Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

BARS-UP STRUCTURAL AUDIT SURVEY FORM

I. General Information:
College/Campus:
ROMBLON STATE UNIVERITY-MAIN CAMPUS
A. BUILDING INFORMATION:
Building Name: AUDIO VISUAL ROOM (AVR)
Address: LIWAYWAY, ODIONGAN, ROMBLON
(Photo of the Building) Number of Floors:________________________
Perspective Number of Rooms:________________________
Years of the Building: _________________________

B. PRIMARY OCCUPANCY/USES OF THE BUILDING: F. CONSTRUCTION DATA:


☐Administration Offices Year Built: ______________
☐ Classroom
☐ Commercial G. BUILDING STRUCTURAL COMPONENTS
☐ Faculty Office  Columns
☐ Health Facility ☐ Wood
☐ Residential ☐ Steel
 Other Uses CONFERENCE ROOM  Reinforced Concrete
 Beams
 No. of Rooms: _________________
☐ Wood
☐ Steel
C. NUMBER OF OCCUPANTS (PEAK HOURS)
 Reinforced Concrete
☐ 0-50
 51-150 Note:  Slab Flooring/ Roof decking
☐ 151-250 (including no. of students) ☐ Wood
☐ 251-350 ☐ Steel
☐ 351+ ☐ Reinforced Concrete
 Roof Trusses
D. POTENTIAL NATURAL HAZARDS:
 Wood
 Earthquake
☐ Steel
☐ Landslide
☐ Flood
☐ Tsunami
 Typhoon
☐ Others, Specify: _________________

E. POTENTIAL MAN MADE HAZARDS:


 Electrical Hazards
 Fire Hazards
☐ Near Construction Sites
☐ Near Dikes, Dumpsites etc.
☐ Other Specify (e.g., settlement)
____________________________
II – BUILDING VISUAL INSPECTION:
CONDITION OF STRUCTURAL COMPONENT
Item
Floor No. Wood Frame Steel Frame Reinforced Concrete Remarks
(Description)
☐ Leaning ☐ Leaning ☐ Leaning GOOD CONDITION
☐ Buckled/ Splitting. ☐ Buckled/ Splitting. ☐ Buckled/
☐ Decayed ☐ Corroded Fractured.
☐ Missing/ Loose/ ☐ Missing/ ☐ Cracks
Corroded Bolt Loose/Corroded Bolt ☐ Spalling
Column
Connections Connections ☐ Honeycombs
☐ Termite Infestation/ ☐ Tearing ☐ Vulnerable to Short
Damage ☐ Vulnerable to Short Column
☐ Separation from Column
Concrete Pedestal
☐ Vulnerable to Short
Column
☐ Sagging/Deflection ☐ Sagging/Deflection ☐ Sagging/Deflection GOOD CONDITION
☐ Splitting ☐ Corrosion ☐ Cracks
☐ Decayed ☐ Tearing ☐ Spalling
Beams ☐ Missing/ Loose/ ☐ Missing/ Loose/ ☐ Honeycombs
Corroded Bolt Corroded Bolt
Connections Connection
Ground ☐ Termite Infestation
Floor ☐ Sagging/Deflection ☐ Sagging/Deflection ☐ Sagging/Deflection N/A
Slab Flooring/ ☐ Splitting ☐ Corrosion ☐ Cracks
Roof Deck: ☐ Decayed ☐ Deterioration of ☐ Spalling
☐ Termite Infestation Connection to Frame ☐ Leaks
☐ Leaks ☐ Leaks
☐ Buckled Members ☐ Buckled Members GOOD CONDITION
☐ Decayed Member ☐ Corrosion of
☐ Missing/ Loose/ Members
Roof Trusses Corroded Bolt ☐ Missing/ Loose/
Connections Corroded Bolt
☐ Termite Infestation Connections
☐ Tearing
☐ Sagging ☐ Sagging ☐ Sagging GOOD CONDITION
☐ Decayed ☐ Corrosion of ☐ Separation from
Stairs
☐ Displacement of Members Joints
Steps/Railing ☐ Displacement of ☐ Spalling
☐ Termite Infestation Steps/Railing ☐ Cracks on Steps
and Rise

CONDITION OF NON-STRUCTURAL COMPONENTS


Item
Floor No. Material Observation Remarks
(Description)
Ground ☐ Concrete Finish ☐ Cracks GOOD CONDITION
Floor ☐ Wood ☐ Displacement
Floor Finish  Tiles ☐ Separation of mortar joints
☐ Others _______ ☐ Termite Infestation

 Plywood ☐ Termite Infestation NEED AN IMMEDIATE


☐ Gypsum Board ☐ Materials not securely fastened. REPAIR
Ceiling ☐ Cork Board  Leak marks
☐ Others _______ ☐ warping

Walls Exterior:  Cracks HAIRLINE CRACKS


 4” CHB ☐ Plaster separation (Kapak)
☐ 6” CHB ☐ Paint deterioration
☐ Dry Wall ☐ Termite attack
☐ Reinforced ☐ Others ____________________
Concrete __________________________

Interior:  Cracks HAIRLINE CRACKS


 4” CHB ☐ Plaster separation (Kapak)
☐ 6” CHB ☐ Paint deterioration
☐ Dry Wall ☐ Termite attack
☐ Reinforced ☐ Others ____________________
Concrete __________________________

Doors ☐ Termite Infestation/Damage GOOD CONDITION


 Panel Door ☐ Not securely fastened.
 Glass Door ☐ Out of plumb and cannot be closed/ opened.
☐ Metal Door ☐ Cracked or broken.
☐ Doorknob and locks are broken.
Doors and
☐ Others ____________________
Windows
Windows ☐ Termite Infestation/Damage GOOD CONDITION
☐ Wood ☐ Not securely fastened.
 Glass ☐ Out of plumb and cannot be closed/ opened.
☐ Others ☐ Cracked or broken.
______________ ☐ Locks are broken.
☐ Others ____________________
__________________________

 Metal/ GI Sheet ☐ Materials not securely fastened. GOOD CONDITION


☐ Concrete Slab ☐ Deterioration/ Corrosion
☐ Discoloration of slab soffit.
Roofing
☐ Leaking
☐ Others ____________________________

CONDITION OF ANCILLARY/ AUXILLARY EQUIPMENT AND FACILITIES


Item
Floor No. Observation
(Description)
Tank Tank Support System Bracing Pipes
☐ Corrosion ☐ Corrosion ☐ Corrosion ☐ Corrosion
☐ Leakage ☐ Cracks ☐ Not securely ☐ Leakage
Water Supply ☐ Spalling ☐ Spalling fastened to support ☐ Clogging
and Piping ☐ Leaning ☐ Deflection system. ☐ Disconnected/ broken.
Ground system ☐ Not securely ☐ Not securely ☐ Not securely fastened to
Floor fastened to Support fastened to floor/ support system.
System. base.

GOOD CONDITION
Remarks:

III. SUMMARY OF ALL PHYSICAL CONDITION


Rating (5 – Very Good, 4 – Good, 3 – Fair, 2- Bad, 1 – Very Bad)
Floor No. Item (Description)
5 – Very Good 4 - Good 3 – Fair 2 – Bad 1 – Very Bad
CONDITION OF STRUCTURAL COMPONENT
Column ☐ ☐ ☐ ☐ ☐
Beams ☐ ☐ ☐ ☐ ☐
Slab Flooring/ Roof ☐ ☐ ☐ ☐ ☐
Deck
Roof Trusses ☐ ☐ ☐ ☐ ☐
Stairs ☐ ☐ ☐ ☐ ☐
CONDITION OF NON-STRUCTURAL COMPONENTS
Floor Finish ☐ ☐ ☐ ☐ ☐
Ceiling ☐ ☐ ☐ ☐ ☐
Ground Floor
Walls ☐ ☐ ☐ ☐ ☐
Doors and Windows ☐ ☐ ☐ ☐ ☐
Roofing ☐ ☐ ☐ ☐ ☐
CONDITION OF ANCILLARY/ AUXILLARY EQUIPMENT AND FACILITIES
Water Supply and Piping ☐ ☐ ☐ ☐ ☐
system
Fire Safety Devices ☐ ☐ ☐ ☐ ☐
Communication and ☐ ☐ ☐ ☐ ☐
Internet Services
Emergency Exit ☐ ☐ ☐ ☐ ☐
Comments: ___________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________

IV – ANNEXES AND ATTACHMENTS/ DOCUMENTATION


Attached photos as a proof and documentation of the inspection

V – COMMENTS AND RECOMMENDATIONS:


1. STRUCTURAL COMPONENTS:
☐ Conduct thorough structural investigation
☐ Non-Destructive test must be conducted by inspectorate, competent structural or Civil Engineer.
☐ No need to conduct non-destructive testing but conduct repairs on minor defects
Specify areas to repair and actions for repair : _________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________.
2. NON-STRUCTURAL COMPONENTS OR ANCILLARY/ AUXILLARY EQUIPMENT AND FACILITIES
☐ Immediate actions on identified components with defect and missing.
Additional Comments: ___________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
__________________________________________________________________________________________

You might also like