Professional Documents
Culture Documents
Course Catalog: Sections
Course Catalog: Sections
SECTIONS Page
View by Equipment
View by Plant Configuration
Section 1: Combined Cycle Fundamentals (English or Spanish).......................................1
Section 2: Gas Turbines (GT) and Combined Cycle (CC) Plants........................................4
Section 3: Conventional Boiler Fundamentals...................................................................37
Section 4: Coal Fired Plants.................................................................................................39
Section 5: Makeup Water Treatment....................................................................................44
Section 6: Maintenance........................................................................................................46
Section 7: Renewables.........................................................................................................49
Book 2 (B2)
Control Screen Navigation and Familiarization. These books are created to provide an overview of
the function of each control screen as well as navigation between control screens.
Book 3 (B3)
Unit Startup and Operation. This book provides a step-by-step explanation, using control screens
for GT, ST, HRSG and BOP as well as sample walk down lists and other relevant content to describe
the startup of a combined cycle plant.
Book 4 (B4)
System Troubleshooting. Only developed through content that is specific to a site and where the
content is provided by the customer.
Page
Plant 1....................................................................................................................................... 4
2X1 combined cycle, Siemens 501FD2 gas turbine, NEM 3-pressure HRSGs, MHI axial flow steam turbine,
water-cooled condenser, and conventional cooling tower.
Plant 2....................................................................................................................................... 5
2X1 combined cycle, GE 7FA.02 gas turbine, Nooter-Eriksen 3-pressure HRSGs, GE D11 steam turbine,
water-cooled condenser, site electrical distribution, and conventional cooling tower. The generator course
available features generator construction, theory, fault protection, and LCI operation. The 7FA gas turbine and
generator courses are also available in Spanish.
Plant 3....................................................................................................................................... 9
2X1 combined cycle, Siemens 501 gas turbine, NEM 3-pressure HRSGs, GE D11 steam turbine, water-cooled
condenser, conventional cooling tower with plume abatement equipment, zero-liquid discharge facility, recycled
water facility, site electrical distribution, and an oil-flooded screw-type gas compressor station.
Plant 4..................................................................................................................................... 12
4X1 combined cycle, GE LM6000 SAC gas turbines, Vogt 2-pressure HRSGs, MHI TCF1 steam turbine,
water-cooled condenser, conventional cooling tower with plume abatement equipment, and site electrical
distribution.
Plant 5..................................................................................................................................... 14
Simple cycle, GE 7EA gas turbine.
Plant 6..................................................................................................................................... 15
Simple cycle, GE LM6000 SAC gas turbine.
Plant 7..................................................................................................................................... 16
Siemens SGT-800 gas turbine. This course is provided with Vogt 2-pressure HRSG and MHI TCF1 steam
turbine courses.
Plant 8..................................................................................................................................... 18
Simple Cycle Siemens V84.2 gas turbine. This turbine is equipped with a bypass stack setup for possible
combined cycle operation.
Plant 9..................................................................................................................................... 19
Simple cycle, GE LMS100 SAC gas turbine.
Plant 10................................................................................................................................... 21
Features an overview of a combined cycle facility equipped with a Toshiba TCDF241 steam turbine and site
electrical distribution.
Plant 11................................................................................................................................... 22
This course covers the design and operation of a 1992 Westinghouse 248MW steam turbine seal oil system.
Plant 12................................................................................................................................... 23
Simple cycle, GE LM2500 SAC gas turbine. There is also a version available with LM2500 Marine references.
Page
Plant 13................................................................................................................................... 24
2X1 combined cycle, GE 7FA gas turbines, NEM 3-pressure HRSGs, GE D11 steam turbine, and an
air-cooled condenser.
Plant 14................................................................................................................................... 26
1X1 combined cycle, GE 7FA gas turbine, NEM 3-pressure HRSGs, GE A10 steam turbine, and a
conventional cooling tower.
Plant 16 .................................................................................................................................. 28
2x1 combined cycle, GE 7FA.05 gas turbines, 7FA.05 gas turbine generator, Vogt 3-pressure HRSGs, boiler
feedwater pump, sample panel, boiler feedwater pump hydraulic coupling, Siemens SST6-5000 steam
turbine, Cleave-Brooks D-type auxiliary steam boiler, 30-cell SPIG air-cooled condenser, electrical distribution,
electrical switchgear, continuous emissions monitoring system (CEMS), and Makeup Water Treatment System.
Plant 17 .................................................................................................................................. 33
2x1 combined cycle, GE 7FA.05 gas turbines, Nooter-Eriksen 3-pressure HRSGs, sample panel, TCDF-40
steam turbine, auxiliary steam boiler, BOP circulating water system, electrical distribution, logic diagrams, and
water treatment plant.
Plant 1 - 2 on 1, Siemens 501FD2 Gas Turbine, 3-Drum NEM HRSG, MHI Steam
4 hrs. 8 mins.
Turbine, Water Cooled Condenser, Cooling Towers
Plant 2 - 2 on 1, GE 7FA Gas Turbine, 3-Drum Nooter-Eriksen HRSG, D-11 ST, Water
23 hrs. 38 mins.
Cooled Condenser, Cooling Towers
GEN01A_0201S_B1 Combined Cycle Site Overview – System Description and Process Flow 10 minutes
GEN01A_0211S_B1 7FA.02 Gas Turbine System Descriptions and Process Flows 2 hrs. 48 mins.
GEN01A_0231S_B1 D-11 Steam Turbine System Description and Process Flows 1 hr. 34 mins.
Plant 3 - 2 on 1, 501FD2 Gas Turbine, 3-Drum Nooter-Eriksen HRSG, D-11 ST, Water
13 hrs. 16 mins.
Cooled Condenser, Cooling Towers, ZLD
GEN01A_0331S_B2 D-11 Mark VI Control Screen Description & Navigation 2 hrs. 31 min.
Plant 4 - 4 on 1, LM6000 GT, 2 Drum HRSG, MHI ST, Water Cooled Condenser, Cooling
10 hrs. 19 mins.
Towers
GEN01A_0511S_B1 7EA Combustion Turbine - Systems and Process Flows 2 hrs. 2 min.
Plant 7 - Siemens SGT800 GT, 2 Drum HRSG, MHI ST, Water Cooled Condenser,
6 hrs. 29 mins.
Cooling Towers
Plant 8 - Siemens V84.2 Simple Cycle CT with a Dual Stack Setup for possible
3 hrs. 14 mins.
Combined Cycle Operation and SCR (NOx catalytic reaction)
GEN01A_0811S_B1 Siemens V84.2 Gas Turbine - Systems & Process Flows 3 hrs. 14 mins.
Plant 13 - 2 on 1, GE 7FA, 3-Drum Nooter-Eriksen HRSG, D-11 ST, Air Cooled 25 hrs. 16 mins.
Condenser
GEN01A_1301S_B1 Combined Cycle Site Overview – System Description & Process Flow 8 minutes
GEN01A_1311S_B1 7FA.02 Gas Turbine - System Descriptions and Process Flows 2 hrs. 48 mins.
GEN01A_1321S_B1 3-Drum HRSG - System Descriptions and Process Flows 1 hr. 55 mins.
GEN01A_1331S_B1 D-11 Steam Turbine - System Description & Process Flows 1 hr. 34 mins.
Plant 14 - 1 on 1, GE 7FA, 3-Drum Nooter-Eriksen HRSG, GE A10 ST, Cooling 14 hrs. 36 mins.
Tower
GEN01A_1401S_B1 Combined Cycle Site Overview – System Description & Process Flow 24 minutes
GEN01A_1411S_B1 7FA.02 Gas Turbine - System Descriptions and Process Flows 2 hrs. 48 mins.
GEN01A_1421S_B1 3-Drum HRSG - System Descriptions and Process Flows 1 hr. 55 mins.
Plant 16 - 2 on 1, GE 7FA.05 Gas Turbine, 7FA.05 Gas Turbine Generator, Vogt 3-Drum
HRSG, Sample Panel, Siemens SST6-5000 Steam Turbine, Air Cooled Condenser and 57 hrs. 42 mins.
Condensate, CEMS, and AUX Boiler
Plant 17 - 2 on 1, GE 7FA.05 Gas Turbine, 7FA.05 Gas Turbine Generator, Vogt 3-Drum
HRSG, Sample Panel, Siemens SST6-5000 Steam Turbine, Air Cooled Condenser and
Condensate, CEMS, and AUX Boiler
Coal Plant 1 - Two Supercritical B&W Boiler Units, Two GE Cross-Compound 750MW
18 hrs. 24 mins.
Steam Turbines, Baghouse, FGD System, Lime Slaking
Coal Plant 2 - Two Subcritical C-E Boilers, Two GE Tandem-Compound 800MW Steam
Turbines, Condensate and Feedwater, Mercury Removal, Circulating Water, Natural- 11 hrs. 46 mins.
Draft Cooling Towers
Renewables