Professional Documents
Culture Documents
Found Plenum LH Primary Delamination and Plate Nut Broken: 00164331 GAH410ZZ Gah4
Found Plenum LH Primary Delamination and Plate Nut Broken: 00164331 GAH410ZZ Gah4
PM/PS: P-73N-000-00-5H-00/101
B737NG Rectif Phase TMB 737-800 PK-GMC
C05-CHECK + A03-CHECK + 6, 12 YR PK-GMC
ORDER : 804445663
WORK PACKAGE NO : 00164331
WORK CENTER / PLANT : GAH410ZZ / GAH4 ORIGINATING ORDER / INT REF.:
804348822/B1/S21-51-0019R0
RAISED BY : Mr Dwi Rusdiyanto DEFECT RAISE DATE: 13.07.2022
0020 W304 S2
OBEY ALL WARNINGS, CAUTIONS AND NOTES GIVEN IN SPECIFIC MANUAL SECTION.
0030 W304 S2
REMOVE FASTENER FOR ACCESS
REFER TO :
- SRM 51-40-02
REV.76 / 10 JUL 2022
OPS. No. DISCREPANCIES FOUND DURING INSPECTION(Use reverse side if necessary): Insp
FORM GMF/Q-003 R9 1 OF 3
MAINTENANCE DISCREPANCY AND RECTIFICATION
PM/PS: P-73N-000-00-5H-00/101
B737NG Rectif Phase TMB 737-800 PK-GMC
JOB DESCRIPTION MECH INSP
0040 W305 S2
PERFORM PERMANENT REPAIR
REFER TO:
- B737-800 AMM 21-51-24 TASK 21-51-24-340-803 PARA 4. FIGURE 801
(REV. 78A / 15 AUG 2022)
0050 W304 S2
REPLACE PLATE NUT
REFER TO :
- SRM 51-40-02
REV.76 / 10 JUL 2022
0060 W304 S2
INSTALL FASTENER
REFER TO :
- SRM 51-40-02
REV.76 / 10 JUL 2022
0070 GAH410E1 E2
DO INSTALL PLENUM LH PRIMARY
REF. AMM TASK 21-51-03-400-804-002
REV, 78. JUN, 15 2022
OPS. No. DISCREPANCIES FOUND DURING INSPECTION(Use reverse side if necessary): Insp
FORM GMF/Q-003 R9 2 OF 3
MAINTENANCE DISCREPANCY AND RECTIFICATION
PM/PS: P-73N-000-00-5H-00/101
B737NG Rectif Phase TMB 737-800 PK-GMC
C05-CHECK + A03-CHECK + 6, 12 YR PK-GMC
ORDER : 804445663
WORK PACKAGE NO : 00164331
WORK CENTER / PLANT : GAH410ZZ / GAH4 ORIGINATING ORDER / INT REF.:
804348822/B1/S21-51-0019R0
RAISED BY : Mr Dwi Rusdiyanto DEFECT RAISE DATE: 13.07.2022
OPS. No. DISCREPANCIES FOUND DURING INSPECTION(Use reverse side if necessary): Insp
CARD CLEARANCE
FORM GMF/Q-003 R9 3 OF 3