: 21-30128 - CONCRETING/PAVING OF LAYDOWN AREA AT THE COMMAND CENTER


PROJECT LOCATION: GMCP SITE, ALAS ASIN, MARIVELES, BATAAN
PROJECT TITLE: CONTRACTOR'S COMMON FACILITY AREA
DOCUMENT NO.: BQA-PS-01
CONSTRUCTION SCHEDULE AND S-CURVE
CALENDAR DAYS

ITEM DURATION JUNE JULY AUGUST SEPTEMBER


NO. WORK DESCRIPTION (DAYS) START DATE END DATE PLANNED ACTUAL STATUS
W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W

1 SITE SURVEY AND DETAILED ENGINEERING 9 01-Jun-22 09-Jun-22 100% 100% Completed
2 COMPLETION OF GENERAL REQUIREMENTS FOR SUBMISSION 5 09-Jun-22 13-Jun-22 100% 99% On-Going
3 MOBILIZATION / PERSONNEL ORIENTATION / TEMFACIL 6 13-Jun-22 17-Jun-22 100% 100% Completed
4 SITE GRADING / SITE PREPARATION 12 17-Jun-22 28-Jun-22 100% 80% On-Going
5 CONCRETE PAVEMENT WORKS 24 26-Jul-22 26-Aug-22 80% 29% On-Going
5.1 EXCAVATION WORKS FOR WALL FOOTING 14 26-Jul-22 12-Aug-22 100% 100% Completed
5.2 REMOVAL OF EXISTING GRAVEL 4 09-Aug-22 12-Aug-22 100% 80% On-Going
5.3 6 08-Aug-22 15-Aug-22
INSTALLATION OF POLYTHELENE SHEET, REBAR AND FORM WORKS FOR WALL FOOTING 100% 70% On-Going
5.4 CONCRETE POURING WORKS FOR WALL FOOTING 1 15-Aug-22 15-Aug-22 100% 40% On-Going
5.5 LAYING OF HOLLOW BLOCKS 4 16-Aug-22 19-Aug-22 100% 0% NOT YET STARTED
5.6 BACKFILLING OF SOIL AND AND COMPACTION 3 17-Aug-22 19-Aug-22 100% 0% NOT YET STARTED
5.7 FIELD DENSITY TEST FOR PAVEMENT 1 19-Aug-22 19-Aug-22 100% 0% NOT YET STARTED
5.7 GRAVEL BEDDING AND COMPACTION 1 22-Aug-22 22-Aug-22 100% 0% NOT YET STARTED
5.8 INSTALLATION OF POLYTHELENE SHEET, REBAR AND FORM WORKS FOR PAVEMENT AND 2 23-Aug-22 24-Aug-22
FENCE POST 0% 0% NOT YET STARTED
5.9 CONCRETE POURING OF PAVEMENT AND FENCE POST 1 25-Aug-22 25-Aug-22 0% 0% NOT YET STARTED
5.10 INSTALLATION OF FENCE POST 1 26-Aug-22 26-Aug-22 0% 0% NOT YET STARTED
6 STAIRWAY WORKS 21 12-Aug-22 09-Sep-22 40% 0% NOT YET STARTED
6.1 SCAFFOLDING WORKS PRIOR FOR THE EXCAVATION OF STAIRWAY FOUNDATION 5 12-Aug-22 18-Aug-22 100% 0% FOR REQUEST (GMEC)
6.2 EXCAVATION FOR STAIRWAY FOUNDATION 2 19-Aug-22 22-Aug-22 100% 0% NOT YET STARTED
6.3 INSTALLATION OF POLYTHELENE SHEET, REBAR AND FORM WORKS FOR STAIRWAY 1 23-Aug-22 23-Aug-22
FOUNDATION 0% 0% NOT YET STARTED
6.4 CONCRETE POURING OF STAIRWAY FOUNDATION 1 24-Aug-22 24-Aug-22 0% 0% NOT YET STARTED
6.5 ERECTION OF STAIRWAY AND RAILINGS 2 08-Sep-22 09-Sep-22 0% 0% NOT YET STARTED
7 CONSTRUCTION OF COMFORT ROOM 30 08-Aug-22 16-Sep-22 70% 14% On-Going
7.1 EXCAVATION OF COMFORT ROOM FOUNDATION AND TIE BEAM 3 08-Aug-22 10-Aug-22 100% 100% Completed
7.2 INSTALLATION OF POLYTHELENE SHEET, REBAR AND FORM WORKS FOR COMFORT ROOM 3 11-Aug-22 15-Aug-22
FOUNDATION, PEDESTAL AND TIE BEAM 100% 50% On-Going
7.3 CONCRETE POURING OF FOUNDATION 1 15-Aug-22 15-Aug-22 100% 0% NOT YET STARTED
7.4 BACKFILLING OF SOIL AND COMPACTION OF FLOOR SLAB AREA 1 16-Aug-22 16-Aug-22 100% 0% NOT YET STARTED
7.4 GRAVEL BEDDING OF FLOOR SLAB AREA AND COMPACTION 1 16-Aug-22 16-Aug-22 100% 0% NOT YET STARTED
7.5 1 17-Aug-22 17-Aug-22
INSTALLATION OF POLYTHELENE SHEET, REBAR AND FORM WORKS FOR FLOOR SLAB AREA 100% 0% NOT YET STARTED
7.6 CONCRETE POURING OF PEDESTAL, TIE BEAM AND FLOOR SLAB 1 18-Aug-22 18-Aug-22 100% 0% NOT YET STARTED
7.7 INSTALLATION OF REBAR AND FORM WORKS FOR COLUMNS AND BEAMS 3 19-Aug-22 23-Aug-22 66% 0% NOT YET STARTED
7.8 CONCRETE POURING OF COLUMNS 1 23-Aug-22 23-Aug-22 0% 0% NOT YET STARTED
7.9 CONCRETE POURING OF BEAMS 1 24-Aug-22 24-Aug-22 0% 0% NOT YET STARTED
7.10 LAYING OF CHB WALLS, ROOFING AND INTERIOR WORKS 12 25-Aug-22 09-Sep-22 0% 0% NOT YET STARTED
7.11 INSTALLATION OF PLUMBING FIXTURES 3 12-Sep-22 14-Sep-22 0% 0% NOT YET STARTED
8 ELECTRICAL WORKS 45 25-Jul-22 17-Sep-22 79% 36% On-Going
8.1 EXCAVATION OF 2 ELECTRICAL FOUNDATIONS 5 25-Jul-22 29-Jul-22 100% 100% Completed
8.2 INSTALLATION OF POLYTHELENE SHEET, REBARS AND FORMWORKS FOR 2 ELECTRICAL 4 01-Aug-22 04-Aug-22
FDN 100% 100% Completed
8.3 CONCRETE POURING OF FOOTING 1 04-Aug-22 04-Aug-22 100% 100% Completed
8.4 INSTALLATION OF ANCHOR BOLTS FOR 2 FDN 1 12-Aug-22 12-Aug-22 100% 0% NOT YET STARTED
8.5 CONCRETE POURING OF PEDESTAL OF 2 FDN 1 15-Aug-22 15-Aug-22 100% 0% NOT YET STARTED
8.6 SCAFFOLDING WORKS PRIOR FOR THE EXCAVATION ONE MORE ELECTRICAL FOUNDATION 5 12-Aug-22 18-Aug-22
AT SLOPE AREA 100% 100% FOR REQUEST (GMEC)
8.7 EXCAVATION OF ELECTRICAL FDN AT SLOPE AREA 1 19-Aug-22 19-Aug-22 100% 0% NOT YET STARTED
8.8 INSTALLATION OF POLYTHELENE SHEET, REBARS AND FORMWORKS FOR ELECTRICAL FDN 1 22-Aug-22 22-Aug-22
AT SLOPE AREA 100% 0% NOT YET STARTED
8.9 CONCRETE POURING OF ELECTRICAL FDN AT SLOPE AREA 3 19-Aug-22 23-Aug-22 66% 0% NOT YET STARTED
8.10 ERECTION OF STEEL STRUCTURE FOR NEW CABLE RACK 3 29-Aug-22 31-Aug-22 0% 0% NOT YET STARTED
8.11 ERECTION OF NEW CABLE TRAY 3 31-Aug-22 02-Sep-22 0% 0% NOT YET STARTED
8.12 INSTALLATION OF ELECTRICAL PANEL BOARDS, CIRCUIT BREAKERS & GROUNDING 5 05-Sep-22 09-Sep-22 0% 0% NOT YET STARTED
8.13 CABLE PULLING WORKS 5 15-Sep-22 21-Sep-22 0% 0% NOT YET STARTED
8.14 ELECTRICAL CABLE TERMINATION WORKS / TAPPING 2 21-Sep-22 22-Sep-22 0% 0% NOT YET STARTED
9 PAINTING WORKS 10 29-Aug-22 09-Sep-22 0% 0% NOT YET STARTED
10 RESTORATION WORKS OF DAMAGED/AFFECTED FACILITIES 5 12-Sep-22 16-Sep-22 0% 0% NOT YET STARTED
11 ELECTRICAL POWER COMMISSIONING AND TESTING 1 23-Sep-22 23-Sep-22 0% 0% NOT YET STARTED
12 PUNCH LIST WORKS AND HOUSEKEEPING 1 23-Sep-22 23-Sep-22 0% 0% NOT YET STARTED
13 TURN OVER WORKS 2 26-Sep-22 27-Sep-22 0% 0% NOT YET STARTED
14 DEMOBILIZATION 3 28-Sep-22 30-Sep-22 0% 0% NOT YET STARTED

Submitted by: Accepted by:

BQA CONSTRUCTION AND TRADING Rochelle Medina / Jake Christian Bermudez


Genaral Contractor GMEC Representative

ARIEL Q. BATUNGBAKAL
Authorized Representative (printed) Signaure

Signature Date
July 15, 2022
Date
HEDULE AND S-CURVE
CALENDAR DAYS

SEPTEMBER
T F
ITB.: 21-30128 - CONCRETING/PAVING OF LAYDOWN AREA AT THE COMMAND CENTER
PROJECT LOCATION: GMCP SITE, ALAS ASIN, MARIVELES, BATAAN
PROJECT TITLE: CONTRACTOR'S COMMON FACILITY AREA
CONSTRUCTION SCHEDULE AND S-CURVE
CALENDAR DAYS

ITEM
WORK DESCRIPTION DURATION START DATE END DATE PLANNED ACTUAL STATUS

102
105
108
111
114
117
120
123
126
129
132
135
138
141
144
147
150
12
15
18
21
24
27
30
33
36
39
42
45
48
51
54
57
60
63
66
69
72
75
78
81
84
87
90
93
96
99
3
6
9
NO.
1 SITE SURVEY AND DETAILED ENGINEERING 9
2 COMPLETION OF GENERAL REQUIREMENTS FOR SUBMISSION 6
3 MOBILIZATION / PERSONNEL ORIENTATION / TEMFACIL 6
4 SITE GRADING / SITE PREPARATION 12
5 EXCAVATION WORKS AND FILLING WORKS 15
6 STEEL REINFORCING WORKS FOR FOUNDATION, WALL FOOTING AND FLOOR SLAB 9
7 PLUMBING WORKS (WATER AND DRAINAGE LINE) & SEPTIC VAULT 18
8 CONCRETE POURING FOR FOUNDATION AND WALL FOOTING 6
9 CONCRETE POURING FOR FLOOR SLAB 9
10 LAYING OF CHB WALLS, COLUMNS, & BEAMS FOR NEW COMFORT ROOM 15
11 INSTALLATION OF ROOFING AND INTERIOR WORKS FOR NEW COMFORT ROOM 6
12 INSTALLATION OF PLUMBING FIXTURES FOR NEW COMFORT ROOM 6
13 FABRICATION OF STAIRS WITH RAILINGS 9
14 FABRICATION OF STRUCTURAL STEEL FOR NEW CABLE RACK 12
15 ERECTION OF STRUCTURAL STEEL NEW CABLE RACK 9
16 INSTALLATION OF STAIRS WITH RAILINGS 6
17 INSTALLATION OF ELECTRICAL CABLE TRAY 15
18 CABLE PULLING WORKS 9
19 INSTALLATION OF ELECTRICAL PANEL BOARDS, CIRCUIT BREAKERS & GROUNDING 9
20 ELECTRICAL CABLE TERMINATION WORKS / TAPPING 6
21 INSTALLATION OF FENCE 18
22 PAINTING WORKS 9
23 RESTORATION WORKS OF DAMAGED FACILITIES 6
24 ELECTRICAL POWER COMMISSIONING AND TESTING 3
25 PUNCH LIST WORKS AND HOUSEKEEPING 9
26 TURN OVER WORKS 3
27 DEMOBILIZATION 6

Submitted by:

BQA CONSTRUCTION AND TRADING


Contractor/Bidder

ARIEL Q. BATUNGBAKAL
Authorized Representative (printed)

Signature

Date