Cumm. Cumm.
Concrete Cement
Concrete Cement
Sl. No. Date Grade Location Side Name of Structure Part of Structure Qty. Content
Qty. Content
(Cum) (MT)
(Cum) (MT)
14.03.2022 M-15 120+295 BHS Box Culvert PCC 18.0 18.0 4.410 4.41
1 14.03.2022 M-15 119+690 BHS Box Culvert PCC 30.0 48.0 7.350 11.76
14.03.2022 M-15 117+140 BHS Box Culvert PCC 12.0 60.0 2.940 14.70
15.03.2022 M-15 121+795 BHS Box Culvert PCC 16.0 76.0 3.920 18.62
15.03.2022 M-15 118+566 BHS Box Culvert PCC 12.0 88.0 2.940 21.56
15.03.2022 M-15 119+200 BHS Box Culvert PCC 17.0 105.0 4.165 25.73
2 15.03.2022 M-15 114+445 BHS Box Culvert PCC 18.0 123.0 4.410 30.14
15.03.2022 M-15 120+865 BHS Box Culvert PCC 24.0 147.0 5.880 36.02
15.03.2022 M-15 115+785 BHS Box Culvert PCC 24.0 171.0 5.880 41.90
15.03.2022 M-15 118+205 BHS Box Culvert PCC 12.0 183.0 2.940 44.84
15.03.2022 M-15 122+800 BHS Box Culvert PCC 12.0 195.0 2.940 47.78
16.03.2022 M-15 122+800 BHS Box Culvert PCC 12.0 207.0 2.940 50.72
16.03.2022 M-15 120+865 BHS Box Culvert PCC 10.0 217.0 2.450 53.17
16.03.2022 M-15 116+400 BHS Box Culvert PCC 18.0 235.0 4.410 57.58
3
16.03.2022 M-15 117+780 BHS Box Culvert PCC 10.0 245.0 2.450 60.03
16.03.2022 M-15 121+375 BHS Box Culvert PCC 18.0 263.0 4.410 64.44
16.03.2022 M-15 123+830 BHS Box Culvert PCC 10.0 273.0 2.450 66.89
17.03.2022 M-15 121+375 BHS Box Culvert PCC 12.0 285.0 2.940 69.83
17.03.2022 M-15 123+830 BHS Box Culvert PCC 12.0 297.0 2.940 72.77
4
17.03.2022 M-15 116+980 BHS Box Culvert PCC 14.0 311.0 3.430 76.20
17.03.2022 M-15 115+200 BHS Box Culvert PCC 15.0 326.0 3.675 79.87
5 19.03.2022 M-15 114+421 BHS Box Culvert PCC 15.0 341.0 3.675 83.55
6 20.03.2022 M-15 118+840 BHS Box Culvert PCC 14.0 355.0 3.430 86.98
7 22.03.2022 M-15 112+130 BHS Box Culvert PCC 12.0 367.0 2.940 89.92
8 23.03.2022 M-15 122+800 BHS Box Culvert PCC 1.0 368.0 0.245 90.16
24.03.2022 M-15 120+831 BHS LVUP PCC 36.0 404.0 8.820 98.98
9
24.03.2022 M-15 120+245 BHS Box Culvert PCC 18.0 422.0 4.410 103.39
25.03.2022 M-15 120+831 BHS LVUP PCC 18.0 440.0 4.410 107.80
25.03.2022 M-15 120+084 BHS MNB PCC 66.0 506.0 16.170 123.97
10
25.03.2022 M-15 114+678 BHS Box Culvert PCC 12.0 518.0 2.940 126.91
25.03.2022 M-15 112+160 BHS Box Culvert PCC 17.0 535.0 4.165 131.08
26.03.2022 M-15 120+084 BHS MNB PCC 3.0 538.0 0.735 131.81
26.03.2022 M-15 111+982 BHS Box Culvert PCC 15.0 553.0 3.675 135.49
26.03.2022 M-15 123+430 BHS Box Culvert PCC 20.0 573.0 4.900 140.39
26.03.2022 M-15 Camp Work PCC 6.0 579.0 1.470 141.86
11
26.03.2022 M-15 111+660 BHS Box Culvert PCC 12.0 591.0 2.940 144.80
26.03.2022 M-15 114+678 BHS Box Culvert PCC 12.0 603.0 2.940 147.74
26.03.2022 M-15 121+795 BHS Box Culvert PCC 6.0 609.0 1.470 149.21
26.03.2022 M-15 111+306 BHS Box Culvert PCC 12.0 621.0 2.940 152.15
27.03.2022 M-15 120+831 BHS LVUP PCC 2.5 623.5 0.613 152.76
27.03.2022 M-15 110+759 BHS Box Culvert PCC 12.0 635.5 2.940 155.70
27.03.2022 M-15 102+960 BHS Box Culvert PCC 18.0 653.5 4.410 160.11
12
27.03.2022 M-15 123+273 MNB PCC 24.0 677.5 5.880 165.99
27.03.2022 M-30 118+566 BHS Box Culvert Raft 10.0 687.5 3.700 169.69
27.03.2022 M-35 Pile 122+350 MJB Test Pile 35.0 722.5 14.000 183.69
28.03.2022 M-35 Pile 122+350 MJB Anchor Pile 36.0 758.5 14.400 198.09
28.03.2022 M-30 121+795 Box Culvert Raft 6.0 764.5 2.220 200.31
28.03.2022 M-30 122+800 LHS Box Culvert Raft 3.0 767.5 1.110 201.42
28.03.2022 M-15 109+375 BHS Box Culvert PCC 11.0 778.5 2.695 204.11
13
28.03.2022 M-15 123+273 BHS MNB PCC 29.0 807.5 7.105 211.22
28.03.2022 M-15 109+512 BHS Box Culvert PCC 6.0 813.5 1.470 212.69
28.03.2022 M-15 102+962 Box Culvert PCC 6.5 820.0 1.593 214.28
28.03.2022 M-15 110+188 BHS Box Culvert PCC 5.0 825.0 1.225 215.51
29.03.2022 M-15 103+200 BHS Box Culvert PCC 17.0 842.0 4.165 219.67
29.03.2022 M-15 110+492 BHS Box Culvert PCC 12.0 854.0 2.940 222.61
29.03.2022 M-15 123+273 BHS MNB PCC 24.0 878.0 5.880 228.49
14
29.03.2022 M-15 110+188 BHS Box Culvert PCC 6.0 884.0 1.470 229.96
29.03.2022 M-15 104+000 Box Culvert PCC 5.0 889.0 1.225 231.19
14 29.03.2022 M-15 109+512 BHS Box Culvert PCC 6.0 895.0 1.470 232.66
29.03.2022 M-15 109+375 BHS Box Culvert PCC 6.0 901.0 1.470 234.13
29.03.2022 M-30 111+982 RHS Box Culvert Raft 8.0 909.0 2.960 237.09
29.03.2022 M-30 122+800 Box Culvert Raft 6.0 915.0 2.220 239.31
29.03.2022 M-30 120+895 LHS Box Culvert Raft 12.0 927.0 4.440 243.75
29.03.2022 M-30 121+795 LHS Box Culvert Raft 15.0 942.0 5.550 249.30
30.03.2022 M-30 111+982 LHS Box Culvert Raft 12.0 954.0 4.440 253.74
30.03.2022 M-30 118+566 Box Culvert Raft 4.0 958.0 1.480 255.22
30.03.2022 M-15 110+375 BHS Box Culvert PCC 5.0 963.0 1.225 256.44
30.03.2022 M-15 123+273 MNB PCC 35.0 998.0 8.575 265.02
15
30.03.2022 M-15 104+000 Box Culvert PCC 12.0 1010.0 2.940 267.96
30.03.2022 M-15 110+093 Box Culvert PCC 6.0 1016.0 1.470 269.43
30.03.2022 M-35 Pile 122+350 MJB Anchor Pile 35.0 1051.0 14.000 283.43
30.03.2022 M-35 Pile 124+575 MNB Test Pile 30.0 1081.0 12.000 295.43
31.03.2022 M-30 122+800 BHS Box Culvert Hunch Wall 5.0 1086.0 1.850 297.28
31.03.2022 M-30 119+200 Box Culvert Raft 12.25 1098.3 4.533 301.81
31.03.2022 M-30 117+140 Box Culvert Raft 6.25 1104.5 2.313 304.12
31.03.2022 M-15 104+400 Box Culvert PCC 18.0 1122.5 4.410 308.53
31.03.2022 M-15 110+375 Box Culvert PCC 6.0 1128.5 1.470 310.00
16 31.03.2022 M-15 123+273 MNB PCC 24.0 1152.5 5.880 315.88
31.03.2022 M-15 109+093 Box Culvert PCC 6.0 1158.5 1.470 317.35
31.03.2022 M-15 103+600 Box Culvert PCC 6.0 1164.5 1.470 318.82
31.03.2022 M-15 109+512 Box Culvert PCC 5.0 1169.5 1.225 320.05
31.03.2022 M-15 108+313 Box Culvert PCC 6.0 1175.5 1.470 321.52
31.03.2022 M-15 122+700 MNB PCC 5.0 1180.5 1.225 322.74
01.04.2022 M-15 108+313 RHS Box Culvert PCC 11.00 1191.5 2.70 325.44
01.04.2022 M-15 106+438 BHS Box Culvert PCC 12.00 1203.5 2.94 328.38
01.04.2022 M-15 122+700 BHS MNB PCC 24.00 1227.5 5.88 334.26
01.04.2022 M-15 109+512 RHS Box Culvert PCC 6.00 1233.5 1.47 335.73
17 01.04.2022 M-15 104+400 BHS Box Culvert PCC 18.00 1251.5 4.41 340.14
01.04.2022 M-30 118+566 RHS Box Culvert Raft 6.00 1257.5 2.22 342.36
01.04.2022 M-30 119+200 RHS Box Culvert Raft 6.00 1263.5 2.22 344.58
01.04.2022 M-30 120+295 RHS Box Culvert Raft 6.00 1269.5 2.22 346.80
01.04.2022 M-35 Pile 124+575 LHS MNB Anchor Pile 41.50 1311.0 16.60 363.40
02.04.2022 M-15 122+700 BHS MNB PCC 21.0 1332.0 5.15 368.54
02.04.2022 M-15 106+438 BHS Box Culvert PCC 24.0 1356.0 5.88 374.42
02.04.2022 M-15 108+575 BHS Box Culvert PCC 17.0 1373.0 4.17 378.59
02.04.2022 M-15 106+675 BHS Box Culvert PCC 12.0 1385.0 2.94 381.53
02.04.2022 M-15 113+600 BHS Box Culvert PCC 6.0 1391.0 1.47 383.00
18
02.04.2022 M-15 106+885 BHS Box Culvert PCC 12.0 1403.0 2.94 385.94
02.04.2022 M-30 120+865 LHS Box culvert Raft 23.0 1426.0 8.51 394.45
02.04.2022 M-30 121+795 LHS Box culvert hunch wall 6.0 1432.0 2.22 396.67
02.04.2022 M-30 119+680 RHS Box culvert Raft 35.0 1467.0 12.95 409.62
02.04.2022 M-30 121+795 RHS Box culvert Raft 12.0 1479.0 4.44 414.06
03.04.2022 M-15 124+280 BHS VUP PCC 18.00 1497.0 4.41 418.47
03.04.2022 M-15 106+438 LHS Box Culvert PCC 18.00 1515.0 4.41 422.88
03.04.2022 M-15 113+600 RHS Box Culvert PCC 10.00 1525.0 2.45 425.33
03.04.2022 M-15 107+120 LHS Box Culvert PCC 6.00 1531.0 1.47 426.80
19 03.04.2022 M-15 106+885 BHS Box Culvert PCC 5.00 1536.0 1.23 428.02
03.04.2022 M-30 119+680 LHS Box Culvert Raft 40.00 1576.0 14.80 442.82
03.04.2022 M-30 111+306 LHS Box Culvert Raft 8.00 1584.0 2.96 445.78
03.04.2022 M-30 112+160 LHS Box Culvert Raft 8.00 1592.0 2.96 448.74
03.04.2022 M-35 Pile 124+575 LHS MNB Anchor Pile 40.00 1632.0 16.00 464.74
04.04.2022 M-15 106+885 BHS Box Culvert PCC 5.00 1637.0 1.23 465.97
04.04.2022 M-15 106+675 BHS Box Culvert PCC 24.00 1661.0 5.88 471.85
04.04.2022 M-15 124+280 BHS VUP PCC 30.00 1691.0 7.35 479.20
04.04.2022 M-15 105+115 BHS Box Culvert PCC 18.00 1709.0 4.41 483.61
20 04.04.2022 M-15 113+085 RHS MNB PCC 17.00 1726.0 4.17 487.77
04.04.2022 M-30 111+982 RHS Box Culvert 1st Lift Wall 11.00 1737.0 4.07 491.84
04.04.2022 M-30 117+140 LHS Box Culvert Raft 10.00 1747.0 3.70 495.54
04.04.2022 M-30 111+306 LHS Box Culvert Bottom Hunch 1.00 1748.0 0.37 495.91
04.04.2022 M-35 Pile 122+350 LHS MJB P2 Pile No.6 36.00 1784.0 14.40 510.31
05.04.2022 M-35 Pile 122+350 LHS MJB P2 Pile No.5 35.00 1819.0 14.00 524.31
05.04.2022 M-15 123+000 BHS MNB PCC 30.00 1849.0 7.35 531.66
05.04.2022 M-15 105+910 BHS Box Culvert PCC 6.00 1855.0 1.47 533.13
05.04.2022 M-15 105+180 BHS Box Culvert PCC 28.00 1883.0 6.86 539.99
05.04.2022 M-15 113+085 LHS MNB PCC 6.00 1889.0 1.47 541.46
21
05.04.2022 M-15 108+597 BHS LVUP PCC 11.00 1900.0 2.70 544.16
05.04.2022 M-30 110+188 LHS Box Culvert Raft 12.00 1912.0 4.44 548.60
05.04.2022 M-35 111+982 LHS Box Culvert Bottom Hunch 2.50 1914.5 0.963 549.56
05.04.2022 M-35 120+831 LHS LVUP Raft 18.00 1932.5 6.93 556.49
05.04.2022 Slurry 120+831 LHS LVUP Raft 1.00 1933.5 0.25 556.74
06.04.2022 M-15 105+910 BHS Box Culvert PCC 15.00 1948.5 3.68 560.41
06.04.2022 M-15 108+860 BHS Box Culvert PCC 17.00 1965.5 4.17 564.58
06.04.2022 M-15 104+810 BHS Box Culvert PCC 20.00 1985.5 4.90 569.48
06.04.2022 M-15 102+485 BHS Box Culvert PCC 18.00 2003.5 4.41 573.89
06.04.2022 M-30 122+800 RHS Box Culvert Wall 10.00 2013.5 3.70 577.59
22
06.04.2022 M-30 118+566 Box Culvert Wall 4.00 2017.5 1.48 579.07
06.04.2022 M-30 117+400 LHS Box Culvert Wall 12.00 2029.5 4.44 583.51
06.04.2022 M-30 115+200 RHS Box Culvert Raft 10.50 2040.0 3.89 587.39
06.04.2022 M-30 119+200 RHS Box Culvert Bottom Hunch 1.50 2041.5 0.56 587.95
06.04.2022 M-35 Pile 122+350 LHS MJB P2 Pile No.6 35.00 2076.5 14.00 601.95
07.04.2022 M-35 Pile 122+350 RHS MJB P2 Pile 35.00 2111.5 14.00 615.95
07.04.2022 M-15 115+740 RHS Box Culvert PCC 6.00 2117.5 1.47 617.42
07.04.2022 M-15 106+885 BHS Box Culvert PCC 6.00 2123.5 1.47 618.89
07.04.2022 M-15 109+675 BHS MNB PCC 30.00 2153.5 7.35 626.24
07.04.2022 M-15 102+100 BHS Box Culvert PCC 6.00 2159.5 1.47 627.71
23 07.04.2022 M-15 101+550 BHS Box Culvert PCC 12.00 2171.5 2.94 630.65
07.04.2022 M-30 119+690 RHS Box Culvert Raft 5.00 2176.5 1.85 632.50
07.04.2022 M-30 109+512 RHS Box Culvert Raft 15.00 2191.5 5.55 638.05
07.04.2022 M-30 117+140 RHS Box Culvert Raft Hunch 6.00 2197.5 2.22 640.27
07.04.2022 M-30 120+865 BHS Box Culvert Raft 66.00 2263.5 24.42 664.69
07.04.2022 Slurry 120+865 BHS Box Culvert Raft 1.00 2264.5 0.25 664.94
08.04.2022 M-15 101+140 BHS Box Culvert PCC 17.00 2281.5 4.17 669.10
08.04.2022 M-15 109+675 RHS MNB PCC 18.00 2299.5 4.41 673.51
08.04.2022 M-15 108+597 LHS LVUP PCC 6.00 2305.5 1.47 674.98
24 08.04.2022 M-30 121+795 LHS Box Culvert Wall 1st Lift 4.00 2309.5 1.48 676.46
08.04.2022 M-35 120+831 LHS LVUP Raft 113.00 2422.5 43.505 719.97
08.04.2022 Slurry 120+831 LHS LVUP Raft 1.00 2423.5 0.250 720.22
08.04.2022 M-35 Pile 122+350 RHS MJB Pile P-2 30.00 2453.5 12.00 732.22
09.04.2022 M-15 108+597 LHS LVUP PCC 12.00 2465.5 2.94 735.16
09.04.2022 M-15 123+270 BHS MNB PCC 12.00 2477.5 2.94 738.10
09.04.2022 M-30 118+566 RHS Box Culvert Wall 1st Lift 6.00 2483.5 2.22 740.32
09.04.2022 M-30 117+440 RHS Box Culvert Raft 4.00 2487.5 1.48 741.80
09.04.2022 M-30 111+982 RHS Box Culvert Slab
1st Lift A1&A2 And 11.00 2498.5 4.07 745.87
25 09.04.2022 M-30 111+306 LHS Box Culvert Bottom Hunch Casting 12.00 2510.5 4.44 750.31
09.04.2022 M-30 121+795 LHS Box Culvert (RHS)
Wall 1st Lift 1.50 2512.0 0.56 750.86
09.04.2022 M-30 112+160 RHS Box Culvert Raft 12.00 2524.0 4.44 755.30
09.04.2022 M-30 115+740 BHS Box Culvert Raft 20.00 2544.0 7.40 762.70
09.04.2022 M-30 122+800 RHS Box Culvert Wall 1st Lift 8.00 2552.0 2.96 765.66
09.04.2022 Slurry 111+982 RHS Box Culvert Slab 1.00 2553.0 0.25 765.91
10.04.2022 M-30 120+865 BHS Box Culvert Hunch 8.00 2561.0 2.96 768.87
10.04.2022 M-30 121+795 LHS Box Culvert Wall 1st Lift 3.50 2564.5 1.30 770.17
10.04.2022 M-30 108+575 RHS Box Culvert Raft 6.00 2570.5 2.22 772.39
10.04.2022 M-30 111+685 LHS Box Culvert Raft 8.00 2578.5 2.96 775.35
10.04.2022 M-15 123+270 RHS MNB PCC 12.00 2590.5 2.94 778.29
26 10.04.2022 M-15 114+688 LHS Box Culvert PCC 6.50 2597.0 1.59 779.88
10.04.2022 M-15 121+621 BHS MNB PCC 30.00 2627.0 7.35 787.23
10.04.2022 M-35 Pile 122+350 LHS MJB P-2 Pile 30.00 2657.0 12.00 799.23
10.04.2022 M-35 Pile 122+350 RHS MJB A-1 Pile 30.00 2687.0 12.00 811.23
10.04.2022 Slurry 123+270 RHS MNB PCC 1.00 2688.0 0.25 811.48
10.04.2022 Slurry 121+621 BHS MNB PCC 1.00 2689.0 0.25 811.73
11.04.2022 M-30 120+595 Box Culvert wall 10.0 2699.0 3.70 815.43
11.04.2022 M-30 111+982 LHS Box Culvert wall 11.0 2710.0 4.07 819.50
11.04.2022 M-30 108+575 LHS Box Culvert Raft 5.5 2715.5 2.04 821.54
27 11.04.2022 M-30 115+785 LHS Box Culvert Raft 6.0 2721.5 2.22 823.76
11.04.2022 M-30 117+140 RHS Box Culvert hunch 4.0 2725.5 1.48 825.24
11.04.2022 M-30 110+188 RHS Box Culvert Raft 8.0 2733.5 2.96 828.20
11.04.2022 M-30 121+188 RHS Box Culvert wall 5.0 2738.5 1.85 830.05
12.04.2022 M-15 114+688 LHS Box Culvert PCC 6.00 2744.5 1.47 831.52
12.04.2022 M-15 123+273 LHS MNB PCC 12.00 2756.5 2.94 834.46
12.04.2022 M-15 103+00 LHS Box Culvert PCC 2.00 2758.5 0.49 834.95
12.04.2022 M-15 104+00 RHS Box Culvert PCC 2.00 2760.5 0.490 835.44
12.04.2022 M-20 121+624 LHS MNB PCC 24.00 2784.5 7.25 842.68
12.04.2022 M-30 120+865 BHS Box Culvert hunch 5.00 2789.5 1.85 844.53
12.04.2022 M-30 109+512 RHS Box Culvert hunch 2.00 2791.5 0.74 845.27
28 12.04.2022 M-30 111+685 RHS Box Culvert hunch 2.00 2793.5 0.74 846.01
12.04.2022 M-30 115+200 LHS Box Culvert hunch 2.00 2795.5 0.74 846.75
12.04.2022 M-35 120+831 LHS MNB hunch 5.00 2800.5 1.925 848.68
12.04.2022 M-35 Pile 124+575 LHS MNB PIle 30.00 2830.5 12.00 860.68
12.04.2022 M-35 Pile 122+350 RHS MJB PIle P2 36.00 2866.5 14.40 875.08
12.04.2022 M-35 Pile 122+350 LHS MJB PIle P2 30.00 2896.5 12.00 887.08
12.04.2023 Slurry 121+624 LHS MNB PCC 1.00 2897.5 0.25 887.33
12.04.2023 Slurry 120+865 BHS Box Culvert hunch 1.00 2898.5 0.25 887.58
13.04.2022 M-15 104+00 RHS Box Culvert PCC 3.00 2901.5 0.735 888.31
13.04.2022 M-15 121+624 LHS MNB PCC 21.00 2922.5 5.145 893.46
13.04.2022 M-15 105+449 RHS MNB PCC 40.00 2962.5 9.800 903.26
13.04.2022 M-30 117+445 RHS Box Culvert Hunch 3.00 2965.5 1.11 904.37
29
13.04.2022 M-30 120+865 LHS Box Culvert Wall 6.00 2971.5 2.22 906.59
13.04.2022 M-35 Pile 122+350 LHS MJB Pile A1 33.00 3004.5 13.20 919.79
13.04.2022 M-35 109+675 LHS MNB Raft 53.00 3057.5 20.405 940.19
13.04.2022 Slurry 109+675 LHS MNB Raft 1.00 3058.5 0.25 940.44
14.04.2022 M-15 105+449 LHS MNB PCC 12.00 3070.5 2.940 943.38
14.04.2022 M-15 106+640 RHS Box Culvert PCC 6.00 3076.5 1.470 944.85
14.04.2022 M-30 106+675 RHS Box Culvert raft 12.50 3089.0 4.63 949.48
30 14.04.2022 M-30 106+675, 110+188 LHS Box Culvert raft 12.00 3101.0 4.44 953.92
14.04.2022 M-35 120+084 RHS MNB Raft 207.00 3308.0 79.695 1033.61
14.04.2022 Slurry 120+084 RHS MNB Raft 1.00 3309.0 0.25 1033.86
14.04.2022 M-35 Pile 122+350 LHS MJB Pile p2/1 37.50 3346.5 15.00 1048.86
15.04.2022 M-15 106+640 BHS Box Culvert PCC 24.00 3370.5 5.880 1054.74
15.04.2022 M-15 105+449 LHS MNB PCC 6.00 3376.5 1.470 1056.21
15.04.2022 M-15 101+880 BHS Box Culvert PCC 18.00 3394.5 4.410 1060.62
15.04.2022 M-15 123+300 RHS MNB PCC 4.00 3398.5 0.980 1061.60
15.04.2022 M-30 111+982 LHS Box Culvert Slab 12.00 3410.5 4.44 1066.04
31 15.04.2022 Slurry 111+982 LHS Box Culvert Slab 1.00 3411.5 0.25 1066.29
15.04.2022 M-30 111+306 LHS Box Culvert Slab 15.00 3426.5 5.55 1071.84
31
15.04.2022 M-30 115+785 RHS Box Culvert Raft 6.00 3432.5 2.22 1074.06
15.04.2022 M-35 113+085 RHS MNB Raft 55.00 3487.5 21.175 1095.24
15.04.2022 M-35 Pile 122+350 LHS MJB Pile A1/P2 35.00 3522.5 14.00 1109.24
15.04.2022 M-35 Pile 124+575 LHS MNB Pile 32.00 3554.5 12.80 1122.04
16.04.2022 M-15 106+640 BHS Box Culvert PCC 6.00 3560.5 1.470 1123.51
16.04.2022 M-15 101+835 BHS Box Culvert PCC 18.00 3578.5 4.410 1127.92
16.04.2022 M-15 122+700 BHS MNB Share key 4.00 3582.5 0.980 1128.90
16.04.2022 M-30 115+200 BHS Box Culvert Raft 12.00 3594.5 4.44 1133.34
32 16.04.2022 M-30 119+200 BHS Box Culvert Wall 11.00 3605.5 4.07 1137.41
16.04.2022 M-30 103+600 RHS Box Culvert Raft 6.50 3612.0 2.41 1139.81
16.04.2022 M-35 120+831 RHS LVUP Raft 108.00 3720.0 41.580 1181.39
16.04.2022 M-35 Pile 122+350 LHS MJB Pile A1/P2 36.00 3756.0 14.40 1195.79
16.04.2022 M-35 Pile 97+074 RHS MJB Anchor Pile 34.00 3790.0 13.60 1209.39
17.04.2022 M-15 122+700 MNB Share key 9.00 3799.0 2.205 1211.60
17.04.2022 M-15 121+880 BHS MNB PCC 48.00 3847.0 11.760 1223.36
17.04.2022 M-15 100+120 BHS MNB PCC 24.00 3871.0 5.880 1229.24
17.04.2022 M-15 Camp safety work Block casting 0.50 3871.5 0.123 1229.36
17.04.2022 M-15 99+890 MNB PCC 30.00 3901.5 7.350 1236.71
33 17.04.2022 M-30 117+440 Box Culvert Bottom Hunch 3.50 3905.0 1.30 1238.01
17.04.2022 M-30 118+250 RHS Box Culvert Raft 12.00 3917.0 4.44 1242.45
17.04.2022 M-30 111+306 RHS box Culvert wall 12.00 3929.0 4.44 1246.89
17.04.2022 M-30 103+600 LHS box Culvert Raft 6.00 3935.0 2.22 1249.11
17.04.2022 M-30 115+785 LHS Box Culvert Bottom Hunch 5.00 3940.0 1.85 1250.96
17.04.2022 M-35 Pile 124+575 RHS MNB Pile 32.00 3972.0 12.80 1263.76
18.04.2022 M-15 100+120 LHS MNB PCC 12.00 3984.0 2.940 1266.70
18.04.2022 M-15 121+880 RHS MNB PCC 18.00 4002.0 4.410 1271.11
18.04.2022 M-15 112+620 BHS box Culvert PCC 13.00 4015.0 3.185 1274.29
18.04.2022 M-15 122+700 BHS MNB Share key 3.00 4018.0 0.735 1275.03
18.04.2022 M-15 121+880 BHS box Culvert Share key 3.00 4021.0 0.735 1275.76
18.04.2022 M-30 120+865 LHS box Culvert wall 9.50 4030.5 3.52 1279.28
18.04.2022 M-30 111+685 LHS box Culvert wall 6.00 4036.5 2.22 1281.50
34
18.04.2022 M-30 106+675 RHS Box Culvert Bottom Hunch 3.50 4040.0 1.30 1282.79
18.04.2022 M-30 119+690 LHS box Culvert wall 12.00 4052.0 4.44 1287.23
18.04.2022 M-35 120+831 RHS LVUP hunch wall 6.00 4058.0 2.310 1289.54
18.04.2022 M-35 120+831 LHS LVUP hunch wall 6.00 4064.0 2.310 1291.85
18.04.2022 M-35 Pile 124+575 LHS MNB Pile A1/P3 32.00 4096.0 12.80 1304.65
18.04.2022 M-35 Pile 122+350 LHS MJB Pile A1/P8 34.00 4130.0 13.60 1318.25
18.04.2022 M-35 Pile 97+450 LHS MNB Pile 34.00 4164.0 13.60 1331.85
19.04.2022 M-15 100+960 BHS MNB PCC 34.00 4198.0 8.330 1340.18
19.04.2022 M-15 114+134 BHS Box Culvert PCC 24.00 4222.0 5.880 1346.06
19.04.2022 M-15 122+700 BHS MNB Share key 3.00 4225.0 0.735 1346.80
19.04.2022 M-30 110+188 LHS Box Culvert wall 6.00 4231.0 2.22 1349.02
19.04.2022 M-30 108+575 BHS Box Culvert Raft 18.00 4249.0 6.66 1355.68
35
19.04.2022 M-30 117+140 LHS Box Culvert wall 6.50 4255.5 2.41 1358.08
19.04.2022 M-30 107+400 LHS Box Culvert Raft 5.50 4261.0 2.04 1360.12
19.04.2022 M-30 115+785 LHS Box Culvert wall 3.00 4264.0 1.11 1361.23
19.04.2022 M-30 115+200 LHS Box Culvert Bottom Hunch 1.50 4265.5 0.56 1361.78
19.04.2022 M-35 120+084 RHS MNB wall Hunch 12.00 4277.5 4.620 1366.40
20.04.2022 M-15 100+280 BHS MNB PCC 23.00 4300.5 5.635 1372.04
20.04.2022 M-30 106+438 BHS Box Culvert Raft 66.00 4366.5 24.42 1396.46
20.04.2022 M-30 120+865 RHS Box Culvert wall 4.50 4371.0 1.67 1398.12
20.04.2022 M-30 104+00 BHS Box Culvert Raft 16.00 4387.0 5.92 1404.04
36
20.04.2022 M-35 117+140 LHS Box Culvert wall 2.00 4389.0 0.770 1404.81
20.04.2022 M-35 Pile 124+575 LHS MNB Pile A2 35.00 4424.0 14.00 1418.81
20.04.2022 M-35 Pile 122+350 RHS MJB Pile P2 36.00 4460.0 14.40 1433.21
20.04.2022 M-35 Pile 122+350 LHS MJB Pile A1 30.00 4490.0 12.00 1445.21
21.04.2022 M-15 100+280 BHS MNB PCC 3.00 4493.0 0.735 1445.95
21.04.2022 M-15 98+950 BHS MNB PCC 18.00 4511.0 4.410 1450.36
21.04.2022 M-15 98+600 BHS MNB PCC 30.00 4541.0 7.350 1457.71
21.04.2022 M-30 118+566 LHS Box Culvert Slab 18.00 4559.0 6.66 1464.37
21.04.2022 M-30 120+865 RHS Box Culvert WALL 4.50 4563.5 1.67 1466.03
21.04.2022 M-30 109+512 LHS Box Culvert Raft(MCW & S/R) 12.00 4575.5 4.44 1470.47
21.04.2022 M-30 121+795 LHS Box Culvert Slab 19.00 4594.5 7.03 1477.50
37
21.04.2022 M-30 111+685 RHS Box Culvert Wall 5.00 4599.5 1.85 1479.35
21.04.2022 M-30 112+130 RHS Box Culvert Raft 12.00 4611.5 4.44 1483.79
21.04.2022 M-30 107+400 RHS Box Culvert Raft 5.50 4617.0 2.04 1485.83
21.04.2022 M-30 108+575 BHS Box Culvert HUNCH 3.00 4620.0 1.11 1486.94
21.04.2022 M-35 Pile 97+566 LHS MNB Anchor Pile 36.00 4656.0 14.40 1501.34
21.04.2022 M-35 Pile 124+575 LHS MNB Pile a1 32.00 4688.0 12.80 1514.14
21.04.2022 M-35 Pile 122+350 RHS MJB Pile a1 30.00 4718.0 12.00 1526.14
22.04.2022 M-15 98+950 LHS MNB PCC 6.00 4724.0 1.470 1527.61
22.04.2022 M-15 98+250 BHS MNB PCC 6.00 4730.0 1.470 1529.08
22.04.2022 M-30 108+575 &103+600 BHS Box Culvert HUNCH 6.00 4736.0 2.22 1531.30
38 22.04.2022 M-30 103+600 &106+438 BHS Box Culvert HUNCH 5.00 4741.0 1.85 1533.15
22.04.2022 M-35 120+084 LHS MNB Raft 214.00 4955.0 82.390 1615.54
22.04.2022 M-35 Pile 122+350 LHS MNB PILE 24.00 4979.0 9.60 1625.14
22.04.2022 M-35 Pile 122+350 RHS MNB Pile P2 28.00 5007.0 11.20 1636.34
23.04.2022 M-15 98+600 BHS MNB PCC 23.00 5030.0 5.635 1641.97
23.04.2022 M-15 98+250 BHS MNB PCC 6.00 5036.0 1.470 1643.44
23.04.2022 M-15 97+850 BHS MNB PCC 29.00 5065.0 7.105 1650.55
23.04.2022 M-30 118+566 BHS Box Culvert Raft 12.00 5077.0 4.44 1654.99
23.04.2022 M-30 120+865 RHS Box Culvert Wall 6.00 5083.0 2.22 1657.21
23.04.2022 M-30 111+306 LHS box Culvert Slab 6.00 5089.0 2.22 1659.43
39 23.04.2022 M-30 106+675 LHS box Culvert raft 6.00 5095.0 2.22 1661.65
23.04.2022 M-30 117+140 RHS box Culvert wall 6.00 5101.0 2.22 1663.87
23.04.2022 M-30 112+160 LHS box Culvert wall 6.00 5107.0 2.22 1666.09
23.04.2022 M-30 120+240 BHS box Culvert wall 12.50 5119.5 4.63 1670.71
23.04.2022 M-30 119+680 BHS box Culvert wall 12.50 5132.0 4.63 1675.34
23.04.2022 M-35 113+085 RHS MNB Bottom Hunch 18.00 5150.0 6.930 1682.27
23.04.2022 M-35 Pile 122+350 LHS MJB Pile a1 37.50 5187.5 15.00 1697.27
24.04.2022 M-15 96+750 BHS Box Culvert PCC 24.00 5211.5 5.880 1703.15
24.04.2022 M-15 96+200 BHS Box Culvert PCC 18.00 5229.5 4.410 1707.56
24.04.2022 M-30 120+295 LHS Box Culvert Slab 12.00 5241.5 4.44 1712.00
24.04.2022 M-30 108+575 RHS BOx Culvert HUNCH 3.00 5244.5 1.11 1713.11
24.04.2022 M-30 109+512 LHS Box Culvert HUNCH 3.00 5247.5 1.11 1714.22
24.04.2022 M-30 111+685 LHS Box Culvert Slab 18.00 5265.5 6.66 1720.88
40 24.04.2022 M-30 102+100 BHS Box Culvert Raft 18.00 5283.5 6.66 1727.54
24.04.2022 M-30 118+250 LHS Box Culvert Raft 18.00 5301.5 6.66 1734.20
24.04.2022 M-30 104+000 BHS Box Culvert HUNCH 6.00 5307.5 2.22 1736.42
24.04.2022 M-30 110+188 RHS Box Culvert Wall 6.00 5313.5 2.22 1738.64
24.04.2022 M-35 120+831 LHS LVUP wall 1st lift 24.00 5337.5 9.240 1747.88
24.04.2022 M-35 Pile 122+350 RHS MJB Pile p2 36.00 5373.5 14.40 1762.28
24.04.2022 M-35 Pile 122+350 LHS MJB Pile A1 32.00 5405.5 12.80 1775.08
25.04.2022 M-15 96+200 BHS MNB PCC 18.00 5423.5 4.410 1779.49
25.04.2022 M-30 120+865 BHS Box Culvert Wall 6.50 5430.0 2.41 1781.89
25.04.2022 M-30 106+675 BHS box Culvert wall 6.00 5436.0 2.22 1784.11
25.04.2022 M-30 104+000 BHS Box Culvert Hunch 6.00 5442.0 2.22 1786.33
41
25.04.2022 M-30 101+141 LHS Box Culvert raft 8.00 5450.0 2.96 1789.29
25.04.2022 M-35 124+280 LHS VUP Raft 117.00 5567.0 45.045 1834.34
25.04.2022 M-35 Pile 124+575 LHS MNB Pile 32.00 5599.0 12.80 1847.14
25.04.2022 M-35 Pile 122+350 RHS MJB Pile A1 31.50 5630.5 12.60 1859.74
26.04.2022 M-15 95+850 BHS MNB PCC 30.00 5660.5 7.350 1867.09
26.04.2022 M-30 103+640 BHS Box Culvert Raft 18.00 5678.5 6.66 1873.75
26.04.2022 M-30 120+084 LHS MNB wall 2nd lift 30.00 5708.5 11.10 1884.85
26.04.2022 M-30 115+785 LHS box Culvert wall MCW 4.50 5713.0 1.67 1886.51
42 26.04.2022 M-30 112+130 BHS Box Culvert Hunch 6.00 5719.0 2.22 1888.73
26.04.2022 M-30 107+400 BHS box Culvert raft 12.00 5731.0 4.44 1893.17
26.04.2022 M-30 111+678 RHS Box Culvert raft 37.25 5768.3 13.78 1906.95
26.04.2022 M-30 102+100 RHS Box Culvert Raft 6.00 5774.3 2.22 1909.17
26.04.2022 M-35 Pile 122+350 LHS MJB Pile A1 30.00 5804.3 12.00 1921.17
27.04.2022 M-15 97+450 BHS MNB PCC 26.00 5830.3 6.370 1927.54
27.04.2022 M-30 102+100 RHS Box Culvert Raft 6.00 5836.3 2.22 1929.76
27.04.2022 M-30 115+785 LHS Box Culvert WALL 1.50 5837.8 0.56 1930.32
27.04.2022 M-30 117+445 LHS Box Culvert Wall MCW 6.50 5844.3 2.41 1932.72
43 27.04.2022 M-30 111+685 RHS Box Culvert Slab 12.00 5856.3 4.44 1937.16
27.04.2022 M-30 115+200 LHS Box Culvert WALL 12.00 5868.3 4.44 1941.60
27.04.2022 M-30 101+140 RHS Box Culvert HUNCH 2.50 5870.8 0.93 1942.53
27.04.2022 M-35 109+675 BHS MNB Raft 136.00 6006.8 52.360 1994.89
27.04.2022 M-35 Pile 122+350 RHS MJB Pile a1 29.50 6036.3 11.80 2006.69
28.04.2022 M-15 122+200 girder casting PCC 4.50 6040.8 1.103 2007.79
28.04.2022 M-30 112+620 RHS Box Culvert Raft 6.00 6046.8 2.22 2010.01
28.04.2022 M-30 115+200 LHS Box Culvert WALL 6.00 6052.8 2.22 2012.23
28.04.2022 M-30 102+100 LHS Box Culvert HUNCH 6.00 6058.8 2.22 2014.45
28.04.2022 M-30 121+795 RHS Box Culvert Slab 18.00 6076.8 6.66 2021.11
28.04.2022 M-30 108+560 RHS Box Culvert WALL 6.00 6082.8 2.22 2023.33
44 28.04.2022 M-30 107+400 BHS Box Culvert HUNCH 6.00 6088.8 2.22 2025.55
28.04.2022 M-30 120+865 BHS Box Culvert WALL 11.00 6099.8 4.07 2029.62
28.04.2022 M-30 109+512 RHS Box Culvert WAL 12.50 6112.3 4.63 2034.25
28.04.2022 M-30 104+00 RHS Box Culvert Raft 6.00 6118.3 2.22 2036.47
28.04.2022 M-35 123+000 RHS MNB Raft 59.00 6177.3 22.715 2059.18
28.04.2022 M-35 120+084 RHS MNB wall 2nd lift 6.00 6183.3 2.310 2061.49
28.04.2022 M-35 Pile 122+350 RHS MJB Pile a1 35.00 6218.3 14.00 2075.49
29.04.2022 M-15 100+280 BHS MNB PCC 6.00 6224.3 1.470 2076.96
29.04.2022 M-30 118+566 LHS Box Culvert Hunch 3.00 6227.3 1.11 2078.07
29.04.2022 M-30 120+200 LHS Box Culvert Hunch 3.00 6230.3 1.11 2079.18
29.04.2022 M-30 101+140 LHS Box Culvert Hunch 1.50 6231.8 0.56 2079.74
29.04.2022 M-30 122+800 RHS Box Culvert Deck Slab 18.00 6249.8 6.66 2086.40
45
29.04.2022 M-30 104+000 LHS Box Culvert Raft 5.50 6255.3 2.04 2088.43
29.04.2022 M-30 109+512 RHS Box Culvert A1 & A2 Wall 1st Lift 6.00 6261.3 2.22 2090.65
29.04.2022 M-30 119+200 RHS Box Culvert Wall 2.00 6263.3 0.74 2091.39
29.04.2022 M-35 124+280 RHS VUP Raft 119.00 6382.3 45.815 2137.21
29.04.2022 M-35 Pile 122+350 RHS MJB Pile A1 33.00 6415.3 13.20 2150.41
30.04.2022 M-30 106+438 BHS Box Culvert Wall 1st lift 24.00 6439.3 8.88 2159.29
30.04.2022 M-30 106+622 BHS Box Culvert Raft 36.00 6475.3 13.32 2172.61
30.04.2022 M-30 120+242 BHS Box Culvert Raft 10.50 6485.8 3.89 2176.49
46 30.04.2022 M-30 119+690 Box Culvert Hunch 2.50 6488.3 0.93 2177.42
30.04.2022 M-35 113+085 RHS MNB Hunch 6.00 6494.3 2.310 2179.73
30.04.2022 M-35 99+890 LHS MNB Raft 55.50 6549.8 21.368 2201.09
30.04.2022 M-35 Pile 122+350 LHS MJB Pile A1 36.00 6585.8 14.40 2215.49
01.05.2022 M-30 101+550 RHS Box Culvert Raft 8.50 6594.3 3.15 2218.64
01.05.2022 M-30 102+100 RHS Box Culvert Hunch 2.50 6596.8 0.93 2219.56
01.05.2022 M-30 112+160 RHS Box Culvert A1 & A2 Wall 1st Lift 6.00 6602.8 2.22 2221.78
01.05.2022 M-30 115+785 RHS Box Culvert wall 1st lift 6.50 6609.3 2.41 2224.19
01.05.2022 M-30 106+438 BHS Box Culvert A1 Wall 5.00 6614.3 1.85 2226.04
47
01.05.2022 M-30 108+575 LHS Box Culvert wall 1st lift 4.50 6618.8 1.67 2227.70
01.05.2022 M-30 103+200 RHS Box Culvert Raft 6.00 6624.8 2.22 2229.92
01.05.2022 M-35 121+624 RHS MNB Raft 180.50 6805.3 69.493 2299.42
01.05.2022 M-35 Pile 122+350 LHS MJB A1 Pile 33.00 6838.3 13.20 2312.62
01.05.2022 M-35 Pile 122+350 RHS MJB A1 Pile 33.00 6871.3 13.20 2325.82
02.05.2022 M-15 120+084 BHS MNB Shear Key PCC 6.00 6877.3 1.470 2327.29
02.05.2022 M-20 99+394 BHS MNB PCC 90.00 6967.3 27.18 2354.47
02.05.2022 M-30 103+200 RHS Box Culvert Raft 4.50 6971.8 1.67 2356.13
02.05.2022 M-30 115+700 RHS Box Culvert Raft 5.50 6977.3 2.04 2358.17
02.05.2022 M-30 109+512 BHS Box Culvert wall 1st lift 3.00 6980.3 1.11 2359.28
48
02.05.2022 M-30 117+445 RHS Box Culvert wall 1st lift 6.00 6986.3 2.22 2361.50
02.05.2022 M-30 106+675 BHS Box Culvert Deck Slab 22.00 7008.3 8.14 2369.64
02.05.2022 M-30 99+394 BHS MNB PCC 6.00 7014.3 2.22 2371.86
02.05.2022 M-35 124+280 VUP A1 Hunch 6.00 7020.3 2.310 2374.17
02.05.2022 M-35 Pile 99+394 BHS MNB PCC 12.00 7032.3 4.80 2378.97
05.05.2022 M-30 104+000 BHS Box Culvert Bottom Hunch 5.00 7037.3 1.85 2380.82
05.05.2022 M-30 106+438 BHS Box Culvert Median Wall 1st Lift 10.00 7047.3 3.70 2384.52
49
05.05.2022 M-30 106+675 LHS Box Culvert Bottom Hunch 1.00 7048.3 0.37 2384.89
05.05.2022 M-30 102+100 RHS Box Culvert Bottom Hunch 2.25 7050.5 0.83 2385.72
06.05.2022 M-15 109+675 RHS MNB PCC 11.00 7061.5 2.695 2388.41
06.05.2022 M-30 103+600 RHS Box Culvert wall 1st lift 3.50 7065.0 1.30 2389.71
50 06.05.2022 M-30 107+400 BHS Box Culvert Wall A1 & A2 1st Lift 6.00 7071.0 2.22 2391.93
06.05.2022 M-35 108+593 LHS LVUP Raft 109.50 7180.5 42.158 2434.09
06.05.2022 M-35 Pile 122+350 RHS MJB Pile A1 36.00 7216.5 14.40 2448.49
07.05.2022 M-30 107+400 BHS Box Culvert wall 1st lift 6.50 7223.0 2.41 2450.89
07.05.2022 M-30 106+640 BHS Box Culvert Bottom Hunch 4.00 7227.0 1.48 2452.37
51 07.05.2022 M-30 102+100 LHS Box Culvert A1 & A2 Wall 1st Lift 8.00 7235.0 2.96 2455.33
07.05.2022 M-30 115+785 RHS Box Culvert Wall 1st Lift 7.50 7242.5 2.78 2458.11
07.05.2022 M-35 99+890 RHS MNB Raft 57.50 7300.0 22.138 2480.24
08.05.2022 M-30 118+566 RHS Box Culvert Deck Slab 15.00 7315.0 5.55 2485.79
52 08.05.2022 M-35 105+449 BHS MNB Raft 231.50 7546.5 89.128 2574.92
08.05.2022 M-35 Pile 122+350 LHS MJB Pile A1 33.00 7579.5 13.20 2588.12
09.05.2022 M-15 123+830 LHS Box Culvert PCC 6.00 7585.5 1.470 2589.59
09.05.2022 M-30 115+745 RHS Box Culvert raft 8.00 7593.5 2.96 2592.55
09.05.2022 M-30 101+140 RHS Box Culvert Wall 8.00 7601.5 2.96 2595.51
09.05.2022 M-30 115+200 RHS Box Culvert Wall 8.50 7610.0 3.15 2598.66
09.05.2022 M-30 112+107 LHS Box Culvert Slab 14.50 7624.5 5.37 2604.02
09.05.2022 M-30 107+120 LHS Box Culvert Raft 5.00 7629.5 1.85 2605.87
53
09.05.2022 M-30 120+295 RHS Box Culvert Wall & Slab 18.00 7647.5 6.66 2612.53
09.05.2022 M-35 113+085 LHS MNB Raft 54.00 7701.5 20.790 2633.32
09.05.2022 M-35 Pile 122+350 RHS MJB Pile A1 36.00 7737.5 14.40 2647.72
09.05.2022 M-35 Pile 122+350 RHS MJB Pile A2 36.00 7773.5 14.40 2662.12
09.05.2022 M-35 Pile 122+350 RHS MJB Pile A2 35.50 7809.0 14.20 2676.32
09.05.2022 M-35 Pile 124+575 MNB Pile A2 32.00 7841.0 12.80 2689.12
10.05.2022 M-15 Camp Camp Work 1.00 7842.0 0.245 2689.37
10.05.2022 M-30 114+678 LHS Box Culvert Raft 36.00 7878.0 13.32 2702.69
10.05.2022 M-30 106+675 LHS Box Culvert Wall 1st lift 5.00 7883.0 1.85 2704.54
54
10.05.2022 M-35 121+830 RHS MNB Raft 202.00 8085.0 77.770 2782.31
10.05.2022 M-35 123+000 LHS MNB Raft & Hunch 70.00 8155.0 26.950 2809.26
10.05.2022 M-35 Pile 122+350 RHS MJB A1 Pile 33.50 8188.5 13.40 2822.66
11.05.2022 M-20 120+084 RHS MNB PCC 6.00 8194.5 1.81 2824.47
11.05.2022 M-30 107+120 BHS Box Culvert Raft 14.50 8209.0 5.37 2829.83
11.05.2022 M-30 115+745 RHS Box Culvert Bottom Hunch 1.50 8210.5 0.56 2830.39
11.05.2022 M-30 122+800 Box Culvert Slab 12.00 8222.5 4.44 2834.83
11.05.2022 M-30 109+512 LHS Box Culvert A1 &A2 1st Lift Wall 6.00 8228.5 2.22 2837.05
11.05.2022 M-30 107+400 LHS Box Culvert wall 2nd lift 4.00 8232.5 1.48 2838.53
11.05.2022 M-30 115+785 RHS Box Culvert Wall 1st lift 6.00 8238.5 2.22 2840.75
11.05.2022 M-30 118+500 LHS Box Culvert Wall 1st lift 6.00 8244.5 2.22 2842.97
55 11.05.2022 M-30 103+600 BHS Box Culvert A1 &A2 1st Lift Wall 4.50 8249.0 1.67 2844.63
11.05.2022 M-30 121+775 LHS Box Culvert Raft 13.00 8262.0 4.81 2849.44
11.05.2022 M-30 102+485 RHS Box Culvert Raft 6.00 8268.0 2.22 2851.66
11.05.2022 M-30 119+690 RHS Box Culvert Deck Slab with Wall 48.00 8316.0 17.76 2869.42
11.05.2022 M-35 120+084 RHS MNB Wall 3rd & 2nd Lift 24.00 8340.0 9.240 2878.66
11.05.2022 M-35 120+831 LHS LVUP Wall 3rd Lift 18.00 8358.0 6.930 2885.59
11.05.2022 M-35 124+280 LHS VUP Wall 1st lift 16.00 8374.0 6.160 2891.75
11.05.2022 M-35 99+890 RHS MNB Haunch 11.50 8385.5 4.428 2896.18
11.05.2022 M-35 Pile 124+575 LHS MNB A1 Pile 33.00 8418.5 13.37 2909.55
56 12.05.2022 M-35 123+280 RHS MNB Raft 444.00 8862.5 170.940 3080.49
13.05.2022 M-35 123+280 RHS MNB Raft 89.00 8951.5 34.265 3114.75
13.05.2022 M-30 102+100 LHS BC WALL 5.00 8956.5 1.85 3116.60
13.05.2022 M-30 102+485 RHS BC Raft 2.00 8958.5 0.74 3117.34
13.05.2022 M-35 99+890 LHS MNB A2 HAUNCH 5.50 8964.0 2.118 3119.46
13.05.2022 M-30 109+512 LHS BC WALL a1 & A2 6.50 8970.5 2.41 3121.86
13.05.2022 M-35 Pile 124+575 MNB PILE 33.00 9003.5 13.37 3135.23
57
13.05.2022 M-15 120+084 RHS MNB Retaing wall A2 pcc 10.00 9013.5 2.45 3137.68
13.05.2022 M-30 107+400 LHS BC Wall 1st lift 5.50 9019.0 2.04 3139.71
13.05.2022 M-30 115+785 LHS BC DECK SLAB 12.00 9031.0 4.44 3144.15
13.05.2022 M-30 106+675 RHS BC RAFT 6.00 9037.0 2.22 3146.37
13.05.2022 M-35 108+593 RHS LVUP RAFT 110.00 9147.0 42.350 3188.72
13.05.2022 M-35 Pile 122+350 RHS MJB PILE A2 30.00 9177.0 12.15 3200.87
14.05.2022 M-30 106+438 RHS BC Raft 23.00 9200.0 8.51 3209.38
14.05.2022 M-15 115+785 LHS BC Utroub PCC 1.50 9201.5 0.37 3209.75
14.05.2022 M-15 120+084 RHS Retaining wall PCC 4.50 9206.0 1.10 3210.85
14.05.2022 M-15 105+449 RHS MNB Shear Key PCC 2.50 9208.5 0.61 3211.47
14.05.2022 M-30 101+550 RHS BC A1 & A2 bottom hunch 3.00 9211.5 1.11 3212.58
14.05.2022 M-30 103+600 LHS BC A2 wall 3.50 9215.0 1.30 3213.87
58 14.05.2022 M-35 Pile 122+350 RHS MJB pile A2 5.00 9220.0 2.03 3215.90
14.05.2022 M-35 109+675 RHS MNB Raft 70.00 9290.0 26.95 3242.85
14.05.2022 M-15 119+690 & 117+140 BC Utroub PCC 12.00 9302.0 2.94 3245.79
14.05.2022 M-35 109+675 LHS MNB Bottom Hunch 9.00 9311.0 3.47 3249.25
14.05.2022 M-35 108+593 LHS LVUP Bottom Hunch 3.00 9314.0 1.155 3250.41
14.05.2022 M-35 Pile 122+350 LHS MJB Pile P1 46.00 9360.0 18.63 3269.04
14.05.2022 M-35 Pile 122+350 RHS MJB Pile A1 32.00 9392.0 12.96 3282.00
14.05.2022 M-35 Pile 123+350 RHS MJB Pile A2 6.00 9398.0 2.43 3284.43
15.05.2022 M-35 Pile 122+350 RHS MJB pile A2 18.00 9416.0 7.29 3291.72
15.05.2022 M-15 118+566 BHS BC Cartan wall PCC 12.00 9428.0 2.94 3294.66
15.05.2022 M-35 113+085 LHS MNB Bottom Hunch 17.50 9445.5 6.74 3301.39
15.05.2022 M-30 102+485 & 103+600 RHS/LHS BC bottom Hunch/wall 4.50 9450.0 1.67 3303.06
15.05.2022 M-35 108+485 BHS LVUP bottom hunch 12.00 9462.0 4.62 3307.68
59
15.05.2022 M-35 Pile 124+575 LHS MNB Pile A1 33.00 9495.0 13.37 3321.04
15.05.2022 M-30 123+934 BHS BC Raft 12.00 9507.0 4.44 3325.48
15.05.2022 M-30 112+130 LHS BC wall 8.00 9515.0 2.96 3328.44
15.05.2022 M-35 120+831 RHS LVUP wall 24.00 9539.0 9.240 3337.68
15.05.02022 M-15 122+350 MJB PILE CAP PCC P2 10.00 9549.0 2.45 3340.13
16.05.2022 M-35 Pile 124+575 LHS MNB Pile 33.00 9582.0 13.37 3353.50
16.05.2022 M-35 120+084 BHS MNB Wall A1 & A2 36.00 9618.0 13.86 3367.36
16.05.2022 M-15 115+785 BHS BC utroub wall PCC 12.00 9630.0 2.94 3370.30
16.05.2022 M-30 101+880 RHS BC Raft 8.75 9638.8 3.24 3373.54
16.05.2022 M-30 106+675 RHS BC Bottom hunch 2.00 9640.8 0.74 3374.28
16.05.2022 M-35 123+000 LHS MNB Wall hunch 6.00 9646.8 2.310 3376.59
16.05.2022 M-30 108+575 BHS MNB Wall A1 6.00 9652.8 2.22 3378.81
16.05.2022 M-15 117+140 BHS BC Cartan wall PCC 12.00 9664.8 2.94 3381.75
60 16.05.2022 M-35 124+280 RHS VUP wall 1st lift 18.00 9682.8 6.930 3388.68
16.05.2022 M-30 112+620 RHS BC hunch 2.50 9685.3 0.93 3389.60
16.05.2022 M-15 116+980 BHS BC Cartan wall PCC 12.00 9697.3 2.94 3392.54
16.05.2022 M-15 117+440 BHS BC Cartan wall PCC 12.00 9709.3 2.94 3395.48
16.05.2022 M-15 95+850 BHS MNB Shear Key PCC 3.50 9712.8 0.86 3396.34
16.05.2022 M-30 120+235 LHS BC wall 6.00 9718.8 2.22 3398.56
16.05.2022 M-30 110+188 LHS BC deck slab 14.00 9732.8 5.18 3403.74
16.05.2022 M-35 Pile 122+350 RHS MJB pile A1 33.00 9765.8 13.37 3417.10
16.05.2022 M-35 Pile 122+350 LHS MJB pile P1 52.00 9817.8 21.06 3438.16
17.05.2022 M-15 118+566 BHS BC Cartan wall PCC 12.00 9829.8 2.94 3441.10
17.05.2022 M-15 119+200 BHS BC Cartan wall PCC 12.00 9841.8 2.94 3444.04
17.05.2022 M-15 120+295 BHS BC Cartan wall PCC 12.00 9853.8 2.94 3446.98
17.05.2022 M-30 107+120 LHS BC Hunch 2.00 9855.8 0.74 3447.72
17.05.2022 M-30 120+235 LHS BC wall 4.00 9859.8 1.48 3449.20
17.05.2022 M-35 99+890 LHS MNB wall A1/A2 12.00 9871.8 4.620 3453.82
17.05.2022 M-30 101+140 LHS BC wall A1/A2 6.00 9877.8 2.22 3456.04
17.05.2022 M-30 107+400 RHS BC wall 5.00 9882.8 1.85 3457.89
17.05.2022 M-30 118+566 RHS BC wall 6.00 9888.8 2.22 3460.11
61 17.05.2022 M-15 119+685 BHS BC Cartan wall PCC 18.00 9906.8 4.41 3464.52
17.05.2022 M-35 99+890 LHS MNB Middle Hunch 5.25 9912.0 2.021 3466.54
17.05.2022 M-30 118+250 LHS BC wall 6.00 9918.0 2.22 3468.76
17.05.2022 M-30 106+640 LHS BC Raft 18.00 9936.0 6.66 3475.42
17.05.2022 M-30 120+865 LHS BC Top Slab 30.00 9966.0 11.10 3486.52
17.05.2022 M-30 102+485 LHS BC Raft 6.00 9972.0 2.22 3488.74
17.05.2022 M-30 115+745 RHS BC A1 & A2 Wall 5.50 9977.5 2.04 3490.78
17.05.2022 M-15 118+250 BHS BC Cartan wall PCC 12.00 9989.5 2.94 3493.72
17.05.2022 M-30 121+275 BHS BC MCW Raft 42.00 10031.5 15.54 3509.26
17.05.2022 M-30 108+575 LHS BC Top Slab 12.00 10043.5 4.44 3513.70
18.05.2022 M-15 121+795 BHS BC Cartan wall PCC 12.00 10055.5 2.94 3516.64
18.05.2022 M-15 120+235 BHS BC Utroub PCC 12.00 10067.5 2.94 3519.58
18.05.2022 M-15 122+350 RHS MJB Pile Cap PCC 6.00 10073.5 1.47 3521.05
18.05.2022 M-15 120+084 RHS MNB A1 R/W PCC 12.00 10085.5 2.94 3523.99
18.05.2022 M-30 101+880 LHS BC Raft 9.00 10094.5 3.33 3527.32
18.05.2022 M-30 123+000 LHS MNB Hunch Wall 9.00 10103.5 3.33 3530.65
18.05.2022 M-30 118+250 LHS BC Wall 4.00 10107.5 1.48 3532.13
62
18.05.2022 M-30 101+140 LHS BC Wall 3.75 10111.3 1.39 3533.52
18.05.2022 M-30 107+400 RHS BC Wall (MCW) 6.50 10117.8 2.41 3535.92
18.05.2022 M-30 120+084 RHS MNB R/W Raft 96.00 10213.8 35.52 3571.44
18.05.2022 M-30 114+687 RHS BC Bottom Hunch 4.00 10217.8 1.48 3572.92
18.05.2022 M-30 109+675 LHS MNB Bottom Hunch 4.00 10221.8 1.48 3574.40
18.05.2022 M-35 113+085 RHS MNB Wall 1st Lift 6.00 10227.8 2.310 3576.71
18.05.2022 M-35 Pile 122+350 RHS MJB Pile A2 36.00 10263.8 14.58 3591.29
19.05.2022 M-15 122+800 BHS BC Cartan wall PCC 12.00 10275.8 2.94 3594.23
19.05.2022 M-15 121+275 LHS BC Utroub PCC 6.50 10282.3 1.59 3595.82
19.05.2022 M-15 120+084 LHS MNB R/W Bed PCC 6.00 10288.3 1.47 3597.29
19.05.2022 M-15 120+295 BHS BC Cartan wall PCC 6.00 10294.3 1.47 3598.76
19.05.2022 M-30 102+250 LHS BC Bottom Hunch 4.75 10299.0 1.76 3600.52
63 19.05.2022 M-30 112+620 LHS BC Raft 9.50 10308.5 3.52 3604.04
19.05.2022 M-30 117+445 LHS BC Deck Slab 6.00 10314.5 2.22 3606.26
19.05.2022 M-35 100+120 RHS MNB Raft 60.00 10374.5 23.100 3629.36
19.05.2022 M-35 99+890 RHS MNB Hunch 6.00 10380.5 2.310 3631.67
19.05.2022 M-35 108+593 LHS LVUP Wall A1 & A2 24.50 10405.0 9.433 3641.10
19.05.2022 M-35 Pile 124+575 LHS MNB Pile A2 36.00 10441.0 14.58 3655.68
20.05.2022 M-15 117+445 RHS BC Cartan wall 2nd Lift 6.00 10447.0 1.47 3657.15
64 20.05.2022 M-15 117+140 RHS BC Cartan wall 2nd Lift 6.00 10453.0 1.47 3658.62
20.05.2022 M-30 117+445 LHS BC Deck Slab 17.00 10470.0 6.29 3664.91
21.05.2022 M-30 112+130 RHS BC Wall A1 & A2 1st Lift 8.50 10478.5 3.15 3668.05
21.05.2022 M-30 108+575 BHS BC A2 1st Lift Wall MCW 8.50 10487.0 3.15 3671.20
21.05.2022 M-35 121+624 LHS MNB Raft 174.00 10661.0 66.990 3738.19
65
21.05.2022 M-35 Pile 122+350 LHS MJB Pile P-1 46.00 10707.0 18.63 3756.82
A1 Pile Head
21.05.2022 M50 122+350 MJB (Test Pile) 1.00 10708.0 0.44 3757.26
22.05.2022 M-15 103+846 BHS VUP PCC 42.50 10750.5 10.41 3767.67
22.05.2022 M-15 120+084 RHS MNB R/W PCC 12.00 10762.5 2.94 3770.61
22.05.2022 M-15 100+960/100+284 BHS MNB Shear Key PCC 6.50 10769.0 1.59 3772.20
22.05.2022 M-30 104+810 BHS BC Raft 13.00 10782.0 4.81 3777.01
22.05.2022 M-30 106+675 LHS BC Top Slab 10.00 10792.0 3.70 3780.71
22.05.2022 M-30 102+485 LHS BC Hunch 3.50 10795.5 1.30 3782.01
66
22.05.2022 M-30 106+640 RHS BC Hunch & Raft 18.50 10814.0 6.85 3788.85
22.05.2022 M-30 102+485 RHS BC A1 1st Lift Wall 4.50 10818.5 1.67 3790.52
22.05.2022 M-30 116+400 RHS BC Raft 13.00 10831.5 4.81 3795.33
22.05.2022 M-35 108+593 LHS LVUP 1st Lift Wall & Hunch 24.50 10856.0 9.433 3804.76
22.05.2022 M-35 Pile 124+575 LHS MNB A2 Pile P10 33.00 10889.0 13.37 3818.13
22.05.2022 M50 124+575 MNB Pile Head 1.00 10890.0 0.44 3818.57
23.05.2022 M-15 121+880 RHS MNB R/W PCC 12.00 10902.0 2.94 3821.51
23.05.2022 M-15 117+140 BHS BC Curtain Wall 2nd Lift 6.00 10908.0 1.47 3822.98
23.05.2022 M-15 117+445 BHS BC Curtain Wall 2nd Lift 6.00 10914.0 1.47 3824.45
23.05.2022 M-15 103+846 BHS VUP PCC (Balance Qty) 2.50 10916.5 0.61 3825.06
23.05.2022 M-30 120+084 LHS MNB R/W Raft A2 78.00 10994.5 28.86 3853.92
67 23.05.2022 M-30 101+550 LHS BC Hunch 3.50 10998.0 1.30 3855.21
23.05.2022 M-30 106+675 RHS BC Wall 1st Lift 5.50 11003.5 2.04 3857.25
23.05.2022 M-35 113+085 RHS MNB A2 1st Lift Wall 6.00 11009.5 2.310 3859.56
23.05.2022 M-35 109+675 RHS MNB Shear Key Raft 12.00 11021.5 4.620 3864.18
23.05.2022 M-35 109+675 BHS MNB A2 Bottom Hunch 7.00 11028.5 2.695 3866.87
23.05.2022 M-35 Pile 122+350 LHS MJB A2 Pile 30.00 11058.5 12.15 3879.02
24.05.2022 M-15 99+365 LHS MNB Shear Key PCC 6.00 11064.5 1.47 3880.49
24.05.2022 M-30 109+512 RHS BC Deck Slab 25.25 11089.8 9.34 3889.84
68
24.05.2022 M-30 107+120 BHS BC Bottom hunch 2.50 11092.3 0.93 3890.76
24.05.2022 M-30 Camp-1 Steel Yard 3.00 11095.3 1.11 3891.87
25.05.2022 M-15 99+365 RHS MNB PCC 30.00 11125.3 7.35 3899.22
25.05.2022 M-30 113+600 RHS BC Raft 8.50 11133.8 3.15 3902.37
25.05.2022 M-30 113+600 LHS BC A1-A2 Bottom Hunch 2.00 11135.8 0.74 3903.11
25.05.2022 M-30 107+120 BHS BC A1 Bottom Hunch 2.50 11138.3 0.93 3904.03
25.05.2022 M-30 108+575 RHS BC Top Slab 9.00 11147.3 3.33 3907.36
69
25.05.2022 M-30 101+550 RHS BC Wall 6.00 11153.3 2.22 3909.58
25.05.2022 M-30 116+400 LHS BC Raft 13.00 11166.3 4.81 3914.39
25.05.2022 M-30 114+687 LHS BC Bottom hunch 3.00 11169.3 1.11 3915.50
25.05.2022 M-35 121+882 LHS MNB Raft 192.00 11361.3 73.920 3989.42
25.05.2022 M-35 Pile 122+350 RHS MJB Pile P2 48.00 11409.3 19.44 4008.86
26.05.2022 M-15 99+365 RHS MNB Shear Key PCC 6.00 11415.3 1.47 4010.33
26.05.2022 M-15 105+430 RHS MNB Shear Key PCC 6.00 11421.3 1.47 4011.80
26.05.2022 M-30 119+200 RHS BC Slab 12.00 11433.3 4.44 4016.24
26.05.2022 M-30 118+250 RHS BC Wall 1st Lift 6.00 11439.3 2.22 4018.46
26.05.2022 M-30 116+980 LHS BC Raft 12.00 11451.3 4.44 4022.90
26.05.2022 M-30 101+550 RHS BC Wall 4.00 11455.3 1.48 4024.38
26.05.2022 M-30 112+160 RHS BC Deck Slab 14.00 11469.3 5.18 4029.56
70 26.05.2022 M-30 120+865 BHS BC Slab MCW 80.00 11549.3 29.60 4059.16
26.05.2022 M-35 124+280 RHS VUP Wall A2 2nd Lift 12.00 11561.3 4.620 4063.78
26.05.2022 M-35 123+000 RHS MNB Middle Wall A1 1st Lift 12.00 11573.3 4.620 4068.40
26.05.2022 M-35 120+831 RHS LVUP wall 2nd lift 18.00 11591.3 6.930 4075.33
26.05.2022 M-35 109+675 LHS MNB Bottom Hunch 2.00 11593.3 0.770 4076.10
4th Lift (RHS) &
26.05.2022 M-35 120+084 MNB 24.00 11617.3 9.240 4085.34
2nd Lift (LHS)
26.05.2022 M-35 Pile 124+575 MNB A1 & A2 Pile 66.00 11683.3 26.73 4112.07
27.05.2022 M-15 118+582 BHS BC Curtain Wall 2nd Lift 12.00 11695.3 2.94 4115.01
27.05.2022 M-15 120+865 RHS BC Raft PCC 12.00 11707.3 2.94 4117.95
27.05.2022 M-30 118+566 LHS BC Deck Slab 16.00 11723.3 5.92 4123.87
27.05.2022 M-30 101+140 RHS BC Deck Slab 18.00 11741.3 6.66 4130.53
27.05.2022 M-30 108+889 RHS BC Raft 6.00 11747.3 2.22 4132.75
27.05.2022 M-30 104+810 BHS BC Bottom Hunch A1A2 4.50 11751.8 1.67 4134.42
71 27.05.2022 M-30 121+275 BC Hunch 4.00 11755.8 1.48 4135.90
27.05.2022 M-30 120+084 LHS MNB A1 R/W Raft 75.00 11830.8 27.75 4163.65
27.05.2022 M-30 Base Camp Steel Yard Base stone Pedestal 2.50 11833.3 0.93 4164.57
27.05.2022 M-35 113+085 RHS MNB Lift Wall P1 & P2 16.00 11849.3 6.160 4170.73
27.05.2022 M-35 109+675 BHS MNB Hunch P2 10.00 11859.3 3.850 4174.58
27.05.2022 M-35 Pile 122+350 LHS MJB Pile P1 41.00 11900.3 16.61 4191.19
27.05.2022 M-35 Pile 122+350 RHS MJB Pile A2 36.00 11936.3 14.58 4205.77
28.05.2022 M-15 118+250 BHS BC Curtain Wall 2nd Lift 6.00 11942.3 1.47 4207.24
28.05.2022 M-15 118+566 BHS BC Curtain Wall 2nd Lift 6.00 11948.3 1.47 4208.71
28.05.2022 M-30 106+675 RHS BC Top Slab 10.00 11958.3 3.70 4212.41
28.05.2022 M-30 113+600 RHS BC Bottom Hunch 2.50 11960.8 0.93 4213.33
72 28.05.2022 M-30 102+962 RHS BC Raft 9.00 11969.8 3.33 4216.66
28.05.2022 M-35 99+890 LHS MNB A1 A2 Wall 2nd Lift 17.00 11986.8 6.545 4223.21
28.05.2022 M-35 95+850 RHS MNB Shear Key Raft 66.00 12052.8 25.410 4248.62
28.05.2022 M-35 100+960 RHS MNB Shear Key Raft 65.50 12118.3 25.218 4273.83
28.05.2022 M-35 Pile 124+575 LHS MJB Pile A2 36.00 12154.3 14.58 4288.41
30.05.2022 M-15 115+460 RHS R/W PCC 6.00 12160.3 1.47 4289.88
30.05.2022 M-15 115+400 RHS R/W PCC 6.00 12166.3 1.47 4291.35
30.05.2022 M-30 108+575 RHS BC Top Slab 15.50 12181.8 5.74 4297.09
30.05.2022 M-30 102+485 RHS BC Wall A1 1st Lift 3.00 12184.8 1.11 4298.20
30.05.2022 M-30 Camp-1 Steel Yard Stone Pedestal 4.50 12189.3 1.67 4299.86
30.05.2022 M-30 115+200 LHS BC Deck Slab 15.50 12204.8 5.74 4305.60
73 30.05.2022 M-30 116+400 RHS BC Hunch 2.50 12207.3 0.93 4306.52
30.05.2022 M-30 104+810 LHS BC Raft 6.00 12213.3 2.22 4308.74
30.05.2022 M-30 102+962 LHS BC Raft 9.00 12222.3 3.33 4312.07
30.05.2022 M-30 108+889 BHS BC Raft 11.00 12233.3 4.07 4316.14
30.05.2022 M-30 102+485 BHS BC Bottom Hunch 2.00 12235.3 0.74 4316.88
30.05.2022 M-30 121+275 RHS BC Raft 14.50 12249.8 5.37 4322.25
30.05.2022 M-35 109+675 LHS MNB 1st Lift Wall P2 & A2 12.00 12261.8 4.620 4326.87
02.06.2022 M-15 97+850 BHS MNB Shear Key PCC 5.50 12267.3 1.35 4328.22
02.06.2022 M-15 111+982 BHS BC Curtain Wall PCC 12.00 12279.3 2.94 4331.16
02.06.2022 M-30 108+575 LHS BC Top Slab 12.50 12291.8 4.63 4335.78
02.06.2022 M-30 101+835 RHS BC Raft 12.00 12303.8 4.44 4340.22
02.06.2022 M-30 107+102 LHS BC A1 & A2 Wall 4.50 12308.3 1.67 4341.89
02.06.2022 M-30 102+485 LHS BC Wall 1st Lift 3.50 12311.8 1.30 4343.18
74
02.06.2022 M-30 109+375 RHS BC Raft 6.50 12318.3 2.41 4345.59
02.06.2022 M-30 119+686 LHS BC Deck Slab 42.00 12360.3 15.54 4361.13
02.06.2022 M-30 102+962 RHS BC Wall 1st Lift 6.00 12366.3 2.22 4363.35
02.06.2022 M-30 120+240 BHS BC Slab MCW 18.00 12384.3 6.66 4370.01
02.06.2022 M-35 113+600 LHS BC A1 & A2 1st Lift 6.00 12390.3 2.31 4372.32
02.06.2022 M-35 113+085 LHS MNB A1 1st Lift Wall 7.75 12398.0 2.98 4375.30
03.06.2022 M-15 115+200 BHS BC Curtain Wall 6.00 12404.0 1.47 4376.77
03.06.2022 M-15 119+685 BC Retaing Wall PCC 6.00 12410.0 1.47 4378.24
03.06.2022 M-15 Casting Yard RE Panel Pedestal Casting 1.50 12411.5 0.37 4378.61
03.06.2022 M-15 115+400 RHS R/W PCC 18.00 12429.5 4.41 4383.02
03.06.2022 M-30 106+640 RHS BC Bottom Hunch 3.50 12433.0 1.30 4384.31
75 03.06.2022 M-30 101+550 RHS BC Wall 1st Lift 7.50 12440.5 2.78 4387.09
75
03.06.2022 M-30 104+810 LHS BC Bottom Hunch 2.50 12443.0 0.93 4388.01
03.06.2022 M-30 117+445 RHS BC Deck Slab 16.00 12459.0 5.92 4393.93
03.06.2022 M-30 116+980 RHS BC Raft 8.50 12467.5 3.15 4397.08
03.06.2022 M-35 Pile 122+350 RHS MJB Pile P1 46.00 12513.5 18.63 4415.71
03.06.2022 M-35 Pile 122+350 RHS MJB Pile A2 38.00 12551.5 15.39 4431.10
04.06.2022 M-15 119+685 BHS BC Retaining Wall PCC 6.00 12557.5 1.47 4432.57
04.06.2022 M-15 112+160 RHS BC Curtain Wall 6.00 12563.5 1.47 4434.04
04.06.2022 M-15 122+800 BHS BC Curtain Wall 2nd Lift 12.00 12575.5 2.94 4436.98
04.06.2022 M-15 119+685 LHS BC PCC 6.00 12581.5 1.47 4438.45
04.06.2022 M-15 110+188 BHS BC Curtain Wall 12.00 12593.5 2.94 4441.39
04.06.2022 M-15 Casting Yard RE Panel Pedestal Casting 1.75 12595.3 0.43 4441.82
04.06.2022 M-30 121+275 LHS BC Wall & Hunch 3.50 12598.8 1.30 4443.11
76
04.06.2022 M-30 109+375 BHS BC Raft MCW 14.00 12612.8 5.18 4448.29
04.06.2022 M-30 109+375 RHS BC Hunch 2.00 12614.8 0.74 4449.03
04.06.2022 M-30 102+962 LHS BC Bottom Hunch 2.25 12617.0 0.83 4449.86
04.06.2022 M-30 102+485 LHS BC Wall 1st Lift 3.50 12620.5 1.30 4451.16
04.06.2022 M-30 112+620 RHS BC Wall A1 & A2 1st Lift 6.50 12627.0 2.41 4453.56
04.06.2022 M-35 Pile 122+350 RHS MJB Pile A2 36.00 12663.0 14.58 4468.14
04.06.2022 M-35 Pile 124+575 LHS MNB Pile A1 33.00 12696.0 13.37 4481.51
05.06.2022 M-15 98+950 RHS MNB Shear Key PCC 3.00 12699.0 0.74 4482.24
05.06.2022 M-15 98+250 RHS MNB Shear Key PCC 3.00 12702.0 0.74 4482.98
05.06.2022 M-15 121+880 RHS MNB R/W Raft PCC 6.00 12708.0 1.47 4484.45
05.06.2022 M-15 Casting Yard RE Panel Pedestal Casting 2.00 12710.0 0.49 4484.94
05.06.2022 M-30 108+889 LHS BC Bottom Hunch 3.00 12713.0 1.11 4486.05
05.06.2022 M-30 120+865 RHS BC Raft 24.00 12737.0 8.88 4494.93
77 05.06.2022 M-30 104+000 BHS BC Wall 1st Lift 7.50 12744.5 2.78 4497.70
05.06.2022 M-30 109+375 LHS BC Raft 6.50 12751.0 2.41 4500.11
05.06.2022 M-30 113+600 RHS BC Wall A1 & A2 1st Lift 8.50 12759.5 3.15 4503.25
05.06.2022 M-30 101+835 LHS BC Raft 12.00 12771.5 4.44 4507.69
05.06.2022 M-30 Camp Boundary Wall 1.50 12773.0 0.56 4508.25
05.06.2022 M-30 116+980 RHS BC Hunch 2.50 12775.5 0.93 4509.17
05.06.2022 M-35 122+700 RHS MNB Raft 58.00 12833.5 22.33 4531.50
06.06.2022 M-15 Casting Yard RE Panel Pedestal Casting 0.75 12834.3 0.18 4531.69
06.06.2022 M-25 Camp Boundary Wall 1.00 12835.3 0.34 4532.03
06.06.2022 M-30 120+084 RHS MNB A1 R/Wall Raft 84.00 12919.3 31.08 4563.11
06.06.2022 M-30 101+880 LHS BC Haunch 2.50 12921.8 0.93 4564.03
06.06.2022 M-30 102+962 RHS BC Wall A2 1st Lift 4.00 12925.8 1.48 4565.51
78
06.06.2022 M-30 108+889 LHS BC Wall 1st Lift 6.50 12932.3 2.41 4567.92
78
06.06.2022 M-30 107+400 RHS BC Top Slab 9.00 12941.3 3.33 4571.25
06.06.2022 M-30 101+140 LHS BC Slab with Top Haunch 14.75 12956.0 5.46 4576.70
06.06.2022 M-35 Pile 124+575 MNB Pile A2 35.00 12991.0 14.18 4590.88
06.06.2022 M-35 Pile 124+575 LHS MNB Pile A1 36.00 13027.0 14.58 4605.46
07.06.2022 M-15 108+313 RHS BC PCC 6.00 13033.0 1.47 4606.93
07.06.2022 M-15 Casting Yard RE Panel Pedestal Casting 1.75 13034.8 0.43 4607.36
07.06.2022 M-25 Camp Boundary Wall 1.50 13036.3 0.51 4607.87
07.06.2022 M-30 108+889 BHS BC Bottom Haunch A1 & A2 6.50 13042.8 2.41 4610.27
07.06.2022 M-30 118+250 RHS BC Slab 16.00 13058.8 5.92 4616.19
79
07.06.2022 M-30 118+566 RHS BC Deck Slab 14.50 13073.3 5.37 4621.56
07.06.2022 M-30 112+620 LHS BC Wall A1 &A2 1st Lift 6.50 13079.8 2.41 4623.96
07.06.2022 M-35 100+960 LHS MNB Raft 60.00 13139.8 23.10 4647.06
07.06.2022 M-35 113+085 RHS MNB Wall A2 2nd Lift 6.00 13145.8 2.31 4649.37
07.06.2022 M-35 Pile 124+575 LHS MNB Pile A1 36.00 13181.8 14.58 4663.95
08.06.2022 M-15 Casting Yard RE Panel Pedestal Casting 1.75 13183.5 0.43 4664.38
08.06.2022 M-25 Camp Boundary Wall 1.00 13184.5 0.34 4664.72
08.06.2022 M-30 115+785 BHS BC Deck Slab 26.00 13210.5 9.62 4674.34
80
08.06.2022 M-30 108+889 LHS BC 1st Lift Wall A1 & A2 6.50 13217.0 2.41 4676.75
08.06.2022 M-30 107+120 RHS BC 1st Lift Wall 5.25 13222.3 1.94 4678.69
80
08.06.2022 M-30 115+477 RHS Retaining wall Raft 25.00 13247.3 9.25 4687.94
08.06.2022 M-30 120+235 LHS BC Wall 1st Lift 6.50 13253.8 2.41 4690.34
08.06.2022 M-30 121+275 LHS BC 1st Lift Wall & Hunch 4.50 13258.3 1.67 4692.01
08.06.2022 M-35 113+085 LHS MNB A1 Wall 2nd Lift 6.50 13264.8 2.50 4694.51
08.06.2022 M-35 122+350 LHS MJB P2 Pile Cap 84.00 13348.8 32.34 4726.85
09.06.2022 M-15 106+675 RHS BC Curtain Wall 6.00 13354.8 1.47 4728.32
09.06.2022 M-25 Camp Store Piller Work 1.50 13356.3 0.51 4728.83
09.06.2022 M-25 Camp Boundary Wall 1.00 13357.3 0.34 4729.17
09.06.2022 M-30 121+880 RHS MNB A2 Retaining Wall Raft 113.00 13470.3 41.81 4770.98
81
09.06.2022 M-30 108+889 LHS BC Top Slab (S/R) 9.50 13479.8 3.52 4774.50
09.06.2022 M-30 115+457 RHS Retaining wall Raft 24.00 13503.8 8.88 4783.38
09.06.2022 M-35 123+480 RHS BC Raft 12.00 13515.8 4.62 4788.00
09.06.2022 M-35 Pile 124+575 LHS MNB A2 Pile 36.00 13551.8 14.58 4802.58
10.06.2022 M-15 Casting Yard RE Panel Pedestal Casting 1.50 13553.3 0.37 4802.94
10.06.2022 M-15 Camp 3rd Batching Plant PCC 10.00 13563.3 2.45 4805.39
10.06.2022 M-25 Camp Boundary Wall 0.50 13563.8 0.17 4805.56
82
10.06.2022 M-30 107+400 LHS BC Top Slab (S/R) 11.50 13575.3 4.26 4809.82
10.06.2022 M-30 121+275 RHS BC Wall & Hunch 6.50 13581.8 2.41 4812.22
10.06.2022 M-35 99+365 LHS MNB Raft 294.00 13875.8 113.19 4925.41
11.06.2022 M-15 Casting Yard RE Panel Pedestal Casting 3.25 13879.0 0.80 4926.21
11.06.2022 M-15 118+250 / 118+566 BC Curtain Wall 2nd Lift 6.00 13885.0 1.47 4927.68
11.06.2022 M-30 119+685 BHS BC Retaining Wall 6.00 13891.0 2.22 4929.90
11.06.2022 M-30 114+134 RHS BC Raft 30.00 13921.0 11.10 4941.00
83 11.06.2022 M-30 119+685 BHS BC Retaining Wall Raft 21.00 13942.0 7.77 4948.77
11.06.2022 M-35 99+365 LHS MNB Raft 54.00 13996.0 20.79 4969.56
11.06.2022 M-35 113+085 LHS MNB Wall A2 1st Lift 6.50 14002.5 2.50 4972.06
11.06.2022 M-35 Pile 124+575 LHS MNB Pile A2 33.00 14035.5 13.37 4985.43
11.06.2022 M-35 Pile 122+350 RHS MJB Pile A2 36.00 14071.5 14.58 5000.01
12.06.2022 M-15 121+624 RHS Returning Wall PCC 18.00 14089.5 4.41 5004.42
12.06.2022 M-15 Casting Yard RE Panel Pedestal Casting 1.50 14091.0 0.37 5004.79
12.06.2022 M-30 107+120 RHS BC A1 & A2 1st Lift 6.00 14097.0 2.22 5007.01
84
12.06.2022 M-30 115+447 To 115+457 RHS Retaining wall Raft 24.00 14121.0 8.88 5015.89
12.06.2022 M-35 109+675 LHS MNB A2 1st Lift Wall 6.00 14127.0 2.31 5018.20
12.06.2022 M-35 123+280 LHS MNB Raft 294.00 14421.0 113.19 5131.39
13.06.2022 M-15 Casting Yard RE Panel Pedestal Casting 1.00 14422.0 0.25 5131.63
13.06.2022 M-30 121+275 BC Wall & Haunch 6.00 14428.0 2.22 5133.85
85
85 13.06.2022 M-30 117+140 RHS BC Deck Slab 18.00 14446.0 6.66 5140.51
13.06.2022 M-30 121+624 RHS MNB A1 Retaining Wall Raft 60.00 14506.0 22.20 5162.71
13.06.2022 M-35 123+280 LHS MNB Raft 222.00 14728.0 85.47 5248.18
14.06.2022 M-15 118+250 BHS BC Curtain Wall 2nd Lift 12.00 14740.0 2.94 5251.12
14.06.2022 M-15 99+890 LHS MNB Retaining Wall PCC 10.50 14750.5 2.57 5253.69
14.06.2022 M-15 121+880 LHS MNB Retaining Wall PCC 18.00 14768.5 4.41 5258.10
14.06.2022 M-25 Camp 3rd Batching Plant Base Raft 45.50 14814.0 15.47 5273.57
86 14.06.2022 M-30 104+810 RHS BC Raft (SR) 11.00 14825.0 4.07 5277.64
14.06.2022 M-30 110+492 RHS BC Raft 6.00 14831.0 2.22 5279.86
14.06.2022 M-35 105+461 RHS MNB Raft 108.00 14939.0 41.58 5321.44
14.06.2022 M-35 120+084 RHS MNB Shear Key 6.00 14945.0 2.31 5323.75
14.06.2022 M-35 Pile 122+350 RHS MJB Pile P1 48.00 14993.0 19.44 5343.19
15.06.2022 M-15 105+461 LHS MNB PCC (S /R) 12.00 15005.0 2.94 5346.13
15.06.2022 M-15 Casting Yard RE Panel Curing Tank PCC 2.00 15007.0 0.49 5346.62
15.06.2022 M-30 108+889 LHS BC Top Slab 18.00 15025.0 6.66 5353.28
15.06.2022 M-30 102+962 LHS BC Wall A1 1st Lift 6.00 15031.0 2.22 5355.50
15.06.2022 M-30 115+497 To 115+517 RHS Retaining wall Raft 12.00 15043.0 4.44 5359.94
15.06.2022 M-30 114+134 LHS BC Raft 24.00 15067.0 8.88 5368.82
15.06.2022 M-30 121+624 RHS MNB Retaining wall Raft 96.00 15163.0 35.52 5404.34
15.06.2022 M-30 Camp Cement Godown Batching Plant Column 2.00 15165.0 0.74 5405.08
87
15.06.2022 M-30 110+188 RHS BC Deck Slab 11.00 15176.0 4.07 5409.15
A1 Wall & Middle Wall
15.06.2022 M-35 121+624 LHS MNB 12.00 15188.0 4.62 5413.77
Hunch
15.06.2022 M-35 122+350 RHS MJB P2 Pile Cap 12.00 15200.0 4.62 5418.39
15.06.2022 M-35 109+675 LHS MNB Wall A1, P1 & P2 1st Lift 12.00 15212.0 4.62 5423.01
24.06.2022 M-35 120+084 RHS MNB A2 R/W 3rd Lift 48.00 16244.9 18.48 5811.16
24.06.2022 M-35 113+085 MNB Wall 3rd Lift 7.00 16251.9 2.70 5813.85
24.06.2022 M-35 Casting Yard RE Wall Panel 15.80 16267.7 6.08 5819.94
24.06.2022 M-35 121+880 BHS MNB Hunch 12.00 16279.7 4.62 5824.56
24.06.2022 M-35 121+880 LHS MNB Shear Key 12.00 16291.7 4.62 5829.18
25.06.2022 M-30 115+457 To 115+477 RHS Retaining wall 1st Lift 16.50 16308.2 6.11 5835.28
25.06.2022 M-30 104+000 LHS Box Culvert 1st Lift Wall 5.00 16313.2 1.85 5837.13
25.06.2022 M-30 121+275 RHS Box Culvert Wall 1st Lift (S/R) 6.00 16319.2 2.22 5839.35
25.06.2022 M-30 123+430/123+830 Box Culvert Hunch 4.00 16323.2 1.48 5840.83
25.06.2022 M-30 119+690 RHS Box Culvert R/Wall 1st Lift 6.00 16329.2 2.22 5843.05
25.06.2022 M-30 121+624 RHS MNB R/Wall Raft 6.00 16335.2 2.22 5845.27
95
25.06.2022 M-35 124+280 BHS VUP Wall 1st Lift & Second Lift 24.00 16359.2 9.24 5854.51
25.06.2022 M-35 123+000 RHS MNB 1st Lift Middle Wall 12.00 16371.2 4.62 5859.13
25.06.2022 M-35 100+120 LHS MNB Raft with Shear Key 54.00 16425.2 20.79 5879.92
25.06.2022 M-35 Casting Yard RE Wall Panel 5.50 16430.7 2.12 5882.04
25.06.2022 M-35 103+850 RHS VUP Raft 90.00 16520.7 34.65 5916.69
26.06.2022 M-30 107+400 LHS BC Slab 12.00 16532.7 4.44 5921.13
26.06.2022 M-35 103+850 RHS VUP Raft 18.00 16550.7 6.93 5928.06
96 26.06.2022 M-35 Casting Yard RE Panel Panel 21.30 16572.0 8.20 5936.26
26.06.2022 M-35 116+690/121+882 RHS/LHS BC Wall & Shear Key 6.00 16578.0 2.31 5938.57
26.06.2022 M-35 99+356 RHS MNB Raft with Shear Key 306.00 16884.0 117.81 6056.38
27.06.2022 M-30 114+134 RHS BC A1 1st Lift Wall 4.00 16916.0 1.48 6064.72
27.06.2022 M-30 106+438 BHS BC Top Slab , Wall & Hunch 96.00 17012.0 35.52 6100.24
97
27.06.2022 M-30 115+477 To 115+497 RHS Retaining wall 1st Lift 17.00 17029.0 6.29 6106.53
27.06.2022 M-30 121+624 RHS MNB A2 Retaining Wall Raft 138.00 17167.0 51.06 6157.59
27.06.2022 M-35 122+350 MJB Pile Develop 2.50 17169.5 0.96 6158.55
27.06.2022 M-35 Casting Yard RE Panel Panel 12.00 17181.5 4.62 6163.17
27.06.2022 M-35 99+356 RHS MNB Raft with Shear Key 30.00 17211.5 11.55 6174.72
28.06.2022 M-30 121+624 RHS MNB A2 Retaining Wall Raft 12.00 17223.5 4.44 6179.16
28.06.2022 M-30 121+882 LHS MNB Retaining wall Raft 108.00 17331.5 39.96 6219.12
98 28.06.2022 M-30 109+375 LHS BC Wall 1st Lift 6.50 17338.0 2.41 6221.53
28.06.2022 M-30 118+250 RHS BC Deck Slab 6.00 17344.0 2.22 6223.75
28.06.2022 M-35 Casting Yard RE Panel Wall 10.20 17354.2 3.93 6227.67
A2 Retaining Wall Pile
30.06.2022 M-30 121+882 LHS MNB 36.00 17390.2 13.32 6240.99
99 Cap
30.06.2022 M-35 Casting Yard RE Wall RE Panel 9.50 17399.7 3.66 6244.65
01.07.2022 M-15 123+000 RHS MNB Retaining Wall Raft PCC 12.00 17411.7 2.94 6247.59
02.07.2022 M-30 115+497 To 115+517 RHS Retaining wall 1st Lift 15.00 17637.5 5.55 6334.00
02.07.2022 M-30 118+250 RHS Box Culvert Deck Slab 15.00 17652.5 5.55 6339.55
02.07.2022 M-30 107+120 LHS Box Culvert Wall MCW 3.00 17655.5 1.11 6340.66
02.07.2022 M-30 116+400 RHS Box Culvert Deck Slab 19.00 17674.5 7.03 6347.69
101
02.07.2022 M-35 120+084 LHS MNB 2nd Lift Wall & Shear Key 24.00 17698.5 9.24 6356.93
02.07.2022 M-35 113+085 LHS MNB Wall 3rd Lift 5.00 17703.5 1.93 6358.85
02.07.2022 M-35 121+624 LHS MNB Hunch 6.00 17709.5 2.31 6361.16
02.07.2022 M-35 121+882 BHS MNB Wall 1st Lift 6.00 17715.5 2.31 6363.47
03.07.2022 M-15 122+700 BHS MNB A2 Retaining Wall PCC 12.00 17727.5 2.94 6366.41
03.07.2022 M-30 120+084 RHS MNB A2 R/Wall 2nd Lift 22.00 17749.5 8.14 6374.55
03.07.2022 M-35 RE Casting Yard RE Wall RE Panel 19.80 17769.3 7.623 6382.18
102 Wall A1 (RHS)/Pile
03.07.2022 M-35 124+280/122+350 VUP/MJB 13.00 17782.3 5.01 6387.18
Development
03.07.2022 M-35 121+882 BHS MNB Wall 1st Lift 24.00 17806.3 9.24 6396.42
03.07.2022 M-35 121+624 LHS MNB A2 Haunch 12.00 17818.3 4.62 6401.04
04.07.2022 M-15 122+700 BHS MNB A1 R/Wall Raft PCC 16.00 17834.3 3.92 6404.96
04.07.2022 M-30 113+600 LHS BC Top Slab 12.50 17846.8 4.63 6409.59
04.07.2022 M-30 116+980 LHS BC Wall 1st Lift 7.00 17853.8 2.59 6412.18
04.07.2022 M-30 112+620 LHS BC Top Slab 15.00 17868.8 5.55 6417.73
04.07.2022 M-30 121+375 RHS BC Top Slab SR 18.00 17886.8 6.66 6424.39
Top Slab with Haunch &
103 04.07.2022 M-30 101+550 LHS BC 13.50 17900.3 5.00 6429.38
Final Lift Wall
04.07.2022 M-30 115+500 RHS Retaining wall Raft 12.50 17912.8 4.63 6434.01
04.07.2022 M-30 123+000 LHS MNB A2 Retaining Wall Raft 18.00 17930.8 6.66 6440.67
04.07.2022 M-35 124+280 RHS VUP wall 2nd lift 12.00 17942.8 4.62 6445.29
04.07.2022 M-35 122+350 RHS MJB A1 Pile Development 2.00 17944.8 0.77 6446.06
04.07.2022 M-35 RE Casting Yard RE Panel Panel 16.00 17960.8 6.16 6452.22
Retaining Wall Raft Bed
05.07.2022 M-15 122+700 BHS MNB 23.00 17983.8 5.64 6457.85
PCC
05.07.2022 M-30 101+550 LHS BC Top Slab 2.00 17985.8 0.74 6458.59
104 A1(RHS) & A2(BHS)
05.07.2022 M-35 99+394 MNB Bottom Haunch 22.00 18007.8 8.47 6467.06
05.07.2022 M-35 122+350 MJB Pile Doublepment 1.50 18009.3 0.58 6467.64
05.07.2022 M-35 RE Casting Yard RE Panel Panel 18.50 18027.8 7.12 6474.76
06.07.2022 M-30 110+492 LHS BC Bottom Haunch 2.50 18030.3 0.93 6475.69
06.07.2022 M-30 115+517 to 115+537 RHS Retaining wall 1st Lift 14.00 18044.3 5.18 6480.87
06.07.2022 M-30 115+745 RHS BC A2 1st Lift Wall MCW 4.50 18048.8 1.67 6482.53
06.07.2022 M-30 117+140 LHS BC Deck Slab 12.00 18060.8 4.44 6486.97
105
06.07.2022 M-35 113+085 RHS MNB Wall 3rd Lift 6.00 18066.8 2.31 6489.28
06.07.2022 M-35 122+350 MJB Pile Doublepment 2.00 18068.8 0.77 6490.05
06.07.2022 M-35 98+950 LHS MNB Raft with Shear Key 60.00 18128.8 23.10 6513.15
06.07.2022 M-35 RE Casting Yard RE Panel Panel 19.30 18148.1 7.43 6520.58
A1 & A2 Wall 1st Lift with
07.07.2022 M-30 114+134 LHS BC 7.00 18155.1 2.59 6523.17
Haunch
07.07.2022 M-30 116+400 LHS BC Wall 1st Lift 9.00 18164.1 3.33 6526.50
106
07.07.2022 M-30 107+120 LHS BC Wall 1st Lift 5.00 18169.1 1.85 6528.35
07.07.2022 M-35 122+350 MJB Pile Doublepment 2.00 18171.1 0.77 6529.12
07.07.2022 M-35 RE Casting Yard RE Panel Panel 4.00 18175.1 1.54 6530.66
A1 Retaining Wall Bed
08.07.2022 M-15 121+882 LHS MNB 18.00 18193.1 4.41 6535.07
PCC
08.07.2022 M-15 Casting Yard Padestal 2.00 18195.1 0.49 6535.56
107
08.07.2022 M-35 97+850 RHS MNB Raft with Shear Key 60.00 18255.1 23.10 6558.66
08.07.2022 M-35 122+350 MJB Pile Doublepment 2.00 18257.1 0.77 6559.43
08.07.2022 M-35 105+461 LHS MNB Raft (SR) 36.00 18293.1 13.86 6573.29
09.07.2022 M-15 121+882 LHS MNB Retaining Wall Bed PCC 2.50 18295.6 0.61 6573.90
108 09.07.2022 M-30 106+438 LHS BC Raft (SR) 18.00 18313.6 6.66 6580.56
09.07.2022 M-35 122+350 MJB A1 Pile Doublepment 2.50 18316.1 0.96 6581.53
09.07.2022 M-35 105+461 LHS MNB Raft (SR) 72.00 18388.1 27.72 6609.25
10.07.2022 M-15 115+752 BHS VUP PCC 42.00 18430.1 10.29 6619.54
10.07.2022 M-30 108+313 RHS BC Raft 33.50 18463.6 12.40 6631.93
109
10.07.2022 M-30 115+745 RHS BC A1 Wall 1st Lift 4.50 18468.1 1.67 6633.60
109
10.07.2022 M-35 99+394 BHS MNB Bottom Haunch M2 12.50 18480.6 4.81 6638.41
10.07.2022 M-35 103+846 LHS VUP Raft 108.50 18589.1 41.77 6680.18
10.07.2022 M-35 RE Casting Yard RE Panel Panel 24.00 18613.1 9.24 6689.42
11.07.2022 M-15 121+624 MNB A2 R/Wall PCC 18.00 18631.1 4.41 6693.83
11.07.2022 M-30 114+678 RHS BC Wall A1 & M1 1st Lift 6.50 18637.6 2.41 6696.24
11.07.2022 M-30 115+537 To 115+550 RHS Retaining wall 1st Lift 12.00 18649.6 4.44 6700.68
A1&2(RHS),3rd Lift
11.07.2022 M-30 119+685 BC (B/S)& 2nd Lift(L/S) 12.00 18661.6 4.44 6705.12
110 11.07.2022 M-30 120+084 RHS MNB Retaining Wall A1 23.00 18684.6 8.51 6713.63
11.07.2022 M-30 123+000 LHS MNB A1 R/W Raft & A2 1st Lift 24.00 18708.6 8.88 6722.51
11.07.2022 M-35 113+085 LHS MNB M1 Wall 2nd Lift 6.50 18715.1 2.50 6725.01
11.07.2022 M-35 120+084 LHS MNB Wall 4th Lift 6.00 18721.1 2.31 6727.32
11.07.2022 M-35 RE Casting Yard RE Panel Panel 20.50 18741.6 7.89 6735.21
12.07.2022 M-15 122+700 BHS MNB R/Wall Bed PCC 2.50 18744.1 0.61 6735.82
12.07.2022 M-30 110+759 RHS BC Raft 8.00 18752.1 2.96 6738.78
12.07.2022 M-30 114+134 BHS BC Middle Wall Haunch 6.75 18758.9 2.50 6741.28
111 12.07.2022 M-35 99+394 RHS MNB Haunch M1 6.00 18764.9 2.31 6743.59
12.07.2022 M-35 99+394 LHS MNB Wall A2 1st Lift 13.50 18778.4 5.20 6748.79
12.07.2022 M-35 124+680 LHS VUP A2 Wall 2nd Lift 26.00 18804.4 10.01 6758.80
12.07.2022 M-35 RE Casting Yard RE Panel Panel 23.00 18827.4 8.86 6767.65
13.07.2022 M-15 Camp Cement Godown Base Filling 0.50 18827.9 0.12 6767.78
13.07.2022 M-30 106+640 LHS BC A1 & A2 Wall 1st Lift SR 8.50 18836.4 3.15 6770.92
13.07.2022 M-30 109+512 LHS BC Deck Slab 22.00 18858.4 8.14 6779.06
13.07.2022 M-30 110+492 RHS BC Wall 1st Lift 6.00 18864.4 2.22 6781.28
112
13.07.2022 M-30 107+120 RHS BC Deck Slab 10.00 18874.4 3.70 6784.98
13.07.2022 M-30 116+400 LHS BC Deck Slab with Wall 18.00 18892.4 6.66 6791.64
13.07.2022 M-30 116+980 RHS BC Deck Slab with Wall 18.00 18910.4 6.66 6798.30
13.07.2022 M-30 123+000 MNB Retaining Wall Raft 28.00 18938.4 10.36 6808.66
13.07.2022 M-35 RE Casting Yard RE Panel Panel 24.00 18962.4 9.24 6817.90
14.07.2022 M-15 122+350 LHS MJB Pile Cap PCC 12.00 18974.4 2.94 6820.84
14.07.2022 M-30 123+000 LHS MNB Retaining Wall 1st Lift 6.00 18980.4 2.22 6823.06
14.07.2022 M-30 114+134 RHS BC Median Wall 1st Lift 2.00 18982.4 0.74 6823.80
14.07.2022 M-35 99+394 RHS MNB Wall 1st Lift 17.00 18999.4 6.55 6830.35
113
113 Wall 1st Lift &
14.07.2022 M-35 121+624 LHS MNB Middle/Bottom 15.00 19014.4 5.78 6836.12
Haunch(RHS)
14.07.2022 M-35 120+831 RHS LVUP Deck Slab 126.00 19140.4 48.51 6884.63
14.07.2022 M-35 RE Casting Yard RE Panel Panel 23.00 19163.4 8.86 6893.49
15.07.2022 M-30 121+880 LHS MNB A1 R/Wall Raft 162.00 19325.4 59.94 6953.43
Bottom Haunch & Mid
15.07.2022 M-30 110+492 LHS BC Wall 3.50 19328.9 1.30 6954.72
114
15.07.2022 M-30 106+438 LHS BC Bottom Haunch 3.00 19331.9 1.11 6955.83
15.07.2022 M-35 RE Casting Yard RE Panel Panel 22.00 19353.9 8.47 6964.30
16.07.2022 M-15 Camp VIP Guest House Sewage Pipe 2.00 19355.9 0.49 6964.79
16.07.2022 M-30 123+000 RHS MNB A2 Retaining Wall Raft 26.00 19381.9 9.62 6974.41
16.07.2022 M-30 115+457 To 115+477 RHS Retaining wall 2nd Lift 12.75 19394.6 4.72 6979.13
115 16.07.2022 M-30 Camp 3rd Batching Plant Silo Column 4.00 19398.6 1.48 6980.61
16.07.2022 M-30 122+700 RHS MNB A1 Retaining Wall Raft 49.00 19447.6 18.13 6998.74
16.07.2022 M-35 113+085 LHS MNB Middle Wall 3rd Lift 6.00 19453.6 2.31 7001.05
16.07.2022 M-35 RE Casting Yard RE Panel Panel 32.50 19486.1 12.51 7013.56
17.07.2022 M-30 115+457 To 115+477 RHS Retaining wall 2nd Lift 13.50 19499.6 5.00 7018.56
17.07.2022 M-30 102+962 LHS BC Top Slab 14.50 19514.1 5.37 7023.92
116
17.07.2022 M-35 124+280 RHS VUP A2 Wall 3rd Lift 12.00 19526.1 4.62 7028.54
17.07.2022 M-35 RE Casting Yard RE Panel Panel 32.20 19558.3 12.40 7040.94
18.07.2022 M-15 123+280 RHS MNB Retaining Wall PCC 18.00 19576.3 4.41 7045.35
18.07.2022 M-15 Casting Yard Labour Hutment 1.50 19577.8 0.37 7045.72
18.07.2022 M-20 121+624 LHS MNB A1 R/Wall Bed PCC 18.00 19595.8 5.44 7051.15
117 18.07.2022 M-30 Camp 3rd Batching Plant Beam & Silo Column 6.00 19601.8 2.22 7053.37
18.07.2022 M-30 123+450 RHS BC Wall 7.50 19609.3 2.78 7056.15
18.07.2022 M-30 121+882 LHS MNB A1 Retaining Wall 29.00 19638.3 10.73 7066.88
18.07.2022 M-35 RE Casting Yard RE Panel Panel 32.50 19670.8 12.51 7079.39
19.07.2022 M-30 121+375 LHS BC Deck Slab MCW 29.00 19699.8 10.73 7090.12
19.07.2022 M-30 116+980 LHS BC Deck Slab with Wall 15.00 19714.8 5.55 7095.67
19.07.2022 M-30 106+640 BHS BC A1 & A2 Wall 1st Lift 22.00 19736.8 8.14 7103.81
118 19.07.2022 M-30 122+700 RHS MNB A2 Retaining Wall Raft 48.50 19785.3 17.95 7121.76
19.07.2022 M-35 113+085 LHS MNB Wall 4th Lift M1 5.00 19790.3 1.93 7123.68
19.07.2022 M-35 124+280 RHS VUP A1 3rd Lift Wall 12.00 19802.3 4.62 7128.30
19.07.2022 M-35 RE Casting Yard RE Panel Panel 26.50 19828.8 10.20 7138.50
20.07.2022 M-15 Camp 3rd Batching Plant Hopper Foundation 1.00 19829.8 0.25 7138.75
20.07.2022 M-15 123+273 RHS MNB R/Wall Raft PCC 18.00 19847.8 4.41 7143.16
20.07.2022 M-30 115+477 To 115+497 RHS Retaining wall 2nd Lift 13.00 19860.8 4.81 7147.97
20.07.2022 M-30 108+313 RHS BC Raft SR 13.00 19873.8 4.81 7152.78
119
20.07.2022 M-35 103+846 RHS VUP Bottom Haunch A1 & A2 15.00 19888.8 5.78 7158.55
20.07.2022 M-35 121+882 BHS MNB 2nd Lift Wall A2 23.00 19911.8 8.86 7167.41
20.07.2022 M-35 122+350 RHS MJB A1 Abutment Cap 192.00 20103.8 73.92 7241.33
20.07.2022 M-35 RE Casting Yard RE Panel Panel 17.50 20121.3 6.74 7248.07
21.07.2022 M-35 122+350 RHS MJB ABT CAP A1 6.00 20127.3 2.31 7250.38
21.07.2022 M-25 Camp column Batching Plant Column 1.50 20128.8 0.51 7250.89
21.07.2022 M-15 123+000 LHS MNB Retaining Wall PCC 18.00 20146.8 4.41 7255.30
120 21.07.2022 M-30 Camp 3rd Batching Plant Silo Column 2.50 20149.3 0.93 7256.22
21.07.2022 M-30 121+882 RHS MNB R/Wall 1st Lift 22.00 20171.3 8.14 7264.36
21.07.2022 M-35 115+752 RHS VUP Raft 108.00 20279.3 41.58 7305.94
21.07.2022 M-35 RE Casting Yard RE Panel Panel 15.20 20294.5 5.85 7311.79
22.07.2022 M-30 123+000 RHS MNB R/Wall 1st Lift 10.00 20304.5 3.70 7315.49
22.07.2022 M-30 110+492 LHS BC Wall A1 3.00 20307.5 1.11 7316.60
22.07.2022 M-30 117+785 LHS BC Raft 8.50 20316.0 3.15 7319.75
121 22.07.2022 M-30 121+624 LHS MNB A2 R/Wall Raft 156.00 20472.0 57.72 7377.47
22.07.2022 M-30 114+134 RHS BC Top Slab 42.00 20514.0 15.54 7393.01
22.07.2022 M-30 104+000 LHS BC Deck Slab S/R 9.25 20523.3 3.42 7396.43
22.07.2022 M-35 RE Casting Yard RE Panel Panel 6.00 20529.3 2.31 7398.74
23.07.2022 M-15 Camp 3rd Batching Plant Bed PCC 9.00 20538.3 2.21 7400.94
23.07.2022 M-15 123+273 LHS MNB R/Wall Raft PCC 18.00 20556.3 4.41 7405.35
23.07.2022 M-30 115+497 To 115+517 RHS Retaining wall 2nd Lift 13.00 20569.3 4.81 7410.16
23.07.2022 M-30 110+492 LHS BC A2 Wall 1st Lift 3.00 20572.3 1.11 7411.27
122 23.07.2022 M-30 123+480 RHS BC A1 Wall 1st Lift 1.00 20573.3 0.37 7411.64
23.07.2022 M-30 109+375 LHS BC Top Slab 11.00 20584.3 4.07 7415.71
23.07.2022 M-30 122+700 RHS MNB A2 R/W 1st Lift 13.00 20597.3 4.81 7420.52
23.07.2022 M-30 121+882 LHS MNB A2 R/W 2nd Lift 24.50 20621.8 9.07 7429.59
23.07.2022 M-35 RE Casting Yard RE Panel Panel 27.00 20648.8 10.40 7439.98
24.07.2022 M-30 104+000 RHS BC Deck Slab S/R 9.75 20658.5 3.61 7443.59
24.07.2022 M-30 117+780 RHS BC Raft 8.50 20667.0 3.15 7446.74
24.07.2022 M-30 107+120 RHS BC Top Slab 13.50 20680.5 5.00 7451.73
24.07.2022 M-30 117+780 LHS BC Bottom Haunch 3.00 20683.5 1.11 7452.84
123
24.07.2022 M-30 123+273 RHS MNB A2 Retaining Wall Raft 120.00 20803.5 44.40 7497.24
24.07.2022 M-35 103+846 LHS VUP Bottom Haunch A1 & A2 13.50 20817.0 5.20 7502.44
24.07.2022 M-35 RE Casting Yard RE Panel Panel 17.50 20834.5 6.74 7509.18
25.07.2022 M-30 122+700 LHS MNB A1 R/Wall Raft 37.00 20871.5 13.69 7522.87
25.07.2022 M-30 120+084 RHS MNB A1 R/Wall 2nd Lift 48.00 20919.5 17.76 7540.63
25.07.2022 M-30 120+084 LHS MNB A1 R/Wall 1st Lift 12.00 20931.5 4.44 7545.07
124
25.07.2022 M-30 121+882 RHS MNB A1 R/Wall 1st Lift 39.00 20970.5 14.43 7559.50
25.07.2022 M-35 120+084 LHS MNB A1 2nd Lift Wall 11.00 20981.5 4.24 7563.73
25.07.2022 M-35 RE Casting Yard RE Panel Panel 24.00 21005.5 9.24 7572.97
26.07.2022 M-30 108+313 RHS BC Raft S/R 6.00 21011.5 2.22 7575.19
26.07.2022 M-30 115+457 To 115+477 RHS Retaining wall 3rd Lift 18.00 21029.5 6.66 7581.85
26.07.2022 M-30 117+780 LHS BC Wall 1st Lift 6.00 21035.5 2.22 7584.07
125 26.07.2022 M-30 123+273 LHS MNB A2 R/Wall Raft 120.00 21155.5 44.40 7628.47
26.07.2022 M-35 109+675 LHS MNB M1 & M2 Wall 1st Lift 10.50 21166.0 4.04 7632.51
26.07.2022 M-35 124+280 LHS VUP A2 R/wall 3rd Lift 12.00 21178.0 4.62 7637.13
26.07.2022 M-35 RE Casting Yard RE Panel Panel 32.00 21210.0 12.32 7649.45
27.07.2022 M-15 Casting Yard Crash Barrier Area PCC 6.50 21216.5 1.59 7651.05
27.07.2022 M-15 121+375 BHS BC R/Wall Bed PCC 9.00 21225.5 2.21 7653.25
27.07.2022 M-25 Camp 3rd Batching Plant Column & Raft 17.75 21243.3 6.04 7659.29
27.07.2022 M-30 115+517 RHS Retaining wall 2nd Lift 12.00 21255.3 4.44 7663.73
Final Lift Wall with Deck
27.07.2022 M-30 121+375 RHS BC 29.00 21284.3 10.73 7674.46
Slab
126
27.07.2022 M-30 117+780 RHS BC Bottom Haunch A1 & A2 4.00 21288.3 1.48 7675.94
27.07.2022 M-30 122+700 LHS MNB A2 R/W & Raft 39.50 21327.8 14.62 7690.55
27.07.2022 M-35 99+394 LHS MNB A2 Wall 2nd Lift 14.00 21341.8 5.39 7695.94
27.07.2022 M-35 103+846 RHS VUP A2 Wall 1st Lift 11.50 21353.3 4.43 7700.37
27.07.2022 M-35 122+350 LHS MJB A1 Pile Cap 66.00 21419.3 25.41 7725.78
27.07.2022 M-35 RE Casting Yard RE Panel Panel 29.00 21448.3 11.17 7736.94
28.07.2022 M-35 122+350 LHS MJB A1 Pile Cap 134.00 21582.3 51.59 7788.53
127
28.07.2022 M-35 RE Casting Yard RE Panel Panel 17.50 21599.8 6.74 7795.27
29.07.2022 M-30 106+640 RHS BC Deck Slab S/R 18.75 21618.5 6.94 7802.21
29.07.2022 M-30 120+084 LHS MNB A1 R/W 3rd & 2nd Lift 32.00 21650.5 11.84 7814.05
29.07.2022 M-30 114+140 LHS BC Top Slab 42.00 21692.5 15.54 7829.59
Slab Top Haunch & final
29.07.2022 M-30 102+485 RHS BC 12.00 21704.5 4.44 7834.03
lift wall
128 29.07.2022 M-30 121+375 RHS BC A1 & A2 R/Wall Raft 11.60 21716.1 4.29 7838.32
29.07.2022 M-30 122+700 RHS MNB A2 R/W 2nd Lift 18.00 21734.1 6.66 7844.98
29.07.2022 M-35 120+084 LHS MNB Middle 1st Lift 7.50 21741.6 2.89 7847.87
29.07.2022 M-35 115+763 LHS VUP Raft 108.00 21849.6 41.58 7889.45
29.07.2022 M-35 RE Casting Yard RE Panel Panel 32.00 21881.6 12.32 7901.77
30.07.2022 M-30 123+280 RHS MNB A1 R/Wall Raft 108.00 21989.6 39.96 7941.73
129
30.07.2022 M-35 RE Casting Yard RE Panel Panel 24.00 22013.6 9.24 7950.97
31.07.2022 M-30 123+280 LHS MNB A1 R/Wall Raft 60.00 22073.6 22.20 7973.17
130
31.07.2022 M-35 RE Casting Yard RE Panel Panel 11.00 22084.6 4.24 7977.40
02.08.2022 M-30 121+375 LHS BC A1 & A2 R/Wall Raft 10.60 22095.2 3.92 7981.33
131
02.08.2022 M-35 RE Casting Yard RE Panel Panel 15.00 22110.2 5.78 7987.10
Wall Final Lift with Top
03.08.2022 M-30 117+780 LHS BC 15.50 22125.7 5.74 7992.84
Slab
03.08.2022 M-30 107+120 LHS BC Deck Slab 11.75 22137.5 4.35 7997.18
03.08.2022 M-30 114+140 BHS BC Parapet 2.50 22140.0 0.93 7998.11
03.08.2022 M-30 115+477 To 115+497 Retaining wall Final Lift 23.00 22163.0 8.51 8006.62
132 03.08.2022 M-30 121+375 RHS BC A1 & A2 R/Wall 1st Lift 4.50 22167.5 1.67 8008.28
03.08.2022 M-30 121+375 LHS BC A1 & A2 R/Wall 1st Lift 5.20 22172.7 1.92 8010.21
03.08.2022 M-35 115+763 RHS VUP A2 Bottom Haunch 5.00 22177.7 1.93 8012.13
03.08.2022 M-35 100+280 LHS MNB Raft with Shear Key 60.00 22237.7 23.10 8035.23
03.08.2022 M-35 RE Casting Yard RE Panel Panel 32.50 22270.2 12.51 8047.75
03.08.2022 M-40 Casting Yard Crash Barrier 1.00 22271.2 0.41 8048.15
04.08.2022 M-15 120+865 RHS BC A1 &A2 R/Wall Bed PCC 3.00 22274.2 0.74 8048.89
04.08.2022 M-30 117+780 RHS BC Wall 1st Lift 8.50 22282.7 3.15 8052.03
Middle 3rd & 2nd Lift
04.08.2022 M-35 120+084 RHS MNB 14.00 22296.7 5.39 8057.42
133 Wall
04.08.2022 M-35 103+846 LHS VUP A1 Wall 1st Lift 12.00 22308.7 4.62 8062.04
04.08.2022 M-35 115+763 RHS VUP A2 Bottom Haunch 2.00 22310.7 0.77 8062.81
04.08.2022 M-35 115+763 RHS VUP A1 Bottom Haunch 6.00 22316.7 2.31 8065.12
04.08.2022 M-35 RE Casting Yard RE Panel Panel 23.50 22340.2 9.05 8074.17
05.08.2022 M-30 121+375 BHS BC A1 R/Wall 2nd Lift 6.00 22346.2 2.22 8076.39
05.08.2022 M-30 108+889 RHS BC Top Slab S/R 9.25 22355.4 3.42 8079.81
05.08.2022 M-30 121+375 RHS BC A2 R/Wall 2nd Lift 4.00 22359.4 1.48 8081.29
134
05.08.2022 M-30 115+537 To 115+550 RHS Retaining wall Final Lift 9.50 22368.9 3.52 8084.81
05.08.2022 M-35 99+395 RHS MNB A2 Wall 2nd Lift 16.50 22385.4 6.35 8091.16
05.08.2022 M-35 RE Casting Yard RE Panel Panel 18.00 22403.4 6.93 8098.09
A1 R/Wall 3rd Lift & A2
06.08.2022 M-30 120+084 LHS MNB 26.00 22429.4 9.62 8107.71
R/Wall 4th Lift RHS
135 06.08.2022 M-35 115+763 LHS VUP A2 Bottom Haunch 6.00 22435.4 2.31 8110.02
06.08.2022 M-35 RE Casting Yard RE Panel Panel 30.00 22465.4 11.55 8121.57
A2 R/W 3rd
07.08.2022 M-30 121+375 BHS BC Lift(RHS) ,A2 R/W 2nd 8.50 22473.9 3.15 8124.71
136 Lift (LHS)
07.07.2022 M-35 103+846 LHS VUP A1 Wall 1st Lift 12.00 22485.9 4.62 8129.33
07.08.2022 M-35 RE Casting Yard RE Panel Panel 31.50 22517.4 12.13 8141.46
08.08.2022 M-30 120+865 RHS BC A1 & A2 R/Wall Raft 11.00 22528.4 4.07 8145.53
08.08.2022 M-30 115+517 to 115+537 RHS Retaining wall Final Lift 14.50 22542.9 5.37 8150.90
137 08.08.2022 M-35 115+763 LHS VUP A1 Bottom Haunch 6.00 22548.9 2.31 8153.21
08.08.2022 M-35 RE Casting Yard RE Panel Panel 30.00 22578.9 11.55 8164.76
08.08.2022 M-40 Casting Yard Crash Barrier 1.00 22579.9 0.41 8165.16
09.08.2022 M-30 120+865 LHS BC A1 & A2 R/Wall Raft 11.00 22590.9 4.07 8169.23
Wall Final Lift with Deck
09.08.2022 M-30 117+780 RHS BC Slab 16.00 22606.9 5.92 8175.15
138
09.08.2022 M-35 109+675 BHS MNB 1st Lift Wall 17.25 22624.2 6.64 8181.79
09.08.2022 M-35 115+763 RHS VUP A2 Wall 1st Lift 12.50 22636.7 4.81 8186.60
10.08.2022 M-30 107+120 LHS BC Top Slab SR 9.00 22645.7 3.33 8189.93
10.08.2022 M-30 109+375 RHS BC Top Slab SR 11.00 22656.7 4.07 8194.00
139 10.08.2022 M-30 120+865 RHS BC A1&A2 R/W 1st Lift 5.80 22662.5 2.15 8196.15
10.08.2022 M-35 103+846 LHS VUP A2 Wall 2nd Lift 12.00 22674.5 4.62 8200.77
10.08.2022 M-35 RE Casting Yard RE Panel Panel 18.00 22692.5 6.93 8207.70
11.08.2022 M-30 104+400 LHS BC Raft S/R 6.00 22698.5 2.22 8209.92
140
11.08.2022 M-30 120+865 LHS BC A1 &A2 R/Wall 1st Lift 5.80 22704.3 2.15 8212.07
12.08.2022 M-30 115+497 to 115+517 RHS Retaining wall Final Lift 14.5 22718.8 5.37 8217.43
141 A1 wall 1st lift &A2 wall
12.08.2022 M-35 115+763 RHS VUP 24 22742.8 9.24 8226.67
2nd Lift
13.08.2022 M-35 103+850 RHS VUP A1 Wall 1st Lift 12 22754.8 4.62 8231.29
142 13.08.2022 M-35 120+084 RHS MNB Middle Wall 4th Lift 9.5 22764.3 3.66 8234.95
13.08.2022 M-30 120+865 RHS BC A1 & A2 R/Wall 2nd Lift 5 22769.3 1.85 8236.80
14.08.2022 M30 104+400 RHS BC Raft S/R 6 22775.3 2.22 8239.02
14.08.2022 M30 120+865 LHS BC A1 & A2 R/Wall 2nd Lift 5 22808.3 1.85 8251.85
143
14.08.2022 M35 Casting Yard RE Panel Panel 18 22793.3 6.93 8245.95
14.08.2022 M40 Casting Yard RE Wall Crash Barrier 10 22803.3 4.05 8250.00
Fly Ash Cumm. Fly 20mm Cumm. 10mm Cumm. Cumm. Cumm.
Sand Admixture Admixture
Content Ash Content Agg. 20mm Agg. Agg. 10mm Agg. Sand Admixture Cement Fly Ash
(MT) (Kg) Received
(MT) (MT) (MT) (MT) (MT) (MT) (MT) (Kg)
0.00 0.00 12.98 12.98 10.55 10.55 14.38 14.38 0.00 0.00
0.00 0.00 21.63 34.61 17.58 28.13 23.97 38.35 0.00 0.00
0.00 0.00 8.65 43.26 7.03 35.16 9.59 47.94 0.00 0.00
0.00 0.00 11.54 54.80 9.38 44.54 12.78 60.72 0.00 0.00
0.00 0.00 8.65 63.45 7.03 51.57 9.59 70.31 0.00 0.00
0.00 0.00 12.26 75.71 9.96 61.53 13.58 83.90 0.00 0.00
0.00 0.00 12.98 88.68 10.55 72.08 14.38 98.28 0.00 0.00
0.00 0.00 17.30 105.99 14.06 86.14 19.18 117.45 0.00 0.00
0.00 0.00 17.30 123.29 14.06 100.21 19.18 136.63 0.00 0.00
0.00 0.00 8.65 131.94 7.03 107.24 9.59 146.22 0.00 0.00
0.00 0.00 8.65 140.60 7.03 114.27 9.59 155.81 0.00 0.00
0.00 0.00 8.65 149.25 7.03 121.30 9.59 165.39 0.00 0.00
0.00 0.00 7.21 156.46 5.86 127.16 7.99 173.38 0.00 0.00
0.00 0.00 12.98 169.44 10.55 137.71 14.38 187.77 0.00 0.00
0.00 0.00 7.21 176.65 5.86 143.57 7.99 195.76 0.00 0.00
0.00 0.00 12.98 189.62 10.55 154.12 14.38 210.14 0.00 0.00
0.00 0.00 7.21 196.83 5.86 159.98 7.99 218.13 0.00 0.00
0.00 0.00 8.65 205.49 7.03 167.01 9.59 227.72 0.00 0.00
0.00 0.00 8.65 214.14 7.03 174.04 9.59 237.30 0.00 0.00
0.00 0.00 10.09 224.23 8.20 182.25 11.19 248.49 0.00 0.00
0.00 0.00 10.82 235.05 8.79 191.04 11.99 260.47 0.00 0.00
0.00 0.00 10.82 245.86 8.79 199.83 11.99 272.46 0.00 0.00
0.00 0.00 10.09 255.96 8.20 208.03 11.19 283.65 0.00 0.00
0.00 0.00 8.65 264.61 7.03 215.06 9.59 293.23 0.00 0.00
0.00 0.00 0.72 265.33 0.59 215.65 0.80 294.03 0.00 0.00
0.00 0.00 25.96 291.28 21.10 236.74 28.76 322.80 0.00 0.00
0.00 0.00 12.98 304.26 10.55 247.29 14.38 337.18 0.00 0.00
0.00 0.00 12.98 317.24 10.55 257.84 14.38 351.56 37.44 37.44
0.00 0.00 47.59 364.83 38.68 296.52 52.73 404.29 137.28 174.72
0.00 0.00 8.65 373.48 7.03 303.55 9.59 413.88 24.96 199.68
0.00 0.00 12.26 385.74 9.96 313.51 13.58 427.47 35.36 235.04
0.00 0.00 2.16 387.90 1.76 315.27 2.40 429.86 6.24 241.28
0.00 0.00 10.82 398.71 8.79 324.06 11.99 441.85 31.20 272.48
0.00 0.00 14.42 413.13 11.72 335.78 15.98 457.83 41.60 314.08
0.00 0.00 4.33 417.46 3.52 339.29 4.79 462.62 12.48 326.56
0.00 0.00 8.65 426.11 7.03 346.33 9.59 472.21 24.96 351.52
0.00 0.00 8.65 434.76 7.03 353.36 9.59 481.80 24.96 376.48
0.00 0.00 4.33 439.09 3.52 356.87 4.79 486.59 12.48 388.96
0.00 0.00 8.65 447.74 7.03 363.91 9.59 496.18 24.96 413.92
0.00 0.00 1.80 449.54 1.47 365.37 2.00 498.18 5.20 419.12
0.00 0.00 8.65 458.20 7.03 372.40 9.59 507.76 24.96 444.08
0.00 0.00 12.98 471.17 10.55 382.95 14.38 522.15 37.44 481.52
0.00 0.00 17.30 488.48 14.06 397.02 19.18 541.32 49.92 531.44
0.00 0.00 7.45 495.93 4.93 401.95 7.56 548.88 25.90 557.34
0.00 0.00 25.13 521.06 16.63 418.57 25.52 574.40 85.05 642.39
0.00 0.00 25.85 546.91 17.10 435.67 26.24 600.64 87.48 729.87
0.00 0.00 4.47 551.38 2.96 438.63 4.54 605.18 15.54 745.41
0.00 0.00 2.24 553.61 1.48 440.11 2.27 607.45 7.77 753.18
0.00 0.00 7.93 561.54 6.45 446.55 8.79 616.23 22.88 776.06
0.00 0.00 20.91 582.45 16.99 463.55 23.17 639.41 60.32 836.38
0.00 0.00 4.33 586.78 3.52 467.06 4.79 644.20 12.48 848.86
0.00 0.00 4.69 591.46 3.81 470.87 5.19 649.39 13.52 862.38
0.00 0.00 3.61 595.07 2.93 473.80 4.00 653.39 10.40 872.78
0.00 0.00 12.26 607.33 9.96 483.76 13.58 666.97 35.36 908.14
0.00 0.00 8.65 615.98 7.03 490.80 9.59 676.56 24.96 933.10
0.00 0.00 17.30 633.28 14.06 504.86 19.18 695.74 49.92 983.02
0.00 0.00 4.33 637.61 3.52 508.38 4.79 700.53 12.48 995.50
0.00 0.00 3.61 641.21 2.93 511.31 4.00 704.52 10.40 1005.90
0.00 0.00 4.33 645.54 3.52 514.82 4.79 709.32 12.48 1018.38
0.00 0.00 4.33 649.86 3.52 518.34 4.79 714.11 12.48 1030.86
0.00 0.00 5.96 655.82 3.94 522.28 6.05 720.16 20.72 1051.58
0.00 0.00 4.47 660.29 2.96 525.24 4.54 724.70 15.54 1067.12
0.00 0.00 8.94 669.23 5.92 531.16 9.07 733.77 31.08 1098.20
0.00 0.00 11.18 680.41 7.40 538.55 11.34 745.11 38.85 1137.05
0.00 0.00 8.94 689.35 5.92 544.47 9.07 754.18 31.08 1168.13
0.00 0.00 2.98 692.33 1.97 546.44 3.02 757.20 10.36 1178.49
0.00 0.00 3.61 695.93 2.93 549.37 4.00 761.20 10.40 1188.89
0.00 0.00 25.24 721.17 20.51 569.88 27.97 789.16 72.80 1261.69
0.00 0.00 8.65 729.82 7.03 576.91 9.59 798.75 24.96 1286.65
0.00 0.00 4.33 734.15 3.52 580.43 4.79 803.55 12.48 1299.13
0.00 0.00 25.13 759.28 16.63 597.05 25.52 829.06 85.05 1384.18
0.00 0.00 21.54 780.82 14.25 611.30 21.87 850.93 72.90 1457.08
0.00 0.00 3.73 784.54 2.47 613.77 3.78 854.71 12.95 1470.03
0.00 0.00 9.13 793.67 6.04 619.81 9.26 863.97 31.73 1501.76
0.00 0.00 4.66 798.32 3.08 622.89 4.73 868.70 16.19 1517.95
0.00 0.00 12.98 811.30 10.55 633.44 14.38 883.08 37.44 1555.39
0.00 0.00 4.33 815.63 3.52 636.95 4.79 887.87 12.48 1567.87
0.00 0.00 17.30 832.93 14.06 651.02 19.18 907.05 49.92 1617.79
0.00 0.00 4.33 837.26 3.52 654.53 4.79 911.84 12.48 1630.27
0.00 0.00 4.33 841.58 3.52 658.05 4.79 916.64 12.48 1642.75
0.00 0.00 3.61 845.19 2.93 660.98 4.00 920.63 10.40 1653.15
0.00 0.00 4.33 849.52 3.52 664.49 4.79 925.43 12.48 1665.63
0.00 0.00 3.61 853.12 2.93 667.42 4.00 929.42 10.40 1676.03
0.00 0.00 7.93 861.05 6.45 673.87 8.79 938.21 22.88 1698.91
0.00 0.00 8.65 869.70 7.03 680.90 9.59 947.80 24.96 1723.87
0.00 0.00 17.30 887.01 14.06 694.97 19.18 966.97 49.92 1773.79
0.00 0.00 4.33 891.33 3.52 698.48 4.79 971.77 12.48 1786.27
0.00 0.00 12.98 904.31 10.55 709.03 14.38 986.15 37.44 1823.71
0.00 0.00 4.47 908.78 2.96 711.99 4.54 990.69 15.54 1839.25
0.00 0.00 4.47 913.25 2.96 714.95 4.54 995.22 15.54 1854.79
0.00 0.00 4.47 917.72 2.96 717.90 4.54 999.76 15.54 1870.33
0.00 0.00 29.80 947.52 19.71 737.62 30.25 1030.01 100.85 1971.17
0.00 0.00 15.14 962.66 12.31 749.92 16.78 1046.79 43.68 2014.85
0.00 0.00 17.30 979.96 14.06 763.99 19.18 1065.97 49.92 2064.77
0.00 0.00 12.26 992.22 9.96 773.95 13.58 1079.55 35.36 2100.13
0.00 0.00 8.65 1000.87 7.03 780.98 9.59 1089.14 24.96 2125.09
0.00 0.00 4.33 1005.20 3.52 784.50 4.79 1093.93 12.48 2137.57
0.00 0.00 8.65 1013.85 7.03 791.53 9.59 1103.52 24.96 2162.53
0.00 0.00 17.14 1030.99 11.34 802.87 17.39 1120.91 59.57 2222.10
0.00 0.00 4.47 1035.46 2.96 805.83 4.54 1125.44 15.54 2237.64
0.00 0.00 26.08 1061.53 17.26 823.08 26.46 1151.90 90.65 2328.29
0.00 0.00 8.94 1070.47 5.92 829.00 9.07 1160.98 31.08 2359.37
0.00 0.00 12.98 1083.45 10.55 839.54 14.38 1175.36 37.44 2396.81
0.00 0.00 12.98 1096.43 10.55 850.09 14.38 1189.74 37.44 2434.25
0.00 0.00 7.21 1103.64 5.86 855.95 7.99 1197.73 20.80 2455.05
0.00 0.00 4.33 1107.96 3.52 859.47 4.79 1202.52 12.48 2467.53
0.00 0.00 3.61 1111.57 2.93 862.40 4.00 1206.52 10.40 2477.93
0.00 0.00 29.80 1141.37 19.72 882.12 30.24 1236.76 103.60 2581.53
0.00 0.00 5.96 1147.33 3.94 886.06 6.05 1242.81 20.72 2602.25
0.00 0.00 5.96 1153.29 3.94 890.01 6.05 1248.85 20.72 2622.97
0.00 0.00 28.72 1182.01 19.00 909.01 29.16 1278.01 97.20 2720.17
0.00 0.00 3.61 1185.61 2.93 911.94 4.00 1282.01 10.40 2730.57
0.00 0.00 17.30 1202.92 14.06 926.00 19.18 1301.19 49.92 2780.49
0.00 0.00 21.63 1224.55 17.58 943.58 23.97 1325.16 62.40 2842.89
0.00 0.00 12.92 1237.47 8.55 952.13 13.12 1338.28 37.44 2880.33
0.00 0.00 12.26 1249.73 9.96 962.09 13.58 1351.86 35.36 2915.69
0.00 0.00 8.20 1257.92 5.42 967.52 8.32 1360.18 28.49 2944.18
0.00 0.00 7.45 1265.37 4.93 972.45 7.56 1367.74 25.90 2970.08
0.00 0.00 0.75 1266.12 0.49 972.94 0.76 1368.49 2.59 2972.67
0.00 0.00 25.85 1291.97 17.10 990.04 26.24 1394.74 87.48 3060.15
0.00 0.00 25.13 1317.10 16.63 1006.66 25.52 1420.25 85.05 3145.20
0.00 0.00 21.63 1338.73 17.58 1024.24 23.97 1444.22 62.40 3207.60
0.00 0.00 4.33 1343.05 3.52 1027.76 4.79 1449.02 12.48 3220.08
0.00 0.00 20.19 1363.24 16.41 1044.17 22.37 1471.39 58.24 3278.32
0.00 0.00 4.33 1367.57 3.52 1047.68 4.79 1476.18 12.48 3290.80
0.00 0.00 7.93 1375.50 6.45 1054.13 8.79 1484.97 22.88 3313.68
0.00 0.00 8.94 1384.44 5.92 1060.05 9.07 1494.04 31.08 3344.76
0.00 0.00 1.853 1386.29 1.228 1061.27 1.88 1495.92 6.26 3351.02
0.00 0.00 13.338 1399.63 8.838 1070.11 13.536 1509.46 45.05 3396.07
0.00 0.00 0.000 1399.63 0.000 1070.11 0.500 1509.96 0.000 3396.07
0.00 0.00 10.82 1410.44 8.79 1078.90 11.99 1521.94 31.20 3427.27
0.00 0.00 12.26 1422.70 9.96 1088.86 13.58 1535.53 35.36 3462.63
0.00 0.00 14.42 1437.12 11.72 1100.58 15.98 1551.51 41.60 3504.23
0.00 0.00 12.98 1450.10 10.55 1111.13 14.38 1565.89 37.44 3541.67
0.00 0.00 7.45 1457.55 4.93 1116.06 7.56 1573.45 25.90 3567.57
0.00 0.00 2.98 1460.53 1.97 1118.03 3.02 1576.47 10.36 3577.93
0.00 0.00 8.94 1469.47 5.92 1123.95 9.07 1585.54 31.08 3609.01
0.00 0.00 7.82 1477.29 5.18 1129.13 7.94 1593.48 27.20 3636.21
0.00 0.00 1.12 1478.41 0.74 1129.86 1.13 1594.62 3.89 3640.09
0.00 0.00 25.13 1503.54 16.63 1146.49 25.52 1620.13 85.05 3725.14
0.00 0.00 25.13 1528.67 16.63 1163.11 25.515 1645.65 85.05 3810.19
0.00 0.00 4.33 1532.99 3.52 1166.63 4.79 1650.44 12.48 3822.67
0.00 0.00 4.33 1537.32 3.52 1170.15 4.79 1655.23 12.48 3835.15
0.00 0.00 21.63 1558.95 17.58 1187.73 23.97 1679.20 62.40 3897.55
0.00 0.00 4.33 1563.28 3.52 1191.24 4.79 1684.00 12.48 3910.03
0.00 0.00 8.65 1571.93 7.03 1198.27 9.59 1693.59 24.96 3934.99
0.00 0.00 3.73 1575.65 2.47 1200.74 3.78 1697.37 12.95 3947.94
0.00 0.00 11.18 1586.83 7.40 1208.13 11.34 1708.71 38.85 3986.79
0.00 0.00 4.47 1591.30 2.96 1211.09 4.54 1713.24 15.54 4002.33
0.00 0.00 49.17 1640.47 32.54 1243.63 49.90 1763.14 170.94 4173.27
0.00 0.00 0.00 1640.47 0.00 1243.63 0.50 1763.64 0.00 4173.27
0.00 0.00 12.26 1652.72 9.96 1253.59 13.58 1777.22 35.36 4208.63
0.00 0.00 12.98 1665.70 10.55 1264.14 14.38 1791.60 37.44 4246.07
0.00 0.00 4.33 1670.03 3.52 1267.66 4.79 1796.40 12.48 4258.55
0.00 0.00 2.98 1673.01 1.97 1269.63 3.02 1799.42 10.36 4268.91
0.00 0.00 83.733 1756.74 55.483 1325.11 84.976 1884.40 282.84 4551.75
0.00 0.00 0.000 1756.74 0.000 1325.11 0.500 1884.90 0.00 4551.75
0.00 0.00 21.54 1778.28 14.25 1339.36 21.87 1906.77 72.9 4624.65
0.00 0.00 8.65 1786.93 7.03 1346.39 9.59 1916.36 24.96 4649.61
0.00 0.00 8.65 1795.59 7.03 1353.43 9.59 1925.94 24.96 4674.57
0.00 0.00 4.47 1800.06 2.96 1356.38 4.54 1930.48 15.54 4690.11
0.00 0.00 2.98 1803.04 1.97 1358.36 3.02 1933.50 10.36 4700.47
0.00 0.00 8.20 1811.23 5.42 1363.78 8.32 1941.82 28.49 4728.96
0.00 0.00 8.94 1820.17 5.92 1369.69 9.07 1950.89 31.08 4760.04
0.00 0.00 1.12 1821.29 0.74 1370.43 1.13 1952.03 3.89 4763.93
0.00 0.00 8.94 1830.23 5.92 1376.35 9.07 1961.10 31.08 4795.01
0.00 0.00 14.90 1845.13 9.86 1386.21 15.12 1976.22 51.80 4846.81
0.00 0.00 5.96 1851.09 3.94 1390.15 6.05 1982.27 20.72 4867.53
1.00 1.00 0.00 1851.09 0.00 1390.15 0.50 1982.77 0.00 4867.53
0.00 0.00 5.96 1857.05 3.94 1394.10 6.05 1988.81 20.72 4888.25
0.00 0.00 2.61 1859.66 1.73 1395.82 2.65 1991.46 9.07 4897.31
0.00 0.00 4.47 1864.13 2.96 1398.78 4.54 1996.00 15.54 4912.85
0.00 0.00 5.96 1870.09 3.94 1402.73 6.05 2002.04 20.72 4933.57
0.00 0.00 8.65 1878.74 7.03 1409.76 9.59 2011.63 24.96 4958.53
0.00 0.00 4.69 1883.42 3.81 1413.57 5.19 2016.83 13.52 4972.05
0.00 0.00 21.63 1905.05 17.58 1431.15 23.97 2040.80 62.40 5034.45
0.00 0.00 21.54 1926.59 14.25 1445.40 21.87 2062.67 72.9 5107.35
0.00 0.00 21.54 1948.13 14.25 1459.65 21.87 2084.54 72.9 5180.25
0.00 0.00 0.00 1948.13 0.00 1459.65 0.50 2085.04 0.00 5180.25
0.00 0.00 0.00 1948.13 0.00 1459.65 0.50 2085.54 0.00 5180.25
0.00 0.00 7.45 1955.58 4.93 1464.58 7.56 2093.10 25.90 5206.15
0.00 0.00 8.20 1963.78 5.42 1470.00 8.32 2101.41 28.49 5234.64
0.00 0.00 4.10 1967.88 2.71 1472.71 4.16 2105.57 14.25 5248.89
0.00 0.00 4.47 1972.35 2.96 1475.67 4.54 2110.11 15.54 5264.43
0.00 0.00 2.98 1975.33 1.97 1477.64 3.02 2113.13 10.36 5274.79
0.00 0.00 5.96 1981.29 3.94 1481.59 6.05 2119.18 20.72 5295.51
0.00 0.00 3.73 1985.01 2.47 1484.05 3.78 2122.96 12.95 5308.46
0.00 0.00 4.33 1989.34 3.52 1487.57 4.79 2127.75 12.48 5320.94
0.00 0.00 8.65 1997.99 7.03 1494.60 9.59 2137.34 24.96 5345.90
0.00 0.00 1.44 1999.43 1.17 1495.77 1.60 2138.94 4.16 5350.06
0.00 0.00 1.44 2000.87 1.17 1496.94 1.60 2140.54 4.16 5354.22
0.00 0.00 18.46 2019.33 12.24 1509.18 18.86 2159.40 57.98 5412.20
0.00 0.00 3.73 2023.05 2.47 1511.65 3.78 2163.18 12.95 5425.15
0.00 0.00 1.49 2024.54 0.99 1512.63 1.51 2164.69 5.18 5430.33
0.00 0.00 1.49 2026.03 0.99 1513.62 1.51 2166.20 5.18 5435.51
0.00 0.00 1.49 2027.52 0.99 1514.61 1.51 2167.72 5.18 5440.69
0.00 0.00 3.705 2031.23 2.455 1517.06 3.76 2171.48 12.52 5453.20
0.00 0.00 21.54 2052.77 14.25 1531.31 21.87 2193.35 72.9 5526.10
0.00 0.00 25.848 2078.62 17.10 1548.41 26.244 2219.59 87.48 5613.58
0.00 0.00 21.54 2100.16 14.25 1562.66 21.87 2241.46 72.9 5686.48
0.00 0.00 0.00 2100.16 0.00 1562.66 0.50 2241.96 0.00 5686.48
0.00 0.00 0.00 2100.16 0.00 1562.66 0.50 2242.46 0.00 5686.48
0.00 0.00 2.16 2102.32 1.76 1564.42 2.40 2244.86 6.24 5692.72
0.00 0.00 15.14 2117.46 12.31 1576.72 16.78 2261.64 43.68 5736.40
0.00 0.00 28.84 2146.30 23.44 1600.16 31.96 2293.60 83.20 5819.60
0.00 0.00 2.24 2148.54 1.48 1601.64 2.27 2295.86 7.77 5827.37
0.00 0.00 4.47 2153.01 2.96 1604.60 4.54 2300.40 15.54 5842.91
0.00 0.00 23.694 2176.70 15.68 1620.28 24.057 2324.46 80.19 5923.10
0.00 0.00 39.273 2215.97 26.023 1646.30 39.856 2364.31 132.66 6055.76
0.00 0.00 0.00 2215.97 0.00 1646.30 0.50 2364.81 0.00 6055.76
0.00 0.00 8.65 2224.63 7.03 1653.33 9.59 2374.40 24.96 6080.72
0.00 0.00 4.33 2228.95 3.52 1656.85 4.79 2379.19 12.48 6093.20
0.00 0.00 9.31 2238.26 6.16 1663.01 9.45 2388.64 32.38 6125.58
0.00 0.00 8.94 2247.20 5.92 1668.93 9.07 2397.72 31.08 6156.66
0.00 0.00 153.387 2400.59 101.637 1770.56 155.664 2553.38 518.12 6674.78
0.00 0.00 0.00 2400.59 0.00 1770.56 0.50 2553.88 0.00 6674.78
0.00 0.00 26.925 2427.52 17.81 1788.38 27.3375 2581.22 91.125 6765.90
0.00 0.00 17.30 2444.82 14.06 1802.44 19.18 2600.39 49.92 6815.82
0.00 0.00 4.33 2449.15 3.52 1805.96 4.79 2605.19 12.48 6828.30
0.00 0.00 12.98 2462.12 10.55 1816.50 14.38 2619.57 37.44 6865.74
0.00 0.00 2.88 2465.01 2.34 1818.85 3.20 2622.77 8.32 6874.06
0.00 0.00 8.94 2473.95 5.92 1824.76 9.07 2631.84 31.08 6905.14
0.00 0.00 0.00 2473.95 0.00 1824.76 0.50 2632.34 0.00 6905.14
0.00 0.00 11.18 2485.12 7.40 1832.16 11.34 2643.68 38.85 6943.99
0.00 0.00 4.47 2489.59 2.96 1835.12 4.54 2648.21 15.54 6959.53
0.00 0.00 40.755 2530.35 27.005 1862.12 41.36 2689.57 137.67 7097.20
0.00 0.00 25.13 2555.48 16.63 1878.75 25.515 2715.09 85.05 7182.25
0.00 0.00 22.976 2578.45 15.20 1893.95 23.328 2738.42 77.76 7260.01
0.00 0.00 4.33 2582.78 3.52 1897.46 4.79 2743.21 12.48 7272.49
0.00 0.00 12.98 2595.76 10.55 1908.01 14.38 2757.59 37.44 7309.93
0.00 0.00 2.88 2598.64 2.34 1910.35 3.20 2760.79 8.32 7318.25
0.00 0.00 8.94 2607.58 5.92 1916.27 9.07 2769.86 31.08 7349.33
0.00 0.00 8.20 2615.78 5.42 1921.69 8.32 2778.18 28.49 7377.82
0.00 0.00 4.84 2620.62 3.20 1924.90 4.91 2783.09 16.84 7394.65
0.00 0.00 80.028 2700.65 53.028 1977.93 81.216 2864.31 270.32 7664.98
0.00 0.00 25.848 2726.50 17.10 1995.03 26.244 2890.55 87.48 7752.46
0.00 0.00 24.412 2750.91 16.15 2011.18 24.786 2915.34 82.62 7835.08
0.00 0.00 6.49 2757.40 5.27 2016.45 7.19 2922.53 18.72 7853.80
0.00 0.00 34.61 2792.00 28.13 2044.58 38.35 2960.88 99.84 7953.64
0.00 0.00 17.30 2809.31 14.06 2058.64 19.18 2980.06 49.92 8003.56
0.00 0.00 0.36 2809.67 0.29 2058.93 0.40 2980.46 1.04 8004.60
0.00 0.00 21.63 2831.30 17.58 2076.51 23.97 3004.43 62.40 8067.00
0.00 0.00 2.61 2833.91 1.73 2078.24 2.65 3007.07 9.07 8076.06
0.00 0.00 8.94 2842.85 5.92 2084.16 9.07 3016.14 31.08 8107.14
0.00 0.00 8.94 2851.79 5.92 2090.07 9.07 3025.22 31.08 8138.22
0.00 0.00 4.47 2856.26 2.96 2093.03 4.54 3029.75 15.54 8153.76
0.00 0.00 3.73 2859.98 2.47 2095.50 3.78 3033.53 12.95 8166.71
0.00 0.00 22.976 2882.96 15.20 2110.70 23.328 3056.86 77.76 8244.47
0.00 0.00 8.65 2891.61 7.03 2117.73 9.59 3066.45 24.96 8269.43
0.00 0.00 12.98 2904.59 10.55 2128.28 14.38 3080.83 37.44 8306.87
0.00 0.00 9.37 2913.96 7.62 2135.89 10.39 3091.22 27.04 8333.91
0.00 0.00 2.16 2916.12 1.76 2137.65 2.40 3093.61 6.24 8340.15
0.00 0.00 2.16 2918.29 1.76 2139.41 2.40 3096.01 6.24 8346.39
0.00 0.00 7.08 2925.36 4.68 2144.09 7.18 3103.19 24.61 8371.00
0.00 0.00 4.47 2929.83 2.96 2147.05 4.54 3107.73 15.54 8386.54
0.00 0.00 2.61 2932.44 1.73 2148.78 2.65 3110.37 9.07 8395.60
0.00 0.00 8.94 2941.38 5.92 2154.69 9.07 3119.45 31.08 8426.68
0.00 0.00 4.446 2945.83 2.946 2157.64 4.512 3123.96 15.02 8441.70
0.00 0.00 4.446 2950.27 2.946 2160.58 4.512 3128.47 15.02 8456.72
0.00 0.00 22.976 2973.25 15.20 2175.78 23.328 3151.80 77.76 8534.48
0.00 0.00 24.412 2997.66 16.15 2191.93 24.786 3176.58 82.62 8617.10
0.00 0.00 24.412 3022.07 16.15 2208.08 24.786 3201.37 82.62 8699.72
0.00 0.00 24.51 3046.59 19.92 2228.01 27.17 3228.54 70.72 8770.44
0.00 0.00 17.30 3063.89 14.06 2242.07 19.18 3247.71 49.92 8820.36
0.00 0.00 2.16 3066.05 1.76 2243.83 2.40 3250.11 6.24 8826.60
0.00 0.00 4.47 3070.52 2.96 2246.79 4.54 3254.65 15.54 8842.14
0.00 0.00 13.41 3083.93 8.87 2255.66 13.61 3268.25 46.62 8888.76
0.00 0.00 4.84 3088.78 3.20 2258.87 4.91 3273.17 16.84 8905.59
0.00 0.00 4.10 3092.87 2.71 2261.58 4.16 3277.33 14.25 8919.84
0.00 0.00 2.24 3095.11 1.48 2263.06 2.27 3279.59 7.77 8927.61
0.00 0.00 1.12 3096.23 0.74 2263.80 1.13 3280.73 3.89 8931.49
0.00 0.00 8.892 3105.12 5.892 2269.69 9.024 3289.75 30.04 8961.53
0.00 0.00 16.58 3121.70 13.48 2283.17 18.38 3308.13 47.84 9009.37
0.00 0.00 49.17 3170.87 32.54 2315.70 49.90 3358.02 170.94 9180.31
0.00 0.00 3.35 3174.22 2.22 2317.92 3.40 3361.43 11.66 9191.97
0.00 0.00 11.92 3186.14 7.89 2325.81 12.10 3373.52 41.44 9233.41
0.00 0.00 1.482 3187.63 0.982 2326.79 1.504 3375.03 5.01 9238.41
0.00 0.00 25.13 3212.76 16.63 2343.42 25.515 3400.54 85.05 9323.46
0.00 0.00 25.848 3238.60 17.10 2360.52 26.244 3426.79 87.48 9410.94
0.00 0.00 21.54 3260.14 14.25 2374.77 21.87 3448.66 72.9 9483.84
0.00 0.00 2.16 3262.31 1.76 2376.53 2.40 3451.05 6.24 9490.08
0.00 0.00 12.98 3275.29 10.55 2387.07 14.38 3465.43 37.44 9527.52
0.00 0.00 21.63 3296.92 17.58 2404.65 23.97 3489.40 62.40 9589.92
0.00 0.00 13.41 3310.33 8.87 2413.53 13.61 3503.01 46.62 9636.54
0.00 0.00 3.35 3313.68 2.22 2415.75 3.40 3506.41 11.66 9648.20
0.00 0.00 8.94 3322.62 5.92 2421.66 9.07 3515.49 31.08 9679.28
0.00 0.00 14.16 3336.77 9.37 2431.03 14.36 3529.85 49.21 9728.49
0.00 0.00 3.73 3340.50 2.47 2433.49 3.78 3533.63 12.95 9741.44
0.00 0.00 8.94 3349.44 5.92 2439.41 9.07 3542.70 31.08 9772.52
0.00 0.00 4.10 3353.54 2.71 2442.12 4.16 3546.86 14.25 9786.76
0.00 0.00 2.24 3355.77 1.48 2443.60 2.27 3549.13 7.77 9794.53
0.00 0.00 25.848 3381.62 17.10 2460.70 26.244 3575.37 87.48 9882.01
0.00 0.00 22.976 3404.59 15.20 2475.90 23.328 3598.70 77.76 9959.77
0.00 0.00 21.54 3426.13 14.25 2490.15 21.87 3620.57 72.9 10032.67
0.00 0.00 4.33 3430.46 3.52 2493.67 4.79 3625.36 12.48 10045.15
0.00 0.00 4.33 3434.79 3.52 2497.18 4.79 3630.16 12.48 10057.63
0.00 0.00 4.47 3439.26 2.96 2500.14 4.54 3634.69 15.54 10073.17
0.00 0.00 3.73 3442.98 2.47 2502.61 3.78 3638.47 12.95 10086.12
0.00 0.00 158.574 3601.56 105.074 2607.68 160.928 3799.40 535.64 10621.76
0.00 0.00 17.232 3618.79 11.40 2619.08 17.496 3816.90 58.32 10680.08
0.00 0.00 20.104 3638.89 13.30 2632.38 20.412 3837.31 68.04 10748.12
0.00 0.00 16.58 3655.47 13.48 2645.86 18.38 3855.69 47.84 10795.96
0.00 0.00 4.33 3659.80 3.52 2649.37 4.79 3860.48 12.48 10808.44
0.00 0.00 20.91 3680.71 16.99 2666.37 23.17 3883.65 60.32 10868.76
0.00 0.00 8.94 3689.65 5.92 2672.28 9.07 3892.72 31.08 10899.84
0.00 0.00 4.47 3694.12 2.96 2675.24 4.54 3897.26 15.54 10915.38
0.00 0.00 4.47 3698.59 2.96 2678.20 4.54 3901.80 15.54 10930.92
0.00 0.00 4.47 3703.06 2.96 2681.16 4.54 3906.33 15.54 10946.46
0.00 0.00 4.47 3707.53 2.96 2684.12 4.54 3910.87 15.54 10962.00
0.00 0.00 4.47 3712.00 2.96 2687.07 4.54 3915.40 15.54 10977.54
0.00 0.00 9.31 3721.31 6.16 2693.24 9.45 3924.85 32.38 11009.92
0.00 0.00 9.31 3730.62 6.16 2699.40 9.45 3934.30 32.38 11042.29
0.00 0.00 13.338 3743.96 8.838 2708.24 13.536 3947.84 45.05 11087.35
0.00 0.00 26.925 3770.89 17.81 2726.05 27.3375 3975.18 91.125 11178.47
0.00 0.00 17.30 3788.19 14.06 2740.11 19.18 3994.35 49.92 11228.39
0.00 0.00 12.98 3801.17 10.55 2750.66 14.38 4008.74 37.44 11265.83
0.00 0.00 8.94 3810.11 5.92 2756.58 9.07 4017.81 31.08 11296.91
0.00 0.00 2.24 3812.34 1.48 2758.06 2.27 4020.08 7.77 11304.68
0.00 0.00 2.24 3814.58 1.48 2759.54 2.27 4022.34 7.77 11312.45
0.00 0.00 13.41 3827.99 8.87 2768.41 13.61 4035.95 46.62 11359.07
0.00 0.00 13.41 3841.40 8.87 2777.28 13.61 4049.56 46.62 11405.69
0.00 0.00 13.41 3854.81 8.87 2786.16 13.61 4063.17 46.62 11452.31
0.00 0.00 4.47 3859.28 2.96 2789.12 4.54 4067.70 15.54 11467.85
0.00 0.00 4.47 3863.75 2.96 2792.07 4.54 4072.24 15.54 11483.39
0.00 0.00 17.784 3881.53 11.784 2803.86 18.048 4090.29 60.07 11543.46
0.00 0.00 25.848 3907.38 17.10 2820.96 26.244 4116.53 87.48 11630.94
0.00 0.00 22.976 3930.36 15.20 2836.16 23.328 4139.86 77.76 11708.70
0.00 0.00 12.98 3943.34 10.55 2846.71 14.38 4154.24 37.44 11746.14
0.00 0.00 4.84 3948.18 3.20 2849.91 4.91 4159.16 16.84 11762.98
0.00 0.00 4.47 3952.65 2.96 2852.87 4.54 4163.69 15.54 11778.52
0.00 0.00 4.47 3957.12 2.96 2855.83 4.54 4168.23 15.54 11794.06
0.00 0.00 5.96 3963.08 3.94 2859.77 6.05 4174.28 20.72 11814.78
0.00 0.00 86.697 4049.77 57.447 2917.22 87.984 4262.26 292.85 12107.63
0.00 0.00 22.976 4072.75 15.20 2932.42 23.328 4285.59 77.76 12185.39
0.00 0.00 22.617 4095.37 14.96 2947.38 22.9635 4308.55 76.545 12261.94
0.00 0.00 21.63 4117.00 17.58 2964.96 23.97 4332.52 62.40 12324.34
0.00 0.00 13.41 4130.41 8.87 2973.83 13.61 4346.13 46.62 12370.96
0.00 0.00 22.35 4152.76 14.79 2988.62 22.68 4368.81 77.70 12448.66
0.00 0.00 3.35 4156.11 2.22 2990.84 3.40 4372.21 11.66 12460.31
0.00 0.00 4.47 4160.58 2.96 2993.80 4.54 4376.75 15.54 12475.85
0.00 0.00 8.94 4169.52 5.92 2999.72 9.07 4385.82 31.08 12506.93
0.00 0.00 27.75 4197.27 18.36 3018.08 28.16 4413.98 96.48 12603.41
0.00 0.00 4.47 4201.74 2.96 3021.04 4.54 4418.52 15.54 12618.95
0.00 0.00 21.54 4223.28 14.25 3035.29 21.87 4440.39 72.9 12691.85
0.00 0.00 18.75 4242.03 15.24 3050.52 20.77 4461.16 54.08 12745.93
0.00 0.00 4.47 4246.50 2.96 3053.48 4.54 4465.70 15.54 12761.47
0.00 0.00 1.12 4247.61 0.74 3054.22 1.13 4466.83 3.89 12765.35
0.00 0.00 4.84 4252.46 3.20 3057.43 4.91 4471.74 16.84 12782.19
0.00 0.00 8.94 4261.40 5.92 3063.34 9.07 4480.82 31.08 12813.27
0.00 0.00 8.94 4270.34 5.92 3069.26 9.07 4489.89 31.08 12844.35
0.00 0.00 1.86 4272.20 1.23 3070.49 1.89 4491.78 6.48 12850.82
0.00 0.00 100.776 4372.98 66.776 3137.27 102.272 4594.05 340.41 13191.23
0.00 0.00 21.181 4394.16 14.01 3151.28 21.5055 4615.56 71.685 13262.92
0.00 0.00 3.24 4397.40 2.64 3153.92 3.60 4619.15 9.36 13272.28
0.00 0.00 4.47 4401.87 2.96 3156.87 4.54 4623.69 15.54 13287.82
0.00 0.00 4.47 4406.34 2.96 3159.83 4.54 4628.22 15.54 13303.36
0.00 0.00 4.47 4410.81 2.96 3162.79 4.54 4632.76 15.54 13318.90
0.00 0.00 13.41 4424.22 8.87 3171.66 13.61 4646.37 46.62 13365.52
0.00 0.00 4.47 4428.69 2.96 3174.62 4.54 4650.90 15.54 13381.06
0.00 0.00 4.47 4433.16 2.96 3177.58 4.54 4655.44 15.54 13396.60
0.00 0.00 8.20 4441.36 5.42 3183.00 8.32 4663.76 28.49 13425.09
0.00 0.00 9.31 4450.67 6.16 3189.17 9.45 4673.21 32.38 13457.46
0.00 0.00 4.47 4455.14 2.96 3192.12 4.54 4677.74 15.54 13473.00
0.00 0.00 43.719 4498.86 28.969 3221.09 44.368 4722.11 147.68 13620.68
0.00 0.00 4.446 4503.30 2.946 3224.04 4.512 4726.62 15.02 13635.70
0.00 0.00 25.13 4528.43 16.63 3240.66 25.515 4752.14 85.05 13720.75
0.00 0.00 4.33 4532.76 3.52 3244.18 4.79 4756.93 12.48 13733.23
0.00 0.00 2.24 4534.99 1.48 3245.66 2.27 4759.20 7.77 13741.00
0.00 0.00 2.24 4537.23 1.48 3247.14 2.27 4761.47 7.77 13748.77
0.00 0.00 1.12 4538.35 0.74 3247.88 1.13 4762.60 3.89 13752.65
0.00 0.00 13.41 4551.76 8.87 3256.75 13.61 4776.21 46.62 13799.27
0.00 0.00 4.10 4555.85 2.71 3259.46 4.16 4780.37 14.25 13813.52
0.00 0.00 4.47 4560.32 2.96 3262.42 4.54 4784.90 15.54 13829.06
0.00 0.00 1.49 4561.81 0.99 3263.41 1.51 4786.41 5.18 13834.24
0.00 0.00 88.179 4649.99 58.429 3321.84 89.488 4875.90 297.86 14132.09
0.00 0.00 23.694 4673.69 15.68 3337.51 24.057 4899.96 80.19 14212.28
0.00 0.00 17.88 4691.57 11.83 3349.34 18.14 4918.10 62.16 14274.44
0.00 0.00 26.82 4718.39 17.75 3367.09 27.22 4945.32 93.24 14367.68
0.00 0.00 7.82 4726.21 5.18 3372.27 7.94 4953.26 27.20 14394.88
0.00 0.00 1.86 4728.07 1.23 3373.50 1.89 4955.15 6.48 14401.35
0.00 0.00 4.446 4732.52 2.946 3376.45 4.512 4959.66 15.02 14416.37
0.00 0.00 41.126 4773.64 27.251 3403.70 41.736 5001.40 138.92 14555.29
0.00 0.00 25.848 4799.49 17.10 3420.80 26.244 5027.64 87.48 14642.77
0.00 0.00 6.33 4805.82 4.19 3424.99 6.43 5034.07 22.02 14664.78
0.00 0.00 1.86 4807.69 1.23 3426.22 1.89 5035.96 6.48 14671.26
0.00 0.00 4.47 4812.16 2.96 3429.18 4.54 5040.49 15.54 14686.80
0.00 0.00 4.84 4817.00 3.20 3432.38 4.91 5045.41 16.84 14703.63
0.00 0.00 3.73 4820.72 2.47 3434.85 3.78 5049.19 12.95 14716.58
0.00 0.00 3.35 4824.08 2.22 3437.07 3.40 5052.59 11.66 14728.24
0.00 0.00 4.47 4828.55 2.96 3440.02 4.54 5057.12 15.54 14743.78
0.00 0.00 133.751 4962.30 88.626 3528.65 135.736 5192.86 451.79 15195.57
0.00 0.00 23.694 4985.99 15.68 3544.32 24.057 5216.92 80.19 15275.76
0.00 0.00 23.694 5009.69 15.68 3560.00 24.057 5240.97 80.19 15355.95
0.00 0.00 4.33 5014.01 3.52 3563.51 4.79 5245.77 12.48 15368.43
0.00 0.00 69.21 5083.22 45.90 3609.41 70.74 5316.51 217.44 15585.87
0.00 0.00 3.35 5086.57 2.22 3611.63 3.40 5319.91 11.66 15597.52
0.00 0.00 4.10 5090.67 2.71 3614.34 4.16 5324.07 14.25 15611.77
0.00 0.00 2.24 5092.91 1.48 3615.82 2.27 5326.34 7.77 15619.54
0.00 0.00 4.47 5097.38 2.96 3618.78 4.54 5330.87 15.54 15635.08
0.00 0.00 16.39 5113.77 10.85 3629.63 16.63 5347.50 56.98 15692.06
0.00 0.00 4.47 5118.24 2.96 3632.59 4.54 5352.04 15.54 15707.60
0.00 0.00 4.446 5122.68 2.946 3635.53 4.512 5356.55 15.02 15722.62
0.00 0.00 8.616 5131.30 5.70 3641.23 8.748 5365.30 29.16 15751.78
0.00 0.00 3.73 5135.02 2.47 3643.70 3.78 5369.08 12.95 15764.73
0.00 0.00 7.45 5142.47 4.93 3648.63 7.56 5376.64 25.90 15790.63
0.00 0.00 0.75 5143.22 0.49 3649.12 0.76 5377.40 2.59 15793.22
0.00 0.00 1.68 5144.90 1.11 3650.23 1.70 5379.10 5.83 15799.04
0.00 0.00 7.93 5152.83 6.45 3656.68 8.79 5387.89 22.88 15821.92
0.00 0.00 2.61 5155.43 1.73 3658.40 2.65 5390.53 9.07 15830.99
0.00 0.00 4.47 5159.90 2.96 3661.36 4.54 5395.07 15.54 15846.53
0.00 0.00 81.140 5241.04 53.765 3715.12 82.344 5477.41 274.08 16120.61
0.00 0.00 25.848 5266.89 17.10 3732.22 26.244 5503.66 87.48 16208.09
0.00 0.00 4.84 5271.73 3.20 3735.43 4.91 5508.57 16.84 16224.92
0.00 0.00 2.98 5274.71 1.97 3737.40 3.02 5511.59 10.36 16235.28
0.00 0.00 5.96 5280.67 3.94 3741.34 6.05 5517.64 20.72 16256.00
0.00 0.00 5.59 5286.26 3.70 3745.04 5.67 5523.31 19.43 16275.43
0.00 0.00 42.608 5328.87 28.233 3773.27 43.24 5566.55 143.92 16419.35
0.00 0.00 11.18 5340.04 7.40 3780.67 11.34 5577.89 38.85 16458.20
0.00 0.00 171.542 5511.59 113.667 3894.34 174.088 5751.98 579.44 17037.65
0.00 0.00 23.694 5535.28 15.68 3910.01 24.057 5776.04 80.19 17117.84
0.00 0.00 4.33 5539.61 3.52 3913.53 4.79 5780.83 12.48 17130.32
0.00 0.00 5.96 5545.57 3.94 3917.47 6.05 5786.88 20.72 17151.04
0.00 0.00 5.96 5551.53 3.94 3921.41 6.05 5792.93 20.72 17171.76
0.00 0.00 6.33 5557.86 4.19 3925.60 6.43 5799.35 22.02 17193.77
0.00 0.00 10.80 5568.66 7.15 3932.75 10.96 5810.31 37.56 17231.33
0.00 0.00 3.73 5572.39 2.47 3935.22 3.78 5814.09 12.95 17244.28
0.00 0.00 13.41 5585.80 8.87 3944.09 13.61 5827.70 46.62 17290.90
0.00 0.00 40.014 5625.81 26.514 3970.61 40.608 5868.31 135.16 17426.06
0.00 0.00 25.848 5651.66 17.10 3987.71 26.244 5894.55 87.48 17513.54
0.00 0.00 25.848 5677.51 17.10 4004.81 26.244 5920.80 87.48 17601.02
0.00 0.00 25.489 5702.99 16.86 4021.67 25.8795 5946.68 86.265 17687.28
0.00 0.00 22.976 5725.97 15.20 4036.87 23.328 5970.01 77.76 17765.04
0.00 0.00 0.72 5726.69 0.59 4037.45 0.80 5970.80 2.08 17767.12
0.00 0.00 26.82 5753.51 17.75 4055.20 27.22 5998.02 93.24 17860.36
0.00 0.00 3.73 5757.24 2.47 4057.67 3.78 6001.80 12.95 17873.31
0.00 0.00 149.682 5906.92 99.182 4156.85 151.904 6153.70 505.61 18378.92
0.00 0.00 51.870 5958.79 34.370 4191.22 52.64 6206.34 175.21 18554.13
0.00 0.00 24.053 5982.84 15.91 4207.13 24.4215 6230.77 81.405 18635.53
0.00 0.00 4.61 5987.46 3.06 4210.19 4.72 6235.48 14.50 18650.03
0.00 0.00 10.80 5998.26 7.15 4217.34 10.96 6246.44 37.56 18687.58
0.00 0.00 1.12 5999.38 0.74 4218.08 1.13 6247.58 3.89 18691.47
0.00 0.00 8.94 6008.32 5.92 4224.00 9.07 6256.65 31.08 18722.55
0.00 0.00 4.47 6012.79 2.96 4226.95 4.54 6261.19 15.54 18738.09
0.00 0.00 2.98 6015.77 1.97 4228.93 3.02 6264.21 10.36 18748.45
0.00 0.00 4.47 6020.24 2.96 4231.88 4.54 6268.75 15.54 18763.99
0.00 0.00 4.47 6024.71 2.96 4234.84 4.54 6273.28 15.54 18779.53
0.00 0.00 3.35 6028.06 2.22 4237.06 3.40 6276.68 11.66 18791.18
0.00 0.00 9.69 6037.74 6.41 4243.47 9.83 6286.51 33.67 18824.85
0.00 0.00 4.47 6042.21 2.96 4246.43 4.54 6291.05 15.54 18840.39
0.00 0.00 35.76 6077.97 23.66 4270.09 36.29 6327.34 124.32 18964.71
0.00 0.00 17.784 6095.76 11.784 4281.88 18.048 6345.38 60.07 19024.79
0.00 0.00 13.338 6109.09 8.838 4290.71 13.536 6358.92 45.05 19069.84
0.00 0.00 11.856 6120.95 7.856 4298.57 12.032 6370.95 40.05 19109.89
0.00 0.00 8.522 6129.47 5.647 4304.22 8.648 6379.60 28.78 19138.67
0.00 0.00 23.694 6153.17 15.68 4319.89 24.057 6403.66 80.19 19218.86
0.00 0.00 329.004 6482.17 218.004 4537.90 333.888 6737.55 1111.332 20330.19
0 0 65.949 6548.12 43.699 4581.59 66.928 6804.47 222.767 20552.96
0 0 3.72 6551.84 2.465 4584.06 3.775 6808.25 12.95 20565.91
0 0 1.488 6553.33 0.986 4585.05 1.51 6809.76 5.18 20571.09
0 0 4.076 6557.40 2.7005 4587.75 4.136 6813.89 13.7665 20584.86
0 0 4.84 6562.25 3.20 4590.95 4.91 6818.81 16.84 20601.69
0 0 23.727 6585.97 15.71 4606.66 24.09 6842.90 80.19 20681.88
0 0 7.33 6593.30 5.95 4612.61 8.12 6851.02 20.83 20702.71
0 0 4.092 6597.39 2.71 4615.32 4.15 6855.17 14.25 20716.96
0 0 8.928 6606.32 5.92 4621.24 9.06 6864.23 31.08 20748.04
0 0 4.464 6610.79 2.96 4624.19 4.53 6868.76 15.54 20763.58
0 0 81.510 6692.30 54.01 4678.20 82.72 6951.48 275.33 21038.91
0.00 0.00 21.57 6713.87 14.28 4692.48 21.9 6973.38 72.9 21111.81
0 0 17.112 6730.98 11.34 4703.82 17.37 6990.75 59.57 21171.38
0 0 1.0995 6732.08 0.89 4704.72 1.22 6991.96 3.12 21174.50
0 0 3.2985 6735.38 2.68 4707.39 3.65 6995.62 9.37 21183.88
0 0 1.8325 6737.21 1.49 4708.88 2.03 6997.65 5.21 21189.08
0 0 2.232 6739.44 1.48 4710.36 2.27 6999.91 7.77 21196.85
0 0 2.604 6742.04 1.73 4712.08 2.64 7002.56 9.07 21205.92
0 0 3.595 6745.64 2.38 4714.46 3.65 7006.21 12.15 21218.07
0 0 51.87 6797.51 34.37 4748.83 52.64 7058.85 175.21 21393.28
0 0 8.796 6806.31 7.14 4755.97 9.74 7068.59 25.00 21418.27
0 0 6.669 6812.97 4.419 4760.39 6.768 7075.36 22.527 21440.80
0 0 2.223 6815.20 1.473 4761.87 2.256 7077.61 7.509 21448.31
0 0 33.074 6848.27 21.90 4783.76 33.58 7111.19 111.78 21560.09
0 0 23.008 6871.28 15.23 4798.99 23.36 7134.55 77.76 21637.85
0 0 4.314 6875.59 2.86 4801.85 4.38 7138.93 14.58 21652.43
0 0 12.942 6888.54 8.57 4810.42 13.14 7152.07 43.74 21696.17
0 0 8.796 6897.33 7.14 4817.56 9.74 7161.82 25.00 21721.17
0 0 12.968 6910.30 8.5925 4826.15 13.16 7174.98 43.8025 21764.97
0 0 3.348 6913.65 2.22 4828.37 3.40 7178.37 11.66 21776.62
0 0 8.892 6922.54 5.892 4834.26 9.024 7187.40 30.036 21806.66
0 0 23.727 6946.27 15.71 4849.97 24.09 7211.49 80.19 21886.85
0 0 8.928 6955.19 5.92 4855.89 9.06 7220.55 31.08 21917.93
0 0 5.952 6961.15 3.94 4859.83 6.04 7226.59 20.72 21938.65
0 0 17.784 6978.93 11.784 4871.61 18.048 7244.64 60.072 21998.72
0 0 7.33 6986.26 5.95 4877.56 8.12 7252.76 20.83 22019.55
0 0 23.727 7009.99 15.71 4893.27 24.09 7276.85 80.19 22099.74
0 0 26.676 7036.66 17.676 4910.95 27.072 7303.92 90.108 22189.85
0 0 8.796 7045.46 7.14 4918.09 9.74 7313.66 25.00 22214.85
0 0 6.51 7051.97 4.31 4922.40 6.61 7320.27 22.66 22237.51
0 0 1.488 7053.46 0.99 4923.39 1.51 7321.78 5.18 22242.69
0 0 4.446 7057.90 2.946 4926.33 4.512 7326.29 15.018 22257.71
0 0 4.464 7062.37 2.96 4929.29 4.53 7330.82 15.54 22273.25
0 0 8.796 7071.16 7.14 4936.43 9.74 7340.56 25.00 22298.24
0 0 13.338 7084.50 8.838 4945.27 13.536 7354.10 45.054 22343.30
0 0 1.86 7086.36 1.23 4946.50 1.89 7355.99 6.48 22349.77
0 0 8.796 7095.16 7.14 4953.64 9.74 7365.73 25.00 22374.77
0 0 8.796 7103.95 7.14 4960.78 9.74 7375.48 25.00 22399.76
0 0 2.5655 7106.52 2.08 4962.86 2.84 7378.32 7.29 22407.05
0 0 4.464 7110.98 2.96 4965.82 4.53 7382.85 15.54 22422.59
0 0 10.416 7121.40 6.90 4972.72 10.57 7393.42 36.26 22458.85
0 0 23.727 7145.13 15.71 4988.43 24.09 7417.51 80.19 22539.04
0 0 37.388 7182.51 24.75 5013.18 37.96 7455.47 126.36 22665.40
0 0 8.796 7191.31 7.14 5020.32 9.74 7465.21 25.00 22690.40
0 0 8.796 7200.11 7.14 5027.46 9.74 7474.96 25.00 22715.40
0 0 8.796 7208.90 7.14 5034.60 9.74 7484.70 25.00 22740.39
0 0 1.488 7210.39 0.99 5035.59 1.51 7486.21 5.18 22745.57
0 0 2.976 7213.37 1.97 5037.56 3.02 7489.23 10.36 22755.93
0 0 8.892 7222.26 5.892 5043.45 9.024 7498.25 30.036 22785.97
0 0 4.464 7226.72 2.96 5046.41 4.53 7502.78 15.54 22801.51
0 0 3.72 7230.44 2.47 5048.88 3.78 7506.56 12.95 22814.46
0 0 4.464 7234.91 2.96 5051.84 4.53 7511.09 15.54 22830.00
0 0 13.194 7248.10 10.71 5062.55 14.62 7525.71 37.49 22867.49
0 0 3.890 7251.99 2.57775 5065.12 3.948 7529.65 13.14075 22880.63
0 0 4.464 7256.45 2.96 5068.08 4.53 7534.18 15.54 22896.17
0 0 13.392 7269.85 8.87 5076.96 13.59 7547.77 46.62 22942.79
0 0 22.32 7292.17 14.79 5091.75 22.65 7570.42 77.70 23020.49
0 0 4.464 7296.63 2.96 5094.70 4.53 7574.95 15.54 23036.03
0 0 4.092 7300.72 2.71 5097.41 4.15 7579.11 14.25 23050.28
0 0 8.796 7309.52 7.14 5104.55 9.74 7588.85 25.00 23075.27
0 0 31.248 7340.77 20.71 5125.26 31.71 7620.56 108.78 23184.05
0 0 8.928 7349.69 5.92 5131.18 9.06 7629.62 31.08 23215.13
0 0 8.796 7358.49 7.14 5138.32 9.74 7639.36 25.00 23240.13
0 0 8.796 7367.29 7.14 5145.46 9.74 7649.11 25.00 23265.13
0 0 4.398 7371.68 3.57 5149.03 4.87 7653.98 12.50 23277.62
0 0 8.796 7380.48 7.14 5156.17 9.74 7663.72 25.00 23302.62
0 0 6.696 7387.18 4.44 5160.60 6.80 7670.52 23.31 23325.93
0 0 6.696 7393.87 4.44 5165.04 6.80 7677.31 23.31 23349.24
0 0 2.976 7396.85 1.97 5167.01 3.02 7680.33 10.36 23359.60
0 0 2.79 7399.64 1.85 5168.86 2.83 7683.17 9.71 23369.31
0 0 4.836 7404.47 3.20 5172.07 4.91 7688.07 16.84 23386.15
0 0 71.424 7475.90 47.33 5219.39 72.48 7760.55 248.64 23634.79
0 0 2.976 7478.87 1.97 5221.37 3.02 7763.57 10.36 23645.15
0 0 2.976 7481.85 1.97 5223.34 3.02 7766.59 10.36 23655.51
0 0 4.446 7486.30 2.946 5226.28 4.512 7771.10 15.018 23670.53
0 0 25.884 7512.18 17.14 5243.42 26.28 7797.38 87.48 23758.01
0 0 8.796 7520.98 7.14 5250.56 9.74 7807.13 25.00 23783.00
0 0 4.7645 7525.74 3.87 5254.43 5.28 7812.41 13.54 23796.54
0 0 4.398 7530.14 3.57 5258.00 4.87 7817.28 12.50 23809.04
0 0 4.398 7534.54 3.57 5261.57 4.87 7822.15 12.50 23821.54
0 0 3.534 7538.07 2.34 5263.91 3.59 7825.74 12.30 23833.84
0 0 7.068 7545.14 4.68 5268.59 7.17 7832.91 24.61 23858.44
0 0 4.464 7549.60 2.96 5271.55 4.53 7837.44 15.54 23873.98
0 0 44.460 7594.06 29.46 5301.01 45.12 7882.56 150.18 24024.16
0 0 4.446 7598.51 2.946 5303.96 4.512 7887.07 15.018 24039.18
0 0 18.155 7616.66 12.0295 5315.99 18.424 7905.50 61.3235 24100.51
0 0 25.884 7642.55 17.14 5333.12 26.28 7931.78 87.48 24187.99
0 0 4.398 7646.94 3.57 5336.69 4.87 7936.65 12.50 24200.48
0 0 4.398 7651.34 3.57 5340.26 4.87 7941.52 12.50 24212.98
0 0 12.648 7663.99 8.38 5348.64 12.84 7954.35 44.03 24257.01
0 0 6.324 7670.31 4.19 5352.83 6.42 7960.77 22.02 24279.03
0 0 6.324 7676.64 4.19 5357.02 6.42 7967.19 22.02 24301.04
0 0 128.934 7805.57 85.434 5442.46 130.848 8098.04 435.522 24736.56
0 0 33.074 7838.65 21.90 5464.35 33.58 8131.62 111.78 24848.34
Chainage
Sl. No. Date Material Side Qty. (Cum) Cement (Kg) Fly Ash (Kg) 20mm (Kg) 10mm (Kg) Dust (Kg)
From To
DLC
DLC
PQC Production Plant- 1
Chainage Admixture
Sl. No. Date Material Side Qty. (Cum) Cement (Kg) Fly Ash (Kg) 30mm (Kg) 20mm (Kg) 10mm (Kg) Sand (Kg)
From To (Kg)