1 Installation requirements
2 Preparation
3 Installation guide
4 Protective measures
Video wall
1741.2
2541.2
800
220
220
Flank Front
SHENZHEN DDW TECHNOLOGY CO.,LTD
www.ddw.net www.ddw.en.alibaba.com
Installation requirements
365
1741.2
300
2906.2
800
Flank Front
SHENZHEN DDW TECHNOLOGY CO.,LTD
www.ddw.net www.ddw.en.alibaba.com
Installation requirements
Air-condition Air-condition
Video wall
√ ×
Temprature 16~30 °
– The power position requirements According to the number of main pillar, behind the wall
mosaics of the reserved power socket (Close to No2.No3 main pillar).
Power
Floor
Ground
– Turn shock, spirit level, a hammer, Lan cable clamp, laptop, digital camera.
Material preparation
Bracket accessories
– By the main column, main stripes, beam, the article established the four main parts.
Screw
The main horizontal bar
Subscript
Main column
Bracket flank
SHENZHEN DDW TECHNOLOGY CO.,LTD
www.ddw.net www.ddw.en.alibaba.com
Bracket installation instructions
Main column
Ground
Appearance damage
Broken screen
5 Power-on test
– Connect the power cord, turn on the screen power switch, power on.
Normal condiction
Note:
1)Hooks the two adjustment screws should be flat, not protruding.
× √
Hooks the two
adjustment screws
should be flat, not
protruding
8 Product placement
– The video wall screen on the Pearl cotton waiting to install.
Adjust angle
Install diagram
– When install from the bottom to up, the installation time to adjust the angle of
each screen.
Install diagram
– When install from the bottom to up, the installation time to adjust the angle of
each screen.
3 2 1
6 5 4
9 8 7
Video matrix
SHENZHEN DDW TECHNOLOGY CO.,LTD
www.ddw.net www.ddw.en.alibaba.com
Cable connection
output Input
3 2 1
6 5 4
Control PC
SHENZHEN DDW TECHNOLOGY CO.,LTD
www.ddw.net www.ddw.en.alibaba.com
Cable connection
3 2 1
Power pallet
6 5 4
9 8 7
Floor
Ground
1 Power on
– To video wall screens energized in turn open the power switch on each screen.
POWER ON
Note:
1)Before energize check the power cord is connected properly with screen.
2)Do not all screens simultaneously energize.
SHENZHEN DDW TECHNOLOGY CO.,LTD
www.ddw.net www.ddw.en.alibaba.com
Product Debug
Operating area
Screen areas
Management Cables
– Products adjustment is completed, with ties to tie cables
– Video cable and control line to go outside of the main column. Power cord to go
inside the main column.
3 2 1
6 5 4
9 8 7
Access control PC or
Other device (Splitter / Access 100-240V
Matrix / Processor) AC power