Republic of the Philippines

Department of Public Works and Highways


UNIFIED PROJECT MANAGEMENT OFFICE
Roads Management Cluster I - Bilateral
2nd Street, Port Area, Manila

PUNCHLIST OF DEFECTS/DEFICIENCIES
DATE OF INSPECTION: _________________________

Project Name : CONTRACT PACKAGE 2 - URGENT REHABILITATION OF TRANSCENTRAL ROADS PROJECT


Location : MARAWI CITY, LANAO DEL SUR

WORK STATION
ITEM DESCRIPTION LOCATION NOTED DEFECIENCIES REMARKS / RECOMMENDATIONS
NO. From To
311 PCCP 0+015.00 0+015.00 C/L MINOR POTHOLES (1" DIA.) RECTIFIED
311 PCCP 0+083.00 0+083.00 R/S MINOR POTHOLES (1.5" DIA.) RECTIFIED
311 PCCP 0+089.00 0+089.00 L/S INADEQUATE SEALANT IN JOINT RECTIFIED
311 PCCP 0+108.00 0+108.00 L/S MINOR SCALING RECTIFIED
311 PCCP 0+136.00 0+136.00 R/S INADEQUATE SEALANT IN JOINT RECTIFIED
311 PCCP 0+211.00 0+211.00 R/S TRANSVERSE CRACK RECTIFIED
311 PCCP 0+215.00 0+215.00 R/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 0+230.00 0+230.00 C/L MINOR SPALLING RECTIFIED
311 PCCP 0+300.00 0+300.00 L/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 0+329.00 0+369.00 L/S RAIN DAMAGED RECTIFIED
311 PCCP 0+380.00 0+380.00 R/S POTHOLES (2" DIA.) RECTIFIED
311 PCCP 0+410.00 0+410.00 R/S POTHOLES (4" DIA.) RECTIFIED
311 PCCP 0+484.00 0+484.00 C/L INSUFFICIENT SEALANT RECTIFIED
311 PCCP 0+510.00 0+510.00 L/S MINOR POTHOLES RECTIFIED
311 PCCP 0+550.00 0+550.00 C/L INSUFFICIENT SEALANT RECTIFIED
311 PCCP 0+613.00 0+613.00 L/S SCOURING RECTIFIED
311 PCCP 0+722.00 0+722.00 L/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 0+779.00 0+779.00 R/S TRANSVERSE CRACK within 1.5m from WPJ RECTIFIED
311 PCCP 0+801.00 0+801.00 C/L SPALLING RECTIFIED
311 PCCP 0+852.00 0+852.00 R/S POTHOLES (3" DIA.) RECTIFIED
311 PCCP 0+868.00 0+868.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 0+910.00 0+910.00 R/S TRANSVERSE CRACK RECTIFIED
311 PCCP 0+960.00 0+960.00 R/S POTHOLES (3" DIA.) RECTIFIED
311 PCCP 0+980.00 0+980.00 R/S MINOR POTHOLES RECTIFIED
311 PCCP 0+990.00 0+990.00 R/S MINOR POTHOLES RECTIFIED
311 PCCP 1+055.00 1+055.00 R/S TRANSVERSE CRACK RECTIFIED
311 PCCP 1+075.00 1+075.00 R/S HARDENED CEMENT SPOILAGE RECTIFIED
Republic of the Philippines
Department of Public Works and Highways
UNIFIED PROJECT MANAGEMENT OFFICE
Roads Management Cluster I - Bilateral
2nd Street, Port Area, Manila

PUNCHLIST OF DEFECTS/DEFICIENCIES
DATE OF INSPECTION: _________________________

Project Name : CONTRACT PACKAGE 2 - URGENT REHABILITATION OF TRANSCENTRAL ROADS PROJECT


Location : MARAWI CITY, LANAO DEL SUR

WORK STATION
ITEM DESCRIPTION LOCATION NOTED DEFECIENCIES REMARKS / RECOMMENDATIONS
NO. From To
311 PCCP 1+085.00 1+085.00 R/S TRANSVERSE CRACK within 1.5m from WPJ RECTIFIED
311 PCCP 1+185.00 1+185.00 L/S MINOR POTHOLES RECTIFIED
311 PCCP 1+256.00 1+256.00 C/L SPALLING RECTIFIED
311 PCCP 1+272.00 1+272.00 L/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 1+302.00 1+302.00 L/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 1+319.00 1+319.00 R/S MINOR POTHOLES RECTIFIED
311 PCCP 1+590.00 1+590.00 R/S MINOR POTHOLES RECTIFIED
311 PCCP 1+690.00 1+690.00 R/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 1+693.00 1+693.00 R/S MINORS SCALING RECTIFIED
311 PCCP 1+710.00 1+710.00 B/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 1+725.00 1+725.00 R/S TRANSVERSE CRACK RECTIFIED
311 PCCP 1+754.00 1+754.00 R/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 1+915.00 1+915.00 R/S SPALLING RECTIFIED
311 PCCP 1+930.00 1+930.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+035.00 2+035.00 R/S HARDENED MORTAR SPOILAGE RECTIFIED
311 PCCP 2+044.00 2+044.00 R/S MINOR POTHOLES RECTIFIED
311 PCCP 2+060.00 2+060.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+144.00 2+144.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+153.00 2+153.00 R/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+156.00 2+156.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+168.00 2+168.00 L/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 2+185.00 2+185.00 L/S TRANSVERES CRACK within middle third RECTIFIED
311 PCCP 2+190.00 2+190.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+215.00 2+215.00 R/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+416.00 2+416.00 R/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+462.00 2+462.00 R/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 2+480.00 2+480.00 R/S MINOR POTHOLES RECTIFIED
Republic of the Philippines
Department of Public Works and Highways
UNIFIED PROJECT MANAGEMENT OFFICE
Roads Management Cluster I - Bilateral
2nd Street, Port Area, Manila

PUNCHLIST OF DEFECTS/DEFICIENCIES
DATE OF INSPECTION: _________________________

Project Name : CONTRACT PACKAGE 2 - URGENT REHABILITATION OF TRANSCENTRAL ROADS PROJECT


Location : MARAWI CITY, LANAO DEL SUR

WORK STATION
ITEM DESCRIPTION LOCATION NOTED DEFECIENCIES REMARKS / RECOMMENDATIONS
NO. From To
311 PCCP 2+510.00 2+510.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+533.00 2+533.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+564.00 2+564.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+573.00 2+573.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+584.00 2+584.00 L/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 2+591.00 2+591.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+592.00 2+592.00 L/S TRANSVERSE CRACK within middle third RECTIFIED
311 PCCP 2+599.00 2+599.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+605.00 2+605.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+616.00 2+616.00 L/S TRANSVERSE CRACK within 1.5m from WPJ RECTIFIED
311 PCCP 2+630.00 2+630.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+637.00 2+637.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+644.00 2+644.00 R/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+661.00 2+661.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+677.00 2+677.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+684.00 2+684.00 B/S TRANSVERSE CRACK within 1.5m from WPJ RECTIFIED
311 PCCP 2+688.00 2+688.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+703.00 2+703.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+709.00 2+709.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+712.00 2+712.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+716.00 2+716.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+720.00 2+720.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+725.00 2+725.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+729.00 2+729.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+733.00 2+733.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+775.00 2+775.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+788.00 2+788.00 L/S TRANSVERSE CRACK RECTIFIED
Republic of the Philippines
Department of Public Works and Highways
UNIFIED PROJECT MANAGEMENT OFFICE
Roads Management Cluster I - Bilateral
2nd Street, Port Area, Manila

PUNCHLIST OF DEFECTS/DEFICIENCIES
DATE OF INSPECTION: _________________________

Project Name : CONTRACT PACKAGE 2 - URGENT REHABILITATION OF TRANSCENTRAL ROADS PROJECT


Location : MARAWI CITY, LANAO DEL SUR

WORK STATION
ITEM DESCRIPTION LOCATION NOTED DEFECIENCIES REMARKS / RECOMMENDATIONS
NO. From To
311 PCCP 2+808.00 2+808.00 R/S TRANSVERSE CRACK within 1.5m from WPJ RECTIFIED
311 PCCP 2+832.00 2+832.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+845.00 2+845.00 L/S TRANSVERSE CRACK RECTIFIED
Republic of the Philippines
Department of Public Works and Highways
UNIFIED PROJECT MANAGEMENT OFFICE
Roads Management Cluster I - Bilateral
2nd Street, Port Area, Manila

PUNCHLIST OF DEFECTS/DEFICIENCIES
DATE OF INSPECTION: _________________________

Project Name : CONTRACT PACKAGE 2 - URGENT REHABILITATION OF TRANSCENTRAL ROADS PROJECT


Location : MARAWI CITY, LANAO DEL SUR

WORK STATION
ITEM DESCRIPTION LOCATION NOTED DEFECIENCIES REMARKS / RECOMMENDATIONS
NO. From To
311 PCCP 2+850.00 2+850.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+895.00 2+895.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+905.00 2+905.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 2+925.00 2+925.00 R/S INADEQUATE SEALANT IN JOINT RECTIFIED
311 PCCP 2+980.00 3+010.00 R/S MINOR SCALING RECTIFIED
311 PCCP 3+060.00 3+060.00 L/S MINOR POTHOLES RECTIFIED
311 PCCP 0+000.00 0+028.00 L/S RAIN DAMAGED RECTIFIED
311 PCCP 0+037.00 0+037.00 R/S POTHOLE RECTIFIED
311 PCCP 0+050.00 0+050.00 R/S CHIPPING RECTIFIED
311 PCCP 0+068.00 0+068.00 R/S POTHOLE RECTIFIED
311 PCCP 0+124.00 0+124.00 C/L DAMAGED PAVEMENT MARKING (YELLOW) RECTIFIED
311 PCCP 0+144.00 0+155.00 R/S HARDENED SPILLED CONCRETE RECTIFIED
311 PCCP 0+189.00 0+189.00 L/S POTHOLE RECTIFIED
311 PCCP 0+226.00 0+226.00 L/S HARDENED SPILLED CONCRETE RECTIFIED
311 PCCP 0+317.00 0+317.00 L/S HARDENED SPILLED CONCRETE RECTIFIED
311 PCCP 0+354.00 0+354.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 0+402.00 0+402.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 0+559.00 0+559.00 L/S HARDENED SPILLED CONCRETE RECTIFIED
311 PCCP 0+677.00 0+677.00 L/S TRANSVERSE CRACK RECTIFIED
311 PCCP 0+718.00 0+718.00 L/S TRANSVERSE CRACK RECTIFIED

Prepared by: Checked and Reviewed by: Approved by: Noted by:

EMMANUEL B. BATARA MAGDARA S. PUNDOMA JOSEFINO S. SARIGAN SOBAIR A. PASANDALAN


Project Manager Resident Engineer Project Manager Project Engineer
Kouzbary Builders Woodfields Consultants Inc. Woodfields Consultants Inc. DPWH-UPMO