Inspeksi Tower Crane

You might also like

Download as rtf, pdf, or txt
Download as rtf, pdf, or txt
You are on page 1of 2

INSPEKSI ALAT

TOWER CRANE
Proyek : __________________________________ No. Alat : __________________
Tanggal Inspeksi : __________________________________ Model /Type : __________________
Sertifikat Alat : __________________
Operator 1 : No. SIO : Operator 2 : No. SIO :
Kondisi Fungsi
No. Item Inspeksi Keterangan
Baik Buruk Baik Buruk
I KONDISI FISIK
1 Basic Mast
2 Anchored (Dudukan pondasi TC)
3 Mast Section (Maal Angkur)
4 Tangga Railling
5 Baut Mur
6 Lock Pen (Baji)
7 Tie In
8 Brashing (Keranjang Trolly)
9 Jacking/Climbing
10 Kebersihan & kerapian alat

II SISTEM PENGGERAK
1 Hoisting System : a.      Motor Hoist
b. Gear Box
c. Drum/Wire Rope
d. Pulley-pulley
e. Sistem Pelumas
2 Trolley System :      a. Motor Trolley
b. Gear Box
c. Drum/Wire Rope
d. Pulley-pulley
e. Roller Trolley
f. Sistem Pelumas
3 Slewing System : a.     Motor Slewing
b. Reducer
c. Gear Box
d. Ring Gear
e. Pulley
f. V-Belt / Couple
III ELECTRICAL SYSTEM
1 Panel Hoist, Trolley, Slewing, Cabin
2 Resistance Bank
3 Carbon Brush
4 Current Supply
5 Motor Blower
6 Breaker (Rem)
7 Drive Control / Joy Stick (Setang)
8 Microverter
9 Voltage Control
10 Alarm System
IV SAFETY / PROTECTION SYSTEM
1 Brake System
2 Limit Switch
3 Hoist Trolley
4 Slewing (Batas Putaran)
5 Over Load Limit
6 Fuse
7 Stoper
8 Lock (Kunci Slewing)
9 Arde & Penangkal Petir
10 Rambu Batas beban maksimum

DiInspeksi Oleh       Diketahui Oleh

(                                  ) ( ) ( )
HSE Mekanik           Site Manager