Prefabricated Data Center Solution

Felicity BigData, Jessore


Felicity BigData DC Technical Requirements

 Uptime Tier III Certification (Design);

 Design Target PUE: 1.6;

 164 racks for phase 1 and 328 racks for all phases;

 78 CT racks and 86 IT racks for phase I & II

 2.3MW power capacity for phase1 and 4.6MW in total;

 1730 Sqm land space for data center use;

 Chilled Water System for DC cooling;

 2N redundant UPS systems and 10 mins backup each system.

2
Configuration Summary
Item Phase I Phase II

Prefabricated building 3 layer 3065㎡ —

IT: 43(6kW)+43(9.5kW) IT: 43(6kW)+43(9.5kW)


Rack(pcs)
CT: 40(6kW)+38(10kW) CT: 40(6kW)+38(10kW)
IT: 4(86 racks) IT: 4(86 racks)
Module DC (pcs)
CT: 4(78 racks) CT: 4(78 racks)

GEN 3 sets 1600kW,2+1 redundancy 1 set 1600kW; 3+1 redundancy

Transformer
2 sets 2000kVA 1 sets 2000kVA
(dry type)
IT: 2*800KVA IT: 2*800KVA
UPS system for IT&CT CT:2*800KVA CT:2*800KVA
2N redundancy 2N redundancy
Single system: 200KVA Single system: 200KVA
Mechanical UPS
1 system, N+1 redundancy 1 system, N+1 redundancy
8 sets TP482000B 8 sets TP482000B
CT Rectifier
2N redundancy 2N redundancy
Data Hall 1: 7 CRAC Cooling(6+1 redundant) Data Hall 1: 7 CRAC Cooling(6+1 redundant)
CRAH
Data Hall 2: 7 CRAC Cooling(6+1 redundant) Data Hall 2: 7 CRAC Cooling(6+1 redundant)

Chiller 3*825KW(2+1 redundancy) 2*825KW(4+1 redundancy)

3
All Phases Site Design 3D Overview

Summary:
1. 1728 sqm(71m*24m)for whole data center site.
2. Building area is 1201 sqm for DC
3. 527 sqm for Guard Room, Road and others
4. White Area:1000 sqm (two floor space for white area)
5. 14 m high for DC building
6. 50 Years lifespan for whole building
4
7. Zone 3 seismic protection.
All Phases Site Design 3D Overview

Summary:
1. 1728 sqm(71m*24m)for whole data center site.
2. Building area is 1201 sqm for DC
3. 527 sqm for Guard Room, Road and others
4. White Area:1000 sqm (two floor space for white area)
5. 14 m high for DC building
6. 50 Years lifespan for whole building
5
7. Zone 3 seismic protection.
Site Design Layout for All Phase
Ground Floor: 250 Sqm for
DG & Oil tank; DG: 4*1600kW

Thermal
Parking & Road Area: 527 Sqm Storage Tank
24 m

Chiller
5*825kW
Data Hall Phase 2 Data Hall Phase 1 Auxiliary
86 IT racks & 78 CT racks 86 IT racks & 78 CT racks Function Area

71 m Frist Floor: 427 Sqm for


chiller system & water
6 tank
Data Center Internal Design

Data Hall
 Totally 4 data halls in all
phases.
 CT:2 data hall, totally
156 racks
 IT: 2 data hall, totally 172
Power Room
racks  Totally 5 power rooms, 2N
redundant.
 4*800kVA UPS system 7
with 10 mins backup time.
Phase I: Ground Floor Layout

NOC
Phase II Phase I

Corridor Corridor Corridor

Reception
Room Experience
Power Power Power
Centre
Room 1A Room 1B Room for
Mechanical
Generator
Room

MMR
BAT. BAT.

ELV
Room 1B Room 1A Toilet
Phase II: Ground Floor Layout

Phase II Phase I

Corridor
BAT.
Room 2A Generator
Room
Power BAT.
Power
Room 2B Room 2B
Room 2A
Phase I: First Floor Layout

Manger Meeting
office Room

Phase II Phase I
Office

Corridor Corridor Corridor

CT: Data Hall 1A Store &


Staging Power
Room Room
Chiller plant
3 Chillers
Reserved in Corridor
Phase II

MMR
ELV
Toilet
78 Racks
Phase II: First Floor Layout

Phase II Phase I

Corridor

CT: Data Hall 2A

Chiller plant
2 Chillers

78 Racks
Phase I: Second Floor Layout

Thermal
Storage Tank

Corridor
Corridor Corridor
IT: Data Hall 1B
Pump
Room

Reserved in Corridor
Phase II

Staff Dorm Toilet


12 Person

86 Racks
Phase II: Second Floor Layout

Phase II Phase I

Corridor

IT: Data Hall 2B

86 Racks
Power System Topology

TR A G DG R TR C TR B
G DG 1 G DG 3 G DG 2

TR DB GCB-R TR DB TR DB

ATS ATS ATS ATS ATS ATS

LT Panel LT Panel LT Panel LT Panel LT Panel LT Panel

UPS UPS UPS UPS UPS ATS Other UPS UPS UPS UPS
Load

Chiller
rectifier AC PDF AC PDF rectifier rectifier AC PDF AC PDF rectifier

CRAC
AC PUMP AC
DC PDF RACK DC PDF DC PDF RACK DC PDF

DC
Phase I & II DC
RACK Mechanical RACK

Phase I Phase II
Power Subsystem | Capacity & Configuration Calculation——Phase I
Total Reactive Apparent
Rated Need Power
Category Devices Quantity Power power(Q) power(S)
Power Facter Factor
(kW) kVAR kVA
IT load 682.5 1 1 0.95 683 224.33 718.42
DCIM load 11.94 1 1 0.95 12 3.92 12.57
IT UPS charging power 68.28 1 1 0.99 68 9.73 68.97
IT UPS loss 31.28 1 1 0.99 31 4.46 31.60
ICT Load IT UPS charging power 68.28 1 1 0.99 68 9.73 68.97
CT UPS loss 28.68 1 1 0.99 29 4.09 28.97
CT Load 620 1 1 0.99 620 88.35 626.26
Rectifier charging power 0 1 1 0.99 0 0.00 0.00
Rectifier loss 31.00 1 1 0.99 31 4.42 31.31
LV system loss
15.42 1 1 0.99 15.41953 2.20 15.58
Total load 1557.37 351.21 1596.48
Reactive compensation 0.00
Capacity after compensation 0.98 1557.37 351.21 1596.48
Main circuit breaker(A) 3200
Transformer Type (kVA) 2000
T&G Final selection Generator Type PRP/DCP(kW) 1600
Transformer Actual Load Rate 80%
Generator Actual Load Rate 97%
Power Subsystem | Capacity & Configuration Calculation——Phase II
Total Reactive Apparent
Rated Need Power
Category Devices Quantity Power power(Q) power(S)
Power Facter Factor
(kW) kVAR kVA
IT load 666.5 1 1 0.95 667 219.07 701.58
DCIM load 0 1 1 0.95 0 0.00 0.00
IT UPS charging power 68.28 1 1 0.99 68 9.73 68.97
IT UPS loss 31.28 1 1 0.99 31 4.46 31.60
ICT Load IT UPS charging power 68.28 1 1 0.99 68 9.73 68.97
CT UPS loss 28.68 1 1 0.99 29 4.09 28.97
CT Load 620 1 1 0.99 620 88.35 626.26
Rectifier charging power 0 1 1 0.99 0 0.00 0.00
Rectifier loss 31.00 1 1 0.99 31 4.42 31.31
LV system loss
15.14 1 1 0.99 15.14013 2.16 15.29
Total load 1529.15 341.99 1566.93
Reactive compensation 0.00
Capacity after compensation 0.98 1529.15 341.99 1566.93
Main circuit breaker(A) 3200
Transformer Type (kVA) 2000
T&G Final selection Generator Type PRP/DCP(kW) 1600
Transformer Actual Load Rate 78%
Generator Actual Load Rate 96%
Power Subsystem | Capacity & Configuration Calculation——ME load
Reactive Apparent
Need Power Total Power
Category Devices Rated Power Quantity power(Q) power(S)
Facter Factor (kW)
kVAR kVA
A/C Power consumption 137.8 1 1 0.9 137.8 66.74 153.11
FAHU 20 1 1 0.85 20 12.39 23.53
dehumidifier 15 1 1 0.85 15 9.30 17.65
Fire damper 1 1 1 0.85 1 0.62 1.18
Chiller 1114.8 1 1 0.9 1114.8 539.92 1238.67
Mechanical Load
Chiller Water Pump 88 1 1 0.85 88 54.54 103.53
Fixed-pressure water refill device 0.5 1 1 0.9 0.5 0.24 0.56
Exhaust fan 3 1 1 0.85 3 1.86 3.53
ME UPS charging power 40.00 1 1 0.99 40 5.70 40.40
ME UPS Loss 17.37 1 1 0.99 17.36842 2.47 17.54
lighting 30 1 1 0.9 30 14.53 33.33
Firefighting 2 1 1 0.8 2 1.50 2.50
Others Sockets 10 1 0.5 0.95 5 1.64 5.26
Otherload(office+gen AUX) 80 1 1 0.9 80 38.75 88.89
LV system loss 15.59 1 1 0.99 15.59468 2.22 15.75
Total load 1570.06 752.43 1741.05
Reactive compensation 300.00
Capacity after compensation 0.96 1570.06 452.43 1633.95
Main circuit breaker(A) 3200
Transformer Type (kVA) 2000
T&G Final selection Generator Type PRP/DCP(kW) 1600
Transformer Actual Load Rate 82%
Generator Actual Load Rate 98%
Delivery time influencing factors

1. Land selection confirm


2. Site permission ready
3. Civil work construction progress

4. Substation ready
5. Electricity acquire ready time
6. Power supply capacity

7. Requirements and Design confirm


8. Brand choosing
9. Customs clearance time
Full Turn Key Project Delivery for FBD

All Civil Construction ELV system for Generator System


& including main fuel Prefabricated DC (not include the
tanks (Lightings, sockets) foundation)

Commercial power HVAC for Prefabricated Fire Extinguish System


application DC for Prefabricated DC

HT power & Bus bar, Containment, Network Equipment


Transformer Cable tray and fiber slot (Router Switch ODF)

LT Panel & Power CCTV & Access control


Racks and Containment
Distribution System for Data Center

DCIM
UPS & Battery System UPTIME Tier Certificate
(Monitor system)