SR No. Activity Project Company Oes Pak Remarks: Page 1 of 8
SR No. Activity Project Company Oes Pak Remarks: Page 1 of 8
Internation in response to the enquiry reference mentioned hereinabove. The Offer is based on the
following documents annexed herewith and shall be read and construed as an integral part.
1. Executive Summary
2. Scope Matrix
3. Price Schedule
1 IMPORTED ITEMS
Supply of Solar PV
1.1 Panels Mono-PERC PV Panels
Supply of Grid-Tied
1.2 Efficiency>98%
Inverters
Supply of DC Surge
1.3 Inverter built-in option
Arrestors
Supply of remote
1.4
monitoring system
2 FABRICATED ITEMS
Supply of Solar PV
2.1
Mounting Structure
Page 1 of 8
3 BREAKERS
Supply of AC Breaker
3.1
(Local)
Supply of DC Cables
on site with male and
4.1 Cu/XLPE/XLPE; EN-50618
female MC4
connectors
Supply of AC cable
4.3 from Inverter till LV Stranded cable
Room
Supply of grounding
4.4 Stranded cable
cable
5 MOUNTING STRUCTURE
Supply of Mounting
5.1
Structure
Area Clearance of
5.3
location
Page 2 of 8
6 ENGINEERING DRAWINGS
Complete Drawings
Panel placement, civil
and manuals of the
work layout, & SLD will be
6.1 installed system and
provided after project
equipment - hard
confirmation.
copies
Complete Drawings
Panel placement, civil
and manuals of the
work layout, & SLD will be
6.2 installed system and
provided after project
equipment - soft
confirmation.
copies
7 MECHANICAL WORKS
Supply of bare
7.1
copper conductors
8 ELECTRICAL WORKS
Interconnection of
8.1 inverters for
monitoring
Electricity
8.2
connection to site
AC grid voltage
8.3
stabilization
Page 3 of 8
Supply of Lightning
8.4
Arrester
9 MISCELLANEOUS WORKS
Location to install
Inverters, AC
9.2
Combiner Box &
other equipment
Regular Cleaning of
9.4 PV Modules after
Project handover
Internet facility at
9.5
site for monitoring
Warehousing and
9.6 Security of Supplied
items till execution
Page 4 of 8
Electricity, water and
9.8 sanitary facilities in
site office
10 CIVIL WORKS
Construction of
10.1
grounding pits
Opening of LC for
11.2
imported items
Page 5 of 8
Inland transportation
11.4 of equipment to the
site
Provide time of
arrival, details of
11.5
driver and timely
delivery
Movement of
Equipment from
11.7
customer warehouse
to site
In transit Insurance
of equipment from
11.8
port of discharge to
the site
Inspection of the
11.9 equipment after
reaching the site
12 COMMISSIONING
Testing of string,
12.1
Inverter voltages,
Pre-execution
12.2 checklist and
commissioning form
Page 6 of 8
Complete testing and
12.3 verification of solar
system
Startup and
12.4 commissioning of
solar system
Training of complete
solar system to
12.6 customer utility
manager
Troubleshooting in
12.7
case of any faults
Page 7 of 8
Page 8 of 8