Professional Documents
Culture Documents
Jsa Disconnect and Run Cables
Jsa Disconnect and Run Cables
VEB/QH/L3-F/142
VELESTO ENERGY BERHAD
01.01
JSA No.: ** N4 - H2S -004 (v. 05) ** [RIG : Nx ] [ DEPT : MR-Marine, DR – Drilling, MC – Mechanical, EL – Electrical, CT – Catering, SC – Service Co, OT – Others ]
RIG - DEPT NO (REV) [NO – xxx ] [ REV – (V.xx) e.g. N2-MR-045(V.03) ]
01.02
Job/ Task Description: DISCONNECT/REPOSITION/PULL/RUN CABLES
(If applicable, refer to work instruction for guidance)
02.01
02.02 02.03 02.04 02.05
STE
DESCRIPTION OF STEPS HAZARDS RISK & CONTROL MEASURES BY WHO
P
-MISCOMMUNICATION -APPLY COLD PERMIT -SOLAR ALERT CREW
1 PRE JOB MEETING -CLASH WITH OTHER OPERATION -CLEAR COMMUNICATION WITH PERSON
-PERSON INVOLVED NOT UNDERSTAND -PJSM
-CONGESTED AREA -HARD BARRICADE OPEN HOLE -SOLAR ALERT CREW
APPROACH WORK SITE AND -OPEN HOLE -BE VIGILANT
2
SITE PREPARATION -PPE
-SHARP EDGES
-SHUT DOWN POWER SOURCE -SOLAR ALERT CREW
DISCONNECTING CABLES
-ELECTRICAL SHOCK -WEAR PPE
-SHARP EDGES -COVER SHARP EDGES
-SLIP AND TRIP -PROPER BODY POSITION
3 -MISCOMMUNICATION -DISSCUSSED CABLES PATH
-ERGONOMIC -PROPER LIFTING TECHNIQUE
-FALL FROM HEIGHT -WEAR FULL BODY HARNESS IF WORK AT HEIGHT
-SUSPENDED LOAD -WATCH THE CRANE MOVEMENT
-CABLES COULD CAUSE INJURY IF WRAPPED AROUD BODY -NEVER WRAP CABLE AROUND YOUR ARMS OR BODY -SOLAR ALERT CREW
-SHARP EDGES -WEAR PPE
4 -SLIP & TRIP HAZARD -PROPER HAND AND FOOT POSITION
PULL/RUN CABLES
(min) -MISCOMMUNICATION -DISCUSS CABLES PATH AND EXECUTE PROPERLY
-ERGONOMIC -PROPER MANUAL LIFTING
-WORKING AT HEIGHT WEAR FULL BODY HARNESS
-SHARP EDGES -SOLAR ALERT CREW
-WEAR PPE
-CUTS
5 -PROPER BODY POSITION
HOUSE KEEPING -PERSONAL INJURY
7
Form No. VEB/QH/L3-F/142
VELESTO ENERGY BERHAD
8
(max)
03.00 JOB SAFETY ANALYSIS CHECKLIST & PROMPTS. THIS SECTION MUST BE MANUALLY FILLED EACH TIME THE JSA BEING USED
03.01A 03.01C
TEAM LEADER: MAHENDRA W. 03.01B POSITION: H2S ENGINEER INITIAL:
03.02A TEAM MEMBER NAME 03.02B POSITION 03.03C INITIAL 03.02A TEAM MEMBER NAME 03.02B POSITION 03.02C INITIAL
1. JEFRI 4.
2. 5.
IMPORTANT : Only those participated in the pre-job safety meeting can participate in performing the task. If new member joining the
3. task halfway, a fresh pre-job safety meeting shall be conducted. If more than five member, use empty spaces on this page to write the
names.
Form No. VEB/QH/L3-F/142
VELESTO ENERGY BERHAD
SUPERVISION
04.01A 04.01FMECHANICAL CHEMICAL
04.01J
Team leader will maintain line of sight active supervision? Live object at workplace identified? Related SDS available on site?
Pre-use inspection carried out? Method of ensuring live objects were secured identified? Chemical hazards explained by supv / Mud Engineer?
NOTE : Crew asked & made aware of live objects that cannot be Emergency shower / eye wash checked?
locked away? PPE available, in good shape, and inspected by supv?
DROPPED
04.01B Line of fire identified? Storage & compatibility hazard understood and acted upon?
Equipment / workplace checked for loose / improperly NOTE : Ventilation adequate?
secured object? NOTE :
Tool and equipment at height logged and accounted for? ACCESS / EGRESS
04.01G
Drop safe tool required and available? Escape route identified and cleared? TRAPPED ENERGY
04.01K
NOTE : Potential entrapment considered and eliminated? Electrocution risks considered and eliminated?
For working at height and confined space, rescue plan Risk of pressure release considered and eliminated?
BIOLOGICAL
04.01C made? Line of fire considered?
Risk of viral/bacterial exist? NOTE : NOTE :
Risk of infection managed to ALARP?
NOTE : MANUAL HANDLING
04.01H PHYSICAL PHYSIOLOGICAL CAPABILITY
04.01L
Object weight is known? Individual physically suited for the task?
FIRE & EXPLOSION
04.01D Safe lifting plan agreed upon? No extended hours or fatigue issue?
Fire-watch assigned on both sides of hot work wall? NOTE : No high work rate?
Flammable verified? NOTE :
NOTE : OCCUPATIONAL RISK
04.01I
High Noise? HOUSEKEEPING
04.01M
ENVIRONMENT
04.01E Limb vibration? Tool & material are at their designated places?
Risk of pollution considered and managed? Luminance? NOTE :
Risk of Loss of Primary Containment (LOPC) considered and Temperature extreme?
managed? NOTE :
NOTE :
05.01A
05.01B 05.01C
Name of dept head who reviewed and KONG / Barge Master 22/8/2020
Date Approved / Revised : Signature:
endorsed this JSA:
06.00 REQUIRED SAFETY EQUIPMENT & PPE FOR THE JOB / TASK (Tick √ boxes) THIS SECTION MUST BE HAND WRITTEN EACH TIME THE JSA BEING USED
A. Hard Hat E. Life Vest / Work Vest I. Respirator Protector M. Gas Detector Q. Permit To Work V. NHOL tool
B. Safety Glass F. Safety Boot J. Hearing Protector N. Walkie-Talkie R. Lock Out/Tag Out W.
07.00 DEBRIEF / LESSONS LEARNED CHECKLIST (Tick √ boxes) THIS SECTION MUST BE HAND WRITTEN EACH TIME THE JSA BEING USED
Form No. VEB/QH/L3-F/142
VELESTO ENERGY BERHAD
Debrief performed Best practices discussed (Plan, Brief, Execution) Areas for improvement discussed (Plan, Brief, Execution)
07.03A NAME 07.03B INITIAL 07.03A NAME 07.03B INITIAL 07.03A NAME 07.03B INITIAL
1. JEFRI 4.
2. 5.
3.
IMPORTANT : By signing this participants confirmed they were individually asked for their feedback on the task performed
08.01 OIM NAME & SIGNATURE Approved as submitted Approved with Changes Rejected DATE :