Professional Documents
Culture Documents
Bellbrook Centre Project Plans
Bellbrook Centre Project Plans
COURSEWARE
ARCHITECTURAL STRUCTURAL
130921 / CD / A00.01 COVER SHEET AND DRAWING SCHEDULE 130921 / CD / S01.01 BASEMENT SLAB FRAMING PLAN
A01.02 SITE PLAN S01.02 GROUND FLOOR SLAB FRAMING PLAN
A02.01 BASEMENT PLAN S01.03 GROUND FLOOR TOP REINFORCEMENT PLAN
A02.02 GROUND FLOOR PLAN S01.04 GROUND FLOOR BTM REINFORCEMENT PLAN
A02.03 FIRST FLOOR PLAN (OFFICE TOWER) S01.05 STRUCTURAL STEEL ROOF PLAN
A02.04 SECOND FLOOR PLAN (OFFICE TOWER) S02.01 CONCRETE DETAILS - BASEMENT LEVEL
A02.05 ROOF PLAN S02.02 CONCRETE DETAILS - GROUND FLOOR
A02.06 CARPARK EXHAUST FAN S02.03 CONCRETE DETAILS - JOINTS
A04.01 ELEVATIONS - SHEET 1 S02.04 TILT PANEL DETAILS
A04.02 ELEVATIONS - SHEET 2 S03.01 STEELWORK DETAILS W.J. KITE SEPT' 20AA
DRAWN DATE
A05.01 SECTIONS - SHEET 1
A05.02
A06.01
SECTIONS - SHEET 2
DETAIL SECTIONS - SHEET 1
ELECTRICAL DISCIPLINE TEAM LEADER DATE
A06.02 DETAIL SECTIONS - SHEET 2 130921 / CD / E01.01 ELECTRICAL NOTES AUTHORISED FOR ISSUE DATE
A06.03 DETAIL SECTIONS - SHEET 3 E02.01 GROUND FLOOR - ELECTRICAL PLAN PCB DEVELOPMENTS
A07.01 CONSTRUCTION DETAILS LTD
A07.02 SERVICE PLATFORM DETAILS BELLBROOK PROFESSIONAL
A08.01 WINDOWS & DOORS MECHANICAL & THREATRE CENTRE
A15.01 PERSPECTIVE - NE
A15.02 PERSPECTIVE - NW 130921 / CD / M01.01 MECHANICAL SERVICES FIRST FLOOR / THEATRE
A15.03 PERSPECIVE VIEWS M01.02 CONDERSOR MOUNTING PADS - ROOF LEVEL COVER SHEET AND
DRAWING SCHEDULE
HYDRAULIC FIRE SCALE AT
A3 SIZE
130921 / CD / H01.01 HYDRAULICS PLAN MASTER SITE NUMBER CLIENT REFERENCE NUMBER
130921 CD A00.01 A
ELEVATED 1000 WIDE PATH FROM REAL PROPERTY
THEATRE FIRE DOORS.
40NB MONOWILLS HANDRAIL TO
DESCRIPTION
FINISH AT RETAINING WALL. LOT ON RP
PARISH OF
1 2 3 ADJACENT
4 5 6 7 COUNTY OF
LOCAL AUTHORITY:
9150 EXISTING
PROPERTY 1000 WIDE CARPARKING LEGEND:
BOUNDARY 2000 7000 PATH AT EXTG 200 HIGH 3900
SET-OUT DIMENSION TO
KERB TO FACE (OR CENTER LINE
GROUND LEVEL RL 96.400
RL 100.100 WHERE NOTED) OF
RL 95.200 RL 96.100 BOUNDARY PROPERTY BOUNDARY
BUILDING WALLS OR TO
RL 96.000
1000
RL 96.300 COLUMN CENTER LINES
3930
58580 O/A
RL 95.500 MANGEMENT
RL 96.375
GARDEN
RL 100.100
1000
E
1000 WIDE
RL 99.950 W.J. KITE SEPT' 20AA
RL 100.000 CONCRETE PATH
EGRESS TO STREET
F
DRAWN DATE
PADMOUNT
RETAINING WALL: TRANSFORMER
TOP RL 99.330 OFFICE FIRE EGRES TURF
RL 96.375 TOWER
DISCIPLINE TEAM LEADER DATE
STAIRS
RL 96.325
BLOCK FIRE EGRES
RL
STAIRS
G AUTHORISED FOR ISSUE DATE
96
BOUNDARY
PROPERTY
.40
EXHAUST STACK:
H LTD
GARDEN GARDEN TURF BELLBROOK PROFESSIONAL
REINF CONC TURF RL 100.000
BLOCK & THREATRE CENTRE
RL 98.650 RL 99.100 RL 99.250 RL 99.650 RL 99.850
TOP OF STACK RL 216 - 220 JOHN FLYNN BLVDE
103.000 RETAINING WALL: FOOTPATH CROSSOVER TO BELLBROOK
3600 x 3600 x 3600 LOCAL AUTHORITY
TOW 100.600
JOHN FLYNN BLVDE REINF CONC FIRE REQUIREMENTS SITE PLAN
PROPERTY SERVICE WATER TANK 1800
BOUNDARY
75480 SCALE AT
As indicated A3 SIZE
HYDRANT & SPRINKLER MASTER SITE NUMBER CLIENT REFERENCE NUMBER
CL COLUMN 330
to OUTSIDE OF WALL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
4430
ZONE. (LINE
MARKING ON
FLOOR) B
2 COL-1
A07.01 (TYPICAL)
8160
BRS01 CAR PARKING BAYS EQ EQ EQ EQ N
140 2600
C
5500
140
39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24
8540
40
140 5100
41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
UP
DP-1
2 2 D
A05.01 BD03 A05.01
1 BASEMENT STAIRWELL No 1
8460
BRS02
2 A07.01 BFC 1
A04.01 140 2600 140 STAIRWELL No 2 A04.01
(SETOUT) 10
190 (BLOCK WALL)
E W.J. KITE SEPT' 20AA
4830 440
(OVERALL)
71 70 69 68 67 66 65 64 63 62 61 60 59 58 57
51380
8540
190 2800 190
73 74 76 77 78 79 80 81 82 83 84 85 86
140
75 LIFT
BL01 AUTHORISED FOR ISSUE DATE
BD04 DP
GRATED DP 150 DP
F PCB DEVELOPMENTS
DRAIN TO
190 2400 190 (BLOCK WALL)190 LTD
OPENING.
8160
to OUTSIDE OF WALL
STAIRWELL No 3 BELLBROOK PROFESSIONAL
BRS03
& THREATRE CENTRE
330 CL COLUMN
1
140
DP 216 - 220 JOHN FLYNN BLVDE
A05.01
DP UP G BELLBROOK
BIKE BASEMENT PLAN
4760
4430
PARKING
105 104 103 102 101 100 99 98 97 96 95 94 93 92 91 90 89 88 87
DP-1
H SCALE AT
1 : 250 A3 SIZE
DP RETAINING WALL VOID FOR 140 2600 140
MASTER SITE NUMBER CLIENT REFERENCE NUMBER
BASEMENT BASEMENT (SETOUT OFF GRID)10
EXHAUST
AIR ROOM 1 BASEMENT PLAN 3 EXHAUST AIR
1 4 DRAWING NUMBER ISSUE SHEET NO
4430
CARPET GD33 CARPET SF1 SHOPFRONT GJAMES 475
2435 1900 4875 1900 3000 RL 100.000 SERIES 100x50 ALUMINIUM
RECEPTION
TENANCY 9 S S S S B SF2 STEGBAR STACKABLE
12674
8160
GD11 SUSPENDED
L S S L S S N
L S S L S S
COL-2 GD12 CPD
GD10 L S S L S S
IN WALL
TENANCY 8 L L
CPD CPD CPD
S S S S
C
92
GD09 VINYL L S S L S S
CPD GD29
TENANCY 4 T5 T6 L S S L S S STAIRWELL
VINYL VINYL VINYL TENANCY 7 SF2 L WALL UNDER
8448
8540
COL-2 VINYL GD28 TIERS
IN WALL GD05 GD06
GD08 GD13
FEMALE
TILES
MALE TICKETS
TILES
1900 92
8460
TENANCY 3 COL-2 CENTRE
2 VINYL
DP
STAIRWELL No 2
DP
LINE OF PLANT MANAGE'T 1
A04.01 1000 ROOM WALL OVER
GD31 A04.01
RL 100.000 GD03
190
3040 90 90 CARPET
CPD
COL-2 COL-1 TEA RM
E
90 1830 1830 1200
COL-2 DP W.J. KITE SEPT' 20AA
140
MALE COL-1
92
800
COL-1 DP-1 GRS01
90 90 DRAWN DATE
2800 190 5360
SF1 GD16
RL 99.950 RL 99.950
2600 190
8448
8540
GD15
TENANCY 2 DP FEMALE WALL:
DISCIPLINE TEAM LEADER DATE
VINYL RL 100.000 1800 HIGH 190
STAIRWELL LINE OF
5710 140
GD02 BLOCKWORK
LIFT
FOYER
190
CPD
190 2400 DP GD19
UP
GD20 PCB DEVELOPMENTS
GD01 GD18 DELIVERY AREA RL 99.950
LTD
GROUND FLOOR TILES BFC
140
8160
190 2710 PADMOUNT
ROOF LINE
OFFICES BELLBROOK PROFESSIONAL
TENANCY 1 140
12674
OVER TRANSFORMER
& THREATRE CENTRE
1 VINYL CARPET
1
190
190
4760 190 1750
DP
TILES GW02
A05.01 COL-2 COL-1 COL-1 COL-1 A05.01
COL-2 DP UP G
SF1
4430
RL 99.950
GW01
GW05
GROUND FLOOR PLAN
COL-2 COL-1 GW03 COL-1 GW04 COL-1 DP-1
3800 DP
190 190
H
200
21380 SCALE AT
CARPORT 200 10629 102 21760 190 2600 190 140 5800 200 1 : 250 A3 SIZE
EXHAUST DUCT CL COL
TO SURFACE (CENTRE MANAGEMENT) MASTER SITE NUMBER CLIENT REFERENCE NUMBER
SCALE 1 : 250
DETAILS OF 130921 CD A02.02 A
EQUIPMENT
1 2 3 4 5 6 7 LEGEND
10730 10730 10730 10730 10730 10730 COL-1 STRUCTURAL COLUMN:
300 x 660 REINF CONCRETE
ROOF TO TENANCY REFER TO STRUCTURAL
AREAS 3 2 4 DRAWING FOR DETAILS
A05.02 A04.02 A05.02 FD01 FIRST FLOOR DOOR
NUMBER
DP DP DP DP FW01 FIRST FLOOR WINDOW
A NUMBER
THEATRE 1 THEATRE 2 PL01 PLANT ROOM LOUVRE
4430
CARPET CARPET NUMBER
PD01 PLANT ROOM DOOR
B NUMBER
8160
N
COL-1 COL-1
C
8540
200
COL-1 COL-1
2 UP 2 D
A05.01
(PLANT ROOM)
A05.01
PD01
PL01 STAIRS TO
8460
8490
PROJECTOR
2 PLANT ROOM ROOM 1
A04.01 FD10 BFC A04.01
PLUMBING
DUCT FD09 PL02 COL-1
COL-1 MALE COL-1 COL-1 E W.J. KITE SEPT' 20AA
460
DRAWN DATE
TEA RM FD05
FD06
8540
DP UP FEMALE FD07 FW06 DISCIPLINE TEAM LEADER DATE
FD01 FD08
LIFT
FD02 AUTHORISED FOR ISSUE DATE
FOYER
8160
BELLBROOK PROFESSIONAL
OFFICES & THREATRE CENTRE
CARPET
1 FW02
DP 1
A05.01 COL-1 COL-1 COL-1 A05.01
G
FIRST FLOOR PLAN
4430
FW01 FW05
COL-1 FW03 COL-1 FW04 COL-1
(OFFICE TOWER)
H SCALE AT
SCALE 1 : 250
A05.02 A04.02 A05.02 6 7 130921 CD A02.03 A
1 2 3 4 5 6 7 LEGEND
10730 10730 10730 10730 10730 10730 COL-1 STRUCTURAL COLUMN:
300 x 660 REINF CONCRETE
ROOF TO TENANCY REFER TO STRUCTURAL
AREAS 3 2 4 DRAWING FOR DETAILS
FD01 FIRST FLOOR DOOR
A05.02 A04.02 A05.02
NUMBER
DP DP DP DP FW01 FIRST FLOOR WINDOW
A NUMBER
THEATRE 1 THEATRE 2 PD01 PLANT ROOM DOOR
4430
NUMBER
PL01 PLANT ROOM LOUVRE
B NUMBER
PRD01 PROJECTOR ROOM DOOR
NUMBER
8160
N
8540
PROJECTOR ROOM VINYL
2 UP 2 D
A05.01 PRD01
A05.01
PD01
PL01
8460
2 PLANT ROOM 1
A04.01 SD10 BFC A04.01
PLUMBING
DUCT SD09 PL02
COL-1 MALE COL-1 COL-1 E W.J. KITE
DRAWN
SEPT' 20AA
DATE
TEA RM SD05
SD06
8540
FEMALE SD07 SW06 DISCIPLINE TEAM LEADER DATE
DP
SD01 SD08
LIFT SD02 AUTHORISED FOR ISSUE DATE
FOYER
8160
BELLBROOK PROFESSIONAL
OFFICES & THREATRE CENTRE
1 SW02
CARPET DP 1
A05.01 COL-1 COL-1 COL-1 A05.01
G
SECOND FLOOR PLAN
4430
SW01 SW05
COL-1 SW03 COL-1 SW04 COL-1 (OFFICE TOWER)
H SCALE AT
1 : 250 A3 SIZE
MASTER SITE NUMBER CLIENT REFERENCE NUMBER
CONCRETE TILT N
MF MF MF
UP SLAB
C
MVG
DP UNDER
MF
5°
MF SPREADER TO
D
MF LOWER ROOF
MF
2 1 DP MEG DP 5° 1
A04.01 A07.02 A04.01
PLANT PLATFORMS MF MEG-1
MF
DP DP-1 MBC
E W.J. KITE
DRAWN
SEPT' 20AA
DATE
FALL FALL
COVERED MEG-1 5°
FALL OUTDOOR AREA:
PARAPET:
CONCRETE
5° MEG MBC DP
MEG-1 WRS FALL FALL WRS
FALL SAIL SHADE, SHS
MBC
DISCIPLINE TEAM LEADER DATE
EXHAUST
FAN
3 SECTION 1 BRUSHABLE
A02.06 SCALE 1 : 100 MEMBRANE
FC
GARDEN
PROTECTION
DRIVEWAY
5000 GEOTEXTILE
FABRIC
VOID FOR
G BASEMENT W.J. KITE SEPT' 20AA
EXHAUST DRAWN DATE
2000 AIR
190 DISCIPLINE TEAM LEADER DATE
190 1210
190
3 PCB DEVELOPMENTS
2410
GRILLES
A02.06 LTD
H
Basement Level BELLBROOK PROFESSIONAL
190
400
600 x 600 DUCT
CENTRIFIGUAL (INLET) AGG DRAIN
EXHAUST FAN
EXHAUST FAN RETAINING WALL CARPARK EXHAUST FAN
OUTLET
SCALE AT
As indicated A3 SIZE
1 PLAN MASTER SITE NUMBER CLIENT REFERENCE NUMBER
A02.06
CARPARK EXHAUST FAN 2 SECTION DRAWING NUMBER ISSUE SHEET NO
900
LIFT SHAFT
2400
Level 2 Roof Level 2 Ceiling
110.800 110.200
Level 2 DP
Level 1 Ceiling
107.200 Plant Room Level 106.600
Level 1 105.400
GF Ceiling
103.600 PRECAST CONCRETE 103.000
Ground Floor Level TILT UP PANELS
100.000
CONCRETE EDGE
Basement Level BEAM
96.400 ROLLER SHUTTER: VOID & RETAINING
PROPERTY SCREEN: 6000 INSTALL TO MANF SPECIFICATIONS WALL FOR BASEMENT
BOUNDARY REFER DETAILS EXHAUST.
(CLEAR OPENING)
COLUMN: 1200 HIGH REINF
REINF CONCRETE CONCRETE BLOCK WALL
2 WEST ELEVATION
SCALE 1 : 250
CENTRE MANAGEMENT
& COVERED AWNING
ROOFS
H G F TOWER
E D C B A
FIRE STAIRS BLOCK PRECAST W.J. KITE SEPT' 20AA
WINDOWS CONCRETE TILT DRAWN DATE
UP PANELS
Level 2 Roof Level 2 Ceiling DISCIPLINE TEAM LEADER DATE
110.800 110.200
DP PROPERTY
Level 2 BOUNDARY Level 1 Ceiling
AUTHORISED FOR ISSUE DATE
3 4
A05.02
1 SOUTH ELEVATION A05.02
SCALE 1 : 250
3
A05.02
ROOF TO
7 6 5 THEATRE 4 3 2 1 W.J. KITE SEPT' 20AA
DRAWN DATE
THEATRE ENTRY
1 LIFT OVERRUN PAD FOOTINGS SERVICE AREA
A06.02 AND FOOTING
PROPERTY
BOUNDARY
1 SECTION 4
A02.01 A05.02
SCALE 1 : 250
3 ROOF SHEETING:
KLIPLOK COLORBOND
A05.02
METAL
1 ROOF SHEETING:
2 3 4 5 6 7
REINF CONCRETE W.J. KITE SEPT' 20AA
KLIPLOK STAIRS TO DRAWN DATE
130921 CD A05.01 A
2 1
A05.01 A05.01
A B C D E F G H
LOUVRES TO
PLANT ROOM
Level 2 Roof Level 2 Ceiling
110.800 SECOND 110.200
Level 2 FLOOR
OFFICES Level 1 Ceiling
107.200
FIRST 106.600
Level 1 FLOOR
103.600 OFFICES GF Ceiling
GF Ceiling GROUND 103.000
103.000 TENANCY 9 FLOOR
OFFICES
Ground Floor Level
100.000 BASEMENT BASEMENT
PROPERTY SF2:
BOUNDARY STACKABLE
SHOPFRONT DOORS
2 3 1
A05.01 A07.01 A05.01
3 SECTION
A02.01 1
SCALE 1 : 250 2
A05.01 A05.01
3
600
A06.01 GF Ceiling
103.000 CEILING:
900
DETAIL SECTION
MASTER SITE NUMBER CLIENT REFERENCE NUMBER
10
Level 1 200 x 200 8 PL CFW TO PFC
103.600
300PFC LINTEL (AWNING)
GF Ceiling ANGLE CLEAT:
103.000 250 x 250 x 5 CFW TO COLORBOND COVER
CEILING:
SOFFIT: AWNING TO 300PFC FLASHING
RONDO 1200 x 600 EXPOSED 3 6mm FC. REFER OFFICES 2-M16 TO ROOF BEAM COL-2 TO 300PFC FIXING:
GRID SUSPEND CEILING ON A06.02 GD06
TO DETAILS 300 LONG x 100 x 10PL CFW
METAL FURRING CHANNELS DOWNPIPE: TO COL-2 2-M16 BOLTS
TENANCY 1 150Ø STAINLESS EACH COLUMN
SHOPFRONT: COVERED STEEL
SOFFIT: GF Ceiling
GJAMES 475 SERIES OR WALKWAY 6mm FC
DOWNPIPE:103.000
GD01
EQUAL 100 x 50 ALUMINIUM SUPPORTED ON 40
FRAMING POWDERCOAT COL-2: 150Ø STAINLESS STEEL
METAL TOP HAT
FINISH 100 x 100 x 5 SHS SECTIONS COL-2:
SKIRTING
(TYPICAL)
Level 2
107.200
Proj Room Level
Level 1 Ceiling
106.735
106.600 CEILING
2 FIRST FLOOR
PACKING
A06.03 OFFICES 25 x 25 x 2
DIRECT STICK ALUMINIUM ANGLE
LIFT SHAFT: PLASTERBOARD FINSH SILL
25 x 20 x 2 ALUMINIUM
190 CORE FILLED INTERNALLY (TYPICAL)
ANGLE SILL SET IN
CONCRETE BLOCK
SEALANT (EXTERNALLY) DIRECT STICK
PLASTERBOARD
SKIRTING INTERNALLY
AWNING ROOF (TYPICAL)
Level 1
CONCRETE BLOCK
103.600
SILL & WALL
GF Ceiling
103.000 CEILING
GROUND FLOOR 2 DETAIL
WINDOW: OFFICES A06.03 SCALE 1 : 10
GJAMES 475 SERIES OR DIRECT STICK
EQUAL ALUMINIUM PLASTERBOARD FINSH
FRAMING. POWDERCOAT INTERNALLY (TYPICAL)
FINISH
190 REINF CONCRETE
BLOCK WALL. DIRECT STICK
PLASTERBOARD FINISH
INTERNALLY
Ground Floor Level
100.000
BASEMENT
B-COL
STRUCTURAL BASEMENT
COLUMN 330 x 600
Basement Level
96.400
1 DETAIL SECTION
A05.01 SCALE 1 : 50
SCALE
DRAWN
LTD
W.J. KITE
DRAWING NUMBER
As indicated
MASTER SITE NUMBER
SHEET 3
AUTHORISED FOR ISSUE
DISCIPLINE TEAM LEADER
AT
DATE
DATE
DATE
DETAIL SECTIONS -
130921 CD A06.03 A
ISSUE
PCB DEVELOPMENTS
SEPT' 20AA
A3 SIZE
BELLBROOK PROFESSIONAL
SHEET NO
SCREEN:
STAIRS:
MONOLITHIC REINF
E
STEEL MESH - POWDERCOAT FINISH CONCRETE
Ground Floor Level
1 100.000
10
BD04 PLUMBING
FC PACKING DUCT
900
1800
30 x 30 x 3mm STEEL EA
POWDERCOAT FINISH
Basement Level
10
COL-1:
3 SECTION 96.400
STRUCTURAL COLUMN 300 x 660
A05.02 SCALE 1 : 50
3
A07.01
FC PACKING
3 1250 100 1250 PLUMBING DUCT
(LANDING)
LANDING
BFC
COL-2:
100 x 100 x 5 SHS 10 W.J. KITE SEPT' 20AA
ROLLER SHUTTER SUPPORT 11 9 DRAWN DATE
12 8
(9 TREADS @ 250)
13 7
DISCIPLINE TEAM LEADER DATE
14 6
2250
15 5
16 4 AUTHORISED FOR ISSUE DATE
A02.01 A02.01
SCALE 1 : 5 BASEMENT STAIRWELL No 2 DRAWING NUMBER
130921 CD A07.01 A
ISSUE SHEET NO
SCALE 1 : 50
NOTE: PLATFORM FRAMING:
CONFIRM PLATFORM WIDTH & LENGTH ON SITE WITH OUTER FRAME 150PFC
SERVICES SUB-CONTRACTORS PRIOR TO FABRICATION. INTERNAL FRAME C150 @ 600 CRS
FIXINGS 10PL CLEATS & COLUMN CAPS
4-M16 8.8/S BOLTS
PLATFORM FLOOR:
WEBFORGE GRATE
3000
HANDRAILS:
MONOWILLS
BALUSTRADE SYSTEM.
E E HOT DIP GALV FINISH
Level 1
103.600
COLUMN SUPPORTS:
3 SECTION 75 x 75 x 6 SHS
12PL CPBW TO
A07.02 COLUMNS 4-M16
SCALE 1 : 50 8.8S/BOLTS TO ROOF
FRAMING.
100 x 6 PL TOWBOARD
CFW TO FLOOR
E
TOEBOARD
1000
4500
3
100
A07.02
A07.02 SCALE 1 : 50
GATE
GATE: AUTHORISED FOR ISSUE DATE
1000
FLASHING:
DEKTITE COMBO
& THREATRE CENTRE
625
SQUARE
SERVICE PLATFORM
2 RAFTER (R1) DETAILS
A07.02 ROOF SHEETING
SCALE AT
As indicated A3 SIZE
1 PLATFORM PLAN 4 FRONT ELEVATION MASTER SITE NUMBER CLIENT REFERENCE NUMBER
12
manufacturer
45 VARIES 45
TO SUIT
AL. LOUVRE
SUPPORT BRACKET
12
WALL LINING/S
METAL DOOR
LOUVRES: STRUCTURAL WALL FRAME
4 ALUMINIUM FRAMED AUSTRAL
A08.01 MONSOON AMF120
LOCATION: PLANTROOM LEVEL
AL. FIXING ANGLE
2 DETAIL
1200 1200 1200 1200 (SECTIONS) TYPICAL METAL DOOR FRAME
Provide 10mm (drainage) gaps
Al FLASHING
@ 400 max c's SCALE 1 : 5
COVER ANGLE
900
TILT-UP PANEL
Refer Struct Eng Dwgs
GF Ceiling
103.000 AUTHORISED FOR ISSUE DATE
PCB DEVELOPMENTS
GD01
LTD
BELLBROOK PROFESSIONAL
3000
2200
WINDOWS & DOORS
Ground Floor Level
100.000 SCALE AT
As indicated A3 SIZE
COL-2: FG PANELS (TYPICAL) MASTER SITE NUMBER CLIENT REFERENCE NUMBER
100 x 100 x 5 SHS GLASS TO COMPLY WITH
1 SECTION ALUMINIUM SURROUND ALL AUSTRALIAN & DRAWING NUMBER ISSUE SHEET NO
SAFETY STANDARDS.
SCALE 1 : 50 130921 CD A08.01 A
1 PERSPECTIVE NE Author 07/14/13
NORTH EAST DRAWN DATE
Approver
AUTHORISED FOR ISSUE DATE
PCB DEVELOPMENTS
LTD
BELLBROOK PROFESSIONAL
& THREATRE CENTRE
PERSPECTIVE - NE
2 PERSPECTIVE SCALE AT
SCALE NTS
DRAWING NUMBER ISSUE SHEET NO
130921 CD A15.01
2 PERSPECTIVE SE
SCALE
Author 07/21/13
DRAWN DATE
Checker
DISCIPLINE TEAM LEADER DATE
Approver
AUTHORISED FOR ISSUE DATE
PCB DEVELOPMENTS
LTD
BELLBROOK PROFESSIONAL
& THREATRE CENTRE
PERSPECTIVE - NW
SCALE AT
A3 SIZE
MASTER SITE NUMBER CLIENT REFERENCE NUMBER
Author 08/31/13
DRAWN DATE
Checker
DISCIPLINE TEAM LEADER DATE
Approver
AUTHORISED FOR ISSUE DATE
PCB DEVELOPMENTS
LTD
BELLBROOK PROFESSIONAL
& THREATRE CENTRE
PERSPECIVE VIEWS
SCALE AT
1:1 A3 SIZE
1. ENERGEX ARE EXPECTED TO SUPPLY AND INSTALL A 1. SUPPLY AND INSTALL NEW DISTRIBUTION SWITCHBOARDS TO 1. PROVIDE EXTERNAL LIGHTING AND 'ACCESS LIGHTS' AS
PADMOUNT TRANSFORMER LOCATED AS SHOWN ON THE THE NEW COMPLEX. NOTE: THE MECHANICAL SERVICES DETAILED ON THE ELECTRICAL DRAWINGS.
ELECTRICAL SITE PLAN. THE PADMOUNT TRANSFORMER IS SWITCHBOARD IS SPECIFIED AS PART OF THE MECHANICAL
REQUIRED TO BE INSTALLED 4 WEEKS BEFORE PRACTICAL SERVICES WORK. THE NEW ELECTRICAL SWITCHBOARDS ARE TO 2. THE EXTERNAL 'ACCESS LIGHTS' ARE TO BE CONTROLLED
COMPLETION AND THE INSTALLATION DATE IS PRESENTLY BE STANDARD ENERGEX APPROVED SWITCHBOARDS. FROM THE CENTRE MANAGEMENT, WHICH IS USUALLY BY A PE
NOMINATED AS 3RD NOVEMBER 2012. CELL AND 7 DAY, 24 HOUR TIME CLOCK (WITH BATTERY
SUPPLY AND INSTALL A CONCRETE FOUNDATION, ALL AS 2. PROVIDE 40KA, 8/20uS SURGE PROTECTION ON EACH NEW BACKUP) WIRED IN SERIES.
REQUIRED BY ENERGEX FOR THE TRANSFORMER INSTALLATION DISTRIBUTION SWITCHBOARD ON EACH PHASE AND NEUTRAL TO
USING THE ENERGEX COMMON EARTH ARRANGEMENT. THE GROUND. INSTALL AND PROTECT THE SURGE PROTECTION IN 3. PROVIDE ALL WIRING, CONTROLS AND CONDUITS NEEDED.
FOUNDATIONS SHALL BE IN ACCORDANCE WITH ENERGEX ACCORDANCE WITH THE MANUFACTURERS REQUIREMENTS. THE
REQUIREMENTS AS APPLICABLE TO THE SOIL CONDITIONS IN SURGE PROTECTION MUST HAVE FAILURE INDICATION VISIBLE 4. IN THE NEW ELECTRICAL SWITCHBOARDS, PROVIDE A
THAT LOCATION. ALL WORK BY THE CONTRACTOR RELATING TO THROUGH THE ESTCUTCHEON. PERMANENT WARNING LABEL NEXT TO ANY ACCESS LIGHTING
THE TRANSFORMER INSTALLATION AND FOUNDATIONS IS TO BE CONTROL RELAYS READING WARNING 240V CONTROL FROM
CARRIED OUT IN ACCORDANCE WITH ENERGEX'S 3. SUPPLY AND INSTALL A METAL DUCT OF DIMENSIONS AT LEAST THE ADMINISTRATION BLOCK.
REQUIREMENTS. SEE THE FOLLOWING INTERNET WEB SITE FOR 100MM WIDE BY 100MM DEEP ABOVE AND BELOW (WHEN
ENERGEX TECHNICAL DETAILS : APPLICABLE) EACH NEW SWITCHBOARD FOR USE ON INCOMING EMERGENCY LIGHTS TESTING
HTTP://WWW.ENERGEX.COM.AU/SERVICE_PROVIDERS/TECHNICA AND OUTGOING CABLING. THIS DUCT IS TO BE MADE FORM 1.6MM
L_DOCS/ASP/TECHNICAL_DOCUMENTS.ASP . THICK ZINC ANNEALED STEEL AND IS TO HAVE A SCREW FIXED 1. UPON COMPLETION, TEST THE EMERGENCY LIGHTING
LID. PAINT THE DUCT TO MATCH THE SURROUNDING WALL. INSTALLATION IN THE NEW 3 STOREY BLOCK TO CONFIRM THE
2. THE ELECTRICAL CONTRACTOR IS TO SUPPLY AND INSTALL EMERGENCY LIGHTS (INCLUDING EMERGENCY EXIT LIGHTS)
ALL LUGS, BOLTS AND FLEXIBLE CONNECTIONS TO CONNECT 4. ALL CIRCUIT BREAKERS ON THE NEW SWITCHBOARDS MUST ARE FULLY FUNCTIONAL AND ABLE TO BE DISCHARGE TESTED
THE NEW CONSUMERS MAINS TO THIS TRANSFORMER. HAVE A FAULT RATING OF AT LEAST 1OKA. USING THE TESTING CONTROLS AT THE GROUND LEVEL
ELECTRICAL DISTRIBUTION SWITCHBOARD DB1.
3. ALL REQUIRED ENERGEX CAPITAL CONTRIBUTIONS RELATING 5. PROVIDE CONTROL RELAYS IN THE NEW ELECTRICAL
TO THE SUPPLY OF THE PADMOUNT TRANSFORMER WILL BE DISTRIBUTION SWITCHBOARDS FOR EMERGENCY LIGHTING
PAID BY THE PRINCIPAL AND SO NEED NOT BE ALLOWED FOR BY MANUAL DISCHARGE TESTING. REFER TO ELECTRICAL DETAILS
THE CONTRACTOR. DRAWING(S).
HV CONDUITS AND CABLES 6. CONTROL ALL GENERAL LIGHTING AND CEILING FANS IN THE
1. ENERGEX WILL SUPPLY AND INSTALL THE REQUIRED HV NEW COMPLEX (EXCLUDING EMERGENCY LIGHTS, AND
CONDUITS AND CABLES TO THE TRANSFORMER SITE. CO- EXTERNAL LIGHTS) VIA CONTACTORS IN THE NEW DISTRIBUTION
ORDINATE WITH ENERGEX. SWITCHBOARDS AND THE ELECTRONIC SECURITY SYSTEM, SUCH
THAT WHEN THE ELECTRONIC SECURITY SYSTEM IN ARMED, ALL W.J. KITE 20AA
CONSUMERS MAINS THE GENERAL LIGHTING AND CEILING FANS IN THE BLOCK ARE DRAWN DATE
130921 CD E01.01 A
LEGEND
1 2 3 4 5 6 7 APPROVED COMMUNAL WALL
MOUNTED LIGHT FITTING,
D-DM: MOUNTED AT 3000mm AGFL
WIRE TO MASTER CONTROL (WATERPROOF)
IN PROJECTOR ROOM
COMMUNAL 2x36W CEILING
MOUNTED LIGHT FITTING
A LIGHT SWITCH
GPO -DOUBLE
EMERGENCY
B EXIT LIGHT
THORN ROUND
CEILING MOUNTED
RECESSED LIGHT
300 x 1200
LINE OF
WALL OVER
MSB'S
LINE OF
E
WALL OVER
W.J. KITE SEPT' 20AA
DRAWN DATE
WIRE EXTERNAL
SECURITY LIGHTING TO
LIFT CONTROL IN CENTRE
SHAFT MANAGEMENT
DISCIPLINE TEAM LEADER DATE
F
AUTHORISED FOR ISSUE DATE
PADMOUNT
PCB DEVELOPMENTS
TRANSFORMER LTD
BELLBROOK PROFESSIONAL
G & THREATRE CENTRE
H GROUND FLOOR -
ELECTRICAL PLAN
SCALE AT
1 : 250 A3 SIZE
1 GROUND FLOOR MASTER SITE NUMBER CLIENT REFERENCE NUMBER
H HYDRANT
H FHR H
D
65Ø 65Ø 65Ø 65Ø 65Ø 65Ø
FHR
AUTHORISED FOR ISSUE DATE
25Ø 25Ø 25Ø 25Ø 25Ø 25Ø
F PCB DEVELOPMENTS
40Ø 40Ø 40Ø 40Ø 40Ø 100Ø 40Ø LTD
BELLBROOK PROFESSIONAL
65Ø 65Ø 65Ø 65Ø 65Ø 65Ø & THREATRE CENTRE
FHR
H
G FIRE SERVICES
25Ø 25Ø 25Ø 25Ø 25Ø 25Ø BASEMENT FIRE LAYOUT
H SCALE
1 : 250
AT
A3 SIZE
BASEMENT LEVEL - SPRINKLER SYSTEM GROUND LEVEL DRAWING NUMBER ISSUE SHEET NO
130921 CD F01.01 A
SCALE 1 : 250
LEGEND
1 2 3 4 5 6 7 ALARM / SIREN
CO2 SUPPRESSION
NOZZLES
H HYDRANT
A PIPE: NOMINAL 25Ø
25Ø
BORE SIZE
SPRINKLER HEADS
40Ø
25Ø 25Ø
H
25Ø
FHR FHR D
40Ø H
S S
A
B
SUSPEND DRAINAGE
FROM GROUND FLOOR
150Ø
LEVEL TO U/S OF SLAB
S DRAINAGE FROM
REFRESHMENTS
S S S S C
100Ø
BASEMENT
150Ø
0Ø
15
PLUMBING DUCT
150Ø
OF SLAB
200Ø
GRATED
DRAINS
PCB DEVELOPMENTS
150Ø
AT GROUND
ACROSS FLOOR LEVEL
STAIRWELL No 3 LTD
OPENINGS 80Ø VENT TO BELLBROOK PROFESSIONAL
ROOF 150Ø & THREATRE CENTRE
DP G
DP SWC HYDRAULICS PLAN
DP
H
SWC SWC 200Ø IOS
SCALE AT
1 : 250 A3 SIZE
BASEMENT AIR MASTER SITE NUMBER CLIENT REFERENCE NUMBER
EXHAUST
EQUIPMENT & 1 HYDRAULICS SERVICES PLAN DRAWING NUMBER ISSUE SHEET NO
WC 40Ø
FWG
100Ø
40Ø
FWG
WC
100Ø
40Ø 2 PART GROUND FLOOR PLAN
A02.06
100Ø TOWER BLOCK
SCALE 1 : 50
WC
IOS
SUSPEND PLUMBING
LINES TO U/S SLAB
100Ø IOS
40Ø
VB WC URINAL VB
W.J. KITE SEPT' 20AA
100Ø 100Ø VB FWG
WC DRAWN DATE
40Ø 40Ø
WC WC HYDRAULIC SERVICES
IOS IOS GND FLOOR DRAINAGE
D SCALE AT
1 : 50 A3 SIZE
MASTER SITE NUMBER CLIENT REFERENCE NUMBER
AIR CONDITIONING
DISCHARGE GRILLE
RA
RETURN AIR GRILLE
RA RA
RA RA
PLANT
D
VRV-EC VRV-EC
AHU RA ROOM
AHU RA AHU VRV-EC VRV-EC AHU
MALE
E Author
DRAWN
09/26/13
DATE
RA Checker
TEA RM FUTURE DUCTING
RA
TO TENANTS DISCIPLINE TEAM LEADER DATE
FEMALE REQUIREMENTS
LIFT Approver
FOYER
G
MECHANICAL SERVICES
FIRST FLOOR / THEATRE
H SCALE AT
1 : 250 A3 SIZE
MASTER SITE NUMBER CLIENT REFERENCE NUMBER
OVERFLASHING &
UPSTAND: FLANGE:
STAINLESS STEEL STAINLESS STEEL
COVER FLASHING:
CFW TO GALV POST
OVERFLASHING:
STAINLESS STEEL.
SECURE WITH M6
FLANGES WELDED S.S. BOLTS
TO UPSTAND
FLASHING UPSTAND FLASHING
FLANGE:
PAVERS SECURE WITH 2No M6
S.S. BOLTS
ROOFING MEMBRANE
TO BOLTS
AUTHORISED FOR ISSUE DATE
PCB DEVELOPMENTS
LTD
BELLBROOK PROFESSIONAL
& THREATRE CENTRE
IB1
IB1
SJ:
GB1
IB1
IB1
IB1
IB1
GB1
(FULL LENGTH OF
IB1
SLAB BETWEEN
COLUMNS
IB1
D
SJ: KCJ: KCJ:
(FULL LENGTH OF (FULL LENGTH OF (FULL LENGTH OF
SLAB BETWEEN SLAB BETWEEN SLAB BETWEEN
COLUMNS COLUMNS COLUMNS
150
IB1
E
SJ:
(FULL LENGTH OF IB1
SLAB BETWEEN KCJ:
(FULL LENGTH OF
COLUMNS W.J. KITE SEPT' 20AA
SLAB BETWEEN
IB1 COLUMNS DRAWN DATE
SJ: 1
(FULL LENGTH OF S02.01 AUTHORISED FOR ISSUE DATE
SLAB BETWEEN
COLUMNS PCB DEVELOPMENTS
IB1
G LTD
BELLBROOK PROFESSIONAL
IB1 & THREATRE CENTRE
H
2-N16 @ 50 CRS. TIE EXTRA GB1
BARS TO U/S OF SLAB FABRIC BASEMENT SLAB
FRAMING PLAN
SLAB
SCALE AT
DENOTES SLAB MINIMIUM THICKNESS OF 1 : 250 A3 SIZE
150
1 BASEMENT SLAB FRAMING PLAN 150 WITH SL92 MESH CENTRAL MASTER SITE NUMBER CLIENT REFERENCE NUMBER
130921 CD S01.01 A
1 2 3 4 5 6 7 SLAB LEGEND
DENOTES SLAB MINIMIUM
EB1 ### THICKNESS OF '###'
REFER TO SLAB PLAN
A REFER TO ARCHITECTURAL
DRAWINGS FOR LOCATION OF
FALLS AND STEPS IN SLAB.
B NOTE:
GROUND FLOOR SLAB &
REINFORCEMENT DETAILS ARE
APPLICIABLE TO TOWER BLOCK
SLAB & REINFORCEMENT DETAILS
EB1
IB2
EB1
IB2
IB2
IB2
VOID:
IB2
STAIRWELL
No 1
IB2
D
3
1 S02.02
S02.02 2 200
S02.02
E
IB2 IB2
VOID:
STAIRWELL 150
No 2
W.J. KITE SEPT' 20AA
VOID: DRAWN DATE
LIFT SHAFT
F DISCIPLINE TEAM LEADER DATE
VOID:
STAIRWELL
AUTHORISED FOR ISSUE DATE
No 4
PCB DEVELOPMENTS
LTD
VOID:
G BELLBROOK PROFESSIONAL
STAIRWELL
& THREATRE CENTRE
No 3
H
FOR REINFORCEMENT EB1
REFER TO SLAB TOP & SLAB GROUND FLOOR SLAB
BOTTOM DENOTES SLAB MINIMIUM THICKNESS. REFER FRAMING PLAN
REINFORCEMENT PLANS 200 TOP & BOTTOM SLAB REINFORCEMENT PLANS SCALE AT
FOR REINFORCEMENT. 1 : 250 A3 SIZE
1 GROUND FLOOR SLAB FRAMING PLAN SHADED AREA DENOTES SLAB SETDOWN
AREAS.
MASTER SITE NUMBER
DRAWING NUMBER
CLIENT REFERENCE NUMBER
ISSUE SHEET NO
SCALE 1 : 250 NOTE: USE SLAB & REINFORCEMENT DETAILS FOR
TOWER BLOCK FLOOR SLAB CONSTRUCTION. 130921 CD S01.02 A
1 2 3 4 5 6 7
A
A A A A A A
B
A A A A A A
B
A
A
A
A
A A A A A A
C
A A A A A A
B B B B B B
D
B B B B B B
1
A
A
B
B
A
S02.02 2
B S02.02 B B B B B
E
3
S02.02
A A A A A A
W.J. KITE SEPT' 20AA
DRAWN DATE
A A A A A A
F DISCIPLINE TEAM LEADER DATE
B
B
A
A
A
A
AUTHORISED FOR ISSUE DATE
A A A A A A PCB DEVELOPMENTS
LTD
G BELLBROOK PROFESSIONAL
A A A A A A & THREATRE CENTRE
H
NOTES
* N12 - 200 DISTRIBUTION STEEL EACH WAY U.N.O. GROUND FLOOR TOP
* LAP ALL BOTTOM STEEL AT SUPPORTS REINFORCEMENT PLAN
* LAP ALL TOP STEEL AT MIDSPAN
ALL ELECTRICAL CONDUITS ARE TO BE LOCATED AT MID- SCALE AT
A3 SIZE
1 : 250
1 GROUND FLOOR TOP REINFORCEMENT PLAN HEIGHT OF SUSPENDED SLAB
TAG REINFORCEMENT
MASTER SITE NUMBER CLIENT REFERENCE NUMBER
B
A A A A A A
A
A
A
C
D
A A A A A A
1
A
A
A
A
S02.02 2
S02.02
E
3
S02.02
W.J. KITE SEPT' 20AA
DRAWN DATE
A A A A A A
F DISCIPLINE TEAM LEADER DATE
A
A
A
A
AUTHORISED FOR ISSUE DATE
PCB DEVELOPMENTS
LTD
G BELLBROOK PROFESSIONAL
& THREATRE CENTRE
H
NOTES
* N12 - 200 DISTRIBUTION STEEL EACH WAY U.N.O. GROUND FLOOR BTM
* LAP ALL BOTTOM STEEL AT SUPPORTS REINFORCEMENT PLAN
* LAP ALL TOP STEEL AT MIDSPAN
ALL ELECTRICAL CONDUITS ARE TO BE LOCATED AT MID- SCALE AT
A3 SIZE
1 : 250
HEIGHT OF SUSPENDED SLAB MASTER SITE NUMBER CLIENT REFERENCE NUMBER
R1
B
WALL:
PRECAST
CONCRETE TILT
UP PANEL
C
JR1
WALL:
PRECAST
CONCRETE TILT WP
UP PANEL
D
R1
P2
COL-1 TP E
R1 PLANT PLATFORM: 3 RB1
P3
REFER TO DWG S02.02
A07.02
TP W.J. KITE SEPT' 20AA
P1
P2 TP DRAWN DATE
R1 TP TP
P2
RB1 AUTHORISED FOR ISSUE DATE
RLB1 WP TP
R1
RLB1
P2 PCB DEVELOPMENTS
TP
COL-1 P2 LTD
2 G BELLBROOK PROFESSIONAL
S03.01 3 & THREATRE CENTRE
R1 S03.01
COL-1
H
TP
1 STRUCTURAL STEEL
ROOF FRAMING SCHEDULE ROOF FRAMING SCHEDULE
S03.01 ROOF PLAN
KEYNOTE STRUCTURAL MEMBER SIZE KEYNOTE STRUCTURAL MEMBER SIZE
SCALE AT
JR JACK RAFTER 360UB40 RB1 ROOF BEAM 1 200UB30 As indicated A3 SIZE
1 ROOF PLAN P1 PURLIN Z20019 RB2 ROOF BEAM 2 300PFC MASTER SITE NUMBER CLIENT REFERENCE NUMBER
W.P.M
D 50
REINFORCEMENT
REFER TO PLAN AND
SCHEDULE
W WPM WPM
C.B
2 DETAIL
S01.01 450 COG
GROUND EDGE BEAM GB1
TYP
SCALE 1 : 20
SLAB MESH
SIZE AND
CB REINFORCEMENT REFER
W.P.M W.P.M
N12 AT 400 'Z' BARS TO SCHEDULE
TYPICAL
D
REINFORCEMENT
REFER TO PLAN
1 DETAIL
S01.01
W PF1 at INTERSECTION OF IB1
SCALE 1 : 20
3 DETAIL W.J. KITE
DRAWN
SEPT' 20AA
DATE
S02.01
INTERNAL BEAM IB1 FOOTING SCHEDULE - BASEMENT
SCALE 1 : 20 MARK DESCRIPTION SIZE REINFORCEMENT DISCIPLINE TEAM LEADER DATE
GB1 GROUND EDGE 400D x 300W 2-N20 TOP & BTM, R10
WALL STARTER BARS
REINFORCEMENT
BEAM LIGS AT 600 CRS UNO AUTHORISED FOR ISSUE DATE
REFER SCHEDULE IB1 INTERNAL 400D x 300W 2-N20 TOP & BTM, R10 PCB DEVELOPMENTS
BEAM LIGS AT 600 CRS UNO
BASEMENT SLAB MESH LTD
FLOOR LINE REFER TO SLAB PLAN PF1 PAD FOOTING 2000W x 2000L x 11/N20 EACH WAY
900D BOTTOM 'U' BARS BELLBROOK PROFESSIONAL
150
COLUMN SCHEDULE
REINFORCEMENT MARK DESCRIPTION SIZE REINFORCEMENT
REFER TO PLAN AND CONCRETE DETAILS -
COL-1 REINF 300W x 660L 6/N28 VERTICAL, R10
SCHEDULE CONCRETE LIGS @ 300 CRS BASEMENT LEVEL
W
COLUMN SCALE AT
1 : 20 A3 SIZE
D
N16 @ 400 'Z' BARS REINFORCEMENT:
D
1 DETAIL 2 DETAIL
S01.02 S01.02
GROUND FLOOR EDGE BEAM EB1 GROUND FLOOR INTERNAL BEAM IB2
SCALE 1 : 20 SCALE 1 : 20
E
W.J. KITE SEPT' 20AA
DRAWN DATE
REINFORCEMENT EB1 EDGE BEAM 500D x 300W 2-N20 TOP & 3-N20 BTM,
REFER SCHEDULE R10 LIGS AT 600 CRS
N16 @ 400 'Z' BARS UNO AUTHORISED FOR ISSUE DATE
S01.02 GROUND FLOOR INTERNAL BEAM w/ WALL OVER N16 @ 400 CRS HORIZONTAL DRAWING NUMBER ISSUE SHEET NO
CONTINIOUS THROUGH
ISOLATION JOINT 1
JOINT
NOTE
T 150
WHEN THE DISTANCE BETWEEN THE JOINTS IS GREATER
THAN 10 METRES PROVIDE A 25 WIDE JOINT AND FINISH
JOINT FILLER 15mm BELOW SLAB LEVEL.
PROVIDE A BOND BREAKER TAPE TO TOP OF JOINT FILLER
SJ
(25mm WIDE POLYETHYLENE TAPE). SAWN JOINT
PCB DEVELOPMENTS
0
50
LTD
'A'
BELLBROOK PROFESSIONAL
& THREATRE CENTRE
'A'
250 BEAM
MIN
200
150
200x200x13 EA
100 LONG
1-M20 BOLT / FERRULE
400 225 EACH LEG
1-N16 ANCHOR
SHEAR BAR
AROUND FERRULE
PLAN at PANEL JOINTS 40 COVER
TILT-UP CONCRETE
WALL PANELS
1 TILT PANEL DETAILS
CORNER JOINTS
1 M20 FERRULE, SCALE 1 : 10
96mm LONG 1-N16 PERIMETER
EACH PANEL BAR
END
1-N16 ANCHOR SHEAR
BAR AROUND FERRULE
RAM PACK DRY 40 COVER
GROUT FULL W.J. KITE SEPT' 20AA
LENGTH OF DRAWN DATE
SOFFIT
1 RLB1
2-M12 PURLIN BOLTS
TO 6PL CLEAT COL-2
ROOF SHEETING
PRECAST 4 SECTION
S03.01 200 x 6PL GUTTER
CONCRETE TILT SCALE 1 : 10 SUPPORTS CFW TO
UP PANEL
RLB1
2 4
S03.01
RB1
R1
R1
165 x 150 x 10PL:
CFW TO RLB1
RLB1
4-M16 BOLTS TO R1
165 x 200 x 10PL CFW 300L x 100 x 10PL CFW
TO R1 TO COL-2
2-M16 BOLTS TO RB1 SOFFIT: 2-M16 BOLTS TO RLB1
REFER TO ARCH DWGS GF Ceiling W.J. KITE SEPT' 20AA
75 x 75 x 6EA 2-M20 CEILING: RLB1 ANGLE CLEAT: 103.000 DRAWN DATE
CHEMSET ANCHORS REFER TO ARCH
300L x 100 x 10PL CFW 250 x 250 x 5 CFW TO
TO WALL. DWGS
TO COL-2 300PFC COL-2
2-M16 BOLTS TO R1 2-M16 BOLTS TO RLB1 2-M16 TO ROOF BEAM DISCIPLINE TEAM LEADER DATE
GF Ceiling
103.000 COL-2
4
AUTHORISED FOR ISSUE DATE
S01.05 S01.05
STD COL-2 FIXINGS STD COL-2 FIXINGS DRAWING NUMBER ISSUE SHEET NO