PERI UZ Beam
For large beam cross-sections

With UZ formwork, beams are


continuously formed.

The UZ beam bracket 40 has no


loose parts.
No ties required for beams with
depths up to 80 cm.
TRIO elements can be used for the
side and bottom formwork.
For extra-wide beams, UZ perfora-
ted rails are used.

Max. beam widths:


1 x UZ perforated rail 80 0.45 m
2 x UZ perforated rail 80 1.35 m
1 x UZ perforated rail129 0.95 m
With 10 cm formwork thickness.
Just 2 system components ensure
simple planning and material
management.
Firm and rigid connections with the UZ
UZ Beam Bracket 40 perforated rail allow for larger spacings.
Weight : 12.10
Item no. : 065056

UZ Perforated Rail
Weight : 7.44
Item no. : 065057

UZ Perforated Rail 129


Weight : 10.30
Item no. : 065065
product range 9.30
Unterzug UZ_ma 05.07.2004 12:27 Uhr Seite a2

Load table for


UZ beam formwork

Permissible width [m] of load that may be carried by UZ 40


beam bracket depending on the depth of the beam and slab

Slab thickness: 0.30 0.40 0.50 0.60 0.70 0.80


h [m]
Beam depth: Version Version Version Version Version Version
d [m]
1 2 1 2 1 2 1 2 1 2 1 2
1x GT 24 2x VT 16 1x GT 24 2x VT 16 1x GT 24 2x VT 16 1x GT 24 2x VT 16 1x GT 24 2x VT 16 1x GT 24 2x VT 16

0 2.20 4.00 1.85 3.50 1.80 3.00 1.55 2.75 1.35 2.25 *1.05 *1.65

0.20 1.70 3.65 1.35 2.85 1.60 2.50 1.40 1.80 *1.05 *1.35 *0.75 *1.05

0.25 1.65 3.45 1.30 2.70 1.55 2.25 1.35 1.65 *1.00 *1.25 *0.70 *0.95

0.30 1.55 3.30 1.15 2.40 1.50 2.00 1.30 1.50 *0.95 *1.15 *0.65 *0.90

0.35 1.50 3.20 1.00 2.15 1.45 1.75 1.25 1.35 *0.90 *1.05 *0.60 *0.80

The maximum deflection is 1/500 *) Timber on end in the UZ 40 beam bracket


is 10 x 8 cm (rather than 8 x 8 cm)

Version 1: The above values relate to the load capacity


of the UZ 40 beam bracket, the upright 8x8 cm
Side form with one or two GT 24s (vertical) timbers and the secondary girders shown
on the drawings.
d

Depending on the formlining used, additional


secondary girders may be needed.

Separate structural calculations must be


h

provided to show the sub-structure can carry


the imposed loads.

The equivalent load (V/100) acting horizontally


and the pressures arising on one side (eg the
edge beam) are to be taken by a restraint
provided by the client.

Version 2: Version 3:
Side form with two or three VT 16s (horizontal) Packing for the beam soffit formwork
pr 9.30 e 07/2004 5ma Art.Nr. 791798 © Copyright by PERI GmbH
d

d
h
h

d = slab depth
h = beam depth
D

PERI GmbH
P.O. Box 12 64 • 89259 Weissenhorn • Tel.: 0 73 09 / 9 50-0 • Fax: 0 73 09 / 9 51-0 • info@peri.de • www.peri.de

You might also like