Mohon Tambahan Data

Luas Eksisting Luas Pengembangan (m2)


No Penggunaan Lahan
(m2)
1 Coarse breaking plant 143,67
2 Washing plant 225,13
3 Picking plant 180,62
4 Fine crushing plant 463,79
5 Concentrate bin 57,25
6 Screening plant 513,69
7 Fine ore bin 1081,68
8 Magnetic Concentration Plant 809,37
9 1# transfer station 57,13 Tidak adalagi
10 2# transfer station 42,01 Tidak ada lagi
11 Mechanical Maintenance Workshop 1514,23
mining truck and heavy duty diesel
12
machine 2106,57
13 oxygen cylinders and acetylene 96,29
14 air compressor station 53,94
15 spare parts and materials storehouse 811,51
16 barreled lubricating oil storehouse 414,37
17 circulating pump station and water tank 456,06
18 office building and warehouse 154,24
19 canteen, bathroom, and warehouse 239,62
20 W.C 43,22
21 Detonator House 95,95
22 substation 549,09
23 generate electricity house 361,26
24 1000 m3 storage 540,91
25 cistern and water pumpstation 2272,44
26 Area of heavy oil power station 24650
27 Road area 4557
28 Area of greening 6990
29 Occupled area of structur 4837
30 laboratory 231,53
Total 54549,57

Luas Pengembangan

Beneficiation Plant (Laydown area, Storage 1000m3, Coarse Breaking Plant, Washing Plant, Fine Crsuhing
Plant, Concentrate Bin, Screening Plant, Fine Ore Bin, Magnetic Concentration Plant) seluas 12.66 Ha
Waste Dam seluas 179.97 Ha
Bendungan air seluas 11.41 Ha
Stasiun pompa air seluas 0.11 Ha
Living Mess area 1 (laydown area, Clinic, Parking, Water Storage and Water Treatment Plant, Mess, Office,
Workshop, Lab, Canteen, Toilet, Warehouse, storage 1000 m3) dan fasilitas (kebun) seluas 65.23 Ha
Living Mess area 2 dan (Laydown area, clinic, parking, Water Storage and Water Treatment Plant, Mess,
Office, Lab, Workshop, Canteen, Toilet, Warehouse) fasilitas (kebun) seluas 37.80 Ha
Jalan akses sepanjang 6.3 KM dan lebar m dengan luas jalan maksimal 5.67 Ha
Lapisan Tanah
Tahun Stripping
Biji Besi (Ton) Penutup
Penambangan Ratio (T/T)
(BCM)
1 2023 1.182.000
2 2024 1.166.000 1.840.000 1.66
3 2025 1.500.000 2.798.000 1.87
4 2026 1.500.000 2.799.000 1.87
5 2027 1.500.000 2.791.000 1.86
6 2028 1.500.000 2.821.000 1.88
7 2029 1.500.000 2.705.000 1.8
8 2030 1.500.000 2.294.000 1.53
9 2031 890.000 1.797.000 2.02
10 2032 801.000 610.000 0.76
Jumlah 11.856.000 21.637.000 1.82

TAMBAHAN DATA untuk BLOK FANGO mulai dari Bahan baku, konsentrat, waste dan refuse ada pada
lembar “further information AMDLE”
Tahun Bahan Baku Hasil Pengolahan (ton) Keterangan
Bijih Besi (ton) Konsentrat Waste Refuse
1 0 0 0 0
2 (2017) 394.300 278.639 82.803 32.858
3 3.000.000 2.120.000 630.000 250.000 Prospek produksi
4 3.000.000 2.120.000 630.000 250.000 Prospek produksi
5 3.000.000 2.120.000 630.000 250.000 Prospek produksi
6 3.000.000 2.120.000 630.000 250.000 Prospek produksi
7 3.000.000 2.120.000 630.000 250.000 Prospek produksi
8 3.000.000 2.120.000 630.000 250.000 Prospek produksi
9 3.000.000 2.120.000 630.000 250.000 Prospek produksi
10 3.000.000 2.120.000 630.000 250.000 Prospek produksi
11 3.000.000 2.120.000 630.000 250.000 Prospek produksi
12 3.000.000 2.120.000 630.000 250.000 Prospek produksi
13 1.595.800 1.127.699 335.118 132.983 Prospek produksi
14 1.551.000 1.096.040 325.710 129.250 Prospek produksi
Total 3.394.300 23.702.378 7.043.631 2.795.092
Produksi
Minta Data Terbaru Ball Mill Plant di blok 2 = 4 MW, BP+Ball Mill di Blok 1 = 7 MW, Mesin2 200 KW,
Pompa slurry waste 146 kW, Mess 1 dan 2 = 200 kW. Tambahan genset untuk power plant = 2x 8 MW.

Jumlah penggunaan
No Jenis Penggunaan Sumber
kW/KVA
1 Pabrik pengolahan 2.755 kW Genset
2 Mesin-mesin 203 kW 2 X (2 MW)
3 Pompa slurry waste 146 kW 2 X (6 MW)
4 Belt Conveyor 967 kW
5 Mess, kantor dan pompa air 190 kW Cadangan
Jumlah 4.261 kW 2 X (7,5 MW)

Penggunaan solar fix :


Pemakaian per bulan
No Jenis BBM Penggunaan
(liter)
1 Solar Domestik + Operational 1.000.000
2 HFO Power Plant 1.500.000
2.500.000

Boleh minta Gambar yang lebih jelas Gambar akan disusulkan


Mohon uraian kegiatan Konstruksi dan operasional Mess, Water Dam, BP,Ball Mill Plant (Blok Hulu
Fango dan Blok Fango) Waste Dam  uraiannya sama dengan amdal sju lama tetapi ada tambahan ball
mill plant (semi autogenous mill, Mill 1 dan Mill 2 yang menggunakan air untuk proses nya).

Untuk BP di Blok Hulu Fango hanya ada penambahan Ball Mill