Parwan Major Multipurpose Irrigation Project (Ph-I M/S GVPR) Bar Chart of Left Main Canal (Length 51.95 KM)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PARWAN MAJOR MULTIPURPOSE IRRIGATION PROJECT (PH-I M/S GVPR)

Bar Chart of Left Main Canal (Length= 51.95 km)

Outlet for Phase-ll


Discharge =10.20 Cumec

RD 4.895 RD 9.70 RD 13.45 RD 16.85 RD 20.60 RD 23.60 RD 26.80 RD 32.65 RD 35.35 RD 39.25 RD 42.05
RD 51.95 KM
KM KM KM KM KM KM KM KM KM KM KM 49.04-
Diggi 1 Diggi 3 Diggi 4 Diggi 6 Diggi 7 Diggi 8 Diggi 9 Diggi 10 Diggi 12 Diggi 13 Diggi 14 49.51km Diggi 18
48.40-
0-5.75 KM 7-9.50 KM 10-12.70 KM 14-17.10 KM 18-20.50 KM 22.05-25.50 KM 30-37.55 KM 48.50km

RD(KM) 0 2.50 5.00 7.50 10.00 12.50 15.00 17.50 20.00 22.50 25.00 27.50 30.00 32.50 35.00 37.50 40.00 42.50 45.00 47.50 50.00 51.95

7.10-7.20 km 14.75- Diggi 17


6.46-6.54 15.00km 18-20 KM 35-37.50 KM RD 46.55 KM
km 7.875- 12.60- 20.25- 25.50- 27.49- 48.10-
Diggi 2 Diggi 5
7.920km 12.90km 22.05km 26.15km 29.65km Diggi 11 Diggi 15 Diggi 16 48.20km Diggi 19
RD 6.20 9.80-10.00km RD 16.35 RD 32.40 RD 40.95 RD 45.65
RD 51.95 KM
KM KM KM KM KM
9.110- 13.80- 16.40- 42.05- 43.80- 45.90- 47.88-
9.140km 14.00km 16.545km 42.20km 43.85km 46.05km 47.975km

Legend:-

Note- Total Discharge of LMC = 22.10 Cumec Not Acquired or alingnment change due to forest

CCA of Phase-I Under LMC = 43159 Ha Profile Under Preparation for Lining

CCA of Phase-II Under LMC = 45602 Ha Excavation EWE Work In Progress

Outlet for Phase-II is at RD 4895 m of LMC Canal EWE Work not in Progress