Professional Documents
Culture Documents
Guang Ming As-Built 4.8.22
Guang Ming As-Built 4.8.22
Sec-01
CA CA
24 24
DW DW
CA DW 03
CA 01
17 02
CA 23a
30
DW DW
15GPM CA MS DW 10 08
GREASE TRAP 23 01 04
CA
05
CA CA
10 10
TRENCH DRAIN
CA CA CA CA
29 03 12 12
PA
CA 04
08 CA
27A
P P
03 04 DW
PA 01
03 MP WF
MP P 01
05
02 02 WC
01
CA CA PA
CA PA
10 26a 02 WF
CA 10 04 WC
02 03 03
P
TRENCH DRAIN 06
MP
CA 07
26b P
CA CA PA MP P
07
27 28 03a 05 03
CA
01
GT-15PM
ACCU FOR WALK-IN ACCU FOR WALK-IN
FREEZER WF CHILLER WC
03a 03a
1 SCALE: 1:75M
APPROVED AS NOTED
DISAPPROVED
REVISE/REDRAW
BY:_____________ DATE:______
ENCLOSURE
With 3/4"
GAS FARM
LP LOW PRESSURE LINE
SHUT-OFF VALVE
R
BALL VALVE
GM
Sec-01
32mm B.I.GAS PIPE MAIN
LD GAS LEAK DETECTOR
LINE@ .3 3 0 m FR OM FF L
R REGULATOR
LD CONTROL PANEL
CA CA
24 24
CA CA CA
17 25 23a
CA
30
CA-05.TWO OPEN TOP LP CA
BURNER 25mm B.I.GAS PIPE 23
NOZZLE LINE@ .330m FROM CA
FFL @60,000 BTU/HR 10
LP LD
CA
05
CA
29
R
TRENCH DRAIN
WITH 3/4" LD CA CA
SHUT-OFF VALVE 12 12
PA
CA 04
08 CA
27A
CA-03.FOUR OPEN TOP HP CA
BURNER 25mm B.I.GAS PIPE 03
NOZZLE LINE@ .330m FROM PA
FFL @320,000 BTU/HR 03
HP WITH 3/4"
SHUT-OFF VALVE PA
CA
02 PA
26a
CA 04
LD 02 CA
10
TRENCH DRAIN
CA
CA-02. ONE BOWL WOK 27
CA
BURNER HP 25mm LD CA
26b
PA
B.I.GAS PIPE NOZZLE CA 28 03a
LINE@.330m FROM FFL 01
@398,000 BTU/HR
HP
GT-15PM
APPROVED
APPROVED AS NOTED
DISAPPROVED
REVISE/REDRAW
BY:_____________ DATE:______
A.C.U. COMPRESSOR
CIRCUIT BREAKER
EVAPORATOR EVAPORATOR
S1 1G SWITCH
SWITCH LINE
LIGHT BULB
DCP DIGITAL CONTROL PANEL
DCP DCP
S1 S1
EVAPORATOR
EVAPORATOR
ECB ECB
1 SCALE: 1:50M
APPROVED
APPROVED AS NOTED
DISAPPROVED
REVISE/REDRAW
BY:_____________ DATE:______