Monitoring Baluster Lamp Balcony Level 2 and 3 All Guest Room ANDAZ Bali

Update : 16 Agustus 2022


Kondisi
Update Kondisi Saat ini
Total Lampu Sebelumnya
NO RINCIAN Penggantian Keterangan
Baluster
Nyala Mati Lampu Nyala Mati

1 Building Ga ( Dangin J )
Area Koridor Lt 2 1 Ballast 4 4 0 4 0
Area Balkon Lt 2 1 Ballast 14 14 0 14 0
2 Building Gb ( Dangin H )
Area Koridor Lt 2 1 Ballast 4 4 0 4 0
Area Balkon Lt 2 1 Ballast 14 10 4 14 0
3 Building Gc ( Dangin G )
Area Koridor Lt 2 1 Ballast 4 4 0 4 0
Area Balkon Lt 2 1 Ballast 14 14 0 14 0
4 Building Gd ( Dangin F )
Area Koridor Lt 2 1 Ballast 4 4 0 4 0
Area Balkon Lt 2 1 Ballast 14 14 0 14 0
5 Building Ge ( Daja D )
Area Koridor Lt 2 1 Ballast 4 0 4 4 4 0
Area Balkon Lt 2 1 Ballast 14 0 14 14 0 Ganti Ballast
6 Building Gf ( Daja C )
Area Koridor Lt 2 1 Ballast 4 0 4 4 4 0
Area Balkon Lt 2 1 Ballast 14 14 0 14 0
7 Building H ( Daja A )
Pagar Lift Lt 1,2,3 1 Ballast 15 15 0 15 0
Koridor Lt 2 1 Ballast 51 27 0 27 0
Koridor Lt 3 24 0 24 0
Balkon Lt 2 1 Ballast 60 36 0 36 0
Balkon Lt 3 6 18 18 24 0
8 Building Ja ( Delod N )
Pagar Lift Lt 1,2,3 1 Ballast 6 2 4 4 6 0
Koridor Lt 2 1 Ballast 30 15 0 0 15 Lampu dipindah ke Balkon
Koridor Lt 3 15 0 12 3 Lampu dipindah ke Balkon
Balkon Lt 2 1 Ballast 42 0 27 18 9 7201
Balkon Lt 3 15 0 15 0
9 Building Jb ( Daja B )
Pagar Lift Lt 1,2,3 1 Ballast 6 6 0 6 0
Koridor Lt 2 1 Ballast 32 17 0 17 0
Koridor Lt 3 15 0 15 0
Balkon Lt 2 1 Ballast 42 27 0 27 0
Balkon Lt 3 15 0 15 0
10 Building Jc ( Daja E )
Pagar Lift Lt 1,2,3 1 Ballast 6 6 0 6 0
Koridor Lt 2 1 Ballast 33 17 0 17 0
Koridor Lt 3 16 0 16 0
Balkon Lt 2 1 Ballast 42 12 15 10 22 5 2209
Balkon Lt 3 13 2 15 0
11 Building E
Balkon Barat 1 Ballast 20 0 20 20 0 Ganti Ballast
Balkon Timur 1 Ballast 10 0 10 10 0 Ganti Ballast
12 Building F
Koridor F1A 1 Ballast 15 2 13 13 15 0
Balkon F1A 1 Ballast 9 9 9 9 0
Balkon F1 2 Ballast 6 6 6 Lampu blm pernah terpasang

Total Lampu 533 383 150 62 495 38

SUMMARY
DEFECT SNAGLIST Baluster

TOTAL DONE NOT DONE

533 495 38

Persentase 93% 7%