No. Drawing List Start End Work Days % Done Architectural Drawings Sep-21 Oct-21 Nov-21
No. Drawing List Start End Work Days % Done Architectural Drawings Sep-21 Oct-21 Nov-21
No. Drawing List Start End Work Days % Done Architectural Drawings Sep-21 Oct-21 Nov-21
Vicinity Map /
1.1 Sep-29 09-Nov 3 0%
Location Map
Site Development
1.2 02-Oct 09-Nov 4 0%
Plan
1.3 Perspective 06-Oct 09-Nov 4 0%
1.4 Floor Plans 10-Oct 09-Nov 7 0%
1.4.
Ground Floor 09-Nov 1.75 0%
1
1.4.
Second Floor 09-Nov 1.75 0%
2
1.4.
Third Floor 09-Nov 1.75 0%
3
1.4.
Fourth Floor 09-Nov 1.75 0%
4
1.5 Elevations 17-Oct 09-Nov 7 0%
1.5.
Front Elevation 09-Nov 1.75 0%
1
1.5.
Rear Elevation 09-Nov 1.75 0%
2
1.5. Right Side
09-Nov 1.75 0%
3 Elevation
1.5. Left Side
09-Nov 1.75 0%
4 Elevation
1.6 Sections 24-Oct 09-Nov 5 0%
1.6.
Cross Section 09-Nov 2.5 0%
1
1.6. Longitudinal
09-Nov 2.5 0%
2 Section
Reflected Ceiling
1.7 29-Oct 09-Nov 3 0%
Plan
Work %
No. Drawing List Start End Nov-21 Dec-21
Days Done
15 16 17 18 19 20 # 22 23 # 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
STRUCTURAL
2 15-Nov Dec-18 34 0%
DRAWINGS
Stairs Detailed
2.1 Dec-18 0%
Drawing
2.2 Bay Section Dec-18 0%
ELECTRICAL
3 Dec-18 0%
DRAWINGS
Location and Site
3.1 Dec-18 0%
Plan
3.2 Electrical Layout Dec-18 0%
Legends or
3.3 Dec-18 0%
Symbols
General Notes or
3.4 Dec-18 0%
Specifications
MECHANICAL
4 Dec-18 0%
DRAWINGS
4.1 Location Plan Dec-18 0%
Mechanical
4.2 Dec-18 0%
Layout
Legends or
4.3 Dec-18 0%
Symbols
General Notes or
4.4 Dec-18 0%
Specifications
PLUMBING AND
5 SANITARY Dec-18 0%
DRAWINGS
Location and Site
5.1 Dec-18 0%
Plan
5.2 Plumbing Layout Dec-18 0%
Isometric
5.3 Dec-18 0%
Drawing
5.4 Toilet Details Dec-18 0%