Kota Annexures
Kota Annexures
A B C D E F G H I J K
Self-assessment Projection of 'where
Basis for assessment and/or Input/Initiative that would move the city
of the city ) with the city wants to be'
Feature Definition Scenario 1 (BASE) Scenario 2 Scenario 3 Scenario 4 (ADVANCED) quantitative indicator (Optional - only from its current status to Advanced status
regard to each with regard to the
if data exists) (Scenario 4: Column G)
feature feature/indicator
• Key experts and citizen groups are
consulted during major projects such as
building of flyover, AMRUT etc. and
City constantly conducts citizen
findings are incorporated in the projects
engagement with people at each
• Every major decision taken is
Ward level to incorporate their
A smart city constantly City undertakes citizen communicated to the citizens via Media, • Conduct Ward level meetings on regular
views, and these shape priorities
participation with some select City conducts citizen engagement Circulars/G.O as well as Nagar Nigam basis
shapes and changes and development projects in the
stakeholders. The findings are at city level and local area level website. • Create Single citizen interface platform on
course of its strategies The City begins identifies city. Multiple means of
Citizen compiled and incorporated in with most stakeholders and in • Functional web based platform, mobile website / app
1 incorporating views of its priorities and projects to pursue communication and getting 2 4
participation some projects or programs. Very most areas. The findings are based application and helpline facility • e-Townhall / e-meetings between key
citizen to bring maximum without consulting citizens. feedback such, both face-to-face
few major decisions are shared compiled and incorporated in (pilot program in Ward 54; helpline no: stakeholders
benefit for all. (Guideline and online are utilised. The
with citizens until final projects projects or programs. +91 9314411381) wherein citizen can • Key information & performance tracking
3.1.6) effectiveness of city governance
are unveiled. give their ideas + NNK Helpline
and service delivery is
(18001806101)
constantly enhanced on the
• Drives undertaken to build citizen
basis of feedback from citizens.
consensus before project initiation such
as door-to-door collection, slum
redevelopment etc.
A Smart City has a unique
identity, which • Multiple fairs being organised in the • Development of Dussehara ground as
distinguishes it from all city - Dusshera Mela (~8 Lakh annual Cultural, Recreational and Commercial
other cities, based on some Built, natural and intangible footfall), Bundi Festival, Dusshera Center – Master Plan is Prepared
key aspect: its location or Historic and cultural resources
There are few architectural heritage are preserved and Adventure Festival, Karik Purnima • Upscaling of current event of Rahgiri
climate; its leading are preserved and utilised to
monuments, symbols, and Historic and cultural heritage utilised as anchors of the city. Jhalawar Festival etc. arranged at Kishor Sagar Lake area to
some extent but limited
industry, its cultural festivals that emphasise the resources are preserved and Historical and cultural resources • Famous tourist places being Garh multiple locations
resources exist to manage and
heritage, its local culture or unique character of the city. Built, utilised and their surroundings are are enahnced through various Palace, Mathuradesh Temple, Kansua • Organization of cultural festivals at a larger
Identity and maintain the immediate
2 cuisine, or other factors. natural and cultural heritage is well-maintained. Public spaces, mediums of expression. Public 3 Shiv Temple, Seven Wonders, Lucky 4 scale to promote Kota
culture surroundings of the heritage
This identity allows an easy not preserved and utilised or public buildings and amenities spaces, open spaces, amenities Burj Rangabari Ganesh Temple etc. • Reflection of a standard design for civic
monuments. New buildinds and
answer to the question enhanced through physical, reflect the cultural identity of the and public buildings reflect local • Sites of historical importance like Kota infrastructure along major corridors
areas are created without much
"why in this city and not management and policy city; identity and are widely used by Garh, Jag Mandir, Umed Bhawan, Shar • Up-gradation of current tourism sites as
thought to how they reflect the
somewhere else?" A Smart structures. the public through festivals, Bhag ki Chatri etc are well maintained tourism centers
identity and culture of hte city.
City celebrates and events and activities. • Major junctions has beautiful Use of venue for other cultural events round
promotes its unique identity sculptures/ statues which are related to the year
and culture. (Guideline Indian history and/ or culture.
3.1.7)
• Inclusive development of Coaching Hub
• City is well known as Coaching Hub of such that the entire Coaching Eco-system is
A smart city has a robust There are adequate India and the Coaching Eco- System is developed in sustainable manner
and resilient economic opportunities for jobs for all major economic driver of City’s growth • Promote social development – especially in
There are some job There is a range of job
There are adequate job sections of income groups and • Coaching eco system includes – coaching areas
base and growth strategy opportiunities in the city but they opportunities in the city for many
opportunities for all sections of skill levels. Job-oriented skill institutes, mess, hostel and other • Strict enforcement for protection of local
Economy and that creates large-scale do not reach all sections of the sections of the population. The
3 society. But skill availability training supported by the city 3 related services 4 industries - local sourcing to be promoted
employment employment and increases population. There are a high city attemps to integrate informal
among residents can sometimes and by industry. Economic • Presence of several industrial areas • Development of Zones for IT and IT
opportunities for the number of jobs in the informal economic activities with formal
be a challenge. activities are suited to and build consisting of textile, agro processing, enabled services
majority of its citizens. sector without sufficient facilities. parts of the city and its economy.
on locational and other stone industries etc. Comprehensive skill development program
(Guideline 2.6 & 3.1.7 & 6.2) advantages of the city. • Traditional industries like Doria sarees to promote employment opportunities for
• 2100+ industrial units in RIICO area local youth
Page 1
RJ-02-KOT_SCP_Annexure_2
A B C D E F G H I J K
Self-assessment Projection of 'where
Basis for assessment and/or Input/Initiative that would move the city
of the city ) with the city wants to be'
Feature Definition Scenario 1 (BASE) Scenario 2 Scenario 3 Scenario 4 (ADVANCED) quantitative indicator (Optional - only from its current status to Advanced status
regard to each with regard to the
if data exists) (Scenario 4: Column G)
feature feature/indicator
Page 2
RJ-02-KOT_SCP_Annexure_2
A B C D E F G H I J K
Self-assessment Projection of 'where
Basis for assessment and/or Input/Initiative that would move the city
of the city ) with the city wants to be'
Feature Definition Scenario 1 (BASE) Scenario 2 Scenario 3 Scenario 4 (ADVANCED) quantitative indicator (Optional - only from its current status to Advanced status
regard to each with regard to the
if data exists) (Scenario 4: Column G)
feature feature/indicator
• NNK has set a target for increasing green
area from 5% to 15% in ABD on priority and
A Smart City has sufficient A variety of public open spaces Public open spaces are well throughout the city in next 10 years through
The city has very few usable • More than 500 parks (~100
and usable public open are available in some dispersed throughout the city. development of gardens and parks,
public open spaces and very few Most areas of the city have some undeveloped)
neighborhoods, but are not Every residential area and work increasing green cover
spaces, many of which are usable green spaces. Available sort of public open space. There • 40% parks developed with aesthetic
green, that promote available in all the areas of the space has access to open space • NNK and UIT has planned theme based
recreational spaces are located is some variety in the types of components like water bodies, cultural-
city or are located far away from within 10 minutes walking plantation of 20,000 trees in next 5-6 years
exercise and outdoor far away and are dispersed at public spaces in the city. heritage structures
residential areas Many of the distance. Open spaces are of • Under ABD Road design is proposed to
Public open recreation for all age long distances around the city. However, public spaces are • 50% parks equipped with child play
8 open spaces have access various types - natural, green, 3 4 accommodate footpaths, cycle tracks, green
spaces groups. Public open The few available public open sometimes not within easy reach equipment
restrictions, or are not well- plazas, parks, or recreation medians etc.
spaces of a range of sizes spaces offer a limited variety of or access of more vulnerable • The city also has a few large gardens
maintained. A variety of types of areas - which serve various • Development and channelization of Nallas
are dispersed throughout experiences for all sections of populations and are more like Ganesh Udyan, Chambal Gardens,
public open spaces may be sections of people. Public along with provision of green walkways,
the City so all citizens can population and age groups such restricted in poorer CV gardens that are popular among
lacking, such as natural areas, spaces tend to truly reflect the pathways and recreational areas along it
have access. (Guidelines as places for sport, places for neighbourhoods. citizens
green areas, parks, plazas, or natural and cultural identity of • Provision of jogging tracks and Wi-Fi
3.1.4 & 6.2) rest, and places for play.
recreation areas. the city. facilities with provision of facilities for
differently-abled and senior citizens in the
parks / gardens
• As per new Master plan 2013, focus is on
improvement of city’s overall infrastructure
and access to all so that more and more land
can be brought under development and
Housing is very limited and highly
Housing is available at most • Majority of the city population have housing stock can be generated
segregated across income Housing is available at all income
income levels but is highly access to housing but it varies across • More than Rs. 1000 crore investment
levels. Population growth far levels, but is segregated across A wide range of a housing is
segregated across income income levels planned in the city’s civic infrastructure apart
A Smart City has sufficient exceeds the creation of new income levels. The growth of available at all cost levels. The
levels. Population growth slightly • Slums have been regularized and from the Smart City Mission which will bring
housing for all income housing. The poor live in supply of housing almost meets supply of housing is growing at
Housing and exceeds the creation of new patta granted to residents more land under development including
9 groups and promotes informal settlements with limited the rate of population growth. pace with population. Afforable, 3 4
inclusiveness housing. The wealthy and the • 9173 EWS/LIG units constructed in scope for affordable housing
integration among social to no access to basic services, Increasingly, lower and middle- moderate, and luxury housing
middle class have housing that last 3 years • The Govt. of Rajasthan is implementing
groups. (Guidelines 3.1.2) and are concentrated in a few income people can find housing are found clustered together in
meets their needs at costs • Newly added areas have large chunk scheme similar to the central scheme of
areas. The wealthy live in in areas that are conveniently many areas of the city
appropriate to their income. The of vacant lands where new projects are Housing for All which will
separate enclaves. Those in the located.
poor live in informal settlements. coming up • Inclusion of facilities for senior citizens and
middle have few , if any options.
differently-abled
• Regulatory provisions to include private
developers in providing affordable housing
(15% EWS / LIG Housing)
• Strengthening and operationalisation of
Personal automobile centric city • Around 18% of city’s area is covered
Street network is complete and public transportation is in progress
with very few modal options. Network of streets are fairly by road network of 2,800 km
follows a clear structure. Public • NMT corridors are identified, cycle tracks
A Smart City does not Long trip lengths for daily The street network system is complete. Public transport covers • Comprehensive Mobility Plan for Kota
transportation network covers are planned along 60 km network under
require an automobile to commute to work and education. elaborate but public transport most areas of the city. However has been prepared
the entire city and intensity of AMRUT and within ABD area under SMART
get around; distances are Accessing various areas by choices are restricted. Public last mile connectivity remains • Separate company is formed for Public
connection relates with the Mission
walking or cycling is difficult. transport can be too expensive or incomplete and affects transport transportation, in the process of
short, buildings are demand. Plenty of options of • Cycle tracks are planned along major roads
Women and vulnerable sections unafforadable for the poor. options. Foot paths are operationalization of buses
accessible from the public transport are available and along proposed development of major
10 Transport find it very difficult to move Pedestrian infrastructure is only accessible in most areas, 2 • Parking facilities: developed at two 4
sidewalk, and transit and affordable for all sections of nallas
independently in the city. There available in select areas. Tha whereas concerns of safe locations and six more locations have
options are plentiful and the society. There is multi-modal • Plan to improve footpath coverage from
is limited public transport. majority of investments focus on crossings and security throughout been identified
attractive to people of all integration at all mass transit 23% to 90% over 5-7 years
Vehicles cause high air and reducing traffic congestion the day remain. Parking zones • To improve last mile connectivity – two
income levels. (Guidelines staions and organized-priced on • Provision of multi-level car parking or
noise pollution levels in the city. through the creation of more are demarcated but absence of cycle sharing projects operationalized
3.1.5 & 6.2) street and off street parking. dedicated parking zones – 10 locations
Vehicles dominate public spaces roads. pricing increases over utilization Concerns of safe crossing and security
Walking and cycling is identified and will be covered under AMRUT
and affect their effective of parking lots. remains
prevalent. • Use of technology for traffic management
functioning.
and increase in traffic compliance
• To make city highly walkable – plans are
A Smart City’s roads are The city is designed mainly for prepared to increase pedestrian footpath
designed equally for the automobile. Daily life without coverage from 23% to 90% under AMRUT
Older areas of the city see a mix The city is highly walkable.
pedestrians, cyclists and a car requires long bus rides. and SCM
of pedestrians, cyclists, and Pavements exist on every street
vehicles; and road safety Walking is difficult and often • Redesign of major roads and junctions is
vehicles but newer areas are and are maintained. Trees line
dangerous; there are few key focus in ABD under SCP and it will be
and sidewalks are focused mainly on the The city has a good network of many sidewalks to provide • Buildings in most parts of the city are
paramount to street design. pavements, existing pavements replicate din the other parts of the city
automobile. In the new areas, pavements and bike lanes. shade for pedestrians. Buildings accessible from street /pavements
need repair and lack trees to • A network of nallas of 10 km is proposed to
Traffic signals are sufficient there are few pavements and Buildings in most areas of the city in most areas of the city are • As per CMP around 23% of roads
provide shade for pedestrians, be restored and channelized to
and traffic rules are main entrances to new buildings are easily accessible from the easily accessible from the covered by footpaths
11 Walkable and marked pedestrian crossings 2 4 accommodate greenways, walkways etc.
enforced. Shops, are not accesible from the front pavement. Howver, traffic signals sidewalk. Traffic signals control • Traffic signal disobeyed frequently,
are rare. New buildings have • No stray animals on roads, footpaths
restaurants, building of the street. large driveways or are sometimes disobeyed and it the flow of automobiles and are making it difficult for pedestrians to
their main entrances set-back • Use of surveillance, automated system to
entrances and trees line the parking lots often separating can feel difficult to cross the enforced. A network of bike cross roads
from the street, sometimes with ensure compliance of traffic rules and safe
sidewalk to encourage them from the street, and street. lanes exists to promote cycling
large driveways or parking lots crossings
walking and there is ample sometimes are are enclosed by as a means of transport. Traffic
separating them from the street, • Target set to plant more than 20,000 tress,
lighting so the pedestrian gates. In these areas, traffic rules are followed and enforced
and sometimes are are enclosed especially along the major roads by UIT and
feels safe day and night. signals are disobeyed. with great seriousness.
by gates. Traffic signals are often NNK to provide shaded pathways for
(Guidelines 3.1.3 & 6.2) disobeyed pedestrians
Page 3
RJ-02-KOT_SCP_Annexure_2
A B C D E F G H I J K
Self-assessment Projection of 'where
Basis for assessment and/or Input/Initiative that would move the city
of the city ) with the city wants to be'
Feature Definition Scenario 1 (BASE) Scenario 2 Scenario 3 Scenario 4 (ADVANCED) quantitative indicator (Optional - only from its current status to Advanced status
regard to each with regard to the
if data exists) (Scenario 4: Column G)
feature feature/indicator
• Expansion of city wide OFC network in
uncovered areas is proposed under Pan City
A Smart City has a robust • The City has 3G / 4G internet proposal of SCM in association with telecom/
The city has made plans to The city offers free wifi services
internet network allowing City has no major plans to bring The city makes has high speed connectivity by multiple private service infra companies
provide high speed internet to provide opportunity for all the
12 IT connectivity high-speed connections to increased high speed internet internet connectivity available in 3 providers 4 • Wi-Fi Hotspots would be created along
connectivity through the existing citizens to connect with high
all offices and dwellings as connectivity to the public. most parts of the city. • Broadband connectivity is provided by main roads and at major public places
framework. speed internet across the city.
desired. (Guideline 6.2) BSNL - Total OFC length – 1192 km including coaching areas
• Free Wi-Fi services for accessing
government information
• With focus on improving connectivity and
• Majority of 24 e-governance modules
All major services are provided better monitoring Control and Command
A Smart City enables easy Essential Government services Some of the public services are through online and offline
have been prepared, and implemented
Center is being set by DoIT for Collectorate
interaction (including are not linked with online • Certain citizen services such as bill
provided online and Most of the services are provided platforms. Citizens and officials and NNK
platforms. Paper intensive payments are provided online
through online and infrastructure for total online and offline. Data can access information on • Integrated mobile app with back end
interactions with the local • Multiple grievance handling systems
ICT-enabled telephone services) with its digitalization is not in place. transparency helps monitoring. accounting and monitor status of integration with CCC will be developed under
Government continues. –website, mobile app, Raj-Sampark
13 government citizens, eliminating delays Service delays occur regularly in Systema and processes to better projects and programs through 2 4 Pan City Proposal of SCP for Kota- this will
Recieving services and response • Municipal Corporation’s mobile app
services and frustrations in some sectors. Responses to coordinate between various data available on online system. provide all services at one stop including
to citizen complaints take a long provides various useful information
interactions with citizen inquiries or complaints are Government agencies are being Robust data infratsructure citizen facilitation
time. There is limited availability • 1200+ e-mitra centers across city
government. (Guidelines often delayed. No integration developed. system shares information and • Digitization of government departments
of data to monitor service Single window system for building
2.4.7 & 3.1.6 & 5.1.4 & 6.2) between services and billing. enhances internal governmental Facility of online payments will be expanded
delivery. permission
coordination. to all services
Page 4
RJ-02-KOT_SCP_Annexure_2
A B C D E F G H I J K
Self-assessment Projection of 'where
Basis for assessment and/or Input/Initiative that would move the city
of the city ) with the city wants to be'
Feature Definition Scenario 1 (BASE) Scenario 2 Scenario 3 Scenario 4 (ADVANCED) quantitative indicator (Optional - only from its current status to Advanced status
regard to each with regard to the
if data exists) (Scenario 4: Column G)
feature feature/indicator
Page 5
RJ-02-KOT_SCP_Annexure_2
A B C D E F G H I J K
Self-assessment Projection of 'where
Basis for assessment and/or Input/Initiative that would move the city
of the city ) with the city wants to be'
Feature Definition Scenario 1 (BASE) Scenario 2 Scenario 3 Scenario 4 (ADVANCED) quantitative indicator (Optional - only from its current status to Advanced status
regard to each with regard to the
if data exists) (Scenario 4: Column G)
feature feature/indicator
A Smart City has an
• Underground electric wiring along major
underground electric wiring
City does not have plans for More than 40% of the city has More than 75% of the city has More than 90% of the city has • Underground wiring: 28% - 11 KV and routes proposed under IPDS scheme –
Underground system to reduce blackouts
21 underground electric wiring underground electric wiring underground electric wiring underground electric wiring 2 19% - 33 KV 4 works are being implemented
electric wiring due to storms and eliminate
system. system. system. system. • Work ongoing under IPDS • Common ducts for utilities proposed under
unsightliness. (Guideline
ABD proposal of SCP
6.2)
Page 6
SMART CITY PROPOSAL for KOTA : ROUND- II
April 2016
A 1 : C I T Y P R O F I L E - KO TA
AREA : 527.03 SqKm.
(Source: Master Plan, UIT)
INDUSTRIAL DEVELOPMENT :
Cotton and Oilseed milling, Textile weaving, Agro
food processing, Fertilizer, Cement and the
manufacture of Metal handcrafts, Kota Stone
Kota Super Thermal Power Plant.
EDUCATION:
Educational hub , coaching city
~ 1.5 - 2 lakh floating population (90% is student
population) (Source: CMP)
A 2 : C I T Y P R O F I L E - KO TA
D WA
334
WaterE
217
L A RNo of
PHYSICAL INFRASTRUCUTRE :
ATE E W
Population Coverage of 75%
L I with challenges AD S&
O
W R MLD
MLD demand
SO
ST
W
TR
SO
E
CO O
RO
Water
R
relating to low pressure, distribution losses
P
S
net Estimated
ANSPO
E MAN
Treatment @135lpcd
R A
Connections
MP
SU
S and physical gradient supply) Supply
Y
capacity
140 140,853
S
T
Y
U AG EN
@65% of Intake
PPL RTA IO PPL N E NT
High NRW (40% ) (Source: AMRUT)
G E EM
MLD
T
*Source :PHED Capacity)
D WA Estimated
E W Poor sewerage
LI coverage (28% S&pop.) WER LA R No of FORDA
AD O
56 MLD Sewage
SO
ST
AF
TR
SO Connections
E
CO O
RO
*Source :
BL
Inadequate available treat. Cap. (32%)
P
S
ANSPO
E MAN
Generation
R A
MP
SLIP,
E H
SU
Improper management of septic tanks Treatment 112 15000AMRUT
G
S
T
MLD
Y
AG EN RTA IO PPL N E NT OU N
G E EM SI
Pollution of natural drains/ streams
T
capacity (80% of 140 MLD)
SO
ST
AF
TR
SO
CO O
RO
BL
scientific disposal of waste *Source :
P
To t a l W a s t e
500
ANSPO
E MAN
R
MP
E H
TPD SWM Dept.
SU
Waste to energy project – bids finalization Generation :
N
G
NNK
S
T
AG EN RTA IO Y PPL N E NT OU N
EM
on anvil T SI
S& Inadequate LA R
W E R pedestrian footpaths (~ 23%) FORDA
AD O
2,828 No .of
23 %
SO
AF
TR
CO O
RO
KM
BL
(Source: CMP) Buses:
P
*Source :
ANSPO
MP
E H
Pedestrian
SU
G
S
Foot paths
Y
RTA IO OU N
system
PPL N E NT SI NO PWD
Length
T
(Source: CMP)
Revenue Properties
PA
Revenue
INCOME FY16 Rs. Cr. (HH Size 5) 11,516
FI
NAN * (Source: finance dept, NNK)
A3 : Key Performance Indicators (KPI’s)
2,828 KM 34 On Street
Total Road Length CITY BUSES Parking
23% (5 Operational)
2 STATIONS Market Places & Street
Vendor Survey in
1.20 min.
installed at NNK office &
in proximity of 50 km selling power through
JVVNL provides
ENERGY power to the city
Avg. Un-Scheduled
Outrage/Feeder
bidirectional meters;
Master Plan in progress
Solar
S A F ET Y
Surveillance project
4 min. of Avg. PUKAR :
Response Time For Women Safety
A4 : Key Performance Indicators (KPI’s)
1,187 E-MITRA CENTRES Monthly
Help-Line
Online Tendering of
On NNK Website through press release, high value projects
single window- bldg
permission For Grievance Redressal, ONLINE PAYMENT
19 E-GOV Platforms NNK helpline
Android based App
through AXIS Bank at
ZERO cost to NNK
Administrative EFFICIENCY
40 Notified Slums
210,135 have been regularized 8,544 EWS/LIG
HOUSEHOLDS in last 3 years Units Constructed
Current Schemes
S TRENGTHS:
Water and Power availability
Strong agricultural base on the periphery
Cultural aspects and recreational assets
wEAKNESS :
Historically narrow financial base
Linear nature of developments
O
Land Monetization
PPORTUNITIES: Unlocking tourism potential
T HREATS :
Persistence of Financial and capacity constraints
Saturation in Coaching Eco-system within Kota
A 6 : S M A R T I N I T I AT I V E S TA K E N AT U L B / S TAT E L E V E L
LED LIGHTING SOLAR ENERGY BIOMETRIC
ATTEDANCE
~6,000 LED lights installed & 100 KV solar panels on KNN • Biometric system is operational
target is 37,000 building rooftop – bidirectional at KNN office
435,100
meter installed & energy sold
Domestic LEDs • Proposal to integrate biometric
distributed under DELP 120 solar lights installed in
system with RAAS system
parks, 200 more to be installed
G a r d e n s Housing P o w e r
Sewerage Disposal Supply
W a l k w a y s Water Supply
1,000
Affordable
Traders
Meeting with key
depts. Under Architects
chairmanship of Coaching Institutes
Collector, Hon. MP Colleges & Universities
and MLA Other stakeholders
O P T I O N S F O R A R E A B A S E D D E V E L O P M E N T & PA N C I T Y P R O P O S A L
F o o t p a t h Economic Opportunities
Recreational Areas
Safety
Health Care Facilities
T r a f f i c M a n a g e m e n tP a r k s
WARD LEVEL MEDIA
CONSULTATION INVOLVEMENT
Green Pace
My Gov:
16,000 likes/
Tourism
Well-planned & Seamless Smart & modern Connectivity, E-Gov & M-Gov, universal
Infrastructure with efficient Governance access, centralised control through CCC
sustainable manner
A 9 : G O A LS A N D S T R AT E G I E S
Set up STUDENT FACILITATION CENTER in collaboration with Coaching Institutes on PPP
Vibrant COACHING HUB with Set up Special Cell for assistance to girl students
HIGH QUALITY OF LIFE
Improved Mobility and Safety
Provide Recreational, Sports and Entertainment facilities
ROAD REDESIGN to accommodate all features such as pedestrian footpaths, cycle tracks,
STRATEGIES
Improve MOBILITY with
utility ducts, medians with greenery etc.
Improve key junctions to reduce congestion and to provide safe access to all
seamless and SAFE Access to Provide parking facilities – onsite and off site
Provide NMT facilities like cycle sharing system
all
MY. Gov.
Stakeholders
3
OPTIONS : Option 1 Option 2 Option 3
Impacton Economy High Medium Medium
PARAMETERS :
2
T
P R
O E D
1
Area Comprises of : Nehru Garden, Collectorate, Kishor Sagar lake, Kotri
Talab, JK Pavilion, Dusshera Ground, Coaching City.
(~ 1,500 pop.)
Influence areas- CV garden, Khel-gram
and hospital & circuit house
B3 : Area Based Proposal : List of Colonies, Parks, Junctions
SN NAME OF COLONIES SN NAME OF JUNCTION
1 Rajeev Gandhi Nagar 1 Gobariya Bawdi Circle
2 Narcotics Colony 2 Talwandi Circle
3 Keshavpura Circle
3 Mahaveer Nagar I
4 Dadabari Tiraha
4 Mahaveer Nagar III
5 CAD Circle
5 Mahaveer Nagar II
6 Ghode baba circle
6 Indira Vihar
7 Aerodrome Cicle
7 Talwandi Sector 1,2 8 Chhavani Circle
8 Talwandi Sector 3,4,5 9 Kotri Circle
9 Talwandi Sector B, C 10 Antaghar Circle
10 Old Jawahar Nagar 11 Nayapura Circle
11 New Jawahar Nagar 12 Agarsen Circle
12 CAD Colony
NAME OF PARK / OPEN
13 Durga Nagar SN
SPACES IN INFLUENCE ZONE
14 Shakti Nagar
1 J.K. Pavillion
15 RPS Colony
2 Shaheed park
16 Sindhi Colony 3 Kota Zoologiical Park
17 Ashoka Colony 4 Chhatravilas Garden
18 Vallabh Nagar, Gumanpura 5 Gopal Niwas Bag
19 Shopping Centre 6 Naga ji ka bag
20 New colony 7 Shar bag
21 Vallabh bari 8 Seven Wonders Park
22 Chhavani 9 Dusshera Ground
B4 : Area Based Proposal : Urban Form : Existing & Proposed
PROPOSED AREA BASED DEVELOPMENT
Gumanpura
Airport
Land
B5 : Area Based Proposal
“Low hanging Fruits” : Key identified projects in the selected area
Dusshera ground : Cultural and Economic Centre
Kishor sagar & Kotri Talab : Tourism and recreational Centre
Development of Parking Facilities : Multipurpose school area, organised street parking
Waste water recycling & reuse for Thermal power plant & DCM – potential of 15 MLD
KEY THEME BASED PROJECTS :
- Green development : gardens, parks & open spaces – maintain at least 15% of the area
- Development of Non Motorised Transport (NMT) Infrastructure : Cycle tracks & Cycle Sharing Scheme, e-
buses, covered footpaths etc. Two Cycle sharing project started on PPP
RECREATIONAL
& Conservation Expand CULTURAL
Dussehera Ground and RECREATIONAL
development facilities
COMMERICAL
CULTURAL &
Development of Nallah SUSTAINABLE
GOALS
Cultural and Garden and Green Urban Environment
Recreational
spaces & Creation Of
Kotri Talab Development OPEN SPACES
Social inclusiveness
~1.5 Student Facilitation Centre
Lakh CCTV, Cell for girls,
Wi-fi , sports, entertainment
students
~ 60%
Recreational and Health
reside Open gym, playground
within Cultural cente, events
ABD
Mobility
Coaching area within ABD Footpath, Smart crossings
Talwandi Circle
Keshavpura Public Transport, e - buses
3 2
Circle Cycle tracks, cycle sharing
Basic Services
24X7 Water, Power
SWM, sewerage
2
1
1
Gobariya Bawdi Circle
B8 : ABD – Thematic Proposals
Coaching Eco-system:
THEME-1 : Inclusive Development of
OPEN
INFORMATION CELL FOR GIRLS
GYMNASIUM
CENTRE
COUNSELING
STUDENT SPECIALLY ABLED
FRIENDLY
CYCLE STANDS
FACILITATION CENTRE
LIBRARY
POLICE
CYCLE TRACK
AND
GAME ZONE FITNESS ATM HEALTH WALKWAYS
B9 : ABD – Thematic Proposals
Beautification of the Cultural and EXISTING OLD MARKET AREA KISHORE SAGAR LAKE & KOTRI TALABA :
and Recreational areas:
THEME-2 : Develop and Expand Cultural
Recreational Areas incorporating : GUMANPURA AND Boating, children entertainment spaces, Vendor’s place
public art, street furniture, Aesthetic
Planting etc.
SHOPPING CENTRE (chowpati), Laser beam Show, theme market, e-rickshaw etc
Regulated on-street and off-
street Parking places, Shaded
footpaths, Pedestrian
Crossings,
Airport
Land
JawaharTalwandi
Nagar
BOUNDARY WALL ART STREET FURNITURE
MAJOR COMPONENTS
Convention Centre-
Auditorium,
Convention /
Marriage, Conference
Hall, Spill over Area.
Food Court
Student/Delegate
Housing
Dussehra Maidan
Ramleela Maidan
AERIAL VIEW OF THE SITE Commercial Shopping
Centre
Club House
Children Amusement
Park
Star Hotel
Multiplex/Serv.
Apt/Commercial
Offices.
Housing for Municipal
Offices
Public Toilets
Parking Zones
Nana Nani Park
B11 : ABD – Thematic Proposals
ESSENTIAL
THEME-1 COMPONENTS
Mobility AndOF ALL STREETS
Accessibility.. Street Redesign..1
MAP SHOWING ROW 181 km of Roads – Redesigning proposed
to all – Street Redesign
THEME-3 : Improve Mobility and Access
20 % of Roads > 24 m
90% Coverage of Footpath (min.1-1.8m footpath
on roads less than 12 m) - proposed
EXISTING ROADS:
Legend:
48 m RoW
36 m RoW
Typical cross section of a road with RoW 36 m
24-30m RoW
18 m RoW
URBAN UTILITIES
Underground Utilities
PROPOSED SMART Common Utility Ducts
STREET LIGHTING UNIVERSAL ACCESSIBILITY CROSSINGS
FEATURES: Pedestrian Scale Low-Mast Kerb Ramps
Duct Banks
New Bus Stops with Street Lighting At-grade Full-Signal
Solar Panel, PIS, Full Cut-off Fixtures Raised Table-Top Crossings
Crossings
Wifi and Toilets LED Lights Tactile Paving Pelican Signals
Smart Pole with Pedestrian Crossings
Auditory Signals
Vehicle Actuated Raised Crossings
Accessible Signage Grade Separate
Signal, CCTV and Crossing (Foot Over
Street Light with Bridge)
Solar Panel Grade Separate
Traffic Information Crossing (Humped
System and Digital Crossing)
Signages
B13 : ABD – Thematic Proposals
CAD Junction : SN Name of Junction
9 No. of Junctions
to all – JUNCTION IMPROVEMENT
THEME-3 : Improve Mobility and Access
7
9 Kotri Circle
Pedestrian refuge at median 9
6 7
3 10 9 4 6 5 5
50 km
stations and 35 bicycles
long dedicated tracks
• 30% coverage of
footpath on existing along roads
10 km
roads
long network along drains
Proposed Dense
network of NMT
Predominantly
Coaching
Bicycle
Share
Institutes,
Student Hostels
and Mess :
B15 : ABD – Thematic Proposals
PEDESTRIAN CROSSINGS AT JUNCTIONS AND MIDBLOCK MAKE WALKABLE CITY
90% Coverage of Continuous Footpath proposed
to all – NMT (Bicycle Friendly)
Pedestrian Phase in traffic signals (All Red)
THEME-3 : Improve Mobility and Access
Pelican Signals at major crossings
Raised Pedestrian Crossings / Table Top with provision of Kerb ramp, tactile tiles (For
Physically Challenged friendly streets: Provision of Ramp
differently abled) at max. 1500 mm height min.
and Tactile Tiles
Zebra Crossing PRIORITY TO SAFETY OF PEDESTRIANS 1-1.8m) wide footpath on roads less than 12 m)
IN JUNCTION IMPROVEMENT PLAN
PRIORITY TO SAFETY OF PEDESTRIANS
AT MIDBLOCK CROSSING
1
SIGNALISED JUNCTIONS :
PEDESTRIAN PHASE : ALL RED Auditory
Pelican Signal
2
TABLE TOP . RAISED
PEDESSTRIAN CROSSING
BUS STOP
25 km long PT network
80 No. of proposed
bus stops
34 Existing buses
10 New E-buses proposed 2
1
4 ON STREET
PARKING MANAGEMENT
EXISTING :
KIOTRI TAL AB
B18 : ABD – Thematic Proposals
Development: Lake Development
THEME-4 - Green and Sustainable
CV Garden
Kishor Sagar
Kotri Talab
Channel
Green shaded
pathways, cycle
tracks with Solar
E X A M P L E O F D E L H I panel at top, Parking and Vendor’s Zone at left over spaces
Example
of Malacca
B20 : Area Based Development :
GREEN BELT ALONG ROADS (50 KM)
THEME-4 - Green and Sustainable
Development: Garden and Green Spaces
Non-Vehicle Streets / Zones Existing No vehicle street practice will be continued e.g. Kishore Sagar
Additional features
Accessible ramp; Important documents to be provided in Brail and audio
Accessibility – 100% Inclusive and disable friendly format; Dedicated facilities for Physically challenged and Mentally
different
Community facilities, Healthcare and amenities; Study Congenial
Creation of Social, Educational and Economic opportunities
Environment; Jobs and investment
C1 : Pan City Smart Solutions : THREE IDENTIFIED SOLUTIONS
1 2 3
SOLID
WASTE WATER SMART INTE.
MANAGEMENT MANAGEMENT TRANS. SYSTEM
SOLID WASTE MANAGEMENT
1
OBJECTIVES :
• Develop integrated and efficient
SWM system - segregation at
source, door to door collection,
SO LID W ASTE MANAGEMENT
2
S M A R T WAT E R M A N A G E M E N T OBJECTIVE :
1. Programmatic approach towards NRW
reduction in phase wise manner
2. 24x7 water supply covering entire city
in 12-15 years
WATER MANAGEMENT
2. SMART METERING
– consumer and bulk
3a
AREA TRAFFIC CONTROL SYSTEMS
(ATCS)
Traffic density monitoring
Variable timing traffic signals
Integrated Traffic Management System.
PARKING SENSORS
IN
3
COMMAND AND CONTROL CENTRE
NODAL POINT FOR SURVEILLANCE, INFORMATION
STORAGE,
b DATA ANALYSIS ETC.
C C C : Control & Command Centre
KEY COMPONENTS
EMERGENCY CALL CENTRE (ECC) DISPATCHING CENTRE (DC) STRATEGIC OPERATIONS &
Will handle all incoming and Will timely and efficiently dispatch, MONITORING SUITE (SOMS)
outgoing public trunk calls in monitor and support operational Will proactively and intelligently monitor the
wake of emergency resources public spaces and will include:
Use SCM funding as viability gap funding to projects financially viable to develop on PPP
Models include - Complete PPP (DBFOT/ BOT), mgmt. contract, revenue sharing with SPV
SPV will have land as its equity in the project so that it gets revenue sharing in long term
D2 : Implementation Plan : ABD PROPOSAL
A . E P C W O R K S – Roads, Utility Ducts, Garden development etc.
Time in months --->> 2 4 6 8 10 12 14 16 28 20 22 24 26 28 30 32
Appointment of consultancy firm for preparation of DPR
1
TIMELINE
TENDER PROCESS
T1 T2 T3 T4 WORK COMPLETE
RECREATIONAL AND TOURISM ACTIVITIES
Phase 1 Phase 2
T1 T2 T3 T4 Complete Complete WORK COMPLETE
NALLAH DEVELOPMENT
T1 T2 T3 T4 WORK COMPLETE
GREEN SPACES, PARKS AND GARDENS
Bulk Metering & SCADA system Phase 1 Successful Phase 2 Successful Phase 3 Successful
T1 T2 T3 T4 DMA Isolation implementation implementation implementation implementation WORK COMPLETE
24X7 WATER SUPPLY
Private player for 24X7 Increase in water supply
hours and system check WORK COMPLETE
Fast track completion T1 T2 T3 T4
100% COVERAGE OF SEWERAGE NETWORK
of ongoing works TENDER PROCESS
Transaction
for feasibility study advisory
WASTE WATER RECYCLING/ REUSE OF WASTE WATER T1 T2 T3 T4 WORK COMPLETE T1 : Invitation of Bids
TA S K :
WORK COMPLETE T2 : Selection of agency
T1 T2 T3 T4
SOLID WASTE MANAGEMENT for DPR
T3 : Approval of DPR
TENDER PROCESS
T1 T2 T3 T4 WORK COMPLETE
ACCESS TO TOILETS T5: WORK COMPLETE
Phase 1 - HT Phase 2 - LT
UNDER GROUND ELECTRIC WIRING T1 T2 T3 T4 Complete Complete WORK COMPLETE
Basic Services DPR for Slum Transaction Selection of
HOUSING AND ALLIED SOCIAL SERVICES T1 T2 T3 in slum rehabilitation advisory PPP player WORK COMPLETE
Phase 1 Phase 2
ROAD REDESIGN – 16 KM ROAD T1 T2 T3 complete complete WORK COMPLETE
TENDER PROCESS
Tender Process
T1 T2 WORK COMPLETE
VEHICLE TRACKING TO EXISTING VEHICLES Tender Process
T1 T2 WORK COMPLETE
VEHICLE TRACKING TO NEW VEHICLES
Phase 1 Successful Phase 2 Successful Phase 3 Successful Phase 4 Successful
T1 T2 T3 T4 implementation implementation implementation implementation WORK COMPLETE
SMART METER Private player
Tender Process
Bulk Metering SCADA SYSTEM
T1 T2 T3 & DMA Isolation IMPLEMENTATION
SCADA Private player
Tender Process Selection of agency Selection of T1 : Invitation of Bids
TA S K :
Transaction
LEAK DETECTION T1 for feasibility study advisory agency WORK COMPLETE
T2 : Selection of agency
Phase 1
T1 T2 T3 T4 WORK COMPLETE for DPR
SMART STREET PARKING Complete
T3 : Approval of DPR
TENDER PROCESS
T1 T2 T3 T4
Phase 1 Phase 2
WORK COMPLETE T5: WORK COMPLETE
PIS - PARKING complete complete
Connected to CCC
CONTROL AND COMMAND CENTRE, OFC AND CITY T1 T2 T3 T4
App/ website
Work Complete
CCC Work
Complete OFC WORK
WIDE APP AND WEBSITE Tender Process COMPLETE
TENDER PROCESS
T1 T2 WORK COMPLETE
E-CHALLAN
SMART CROSSING T1 T2 T3
Phase 1
complete
Phase 2
complete
WORK COMPLETE
T1 T2 WORK COMPLETE
SOLAR BLINKERS
T1 T2 3rd phase WORK COMPLETE
ATCS 1st phase 2nd phase
D5 : Implementation Plan : PROPOSED SPV STRUCTURE
Provide
Loans and Grants
Technical support
*State share under SCM of Rs. 250 crore will go upto Rs. 300 crore considering budget announcement
or part of state funding captured under convergence as state contribution
**NNK’s share in Smart City Project is estimated at Rs. 103 crore (for five years) as its own share
which will go upto Rs. 200 crore considering its own contri. in schemes like AMRUT which is captured in convergence (Rs. 47
crore) & viability gap (Rs. 50 crore) funding for PPP projects
O&M cost in base year is estimated at Rs. 22.8 crore against revenue of Rs. 24 crore
O&M cost in the fifth year estimated Rs. 43.6 crore against revenue of Rs. 50.8 crore
E2 : Project Capital Cost: AREA BASED DEVELOPMENT
COMPONENTS
1 Lake Development Cost - K O T R I T A L A B 36
2 Lake side facilities & tourism activities – K I S H O R S A G A R & K O T R I T A L A B
PROJECT CAPITAL COST
14
3 24x7 water supply and Rainwater harvesting 173
PROJECT
4 Sewerage and Septage Management 214
5 Solid Waste Management 24
6 Access to Toilets 9
7 Nalla Development 28
8 Integrated Road re-design - Arterial - 16 km 78
9 Integrated Road re-design - Other Roads - 165 km 136
COST
INFRASTRUCTURE 10 Street Lighting 10
& 11 Cycle sharing system 3
AFFORDABLE 12 Housing for all and Social Infrastructure 27
HOUSING 13 Student Facilitation Center 6
( i n C r. )
14 Community Facilities 6
15 Energy Security and Sourcing 98
16 Gardens , parks and open spaces 11
17 E - buses 20
MANAGEMENT
E S T I M AT E D C A P I TA L C O S T
C. SMART INTEGRATED TRANSPORT SYSTEM Rs. 115 Cr. to charge the users for
connection
UIDSSMT
/RCMAY
Housing
contri./
AMRUT
INFRASTRUCTURE
for ALL
Citizen
RUIDP
MNRE
depts.
Other
NRCP
Total
IPDS
SBM
PPP
inv.
(Rs. crore)
Water Supply 20 - 20.5 40.5
Sewerage 17.2 6.1 50.0 26.0 30.6 15.0 144.9
Solid Waste Management 3.2 3.2
Roads and Transport infra. 5.7 13.7 19.4
Power (Transmission infra., HT-LT
underground, Automation etc.) 42 .0 10 .0 52 .0
Solar related Components 14.7 18 .4 33.1
Gardens 2.3 2.3
SWD 5.7 5.7
Affordable Housing 13.5 13.5 27.0
Cycle sharing system 3.0 3.0
LED lighting 10 .0 10.0
Installation of CCTV cameras 1.0 1.0
Command and control center 42.0 42.0
OFC Network 36.0 36.0
E- Buses 7.0 7.0
T o t a l 51.0 9.3 50 .0 26 .0 30.6 13.5 42 .0 14.7 46.2 48.9 95.0 427
Development of Dussehera
Ground 175 175
Lake side tourism 1 1
Grand Total : ABD 51 9 50 26 31 14 42 15 222 49 95 603
• Convergence of schemes : Funds available for Kota city under various schemes: Rs. 1,334 crore, out of
which
– Funds apportioned for ABD is estimated at Rs. 381 crore (out of Rs. 603 crore)
– PPP : Additionally, in ABD investment under PPP is expected to be Rs. 222 crore
E5: FINANCIAL PLAN: ABD - LIST OF PPP PROJECTS
center & Start category hotel, (b) Commercial complex with multiplex, (c) Club house and (d) service apartments
L A N D M O N E T I S A T I O N : Out of total project cost of Rs. 175 crore, around Rs. 125 crore is expected
through land monetisation i.e. auctioning of plots or PPP – expected one time revenue Rs. 70 crore
A N N U A L R E V E N U E S H A R I N G : Additionally the PPP projects will be structured such that there is
annual revenue sharing of Rs. 6.6 crore after commissioning of project
SN REVENUE ACCOUNT (Rs. crore) 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23
REVENUE RECEIPTS for ABD
1 UD Tax 1.85 2.14 2.33 3.11 3.26 3.43
2 Water Supply charges 1.55 1.96 2.28 2.61 3.11 3.26
3 Sewerage charges 0.31 0.57 0.82 1.14 1.47 1.63
MODEL
O&M cost in base year esti. Rs. 22.8 crore against revenue of Rs. 24 crore
O&M cost in the fifth year esti. Rs. 43.6 crore against revenue of Rs. 50.8 crore
E7 : Financial Plan : ABD - O & M C O S T & F I N A N C I N G WAY S
SN REVENUE EXPENDITURE (Rs. crore) 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23
O & M CO ST & FI NANCING WAYS
For the components within ABD – the O&M cost is captured in the O&M cost of the water
PAN CITY PROPOSAL :
Population Projections
2001 2011 2015 2016 2019 2021 2024 2031 2035
City population 6,94,316 1,001,064 1,135,000 1,188,248 1,361,798 1,470,705 1,650,609 2,160,674 2,424,981
ABD Population 140,403 251,838
115,000 171,418
ABD : Design population for water
251,838
supply and sewerage
ABD : Floating population 90,000
ABD : Population in coaching area
164,946
including floating population,
1
2
3
4
5
6
7
8
9
10
11
12
13
2 Consent to Participate –
Parastatal bodies & Boards
14
Minutes of Meeting
15
16
Command Area Development, Kota
17
Urban Improvement Trust, Kota
18
Public Health Engineering Department, Kota
19
Rajasthan Urban Infrastructure Development Project,
Zone – Kota
20
Superintendent of Police, Kota city
21
Regional Transport Office, Kota
22
Jaipur Vij Vitran Nigam Limited, Kota
23
Rajasthan Housing Board, Kota circle, Kota
24
Divisional Tourism Office, Kota
25
Rajasthan Pollution Control Board, Kota
26
Public Works Department, City Zone, Kota
27
GAIL GAS Limited, Kota
28
BSNL, Kota
29
Rajasthan State Industrial Development & Investment
Corporation Ltd, Kota
30
3 Institutional
Arrangement and
Human Resource Plan
of SPV
31
32
33
4 Institutional
arrangement with
existing SPV
34
35
5
Ongoing Initatives
36
LoI - Bicycle Sharing system
37
38
Preparation of Solar City Master Plan
39
Waste Water Recycling and Reuse
40
41
Proposal for Energy efficient and Green Buildings
42
43
Installation of Energy efficient Street Lights
44
Tender: TA/ Consultant for Integrated Bus Transport
Management Agency & Project Development Service
45
Solid Waste to Energy
46
47
MoU between Nagar Nigam Kota and FICCI
48
49
50
51
52
53
MoU between Nagar Nigam Kota and Reliance Jio to
install Ground Based Mast
54
55
56
57
58
59
6 Letter of Intent -
Private Participation
60
KPIT – Smart Transport and E-Governance
61
62
WABAG – Water and Waste Water PPP Projects
63
L&T – Smart Technology oriented Turnkey solutions
64
ICICI Bank – Smart Technology oriented Payment
solutions
65
66
Allen Career Institute
67
Career Point University
68
7
State Policies
69
Rain Water Harvesting
70
71
72
73
74
State Solar Energy Policy
75
76
77
78
State Sewerage & Waste Water Policy - 2016
79
80
81
82
8 Minutes of Meeting –
State High Power
Standing Committee
83
84
85
86
87
88
89