A&C-2 of Package - 4

ADDBNDUJI & CORRIGENDUM No.2

RVRL/ RKSB-KNPGtT&NDER/ TOIIN&LS/PK-4 Date: 25.03.2020

RVNL/RKSB-KBPG/TENDER/TOIINBLS/ PK-4 Dated: 26.02.2020


Bid Notiftcation No.
Name of the Work "CONSTRUCTION OT TUNNBLS, l'OR.lfATION, CONSTRUCTION SHAFT AND OTHER ANCILLARY
WORKS FROM CHAINAGB 47+360 to 63+117 IOI (FLS) WITH TBM AND NATM UNDER
PACKAGB-4 IN CONNECTION WITH NBW BG LlNB BB'l"IVBBN RlSHIKESH AND KARANPRAYAG
(125KM) IN THB STATE OF VTTARAKHAND, INDIA."

The following changes are to be incorporated at the appropriate place in A&C- 1;

Pap Tobe readaa


81' Clause £idating
Ro.
1. Clause 7 of S.N. 1 A pre-bid meeting is proposed to be held on A pre-bid meeting is proposed to be held on
IFB of Bid or 15/ 04/2020 at 11.30 hrs. 1n Rail Vikas Nigam 07/ 05/2020 at 11.30 hrs. in Rail Vi.kas Nigam
Document A&C-1 limited Corporate Office New Delhi at August Kranti limited Corporate Office New Delhi at August Kranti
Bhavan, Bhikaji Cama Place New Delhi 110066, Bhavan, Bhikaji Cama Place New Delhi 110066,
India.
India.
2. Clause 12 of S.N. 2 Dat. of Receipt and opening ofBida: The completed Date of Receipt -di opentn& ofBlda: The completed
IFB of Bid or Bids must be submitted through e-tendering portal Bids must be submitted through e-tendering portal
Document A&C-1 https://rvnl.euniwizarde.com/ before 11.00 hrs. on https:/ /rvnl.euniwizarde.com/ before 11.00 hrs. on
17/ 06/'l.020 and the same shall be opened at lll.30
21/05/2020 and the same shall be opened at 11.30
hrs on same day.
hrs on same day.

3. lTB-7.4 {Bid S.N. 3 A Pre-Bid meeting is proposed to be held at the A Pre-Bid meeting is proposed to be held at the
Data Sheet) or following date, time and place: following date, time and place:
(Section-2) A&C-1 Date: 15.04.2020 Date: 07.05. 2020
Time: 11:30 hrs. Time: 11:30 hrs.
Rail Vikas Nigam limited Corporate Office, New Delhi Rail Vilcas Nigam limited Corporate Office, New Delhi
at August Kranti Bhavan, Bhikaji Cama Place, at August Kranti Bhavan, Bhikaji Cama Place,
New Delhi 110066, India. New Delhi 110066, lndia.
Site visit is not proposed to be organized by the Site visit is not proposed to be organized by the
Employer. However, the bidders are advised to visit Employer. However, the bidders are advised to visit
the site before submission of bid. the site before submission of bid.

Digitally signed by
CHINMAY IPage
CHINMAYI SHARMA
Date: 2020.03.26
SHARMA 13:45:01 IST
.
4.
C1aUN

ITB-19.2 IBid
...,.
Ro.
S.N.4
Balatlns
The bid. aecurity ahall be valid up to 29/12/2020.
Tobenadu
ActC'-2 of PilCbl~ • 4

The bid aecurity shall be valid up to 25/01/2021.


Data Shttl) or The original Bank Ouarantee lhould be eubmitlcd to The origjnal Bank Guarantee should be 1ubmitted to
(Sfflion-2) AAC-1 Chier Project Manager. Chief Project Manager.
Rail Vikaa Ni.gam Limited, Rail Vika1 Nipm Umited.
Floor/Room No.: RVNL omce Building. Floor /Room No. : RVNL office Building.
I Oppoaite OST Bhawan ()ppolite GST Bhavan
Street Addrcaa: Nc.xt to OMVN, Shyampur Bypa11 Road Street AddreM: Next to OMVN. Shyampur Bypass Road
City: Riahikesh. Pin Code: 249201 City: Rilhikelh. Pm Code: 2◄9'201
Country: Indian Republic Country: Indian Republic
Tel. No.: Tel 0135-2442008. Tel. No.: Tel 0135-2442008.
Fax:2442008 Fax: 2442008
Mail : himan1u.ba.doni@rvnl.org Mail: himanau.badonigrvnl.org
5. Clause 22.1 S.N. 5 For bid aubmitlion purpoaca addrcaa ia: Por bid aubmiasion purpoan lddrna is:
1TB IBid or httpa:/ /www.rvnl.euniwizarde.com httpa://www.rvnl.euniwizarde.com
Data Sheet) A&C-1 The deadline for bid submission ia: The deadline for bid aubmiaion it:
(Stttion-2) Date: 21/05/2020. Date: 1'7/06/2020.
Time: 11 :00 hra. Time: 11 :00 hra.

6. Clause 25.1 S.N. 6 The online bid opening shall take plac-e at e-tendcring The online bid opening sh.all take place at e-ttndcring
l'TB (Bid Of ponal of RVNL bUg1;llwww.C!Dl.~uoiwimrd~1~m : or
portal RVNL bn21; l l...-cw,I!Dl,t!Annrizarslt-C'Offl :
Data Sheet) A81C-1 Bid Opening: Bid Opening:
(Section-2) Date: 21/05/2020 Date: 17/06/2020
Time: 11 :30 hra. Time: 11 :30 hn.