou Baru
New Expressway/Bypass WP 32 18.4
2 WP 33 Kg Lumou Baru – Kg Toupos 17.6
Inclusion Is Pending Confirmation From WP 34 Kg Toupos - Kg Nabutan 26.0
KKRM WP 35 Kg Nabutan - Ranau 31.0

3
Land Acq Parcel Database

Area Acquired

5
4
Selection of Road Alignment – Lidar Survey

 Carried out by Licensed Surveyor


 800 m to 1 km corridor
 Digital Terrain Model - at 0.5m resolution in
ECW format.
 Digital Elevation Model/Digital Surface Model -
Consist of a pre-set grid interval of ground points
which represent the earth surface and include all
objects in it.
 Digital Orthophotos - must be corrected (ortho-
rectified) and repositioned (Geo Referenced) to
the actual WGS 84 coordinate and GDM 2000.
Digital Orthophotos files delivered in GEOTIFF or
ECW Format with suitable image resolution.
 All digitized features and contour shall be
converted in Moss Genio Format

5
Detail Engineering Survey (long & cross section)

 Divided into 35 packages


 Surveyed by 20 registered
licensed surveyor
 Detail Surveys information
given to PDP
 Consulting Engineers
prepare alignment plan and
engineering design plan

6
Acquisition Proposal by Licensed Surveyor

 Alignment plan and


engineering design plan
given to Licensed Surveyor.
 Licensed Surveyors (LS)
purchase Digital Cadastral
Data and Land Title
Information's.
 LS prepare proposed
acquisition plans in the
digital form (DCDB & LTIS)
 LS submit digital plan
(*.shape file) to Lands &
Surveys Department

7
Automated Plan Checking

 Digital plan checking by LSD


 Overlay with Cadastral Data
Base
 If everything in order, LSD
advise LS to print proposed
plans to be sign by Director of
JKR as client department.
 Proposed Acquisition Plans
submitted to LSD and to be
approved Director/Deputy
Director.
 Approved Acquisition Plans dan
Draft Gazette Notification sent
to Chief Minister Office for
approval.
 Gazette Notification publish at
government gazette.
 Lands officially acquired
Land Acq Parcel Development Database

8
Land Acq Parcel Development Database

9
Compensation Value @ Land Acq Parcel Database

10
Pan Borneo Alignment Plan

11
New Image on top of Google Earth

12
Land Acquisition Gazette Plan

13
Land Acquisition Gazette Notification

14
New Images – for ground inspection to determine
Land and Building Compensations

Google Earth New Image on top of Google Earth

15
Historical Land Value Records to value land acquisition