OBJEKTIF / OBJECTIVE: Trainee must be able to perform three phase wiring so that
three phase wiring specifications and procedures identified, three phase wiring tools,
equipment and materials identified, wiring activities carried out, three phase earthling
system installation carried out, three phase distribution board (db) (metallic or insulated)
installation carried out, fitting and accessories installation carried out, wiring system visual
inspection carried out, dead circuit test carried out, live circuit test carried out and single
phase work activities report prepared in accordance with electrical act 1990, electrical
regulation 1994 and other related rules and regulations body and statutory requirements.
NO. KOD / CODE NO. EE-320-3:2012 /C02T (10/24) MUKA : 2
i. ______________________________________________
ii. ______________________________________________
iii. ______________________________________________
iv. ______________________________________________
v. ______________________________________________
vi. ______________________________________________
vii. ______________________________________________
[7 Markah]