District:: Executive Name Project Total Camers Total Online Total Oiffline
District:: Executive Name Project Total Camers Total Online Total Oiffline
District:: Executive Name Project Total Camers Total Online Total Oiffline
District:
Executive Name Project Total camers Total online Total oiffline
Sign:
Team Leader
MRM
Date:
online % Key Issues Issue Closure Time Line Improvemental Action Plan
Executive BDM
Suppor Required
Wee
District: Anantapur
Executive Name Project Total camers
255
Narasimha APSFL
CIVIL SUPPLIES 17
Naresh APSFL 78
59
CIVIL SUPPLIES
Kishore 109
APSFL
32
CIVIL SUPPLIES
Key Focus Areas Hydralic Ladder & Service Camers
Sign:
Team Leader:
Weekly Review Meeting
Total online Total oiffline Offline Issues
A). RTC bus stand 1 camera cat-6 issue
B). SP Camp office 1 camera cat-6 issue
C). SBI Sai nagar 1 FRS Need to reinstall
123 132 D). Camera Dismantle Due to Road Extension-67, . Not Installed-
20, OFC Cut Due To Road Extension-23, Missing FIR-5, JB Damage- 14
102 7 A). Rajiv Gandhi Circle, gooty, Cat-6 Issue Ladder Dependency
B).6 Need to check
A). 2 Dome Cameras Tadipathri Godown offline Cat-6 issue Ladder dependency
B).2
21 11 Cameras Gooty Godown offline 1 Fixed camera Cat-6 Issue Ladeer
Dependency, 1 Camera Sent to Service
C).7 Cameras Yadiki Godown Offline 2 Fixed & 1 ANPR camera Need To Reinstall
& 1 Camera Adaptor Issue, 3 need to check
Service Camers
Executive:
Date:30-04-2022
Requirment to close issue Issue Closure Time Line
A). Hydraulic ladder required, cat-6 & Power Cable Required, Desktop
Connection Cables,
B). Earthing Bags 2, Manpower to do Earthing, Service Cameras Required
from Vijayawada, Cat-6 & Power Cable, 1 Media Converter, 12V-Adaptors-3
C). 3
ANPR, 1 Fixed Service Cameras Required from Vijayawada, Hydraulic ladder
required 5/11/2022
A). Hydraulic ladder required
5/7/2022
A). Hydraulic ladder required
B). Hydraulic ladder required, 1 Dome Service Camera Required from
Vijayawada
C). Hydraulic ladder required, 12v adaptor-1
5/8/2022