Load Schedule PB1 Load Schedule PB2,3,4,5 Unit 01 UNIT 02-03-04-05
Load Schedule PB1 Load Schedule PB2,3,4,5 Unit 01 UNIT 02-03-04-05
6.
5.
1.
LICENSED REGISTERED ELECTRICAL ENGINEER.
ELECTRICAL WORKS SHALL BE UNDER THE IMMEDIATE SUPERVISION OF A DULY
EDITION OF THE P.E.C. THE RULES AND REGULATIONS OF THE LOCAL ENFORCING
GENERAL NOTES:
7.
CONDUIT SHALL BE USED WHERE REQUIRED MINIMUM SIZE FOR ALL CONDUITS SHALL BE
3.
2.
VOLTS LINE TO NEUTRAL, 60 HZ.
WITH THESE PLANS AND SPECIFICATIONS, THE APPLICABLE PROVISIONS OF THE LATEST
AUTHORITY AND THE REQUIREMENTS OF THE LOCAL POWER COMPANIES,THE
ANY DISCREPANCY IN LOCATION AND RATINGS OF
CHANGES HALL BE MADE ACCORDINGLY.
WITH THE OWNER OR ANY OF HIS REPRESENTATIVES AND
EQUIPMENT AND APPARATUS SHALL
THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF SERVICE
ENTRANCE FOR CONNECTION TO THE POWER SUPPLY.
____ A
C1 C10
8 LO. 20A 40A PWH
C2 C11
14 LO. 20A 30A LAU. CO
C3 C12
11 LO.
BE VERIFIED
20A 40A PWH
C4 C13
18 LO. 20A 40A PWH
C5 C14
10 CO. 20A 30A ACU
1800
1500
EARTH
12.020 VA x 80% D.F. + 25% (2200VA) SIZE OF FEEDER : 12.020 VA x 80% D.F. + 25% (2200VA) SIZE OF FEEDER :
I FL= I FL=
230 V USE : 2- 14 mm² THHN 230 V USE : 2- 14 mm² THHN
1-8.0 mm² THW (G ) / 25mm Ø IMT 1-8.0 mm² THW (G ) / 25mm Ø IMT
I FL= 37.46 Amperes / 60 AT MAIN MAIN : 60 AT, 2P, 230V, 60HZ I FL= 37.46 Amperes / 60 AT MAIN MAIN : 60 AT, 2P, 230V, 60HZ