Professional Documents
Culture Documents
Risk Assessment For Braket Scaffolding: Construction of Lubricating Oil Blending Plant (LOBP)
Risk Assessment For Braket Scaffolding: Construction of Lubricating Oil Blending Plant (LOBP)
Co Date:25-SEPTEMBER2017
1 Erection of Handling of Manual Handling repetitive Back Pain, Neck spinal 4 3 M Workers shall take rest 15 minutes 2 2 L Y
Bracket Scaffold work. cord Strains, WRULDs after 1-hour work. Or Job
Scaffolding Material rotation
Electrocution Using damaged power Serious personnel injuries, 4 4 H Don’t use damaged cables at site. 1 3 L Y
or electric cables, Lack of inspection unconsciousness Inspect the tools and cables prior to
shock while prior to use. Internal or external Burn use.
welding of Missing of safety devices injuries All power and equipments shall be
bracket straps on electrical equipments inspected periodically by a
and wet conditions. competent person. Make sure
safety devices are installed (ELCB,
earthing) for all electrical
equipments,
Suitable PPE must be worn by
workers. Keep the clothing and
environment dry as reasonably
practicable.
Arcing and fire Damaged cables, loose External Burn injuries 3 4 M Don’t use damaged cables, and 1 2 L Y
connections, Property damaged equipment at site. Inspect the
Overloading, Flammable cables prior to use. Make sure the
material nearby welding all cables connections are proper.
location. Don’t over load the cables.
Don’t trail the cables on vehicle
routs. Maintain good
housekeeping ,remove flammable
material from working area.
ALKHORAYEF LUBRICANTS MANUFACTURING .Co Date:25-SEPTEMBER2017
Falling of Incorrect material lifting Personnel injuries 3 3 M Use correct methods to shift 1 3 L Y
material from methods while taking material upward or down work.
height while material upward or down Grip the material firmly. Use proper
erection ward, Material slipped PPE, Don’t stand under scaffold
scaffold. from erector hands. while erection. Keep proper
communication.
Personnel incompetency, damaged Serious Personnel injuries 4 5 H Only Certified scaffolders shall erect 1 3 L Y
falling from members of scaffolds, Possible fatality. the scaffold, inspect and use the
height while Incorrect method of scaffold material that is in good
erection erection. incorrect welding condition. Scaffold shall be erected
of bracket straps. in descending order. Bracket straps
Lack of 100% Tie off shall be welded by qualified welder
and inspection shall be done QC
after welding. Wear full body
harness, follow 100% tie off rule
and clamp accordingly.
Extreme Working under direct Health effects(muscle 4 5 H Avoid to work under direct sunlight 1 4 L Y
Temperature sunlight cramps or rashes, heat as reasonably practicable, create
exhaustion, dehydration awareness between workers
or heat stroke) through ALMC heat stress
campaign, make sure all welfare
facilities are on place, rest after
every one hour. Drink one cup of
cool water in every 20 mint
NAME SIGNATURE
PREPARED BY CS
REVIEWED BY CS
REVIEWED BY ALMC
APPROVED BY ALMC
RISK MATRIX
LIKELIHOOD Rare remote possibility Unlikely Possible Likely Almost certain could
happen frequently
SEVERITY
(IMPACT)
2 3 4 5
1
Low Low Low Low Medium
Insignificant 1 1 2 3 4 5
Low Low Medium Medium Medium
Minor 2 2 4 6 8 10
Low Medium Medium Medium High
Moderate 3 3 6 9 12 15
Low Medium Medium High High
4 8 12 16 20
Significant 4
Medium Medium High High High
5 10 15 20 25
Major 5