Professional Documents
Culture Documents
Symbol: 11KV Source Generator Source Lighting Arrester Dropout Fuse HT Meter Potential Transformer Current Transformer
Symbol: 11KV Source Generator Source Lighting Arrester Dropout Fuse HT Meter Potential Transformer Current Transformer
A FROM A
SYMBOL RING MAIN UNIT
11kV
LA
DOF
11KV Source
HT
G Generator Source METER
Lighting Arrester
PT
11000/110V
Dropout Fuse
630A 11KV HT
TP VCB SWITCHGEAR
B PANEL B
HT Meter M
CT- 60/5/5A
R IDMT
Potential Transformer
Current Transformer I=39.36A
3(1x95)RM-(2XSEFGBY) XLPE
Ish=9.5KA
I=1083A
Transformer 4x2(1x400)RM-TP+N,1(1x400)RM-E
500KVA
GENERATOR
1250A
C CB (ACB/MCCB) TP MCCB C
LT BOX SIZE-2000x600x600mm (HxLxD) 0.415kV
G 10%
M CT- 1250/5A
Capacitor Bank
(100x7)Sq.MM TP+N+E BUSBAR 0.415kV I=720A
I=720A
Magnetic Contactor 800A 800A 800A
PFI BOX SIZE-2000x1000x600mm (HxLxD)
I=720A
L Load I=650A
4(1x400)RM-TP+N,(1x240)RM-E 4(1x400)RM-TP+N,(1x240)RM-E
4(1x400)RM-TP+N,(1x240)RM-E
3x2(1x400)RM-TP
ATS
Automatic Transfer Switch
PFI PANEL
(70x7)Sq.MM TP-BUSBAR
800A 800A
TP MCCB TP MCCB
D D
(70x7)Sq.MM TP+N+E BUSBAR 0.415kV (70x7)Sq.MM TP+N+E BUSBAR 0.415kV
0.415kV
160A 160A 160A 160A 125A 160A 100A 160A 160A 63A 50A 50A 50A 50A 63A 63A 63A 63A 63A
BREAKERS TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB TP MCCB
4(1x50)RM-TP+N
4(1x50)RM-TP+N
4(1x50)RM-TP+N
4(1x50)RM-TP+N
4(1x50)RM-TP+N
4(1x50)RM-TP+N
4(1x35)RM-TP+N
4(1x50)RM-TP+N
4(1x50)RM-TP+N
4(1x25)RM-TP+N
4(1x25)RM-TP+N
4(1x25)RM-TP+N
4(1x25)RM-TP+N
4(1x25)RM-TP+N
4(1x25)RM-TP+N
4(1x25)RM-TP+N
4(1x25)RM-TP+N
(1x25)RM-E
(1x25)RM-E
(1x25)RM-E
(1x25)RM-E
(1x25)RM-E
(1x25)RM-E
(1x16)RM-E
(1x25)RM-E
(1x25)RM-E
(1x16)RM-E
(1x16)RM-E
(1x16)RM-E
(1x16)RM-E
(1x16)RM-E
(1x16)RM-E
(1x16)RM-E
(1x16)RM-E
MC
450KVAR PFI 70KW 70KW 70KW 70KW 50KW 30KW 70KW 70KW 25KW 20KW 20KW 20KW 20KW 22KW 22KW 22KW 22KW 22KW
I=126A I=126A I=126A I=126A I=90A I=54A I=126A I=126A I=45A I=36A I=36A I=36A I=36A I=40A I=40A I=40A I=40A I=40A
L L L L L L L L L L L L L L L L L L L
1ST 2ND 5TH 6TH 7TH LIFT 3RD FLOOR 4TH FLOOR GROUND FLOOR 1ST FLOOR 2ND FLOOR 3RD FLOOR 4TH FLOOR 5TH FLOOR 6TH FLOOR 7TH FLOOR SPARE SPARE
SPARE
FLOOR FLOOR FLOOR FLOOR FLOOR
AC LOAD LIGHTING LOAD
E LT SWITCHGEAR-2 (A/C LOAD) ELT SWITCHGEAR -1 (LIGHTING LOAD) E
1 2 3 4 5 6 7 8