Kertas Tugasan C02

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

KOLEJ VOKASIONAL KUCHING ( K05042 )

JALAN KOLEJ, BATU LINTANG


93200 KUCHING,
SARAWAK

KOD DAN NAMA KERTAS TUGASAN


EE-320-3:2012 THREE PHASE ELECTRICAL
PROGRAM / PROGRAM’S
INSTALLATION & MAINTENANCE
CODE & NAME
TAHAP / LEVEL 3 (THREE)
NO. DAN TAJUK UNIT
KOMPETENSI /
EE-320-3:2012-C02 : THREE PHASE WIRING
COMPETENCY UNIT NO.
AND TITLE
1.IDENTIFY THREE PHASE WIRING
SPECIFICATIONS AND PROCEDURES
2. IDENTIFY THREE PHASE WIRING TOOLS,
EQUIPMENT AND MATERIALS
3. CARRY OUT WIRING ACTIVITIES
4. CARRY OUT THREE PHASE EARTHING
SYSTEM INSTALLATION
NO. DAN PENYATAAN 5. CARRY OUT THREE PHASE DISTRIBUTION
AKTIVITI KERJA / WORK BOARD (DB) (METALLIC OR INSULATED)
ACTIVITIES NO. AND INSTALLATION
STATEMENT 6. CARRY OUT FITTING AND ACCESSORIES
INSTALLATION
7. CARRY OUT WIRING SYSTEM VISUAL
INSPECTION
8. CARRY OUT DEAD CIRCUIT TEST
9. CARRY OUT LIVE CIRCUIT TEST
10. PREPARE THREE PHASE WORK ACTIVITIES
REPORT
Muka / Page : 01
NO.KOD / CODE NO. EE-320-3:2012/C02/T (10/24)
Drpd/of : 03

TITLE: SISTEM PEMBUMIAN

OBJEKTIF / OBJECTIVE: Trainee must be able to perform three phase wiring so that
three phase wiring specifications and procedures identified, three phase wiring tools,
equipment and materials identified, wiring activities carried out, three phase earthling
system installation carried out, three phase distribution board (db) (metallic or insulated)
installation carried out, fitting and accessories installation carried out, wiring system visual
inspection carried out, dead circuit test carried out, live circuit test carried out and single
phase work activities report prepared in accordance with electrical act 1990, electrical
regulation 1994 and other related rules and regulations body and statutory requirements.
NO. KOD / CODE NO. EE-320-3:2012 /C02T (10/24) MUKA : 2

Arahan: Isikan tempat kosong dengan jawapan yang sesuai

1. Nyatakan fungsi pembumian.


_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
[5 Markah]

2. Senaraikan peralatan serta bahan bagi pembumian


i. ___________________________________________________
ii. ___________________________________________________
iii. ___________________________________________________
iv. ___________________________________________________
v. ___________________________________________________
vi. ___________________________________________________
vii. ___________________________________________________
[7 Markah]

3. Gambarajah diatas merujuk kepada ___________________________


[1 Markah]

4. Senaraikan prosedur pembumian.

i. ______________________________________________
ii. ______________________________________________
iii. ______________________________________________
iv. ______________________________________________
v. ______________________________________________
vi. ______________________________________________
vii. ______________________________________________

[7 Markah]
NO. KOD / CODE NO. EE-320-3:2012 /C02/T (10/24) MUKA : 3

KEPUTUSAN PENILAIAN

ULASAN PEGAWAI PENILAI :

Tarikh :
(Tandatangan Pegawai Penilai)

You might also like