Jacobs Engineering Canada
Jacobs Contract No. CE4123,
Client: Suncor Firebag Wellpad 110
Supplier’s Document Review Sheet
Equipment Numbers ‘Comments
110PV-80002
Review Status Codes Project/Req Title | Firebag Wellpad 110
w 11 -Work May Proceed Supplier CCI VALVES INC
2.- Revise and Resubmit: Work may
Proceed subjoct to. incorporation cf
Changes indicated
3 = STOP WORK per attached wren
Instructions
4 + Review Not Required: Work may
recood
PLEASE NOTE: Femitont pcs des ot
cepa o prov of deen dey eatin,
ties, metodo mer dev or sacl ty te
Doc. Description
CCI - INSTALLATION OPERATION AND.
MAINTENANCE MANUAL INDEX - TAG
140PV-80002
Vendor Document
No.
1OM INDEX
Client Document
No.
VP110-J-85-1
Ses nat re st el ce th
Senna tence
Purchase Order No. Doc Cat. Issue
« 02-03112-CC083148 L111 1A
SIGN: oo $Y Categories Othercategories
DATE : 4 2. Date Received 01/24/2013'T COVER SHEET
el DOCUM!
We Solve Control Valve Problems”
PROJECT INFORMATION
CUSTOMER NAME ‘SUNGOR ENERGY
PROJECT : FIREBAG SAGD
JPROJECT NUMBER ——: 203537
PURCHASE ORDER _:_ CE412330-CC083148-00
DOCUMENT INFORMATION
DOCUMENT TITLE 7 Installation, Operation & Maintenance Manual Index
DOCUMENT NUMBER — : 203537-1-IOMM Index
JDOCUMENT REVISION = 0
{TAG NUMBER 110PV-80002
DOCUMENT TYPE + Manual
|PURPOSE 2 Comments / Approval
|SFOG NUMBER 1 33856 2
REVISION HISTORY
0 24-Jan-13 | 1st issue
REV DATE DESCRIPTIONINSTALLATION,OPERATION,
MAINTENANCE MANUAL 900D
TABLE OF CONTENTS
SECTION 1
CATALOG INFORMATION A16
SECTION 2 4
SAFETY IS GOOD BUSINESS: 1
IMPORTANT TECHNICAL ASSEMBL Y/DIS-ASSEMBLY INSTRUCTIONS ARE INCLUDED IN THE DRAWINGS.
‘SEE SECTION 8,INTRODUCTION.
2.1, GENERAL DESCRIPTION...
2.2. PRINCIPLE OF OPERATIOI
2.3. INTRODUCTION...
SECTION 3
‘HANDLIN
3.1 SCOPE.
3.2. INTRODUCTION. o....
3.3. RECEIVING AND INSPECTION.
3.4 STORAGE.
3.8. REMOVAL FROM SHIPPING CONTAINER.
3.6 INSTALLATION. : 7
3.7. WELDING OF VALVE BODY TO PIPE AND POST-WELD STRESS RELIEF...
3.8 LINE FLUSHING AND CHEMICAL CLEANING...
3.9. INSULATING HOT VALVES...
3.10 COMMISSIONING CHECKLIST...
3.11 START-UP AND OPERATION. :
3.12 INSTRUCTIONS FOR ACTUATORS
3.13 POSITIONER CALIBRATION. 1...
3.14 SNAP ACTING RELAY CALIBRATION.
SECTION 4
PNEUMATIC ACTUATOR-YOKE ASSEMBLY
4.1 SCOPE.
4.2 DISASSI
4.3. ASSEMBLY...
SECTION 5,
TRIM ASSEMBLY
8.1 SCOPE
5.2 DISASSEMBLY.
5.3 ASSEMBLY...
SECTION 6
ACTUATOR
6.1 SCOPE xcs
6.2. INTRODUCTION...
63 DISASSEMBLY.
64 ASSEMBLY...
65 TESTING.......
SECTION 7.
‘MAINTENANCE.
7.1 SCOPE...
7.2 PREVENTATIVE MAINTENANCE
OV RRR R666 ble NN!
7.3. FAULT-FINDING AND RECOMMENDED REPAIR OT
7.4 INSPECTION AND REPAIR. 30
7.5 CLEANING MATERIALS REQUIRED 31
7.6 CLEANING METHODS. ve 3t
‘CONTROL COMPONENTS, Bie (R) BSETETT
22801 AVENIDA. EMPRESA Fa (40) 850-678 REV: NC.
RANCHO SANTA MARGARITA CA $2688 EMALINFO@CONALVE COMYe SoWve Conta vale Probleme
INSTALLATION, OPERATION,
MAINTENANCE MANUAL 900D |
7.7 RECOMMENDED SPARE PARTS. enn 3t
7.8 LONG LEAD TIME ITEMS... i sn
SECTION 8 33
‘SPECIAL VALVE COMPONENTS (ASCO SOLENOID VALVE, DVC POSITIONER, REGULATOR & VOLUME
BOOSTER
SECTION 9 34
VALVE OUTLINE & DIMENSIONAL DRAWINGS J05 34
INSTRUMENT TERMINATION DETAILS JO6 35
PNEUMATIC CONTROL SCHEMATICS J28 36
SECTION 10 37,
CONTROL VALVE SIGNATURE CURVE J34 7
CONTROL VALVE SIZING J45 38
SECTION 11 39
RECOMMENDED SPARE PARTS LIST_NOt 39
CONTROL COUPONENTS-INE PE (o) SSOTOTT
22501 AVENIOA. EMPRESA FA (oe) 858-1678 REV: NC
RANCHO SANTAMARGARITA,CA 97608 EMALINFO@COWVALVE COM