To shut down the Perstorp formaldehyde plant in a safe way, the procedures presented in these
chapters should be followed carefully. The shutdown procedure differs if the plant is shut down
for maintenance or to stand-by conditions.
In case the safety system shuts down the plant or parts of the plant, the procedures in section 10
(doc.no. 64-D2. 10.2 to 64-D2.lO.4) should be followed.
2 SHUTDOWN
The following procedure describes how the whole plant should be shut down for an
extended period or to stand-by conditions. The procedure is not a checklist, but describes
what actions should be taken and what to take into consideration.
• Stop the caustic feed pump to the urea feed line to the top of first stage absorber.
• Re-route the condensate to the first absorber by closing the manual valve(50117c)
to the condensate tank and opening (50118a) to the top tray of the first absorber.
• Close one manual valve in the urea feed line and shut off the urea feed pump.
• Afler urea feed is stopped run the methanol feed until the urea is diluted on the
valve trays (15 minutes recommended).
• Stop the methanol feed with the B-interlock from the DCS.
• Set the oxygen controller (AIC-30023) to manual and freeze the position of valve
AV-30023.
• Wait one minute afier the methanol has been shut off.
• Set pressure controller PICS-40026 to manual and freeze the positions of valves
PV-40026 A/B.
• Open the atmospheric valve (40122a) when the HTF temperature (TI-40021) is
below 257 °C. (There is a risk of flashing HTF if the atmospheric valve is opened too
early.)
• Minimize the cooling water flow to absorber C-5004, heat exchanger H-5009 and
heat exchanger H-5010 by closing valves 91140c, 9111la and TV50101 (Place in
manual mode and close).
• Close one manual valve in the BFW line to the HTF condenser.
• Decrease the process water flow (FICS-83021) in “auto” to the minimum level
that will not allow the trays to become dry.
Check regularly:
• The product temperature (TIC-50011).
• If the temperature falls below the concentration, dilute the lower absorber
circulation with BFW from the BFW tank or with low pressure steam.
• If the HTF temperature (TI-40021) falls below 250 °C, start to circulate HTF
over the reactor and the HTF condenser.
• Start the HTF heater in accordance with the procedure in section 8 (doc.no. 64-
D2.8.2 chapter 2.2 or 64-D2.8.3 chapter 3.2).
2.9 Prepare the plant for shutdown for an extended period or maintenance
• Prepare the absorber system in accordance with the procedure in chapter 3.1.
• Prepare the BFW system in accordance with the procedure in chapter 3.2
• Prepare the HTF system in accordance with the procedure in chapter 3.3.
If there is a risk of freezing, drain the systems which have no steam or electrical tracing.
Preparations when the plant should be shutdown for an extended shut down or
maintenance.
• Wash down the absorbers with water and empty the towers. It will take
approximately one day.
• Decrease the liquid level in absorption tower C-5002 to the lower limit of the
level glass in order to reduce amount of off spec product.
• Open the bypass valve (83102a) over control valve FV—83021 to increase the
To get proper washing of the valve trays run the fans on minimun circulation for two
times one hour during the washing period.
Continue when the formaldehyde concentration has dropped to less than 1% in the
lower circulation. Please observe local regulations.
• Set process water controller FIC-83021 to manual and close valve FV-83021.
• Close one manual valve in the BFW line to the HTF condenser.
• Turn off the BFW pump.
• Close the valves afier the pump.
• Close one manual valve in the BFW line to the BFW tank.
• Close the valves in the LP steam lines to the BFW tank.
• Close manually the steam valves from the HTF condenser.
3.3 HTF system
Ensure that the manual valve (40122a) between HTF condenser and tank is open.
Close the manual valves around PV-40026 A/B.
The HTF can be drained into the storage tank when the HTF temperature is less than
100°C.
Open the valve between the HTF heater and the reactor (40106a).
Open the valve between the HTF heater and the storage tank (40105a).
Drain the HTF into the tank.
Close the valves.
If the HTF is not drained into the storage tank, it should be circulated over the reactor and
the HTF condenser.
Start to circulate HTF in accordance with the procedure in section 8 (doc.no.
64-D2.8.5 chapter 4.5).
Start the HTF heater in accordance with the procedure in section 8 (doc.no. 64-
D2.8.2 chapter 2.2 or 64-D2.8.3 chapter 3.2).
During every extended shutdown, test the time it takes to close the methanol safety valve,
AV 30045. If possible, check the other parts of the safety system.