INSTITUT TEKNOLOGI NASIONAL MALANG
FAKULTAS TEKNOLOGI INDUSTRI JURUSAN TEKNIK MESIN
LABORATORIUM PENGUJIAN MATERIAL
aya Keranglo Km, 2 Telp. (0 36 Ext, $11 Malang
—_—>———$
Lampiran
HASIL UJI TARIK BAJA TULANGAN BETON
‘Nomar MW0103/ Lab PHIZO2
Dikirim Oleh (CV. ARTA DWILESTARL
Tangeal 22 Agustus 2022
‘Tanggal Pengujan 29 Agustus 2022
Pekeyjaan Pembangunan Puskesmas Suruhwadang Bitar
CContoh ‘esi Polos Diameter 8 mm, Besi Polos Diameter 10 mm, B
Diameter 13 mm. Besi Ulr Diameter 16 mm, Besi Ur Diameter 19 mm,
Besi UlieDiameter2 mm
Max ‘Tensile
Jumtah | Diameter | Berat_ | Aren
* | Force [02% YS | Strang
sample | (mm) | pin | Mn | Tee Oe eS ima | C4)
param] 1 | tae | om | seas [erm] mr | mae | ae
1 [Pameer (a —[aans [eae [onan [ano | seas [man [as
3 | tae | eam | seas |2m0| war | 379 | as
Daipom | 1 | 286 | ass | rasa | ano | so9 | S626 | ss
2 fea, [2 ooi7 | mass [ais | i721 | stos | ss
3 cas | ast [am | me | sm |S
BeiPos |? casey | vase [307 | sci | 4639 | 24
3 z aasr | rast | 360 | soos | 466s | 25
z cass | mast [307 | sen | or | a5
29 Agustus 2022
pengulian Material
‘ hardjo, MT
\sausnt9'f6901 1992021001
Dipinda dengan CamScanner
bipindai dengan CamscannerINSTITUT T
KNOLOGI NASIONAL MALANG
PAKULTAS TEKNOLOGI INDUSTIU JURUSAN TEKNIK MESIN
LABORATORIUM PENGUJIAN MATERIAL,
ami
Specimen et
marae, ome | tay” | im | at | Foe uae
‘Besi Ulir 1 | 12887 | 1.0246 35.83 siss | 24
es 2 | 12880 1.025, 33.53 47149 | 27
3 [asst | tae vas | st | a
7 [ee was [ae |
2 [ase | aa | eas [os
3 [sen aos [lan [as
T [se | aos 29 [ast] »
2 | emm[ 2am nan [nm
3 | aor | a aa _[ af
1 [aire | 2900 aa [en [3s
2p anans_[ a6 aa | on [os
3 | aan 253, ce | of |e
Dipl dengan Camseanner
bipindai dengan CamscannerINSTITUT TEKNOLOGI NASIONAL MALANG
FAKULTAS TEKNOLOGI INDUSTRI JURUSAN TEKNIK MESIN
LABORATORIUM PENGUJIAN MATERIAL
J}, Raya Karanglo Km, 2 Telp. (0341) 417636 Ext. $11
‘Nomor —: TNofoaab PMN022
Lampiran 1 (Satu) Lembar
asi Uji Tarik Best Polos dan BesiUlir
Kepada Vth, Bapak Pimpinan
(CV. ARTA DWI LESTARI
Di
Temp.
Dengan hormat,
Bersara ini kam sampaitan hai Uji Tai, Bes Polos Diameter 8 mm , esi Polos
Diameter 10 mm, Besi Uli Diameter 13mm Besi Uli Diameter 16 mam, Besi lie
Diameter 19 mm, Bsi UlirDiameter 22 mm Untuk Kegistan: Pembangunan
PPoskesmas Suruhwadang Bitar Pengujian Tarik dlskukan pada Laboratorium
Pengujian Material ITN’ Malang. Hasil Uji Tarik eeu dapat iat pada larpirn,
DDemikian ats kerasama yang balk kami menyampaikan rime kasih.
‘pide dengan camscanner
bipindai dengan Camscanner