The document is a programme for Contract 3310 for the North Runway Modification Works. It outlines the schedule and key dates for the contract from June 2021 through September 2024. The schedule includes the starting date of the contract in June 2021, closure of the existing North Runway in September 2022, and contract completion dates divided into 5 stages ending in September 2024.
The document is a programme for Contract 3310 for the North Runway Modification Works. It outlines the schedule and key dates for the contract from June 2021 through September 2024. The schedule includes the starting date of the contract in June 2021, closure of the existing North Runway in September 2022, and contract completion dates divided into 5 stages ending in September 2024.
The document is a programme for Contract 3310 for the North Runway Modification Works. It outlines the schedule and key dates for the contract from June 2021 through September 2024. The schedule includes the starting date of the contract in June 2021, closure of the existing North Runway in September 2022, and contract completion dates divided into 5 stages ending in September 2024.
The document is a programme for Contract 3310 for the North Runway Modification Works. It outlines the schedule and key dates for the contract from June 2021 through September 2024. The schedule includes the starting date of the contract in June 2021, closure of the existing North Runway in September 2022, and contract completion dates divided into 5 stages ending in September 2024.
Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Programme for Contract 3310 - North Runway Modification Works (Rev. B02) 965 1699 07-Jun-21 A 01-Sep-24 29-Nov-21 01-Sep-24 0 ----- Contract Dates ----- C01_7 d/w - 10h/d - No HK Hols1183 - No B/O periods 0 (was 07-Jun-21 C1) A 01-Sep-24 29-Nov-21 01-Sep-24 0 Schedule of Significant Date [PS Appendix C1] C01_7 d/w - 10h/d - No HK Hols451 - No B/O periods 0 (was 07-Jun-21 C1) A 01-Sep-22 29-Nov-21 01-Sep-22 1 310.K.EX.A010 starting date [7 Jun 2021] C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 29-Nov-21 Hols - No B/O periods (was 310.K.EX.A070 Closure Date of Existing North Runway September of 2022 [PS10.2.13, assumed 01 Sep C1) C01_7 d/w - 10h/d - No HK 0 01-Sep-22* 01-Sep-22 1 2022] Hols - No B/O periods (was Contract Completion C1) C01_7 d/w - 10h/d - No HK Hols623 - No B/O periods 0 (was18-Dec-22 C1) 01-Sep-24 18-Dec-22 01-Sep-24 0 Contract Completion Key Dates (Stage 1 to 7) [PS Appendix B] C01_7 d/w - 10h/d - No HK Hols560 - No B/O periods 0 (was18-Dec-22 C1) 30-Jun-24 18-Dec-22 30-Jun-24 0 310.K.EX.A944 [Contract] KD-1 (Stage 1) - Comp AGL Vault D Annex, ABWF, BS, AS, Megger Tests, C01_7 d/w - 10h/d - No HK 0 18-Dec-22* 18-Dec-22 0 provide access to others [18 Dec 22] Hols - No B/O periods (was 310.K.EX.A948 [Contract] KD-2 (Stage 2) - Comp AGL Vault C Annex, ABWF, BS, AS, Megger Tests, C1) C01_7 d/w - 10h/d - No HK 0 19-Feb-23* 19-Feb-23 0 provide access to others [19 Feb 23] Hols - No B/O periods (was 310.K.EX.A952 [Contract] KD-3(Stage 3) - Comp Comm Rm. CR305 within PBA, ABWF, BS, AS final fix, C1) C01_7 d/w - 10h/d - No HK 0 26-Feb-23* 26-Feb-23 0 provide access to others [26 Feb 23] Hols - No B/O periods (was 310.K.EX.A956 [Contract] KD-4(Stage 4)-Comp cable duct incl.drawpit along W perimeter C1) C01_7 d/w - 10h/d - No HK 0 19-Mar-23* 19-Mar-23 0 seawalls,access for CLP cabling[19 Mar23] Hols - No B/O periods (was 310.K.EX.A960 [Contract] KD-5A (Stage 5) - Comp AGL System within 3310/IA/1 [30 Apr 23] C1) C01_7 d/w - 10h/d - No HK 0 30-Apr-23* 30-Apr-23 0 Hols - No B/O periods (was 310.K.EX.A964 [Contract] KD-5B (Stage 5) - Comp AGL System within 3310/IA/6 [25 Jun 23] C1) C01_7 d/w - 10h/d - No HK 0 25-Jun-23* 25-Jun-23 0 Hols - No B/O periods (was 310.K.EX.A968 [Contract] KD-5C (Stage 5) - Comp AGL System within 3310/IA/7 [30 Jul 23] C1) C01_7 d/w - 10h/d - No HK 0 30-Jul-23* 30-Jul-23 0 Hols - No B/O periods (was 310.K.EX.A972 [Contract] KD-5D (Stage 5) - Comp AGL System within 3310/IA/8 [27 Aug 23] C1) C01_7 d/w - 10h/d - No HK 0 27-Aug-23* 27-Aug-23 0 Hols - No B/O periods (was 310.K.EX.A976 [Contract] KD-5E (Stage 5) - Comp AGL System within 3310/IA/4 [24 Sep 23] C1) C01_7 d/w - 10h/d - No HK 0 24-Sep-23* 24-Sep-23 0 Hols - No B/O periods (was 310.K.EX.A980 [Contract] KD-5F (Stage 5) - Comp AGL System within 3310/IA/2 [26 Nov 23] C1) C01_7 d/w - 10h/d - No HK 0 26-Nov-23* 26-Nov-23 0 Hols - No B/O periods (was 310.K.EX.A984 [Contract] KD-5G (Stage 5) - Comp AGL System within 3310/IA/3 [17 Dec 23] C1) C01_7 d/w - 10h/d - No HK 0 17-Dec-23* 17-Dec-23 0 Hols - No B/O periods (was 310.K.EX.A992 [Contract] KD-6(Stage 6)-Comp comm cabling btw. Comm Rm in ATCT&BATCC on ex. C1) C01_7 d/w - 10h/d - No HK 0 31-Dec-23* 31-Dec-23 0 Airport and Comm Rm in New ATCT [31 Dec 23] Hols - No B/O periods (was 310.K.EX.A988 [Contract] KD-5H (Stage 5) - Comp AGL System within 3310/IA/5 [14 Jan 24] C1) C01_7 d/w - 10h/d - No HK 0 14-Jan-24* 14-Jan-24 0 Hols - No B/O periods (was 310.K.EX.A996 [Contract] KD-7 (Stage 7)-Comp modi of ex. N-Runway incl.line marking, T&C ready for C1) C01_7 d/w - 10h/d - No HK 0 30-Jun-24* 30-Jun-24 0 CAD/AA flight check [30 Jun 24] Hols - No B/O periods (was Contract Completion Date (Section 1 to 5 & Complete the whole of the works)[Appendix B] C1) C01_7 d/w - 10h/d - No HK Hols364 - No B/O periods 0 (was03-Sep-23 C1) 01-Sep-24 03-Sep-23 01-Sep-24 0 310.K.EX.A1000 [Contract] KD-8(Section 1)-Comp aviation fuel direct buried pipeline&temp filling point incl C01_7 d/w - 10h/d - No HK 0 03-Sep-23* 03-Sep-23 0 T&C,ready for use[3 Sep 23] Hols - No B/O periods (was 310.K.EX.A1004 [Contract] KD-9 (Section 2) - Comp aviation fuel pipeline through WVT incl T&C, license, C1) C01_7 d/w - 10h/d - No HK 0 30-Jun-24* 30-Jun-24 0 ready for use [30 Jun 24] Hols - No B/O periods (was 310.K.EX.A1008 [Contract] KD-10(Section 3)-Comp wk for all ancillary buildings incl.T&C&stat. appv, C1) C01_7 d/w - 10h/d - No HK 0 14-Jul-24* 14-Jul-24 0 consents, ready for use [14 Jul 24] Hols - No B/O periods (was 310.K.EX.A1012 [Contract] KD-11 (Section 4)-Comp all works for EVT and WVT incl T&C, stat. appv., C1) C01_7 d/w - 10h/d - No HK 0 28-Jul-24* 28-Jul-24 0 consents, ready for use [28 Jul 24] Hols - No B/O periods (was 310.K.EX.A1016 [Contract] KD-12 (Section 5)- Comp all works incl. T&C, Stat. appv., licenses incl CAD C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 aerodrome licensing [25 Aug 24] Hols - No B/O periods (was 310.K.EX.A1020 [Contract] KD-13 (the whole of the works) - Achieve Completion of the whole of the works C1) C01_7 d/w - 10h/d - No HK 0 01-Sep-24* 01-Sep-24 0 and vacate the site [1 Sep 24] Hols - No B/O periods (was Planned Completion C1) C01_7 d/w - 10h/d - No HK Hols622 - No B/O periods 0 (was17-Dec-22 C1) 30-Aug-24 18-Dec-22 01-Sep-24 2
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 1 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Planned Completion Key Dates (Stage 1 to 7) C01_7 d/w - 10h/d - No HK Hols556 - No B/O periods 0 (was17-Dec-22 C1) 25-Jun-24 18-Dec-22 30-Jun-24 5 310.K.EX.A014 [Planned] KD-1 (Stage 1) - Comp AGL Vault D Annex, ABWF, BS, AS, Megger Tests, C01_7 d/w - 10h/d - No HK 0 17-Dec-22* 18-Dec-22 1 provide access to others Hols - No B/O periods (was 310.K.EX.A022 [Planned] KD-3 (Stage 3) - Comp Comm Rm. CR305 within PBA, ABWF, BS, AS final fix, C1)C01_7 d/w - 10h/d - No HK 0 24-Feb-23* 26-Feb-23 2 provide access to others Hols - No B/O periods (was 310.K.EX.A026 [Planned] KD-4 (Stage 4) - Comp cable duct incl. drawpits along W perimeter seawalls, C1) C01_7 d/w - 10h/d - No HK 0 18-Mar-23* 19-Mar-23 1 provide access for CLP cabling Hols - No B/O periods (was 310.K.EX.A018 [Planned] KD-2 (Stage 2) - Comp AGL Vault C Annex, ABWF, BS, AS, Megger Tests, C1) C01_7 d/w - 10h/d - No HK 0 29-Mar-23* 19-Feb-23 -38 provide access to others Hols - No B/O periods (was 310.K.EX.A030 [Planned] KD-5A (Stage 5) - Comp AGL System within 3310/IA/1 C1) C01_7 d/w - 10h/d - No HK 0 17-Apr-23* 30-Apr-23 13 Hols - No B/O periods (was 310.K.EX.A034 [Planned] KD-5B (Stage 5) - Comp AGL System within 3310/IA/6 C1) C01_7 d/w - 10h/d - No HK 0 24-Jun-23* 25-Jun-23 1 Hols - No B/O periods (was 310.K.EX.A038 [Planned] KD-5C (Stage 5) - Comp AGL System within 3310/IA/7 C1) C01_7 d/w - 10h/d - No HK 0 22-Jul-23* 30-Jul-23 8 Hols - No B/O periods (was 310.K.EX.A042 [Planned] KD-5D (Stage 5) - Comp AGL System within 3310/IA/8 C1) C01_7 d/w - 10h/d - No HK 0 14-Aug-23* 27-Aug-23 13 Hols - No B/O periods (was 310.K.EX.A046 [Planned] KD-5E (Stage 5) - Comp AGL System within 3310/IA/4 C1) C01_7 d/w - 10h/d - No HK 0 28-Aug-23* 24-Sep-23 27 Hols - No B/O periods (was 310.K.EX.A050 [Planned] KD-5F (Stage 5) - Comp AGL System within 3310/IA/2 C1) C01_7 d/w - 10h/d - No HK 0 21-Nov-23* 26-Nov-23 5 Hols - No B/O periods (was 310.K.EX.A054 [Planned] KD-5G (Stage 5) - Comp AGL System within 3310/IA/3 C1) C01_7 d/w - 10h/d - No HK 0 13-Dec-23* 17-Dec-23 4 Hols - No B/O periods (was 310.K.EX.A062 [Planned] KD-6 (Stage 6) - Comp comm cabling btw. Comm Rm in ATCT & BATCC on C1) C01_7 d/w - 10h/d - No HK 0 27-Dec-23* 31-Dec-23 4 ex. Airport and Comm Rm in New ATCT Hols - No B/O periods (was 310.K.EX.A058 [Planned] KD-5H (Stage 5) - Comp AGL System within 3310/IA/5 C1) C01_7 d/w - 10h/d - No HK 0 13-Jan-24* 14-Jan-24 1 Hols - No B/O periods (was 310.K.EX.A066 [Planned] KD-7 (Stage 7) - Comp modi of ex. N-Runway incl. line marking, T&C ready for C1) C01_7 d/w - 10h/d - No HK 0 25-Jun-24* 30-Jun-24 5 CAD/AA flight check Hols - No B/O periods (was Planned Completion Dates (Section 1 to 5 & Complete the whole of the works) C1) C01_7 d/w - 10h/d - No HK Hols362 - No B/O periods 0 (was03-Sep-23 C1) 30-Aug-24 03-Sep-23 01-Sep-24 2 310.K.EX.A100 [Planned] KD-8 (Section 1) - Comp aviation fuel direct buried pipeline & temp filling point C01_7 d/w - 10h/d - No HK 0 03-Sep-23* 03-Sep-23 0 incl T&C, ready for use Hols - No B/O periods (was 310.K.EX.A104 [Planned] KD-9 (Section 2) - Comp aviation fuel pipeline through WVT incl T&C, license, C1) C01_7 d/w - 10h/d - No HK 0 15-Jun-24* 30-Jun-24 15 ready for use Hols - No B/O periods (was 310.K.EX.A108 [Planned] KD-10 (Section 3) - Comp works for all ancillary buildings incl. T&C & stat. appv, C1) C01_7 d/w - 10h/d - No HK 0 26-Jun-24* 14-Jul-24 18 consents, ready for use Hols - No B/O periods (was 310.K.EX.A112 [Planned] KD-11 (Section 4) - Comp all works for EVT and WVT incl T&C, stat. appv., C1) C01_7 d/w - 10h/d - No HK 0 23-Jul-24* 28-Jul-24 5 consents, ready for use Hols - No B/O periods (was 310.K.EX.A116 [Planned] KD-12 (Section 5) - Comp all works incl. T&C, Stat. appv., consents, licenses C1) C01_7 d/w - 10h/d - No HK 0 20-Aug-24* 25-Aug-24 5 incl CAD aerodrome licensing Hols - No B/O periods (was 310.K.EX.A120 [Planned] KD-13 (the whole of the works) - Achieve Completion of the whole of the works C1) C01_7 d/w - 10h/d - No HK 0 30-Aug-24* 01-Sep-24 2 and vacate the site Hols - No B/O periods (was Option Exercise Date C1) C01_7 d/w - 10h/d - No HK Hols944 - No B/O periods 0 (was 20-Jul-21 C1) A 18-Feb-24 27-Mar-22 18-Feb-24 0 310.K.EX.A920 Option - Latest Exercise Date for Option 3310/A and 3310/B [within 3 months of the C01_7 d/w - 10h/d - No HK 0 20-Jul-21 A 27-Mar-22 starting date; PS38.1] Hols - No B/O periods (was Contract Completion Date of Optional Works [PS Appendix B] C1) C01_7 d/w - 10h/d - No HK Hols567 - No B/O periods 0 (was31-Jul-22 C1) 18-Feb-24 31-Jul-22 18-Feb-24 0 310.K.EX.A1024 [Contract] KD-G1 - Comp all civil wks for HKO Anemometers,incl.power,sys cabling to ex. C01_7 d/w - 10h/d - No HK 0 31-Jul-22* 31-Jul-22 0 ATCX and BATCX, T&C [31 Jul 22] Hols - No B/O periods (was 310.K.EX.A1028 [Contract] KD-G2 - Localizer Bldg C, Glide Path Bldg C & D, HKPF Bldg [8 Oct 23] C1) C01_7 d/w - 10h/d - No HK 0 08-Oct-23* 08-Oct-23 0 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 2 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.K.EX.A1032 [Contract] KD-G3-Civil wks for HKO Runway Visual Range,Forward Scatterer, Ceilometer C01_7 d/w - 10h/d - No HK 0 15-Oct-23* 15-Oct-23 0 & X-Band Radar HKO .... [15 Oct 23] Hols - No B/O periods (was 310.K.EX.A1036 [Contract]KD-G4 - Civil wks for C&ED with associated power&sys cabling incl. T&C, C1) C01_7 d/w - 10h/d - No HK 0 18-Feb-24* 18-Feb-24 0 approval and consent ..... [18 Feb 24] Hols - No B/O periods (was Planned Completion Date of Optional Works C1) C01_7 d/w - 10h/d - No HK Hols565 - No B/O periods 0 (was31-Jul-22 C1) 16-Feb-24 31-Jul-22 18-Feb-24 2 310.K.EX.A200 [Planned] KD-G1 - Comp all civil works for HKO Anemometers, incl. power, system C01_7 d/w - 10h/d - No HK 0 31-Jul-22* 31-Jul-22 0 cabling to ex. ATCX and BATCX, T&C Hols - No B/O periods (was 310.K.EX.A204 [Planned] KD-G2 - Localizer Bldg C, Glide Path Bldg C & D, HKPF Bldg C1) C01_7 d/w - 10h/d - No HK 0 07-Oct-23* 08-Oct-23 1 Hols - No B/O periods (was 310.K.EX.A228 [Planned] KD-G3 - Civil works for HKO Runway Visual Range, Forward Scatterer, C1) C01_7 d/w - 10h/d - No HK 0 11-Oct-23* 15-Oct-23 4 Ceilometer and X-Band Radar HKO .... Hols - No B/O periods (was 310.K.EX.A244 [Planned] KD-G4 - Civil works for C&ED with associated power and system cabling incl. C1) C01_7 d/w - 10h/d - No HK 0 16-Feb-24* 18-Feb-24 2 T&C, approval and consent ..... Hols - No B/O periods (was Access Dates [PS Appendix C2] C1) C01_7 d/w - 10h/d - No HK Hols770 - No B/O periods 0 (was 07-Jun-21 C1) A 17-Jul-23 29-Nov-21 01-Sep-24 413 310.A.EX.A300 Access to 3310/1 [7 Jun 21] C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 27-Jul-22 Hols - No B/O periods (was 310.A.EX.A304 Access to 3310/2 [7 Jun 21] C1) C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 10-Jan-23 Hols - No B/O periods (was 310.A.EX.A308 Access to 3310/3 [7 Jun 21] C1) C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 13-Aug-22 Hols - No B/O periods (was 310.A.EX.A312 Access to 3310/4 [7 Jun 21] C1) C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 26-May-22 Hols - No B/O periods (was 310.A.EX.A324 Access to 3310/6 [7 Jun 21] C1) C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 30-Mar-22 Hols - No B/O periods (was 310.A.EX.A348 Access to 3310/8 [7 Jun 21] C1) C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 08-Nov-22 Hols - No B/O periods (was 310.A.EX.A376 Access to 3310/13 [7 Jun 21] C1) C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 23-Jul-22 Hols - No B/O periods (was 310.A.EX.A328 Access to 3310/6A [4 Oct 21] C1) C01_7 d/w - 10h/d - No HK 0 04-Oct-21 A 30-Mar-22 Hols - No B/O periods (was 310.A.EX.A368 Access to 3310/11 [9 Aug 21] C1) C01_7 d/w - 10h/d - No HK 0 28-Oct-21 A 28-Mar-22 Hols - No B/O periods (was 310.A.EX.A366 Access to 3310/10A [9 Aug 21] C1) C01_7 d/w - 10h/d - No HK 0 28-Oct-21 A 01-Sep-24 Hols - No B/O periods (was 310.A.EX.A332 Access to 3310/6B [3 Jan 22] C1) C01_7 d/w - 10h/d - No HK 0 27-Mar-22* 03-Jan-22 -83 Hols - No B/O periods (was 310.A.EX.A336 Access to 3310/6C [7 Mar 22] C1) C01_7 d/w - 10h/d - No HK 0 27-Mar-22* 07-Mar-22 -20 Hols - No B/O periods (was 310.A.EX.A356 Access to 3310/8B [7 Mar 22] C1) C01_7 d/w - 10h/d - No HK 0 27-Mar-22* 07-Mar-22 -20 Hols - No B/O periods (was 310.A.EX.A364 Access to 3310/10 [31 Jan 22] C1) C01_7 d/w - 10h/d - No HK 0 27-Mar-22* 31-Jan-22 -55 Hols - No B/O periods (was 310.A.EX.A384 Access to 3310/14 [29 Nov 21] C1) C01_7 d/w - 10h/d - No HK 0 27-Mar-22* 29-Nov-21 -118 Hols - No B/O periods (was 310.A.EX.A374 Access to 3310/12A [4 Apr 22] C1) C01_7 d/w - 10h/d - No HK 0 04-Apr-22* 04-Apr-22 0 Hols - No B/O periods (was 310.A.EX.A352 Access to 3310/8A [4 Jul 22] C1) C01_7 d/w - 10h/d - No HK 0 04-Jul-22* 04-Jul-22 0 Hols - No B/O periods (was 310.A.EX.A372 Access to 3310/12 [4 Jul 22] C1) C01_7 d/w - 10h/d - No HK 0 04-Jul-22* 04-Jul-22 0 Hols - No B/O periods (was 310.A.EX.A362 Access to 3310/9A [4 Jul 22] C1) C01_7 d/w - 10h/d - No HK 0 04-Jul-22* 04-Jul-22 0 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 3 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.A.EX.A340 Access to 3310/7 [5 Sep 22] C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 05-Sep-22 0 Hols - No B/O periods (was 310.A.EX.A344 Access to 3310/7A [5 Sep 22] C1) C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 05-Sep-22 0 Hols - No B/O periods (was 310.A.EX.A360 Access to 3310/9 [5 Sep 22] C1) C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 05-Sep-22 0 Hols - No B/O periods (was 310.A.EX.A380 Access to 3310/13A [5 Sep 22] C1) C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 05-Sep-22 0 Hols - No B/O periods (was 310.A.EX.A500 Access to Road Tunnel Plant Building B [5 Sep 22] C1) C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 05-Sep-22 0 Hols - No B/O periods (was 310.A.EX.A504 Access to Road Tunnel Plant Building C [5 Sep 22] C1) C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 04-Sep-22 0 Hols - No B/O periods (was 310.A.EX.A508 Access to South Section of EVT Tunnel at Existing Airport [5 Sep 22] C1) C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 05-Sep-22 0 Hols - No B/O periods (was 310.A.EX.A480 Access to Communication Rm CR358 (New Air Traffic Control Tower) [28 Nov 22] C1) C01_7 d/w - 10h/d - No HK 0 28-Nov-22* 28-Nov-22 0 Hols - No B/O periods (was 310.A.EX.A316 Access to 3310/5 [2 Jan 23] C1) C01_7 d/w - 10h/d - No HK 0 02-Jan-23* 02-Jan-23 0 Hols - No B/O periods (was 310.A.EX.A320 Access to 3310/5A [6 Mar 23] C1) C01_7 d/w - 10h/d - No HK 0 06-Mar-23* 06-Mar-23 0 Hols - No B/O periods (was 310.A.EX.A484 Access to Communication Rm CR306 (Aircraft Fuel Dispenser Staging and Staff C1) C01_7 d/w - 10h/d - No HK 0 27-Mar-23* 27-Mar-23 0 Facilities) [27 Mar 23] Hols - No B/O periods (was 310.A.EX.A488 Access to Data Centre [1 May 23] C1) C01_7 d/w - 10h/d - No HK 0 01-May-23* 01-May-23 0 Hols - No B/O periods (was 310.A.EX.A492 Access to Communication Room CR308 (Electrical Substation 5) [3 Jul 23] C1) C01_7 d/w - 10h/d - No HK 0 03-Jul-23* 03-Jul-23 0 Hols - No B/O periods (was 310.A.EX.A496 Access to Communication Room CR78 (Backup IAC) [17 Jul 23] C1) C01_7 d/w - 10h/d - No HK 0 17-Jul-23* 17-Jul-23 0 Hols - No B/O periods (was Vacate Dates [PS Appendix C2] C1) C01_7 d/w - 10h/d - No HK Hols609 - No B/O periods 0 (was25-Dec-22 C1) 25-Aug-24 25-Dec-22 25-Aug-24 0 310.A.EX.A476 Vacate 3310/14 [25 Dec 22] C01_7 d/w - 10h/d - No HK 0 25-Dec-22* 25-Dec-22 0 Hols - No B/O periods (was 310.A.EX.A436 Vacate 3310/7A [25 Jun 23] C1) C01_7 d/w - 10h/d - No HK 0 25-Jun-23* 25-Jun-23 0 Hols - No B/O periods (was 310.A.EX.A392 Vacate 3310/1 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A396 Vacate 3310/2 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A400 Vacate 3310/3 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A404 Vacate 3310/4 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A408 Vacate 3310/5 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A412 Vacate 3310/5A [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A416 Vacate 3310/6 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A420 Vacate 3310/6A [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A424 Vacate 3310/6B [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 4 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.A.EX.A428 Vacate 3310/6C [25 Aug 24] C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A432 Vacate 3310/7 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A440 Vacate 3310/8 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A444 Vacate 3310/8A [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A448 Vacate 3310/8B [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A452 Vacate 3310/9 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A456 Vacate 3310/10 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A460 Vacate 3310/11 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A464 Vacate 3310/12 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A468 Vacate 3310/13 [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A472 Vacate 3310/13A [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A458 Vacate 3310/10A [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A454 Vacate 3310/9A [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was 310.A.EX.A466 Vacate 3310/12A [25 Aug 24] C1) C01_7 d/w - 10h/d - No HK 0 25-Aug-24* 25-Aug-24 0 Hols - No B/O periods (was Programme Milestone Dates [PS Appendix C4] C1) C01_7 d/w - 10h/d - No HK Hols850 - No B/O periods 0 (was27-Mar-22 C1) 23-Jul-24 27-Feb-22 26-Jul-24 3 310.K.EX.A520 PMS06 - Comp ground improvement works in 3310/6A [27 Feb 22] C01_7 d/w - 10h/d - No HK 0 27-Mar-22* 27-Feb-22 -27 Hols - No B/O periods (was 310.K.EX.A500 PMS01 - Comp ground improvement works in 3310/10 [1 May 22] C1) C01_7 d/w - 10h/d - No HK 0 01-May-22* 01-May-22 0 Hols - No B/O periods (was 310.K.EX.A592 PMS23 - Comp all works for Road Tunnel PBB and stat. apprv, consents, ready for use [4 C1) C01_7 d/w - 10h/d - No HK 0 04-Dec-22* 04-Dec-22 0 Dec 22] Hols - No B/O periods (was 310.K.EX.A504 PMS02 - Comp West Box Culvert in 3310/10 & 3310/10A (excl. connection with ex. outfall C1) C01_7 d/w - 10h/d - No HK 0 01-Jan-23* 01-Jan-23 0 no.3) [1 Jan 23] Hols - No B/O periods (was 310.K.EX.A596 PMS24 - Comp all works for Road Tunnel PBC and stat. apprv, consents, ready for use [1 C1) C01_7 d/w - 10h/d - No HK 0 01-Jan-23* 01-Jan-23 0 Jan 23] Hols - No B/O periods (was 310.K.EX.A532 PMS09 - Comp seawall and ground improvement works in 3310/11 [5 Feb 23] C1) C01_7 d/w - 10h/d - No HK 0 05-Feb-23* 05-Feb-23 0 Hols - No B/O periods (was 310.K.EX.A544 PMS13 - Comp all civil works for EVT in 3310/6 and 3310/6C (excl. a section of tunnel C1) C01_7 d/w - 10h/d - No HK 0 06-Feb-23* 05-Feb-23 0 near ex. seawall) [5 Feb 23] Hols - No B/O periods (was 310.K.EX.A604 PMS25 - Comp all works for GSE Vehicle Wash Facility, obtain stat. apprv., consents, C1) C01_7 d/w - 10h/d - No HK 0 05-Mar-23* 05-Mar-23 0 ready for use [5 Mar 23] Hols - No B/O periods (was 310.K.EX.A534 PMS10 - Comp all cable duct incl. drawpits along W-perimeter seawalls; provide access to C1) C01_7 d/w - 10h/d - No HK 0 19-Mar-23* 19-Mar-23 0 CLP [19 Mar 23] Hols - No B/O periods (was 310.K.EX.A508 PMS03 - Comp the seawall and land filling works in area 3310/10A [2 Apr 23] C1) C01_7 d/w - 10h/d - No HK 0 02-Apr-23* 02-Apr-23 0 Hols - No B/O periods (was 310.K.EX.A512 PMS04 - Comp box culvert no.3 and western box culvert in 3310/9 [2 Apr 23] C1) C01_7 d/w - 10h/d - No HK 0 02-Apr-23* 02-Apr-23 0 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 5 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.K.EX.A608 PMS26 - Comp all works for Comm. Equip. Bldg D, obtain stat. apprv., consents, ready for C01_7 d/w - 10h/d - No HK 0 02-Apr-23* 02-Apr-23 0 use [2 Apr 23] Hols - No B/O periods (was 310.K.EX.A536 PMS11 - Comp land filling works in 3310/11 [30 Apr 23] C1) C01_7 d/w - 10h/d - No HK 0 30-Apr-23* 30-Apr-23 0 Hols - No B/O periods (was 310.K.EX.A924 PMS30 - Comp all civil enabling works in 3310/IA/1 and provide access to Others to C1) C01_7 d/w - 10h/d - No HK 0 30-Apr-23* 30-Apr-23 0 complete AGL [30 Apr 23] Hols - No B/O periods (was 310.K.EX.A612 PMS27 - Comp all works for GSE Battery Charging B, obtain stat. apprv., consents, ready C1) C01_7 d/w - 10h/d - No HK 0 04-Jun-23* 03-Jun-23 0 for use [4 Jun 23] Hols - No B/O periods (was 310.K.EX.A548 PMS14 - Comp all civil works for EVT in 3310/7 [4 Jun 23] C1) C01_7 d/w - 10h/d - No HK 0 04-Jun-23* 04-Jun-23 0 Hols - No B/O periods (was 310.K.EX.A516 PMS05 - Comp all civil enabling works in IA/6 and provide access for others [25 Jun 23] C1) C01_7 d/w - 10h/d - No HK 0 25-Jun-23* 25-Jun-23 0 Hols - No B/O periods (was 310.K.EX.A616 PMS28 - Comp all works for Screening Facility, obtain stat. apprv., consents, ready for C1) C01_7 d/w - 10h/d - No HK 0 02-Jul-23* 02-Jul-23 0 use [2 Jul 23] Hols - No B/O periods (was 310.K.EX.A928 PMS31 - Comp all civil enabling works in 3310/IA/7 and provide access to Others to C1) C01_7 d/w - 10h/d - No HK 0 30-Jul-23* 30-Jul-23 0 complete AGL [30 Jul 23] Hols - No B/O periods (was 310.K.EX.A540 PMS12 - Comp all civil enabling works in IA/8 and provide access for others [27 Aug 23] C1) C01_7 d/w - 10h/d - No HK 0 27-Aug-23* 27-Aug-23 0 Hols - No B/O periods (was 310.K.EX.A552 PMS15 - Comp all civil works for EVT in Ex. N-Runway [3 Sep 23] C1) C01_7 d/w - 10h/d - No HK 0 03-Sep-23* 03-Sep-23 0 Hols - No B/O periods (was 310.K.EX.A932 PMS32 - Comp all civil enabling works in 3310/IA/4 and provide access to Others to C1) C01_7 d/w - 10h/d - No HK 0 24-Sep-23* 24-Sep-23 0 complete AGL [24 Sep 23] Hols - No B/O periods (was 310.K.EX.A524 PMS07 - Comp eastern box culvert in 3310/6 and 3310/6A [1 Oct 23] C1) C01_7 d/w - 10h/d - No HK 0 01-Oct-23* 01-Oct-23 0 Hols - No B/O periods (was 310.K.EX.A564 PMS18 - Comp all civil works for WVT [1 Oct 23] C1) C01_7 d/w - 10h/d - No HK 0 01-Oct-23* 01-Oct-23 0 Hols - No B/O periods (was 310.K.EX.A568 PMS19 - Comp Section 1 Aviation Fuel Pipeline and incl. T&C [1 Oct 23] C1) C01_7 d/w - 10h/d - No HK 0 01-Oct-23* 01-Oct-23 0 Hols - No B/O periods (was 310.K.EX.A528 PMS08 - Comp all civil enabling works in IA/2 and provide access for others [26 Nov 23] C1) C01_7 d/w - 10h/d - No HK 0 26-Nov-23* 26-Nov-23 0 Hols - No B/O periods (was 310.K.EX.A556 PMS16 - Comp all civil enabling works in IA/3 and provide access for others [17 Dec 23] C1) C01_7 d/w - 10h/d - No HK 0 17-Dec-23* 17-Dec-23 0 Hols - No B/O periods (was 310.K.EX.A580 PMS20 - Comp all civil enabling works in IA/5 and provide access for others [14 Jan 24] C1) C01_7 d/w - 10h/d - No HK 0 14-Jan-24* 14-Jan-24 0 Hols - No B/O periods (was 310.K.EX.A620 PMS29 - Comp all works for Security Gatehouse B, obtain stat. apprv., consents, ready C1) C01_7 d/w - 10h/d - No HK 0 18-Feb-24* 18-Feb-24 0 for use [18 Feb 24] Hols - No B/O periods (was 310.K.EX.A584 PMS21 - Comp Aviation Fuel Pipeline through WVT connect to ex. fuel system, T&C, stat. C1) C01_7 d/w - 10h/d - No HK 0 30-Jun-24* 30-Jun-24 0 apprv, license [30 Jun 24] Hols - No B/O periods (was 310.K.EX.A560 PMS17 - Comp all works for EVT incl T&C, obtain all statutory approval & consent, ready C1) C01_7 d/w - 10h/d - No HK 0 22-Jul-24 26-Jul-24 4 for use [28 Jul 24] Hols - No B/O periods (was 310.K.EX.A588 PMS22 - Comp all works for WVT incl T&C, stat. apprv, consents, ready for use [28 Jul C1) C01_7 d/w - 10h/d - No HK 0 23-Jul-24 26-Jul-24 3 24] Hols - No B/O periods (was Schedule of Submission Dates [PS Appendix C3] C1) C01_7 d/w - 10h/d - No HK Hols693 - No B/O periods 0 (was 11-Jul-21 C1) A 04-Jun-23 26-Mar-22 04-Jun-23 0 310.K.EX.A700 01 - Submit - Site layout plan and logistic arrangement [11 Jul 21] C01_7 d/w - 10h/d - No HK 0 11-Jul-21 A 19-Apr-22 Hols - No B/O periods (was 310.K.EX.A720 02 - Submit - Interface Management Plan [11 Jul 21] C1) C01_7 d/w - 10h/d - No HK 0 11-Jul-21 A 19-Apr-22 Hols - No B/O periods (was 310.K.EX.A724 03 - Submit - Detailed design and method statement of interim security fencing [11 Jul 21] C1) C01_7 d/w - 10h/d - No HK 0 21-Jul-21 A 08-Jun-22 Hols - No B/O periods (was 310.K.EX.A728 05- Submit - Method statement for construction of ducting and drawpits [8 Aug 21] C1) C01_7 d/w - 10h/d - No HK 0 07-Aug-21 A 08-Jun-22 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 6 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.K.EX.A732 06- Submit - Method statement for construction of taxiway pavement [8 Aug 21] C01_7 d/w - 10h/d - No HK 0 07-Aug-21 A 09-Nov-22 Hols - No B/O periods (was 310.K.EX.A736 07 - Submit - Method statement for construction of runway pavement [8 Aug 21] C1) C01_7 d/w - 10h/d - No HK 0 07-Aug-21 A 09-Nov-22 Hols - No B/O periods (was 310.K.EX.A740 08 - Submit - Method statement incl. temp work design & ELS for construction of box C1) C01_7 d/w - 10h/d - No HK 0 30-Aug-21 A 17-May-22 culverts [5 Sep 21] Hols - No B/O periods (was 310.K.EX.A725 04 - Submit - MS for the gnd improvement works under the new parallel taxiway incl C1) C01_7 d/w - 10h/d - No HK 0 01-Sep-21 A 19-Apr-22 removal armour rock [11 Jul 21] Hols - No B/O periods (was 310.K.EX.A744 09 - Submit - MS incl. temp work design & ELS for rock wedge Gnd improvement, seawall C1) C01_7 d/w - 10h/d - No HK 0 05-Sep-21 A 08-Nov-22 & land formation [5 Sep 21] Hols - No B/O periods (was 310.K.EX.A748 10 - Submit - Method statement for construction of civil wks for enhanced EVWL, AGL and C1) C01_7 d/w - 10h/d - No HK 0 05-Sep-21 A 15-Mar-23 its asso. diversion [5 Sep 21] Hols - No B/O periods (was 310.K.EX.A752 11 - Submit - Method statement for land formation at western end of the existing C1) C01_7 d/w - 10h/d - No HK 0 05-Sep-21 A 19-Apr-22 N-Runway [5 Sep 21] Hols - No B/O periods (was 310.K.EX.A764 14 - Submit - Method statement for construction of WVT [7 Nov 21] C1) C01_7 d/w - 10h/d - No HK 0 07-Nov-21 A 26-Jul-22 Hols - No B/O periods (was 310.K.EX.A768 15 - Submit - Method statement for construction of EVT and Road Tunnel PBA [7 Nov 21] C1) C01_7 d/w - 10h/d - No HK 0 16-Nov-21 A 20-Oct-22 Hols - No B/O periods (was 310.K.EX.A756 12 - Submit - Method statement for construction of Stage 1 aviation fuel direct buried C1) C01_7 d/w - 10h/d - No HK 0 20-Nov-21 A 14-Jun-22 pipeline [7 Nov 21] Hols - No B/O periods (was 310.K.EX.A784 18 - Submit - Method statement for construction of pavement tie-in to ex. Taxiway E&F C1) C01_7 d/w - 10h/d - No HK 0 06-Dec-21 A 06-Mar-23 incl AGL civil works [5 Dec 21] Hols - No B/O periods (was 310.K.EX.A772 16 - Submit - Method statement for installation and tie-in of various utilities to existing C1) C01_7 d/w - 10h/d - No HK 0 08-Dec-21 A 26-Jan-23 network [5 Dec 21] Hols - No B/O periods (was 310.K.EX.A796 21 - Submit - Method statement for construction of tie-in of storm water box culvert [6 Mar C1) C01_7 d/w - 10h/d - No HK 0 15-Dec-21 A 26-Jan-23 22] Hols - No B/O periods (was 310.K.EX.A780 17 - Submit - Method statement for construction of tie-in of box culvert [5 Dec 21] C1) C01_7 d/w - 10h/d - No HK 0 20-Dec-21 A 26-Jan-23 Hols - No B/O periods (was 310.K.EX.A800 22 - Submit - Method statement for construction of Airport Authority ancillary buildings [6 C1) C01_7 d/w - 10h/d - No HK 0 25-Feb-22 A 19-Apr-22 Mar 22] Hols - No B/O periods (was 310.K.EX.A788 19 - Submit - shop drawings and method statement for pre-cast unit of EVT and WVT [6 C1) C01_7 d/w - 10h/d - No HK 0 27-Mar-22* 26-Mar-22 0 Mar 22] Hols - No B/O periods (was 310.K.EX.A792 20 - Submit - Method statement for installation works of Airport/Airfield Systems and C1) C01_7 d/w - 10h/d - No HK 0 01-Apr-22* 01-Apr-22 0 equipment [6 Mar 22] Hols - No B/O periods (was 310.K.EX.A760 13 - Submit - shop drawings for interim fence and permanent fence C1) C01_7 d/w - 10h/d - No HK 0 16-Apr-22 07-Jun-22 52 Hols - No B/O periods (was 310.K.EX.A808 24 - Submit - Method statement for construction of Stage 2 aviation fuel pipeline through C1) C01_7 d/w - 10h/d - No HK 0 25-May-22* 25-May-22 0 WVT [5 Jun 22] Hols - No B/O periods (was 310.K.EX.A804 23 - Submit - Method statement for demolition of North Eastern Loading Quay and sloping C1) C01_7 d/w - 10h/d - No HK 0 01-Jun-22* 01-Jun-22 0 seawall reinstatement [5 Jun 22] Hols - No B/O periods (was 310.K.EX.A812 25 - Submit - T&C Plan for Airport Authority ancillary buildings [4 Dec 22] C1) C01_7 d/w - 10h/d - No HK 0 02-Nov-22* 02-Nov-22 0 Hols - No B/O periods (was 310.K.EX.A816 26 - Submit - T&C Plan for WVT (East to West Section) [4 Dec 22] C1) C01_7 d/w - 10h/d - No HK 0 28-Nov-22* 28-Nov-22 0 Hols - No B/O periods (was 310.K.EX.A820 27 - Submit - T&C Plan for EVT [4 Dec 22] C1) C01_7 d/w - 10h/d - No HK 0 03-Dec-22* 03-Dec-22 0 Hols - No B/O periods (was 310.K.EX.A824 28 - Submit - T&C Plan for Stage 1 and Stage 2 aviation fuel system [5 Mar 23] C1) C01_7 d/w - 10h/d - No HK 0 05-Mar-23* 05-Mar-23 0 Hols - No B/O periods (was 310.K.EX.A828 29 - Submit - T&C Plan for readiness of the existing N-Runway for test flights [5 Mar 23] C1) C01_7 d/w - 10h/d - No HK 0 05-Mar-23* 05-Mar-23 0 Hols - No B/O periods (was 310.K.EX.A832 30 - Submit - T&C Plan for readiness of the operational readiness of initial 3RS [4 Jun 23] C1) C01_7 d/w - 10h/d - No HK 0 04-Jun-23* 04-Jun-23 0 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 7 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Anticipated BD Exemption Dates [PS Appendix C5] C01_7 d/w - 10h/d - No HK Hols617 - No B/O periods 0 (was 20-Jun-21 C1) A 13-Feb-23 06-Mar-22 20-May-23 96 310.K.EX.A708 2. Stormwater drainage & box culvert system box culverts no. 18 - Structural Plan [15wks C01_7 d/w - 10h/d - No HK 0 20-Jun-21 A 25-May-22 after GI reports] Hols - No B/O periods (was 310.K.EX.A936 14. EVT Structural Plan [12 Sep 21] C1) C01_7 d/w - 10h/d - No HK 0 12-Sep-21 A 10-Dec-22 Hols - No B/O periods (was 310.K.EX.A704 1. Stormwater drainage & box culvert system box culverts no. 18 - Drainage Plan [17 Oct C1) C01_7 d/w - 10h/d - No HK 0 17-Oct-21 A 08-Jun-22 21] Hols - No B/O periods (was 310.K.EX.A712 3. Stormwater drainage & box culvert system box culverts no. 19 - Drainage Plan [17 Oct C1) C01_7 d/w - 10h/d - No HK 0 17-Oct-21 A 08-May-23 21] Hols - No B/O periods (was 310.K.EX.A716 4. Stormwater drainage & box culvert system box culverts no. 19 - Structural Plan [17 Oct C1) C01_7 d/w - 10h/d - No HK 0 17-Oct-21 A 16-May-22 21] Hols - No B/O periods (was 310.K.EX.A940 15. WVT Structural Plan [6 Mar 22] C1) C01_7 d/w - 10h/d - No HK 0 27-Mar-22* 06-Mar-22 -20 Hols - No B/O periods (was 310.K.EX.A852 8. GSE Battery Charging B - Building Plan [17 Jul 22] C1) C01_7 d/w - 10h/d - No HK 0 17-Jul-22* 17-Jul-22 0 Hols - No B/O periods (was 310.K.EX.A856 9. GSE Battery Charging B - Drainage Plan [17 Jul 22] C1) C01_7 d/w - 10h/d - No HK 0 17-Jul-22* 17-Jul-22 0 Hols - No B/O periods (was 310.K.EX.A860 10. Maintenance Facilities Forecourt & coach staging A & Bus Stop - Drainage Plan [17 C1) C01_7 d/w - 10h/d - No HK 0 17-Jul-22* 17-Jul-22 0 Jul 22] Hols - No B/O periods (was 310.K.EX.A864 11. Communications Equipment Building D - Drainage Plan [17 Jul 22] C1) C01_7 d/w - 10h/d - No HK 0 17-Jul-22* 17-Jul-22 0 Hols - No B/O periods (was 310.K.EX.A868 12. GSE Storage Area - Drainage Plan [17 Jul 22] C1) C01_7 d/w - 10h/d - No HK 0 17-Jul-22* 17-Jul-22 0 Hols - No B/O periods (was 310.K.EX.A872 13. GSE Vehicle Wash Facility - Drainage Plan [18 Sep 22] C1) C01_7 d/w - 10h/d - No HK 0 18-Sep-22* 18-Sep-22 0 Hols - No B/O periods (was 310.K.EX.A840 5. Road Tunnel Plant Building A - Foundation Plan [25 Sep 22] C1) C01_7 d/w - 10h/d - No HK 0 25-Sep-22* 25-Sep-22 0 Hols - No B/O periods (was 310.K.EX.A844 6. Road Tunnel Plant Building A - Superstructure Plan [25 Sep 22] C1) C01_7 d/w - 10h/d - No HK 0 25-Sep-22* 25-Sep-22 0 Hols - No B/O periods (was 310.K.EX.A848 7. Road Tunnel Plant Building A - Drainage Plan [25 Sep 22] C1) C01_7 d/w - 10h/d - No HK 0 25-Sep-22* 25-Sep-22 0 Hols - No B/O periods (was Option Work C1) C01_7 d/w - 10h/d - No HK Hols211 - No B/O periods 0 (was17-Jul-22 C1) 13-Feb-23 17-Jul-22 20-May-23 96 310.K.EX.A900 Option 7. C&ED Vehicle Search Bay - Foundation Plan [17 Jul 22] C01_7 d/w - 10h/d - No HK 0 17-Jul-22* 17-Jul-22 0 Hols - No B/O periods (was 310.K.EX.A904 Option 8. C&ED Vehicle Search Bay - Superstructure Plan [17 Jul 22] C1) C01_7 d/w - 10h/d - No HK 0 17-Jul-22* 17-Jul-22 0 Hols - No B/O periods (was 310.K.EX.A908 Option 9. C&ED Vehicle Traffic Control Kiosk - Foundation Plan [17 Jul 22] C1) C01_7 d/w - 10h/d - No HK 0 17-Jul-22* 17-Jul-22 0 Hols - No B/O periods (was 310.K.EX.A912 Option 10. C&ED Vehicle Traffic Control Kiosk - Superstructure Plan [17 Jul 22] C1) C01_7 d/w - 10h/d - No HK 0 17-Jul-22* 17-Jul-22 0 Hols - No B/O periods (was 310.K.EX.A916 Option 11. C&ED Operational Office and Kennel Area - Drainage Plan [18 Sep 22] C1) C01_7 d/w - 10h/d - No HK 0 18-Sep-22* 18-Sep-22 0 Hols - No B/O periods (was 310.K.EX.A876 Option 1. CAD Localizer Equipment Building - Foundation Plan [15 wks after receipt of C1) C01_7 d/w - 10h/d - No HK 0 17-Dec-22 21-Dec-22 4 Gnd Invest. Report] Hols - No B/O periods (was 310.K.EX.A880 Option 2. CAD Localizer Equipment Building - Superstructure Plan [15 wks after receipt of C1) C01_7 d/w - 10h/d - No HK 0 17-Dec-22 10-Jan-23 24 Gnd Invest. Report] Hols - No B/O periods (was 310.K.EX.A884 Option 3. CAD Localizer Equipment Building - Drainage Plan [15 wks after receipt of Gnd C1) C01_7 d/w - 10h/d - No HK 0 17-Dec-22 20-May-23 154 Invest. Report] Hols - No B/O periods (was 310.K.EX.A888 Option 4. Police Equipment Room - Foundation Plan [15 wks after receipt of Gnd Invest. C1) C01_7 d/w - 10h/d - No HK 0 13-Feb-23 13-Feb-23 0 Report] Hols - No B/O periods (was 310.K.EX.A892 Option 5. Police Equipment Room - Superstructure Plan [15 wks after receipt of Gnd C1) C01_7 d/w - 10h/d - No HK 0 13-Feb-23 13-Feb-23 0 Invest. Report] Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 8 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.K.EX.A896 Option 6. Police Equipment Room - Drainage Plan [15 wks after receipt of Gnd Invest. C01_7 d/w - 10h/d - No HK 0 13-Feb-23 13-Feb-23 0 Report] Hols - No B/O periods (was Cost Centre #01 - Preliminaries and General Requirements C1) C01_7 d/w - 10h/d - No HK Hols1167 - No B/O periods 0 (was 20-Jun-21 C1) A 30-Aug-24 30-Mar-22 01-Sep-24 2 CC#1 ----- Design and Submission ----- C01_7 d/w - 10h/d - No HK Hols741 - No B/O periods 0 (was 21-Jun-21 C1) A 02-Jul-23 31-Mar-22 30-Jun-24 364 Management Plan Submission C01_7 d/w - 10h/d - No HK Hols283 - No B/O periods 0 (was 21-Jun-21 C1) A 31-Mar-22 31-Mar-22 30-Jun-24 822 01 - Site Layout Plan and Logistics Arrangement [PS App C1; 5wks] C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 11-Jul-21 C1) A 11-Jul-21 A 19-Apr-22 19-Apr-22 310.D.EX.A921 Site Layout Plan and Logistics Management - submit document to PM [PS App C1, 5wks] C01_7 d/w - 10h/d - No HK 0 11-Jul-21 A 19-Apr-22 Hols - No B/O periods (was 02 - Interface Management Plan [PS App C1; 5wks] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 11-Jul-21 C1) A 11-Jul-21 A 19-Apr-22 19-Apr-22 310.D.EX.A925 Interface Management Plan - Submit document to PM [PS App C1, 5wks] C01_7 d/w - 10h/d - No HK 0 11-Jul-21 A 19-Apr-22 Hols - No B/O periods (was Site Management Plan [PS13.2.1; within 21d of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 27-Jun-21 C1) A 27-Jun-21 A 19-Apr-22 19-Apr-22 310.D.EX.A929 Site Management Plan - Submit document to PM [PS13.2.1; within 21d of starting date] C01_7 d/w - 10h/d - No HK 0 27-Jun-21 A 19-Apr-22 Hols - No B/O periods (was Management Quality Plan [PS11.2; within 28d of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 05-Jul-21 C1) A 05-Jul-21 A 30-Jun-24 30-Jun-24 310.D.EX.A945 Management Quality Plan - Submit document to PM [PS11.2; within 28d of starting date] C01_7 d/w - 10h/d - No HK 0 05-Jul-21 A 30-Jun-24 Hols - No B/O periods (was Design Quality Plan [PS11.3; within 28d of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 05-Jul-21 C1) A 05-Jul-21 A 30-Jun-24 30-Jun-24 310.D.EX.A949 Design Quality Plan - Submit document to PM [PS11.2; within 28d of starting date] C01_7 d/w - 10h/d - No HK 0 05-Jul-21 A 30-Jun-24 Hols - No B/O periods (was Project Health and Safety Management Plan [PS12.1; within 14d of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 21-Jun-21 C1) A 21-Jun-21 A 30-Jun-24 30-Jun-24 310.D.EX.A953 Project Health and Safety Management Plan - Submit document to PM [PS12.1; within C01_7 d/w - 10h/d - No HK 0 21-Jun-21 A 30-Jun-24 14d of starting date] Hols - No B/O periods (was Project Health and Safety Management Manual [PS12.1; within 14d of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 21-Jun-21 C1) A 21-Jun-21 A 30-Jun-24 30-Jun-24 310.D.EX.A956 Project Health and Safety Management Manual - Submit document to PM [PS12.1; within C01_7 d/w - 10h/d - No HK 0 21-Jun-21 A 30-Jun-24 14d of starting date] Hols - No B/O periods (was Detail Environmental Management Plan [PS14.1.4; within 28d of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 05-Jul-21 C1) A 05-Jul-21 A 30-Jun-24 30-Jun-24 310.D.EX.A960 Detail Environmental Management Plan - Submit document to PM [PS14.1.4; within 28d C01_7 d/w - 10h/d - No HK 0 05-Jul-21 A 30-Jun-24 of starting date] Hols - No B/O periods (was Sustainable Construction Management Plan [PS14.3.2; within 2M of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 18-Aug-21 C1) A 18-Aug-21 A 30-Jun-24 30-Jun-24 310.D.EX.A964 Sustainable Construction Management Plan - Submit document to PM [PS14.3.2; within C01_7 d/w - 10h/d - No HK 0 18-Aug-21 A 30-Jun-24 2M of starting date] Hols - No B/O periods (was Contract-specific Waste Management Plan (WMP) C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 05-Jul-21 C1) A 05-Jul-21 A 30-Jun-24 30-Jun-24 310.D.EX.A1004 Contract Specific Waste Management Plan - Submit document to PM [PS14.1.6; within C01_7 d/w - 10h/d - No HK 0 05-Jul-21 A 30-Jun-24 28d of starting date] Hols - No B/O periods (was Construction and Demolition Material Management Plan C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was31-Mar-22 C1) 31-Mar-22 31-Mar-22 31-Mar-22 0 310.D.EX.A1008 Construction and Demolition Material Management Plan - Submit document to PM C01_7 d/w - 10h/d - No HK 0 31-Mar-22* 31-Mar-22 0 Hols - No B/O periods (was Site Management Plan for Trip Ticket Implementation C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 28-Oct-21 C1) A 28-Oct-21 A 30-Jun-24 30-Jun-24 310.D.EX.A1012 Site Management Plan for Trip Ticket Implementation - Submit document to PM C01_7 d/w - 10h/d - No HK 0 28-Oct-21 A 30-Jun-24 Hols - No B/O periods (was Contract-specific Spill Response Plan (SRP) C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 05-Jul-21 C1) A 05-Jul-21 A 30-Jun-24 30-Jun-24 310.D.EX.A1016 Contract-specific Spill Response Plan (SRP) - Submit document to PM C01_7 d/w - 10h/d - No HK 0 05-Jul-21 A 30-Jun-24 Hols - No B/O periods (was Design Management Plan [PS15.2.5; within 1M of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 08-Jul-21 C1) A 08-Jul-21 A 30-Jun-24 30-Jun-24 310.D.EX.A968 Design Management Plan - Submit document to PM [PS15.2.5; within 1M of starting date] C01_7 d/w - 10h/d - No HK 0 08-Jul-21 A 30-Jun-24 Hols - No B/O periods (was Subcontractor Management Plan [PS22.1.1; within 28d of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 02-Jul-21 C1) A 02-Jul-21 A 30-Jun-24 30-Jun-24 310.D.EX.A972 Subcontractor Management Plan - Submit document to PM [PS22.1.1; within 28d of C01_7 d/w - 10h/d - No HK 0 02-Jul-21 A 30-Jun-24 starting date] Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 9 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S BIM Project Execution Plan (PXP) [PS26.1; within 1M of starting date] C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 08-Jul-21 C1) A 08-Jul-21 A 30-Jun-24 30-Jun-24 310.D.EX.A976 BIM Project Execution Plan (PXP) - Submit document to PM [PS26.1; within 1M of C01_7 d/w - 10h/d - No HK 0 08-Jul-21 A 30-Jun-24 starting date] Hols - No B/O periods (was Risk Management Plan [PS27.1; within 1M after starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 08-Jul-21 C1) A 08-Jul-21 A 30-Jun-24 30-Jun-24 310.D.EX.A980 Risk Management Plan - Submit document to PM [PS27.1; within 1M after starting date] C01_7 d/w - 10h/d - No HK 0 08-Jul-21 A 30-Jun-24 Hols - No B/O periods (was Initial Risk Register [PS27.3; within 1M after starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 07-Jul-21 C1) A 07-Jul-21 A 19-Apr-22 19-Apr-22 310.D.EX.A984 Initial Risk Register - Submit document to PM [PS27.3; within 1M after starting date] C01_7 d/w - 10h/d - No HK 0 07-Jul-21 A 19-Apr-22 Hols - No B/O periods (was Initial Subcontracting Strategy for Providing the Works [PS32.3; within 28d of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 04-Jul-21 C1) A 04-Jul-21 A 19-Apr-22 19-Apr-22 310.D.EX.A988 Initial Subcontracting Strategy for Providing the Works - Submit document to PM [PS32.3; C01_7 d/w - 10h/d - No HK 0 04-Jul-21 A 19-Apr-22 within 28d of starting date] Hols - No B/O periods (was Programme Submission C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 27-Jun-21 C1) A 27-Jun-21 A 19-Apr-22 19-Apr-22 Programme [PS10.1.1; within 21d of starting date] C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 27-Jun-21 C1) A 27-Jun-21 A 19-Apr-22 19-Apr-22 310.D.EX.A933 Programme - Submit document to PM [PS10.1.1; within 21d of starting date] C01_7 d/w - 10h/d - No HK 0 27-Jun-21 A 19-Apr-22 Hols - No B/O periods (was Testing and Commissioning Plan for the readiness of the existing North Runway for test flights C1) C01_7 d/w - 10h/d - No HK Hols28 - No B/O periods 0 (was05-Mar-23 C1) 02-Apr-23 05-Mar-23 29-Mar-24 362 310.D.EX.A130 T&C Plan for readiness of Ex. North Runway for test flights - Preparation of T&C plan C01_7 d/w - 10h/d - No HK 0 05-Mar-23 05-Mar-23 0 Hols - No B/O periods (was 310.D.EX.A992 T&C Plan for readiness of Ex. North Runway for test flights - PM review and acceptance C1) C01_7 d/w - 10h/d - No HK 0 02-Apr-23 29-Mar-24 362 Hols - No B/O periods (was Testing and commissioning plan for the operational readiness of initial 3RS C1) C01_7 d/w - 10h/d - No HK Hols28 - No B/O periods 0 (was04-Jun-23 C1) 02-Jul-23 04-Jun-23 29-Mar-24 271 310.D.EX.A1000 T&C Plan for Operational Readiness of Initial 3RS - Preparation of T&C Plan C01_7 d/w - 10h/d - No HK 0 04-Jun-23 04-Jun-23 0 Hols - No B/O periods (was 310.D.EX.A996 T&C Plan for Operational Readiness of Initial 3RS - PM review and acceptance C1) C01_7 d/w - 10h/d - No HK 0 02-Jul-23 29-Mar-24 271 Hols - No B/O periods (was CC#1 ----- Procurement ----- C1) C01_7 d/w - 10h/d - No HK Hols17 - No B/O periods 0 (was 20-Jun-21 C1) A 07-Jul-21 A 19-Apr-22 30-Jun-24 Appointment of Coordination Manager [PS9.1 within 14d of starting date] C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 20-Jun-21 C1) A 20-Jun-21 A 19-Apr-22 19-Apr-22 310.P.EX.A010 Appointment of Coordination Manager [PS9.1; within 14d of starting date] C01_7 d/w - 10h/d - No HK 0 20-Jun-21 A 19-Apr-22 Hols - No B/O periods (was Appointment of BIM Manager [PS26.2 within 1M of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 07-Jul-21 C1) A 07-Jul-21 A 30-Jun-24 30-Jun-24 310.P.EX.A014 Appointment of BIM Manager [PS26.2; within 1M of starting date] C01_7 d/w - 10h/d - No HK 0 07-Jul-21 A 30-Jun-24 Hols - No B/O periods (was Appointment of Risk Manager [PS27.2 within 1M of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 07-Jul-21 C1) A 07-Jul-21 A 19-Apr-22 19-Apr-22 310.P.EX.A018 Appointment of Risk Manager [PS27.2; within 1M of starting date] C01_7 d/w - 10h/d - No HK 0 07-Jul-21 A 19-Apr-22 Hols - No B/O periods (was CC#1 ----- Construction ----- C1) C01_7 d/w - 10h/d - No HK Hols404 - No B/O periods 0 (was 30-Jun-21 C1) A 08-Aug-22 30-Mar-22 01-Sep-22 24 Provide Hygene and Welfare Facility for Workers [PS13.9.1 within 28d of starting date] C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 30-Jun-21 C1) A 30-Jun-21 A 30-Mar-22 30-Mar-22 310.C.EX.A100 Provide Hygiene and Welfare Facility for Workers [PS13.9.1; within 28d of starting date] C01_7 d/w - 10h/d - No HK 0 30-Jun-21 A 30-Mar-22 Hols - No B/O periods (was Provide Land Transportation for Client, PM ... [PS24.1.1 within 2M of starting date] C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 30-Sep-21 C1) A 30-Sep-21 A 30-Mar-22 30-Mar-22 310.C.EX.A104 Provide Land Transportation for Client, PM... [PS24.1.1; within 2M of starting date] C01_7 d/w - 10h/d - No HK 0 30-Sep-21 A 30-Mar-22 Hols - No B/O periods (was Application of AHR exemption from CAD for infringement of the gazetted AHRP after Ex. N-Runway close C1) C01_7 d/w - 10h/d - No HK Hols135 - No B/O periods 0 (was27-Mar-22 C1) 08-Aug-22 20-Apr-22 01-Sep-22 24 310.C.EX.A108 Exemption of AHRP after Ex. N-Runway closure - Prepare application document C01_7 d/w - 10h/d - No HK 30 27-Mar-22 25-Apr-22 20-Apr-22 19-May-22 24 Hols - No B/O periods (was 310.C.EX.A112 Exemption of AHRP after Ex. N-Runway closure - PM review and comment C1) C01_7 d/w - 10h/d - No HK 28 26-Apr-22 23-May-22 20-May-22 16-Jun-22 24 Hols - No B/O periods (was 310.C.EX.A116 Exemption of AHRP after Ex. N-Runway closure - Address PM comments C1) C01_7 d/w - 10h/d - No HK 21 24-May-22 13-Jun-22 17-Jun-22 07-Jul-22 24 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 10 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.A120 Exemption of AHRP after Ex. N-Runway closure - PM accept C01_7 d/w - 10h/d - No HK 28 14-Jun-22 11-Jul-22 08-Jul-22 04-Aug-22 24 Hols - No B/O periods (was 310.C.EX.A124 Exemption of AHRP after Ex. N-Runway closure - CAD review and approval C1) C01_7 d/w - 10h/d - No HK 28 12-Jul-22 08-Aug-22 05-Aug-22 01-Sep-22 24 Hols - No B/O periods (was CC#1 ----- Testing and Commissioning ----- C1) C01_7 d/w - 10h/d - No HK Hols156 - No B/O periods 0 (was28-Mar-24 C1) 30-Aug-24 30-Mar-24 01-Sep-24 2 Testing and Commissioning for readiness of the existing North Runway to test flights C01_7 d/w - 10h/d - No HK Hols146 - No B/O periods 0 (was28-Mar-24 C1) 20-Aug-24 30-Mar-24 25-Aug-24 5 310.C.EX.A324 Testing and Commissioning for readiness of the existing North Runway to test flights C01_7 d/w - 10h/d - No HK 90 28-Mar-24 25-Jun-24 30-Mar-24 27-Jun-24 2 Hols - No B/O periods (was 310.C.EX.A944 Tentative Commencement Date of Flight Test for Middle Runway [PS 10.2.82] C1) C01_7 d/w - 10h/d - No HK 0 26-Jun-24 28-Jun-24 2 Hols - No B/O periods (was 310.C.EX.A948 Tentative Flight test period [8 weeks, PS 10.2.82] (remove security fence along the cross C1) C01_7 d/w - 10h/d - No HK 56 26-Jun-24 20-Aug-24 28-Jun-24 22-Aug-24 2 over taxiway, PS 10.2.83) Hols - No B/O periods (was 310.C.EX.A320 Miscellaneous Works & Final T&C for the Operational Readiness of Initial 3RS to achieve C1) C01_7 d/w - 10h/d - No HK 27 24-Jul-24 19-Aug-24 27-Jul-24 22-Aug-24 3 KD-12 Hols - No B/O periods (was 310.C.EX.A952 Achieve KD-12 after flight test completed C1) C01_7 d/w - 10h/d - No HK 0 20-Aug-24 25-Aug-24 5 Hols - No B/O periods (was Testing and commissioning for the operational readiness of initial 3RS C1) C01_7 d/w - 10h/d - No HK Hols10 - No B/O periods 0 (was21-Aug-24 C1) 30-Aug-24 23-Aug-24 01-Sep-24 2 310.C.EX.A950 Remove Remaining Equipment off site, Miscellaneous works to achieve KD-13 C01_7 d/w - 10h/d - No HK 10 21-Aug-24 30-Aug-24 23-Aug-24 01-Sep-24 2 Hols - No B/O periods (was 310.C.EX.A951 Achieve KD-13 C1) C01_7 d/w - 10h/d - No HK 0 30-Aug-24 01-Sep-24 2 Hols - No B/O periods (was Cost Centre #02 - Land Formation and Ground Treatment Works C1) 932 91 12-Jun-21 A 30-Jul-24 28-Mar-22 25-Aug-24 22 CC#02 ----- Design and Others----- C01_7 d/w - 10h/d - No HK Hols388 - No B/O periods 0 (was 06-Aug-21 C1) A 28-Aug-22 28-Mar-22 01-Sep-22 4 Reclamation - Design of Temporary Marine Platform Erection C01_7 d/w - 10h/d - No HK Hols30 - No B/O periods 0 (was 06-Aug-21 C1) A 15-Oct-21 A 28-Mar-22 28-Mar-22 310.D.G3.F010 Marine Platform Design - prepare and submit with ICE C01_7 d/w - 10h/d - No HK 30 06-Aug-21 A 15-Oct-21 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was Reclamation - Demolition Plan for Demolish Approach Light Columns and Bridge C1) C01_7 d/w - 10h/d - No HK Hols246 - No B/O periods 0 (was 26-Dec-21 C1) A 28-Aug-22 31-Mar-22 01-Sep-22 4 310.D.G3.F122 Demolition Plan for Demolish Approach Light Bridge - prepare design and submit with ICE C01_7 d/w - 10h/d - No HK 60 26-Dec-21 A 27-Apr-22 31-Mar-22 01-May-22 4 Hols - No B/O periods (was 310.D.G3.F126 Demolition Plan for Demolish Approach Light Bridge - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 28-Apr-22 25-May-22 02-May-22 29-May-22 4 Hols - No B/O periods (was 310.D.G3.F130 Demolition Plan for Demolish Approach Light Bridge - ICC, M&VC review design and C1) C01_7 d/w - 10h/d - No HK 21 26-May-22 15-Jun-22 30-May-22 19-Jun-22 4 issue check certificates Hols - No B/O periods (was 310.D.G3.F146 Demolition Plan for Demolish Approach Light Bridge - BD approve C1) C01_7 d/w - 10h/d - No HK 60 16-Jun-22 14-Aug-22 20-Jun-22 18-Aug-22 4 Hols - No B/O periods (was 310.D.G3.F150 Demolition Plan for Demolish Approach Light Bridge - prepare and submit Form BA8 and C1) C01_7 d/w - 10h/d - No HK 7 15-Aug-22 21-Aug-22 19-Aug-22 25-Aug-22 4 grant consent Hols - No B/O periods (was 310.D.G3.F154 Demolition Plan for Demolish Approach Light Bridge - prepare and submit Form BA10 to C1) C01_7 d/w - 10h/d - No HK 7 22-Aug-22 28-Aug-22 26-Aug-22 01-Sep-22 4 notify work commencement Hols - No B/O periods (was Reclamation - Notification of works C1) C01_7 d/w - 10h/d - No HK Hols 7- No B/O periods 0 (was 26-Aug-21 C1) A 01-Sep-21 A 19-Apr-22 19-Apr-22 310.D.R0.L356 Reclamation - Submit Form BA10 for notification of DJM commencement C01_7 d/w - 10h/d - No HK 7 26-Aug-21 A 01-Sep-21 A 19-Apr-22 19-Apr-22 Hols - No B/O periods (was CC#02 ----- Method Statement----- C1) C01_7 d/w - 10h/d - No HK Hols383 - No B/O periods 0 (was 12-Jun-21 C1) A 29-Jun-22 28-Mar-22 03-Dec-23 522 MS no. 9 - Method Statement for Seawall Construction incl. temp Platform Erection C01_7 d/w - 10h/d - No HK Hols205 - No B/O periods 0 (was 06-Aug-21 C1) A 26-Nov-21 A 28-Mar-22 28-Mar-22 310.D.G3.F082 MS no.9 - for Seawall construction incl temp Platform erection - prepare document C01_7 d/w - 10h/d - No HK 30 06-Aug-21 A 11-Sep-21 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.D.G3.F086 MS no.9 - for Seawall construction incl temp platform erection - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 13-Sep-21 A 26-Nov-21 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was MS no. 9 - Method Statement for Temp Wks & ELS for Rock Wedge Ground Improvement, etc C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was 06-Aug-21 C1) A 18-Nov-21 A 28-Mar-22 28-Mar-22 310.D.G3.F158 MS no.9 - for Temp Works & ELS for Rock Wedge Ground Improvement, Seawall & land C01_7 d/w - 10h/d - No HK 30 06-Aug-21 A 11-Sep-21 A 28-Mar-22 28-Mar-22 formation - prepare document Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 11 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.G3.F162 MS no.9 - for Temp Works & ELS for Rock Wedge Ground Improvement, Seawall & land C01_7 d/w - 10h/d - No HK 28 12-Sep-21 A 18-Nov-21 A 28-Mar-22 28-Mar-22 formation - PM review and accept Hols - No B/O periods (was MS no. 4 - Remaining Ground Improvement Works Under the New Taxiway C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was 12-Jun-21 C1) A 17-Sep-21 A 28-Mar-22 28-Mar-22 310.D.G3.F098 MS no.4 - Remaining Ground Improvement Works Under the New Taxiway - prepare C01_7 d/w - 10h/d - No HK 30 12-Jun-21 A 11-Jul-21 A 28-Mar-22 28-Mar-22 document Hols - No B/O periods (was 310.D.G3.F102 MS no.4 - Remaining Ground Improvement Works Under the New Taxiway - PM review C1) C01_7 d/w - 10h/d - No HK 28 12-Jul-21 A 17-Sep-21 A 28-Mar-22 28-Mar-22 and accept Hols - No B/O periods (was MS no. 11 - Method Statement for Land Formation at the Western end of Existing North Runway C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was 06-Aug-21 C1) A 03-Nov-21 A 19-Apr-22 19-Apr-22 310.D.G3.F090 MS no.11 - for Land Formation at the Western end of Existing North Runway - prepare C01_7 d/w - 10h/d - No HK 30 06-Aug-21 A 11-Sep-21 A 19-Apr-22 19-Apr-22 document Hols - No B/O periods (was 310.D.G3.F094 MS no.11 - for Land Formation at the Western end of Existing North Runway - PM review C1) C01_7 d/w - 10h/d - No HK 28 12-Sep-21 A 03-Nov-21 A 19-Apr-22 19-Apr-22 and accept Hols - No B/O periods (was MS no. 23 - Method Statement for Demolition of NE Loading Quay and Seawall Reinstatement C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was03-May-22 C1) 29-Jun-22 03-May-22 03-Dec-23 522 310.D.TX.F140 MS no.23 - Method Statement for Demolition of NE Loading Quay and Seawall C01_7 d/w - 10h/d - No HK 30 03-May-22 01-Jun-22 03-May-22 01-Jun-22 0 Reinstatement - prepare document Hols - No B/O periods (was 310.D.TX.F144 MS no.23 - Method Statement for Demolition of NE Loading Quay and Seawall C1) C01_7 d/w - 10h/d - No HK 28 02-Jun-22 29-Jun-22 06-Nov-23 03-Dec-23 522 Reinstatement - PM review and accept Hols - No B/O periods (was CC#02 ----- Procurement ----- C1) C01_7 d/w - 10h/d - No HK Hols281 - No B/O periods 0 (was 09-Aug-21 C1) A 06-Jan-22 A 28-Mar-22 02-Sep-22 Subletting - Reclamation Works in Works Area 3310/11 & 3310/08 C01_7 d/w - 10h/d - No HK Hols281 - No B/O periods 0 (was 09-Aug-21 C1) A 06-Jan-22 A 28-Mar-22 02-Sep-22 310.P.G3.F118 3310/11 Subletting - Temporary Working Platform for Marine Works - Award sub-contract C01_7 d/w - 10h/d - No HK 90 09-Aug-21 A 15-Nov-21 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.P.EX.H190 Area E2b & E5: Subletting - Cement Supply for DJM - Award supplier C1) C01_7 d/w - 10h/d - No HK 17 17-Sep-21 A 12-Nov-21 A 26-Apr-22 26-Apr-22 Hols - No B/O periods (was 310.P.G3.F166 3310/11Subletting - Ground Improvement Works DJM - Award sub-contract C1) C01_7 d/w - 10h/d - No HK 17 17-Sep-21 A 18-Nov-21 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.P.EX.H189 Area E2b & E5: Subletting - Ground Improvement Works DJM - Award sub-contract C1) C01_7 d/w - 10h/d - No HK 17 17-Sep-21 A 18-Nov-21 A 30-Mar-22 30-Mar-22 Hols - No B/O periods (was 310.P.G3.F214 3310/11 Subletting - Removal of Existing Structures - Stage 1&2 C1) C01_7 d/w - 10h/d - No HK 90 17-Sep-21 A 06-Jan-22 A 02-Sep-22 02-Sep-22 Preparation,Submission& Apvl,Tender&Award Hols - No B/O periods (was 310.P.G3.F218 3310/11 Subletting - Cement Supply for DJM - Award supplier C1) C01_7 d/w - 10h/d - No HK 17 26-Sep-21 A 18-Nov-21 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.P.G3.F190 Subletting - Land Formation in Works Area 3310/11 - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 06-Jan-22 A 16-May-22 16-May-22 Approval,Tender&Award sub-contract Hols - No B/O periods (was CC#02 ----- Construction ----- C1) 886 91 31-Jul-21 A 23-Jul-24 28-Mar-22 17-Aug-24 22 CC#02 - 3310/11 - Area G1 & G2 - Reclamation Works 259 13 02-Nov-21 A 20-Oct-22 12-Apr-22 20-Oct-22 0 CC#02 - 3310/11 - Area G1 & G2 - Site Preparation C11_6 d/w - 10h/d - With HK Hols4 - No B/O 0periods (was 02-Nov-21 C3) A 10-Nov-21 A 19-Apr-22 19-Apr-22 310.C.G1.J100 3310/11 - Area G1&G2 - Site setup C11_6 d/w - 10h/d - With 4 02-Nov-21 A 10-Nov-21 A 19-Apr-22 19-Apr-22 HK Hols - No B/O periods CC#02 - 3310/11 - Area G1 & G2 - DJM for Rock Wedge with Testing (was C3) 160 8 11-Nov-21 A 23-Jul-22 12-Apr-22 14-Aug-22 18 310.C.G1.J107 3310/11 - Area G1&G2 - CPT for DJM C11_6 d/w - 10h/d - With 32 2 11-Nov-21 A 28-Nov-21 A 19-Apr-22 19-Apr-22 HK Hols - No B/O periods 310.C.G1.J115.B02 3310/11 - Area G1 - Plant mobilization (was C11_6C3) d/w - 10h/d - With 3 12-Apr-22 14-Apr-22 12-Apr-22 14-Apr-22 0 HK Hols - No B/O periods 310.C.G1.J112 3310/11 - Area G1 - construct DJM for rock wedge [436nos. @1.5 no./shift/rig; use 4 rigs (was C11_6C3) d/w - 10h/d - With 40 3 19-Apr-22 06-Jun-22 19-Apr-22 06-Jun-22 0 @2-shifts] HK Hols - No B/O periods 310.C.G1.J112.B02 3310/11 - Area G2 - construct DJM for rock wedge [88nos. @1.5 no./2-shifts/rig; use 2 (was C11_6C3) d/w - 10h/d - With 32 3 12-May-22 18-Jun-22 12-May-22 18-Jun-22 0 rigs] HK Hols - No B/O periods 310.C.G1.J140 3310/11 - Area G1&G2 - DJM coring, testing & reporting (was C01_7C3) d/w - 10h/d - No HK 35 19-Jun-22 23-Jul-22 11-Jul-22 14-Aug-22 22 Hols - No B/O periods (was CC#02 - 3310/11 - Area G1 & G2 - Backfilling C1) C11_6 d/w - 10h/d - With HK Hols 116- No B/O 5periods (was 02-Jun-22 C3) 20-Oct-22 02-Jun-22 20-Oct-22 0
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 12 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.G1.J143 3310/11 - Area G1&G2 - remove armour rock along old seawall w/ transition layer [208m2 C11_6 d/w - 10h/d - With 61 02-Jun-22 13-Aug-22 02-Jun-22 13-Aug-22 0 x 293m=60944m3; @250m3/d/wf; 4wf] HK Hols - No B/O periods 310.C.G1.J152 3310/11 - Area G1&G2 - construct new seawall at final alignment (was C11_6C3) d/w - 10h/d - With 24 01-Aug-22 27-Aug-22 01-Aug-22 27-Aug-22 0 HK Hols - No B/O periods 310.C.G1.J136 3310/11 - Area G1&G2 - backfill from +3.0 to +6.5mPD [174,926m3 @350m3/d/wf; 10wf] (was C11_6C3) d/w - 10h/d - With 55 5 15-Aug-22 20-Oct-22 15-Aug-22 20-Oct-22 0 HK Hols - No B/O periods CC#02 - 3310/11 - Area G3 - Reclamation Works (was C3) 324 35 03-Nov-21 A 04-Mar-23 28-Mar-22 10-Apr-23 27 CC#02 - 3310/11 - Area G3 - Site Preparation 4 0 03-Nov-21 A 05-Sep-22 28-Mar-22 06-Sep-22 1 310.C.G3.J200 3310/11 - Area G3 - site preparation & plant mobilization C03_7 d/w - 10h/d - With 4 03-Nov-21 A 06-Nov-21 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.C.G3.J010 3310/11 - Area G3 - assume closure date of Ex. N-Runway C11_6 d/w - 10h/d - With 0 01-Sep-22 02-Sep-22 1 HK Hols - No B/O periods 310.C.G3.J232 3310/11 - Area G3 - decommissioning of approach light (was C11_6C3) d/w - 10h/d - With 4 01-Sep-22 05-Sep-22 02-Sep-22 06-Sep-22 1 HK Hols - No B/O periods CC#02 - 3310/11 - Area G3 - Construct Temporary Marine Platform (was C3) 205 4 07-Nov-21 A 21-Jan-22 A 28-Mar-22 28-Mar-22 310.C.G3.J308 3310/11 - Area G3 - install pipe pile for temp steel platform [70nos. @4nos./d/wf; 2wf] C03_7 d/w - 10h/d - With 13 3 07-Nov-21 A 24-Nov-21 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.C.G3.J312 3310/11 - Area G3 - construct steel platform deck C03_7 d/w - 10h/d - With 27 1 25-Nov-21 A 04-Jan-22 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.C.G3.J399.B01 3310/11 - Area G3 - Silt Curtain Installation C11_6 d/w - 10h/d - With 10 05-Jan-22 A 15-Jan-22 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.C.G3.J393.B01 3310/11 - Area G3 - Environmental inspection/Dolphin Observation (was C01_7C3) d/w - 10h/d - No HK 7 15-Jan-22 A 21-Jan-22 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was CC#02 - 3310/11 - Area G3 - DJM along Approach Light Structure with Testing C1) C03_7 d/w - 10h/d - With HK Hols 338- No B/O 5periods 21-Jan-22 A 03-Feb-23 28-Mar-22 17-Feb-23 14 310.C.G3.J204 3310/11 - Area G3 (within Temp. Platform) - construct DJM [60nos. @1.5 no./shift/rig; use C03_7 d/w - 10h/d - With 32 2 21-Jan-22 A 14-Mar-22 A 28-Mar-22 28-Mar-22 2 rigs] HK Hols - No B/O periods 310.C.G3.J206.B01 3310/11 - Area G3 (within Temp. Platform) - construct Remaining DJM [16 no. @1.5 C03_7 d/w - 10h/d - With 12 1 25-Mar-22 A 30-Mar-22 08-May-22 11-May-22 36 no./2-shift/rig; use 2 rigs] HK Hols - No B/O periods 310.C.G3.J208.B01 3310/11 - Area G3 (outside Temp. Platform) - construct DJM [60 nos. @1.5 no./shift/rig; C03_7 d/w - 10h/d - With 22 2 02-Dec-22 23-Dec-22 02-Dec-22 23-Dec-22 0 use 2 rigs] HK Hols - No B/O periods 310.C.G3.J208 3310/11 - Area G3 - DJM test (along Approach Light Structure) and reporting C03_7 d/w - 10h/d - With 28 24-Dec-22 27-Jan-23 24-Dec-22 27-Jan-23 0 HK Hols - No B/O periods 310.C.G3.J324 3310/11 - Area G3 - remove temp platform (fill area) (24hrs/d; 7d) C03_7 d/w - 10h/d - With 7 28-Jan-23 03-Feb-23 11-Feb-23 17-Feb-23 14 HK Hols - No B/O periods CC#02 - 3310/11 - Area G3 - Seawall Structure at West End of Old North Runway 252 7 28-Jan-22 A 05-Dec-22 28-Mar-22 10-Apr-23 99 CC#02 - 3310/11 - Area G3 - West End Seawall - Cutting of Existing Approach Light Post 75 2 06-Sep-22 05-Dec-22 07-Sep-22 10-Apr-23 99 310.C.G3.J148 3310/11 - Area G3 - West End Seawall - decommissioning of approach light and cut C03_7 d/w - 10h/d - With 11 2 06-Sep-22 17-Sep-22 07-Sep-22 18-Sep-22 1 approach light post [2 no, 1wf] HK Hols - No B/O periods 310.C.G3.J316 3310/11 - Area G3 - cut approach light post [8 no. @2d/no./wf, 1wf] C11_6 d/w - 10h/d - With 16 14-Nov-22 01-Dec-22 14-Nov-22 01-Dec-22 0 HK Hols - No B/O periods 310.C.G3.J304 3310/11 - Area G3 - demolish approach light - submit Form BA14 for completion of work (was C01_7C3) d/w - 10h/d - No HK 4 02-Dec-22 05-Dec-22 07-Apr-23 10-Apr-23 126 Hols - No B/O periods (was CC#02 - 3310/11 - Area G3 - West End Seawall - DJM Wall Construction with Testing C1) 68 3 28-Jan-22 A 27-Apr-22 28-Mar-22 10-Feb-23 237 310.C.G3.J104 3310/11 - Area G3 - West End Seawall - Plant Mobilization, condition survey and site C11_6 d/w - 10h/d - With 9 28-Jan-22 A 05-Feb-22 A 28-Mar-22 28-Mar-22 setup HK Hols - No B/O periods 310.C.G3.J124 3310/11 - Area G3 - West End Seawall - Construct DJM Wall [98 nos. @1.5 no./shift/rig; (was C3) C03_7 d/w - 10h/d - With 27 3 06-Feb-22 A 16-Mar-22 A 28-Mar-22 28-Mar-22 use 3 rigs] HK Hols - No B/O periods 310.C.G3.J156 3310/11 - Area G3 - West End Seawall - testing and reporting C01_7 d/w - 10h/d - No HK 28 31-Mar-22 27-Apr-22 07-Jul-22 03-Aug-22 98 Hols - No B/O periods (was 310.C.G3.J320 3310/11 - Area G3 - remove temp platform (seawall) (24hrs/d; 7d) C1) C03_7 d/w - 10h/d - With 7 14-Apr-22 24-Apr-22 04-Feb-23 10-Feb-23 279 HK Hols - No B/O periods
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 13 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S CC#02 - 3310/11 - Area G3 - West End Seawall - Seawall Armour Placing C11_6 d/w - 10h/d - With HK Hols 17- No B/O 2periods (was 27-Oct-22 C3) 15-Nov-22 13-Jan-23 04-Feb-23 65 310.C.G3.J152 3310/11 - Area G3 - West End Seawall - place "final" seawall armour C11_6 d/w - 10h/d - With 17 2 27-Oct-22 15-Nov-22 13-Jan-23 04-Feb-23 65 HK Hols - No B/O periods CC#02 - 3310/11 - Area G3 - DJM for Rock Wedge with Testing (was C03_7C3) d/w - 10h/d - With HK Hols 59- No B/O 3periods 02-Dec-22 05-Feb-23 02-Dec-22 05-Feb-23 0 310.C.G3.J224 3310/11 - Area G3 - construct DJM (Area G3) for Rock Wedge [214nos. @1.5 C03_7 d/w - 10h/d - With 31 3 02-Dec-22 04-Jan-23 02-Dec-22 04-Jan-23 0 no./shift/rig; use 3 rigs @2-shifts] HK Hols - No B/O periods 310.C.G3.J228 3310/11 - Area G3 - test and reporting for rock wedge DJM (Area G3) C03_7 d/w - 10h/d - With 28 05-Jan-23 05-Feb-23 05-Jan-23 05-Feb-23 0 HK Hols - No B/O periods CC#02 - 3310/11 - Area G3 - Removal of Rock Wedge along Old Seawall C11_6 d/w - 10h/d - With HK Hols 48- No B/O 3periods (was 05-Jan-23 C3) 04-Mar-23 18-Jan-23 17-Mar-23 11 310.C.G3.J244 3310/11 - Area G3 - remove armour rock along old seawall w/ transition layer [208mL x C11_6 d/w - 10h/d - With 24 2 05-Jan-23 04-Feb-23 18-Jan-23 17-Feb-23 11 40m2= 8320m3; @250m3/d/wf; 2wf] HK Hols - No B/O periods 310.C.G3.J248 3310/11 - Area G3 - backfill to +6.5mPD after remove armour rock [37,440m3; 5wf] (was C11_6C3) d/w - 10h/d - With 24 1 06-Feb-23 04-Mar-23 18-Feb-23 17-Mar-23 11 HK Hols - No B/O periods CC#02 - 3310/11 - Area G3 - Backfilling (was C3) 113 13 19-Sep-22 05-Feb-23 19-Sep-22 17-Feb-23 11 CC#02 - 3310/11 - Area G3 - West End Seawall - Seawall Core Material Filling C11_6 d/w - 10h/d - With HK Hols 31- No B/O 3periods (was 19-Sep-22 C3) 26-Oct-22 19-Sep-22 18-Nov-22 20 310.C.G3.J136 3310/11 - Area G3 - West End Seawall - fill seawall core seabed to +3.0mPD (14,700m3 C11_6 d/w - 10h/d - With 13 1 19-Sep-22 05-Oct-22 19-Sep-22 05-Oct-22 0 @1200m3/d/wf) HK Hols - No B/O periods 310.C.G3.J140 3310/11 - Area G3 - West End Seawall - fill seawall core +3.0 to + 6.5mPD (33,590m3; (was C11_6C3) d/w - 10h/d - With 18 2 06-Oct-22 26-Oct-22 29-Oct-22 18-Nov-22 20 @350m3/d/wf; 6wf) HK Hols - No B/O periods CC#02 - 3310/11 - Area G3 - along Approach Light Structure - Backfilling to +3.0mPD (was C01_7C3) d/w - 10h/d - No HK Hols59 - No B/O periods 4 (was06-Oct-22 C1) 03-Dec-22 06-Oct-22 03-Dec-22 0 310.C.G3.J212 3310/11 - Area G3 - backfill from seabed to +3.0mPD (80m behind seawall) [48,276m3; C01_7 d/w - 10h/d - No HK 18 2 06-Oct-22 23-Oct-22 06-Oct-22 23-Oct-22 0 @500/d/wf; 6wf] Hols - No B/O periods (was 310.C.G3.J220 3310/11 - Area G3 - backfill from seabed to +3.0mPD (remaining 184mL) [119,312m3; C1) C01_7 d/w - 10h/d - No HK 41 2 24-Oct-22 03-Dec-22 24-Oct-22 03-Dec-22 0 @500/d/wf; 6wf] Hols - No B/O periods (was CC#02 - 3310/11 - Area G3 - along Approach Light Structure - Backfilling +3.0mPD to 6.5mPD C1) C01_7 d/w - 10h/d - No HK Hols102 - No B/O periods 6 (was27-Oct-22 C1) 05-Feb-23 19-Nov-22 17-Feb-23 12 310.C.G3.J216 3310/11 - Area G3 - backfill from +3.0 to +6.5mPD (80m behind seawall) [110,100m3; C01_7 d/w - 10h/d - No HK 27 3 27-Oct-22 22-Nov-22 19-Nov-22 15-Dec-22 23 @500/d/wf; 9wf] Hols - No B/O periods (was 310.C.G3.J240 3310/11 - Area G3 - backfill from 3.0m to +6.5mPD (remaining 184mL) [215,686m3; C1) C01_7 d/w - 10h/d - No HK 64 3 04-Dec-22 05-Feb-23 16-Dec-22 17-Feb-23 12 @350/d/wf; 10wf] Hols - No B/O periods (was CC#02 - 3310/11 - Area G4 - Reclamation Works C1) C11_6 d/w - 10h/d - With HK Hols 285- No B/O 9periods (was 18-Nov-21 C3) A 19-Nov-22 28-Mar-22 26-Nov-22 6 CC#02 - 3310/11 - Area G4 - Site Preparation C11_6 d/w - 10h/d - With HK Hols4 - No B/O 0periods (was 06-Dec-21 C3) A 09-Dec-21 A 28-Mar-22 28-Mar-22 310.C.G4.J100 3310/11 - Area G4 - site preparation C11_6 d/w - 10h/d - With 4 06-Dec-21 A 09-Dec-21 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods CC#02 - 3310/11 - Area G4 - DJM for Rock Wedge with Testing (was C11_6C3) d/w - 10h/d - With HK Hols 123- No B/O 4periods (was 18-Nov-21 C3) A 11-Jun-22 28-Mar-22 14-Jul-22 27 310.C.G4.J112 3310/11 - Area G4 - CPT for DJM [4 nos. @4d/no/rig] C11_6 d/w - 10h/d - With 20 1 18-Nov-21 A 24-Nov-21 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.C.G4.J113.B02 3310/11 - Area G4 - Plant Mobilization and site setup (was C11_6C3) d/w - 10h/d - With 4 24-Mar-22 A 27-Mar-22 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.C.G4.J116 3310/11 - Area G4 - construct DJM for rock wedge [169 nos. @1.5 no./shift/rig; use 2 rigs (was C11_6C3) d/w - 10h/d - With 37 3 28-Mar-22 A 11-May-22 28-Mar-22 11-May-22 0 @2-shifts] HK Hols - No B/O periods 310.C.G4.J140 3310/11 - Area G4 - DJM testing and reporting (was C11_6C3) d/w - 10h/d - With 26 12-May-22 11-Jun-22 14-Jun-22 14-Jul-22 27 HK Hols - No B/O periods CC#02 - 3310/11 - Area G4 - Removal of Rock Wedge along Old Seawall (was C11_6C3) d/w - 10h/d - With HK Hols 24- No B/O 2periods (was 12-May-22 C3) 09-Jun-22 16-May-22 13-Jun-22 3 310.C.G4.J124 3310/11 - Area G4 - remove armour rock along old seawall w/ transition layer [32m2 x C11_6 d/w - 10h/d - With 24 2 12-May-22 09-Jun-22 16-May-22 13-Jun-22 3 330=10,560m3; @250m3/d/wf; 2wf] HK Hols - No B/O periods CC#02 - 3310/11 - Area G4 - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 136- No B/O 3periods (was 10-Jun-22 C3) 19-Nov-22 14-Jun-22 26-Nov-22 6 310.C.G4.J104 3310/11 - Area G4 - backfill (South) from +3.0m to +6.5mPD (south side) [17,978m3; C11_6 d/w - 10h/d - With 64 2 10-Jun-22 24-Aug-22 14-Jun-22 27-Aug-22 3 @350/d/wf] HK Hols - No B/O periods 310.C.G4.J108 3310/11 - Area G4 - backfill (North) from +3.0 to +6.5mPD [25,100m3; @350/d/wf; 4wf] (was C11_6C3) d/w - 10h/d - With 24 1 24-Oct-22 19-Nov-22 31-Oct-22 26-Nov-22 6 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:43 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 14 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S CC#02 - 3310/5,6,6A,7 - Area E1 - DJM/CSM at EBC no. 5,6,19 219 2 18-Aug-21 A 15-May-22 30-Mar-22 17-May-22 2 CC#02 - 3310/6A - Box Culvert 5,6,19 - DJM/CSM at Area E1 219 2 18-Aug-21 A 15-May-22 30-Mar-22 17-May-22 2 310.C.R0.X302 BA8 Submission for DJM C11_6 d/w - 10h/d - With 7 18-Aug-21 A 25-Aug-21 A 30-Mar-22 30-Mar-22 HK Hols - No B/O periods 310.C.R0.X306 BA10 Submission for DJM (was C11_6C3) d/w - 10h/d - With 7 26-Aug-21 A 02-Sep-21 A 30-Mar-22 30-Mar-22 HK Hols - No B/O periods 310.C.R0.X286 3310/6A - Area E1 - CPT [40 nos. @4d/no; 8wf] (was C11_6C3) d/w - 10h/d - With 22 2 10-Sep-21 A 25-Oct-21 A 30-Mar-22 30-Mar-22 HK Hols - No B/O periods 310.C.R0.X279.B01 3310/6A - Area E1 - Plant Mobilization and plant setup (was C11_6C3) d/w - 10h/d - With 4 08-Nov-21 A 11-Nov-21 A 22-Apr-22 22-Apr-22 HK Hols - No B/O periods 310.C.R0.X291.B01 3310/6A - Area E1 - construct CSM [1,037nos.; @3 no./shift/rig; use 2rigs @2-shifts] (was C11_6C3) d/w - 10h/d - With 52 11-Nov-21 A 06-Mar-22 A 22-Apr-22 22-Apr-22 HK Hols - No B/O periods 310.C.R0.X278 3310/6A - Area E1 - Plant Mobilization and plant setup (was C11_6C3) d/w - 10h/d - With 4 25-Nov-21 A 06-Dec-21 A 30-Mar-22 30-Mar-22 HK Hols - No B/O periods 310.C.R0.X290 3310/6A - Area E1 - construct DJM [939nos.; @1.5 no./shift/rig; use 4 rigs @2-shifts] (was C11_6C3) d/w - 10h/d - With 71 07-Dec-21 A 21-Apr-22 30-Mar-22 23-Apr-22 2 HK Hols - No B/O periods 310.C.R0.X295.B01 3310/6A - Area E1 - CSM Coring test and reporting (was C01_7C3) d/w - 10h/d - No HK 21 07-Mar-22 A 10-Apr-22 22-Apr-22 06-May-22 26 Hols - No B/O periods (was 310.C.R0.X294 3310/6A - Area E1 - DJM test and reporting C1) C01_7 d/w - 10h/d - No HK 24 22-Apr-22 15-May-22 24-Apr-22 17-May-22 2 Hols - No B/O periods (was CC#02 - 3310/8 - Area E2b - Reclamation Works C1) 426 17 31-Jul-21 A 31-Dec-22 19-Apr-22 16-Nov-23 259 CC#02 - 3310/8 Site Preparation and Establishment C11_6 d/w - 10h/d - With HK Hols 24- No B/O 0periods (was 31-Jul-21 C3) A 27-Aug-21 A 08-Nov-22 08-Nov-22 310.C.EX.H940 3310/8 - Area E2b - access to Works Area C11_6 d/w - 10h/d - With 0 31-Jul-21 A 08-Nov-22 HK Hols - No B/O periods 310.C.EX.H944 3310/8 - Area E2b - underground utilities survey and reporting (was C11_6C3) d/w - 10h/d - With 6 31-Jul-21 A 06-Aug-21 A 08-Nov-22 08-Nov-22 HK Hols - No B/O periods 310.C.EX.H952 3310/8 - Area E2b - carry out condition survey and reporting (was C11_6C3) d/w - 10h/d - With 6 31-Jul-21 A 06-Aug-21 A 08-Nov-22 08-Nov-22 HK Hols - No B/O periods 310.C.EX.H948 3310/8 - Area E2b - instrumentation works (was C11_6C3) d/w - 10h/d - With 24 31-Jul-21 A 27-Aug-21 A 08-Nov-22 08-Nov-22 HK Hols - No B/O periods CC#02 - 3310/8 - Area E2b - DJM/CSM (was C3) 238 15 14-Sep-21 A 29-Jul-22 19-Apr-22 14-Feb-23 163 310.C.EX.H960 3310/8 - Area E2b - CPT for DJM [23 nos. @4d/no./wf; 4wf] C11_6 d/w - 10h/d - With 26 3 14-Sep-21 A 01-Nov-21 A 19-Apr-22 19-Apr-22 HK Hols - No B/O periods 310.C.EX.H062.B01 3310/8 - Area E2b - CSM Plant mobilization (was C11_6C3) d/w - 10h/d - With 7 13-Mar-22 A 19-Mar-22 A 28-Oct-22 28-Oct-22 HK Hols - No B/O periods 310.C.EX.H965.B01 3310/8 - Area E2b - construct CSM [1,018nos. @3 no./shift/rig; use 2rigs @2-shifts] (was C11_6C3) d/w - 10h/d - With 94 9 19-Mar-22 A 25-Jun-22 28-Oct-22 21-Jan-23 174 HK Hols - No B/O periods 310.C.EX.H061 3310/8 - Area E2b - DJM Plant mobilization (was C11_6C3) d/w - 10h/d - With 7 22-Apr-22 29-Apr-22 08-Nov-22 15-Nov-22 165 HK Hols - No B/O periods 310.C.EX.H964 3310/8 - Area E2b - construct DJM [509nos. @1.5 no./shift/rig; use 4 rigs @2-shifts] (was C11_6C3) d/w - 10h/d - With 47 3 30-Apr-22 25-Jun-22 16-Nov-22 11-Jan-23 165 HK Hols - No B/O periods 310.C.EX.H967.B01 3310/8 - Area E2b - CSM Coring test and reporting (was C01_7C3) d/w - 10h/d - No HK 21 26-Jun-22 16-Jul-22 25-Jan-23 14-Feb-23 213 Hols - No B/O periods (was 310.C.EX.H968 3310/8 - Area E2b - DJM test and report C1) C01_7 d/w - 10h/d - No HK 34 26-Jun-22 29-Jul-22 12-Jan-23 14-Feb-23 200 Hols - No B/O periods (was CC#02 - 3310/8 - Backfill C1) C11_6 d/w - 10h/d - With HK Hols 117- No B/O 2periods (was 13-Aug-22 C3) 31-Dec-22 29-Jun-23 16-Nov-23 259 310.C.EX.W302 EVT - 3310/8 - Backfill from +3.0 to +6.5 [169,510m3 @350m3/d/wf, 4wf] C11_6 d/w - 10h/d - With 117 2 13-Aug-22 31-Dec-22 29-Jun-23 16-Nov-23 259 HK Hols - No B/O periods CC#02 - 3310/10,10A,9 - Area E5 - DJM at WBC no. 3,4,18 (was C3) 488 9 13-Aug-21 A 06-Apr-23 28-Mar-22 06-Apr-23 0 310.C.R0.L138.B01 3310/10,10a - Partial access to Works Area 3310/10 C01_7 d/w - 10h/d - No HK 0 13-Aug-21 A 28-Mar-22 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 15 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.R0.X1002 BA8 Submission for all DJM Works C11_6 d/w - 10h/d - With 7 18-Aug-21 A 25-Aug-21 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.C.R0.X1006 BA10 Submission for DJM (was C11_6C3) d/w - 10h/d - With 7 26-Aug-21 A 01-Sep-21 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.C.R0.L138 3310/10,10a - DJM (Area E5) - CPT (was C11_6C3) d/w - 10h/d - With 30 01-Nov-21 A 11-Nov-21 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.C.R0.L132 3310/10,10a - DJM (Area E5) - Plant mobilization (was C11_6C3) d/w - 10h/d - With 7 25-Nov-21 A 30-Nov-21 A 26-Apr-22 26-Apr-22 HK Hols - No B/O periods CC#02 - 3310/10 - BC 3,4,18 - DJM at Area E5 (was C3) 52 2 30-Nov-21 A 06-Apr-22 28-Mar-22 06-May-22 22 310.C.R0.L144 3310/10 - Area E5 - construct DJM (Under Box Culvert) [431 nos. @1.5 no./shift/rig; use 4 C11_6 d/w - 10h/d - With 32 2 30-Nov-21 A 12-Mar-22 A 28-Mar-22 28-Mar-22 rigs @2-shifts] HK Hols - No B/O periods 310.C.R0.L152 3310/10 - Area E5 - testing and reporting for DJM (Under Box Culvert) (was C01_7C3) d/w - 10h/d - No HK 24 13-Mar-22 A 06-Apr-22 26-Apr-22 06-May-22 30 Hols - No B/O periods (was CC#02 - 3310/10a - BC 3,4,18 - DJM at Area E5 C1) 306 7 14-Mar-22 A 06-Apr-23 28-Mar-22 06-Apr-23 0 310.C.R0.L154 3310/10a - Area E5 - construct DJM (Outside swale area) [318nos. @1.5 no./shift/rig; use C11_6 d/w - 10h/d - With 30 3 14-Mar-22 A 11-Apr-22 28-Mar-22 11-Apr-22 0 4 rigs @2-shifts] HK Hols - No B/O periods 310.C.R0.L156 3310/10a - Area E5 - testing and reporting for DJM (Outside swale area) (was C01_7C3) d/w - 10h/d - No HK 34 2 12-Apr-22 15-May-22 01-Jul-22 03-Aug-22 80 Hols - No B/O periods (was 310.C.R0.L196 3310/10a - Area E5 - construct DJM (Swale Area) after filling [67nos. @1.5 no./shift/rig; C1) C11_6 d/w - 10h/d - With 12 2 28-Feb-23 13-Mar-23 28-Feb-23 13-Mar-23 0 use 2rig @2-shifts] HK Hols - No B/O periods 310.C.R0.L197 3310/10a - Area E5 - testing and reporting for DJM (Swale area) after filling (was C01_7C3) d/w - 10h/d - No HK 24 14-Mar-23 06-Apr-23 14-Mar-23 06-Apr-23 0 Hols - No B/O periods (was CC#02 - Removal of North East Quay (Eastern Construction Berth) C1) 71 2 03-Dec-23 29-Feb-24 03-Dec-23 29-Feb-24 0 CC#02 - Demolition of Steel Platform 55 0 03-Dec-23 08-Feb-24 03-Dec-23 08-Feb-24 0 310.C.XX.J090 Removal of NE Quay - latest closure date of NE Loading Quay [Dec 2023, TQ no.232] C01_7 d/w - 10h/d - No HK 0 03-Dec-23 03-Dec-23 0 Hols - No B/O periods (was 310.C.XX.J100 Removal of NE Quay - Plant mobilization C1) C11_6 d/w - 10h/d - With 10 04-Dec-23 14-Dec-23 04-Dec-23 14-Dec-23 0 HK Hols - No B/O periods 310.C.XX.J104 Removal of NE Quay - Site Setup with Silt Curtain (was C11_6C3) d/w - 10h/d - With 10 04-Dec-23 14-Dec-23 04-Dec-23 14-Dec-23 0 HK Hols - No B/O periods 310.C.XX.J184 Removal of NE Quay - demolish steel platform including marine pile (was C11_6C3) d/w - 10h/d - With 14 15-Dec-23 03-Jan-24 15-Dec-23 03-Jan-24 0 HK Hols - No B/O periods 310.C.XX.J102 Removal of NE Quay - Fill behind seawall to formation level (was C11_6C3) d/w - 10h/d - With 30 15-Dec-23 22-Jan-24 05-Jan-24 08-Feb-24 15 HK Hols - No B/O periods 310.C.XX.J185 Removal of NE Quay - remove marine piles (was C11_6C3) d/w - 10h/d - With 31 04-Jan-24 08-Feb-24 04-Jan-24 08-Feb-24 0 HK Hols - No B/O periods 310.C.XX.J103 Removal of NE Quay - complete fill behind seawall [6 wks after closure loading quay, TQ (was C11_6C3) d/w - 10h/d - With 0 22-Jan-24 08-Feb-24 15 no.232] HK Hols - No B/O periods CC#02 - Reinstate North East Quay Seawall Structure (was C11_6C3) d/w - 10h/d - With HK Hols 16- No B/O 2periods (was 09-Feb-24 C3) 29-Feb-24 09-Feb-24 29-Feb-24 0 310.C.XX.J188 NE Quay Seawall Structure - fill armour rock [8,282m3 @400m3/d/wf; 2wf] C11_6 d/w - 10h/d - With 16 1 09-Feb-24 29-Feb-24 09-Feb-24 29-Feb-24 0 HK Hols - No B/O periods 310.C.XX.J348 NE Quay Seawall Structure - complete seawall reinstatement [by Feb 2024, TQ no. 232] (was C11_6C3) d/w - 10h/d - With 0 1 29-Feb-24* 29-Feb-24 0 HK Hols - No B/O periods CC#02 - Removal of North Boat Point (was C3) 88 2 13-Aug-22 27-Nov-22 01-Mar-23 12-Jun-23 157 310.C.EX.H965 3310/8 - Ex. N Boat Point - Remove concrete coping C11_6 d/w - 10h/d - With 10 13-Aug-22 24-Aug-22 01-Mar-23 11-Mar-23 163 HK Hols - No B/O periods 310.C.EX.H969 3310/8 - Ex. N Boat Point - Remove seawall blocks [approx 70nos.; 5nos./d] [NOTAM] (was C3) - NOTAM C23_4d/w 15 1 25-Aug-22 19-Sep-22 12-Mar-23 26-Apr-23 65 (M,W,Th,Su-01:30-07:30) - 310.C.EX.H973 3310/8 - Ex. N Boat Point - Backfill to +6.5mPD [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 15 1 21-Sep-22 27-Nov-22 27-Apr-23 12-Jun-23 65 (M,W,Th,Su-01:30-07:30) - CC#02 - Seawall Structure at D6 Area (Outfall no. 3 & 4) No HK d/w C11_6 Hols- -10h/d With B/O - With HK Hols 135- No B/O 2periods (was 08-Oct-22 C3) 20-Mar-23 13-Feb-23 01-Apr-23 11
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 16 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.R0.L746 Seawall Structure at Outfall no. 3,4 - fill seawall core and armour rock C11_6 d/w - 10h/d - With 21 1 08-Oct-22 01-Nov-22 13-Feb-23 08-Mar-23 104 HK Hols - No B/O periods 310.C.R0.L754 Seawall Structure at swale outlet - fill seawall core and armour rock (was C11_6C3) d/w - 10h/d - With 21 1 24-Feb-23 20-Mar-23 09-Mar-23 01-Apr-23 11 HK Hols - No B/O periods CC#02 - Seawall Structure at West Construction Berth (was C11_6C3) d/w - 10h/d - With HK Hols 120- No B/O 0periods (was 26-Feb-24 C3) 23-Jul-24 22-Mar-24 17-Aug-24 22 310.C.XX.J191 Seawall Structure at West Construction Berth - tentative date of closure C11_6 d/w - 10h/d - With 0 26-Feb-24 22-Mar-24 22 HK Hols - No B/O periods 310.C.XX.J304 Seawall Structure at West Construction Berth - construct the seawall structure (was C11_6C3) d/w - 10h/d - With 108 26-Feb-24 09-Jul-24 22-Mar-24 03-Aug-24 22 HK Hols - No B/O periods 310.C.XX.J308 Seawall Structure at West Construction Berth - fill behind seawall [2278m3 @350m3/d/wf] (was C11_6C3) d/w - 10h/d - With 12 10-Jul-24 23-Jul-24 05-Aug-24 17-Aug-24 22 HK Hols - No B/O periods CC#02 - Edge Structures around East Approach Light (was C11_6C3) d/w - 10h/d - With HK Hols 96- No B/O 0periods (was 01-Sep-22 C3) 24-Dec-22 09-Dec-22 06-Apr-23 82 310.C.XX.J315 Edge Structure around East Approach Light - site preparation with Silt Curtain & C11_6 d/w - 10h/d - With 50 01-Sep-22 01-Nov-22 09-Dec-22 10-Feb-23 82 demolition works HK Hols - No B/O periods 310.C.XX.J340 Edge Structure around East Approach Light - construct Edge structure (was C11_6C3) d/w - 10h/d - With 46 02-Nov-22 24-Dec-22 11-Feb-23 06-Apr-23 82 HK Hols - No B/O periods CC#02 ----- Testing and Commissioning ----- (was C01_7C3) d/w - 10h/d - No HK Hols846 - No B/O periods 0 (was07-Apr-22 C1) 30-Jul-24 07-May-22 25-Aug-24 26 CC#02 - DJM/CSM in Area G1 to G4, E1, E2b & E5 C01_7 d/w - 10h/d - No HK Hols379 - No B/O periods 0 (was07-Apr-22 C1) 20-Apr-23 07-May-22 20-Apr-23 0 310.C.R0.L176 3310/10 - DJM in Area E5 (under Box Culvert) - submit Form BA14 for completion of C01_7 d/w - 10h/d - No HK 7 07-Apr-22 13-Apr-22 07-May-22 13-May-22 30 works Hols - No B/O periods (was 310.C.G3.J160 3310/11 - DJM Wall in Area G3 (West End Seawall) - submit form BA14 for partial C1) C01_7 d/w - 10h/d - No HK 14 05-May-22 18-May-22 04-Aug-22 17-Aug-22 91 completion of works Hols - No B/O periods (was 310.C.R0.X298 3310/6A - DJM/CSM in Area E1 - DJM submit form BA14 C1) C01_7 d/w - 10h/d - No HK 14 05-May-22 18-May-22 07-May-22 20-May-22 2 Hols - No B/O periods (was 310.C.R0.L177 3310/10 - DJM in Area E5 (outside Box Culvert) - submit Form BA14 for completion of C1) C01_7 d/w - 10h/d - No HK 14 16-May-22 29-May-22 04-Aug-22 17-Aug-22 80 works Hols - No B/O periods (was 310.C.G3.J365 3310/11 - DJM in Area G4 - submit Form BA14 for completion of works C1) C01_7 d/w - 10h/d - No HK 14 12-Jun-22 25-Jun-22 15-Feb-23 28-Feb-23 248 Hols - No B/O periods (was 310.C.G1.J148 3310/11 - DJM in Area G1&G2 - submit form BA14 for completion of works C1) C01_7 d/w - 10h/d - No HK 14 24-Jul-22 06-Aug-22 15-Feb-23 28-Feb-23 206 Hols - No B/O periods (was 310.C.EX.H133 3310/8 - DJM/CSM in Area E2b - Submit BA14 for completion of work C1) C01_7 d/w - 10h/d - No HK 14 30-Jul-22 12-Aug-22 15-Feb-23 28-Feb-23 200 Hols - No B/O periods (was 310.C.G3.J361 3310/11 - DJM in Area G3 (along Approach Light Structure) - submit Form BA14 for C1) C01_7 d/w - 10h/d - No HK 14 28-Jan-23 10-Feb-23 07-Apr-23 20-Apr-23 69 completion of works Hols - No B/O periods (was 310.C.G3.J300 3310/11 - DJM in Area G3 (Rock Wedge) - submit Form BA14 for completion of works C1) C01_7 d/w - 10h/d - No HK 14 06-Feb-23 19-Feb-23 07-Apr-23 20-Apr-23 60 Hols - No B/O periods (was 310.C.R0.L178 3310/10 - DJM in Area E5 (at Swale area) - submit Form BA14 for completion of works C1) C01_7 d/w - 10h/d - No HK 14 07-Apr-23 20-Apr-23 07-Apr-23 20-Apr-23 0 Hols - No B/O periods (was CC#02 - Reclamation Works C1) C01_7 d/w - 10h/d - No HK Hols238 - No B/O periods 0 (was24-Jul-22 C1) 18-Mar-23 28-Jul-22 20-Apr-23 33 310.C.G3.J398.B01 3310/11 - Reclamation Work in Zone G4 (Localizer Bldg C) - submit Form BA14 for C01_7 d/w - 10h/d - No HK 14 24-Jul-22 06-Aug-22 28-Jul-22 10-Aug-22 4 completion of works Hols - No B/O periods (was 310.C.G3.J397.B01 3310/11 - Reclamation Work in Zone G1 & G2 (HKPF Bldg) - submit Form BA14 for C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 23-Aug-22 05-Sep-22 0 completion of works Hols - No B/O periods (was 310.C.G3.J385 3310/11 - Reclamation Work in Zone G4 (South) - submit Form BA14 for completion of C1) C01_7 d/w - 10h/d - No HK 14 25-Aug-22 07-Sep-22 07-Apr-23 20-Apr-23 225 works Hols - No B/O periods (was 310.C.G3.J377 3310/11 - Reclamation Work in Zone G1 & G2 - submit Form BA14 for completion of C1) C01_7 d/w - 10h/d - No HK 14 21-Oct-22 03-Nov-22 07-Apr-23 20-Apr-23 168 works Hols - No B/O periods (was 310.C.G3.J389 3310/11 - Reclamation Work in Zone G4 (North) - submit Form BA14 for completion of C1) C01_7 d/w - 10h/d - No HK 14 20-Nov-22 03-Dec-22 07-Apr-23 20-Apr-23 138 works Hols - No B/O periods (was 310.C.G3.J381 3310/11 - Reclamation Work in Zone G3 - submit Form BA14 for completion of works C1) C01_7 d/w - 10h/d - No HK 14 05-Mar-23 18-Mar-23 07-Apr-23 20-Apr-23 33 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 17 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S CC#02 - Road Drainage Works C01_7 d/w - 10h/d - No HK Hols30 - No B/O periods 0 (was20-May-23 C1) 18-Jun-23 01-Jun-24 30-Jun-24 378 310.C.G3.J373 3310/11 - Road Drainage Work - Prepare as-built drawings and submit Form BA14 for C01_7 d/w - 10h/d - No HK 30 20-May-23 18-Jun-23 01-Jun-24 30-Jun-24 378 completion of work Hols - No B/O periods (was CC#02 - Stormwater Drainage Works C1) C01_7 d/w - 10h/d - No HK Hols30 - No B/O periods 0 (was08-Feb-23 C1) 09-Mar-23 01-Jun-24 30-Jun-24 479 310.C.G3.J369 3310/11 - Stormwater Drainage Work - Prepare as-built drawings and submit Form BA14 C01_7 d/w - 10h/d - No HK 30 08-Feb-23 09-Mar-23 01-Jun-24 30-Jun-24 479 for completion of work Hols - No B/O periods (was CC#02 - West End Seawall C1) C01_7 d/w - 10h/d - No HK Hols 4- No B/O periods 0 (was16-Nov-22 C1) 19-Nov-22 07-Apr-23 10-Apr-23 142 310.C.G3.J164 3310/11 - West End Seawall - submit Form BA14 for completion of West End Seawall C01_7 d/w - 10h/d - No HK 4 16-Nov-22 19-Nov-22 07-Apr-23 10-Apr-23 142 Hols - No B/O periods (was CC#02 - Roadwork, Security Fencing and Central Reserve C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was21-Mar-24 C1) 12-Jun-24 03-Jun-24 25-Aug-24 74 310.C.G4.J169 3310/11 - Roadwork, Security Fence, Central Reserve - Testing and commissioning C01_7 d/w - 10h/d - No HK 10 21-Mar-24 30-Mar-24 03-Jun-24 12-Jun-24 74 Hols - No B/O periods (was 310.C.G4.J172 3310/11 - Roadwork, Security Fence, Central Reserve - Submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 14 31-Mar-24 13-Apr-24 13-Jun-24 26-Jun-24 74 Hols - No B/O periods (was 310.C.G4.J176 3310/11 - Roadwork, Security Fence, Central Reserve - Statutory Inspection C1) C01_7 d/w - 10h/d - No HK 30 14-Apr-24 13-May-24 27-Jun-24 26-Jul-24 74 Hols - No B/O periods (was 310.C.G4.J180 3310/11 - Roadwork, Security Fence, Central Reserve - Achieve KD-12 C1) C01_7 d/w - 10h/d - No HK 30 14-May-24 12-Jun-24 27-Jul-24 25-Aug-24 74 Hols - No B/O periods (was CC#02 - NE Quay Seawall Structure C1) C01_7 d/w - 10h/d - No HK Hols 7- No B/O periods 0 (was01-Mar-24 C1) 07-Mar-24 16-Aug-24 22-Aug-24 168 310.C.G4.J182 NE Quay Seawall Structure - submit Form BA14 for completion of work C01_7 d/w - 10h/d - No HK 7 01-Mar-24 07-Mar-24 16-Aug-24 22-Aug-24 168 Hols - No B/O periods (was 310.C.G4.J190 NE Quay Seawall Structure - Achieve KD-12 C1) C01_7 d/w - 10h/d - No HK 0 07-Mar-24 22-Aug-24 168 Hols - No B/O periods (was CC#02 - Seawall Structure at West Construction Berth C1) C01_7 d/w - 10h/d - No HK Hols 7- No B/O periods 0 (was24-Jul-24 C1) 30-Jul-24 19-Aug-24 25-Aug-24 26 310.C.XX.J311 Seawall Structure at West Construction Berth - submit Form BA14 for completion of work C01_7 d/w - 10h/d - No HK 7 24-Jul-24 30-Jul-24 19-Aug-24 25-Aug-24 26 Hols - No B/O periods (was 310.C.XX.J312 Seawall Structure at West Construction Berth - Achieve KD-12 C1) C01_7 d/w - 10h/d - No HK 0 30-Jul-24 25-Aug-24 26 Hols - No B/O periods (was CC#02 - Edge Structure around East Approach Light C1) C01_7 d/w - 10h/d - No HK Hols 7- No B/O periods 0 (was25-Dec-22 C1) 31-Dec-22 07-Apr-23 25-Aug-24 603 310.C.XX.J342 Edge Structure around East Approach Light - submit Form BA14 for completion of work C01_7 d/w - 10h/d - No HK 7 25-Dec-22 31-Dec-22 07-Apr-23 13-Apr-23 103 Hols - No B/O periods (was 310.C.XX.J344 Edge Structure around East Approach Light - Achieve KD-12 C1) C01_7 d/w - 10h/d - No HK 0 31-Dec-22 25-Aug-24 603 Hols - No B/O periods (was Cost Centre #03 - Airfield AGL & Pavement Works C1) 881 325 10-Jul-21 A 25-Jun-24 03-Jan-22 25-Aug-24 51 CC#3 ----- Design and Others----- C01_7 d/w - 10h/d - No HK Hols166 - No B/O periods 0 (was 24-Dec-21 C1) A 31-Aug-22 13-Apr-22 01-Dec-22 92 Mobile Aggregate Mixing Plant C01_7 d/w - 10h/d - No HK Hols42 - No B/O periods 0 (was27-Mar-22 C1) 07-May-22 21-Oct-22 01-Dec-22 208 310.D.G3.F166 Mobile Aggregate Mixing Plant - prepare and submit footing to ICE C01_7 d/w - 10h/d - No HK 14 27-Mar-22 09-Apr-22 21-Oct-22 03-Nov-22 208 Hols - No B/O periods (was 310.D.G3.F170 Mobile Aggregate Mixing Plant - ICE Review/Comments/Approved of footing C1) C01_7 d/w - 10h/d - No HK 7 10-Apr-22 16-Apr-22 04-Nov-22 10-Nov-22 208 Hols - No B/O periods (was 310.D.G3.F174 Mobile Aggregate Mixing Plant - PM - Review and Approved footing C1) C01_7 d/w - 10h/d - No HK 21 17-Apr-22 07-May-22 11-Nov-22 01-Dec-22 208 Hols - No B/O periods (was AGL C1) C01_7 d/w - 10h/d - No HK Hols166 - No B/O periods 0 (was 24-Dec-21 C1) A 31-Aug-22 13-Apr-22 01-Dec-22 92 AGL - Drawing Submission C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was26-May-22 C1) 31-Aug-22 09-Aug-22 14-Nov-22 75 310.D.WS.L1520 Prepare and Submit AGL Drawings C01_7 d/w - 10h/d - No HK 21 26-May-22 15-Jun-22 09-Aug-22 29-Aug-22 75 Hols - No B/O periods (was 310.D.WS.L1660 PM Review and Comments - 1st round C1) C01_7 d/w - 10h/d - No HK 28 16-Jun-22 13-Jul-22 30-Aug-22 26-Sep-22 75 Hols - No B/O periods (was 310.D.WS.L1656 Prepare and Resubmit AGL Drawings - 2nd round C1) C01_7 d/w - 10h/d - No HK 21 14-Jul-22 03-Aug-22 27-Sep-22 17-Oct-22 75 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 18 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1524 PM Review and Accept AGL Drawing C01_7 d/w - 10h/d - No HK 28 04-Aug-22 31-Aug-22 18-Oct-22 14-Nov-22 75 Hols - No B/O periods (was AGL - Material Submission Long Lead Item (AGL Cans and Accessories) C1) C01_7 d/w - 10h/d - No HK Hols79 - No B/O periods 0 (was 24-Dec-21 C1) A 05-Jun-22 13-Apr-22 22-Jun-22 17 310.C.AF.F100 Major Long Lead Items - Preparation & Submission of AGL Cans and Accessories C01_7 d/w - 10h/d - No HK 28 24-Dec-21 A 10-Apr-22 13-Apr-22 27-Apr-22 17 Hols - No B/O periods (was 310.C.AF.F104 Major Long Lead Items - Comments & Acceptance for AGL Cans and Accessories 1st C1) C01_7 d/w - 10h/d - No HK 28 11-Apr-22 08-May-22 28-Apr-22 25-May-22 17 Round Hols - No B/O periods (was 310.D.WS.L1536 Major Long Lead Items - Preparation & Resubmission of AGL Cans and Accessories 2nd C1) C01_7 d/w - 10h/d - No HK 7 09-May-22 15-May-22 26-May-22 01-Jun-22 17 Round Hols - No B/O periods (was 310.D.WS.L1540 Major Long Lead Items - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 21 16-May-22 05-Jun-22 02-Jun-22 22-Jun-22 17 Hols - No B/O periods (was Quarry Submission C1) C01_7 d/w - 10h/d - No HK Hols77 - No B/O periods 0 (was16-May-22 C1) 31-Jul-22 16-Sep-22 01-Dec-22 123 310.C.AF.F121.B02 Prepare and Submit Proposed Quarry (Primary and Secondary) - 1st Round C01_7 d/w - 10h/d - No HK 14 16-May-22 29-May-22 16-Sep-22 29-Sep-22 123 Hols - No B/O periods (was 310.C.AF.F131.B02 PM Review and Comments Proposed Quarry (Primary and Secondary) - 1st Round C1) C01_7 d/w - 10h/d - No HK 28 30-May-22 26-Jun-22 30-Sep-22 27-Oct-22 123 Hols - No B/O periods (was 310.C.AF.F141.B02 Prepare and Submit Proposed Quarry (Primary and Secondary) - 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 27-Jun-22 03-Jul-22 28-Oct-22 03-Nov-22 123 Hols - No B/O periods (was 310.C.AF.F151.B02 PM Review and Accept Proposed Quarry (Primary and Secondary) C1) C01_7 d/w - 10h/d - No HK 28 04-Jul-22 31-Jul-22 04-Nov-22 01-Dec-22 123 Hols - No B/O periods (was AGL - Material Submission (CASB/CABC) C1) C01_7 d/w - 10h/d - No HK Hols100 - No B/O periods 0 (was16-May-22 C1) 23-Aug-22 12-Jun-22 19-Sep-22 27 310.C.AF.F116 Preparation & Submission for CASB/CABC Materials C01_7 d/w - 10h/d - No HK 30 16-May-22 14-Jun-22 12-Jun-22 11-Jul-22 27 Hols - No B/O periods (was 310.C.AF.F532 Comments & Acceptance for CASB/CABC Materials 1st Round C1) C01_7 d/w - 10h/d - No HK 28 15-Jun-22 12-Jul-22 12-Jul-22 08-Aug-22 27 Hols - No B/O periods (was 310.C.AF.F528 Preparation & Resubmission for CASB/CABC Materials 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 13-Jul-22 26-Jul-22 09-Aug-22 22-Aug-22 27 Hols - No B/O periods (was 310.C.AF.F120 Comments & Acceptance for CASB/CABC Materials 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 27-Jul-22 23-Aug-22 23-Aug-22 19-Sep-22 27 Hols - No B/O periods (was CC#3 ----- Method Statement ------ C1) C01_7 d/w - 10h/d - No HK Hols318 - No B/O periods 0 (was 10-Jul-21 C1) A 23-May-22 27-Mar-22 25-Jun-23 397 MS no.06 - Method Statement for Construction of Taxiway Pavement C01_7 d/w - 10h/d - No HK Hols197 - No B/O periods 0 (was 10-Jul-21 C1) A 24-Aug-21 A 27-Mar-22 27-Mar-22 310.D.TX.A132 MS no.6 - Method Statement for Construction of Taxiway Pavement - prepare document C01_7 d/w - 10h/d - No HK 30 10-Jul-21 A 07-Aug-21 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.D.TX.A136 MS no.6 - Method Statement for Construction of Taxiway Pavement - PM review and C1) C01_7 d/w - 10h/d - No HK 28 08-Aug-21 A 24-Aug-21 A 27-Mar-22 27-Mar-22 accept Hols - No B/O periods (was MS no.07 - Method Statement for Construction of Runway Pavement C1) C01_7 d/w - 10h/d - No HK Hols197 - No B/O periods 0 (was 10-Jul-21 C1) A 24-Aug-21 A 27-Mar-22 27-Mar-22 310.D.TX.A108 MS no.7 - Method Statement for Construction of Runway Pavement - prepare document C01_7 d/w - 10h/d - No HK 30 10-Jul-21 A 07-Aug-21 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.D.TX.A112 MS no.7 - Method Statement for Construction of Runway Pavement - PM review and C1) C01_7 d/w - 10h/d - No HK 28 08-Aug-21 A 24-Aug-21 A 27-Mar-22 27-Mar-22 accept Hols - No B/O periods (was MS no.10 - Method Statement for EVWL, AGL and its associated diversion C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was 07-Aug-21 C1) A 26-Feb-22 A 04-Feb-23 25-Jun-23 310.D.TX.A116 MS no.10 - MS for Construction Civil Works for EVWL, AGL and its associated diversion - C01_7 d/w - 10h/d - No HK 30 07-Aug-21 A 30-Aug-21 A 04-Feb-23 04-Feb-23 prepare document Hols - No B/O periods (was 310.D.TX.A120 MS no.10 - MS for Construction Civil Works for EVWL, AGL and its associated diversion - C1) C01_7 d/w - 10h/d - No HK 28 31-Aug-21 A 26-Feb-22 A 25-Jun-23 25-Jun-23 PM review and accept Hols - No B/O periods (was MS no.18 - Method Statement for Construction of Pavement Tie-in to Ex. Taxiway E&F incl. AGL C1) d/w - 10h/d - No HK Hols58 C01_7 - No B/O periods 0 (was27-Mar-22 C1) 23-May-22 04-Feb-23 24-Jun-23 397 310.D.TX.A124 MS no.18 - MS for Construction of Pavement Tie-in to Ex. Taxiway E&F - prepare C01_7 d/w - 10h/d - No HK 30 27-Mar-22 25-Apr-22 04-Feb-23 05-Mar-23 314 document Hols - No B/O periods (was 310.D.TX.A128 MS no.18 - MS for Construction of Pavement Tie-in to Ex. Taxiway E&F - PM review and C1) C01_7 d/w - 10h/d - No HK 28 26-Apr-22 23-May-22 28-May-23 24-Jun-23 397 accept Hols - No B/O periods (was CC#3 ----- Procurement ------ C1) C01_7 d/w - 10h/d - No HK Hols399 - No B/O periods 0 (was 30-Oct-21 C1) A 02-Dec-22 13-Apr-22 28-Feb-24 453
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 19 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Subletting C01_7 d/w - 10h/d - No HK Hols330 - No B/O periods 0 (was 14-Nov-21 C1) A 09-Oct-22 13-Apr-22 01-Dec-23 418 310.C.AF.F182 Subletting - Airfield Pavement AGL Cans - Stage 1&2 Preparation,Submission& C01_7 d/w - 10h/d - No HK 90 14-Nov-21 A 10-Apr-22 13-Apr-22 27-Apr-22 17 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.C.AF.196 Subletting - Airfield Earthwork - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 14-Jun-22 22-Jun-22 09-Sep-22 87 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.C.AF.F164 Subletting - Airfield Pavement CASB/CABC-Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 30-Jan-22 A 15-May-22 23-Apr-22 11-Jun-22 27 Approval,Tender&Award sub-contract(w.testing) Hols - No B/O periods (was 310.C.AF.F548 Subletting - Civil Works & Others - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 76 14-Mar-22 A 10-Jun-22 27-Aug-22 10-Nov-22 153 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.C.AF.F180 Subletting - Airfield Pavement Asphalt - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 23-May-22 20-Aug-22 10-Oct-22 07-Jan-23 140 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.C.AF.F540 Subletting - Pavement Marking - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 22-Jun-22 19-Sep-22 29-May-23 26-Aug-23 341 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.C.AF.F544 Subletting - Landscape Softwork - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 12-Jul-22 09-Oct-22 03-Sep-23 01-Dec-23 418 Approval,Tender&Award sub-contract Hols - No B/O periods (was Airfield Underground Utilities, Aviation Fuel Pipeline & Hydrant (AFPH) C1) C01_7 d/w - 10h/d - No HK Hols395 - No B/O periods 0 (was 30-Oct-21 C1) A 28-Nov-22 23-May-22 28-Feb-24 457 310.P.EX.F132 Subletting - Airfield MEP - Award sub-contract C01_7 d/w - 10h/d - No HK 90 30-Oct-21 A 18-Jan-22 A 04-Jun-22 04-Jun-22 Hols - No B/O periods (was 310.P.EX.U154 Subletting - Potable Water&Fire Hydrant (PWFH) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 04-Nov-21 A 20-May-22 03-Aug-22 26-Sep-22 129 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.U130 Subletting - AFHS (With testing ) - Section 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 11-Mar-22 A 23-May-22 23-May-22 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.U142 Subletting - Drainage & Ducting/ Pipeworks - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 20-May-22 06-Jun-22 30-Jul-22 71 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.U135 Subletting - Gas Supply System & UUs - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK90 03-Jan-22 A 31-May-22 04-Jun-22 08-Aug-22 69 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.C.AF.F536 Subletting - Road Marking - Stage 1&2 Preparation,Submission& Approval,Tender&Award C1) C01_7 d/w - 10h/d - No HK 90 31-Aug-22 28-Nov-22 01-Dec-23 28-Feb-24 457 sub-contract Hols - No B/O periods (was Procurement C1) C01_7 d/w - 10h/d - No HK Hols194 - No B/O periods 0 (was23-May-22 C1) 02-Dec-22 09-Jun-22 19-Dec-22 17 Major Long Lead Items - AGL Cans & Accessories C01_7 d/w - 10h/d - No HK Hols194 - No B/O periods 0 (was23-May-22 C1) 02-Dec-22 09-Jun-22 19-Dec-22 17 310.C.AF.F108 Procurement Major Long Lead Items - Place Order & Manufacture for AGL Cans and C01_7 d/w - 10h/d - No HK 180 23-May-22 18-Nov-22 09-Jun-22 05-Dec-22 17 Accessories Hols - No B/O periods (was 310.C.AF.F112 Procurement Major Long Lead Items - Delivery on Site for AGL Cans and Accessories C1) C01_7 d/w - 10h/d - No HK 14 19-Nov-22 02-Dec-22 06-Dec-22 19-Dec-22 17 Hols - No B/O periods (was Major Long Lead Items - CASB/CABC Materials C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was24-Aug-22 C1) 18-Oct-22 20-Sep-22 14-Nov-22 27 310.C.AF.F128 Procurement CASB/CABC - Apply permit from AA and Marine Department for delivery C01_7 d/w - 10h/d - No HK 28 24-Aug-22 20-Sep-22 20-Sep-22 17-Oct-22 27 Hols - No B/O periods (was 310.C.AF.F132 Procurement CASB/CABC - Prepare and deliver CASB/CABC to the Site (source via C1) C01_7 d/w - 10h/d - No HK 28 21-Sep-22 18-Oct-22 18-Oct-22 14-Nov-22 27 marine) Hols - No B/O periods (was CC#3 ----- Construction ------ C1) 622 325 28-Mar-22 02-May-24 03-Jan-22 25-Aug-24 95 3310/6B Site Preparation and Establishment C11_6 d/w - 10h/d - With HK Hols 24- No B/O 0periods (was 28-Mar-22 C3) 28-Apr-22 03-Jan-22 17-Jul-23 362 310.C.EX.H065 3310/6B - access to Works Area C11_6 d/w - 10h/d - With 0 28-Mar-22* 03-Jan-22 -69 HK Hols - No B/O periods 310.C.EX.H066 3310/6B - underground utilities survey and reporting + carry out topographic survey and (was C11_6C3) d/w - 10h/d - With 6 28-Mar-22 02-Apr-22 17-Jun-23 24-Jun-23 362 reporting HK Hols - No B/O periods 310.C.EX.H074 3310/6B - carry out condition survey and reporting (was C3) C11_6 d/w - 10h/d - With 6 28-Mar-22 02-Apr-22 17-Jun-23 24-Jun-23 362 HK Hols - No B/O periods 310.C.EX.H070 3310/6B - instrumentation works (was C11_6C3) d/w - 10h/d - With 24 28-Mar-22 28-Apr-22 17-Jun-23 17-Jul-23 362 HK Hols - No B/O periods Preparation Works (was C11_6C3) d/w - 10h/d - With HK Hols 118- No B/O 0periods (was 15-Jun-22 C3) 03-Nov-22 27-Aug-22 17-Jan-23 62
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 20 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.AF.F022 Aggregate Plant - Footing & Plant Erection C11_6 d/w - 10h/d - With 60 15-Jun-22 24-Aug-22 27-Aug-22 08-Nov-22 62 HK Hols - No B/O periods 310.T.AF.F025 Trial for the pavement and submit report (was C11_6C3) d/w - 10h/d - With 30 25-Aug-22 29-Sep-22 09-Nov-22 13-Dec-22 62 HK Hols - No B/O periods 310.T.AF.F025.B02 PM Review and Accept Trial Report (was C11_6C3) d/w - 10h/d - With 28 30-Sep-22 03-Nov-22 14-Dec-22 17-Jan-23 62 HK Hols - No B/O periods Airfield AGL + Pavement Works After Commissioning Interim 2RS (was C3) 538 325 12-Jul-22 02-May-24 26-Aug-22 25-Aug-24 95 AGL Mock Up C11_6 d/w - 10h/d - With HK Hols 96- No B/O 0periods (was 12-Jul-22 C3) 03-Nov-22 26-Aug-22 19-Dec-22 39 310.C.RC.1000.B02 AGL Mock Up - inlc submission/appvl (48d) + installation (24d) C11_6 d/w - 10h/d - With 72 12-Jul-22 06-Oct-22 26-Aug-22 21-Nov-22 39 HK Hols - No B/O periods 310.C.RC.1010.B02 AGL Mock Up - PM review and appvl (was C11_6C3) d/w - 10h/d - With 24 07-Oct-22 03-Nov-22 22-Nov-22 19-Dec-22 39 HK Hols - No B/O periods Works Area 3310/1a (was C3) - NOTAM (M,W,Th,Su-01:30-07:30) C23_4d/w 77 0 - No HK 04-Dec-22 Hols - With B/O09-Jul-23 Periods & Flight25-Jun-23 Checks 17-Dec-23 68 310.T.AF.F010 Phase 3310/1a - Resurfacing Works of Taxiways and Apron [NOTAM] C23_4d/w - NOTAM 20 04-Dec-22 16-Feb-23 25-Jun-23 27-Jul-23 68 (M,W,Th,Su-01:30-07:30) - 310.T.AF.F015.B02 Carry Out As-Built Survey and Submit Report (NOTAM) No HK Hols- -NOTAM C23_4d/w With B/O 5 19-Feb-23 26-Feb-23 30-Jul-23 06-Aug-23 68 (M,W,Th,Su-01:30-07:30) - 310.T.AF.F013 Phase 3310/1a - AGL Base Can/Ductbank/Mid Can (10 nr)) [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 20 27-Feb-23 02-Apr-23 07-Aug-23 10-Sep-23 68 (M,W,Th,Su-01:30-07:30) - 310.T.AF.F016 Phase 3310/1a - AGL Top Can (10 nr) [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 14 24-Apr-23 07-Jun-23 11-Sep-23 25-Oct-23 68 (M,W,Th,Su-01:30-07:30) - 310.T.AF.F019 3310/1a - Line markings and defects remedial works [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 18 08-Jun-23 09-Jul-23 26-Oct-23 17-Dec-23 68 (M,W,Th,Su-01:30-07:30) - Interface Work Area 3310/IA/1 (Pavement and AGL) No HK Hols - With B/O 393 42 01-Sep-22 27-Dec-23 09-Nov-22 29-Mar-24 76 3310/IA/1-2 C11_6 d/w - 10h/d - With HK Hols 181- No B/O20 periods (was 01-Sep-22 C3) 13-Apr-23 09-Nov-22 09-May-23 21 310.T.AF.F010.B02 Carry Out Initial Survey to Check Level C11_6 d/w - 10h/d - With 3 01-Sep-22 03-Sep-22 06-May-23 09-May-23 199 HK Hols - No B/O periods 3310/IA/1-2 Pavement (was C11_6C3) d/w - 10h/d - With HK Hols 171- No B/O13 periods (was 01-Sep-22 C3) 28-Mar-23 09-Nov-22 18-Apr-23 14 310.C.FA.P127 3310/IA/1-2 - Site Formation for Taxiway (14048 m3) C11_6 d/w - 10h/d - With 20 2 01-Sep-22 24-Sep-22 09-Nov-22 01-Dec-22 56 HK Hols - No B/O periods 310.C.FA.P133 3310/IA/1-2 Subgrade Works for Taxiway (cut:15169m3; fill:64079m3) (was C11_6C3) d/w - 10h/d - With 40 2 27-Oct-22 12-Dec-22 15-Nov-22 31-Dec-22 16 HK Hols - No B/O periods 310.C.FA.P136 3310/IA/1-2 CASB (16600m3) (39840 tonne) (was C11_6C3) d/w - 10h/d - With 42 2 14-Nov-22 03-Jan-23 02-Dec-22 21-Jan-23 16 HK Hols - No B/O periods 310.C.FA.P139 3310/IA/1-2 CABC (25152m3) (60364.80 tonne) (was C11_6C3) d/w - 10h/d - With 52 2 10-Dec-22 14-Feb-23 18-Jan-23 22-Mar-23 31 HK Hols - No B/O periods 310.C.FA.P142 3310/IA/1-2 Asphalt (MABC/MAWC/PMABC) (7434m3) (17841.6 tonne) (was C11_6C3) d/w - 10h/d - With 21 2 21-Feb-23 16-Mar-23 09-Mar-23 01-Apr-23 14 HK Hols - No B/O periods 310.C.FA.P145 3310/IA/1-2 Asphalt (PMAWC) (3896m3) (9350.4 tonne) (was C11_6C3) d/w - 10h/d - With 10 1 10-Mar-23 21-Mar-23 27-Mar-23 11-Apr-23 14 HK Hols - No B/O periods 310.C.FA.P792 3310/IA/1-2 - Milling of the Existing Runway (was C11_6C3) d/w - 10h/d - With 6 2 22-Mar-23 28-Mar-23 12-Apr-23 18-Apr-23 14 HK Hols - No B/O periods 3310/IA/1-2 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 104- No B/O 7periods (was 03-Dec-22 C3) 13-Apr-23 20-Dec-22 29-Apr-23 14 310.C.FA.P151 3310/IA/1-2 AGL Ductbank (8256 m) C11_6 d/w - 10h/d - With 42 2 03-Dec-22 26-Jan-23 28-Dec-22 18-Feb-23 20 HK Hols - No B/O periods 310.C.FA.P148 3310/IA/1-2 AGL Drawpit/Earthpit/Base Can (369 nr) - 8 no/d, 1 WF (was C3) C11_6 d/w - 10h/d - With 48 2 03-Dec-22 02-Feb-23 20-Dec-22 18-Feb-23 14 HK Hols - No B/O periods 310.C.FA.P154 3310/IA/1-2 AGL Mid Can (369 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 20 2 03-Feb-23 25-Feb-23 20-Feb-23 14-Mar-23 14 HK Hols - No B/O periods 310.C.FA.P157 3310/IA/1-2 AGL Top Can (369 nr) (was C11_6C3) d/w - 10h/d - With 10 1 29-Mar-23 13-Apr-23 19-Apr-23 29-Apr-23 14 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 21 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 3310/IA/1-1 C11_6 d/w - 10h/d - With HK Hols 164- No B/O20 periods (was 26-Sep-22 C3) 17-Apr-23 15-Dec-22 29-Apr-23 11 3310/IA/1-1 Pavement C11_6 d/w - 10h/d - With HK Hols 164- No B/O13 periods (was 26-Sep-22 C3) 17-Apr-23 15-Dec-22 29-Apr-23 11 310.C.FA.P100 3310/IA/1-1 - Site Formation for Taxiway (2565 m3) C11_6 d/w - 10h/d - With 20 2 26-Sep-22 20-Oct-22 15-Dec-22 09-Jan-23 67 HK Hols - No B/O periods 310.C.FA.P103 3310/IA/1-1 - Subgrade (cut:79857m3; fill: 40518m3) (was C11_6C3) d/w - 10h/d - With 30 2 27-Dec-22 04-Feb-23 10-Jan-23 16-Feb-23 11 HK Hols - No B/O periods 310.C.FA.P106 3310/IA/1-1 - CASB (24865m3) (59676 tonne) (was C11_6C3) d/w - 10h/d - With 34 2 09-Jan-23 20-Feb-23 21-Jan-23 04-Mar-23 11 HK Hols - No B/O periods 310.C.FA.P109 3310/IA/1-1 - CABC (16958m3) (40699.20 tonne) (was C11_6C3) d/w - 10h/d - With 22 2 17-Feb-23 14-Mar-23 02-Mar-23 27-Mar-23 11 HK Hols - No B/O periods 310.C.FA.P112 3310/IA/1-1 - Asphalt (MABC/MAWC/PMABC) (14087m3) (33,808.8 tonne) (was C11_6C3) d/w - 10h/d - With 24 2 03-Mar-23 30-Mar-23 16-Mar-23 17-Apr-23 11 HK Hols - No B/O periods 310.C.FA.P115 3310/IA/1-1 - Asphalt (PMAWC) (6888m3) (16531.2 tonne) (was C11_6C3) d/w - 10h/d - With 16 1 18-Mar-23 06-Apr-23 31-Mar-23 22-Apr-23 11 HK Hols - No B/O periods 310.C.FA.P788 3310/IA/1-1 - Milling of the Existing Runway (was C11_6C3) d/w - 10h/d - With 6 2 11-Apr-23 17-Apr-23 24-Apr-23 29-Apr-23 11 HK Hols - No B/O periods 3310/IA/1-1 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 59- No B/O 7periods (was 03-Feb-23 C3) 17-Apr-23 16-Feb-23 29-Apr-23 11 310.C.FA.P118 3310/IA/1-1 - AGL Drawpit/Earthpit/Base Can (371 nr) - 8 no/d, 2 WF C11_6 d/w - 10h/d - With 25 2 03-Feb-23 03-Mar-23 16-Feb-23 16-Mar-23 11 HK Hols - No B/O periods 310.C.FA.P121 3310/IA/1-1 - AGL Ductbank (6381m) (was C11_6C3) d/w - 10h/d - With 34 2 03-Feb-23 14-Mar-23 16-Feb-23 27-Mar-23 11 HK Hols - No B/O periods 310.C.FA.P124 3310/IA/1-1 - AGL Mid Can (371 nr) - 20 no/d, 2 WF (was C11_6C3) d/w - 10h/d - With 11 2 01-Mar-23 13-Mar-23 14-Mar-23 25-Mar-23 11 HK Hols - No B/O periods 310.C.FA.P130 3310/IA/1-1 - AGL Top Can (371 nr) (was C11_6C3) d/w - 10h/d - With 16 1 25-Mar-23 17-Apr-23 12-Apr-23 29-Apr-23 11 HK Hols - No B/O periods 3310/IA/1 Interface Work Area Completion and Remaining Works (was C3) 262 2 10-Feb-23 27-Dec-23 06-Mar-23 29-Mar-24 76 310.C.FA.P828 3310/IA/1 - AGL Foundations/Earthing Rode C11_6 d/w - 10h/d - With 28 2 10-Feb-23 14-Mar-23 06-Mar-23 11-Apr-23 20 HK Hols - No B/O periods 310.C.FA.P180 Achieved KD-5A Complete all civil works for AGL Sys at IWA 3310/IA/1 & provide access (was C01_7C3) d/w - 10h/d - No HK 0 17-Apr-23 30-Apr-23 13 for Contract <3305> Hols - No B/O periods (was 310.C.FA.P184 Allow Access to Contract <3305> for AGL System Works for Interface Work Area C1) C01_7 d/w - 10h/d - No HK 0 17-Apr-23 30-Apr-23 13 3310/IA/1 Hols - No B/O periods (was 310.C.FA.P164 3310/IA/1 - AGL System Works (by Contract <3305>) (assumed 6 months) C1) C01_7 d/w - 10h/d - No HK 180 18-Apr-23 14-Oct-23 21-Jul-23 16-Jan-24 94 Hols - No B/O periods (was 310.C.FA.P160 3310/IA/1 - Runway Grooving C1) C11_6 d/w - 10h/d - With 12 16-Oct-23 30-Oct-23 17-Jan-24 30-Jan-24 76 HK Hols - No B/O periods 310.C.FA.P163 3310/IA/1 - Line Marking or defect remedial works @ 3310/IA/1 (was C11_6C3) d/w - 10h/d - With 48 31-Oct-23 27-Dec-23 31-Jan-24 28-Mar-24 76 HK Hols - No B/O periods 310.C.FA.P166 3310/IA/1 - Stabilized subgrade and Soil mixed with Hydroseeding (was C11_6C3) d/w - 10h/d - With 48 31-Oct-23 27-Dec-23 31-Jan-24 28-Mar-24 76 HK Hols - No B/O periods 310.C.FA.P170 WA 3310/3 - Vacate Work Area (was C01_7C3) d/w - 10h/d - No HK 0 27-Dec-23 29-Mar-24 93 Hols - No B/O periods (was Interface Work Area 3310/IA/2 (Pavement and AGL) C1) 466 36 05-Sep-22 28-Mar-24 10-May-23 25-Aug-24 120 3310/IA/2-2 C11_6 d/w - 10h/d - With HK Hols 357- No B/O18 periods (was 05-Sep-22 C3) 16-Nov-23 10-May-23 25-Nov-23 8 3310/IA/2-2 Pavement C11_6 d/w - 10h/d - With HK Hols 329- No B/O11 periods (was 05-Sep-22 C3) 13-Oct-23 10-May-23 04-Nov-23 18 310.C.FA.P860.B02 3310/IA/2 - Carry Out Survey to Check Level C11_6 d/w - 10h/d - With 6 1 05-Sep-22 12-Sep-22 10-May-23 16-May-23 199 HK Hols - No B/O periods 310.C.FA.P117 3310/IA/2-2 (Pavement) - Site Formation (4111 m3) (was C11_6C3) d/w - 10h/d - With 6 1 28-Jun-23 05-Jul-23 12-Jul-23 18-Jul-23 11 HK Hols - No B/O periods 310.C.FA.P120 3310/IA/2-2 (Pavement) - Subgrade Works (fill:9138m3, subgrade:41909m3) (was C11_6C3) d/w - 10h/d - With 47 2 18-Jul-23 09-Sep-23 19-Jul-23 11-Sep-23 1 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 22 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.FA.P126 3310/IA/2-2 (Pavement) - CASB (22007m3) (52816.80 tonne) C11_6 d/w - 10h/d - With 52 2 18-Jul-23 15-Sep-23 19-Jul-23 16-Sep-23 1 HK Hols - No B/O periods 310.C.FA.P144 3310/IA/2-2 (Pavement) - CABC (15260m3) (36624 tonne) (was C11_6C3) d/w - 10h/d - With 47 2 16-Aug-23 11-Oct-23 22-Aug-23 17-Oct-23 5 HK Hols - No B/O periods 310.C.FA.P156 3310/IA/2-2 (Pavement) - Asphalt (MABC/MAWC/PMABC) (9658m3) (23179.2 tonne) (was C11_6C3) d/w - 10h/d - With 32 2 02-Sep-23 11-Oct-23 26-Sep-23 04-Nov-23 20 HK Hols - No B/O periods 310.C.FA.P162 3310/IA/2-2 (Pavement) - Asphalt (PMAWC) (2230m3) (5352 tonne) (was C11_6C3) d/w - 10h/d - With 10 1 03-Oct-23 13-Oct-23 04-Oct-23 14-Oct-23 1 HK Hols - No B/O periods 3310/IA/2-2 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 95- No B/O 7periods (was 26-Jul-23 C3) 16-Nov-23 27-Jul-23 25-Nov-23 8 310.C.FA.P135 3310/IA/2-2 (AGL) - AGL Drawpit/Earthpit/Base Can (427 nr) - 8 no/d, 1 WF C11_6 d/w - 10h/d - With 55 2 26-Jul-23 27-Sep-23 27-Jul-23 28-Sep-23 1 HK Hols - No B/O periods 310.C.FA.P138 3310/IA/2-2 (AGL) - AGL Ductbank (5932 m) (was C11_6C3) d/w - 10h/d - With 52 2 29-Jul-23 27-Sep-23 04-Aug-23 05-Oct-23 5 HK Hols - No B/O periods 310.C.FA.P150 3310/IA/2-2 (AGL) - AGL Mid Can (427 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 23 2 01-Sep-23 27-Sep-23 02-Sep-23 28-Sep-23 1 HK Hols - No B/O periods 310.C.FA.P168 3310/IA/2-2 (AGL) - AGL Top Can (427 nr) (was C11_6C3) d/w - 10h/d - With 10 1 06-Nov-23 16-Nov-23 15-Nov-23 25-Nov-23 8 HK Hols - No B/O periods 3310/IA/2-1 (was C11_6C3) d/w - 10h/d - With HK Hols 109- No B/O16 periods (was 14-Jul-23 C3) 21-Nov-23 17-Jul-23 22-Nov-23 1 3310/IA/2-1 Pavement C11_6 d/w - 10h/d - With HK Hols 85- No B/O 9periods (was 14-Jul-23 C3) 24-Oct-23 17-Jul-23 25-Oct-23 1 310.C.FA.P105 3310/IA/2-1 (Pavement) - Subgrade Works (cut/fill: subrade:46593 m3) C11_6 d/w - 10h/d - With 52 2 14-Jul-23 12-Sep-23 17-Jul-23 14-Sep-23 2 HK Hols - No B/O periods 310.C.FA.P123 3310/IA/2-1 (Pavement) - CASB (25039m3) (60093.60 tonne) (was C11_6C3) d/w - 10h/d - With 62 2 26-Jul-23 07-Oct-23 28-Jul-23 10-Oct-23 2 HK Hols - No B/O periods 310.C.FA.P141 3310/IA/2-1 (Pavement) - CABC (17291m3) (41.498.40 tonne) (was C11_6C3) d/w - 10h/d - With 47 2 24-Aug-23 19-Oct-23 26-Aug-23 21-Oct-23 2 HK Hols - No B/O periods 310.C.FA.P153 3310/IA/2-1 (Pavement) - Asphalt (MABC/MAWC/PMABC) (11365m3) (27276 tonne) (was C11_6C3) d/w - 10h/d - With 42 2 26-Aug-23 16-Oct-23 29-Aug-23 18-Oct-23 2 HK Hols - No B/O periods 310.C.FA.P159 3310/IA/2-1 (Pavement) - Asphalt (PMAWC) (2464m3) (5913.6 tonne) (was C11_6C3) d/w - 10h/d - With 11 1 11-Oct-23 24-Oct-23 12-Oct-23 25-Oct-23 1 HK Hols - No B/O periods 3310/IA/2-1 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 101- No B/O 7periods (was 24-Jul-23 C3) 21-Nov-23 26-Jul-23 22-Nov-23 1 310.C.FA.P129 3310/IA/2-1 (AGL) - AGL Drawpit/Earthpit/Base Can (535 nr) - 8 no/d, 1 WF C11_6 d/w - 10h/d - With 69 2 24-Jul-23 13-Oct-23 26-Jul-23 16-Oct-23 2 HK Hols - No B/O periods 310.C.FA.P132 3310/IA/2-1 (AGL) - AGL Ductbank (10475 m) (was C11_6C3) d/w - 10h/d - With 62 2 01-Aug-23 13-Oct-23 03-Aug-23 16-Oct-23 2 HK Hols - No B/O periods 310.C.FA.P147 3310/IA/2-1 (AGL) - AGL Mid Can (535 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 29 2 05-Sep-23 10-Oct-23 07-Sep-23 12-Oct-23 2 HK Hols - No B/O periods 310.C.FA.P165 3310/IA/2-1 (AGL) - AGL Top Can (535 nr) (was C11_6C3) d/w - 10h/d - With 11 1 09-Nov-23 21-Nov-23 10-Nov-23 22-Nov-23 1 HK Hols - No B/O periods 3310/IA/2 Interface Work Area Completion and Remaining Works (was C3) 137 2 14-Oct-23 28-Mar-24 20-Oct-23 25-Aug-24 120 310.C.FA.P832 3310/IA/2 - AGL Foundations/Earthing Rode C11_6 d/w - 10h/d - With 28 2 14-Oct-23 16-Nov-23 20-Oct-23 22-Nov-23 5 HK Hols - No B/O periods 310.C.FA.P108 Achieved KD-5F Complete all civil works for AGL Sys at IWA 3310/IA/2 & provide access (was C01_7C3) d/w - 10h/d - No HK 0 21-Nov-23 25-Nov-23 4 for Contract <3305> Hols - No B/O periods (was 310.C.FA.P111 Allow Access to Contract <3305> for AGL System Works for Interface Work Area C1) C01_7 d/w - 10h/d - No HK 0 21-Nov-23 25-Nov-23 4 3310/IA/2 Hols - No B/O periods (was 310.C.FA.P102 Achieved PMS 08 - Complete all civil enabling works in 3310/IA/2 & allow access for C1) C11_6 d/w - 10h/d - With 3 22-Nov-23 24-Nov-23 23-Nov-23 25-Nov-23 1 Others to install HK Hols - No B/O periods 310.C.FA.P114 3310/IA/2 - AGL System Works (by Contract <3305>) (assumed 3 months) (was C01_7C3) d/w - 10h/d - No HK 90 25-Nov-23 22-Feb-24 26-Nov-23 23-Feb-24 1 Hols - No B/O periods (was 310.C.FA.P174 3310/IA/2 - Soil mixed with Hydroseeding C1) C11_6 d/w - 10h/d - With 30 14-Feb-24 19-Mar-24 23-Feb-24 28-Mar-24 8 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 23 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.FA.P171 3310/IA/2 - Line Marking or defect remedial works C11_6 d/w - 10h/d - With 30 23-Feb-24 28-Mar-24 24-Feb-24 02-Apr-24 1 HK Hols - No B/O periods 310.C.FA.P177 WA 3310/5, 6, 6A, & 7, 7A - Vacate Work Area (Portion) (was C01_7C3) d/w - 10h/d - No HK 0 28-Mar-24 25-Aug-24 150 Hols - No B/O periods (was Interface Work Area 3310/IA/3 (Pavement and AGL) C1) 485 58 13-Sep-22 02-May-24 17-May-23 25-Aug-24 95 3310/IA/3-3 C11_6 d/w - 10h/d - With HK Hols 374- No B/O18 periods (was 13-Sep-22 C3) 13-Dec-23 17-May-23 16-Dec-23 3 3310/IA/3-3 Pavement C11_6 d/w - 10h/d - With HK Hols 314- No B/O11 periods (was 13-Sep-22 C3) 03-Oct-23 17-May-23 30-Nov-23 49 310.C.FA.P865.B02 3310/IA/3 - Carry Out Survey to Check Level C11_6 d/w - 10h/d - With 6 1 13-Sep-22 19-Sep-22 17-May-23 23-May-23 199 HK Hols - No B/O periods 310.C.FA.P400 3310/IA/3-3 (Pavement) - Subgrade Works (cut:2077m3; subgrade:13223m3) (was C11_6C3) d/w - 10h/d - With 35 2 02-Mar-23 15-Apr-23 29-Jul-23 07-Sep-23 120 HK Hols - No B/O periods 310.C.FA.P796 3310/IA/3-3 - Milling of the Existing Runway (was C11_6C3) d/w - 10h/d - With 6 2 17-Apr-23 22-Apr-23 25-Oct-23 31-Oct-23 157 HK Hols - No B/O periods 310.C.FA.P403 3310/IA/3-3 (Pavement) - CASB (9853m3) (23647.20 tonne) (was C11_6C3) d/w - 10h/d - With 23 2 17-Apr-23 13-May-23 08-Sep-23 06-Oct-23 120 HK Hols - No B/O periods 310.C.FA.P412 3310/IA/3-3 (Pavement) - CABC (7201m3) (17282.40 tonne) (was C11_6C3) d/w - 10h/d - With 23 2 11-May-23 07-Jun-23 04-Oct-23 31-Oct-23 120 HK Hols - No B/O periods 310.C.FA.P418 3310/IA/3-3 (Pavement) - Asphalt (MABC/MAWC/PMABC) (3414m3) (8193.6 tonne) (was C11_6C3) d/w - 10h/d - With 14 1 08-Jun-23 24-Jun-23 01-Nov-23 16-Nov-23 120 HK Hols - No B/O periods 310.C.FA.P421 3310/IA/3-3 (Pavement) - Asphalt (PMAWC) (2668m3) (6403.2 tonne) (was C11_6C3) d/w - 10h/d - With 12 1 18-Sep-23 03-Oct-23 17-Nov-23 30-Nov-23 49 HK Hols - No B/O periods 3310/IA/3-3 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 197- No B/O 7periods (was 20-Apr-23 C3) 13-Dec-23 10-Oct-23 16-Dec-23 3 310.C.FA.P406 3310/IA/3-3 (AGL) - AGL Drawpit/Earthpit/Base Can (184 nr) - 8 no/d, 1 WF C11_6 d/w - 10h/d - With 25 2 20-Apr-23 19-May-23 10-Oct-23 08-Nov-23 142 HK Hols - No B/O periods 310.C.FA.P409 3310/IA/3-3 (AGL) - AGL Ductbank (3523 m) (was C11_6C3) d/w - 10h/d - With 30 2 20-Apr-23 25-May-23 10-Oct-23 14-Nov-23 142 HK Hols - No B/O periods 310.C.FA.P415 3310/IA/3-3 (AGL) - AGL Mid Can (184 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 11 2 27-May-23 08-Jun-23 21-Nov-23 02-Dec-23 147 HK Hols - No B/O periods 310.C.FA.P424 3310/IA/3-3 (AGL) - AGL Top Can (184 nr) (was C11_6C3) d/w - 10h/d - With 12 1 30-Nov-23 13-Dec-23 04-Dec-23 16-Dec-23 3 HK Hols - No B/O periods 3310/IA/3-1 (was C11_6C3) d/w - 10h/d - With HK Hols 174- No B/O17 periods (was 18-May-23 C3) 13-Dec-23 18-Jul-23 16-Dec-23 3 3310/IA/3-1 Pavement C11_6 d/w - 10h/d - With HK Hols 106- No B/O10 periods (was 18-May-23 C3) 21-Sep-23 18-Jul-23 21-Nov-23 49 310.C.FA.P427 3310/IA/3-1 (Pavement) - Subgrade Works (fill:4637m3; subgrade: 25259m3) C11_6 d/w - 10h/d - With 34 2 18-May-23 28-Jun-23 18-Jul-23 25-Aug-23 49 HK Hols - No B/O periods 310.C.FA.P430 3310/IA/3-1 (Pavement) - CASB (15469m3) (37125.60 tonne) (was C11_6C3) d/w - 10h/d - With 48 2 31-May-23 27-Jul-23 29-Jul-23 22-Sep-23 49 HK Hols - No B/O periods 310.C.FA.P800 3310/IA/3-1 - Milling of the Existing Runway (was C11_6C3) d/w - 10h/d - With 6 2 29-Jun-23 06-Jul-23 14-Oct-23 20-Oct-23 89 HK Hols - No B/O periods 310.C.FA.P433 3310/IA/3-1 (Pavement) - CABC (12965m3) (31116.0 tonne) (was C11_6C3) d/w - 10h/d - With 41 2 28-Jul-23 13-Sep-23 23-Sep-23 13-Nov-23 49 HK Hols - No B/O periods 310.C.FA.P436 3310/IA/3-1 (Pavement) - Asphalt (MABC/MAWC/PMABC) (3567m3) (8560.8 tonne) (was C11_6C3) d/w - 10h/d - With 15 1 23-Aug-23 08-Sep-23 21-Oct-23 08-Nov-23 49 HK Hols - No B/O periods 310.C.FA.P439 3310/IA/3-1 (Pavement) - Asphalt (PMAWC) (2273m3) (5455.2 tonne) (was C11_6C3) d/w - 10h/d - With 11 1 09-Sep-23 21-Sep-23 09-Nov-23 21-Nov-23 49 HK Hols - No B/O periods 3310/IA/3-1 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 154- No B/O 7periods (was 12-Jun-23 C3) 13-Dec-23 04-Sep-23 16-Dec-23 3 310.C.FA.P442 3310/IA/3-1 (AGL) - AGL Drawpit/Earthpit/Base Can (298 nr) - 8 no/d, 1 WF C11_6 d/w - 10h/d - With 39 2 12-Jun-23 28-Jul-23 09-Sep-23 27-Oct-23 75 HK Hols - No B/O periods 310.C.FA.P445 3310/IA/3-1 (AGL) - AGL Ductbank (5195 m) (was C11_6C3) d/w - 10h/d - With 48 2 12-Jun-23 08-Aug-23 04-Sep-23 01-Nov-23 70 HK Hols - No B/O periods 310.C.FA.P448 3310/IA/3-1 (AGL) - AGL Mid Can (298 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 17 2 09-Aug-23 28-Aug-23 07-Oct-23 27-Oct-23 49 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 24 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.FA.P451 3310/IA/3-1 (AGL) - AGL Top Can (298 nr) C11_6 d/w - 10h/d - With 11 1 01-Dec-23 13-Dec-23 05-Dec-23 16-Dec-23 3 HK Hols - No B/O periods 3310/IA/3-2b (EVT) (was C11_6C3) d/w - 10h/d - With HK Hols 155- No B/O 7periods (was 09-Jun-23 C3) 13-Dec-23 17-Oct-23 16-Dec-23 3 3310/IA/3-2b (EVT) Pavement C11_6 d/w - 10h/d - With HK Hols 51- No B/O 2periods (was 09-Jun-23 C3) 10-Aug-23 17-Oct-23 16-Dec-23 107 310.C.FA.P401 *** Complete Backfilling of EVT(Southern Section) *** C11_6 d/w - 10h/d - With 0 09-Jun-23 17-Oct-23 107 HK Hols - No B/O periods 310.C.FA.P407 3310/IA/3-2b (Pavement) - Subgrade Works for Taxiway (cut:6770m3; subgrade:5747m3) (was C11_6C3) d/w - 10h/d - With 14 10-Jun-23 27-Jun-23 18-Oct-23 03-Nov-23 107 HK Hols - No B/O periods 310.C.FA.P804 3310/IA/3-2b - Milling of the Existing Runway (was C11_6C3) d/w - 10h/d - With 6 2 28-Jun-23 05-Jul-23 30-Nov-23 06-Dec-23 129 HK Hols - No B/O periods 310.C.FA.P410 3310/IA/3-2b (Pavement) - CASB (3248m3) (7795.20 tonne) (was C11_6C3) d/w - 10h/d - With 12 28-Jun-23 12-Jul-23 04-Nov-23 17-Nov-23 107 HK Hols - No B/O periods 310.C.FA.P404 3310/IA/3-2b (Pavement) - CABC (3247m3) (7792.80 tonne) (was C11_6C3) d/w - 10h/d - With 10 18-Jul-23 28-Jul-23 23-Nov-23 04-Dec-23 107 HK Hols - No B/O periods 310.C.FA.P419 3310/IA/3-2b - realign interim security fence (was C11_6C3) d/w - 10h/d - With 10 31-Jul-23 10-Aug-23 06-Dec-23 16-Dec-23 107 HK Hols - No B/O periods 310.C.FA.P413 3310/IA/3-2b (Pavement) - Asphalt (MABC/MAWC/PMABC) (1010m3) (2424 tonne) (was C11_6C3) d/w - 10h/d - With 4 01-Aug-23 04-Aug-23 07-Dec-23 11-Dec-23 107 HK Hols - No B/O periods 310.C.FA.P416 3310/IA/3-2b (Pavement) - Asphalt (PMAWC) (1259m3) (3021.6 tonne) (was C11_6C3) d/w - 10h/d - With 5 05-Aug-23 10-Aug-23 12-Dec-23 16-Dec-23 107 HK Hols - No B/O periods 3310/IA/3-2b (EVT) AGL (was C11_6C3) d/w - 10h/d - With HK Hols 136- No B/O 5periods (was 05-Jul-23 C3) 13-Dec-23 10-Nov-23 16-Dec-23 3 310.C.FA.P422 3310/IA/3-2b (AGL) - AGL Drawpit/Earthpit/Base Can (46 nr) - 8 no/d, 1 WF C11_6 d/w - 10h/d - With 7 1 05-Jul-23 12-Jul-23 10-Nov-23 17-Nov-23 107 HK Hols - No B/O periods 310.C.FA.P425 3310/IA/3-2b (AGL) - AGL Ductbank (800 m) (was C11_6C3) d/w - 10h/d - With 12 2 11-Jul-23 24-Jul-23 16-Nov-23 29-Nov-23 107 HK Hols - No B/O periods 310.C.FA.P428 3310/IA/3-2b (AGL) - AGL Mid Can (46 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 3 1 29-Jul-23 01-Aug-23 05-Dec-23 07-Dec-23 107 HK Hols - No B/O periods 310.C.FA.P431 3310/IA/3-2b (AGL) - AGL Top Can (46 nr) (was C11_6C3) d/w - 10h/d - With 5 1 08-Dec-23 13-Dec-23 12-Dec-23 16-Dec-23 3 HK Hols - No B/O periods 3310/IA/3-2a (EVT) (was C11_6C3) d/w - 10h/d - With HK Hols 53- No B/O14 periods (was 12-Oct-23 C3) 13-Dec-23 16-Oct-23 16-Dec-23 3 3310/IA/3-2a (EVT) Pavement C11_6 d/w - 10h/d - With HK Hols 44- No B/O 8periods (was 12-Oct-23 C3) 02-Dec-23 16-Oct-23 11-Dec-23 7 310.C.FA.P432 3310/IA/3 -2a (Pavement) - Subgrade Works (cut/fill:0; subgrade:17344m3) C11_6 d/w - 10h/d - With 21 2 12-Oct-23 06-Nov-23 16-Oct-23 09-Nov-23 3 HK Hols - No B/O periods 310.C.FA.P435 3310/IA/3 -2a (Pavement) - CASB (9081m3) (21794.40 tonne) (was C11_6C3) d/w - 10h/d - With 21 2 18-Oct-23 11-Nov-23 21-Oct-23 15-Nov-23 3 HK Hols - No B/O periods 310.C.FA.P438 3310/IA/3 -2a (Pavement) - CABC (6995m3) (16788.00 tonne) (was C11_6C3) d/w - 10h/d - With 21 2 31-Oct-23 23-Nov-23 08-Nov-23 01-Dec-23 7 HK Hols - No B/O periods 310.C.FA.P441 3310/IA/3 -2a (Pavement) - Asphalt (MABC/MAWC/PMABC) (3659m3) (8781.6 tonne) (was C11_6C3) d/w - 10h/d - With 14 1 11-Nov-23 27-Nov-23 20-Nov-23 05-Dec-23 7 HK Hols - No B/O periods 310.C.FA.P444 3310/IA/3 -2a (Pavement) - Asphalt (PMAWC) (935m3) (2244 tonne) (was C11_6C3) d/w - 10h/d - With 5 1 28-Nov-23 02-Dec-23 06-Dec-23 11-Dec-23 7 HK Hols - No B/O periods 3310/IA/3-2a (EVT) AGL (was C11_6C3) d/w - 10h/d - With HK Hols 51- No B/O 6periods (was 14-Oct-23 C3) 13-Dec-23 18-Oct-23 16-Dec-23 3 310.C.FA.P450 3310/IA/3 -2a (AGL) - AGL Ductbank (3130 m) C11_6 d/w - 10h/d - With 29 2 14-Oct-23 17-Nov-23 18-Oct-23 21-Nov-23 3 HK Hols - No B/O periods 310.C.FA.P447 3310/IA/3 -2a (AGL) - AGL Drawpit/Earthpit/Base Can (151 nr) - 8 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 21 2 25-Oct-23 17-Nov-23 02-Nov-23 25-Nov-23 7 HK Hols - No B/O periods 310.C.FA.P453 3310/IA/3 -2a (AGL) - AGL Mid Can (151 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 9 1 11-Nov-23 21-Nov-23 20-Nov-23 29-Nov-23 7 HK Hols - No B/O periods 310.C.FA.P456 3310/IA/3 -2a (AGL) - AGL Top Can (151 nr) (was C11_6C3) d/w - 10h/d - With 5 1 08-Dec-23 13-Dec-23 12-Dec-23 16-Dec-23 3 HK Hols - No B/O periods 3310/IA/3 Interface Work Area Completion and Remaining Works (was C3) 139 2 11-Nov-23 02-May-24 15-Nov-23 25-Aug-24 95
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 25 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.FA.P836 3310/IA/3 - AGL Foundations/Earthing Rode C11_6 d/w - 10h/d - With 28 2 11-Nov-23 13-Dec-23 15-Nov-23 16-Dec-23 3 HK Hols - No B/O periods 310.C.FA.P455 Achieved KD-5G Complete all civil works for AGL Sys at IWA 3310/IA/3 & provide access (was C01_7C3) d/w - 10h/d - No HK 0 13-Dec-23 17-Dec-23 4 for Contract <3305> Hols - No B/O periods (was 310.C.FA.P458 Allow Access to Contract <3305> for AGL System Works for Interface Work Area C1) C01_7 d/w - 10h/d - No HK 0 13-Dec-23 19-Dec-23 6 3310/IA/3 Hols - No B/O periods (was 310.C.FA.P452 Achieved PMS #16 - Complete all civil wks in 3310/IA/3 &provide access for Others to C1) C11_6 d/w - 10h/d - With 0 13-Dec-23 28-Mar-24 86 complete installation of AGL system HK Hols - No B/O periods 310.C.FA.P784 3310/IA/3 - AGL System Works (by Contract <3305>) (assumed 3 months) (was C01_7C3) d/w - 10h/d - No HK 90 14-Dec-23 12-Mar-24 20-Dec-23 18-Mar-24 6 Hols - No B/O periods (was 310.C.FA.P470 3310/IA/3 - Soil mixed with Hydroseeding (3412 m3) @3310/IA/3-1 C1) C11_6 d/w - 10h/d - With 30 17-Feb-24 22-Mar-24 23-Feb-24 28-Mar-24 5 HK Hols - No B/O periods 310.C.FA.P464 3310/IA/3 - Runway Grooving @3310/IA/3 (was C11_6C3) d/w - 10h/d - With 9 13-Mar-24 22-Mar-24 19-Mar-24 28-Mar-24 5 HK Hols - No B/O periods 310.C.FA.P467 3310/IA/3 - Line Marking or defect remedial works @3310/IA/3-2a (was C11_6C3) d/w - 10h/d - With 30 23-Mar-24 02-May-24 02-Apr-24 08-May-24 5 HK Hols - No B/O periods 310.C.FA.P473 WA 3310/3, 6, 6B, 6C, 7, 8 & B - Vacate Work Area (Portion) (was C01_7C3) d/w - 10h/d - No HK 0 02-May-24 25-Aug-24 115 Hols - No B/O periods (was Interface Work Area 3310/IA/4 (Pavement and AGL) C1) 381 38 20-Sep-22 30-Dec-23 24-May-23 24-Aug-24 193 3310/IA/4-1 C11_6 d/w - 10h/d - With HK Hols 279- No B/O13 periods (was 20-Sep-22 C3) 28-Aug-23 24-May-23 23-Sep-23 23 3310/IA/4-1 Pavement C11_6 d/w - 10h/d - With HK Hols 218- No B/O 9periods (was 20-Sep-22 C3) 15-Jun-23 24-May-23 11-Sep-23 73 310.C.FA.P870.B02 3310/IA/4 - Carry Out Survey to Check Level C11_6 d/w - 10h/d - With 6 1 20-Sep-22 26-Sep-22 24-May-23 31-May-23 199 HK Hols - No B/O periods 310.C.FA.P742 3310/IA/4-1 (Pavement) - Site Formation (was C11_6C3) d/w - 10h/d - With 2 1 09-Jan-23 10-Jan-23 07-Jul-23 08-Jul-23 143 HK Hols - No B/O periods 310.C.FA.P744 3310/IA/4-1 (Pavement) - Subgrade Works (fill:3473m3; subgrade:5276m3) (was C11_6C3) d/w - 10h/d - With 14 1 11-Apr-23 26-Apr-23 10-Jul-23 25-Jul-23 73 HK Hols - No B/O periods 310.C.FA.P748 3310/IA/4-1 (Pavement) - CASB (4399m3) (10557.60 tonne) (was C11_6C3) d/w - 10h/d - With 14 1 17-Apr-23 03-May-23 15-Jul-23 31-Jul-23 73 HK Hols - No B/O periods 310.C.FA.P808 3310/IA/4-1 Milling of the Existing Runway (was C11_6C3) d/w - 10h/d - With 6 2 27-Apr-23 04-May-23 18-Aug-23 24-Aug-23 93 HK Hols - No B/O periods 310.C.FA.P752 3310/IA/4-1 (Pavement) - CABC (3399m3) (8157.60 tonne) (was C11_6C3) d/w - 10h/d - With 11 1 03-May-23 15-May-23 31-Jul-23 11-Aug-23 73 HK Hols - No B/O periods 310.C.FA.P756 3310/IA/4-1 (Pavement) - Asphalt (MABC/MAWC/PMABC) (2082m3) (4996.8 tonne) (was C11_6C3) d/w - 10h/d - With 9 1 18-May-23 29-May-23 15-Aug-23 24-Aug-23 73 HK Hols - No B/O periods 310.C.FA.P760 3310/IA/4-1 (Pavement) - Asphalt (PMAWC) (3504m3) (8409.6 tonne) (was C11_6C3) d/w - 10h/d - With 15 1 30-May-23 15-Jun-23 25-Aug-23 11-Sep-23 73 HK Hols - No B/O periods 3310/IA/4-1 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 107- No B/O 4periods (was 21-Apr-23 C3) 28-Aug-23 20-Jul-23 23-Sep-23 23 310.C.FA.P768 3310/IA/4-1 (AGL) - AGL Drawpit/Earthpit/Base Can (112 nr) - 8 no/d, 1 WF C11_6 d/w - 10h/d - With 15 1 21-Apr-23 09-May-23 20-Jul-23 05-Aug-23 73 HK Hols - No B/O periods 310.C.FA.P772 3310/IA/4-1 (AGL) - AGL Ductbank (2625 m) (was C11_6C3) d/w - 10h/d - With 14 1 22-Apr-23 09-May-23 21-Jul-23 05-Aug-23 73 HK Hols - No B/O periods 310.C.FA.P776 3310/IA/4-1( AGL) - AGL Mid Can (112 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 7 1 15-May-23 22-May-23 11-Aug-23 18-Aug-23 73 HK Hols - No B/O periods 310.C.FA.P780 3310/IA/4-1 (AGL) - AGL Top Can 112nr) (was C11_6C3) d/w - 10h/d - With 11 1 16-Aug-23 28-Aug-23 12-Sep-23 23-Sep-23 23 HK Hols - No B/O periods 3310/IA/4-3 (was C11_6C3) d/w - 10h/d - With HK Hols 130- No B/O15 periods (was 17-Mar-23 C3) 24-Aug-23 13-Jun-23 23-Sep-23 26 3310/IA/4-3 Pavement C11_6 d/w - 10h/d - With HK Hols 69- No B/O 9periods (was 17-Mar-23 C3) 12-Jun-23 13-Jun-23 22-Sep-23 86 310.C.FA.P061 3310/IA/4-3 (Pavement) - Site Formation C11_6 d/w - 10h/d - With 1 1 17-Mar-23 17-Mar-23 13-Jun-23 13-Jun-23 69 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 26 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.FA.P064 3310/IA/4-3 (Pavement) - Subgrade Works (cut:10366m3; subgrade:27681 m3) C11_6 d/w - 10h/d - With 35 2 18-Mar-23 03-May-23 14-Jun-23 26-Jul-23 69 HK Hols - No B/O periods 310.C.FA.P067 3310/IA/4-3 (Pavement) - CASB (15297m3) (36712.80 tonne) (was C11_6C3) d/w - 10h/d - With 45 2 24-Mar-23 20-May-23 20-Jun-23 12-Aug-23 69 HK Hols - No B/O periods 310.C.FA.P076 3310/IA/4-3 (Pavement) - CABC (14475m3) (34740.00 tonne) (was C11_6C3) d/w - 10h/d - With 44 2 11-Apr-23 02-Jun-23 03-Aug-23 22-Sep-23 94 HK Hols - No B/O periods 310.C.FA.P082 3310/IA/4-3 (Pavement) - Asphalt (MABC/MAWC/PMABC) (4256m3) (10214.4 tonne) (was C11_6C3) d/w - 10h/d - With 16 1 15-May-23 02-Jun-23 31-Aug-23 18-Sep-23 90 HK Hols - No B/O periods 310.C.FA.P085 3310/IA/4-3 (Pavement) - Asphalt (PMAWC) (3432m3) (8236.8 tonne) (was C11_6C3) d/w - 10h/d - With 13 1 29-May-23 12-Jun-23 30-Aug-23 13-Sep-23 78 HK Hols - No B/O periods 3310/IA/4-3 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 121- No B/O 6periods (was 28-Mar-23 C3) 24-Aug-23 24-Jun-23 23-Sep-23 26 310.C.FA.P073 3310/IA/4-3 (AGL) - AGL Ductbank (5161 m) C11_6 d/w - 10h/d - With 47 2 28-Mar-23 27-May-23 24-Jun-23 18-Aug-23 69 HK Hols - No B/O periods 310.C.FA.P070 3310/IA/4-3 (AGL) - AGL Drawpit/Earthpit/Base Can (251 nr) - 8 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 33 2 18-Apr-23 27-May-23 22-Jul-23 29-Aug-23 78 HK Hols - No B/O periods 310.C.FA.P079 3310/IA/4-3( AGL) - AGL Mid Can (251 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 13 1 12-May-23 27-May-23 15-Aug-23 29-Aug-23 78 HK Hols - No B/O periods 310.C.FA.P088 3310/IA/4-3 (AGL) - AGL Top Can (251 nr) (was C11_6C3) d/w - 10h/d - With 9 1 15-Aug-23 24-Aug-23 14-Sep-23 23-Sep-23 26 HK Hols - No B/O periods 3310/IA/4-2 (was C3) - NOTAM (M,W,Th,Su-01:30-07:30) C23_4d/w 64 8 - No HK 26-Mar-23 Hols - With B/O 27-Aug-23 Periods & Flight01-Jun-23 Checks 24-Sep-23 17 3310/IA/4-2 Pavement C23_4d/w - NOTAM (M,W,Th,Su-01:30-07:30) 36 4 - No HK 26-Mar-23 Hols - With B/O06-Jul-23 Periods & Flight01-Jun-23 Checks 10-Sep-23 37 310.C.FA.P089 3310/IA/4-2 (Pavement) - Reinstatement of Taxiways T, B6 and A (after modification of C23_4d/w - NOTAM 11 1 26-Mar-23 24-May-23 01-Jun-23 19-Jun-23 15 existing drainage) [NOTAM] (M,W,Th,Su-01:30-07:30) - 310.C.FA.P092 3310/IA/4-2 (Pavement) - Milling or Excavation [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 5 1 25-May-23 01-Jun-23 21-Jun-23 28-Jun-23 15 (M,W,Th,Su-01:30-07:30) - 310.C.FA.P095 3310/IA/4-2 (Pavement) - Asphalt (MABC/MAWC/PMABC) (377m3) (904.80 No HK Hols- -NOTAM C23_4d/w With B/O 11 1 11-Jun-23 28-Jun-23 14-Aug-23 31-Aug-23 37 tonne)[NOTAM] (M,W,Th,Su-01:30-07:30) - 310.C.FA.P098 3310/IA/4-2 (Pavement) - Asphalt (PMAWC) (1056m3) (2534.40 tonne) [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 5 1 29-Jun-23 06-Jul-23 03-Sep-23 10-Sep-23 37 (M,W,Th,Su-01:30-07:30) - 3310/IA/4-2 AGL No HK Hols- -NOTAM C23_4d/w With B/O(M,W,Th,Su-01:30-07:30) 54 4 - No HK 24-May-23 Hols - With B/O 27-Aug-23 Periods & Flight19-Jun-23 Checks 24-Sep-23 17 310.C.FA.P113 3310/IA/4-2 (AGL) - AGL Ductbank (561 m) [NOTAM] C23_4d/w - NOTAM 11 1 24-May-23 11-Jun-23 19-Jun-23 06-Jul-23 15 (M,W,Th,Su-01:30-07:30) - 310.C.FA.P116 3310/IA/4-2 (AGL) - AGL Drawpit/Earthpit/Base Can (18 nr) [NOTAM] - 2 no/d, 1 WF No HK Hols- -NOTAM C23_4d/w With B/O 10 1 25-May-23 11-Jun-23 30-Jul-23 14-Aug-23 37 (NOTAM) (M,W,Th,Su-01:30-07:30) - 310.C.FA.P119 3310/IA/4-2 (AGL) - AGL Mid Can (18 nr) [NOTAM] - 5 no/d, 1 WF (NOTAM) No HK Hols- -NOTAM C23_4d/w With B/O 5 1 12-Jun-23 19-Jun-23 16-Aug-23 23-Aug-23 37 (M,W,Th,Su-01:30-07:30) - 310.C.FA.P122 3310/IA/4-2 (AGL) - AGL Top Can (18 nr) [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 8 1 13-Aug-23 27-Aug-23 11-Sep-23 24-Sep-23 17 (M,W,Th,Su-01:30-07:30) - 3310/IA/4 Interface Work Area Completion and Remaining Works No HK Hols - With B/O 133 2 24-Jul-23 30-Dec-23 19-Aug-23 24-Aug-24 193 310.C.FA.P840 3310/IA/4 - AGL Foundations/Earthing Rode C11_6 d/w - 10h/d - With 28 2 24-Jul-23 24-Aug-23 19-Aug-23 20-Sep-23 23 HK Hols - No B/O periods 310.C.FA.P101 Achieved KD-5E Complete all civil works for AGL Sys at IWA 3310/IA/4 & provide access (was C01_7C3) d/w - 10h/d - No HK 0 28-Aug-23 24-Sep-23 27 for Contract <3305> Hols - No B/O periods (was 310.C.FA.P104 Allow Access to Contract <3305> for AGL System Works for Interface Work Area C1) C01_7 d/w - 10h/d - No HK 0 28-Aug-23 27-Nov-23 91 3310/IA/4 Hols - No B/O periods (was 310.C.FA.P107 3310/IA/4 - AGL System Works (by Contract <3305>) (assumed 3 months) C1) C01_7 d/w - 10h/d - No HK 90 29-Aug-23 26-Nov-23 28-Nov-23 25-Feb-24 91 Hols - No B/O periods (was 310.C.FA.P110 3310/IA/4 - Runway Grooving C1) C11_6 d/w - 10h/d - With 9 27-Nov-23 06-Dec-23 26-Feb-24 06-Mar-24 73 HK Hols - No B/O periods 310.C.FA.P128 3310/IA/4- Line Marking or defect remedial works [NOTAM] (was C3) - NOTAM C23_4d/w 6 07-Dec-23 17-Dec-23 14-Mar-24 24-Mar-24 32 (M,W,Th,Su-01:30-07:30) - No HK Hols - With B/O Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 27 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.FA.P125 3310/IA/4 -Soil mixed with Hydroseeding C11_6 d/w - 10h/d - With 19 07-Dec-23 30-Dec-23 07-Mar-24 28-Mar-24 73 HK Hols - No B/O periods 310.C.FA.P131 3310/IA/4 - Vacate Work Areas 3310/2, 3, 8, 8A, 8B (was C11_6C3) d/w - 10h/d - With 0 30-Dec-23 24-Aug-24 193 HK Hols - No B/O periods Interface Work Area 3310/IA/5 (Pavement and AGL) (was C3) 447 60 27-Sep-22 27-Mar-24 07-Sep-23 25-Aug-24 121 3310/IA/5-1 C11_6 d/w - 10h/d - With HK Hols 386- No B/O17 periods (was 27-Sep-22 C3) 13-Jan-24 07-Sep-23 13-Jan-24 0 3310/IA/5-1 Pavement C11_6 d/w - 10h/d - With HK Hols 361- No B/O11 periods (was 27-Sep-22 C3) 12-Dec-23 07-Sep-23 05-Jan-24 18 310.C.FA.P875.B02 3310/IA/5 - Carry Out Survey to Check Level C11_6 d/w - 10h/d - With 6 1 27-Sep-22 05-Oct-22 07-Sep-23 13-Sep-23 281 HK Hols - No B/O periods 310.C.FA.P475 3310/IA/5-1 (Pavement) - Subgrade Works (cut:7193m3; subgrade:14505 m3) (was C11_6C3) d/w - 10h/d - With 38 2 14-Sep-23 31-Oct-23 07-Oct-23 21-Nov-23 18 HK Hols - No B/O periods 310.C.FA.P478 3310/IA/5-1 (Pavement) - CASB (9928m3)(23827.20 tonne) (was C11_6C3) d/w - 10h/d - With 32 2 29-Sep-23 08-Nov-23 24-Oct-23 29-Nov-23 18 HK Hols - No B/O periods 310.C.FA.P484 3310/IA/5-1 (Pavement) - CABC (8432m3) (20236.80 tonne) (was C11_6C3) d/w - 10h/d - With 27 2 24-Oct-23 23-Nov-23 14-Nov-23 14-Dec-23 18 HK Hols - No B/O periods 310.C.FA.P812 3310/IA/5-1 - Milling of the Existing Runway (was C11_6C3) d/w - 10h/d - With 6 2 01-Nov-23 07-Nov-23 04-Dec-23 09-Dec-23 28 HK Hols - No B/O periods 310.C.FA.P505 3310/IA/5-1 (Pavement) - Asphalt (MABC/MAWC/PMABC) (2585m3) (6204 tonne) (was C11_6C3) d/w - 10h/d - With 11 1 20-Nov-23 01-Dec-23 11-Dec-23 22-Dec-23 18 HK Hols - No B/O periods 310.C.FA.P511 3310/IA/5-1 (Pavement) - Asphalt (PMAWC) (2124m3) (5097.6 tonne) (was C11_6C3) d/w - 10h/d - With 9 1 02-Dec-23 12-Dec-23 23-Dec-23 05-Jan-24 18 HK Hols - No B/O periods 3310/IA/5-1 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 89- No B/O 6periods (was 26-Sep-23 C3) 13-Jan-24 19-Oct-23 13-Jan-24 0 310.C.FA.P485 3310/IA/5-1 (AGL) - AGL Drawpit/Earthpit/Base Can (313 nr) - 8 no/d, 1 WF C11_6 d/w - 10h/d - With 41 2 26-Sep-23 15-Nov-23 19-Oct-23 06-Dec-23 18 HK Hols - No B/O periods 310.C.FA.P488 3310/IA/5-1 (AGL) - AGL Ductbank (4719m) (was C11_6C3) d/w - 10h/d - With 32 2 09-Oct-23 15-Nov-23 31-Oct-23 06-Dec-23 18 HK Hols - No B/O periods 310.C.FA.P494 3310/IA/5-1 (AGL) - AGL Mid Can (313 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 17 1 04-Nov-23 23-Nov-23 25-Nov-23 14-Dec-23 18 HK Hols - No B/O periods 310.C.FA.P503 3310/IA/5-1 (AGL) - AGL Top Can (313 nr) (was C11_6C3) d/w - 10h/d - With 9 1 04-Jan-24 13-Jan-24 04-Jan-24 13-Jan-24 0 HK Hols - No B/O periods 3310/IA/5-2b (was C11_6C3) d/w - 10h/d - With HK Hols 93- No B/O13 periods (was 21-Sep-23 C3) 13-Jan-24 28-Oct-23 13-Jan-24 0 3310/IA/5-2b Pavement C11_6 d/w - 10h/d - With HK Hols 53- No B/O 8periods (was 21-Sep-23 C3) 24-Nov-23 28-Oct-23 09-Jan-24 36 310.C.FA.P481 3310/IA/5-2b (Pavement) - Subgrade Works (cut:1676m3: subgrade:2523m3) C11_6 d/w - 10h/d - With 33 2 21-Sep-23 01-Nov-23 28-Oct-23 05-Dec-23 29 HK Hols - No B/O periods 310.C.FA.P487 3310/IA/5-2b (Pavement) - CASB (1971m3) (4730.40 tonne) (was C11_6C3) d/w - 10h/d - With 23 2 11-Oct-23 07-Nov-23 15-Nov-23 11-Dec-23 29 HK Hols - No B/O periods 310.C.FA.P496 3310/IA/5-2b (Pavement) - CABC (2004m3) (4809.60 tonne) (was C11_6C3) d/w - 10h/d - With 22 2 25-Oct-23 18-Nov-23 06-Dec-23 03-Jan-24 36 HK Hols - No B/O periods 310.C.FA.P502 3310/IA/5-2b (Pavement) - Asphalt (MABC/MAWC/PMABC) (781m3) (1874.4 tonne) (was C11_6C3) d/w - 10h/d - With 9 1 08-Nov-23 17-Nov-23 20-Dec-23 02-Jan-24 36 HK Hols - No B/O periods 310.C.FA.P508 3310/IA/5-2b (Pavement) - Asphalt (PMAWC) (950m3) (2280 tonne) (was C11_6C3) d/w - 10h/d - With 6 1 18-Nov-23 24-Nov-23 03-Jan-24 09-Jan-24 36 HK Hols - No B/O periods 3310/IA/5-2b AGL (was C11_6C3) d/w - 10h/d - With HK Hols 73- No B/O 5periods (was 17-Oct-23 C3) 13-Jan-24 21-Nov-23 13-Jan-24 0 310.C.FA.P493 3310/IA/5-2b (AGL) - AGL Ductbank (2704 m) C11_6 d/w - 10h/d - With 23 2 17-Oct-23 13-Nov-23 21-Nov-23 16-Dec-23 29 HK Hols - No B/O periods 310.C.FA.P490 3310/IA/5-2b (AGL) - AGL Drawpit/Earthpit/Base Can (100 nr) - 8 no/d, 1 WF (was C3) C11_6 d/w - 10h/d - With 14 1 28-Oct-23 13-Nov-23 01-Dec-23 16-Dec-23 29 HK Hols - No B/O periods 310.C.FA.P499 3310/IA/5-2b (AGL) - AGL Mid Can (100 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 6 1 06-Nov-23 11-Nov-23 18-Dec-23 23-Dec-23 36 HK Hols - No B/O periods 310.C.FA.P514 3310/IA/5-2b (AGL) - AGL Top Can (120 nr) (was C11_6C3) d/w - 10h/d - With 6 1 08-Jan-24 13-Jan-24 08-Jan-24 13-Jan-24 0 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 28 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 3310/IA/5-2a (WVT) C11_6 d/w - 10h/d - With HK Hols 75- No B/O15 periods (was 14-Oct-23 C3) 13-Jan-24 14-Oct-23 13-Jan-24 0 3310/IA/5-2a (WVT) Pavement C11_6 d/w - 10h/d - With HK Hols 68- No B/O10 periods (was 14-Oct-23 C3) 05-Jan-24 14-Oct-23 13-Jan-24 7 310.C.FA.P482 3310/IA/5-2a (Pavement) - Subgrade Works (cut/fill: 0 ; subgrade:29527 m3) C11_6 d/w - 10h/d - With 30 2 14-Oct-23 20-Nov-23 14-Oct-23 18-Nov-23 0 HK Hols - No B/O periods 310.C.FA.P491 3310/IA/5-2a (Pavement) - CASB (14748m3) (35395.20 tonne) (was C11_6C3) d/w - 10h/d - With 31 2 03-Nov-23 08-Dec-23 03-Nov-23 08-Dec-23 0 HK Hols - No B/O periods 310.C.EX.U429 3310/IA/5-2a (Pavement) - WVT Completion of Zone 3 backfill to +6.5 (was C11_6C3) d/w - 10h/d - With 0 20-Nov-23 18-Nov-23 0 HK Hols - No B/O periods 310.C.FA.P816 3310/IA/5-2a - Milling of the Existing Runway (was C11_6C3) d/w - 10h/d - With 6 2 20-Nov-23 25-Nov-23 16-Dec-23 22-Dec-23 23 HK Hols - No B/O periods 310.C.FA.P497 3310/IA/5-2a (Pavement) - CABC (13500m3) (32400 tonne) (was C11_6C3) d/w - 10h/d - With 21 2 30-Nov-23 23-Dec-23 08-Dec-23 04-Jan-24 7 HK Hols - No B/O periods 310.C.FA.P500 3310/IA/5-2a (Pavement) - Asphalt (MABC/MAWC/PMABC) (3650m3) (8760 tonne) (was C11_6C3) d/w - 10h/d - With 11 1 15-Dec-23 29-Dec-23 23-Dec-23 08-Jan-24 7 HK Hols - No B/O periods 310.C.FA.P506 3310/IA/5-2a (Pavement) - Asphalt (PMAWC) (1499 m3) (3597.6 tonne) (was C11_6C3) d/w - 10h/d - With 5 1 30-Dec-23 05-Jan-24 09-Jan-24 13-Jan-24 7 HK Hols - No B/O periods 3310/IA/5-2a (WVT) AGL (was C11_6C3) d/w - 10h/d - With HK Hols 59- No B/O 5periods (was 03-Nov-23 C3) 13-Jan-24 03-Nov-23 13-Jan-24 0 310.C.FA.P548 3310/IA/5-2a (AGL) - AGL Ductbank (2703m) C11_6 d/w - 10h/d - With 31 2 03-Nov-23 08-Dec-23 03-Nov-23 08-Dec-23 0 HK Hols - No B/O periods 310.C.FA.P545 3310/IA/5-2a (AGL) - AGL Drawpit/Earthpit/Base Can (100 nr) - 8 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 14 1 23-Nov-23 08-Dec-23 23-Nov-23 08-Dec-23 0 HK Hols - No B/O periods 310.C.FA.P563 3310/IA/5-2a (AGL) - AGL Mid Can (100nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 5 1 12-Dec-23 16-Dec-23 03-Jan-24 08-Jan-24 16 HK Hols - No B/O periods 310.C.FA.P569 3310/IA/5-2a (AGL) - AGL Top Can (100 nr) (was C11_6C3) d/w - 10h/d - With 5 1 09-Jan-24 13-Jan-24 09-Jan-24 13-Jan-24 0 HK Hols - No B/O periods 3310/IA/5-3 (was C11_6C3) d/w - 10h/d - With HK Hols 215- No B/O13 periods (was 26-Apr-23 C3) 13-Jan-24 14-Sep-23 13-Jan-24 0 3310/IA/5-3 Pavement C11_6 d/w - 10h/d - With HK Hols 91- No B/O 9periods (was 26-Apr-23 C3) 15-Aug-23 14-Sep-23 04-Jan-24 116 310.C.FA.P530 3310.IA/5-3 (Pavement) - Site Formation C11_6 d/w - 10h/d - With 30 2 26-Apr-23 02-Jun-23 14-Sep-23 20-Oct-23 116 HK Hols - No B/O periods 310.C.FA.P533 3310.IA/5-3 (Pavement) - Subgrade Works (cut: 7543m3; subgrade:7023 m3) (was C11_6C3) d/w - 10h/d - With 16 1 27-May-23 15-Jun-23 16-Oct-23 03-Nov-23 116 HK Hols - No B/O periods 310.C.FA.P820 3310/IA/5-3 - Milling of the Existing Runway (was C11_6C3) d/w - 10h/d - With 6 2 15-Jun-23 23-Jun-23 08-Dec-23 14-Dec-23 145 HK Hols - No B/O periods 310.C.FA.P536 3310.IA/5-3 (Pavement) - CASB (3862m3) (9268.80 tonne) (was C11_6C3) d/w - 10h/d - With 11 1 15-Jun-23 29-Jun-23 04-Nov-23 16-Nov-23 116 HK Hols - No B/O periods 310.C.FA.P551 3310.IA/5-3 (Pavement) - CABC (4311m3) (10346.40 tonne) (was C11_6C3) d/w - 10h/d - With 11 1 13-Jul-23 26-Jul-23 30-Nov-23 12-Dec-23 116 HK Hols - No B/O periods 310.C.FA.P557 3310.IA/5-3 (Pavement) - Asphalt (MABC/MAWC/PMABC) (1808m3) (4339.2 tonne) (was C11_6C3) d/w - 10h/d - With 7 1 28-Jul-23 05-Aug-23 15-Dec-23 22-Dec-23 116 HK Hols - No B/O periods 310.C.FA.P560 3310.IA/5-3 (Pavement) - Asphalt (PMAWC) (1877m3) (4504.8 tonne) (was C11_6C3) d/w - 10h/d - With 8 1 05-Aug-23 15-Aug-23 23-Dec-23 04-Jan-24 116 HK Hols - No B/O periods 3310/IA/5-3 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 163- No B/O 4periods (was 29-Jun-23 C3) 13-Jan-24 17-Nov-23 13-Jan-24 0 310.C.FA.P539 3310.IA/5-3 (AGL) - AGL Drawpit/Earthpit/Base Can (49 nr) - 8 no/d, 1 WF C11_6 d/w - 10h/d - With 7 1 29-Jun-23 08-Jul-23 22-Nov-23 29-Nov-23 120 HK Hols - No B/O periods 310.C.FA.P542 3310.IA/5-3 (AGL) - AGL Ductbank (937 m) (was C11_6C3) d/w - 10h/d - With 11 1 29-Jun-23 13-Jul-23 17-Nov-23 29-Nov-23 116 HK Hols - No B/O periods 310.C.FA.P554 3310.IA/5-3 (AGL) - AGL Mid Can (49 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 3 1 25-Jul-23 28-Jul-23 12-Dec-23 14-Dec-23 116 HK Hols - No B/O periods 310.C.FA.P566 3310.IA/5-3 (AGL) - AGL Top Can (49 nr) (was C11_6C3) d/w - 10h/d - With 8 1 05-Jan-24 13-Jan-24 05-Jan-24 13-Jan-24 0 HK Hols - No B/O periods 3310/IA/5 Interface Work Area Completion and Remaining Works (was C3) 89 2 09-Dec-23 27-Mar-24 09-Dec-23 25-Aug-24 121
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 29 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.FA.P844 3310/IA/5 - AGL Foundations/Earthing Rode C11_6 d/w - 10h/d - With 28 2 09-Dec-23 13-Jan-24 09-Dec-23 13-Jan-24 0 HK Hols - No B/O periods 310.C.FA.P509 Achieved KD-5H Complete all civil works for AGL Sys at IWA 3310/IA/5 & provide access (was C01_7C3) d/w - 10h/d - No HK 0 13-Jan-24 14-Jan-24 1 for Contract <3305> Hols - No B/O periods (was 310.C.FA.P512 Allow Access to Contract <3305> for AGL System Works for Interface Work Area C1) C01_7 d/w - 10h/d - No HK 0 13-Jan-24 14-Jan-24 1 3310/IA/5 Hols - No B/O periods (was 310.C.FA.P515 3310/IA/5 - AGL System Works (by Contract <3305>) (assumed 2 months) C1) C01_7 d/w - 10h/d - No HK 60 14-Jan-24 13-Mar-24 15-Jan-24 14-Mar-24 1 Hols - No B/O periods (was 310.C.FA.P518 3310/IA/5- Runway Grooving C1) C11_6 d/w - 10h/d - With 7 06-Mar-24 13-Mar-24 07-Mar-24 14-Mar-24 1 HK Hols - No B/O periods 310.C.FA.P524 3310/IA/5- Soil mixed with Hydroseeding (was C11_6C3) d/w - 10h/d - With 12 14-Mar-24 27-Mar-24 15-Mar-24 28-Mar-24 1 HK Hols - No B/O periods 310.C.FA.P521 3310/IA/5- Line Marking or defect remedial works (was C11_6C3) d/w - 10h/d - With 12 14-Mar-24 27-Mar-24 15-Mar-24 28-Mar-24 1 HK Hols - No B/O periods 310.C.FA.P527 WA 3310/4, 2, 9, 9A - Vacate Work Area (Portion) (was C01_7C3) d/w - 10h/d - No HK 0 27-Mar-24 25-Aug-24 151 Hols - No B/O periods (was Interface Work Area 3310/IA/6 (Pavement and AGL) C1) 438 42 01-Sep-22 21-Feb-24 03-Feb-23 25-Aug-24 151 3310/IA/6-2 C11_6 d/w - 10h/d - With HK Hols 226- No B/O24 periods (was 01-Sep-22 C3) 07-Jun-23 03-Feb-23 24-Jun-23 14 3310/IA/6-2 Pavement C11_6 d/w - 10h/d - With HK Hols 226- No B/O16 periods (was 01-Sep-22 C3) 07-Jun-23 03-Feb-23 24-Jun-23 14 310.C.FA.P010.B02 3310/IA/6 (Pavement) - Carry Out Survey to Check Level C11_6 d/w - 10h/d - With 6 2 01-Sep-22 07-Sep-22 03-Feb-23 09-Feb-23 125 HK Hols - No B/O periods 310.C.FA.P010 3310/IA/6-2 (Pavement) - Site Formation (was C11_6C3) d/w - 10h/d - With 20 2 26-Sep-22 20-Oct-22 10-Feb-23 04-Mar-23 111 HK Hols - No B/O periods 310.C.FA.P013 3310/IA/6-2 (Pavement) - Subgrade Works (cut: 91297m3; subgrade:28810 m3) (was C11_6C3) d/w - 10h/d - With 38 2 11-Feb-23 27-Mar-23 28-Feb-23 17-Apr-23 14 HK Hols - No B/O periods 310.C.FA.P016 3310/IA/6-2 (Pavement) - CASB (15450m3) (37080 tonne) (was C11_6C3) d/w - 10h/d - With 48 2 17-Feb-23 18-Apr-23 15-Mar-23 15-May-23 22 HK Hols - No B/O periods 310.C.FA.P019 3310/IA/6-2 (Pavement) - CABC (15396m3) (36950.40 tonne) (was C11_6C3) d/w - 10h/d - With 48 2 07-Mar-23 06-May-23 13-Apr-23 09-Jun-23 28 HK Hols - No B/O periods 310.C.FA.P824 3310/IA/6-2 - Milling of the Existing Runway (was C11_6C3) d/w - 10h/d - With 6 2 28-Mar-23 03-Apr-23 18-Apr-23 24-Apr-23 14 HK Hols - No B/O periods 310.C.FA.P022 3310/IA/6-2 (Pavement) - Asphalt (MABC/MAWC/PMABC) (10714m3) (25713.6 tonne) (was C11_6C3) d/w - 10h/d - With 45 2 04-Apr-23 01-Jun-23 25-Apr-23 17-Jun-23 14 HK Hols - No B/O periods 310.C.FA.P025 3310/IA/6-2 (Pavement) - Asphalt (PMAWC) (7002m3) (16804.8 tonne) (was C11_6C3) d/w - 10h/d - With 30 2 03-May-23 07-Jun-23 19-May-23 24-Jun-23 14 HK Hols - No B/O periods 3310/IA/6-2 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 84- No B/O 8periods (was 23-Feb-23 C3) 07-Jun-23 21-Mar-23 24-Jun-23 14 310.C.FA.P031 3310/IA/6-2 (AGL) - AGL Ductbank (13794 m) C11_6 d/w - 10h/d - With 48 2 23-Feb-23 24-Apr-23 21-Mar-23 20-May-23 22 HK Hols - No B/O periods 310.C.FA.P028 3310/IA/6-2 (AGL) - AGL Drawpit/Earthpit/Base Can (819 nr) - 8 no/d, 2 WF (was C11_6C3) d/w - 10h/d - With 53 2 23-Feb-23 29-Apr-23 28-Mar-23 03-Jun-23 28 HK Hols - No B/O periods 310.C.FA.P034 3310/IA/6-2 (AGL) - AGL Mid Can (819 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 43 2 13-Mar-23 06-May-23 19-Apr-23 09-Jun-23 28 HK Hols - No B/O periods 310.C.FA.P037 3310/IA/6-2 (AGL) - AGL Top Can (819 nr) (was C11_6C3) d/w - 10h/d - With 30 2 03-May-23 07-Jun-23 19-May-23 24-Jun-23 14 HK Hols - No B/O periods 3310/IA/6-1 (was C11_6C3) d/w - 10h/d - With HK Hols 89- No B/O16 periods (was 06-Mar-23 C3) 24-Jun-23 06-Mar-23 12-Jul-23 14 3310/IA/6-1 Pavement C11_6 d/w - 10h/d - With HK Hols 86- No B/O 9periods (was 06-Mar-23 C3) 20-Jun-23 06-Mar-23 12-Jul-23 17 310.C.FA.P011 3310/IA/6-1 (Pavement) - Subgrade Works (cut/fill:0; subgrade:56087 m3) C11_6 d/w - 10h/d - With 46 2 06-Mar-23 03-May-23 06-Mar-23 03-May-23 0 HK Hols - No B/O periods 310.C.FA.P014 3310/IA/6-1 (Pavement) - CASB (29078m3) (69787 tonne) (was C11_6C3) d/w - 10h/d - With 62 2 10-Mar-23 27-May-23 10-Mar-23 27-May-23 0 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 30 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.FA.P017 3310/IA/6-1 (Pavement) - CABC (19007m3) (45616.80 tonne) C11_6 d/w - 10h/d - With 57 2 21-Mar-23 01-Jun-23 04-May-23 12-Jul-23 33 HK Hols - No B/O periods 310.C.FA.P020 3310/IA/6-1 (Pavement) - Asphalt (MABC/MAWC/PMABC) (14,885m3) (35724 tonne) (was C11_6C3) d/w - 10h/d - With 25 2 17-May-23 15-Jun-23 20-May-23 19-Jun-23 3 HK Hols - No B/O periods 310.C.FA.P023 3310/IA/6-1 (Pavement) - Asphalt (PMAWC) (2,955m3) (7092 tonne) (was C11_6C3) d/w - 10h/d - With 11 1 08-Jun-23 20-Jun-23 12-Jun-23 24-Jun-23 3 HK Hols - No B/O periods 3310/IA/6-1 AGL (was C11_6C3) d/w - 10h/d - With HK Hols 81- No B/O 7periods (was 15-Mar-23 C3) 24-Jun-23 15-Mar-23 24-Jun-23 0 310.C.FA.P045 3310/IA/6-1 (AGL) - AGL Ductbank (9153 m) C11_6 d/w - 10h/d - With 62 2 15-Mar-23 01-Jun-23 20-Mar-23 06-Jun-23 4 HK Hols - No B/O periods 310.C.FA.P042 3310/IA/6-1 (AGL) - AGL Drawpit/Earthpit/Base Can (510 nr) - 8 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 66 2 15-Mar-23 06-Jun-23 15-Mar-23 06-Jun-23 0 HK Hols - No B/O periods 310.C.FA.P048 3310/IA/6-1 (AGL) - AGL Mid Can (510 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 28 2 09-May-23 10-Jun-23 09-May-23 10-Jun-23 0 HK Hols - No B/O periods 310.C.FA.P051 3310/IA/6-1 (AGL) - AGL Top Can (510 nr) (was C11_6C3) d/w - 10h/d - With 11 1 12-Jun-23 24-Jun-23 12-Jun-23 24-Jun-23 0 HK Hols - No B/O periods 3310/IA/6 Interface Work Area Completion and Remaining Works (was C3) 248 2 25-Apr-23 21-Feb-24 22-May-23 25-Aug-24 151 310.C.FA.P848 3310/IA/6 - AGL Foundations/Earthing Rode C11_6 d/w - 10h/d - With 28 2 25-Apr-23 29-May-23 22-May-23 24-Jun-23 22 HK Hols - No B/O periods 310.C.FA.P030 Achieved KD-5B Complete all civil works for AGL Sys at IWA 3310/IA/6 & provide access (was C01_7C3) d/w - 10h/d - No HK 0 24-Jun-23 25-Jun-23 1 for Contract <3305> Hols - No B/O periods (was 310.C.FA.P033 Allow Access to Contract <3305> for AGL System Works for Interface Work Area C1) C01_7 d/w - 10h/d - No HK 0 24-Jun-23 03-Aug-23 40 3310/IA/6 Hols - No B/O periods (was 310.C.FA.P027 Achieve PMS 05 - Complete all civil enabling works in area 3310/IA/6 and provide access C1) C11_6 d/w - 10h/d - With 0 24-Jun-23 24-Jun-23 0 to Others to complete AGL System HK Hols - No B/O periods 310.C.FA.P036 3310/IA/6 - AGL System Works (by Contract <3305>) (assumed 6 months) (was C01_7C3) d/w - 10h/d - No HK 180 25-Jun-23 21-Dec-23 04-Aug-23 30-Jan-24 40 Hols - No B/O periods (was 310.C.FA.P039 3310/IA/6 - Runway Grooving C1) C11_6 d/w - 10h/d - With 12 22-Dec-23 08-Jan-24 31-Jan-24 15-Feb-24 31 HK Hols - No B/O periods 310.C.FA.P054 3310/IA/6 - Line Marking or defect remedial works @3310/IA/6-1 (was C11_6C3) d/w - 10h/d - With 48 22-Dec-23 21-Feb-24 31-Jan-24 28-Mar-24 31 HK Hols - No B/O periods 310.C.FA.P057 3310/IA/6 - Soil mixed with Hydroseeding (was C11_6C3) d/w - 10h/d - With 48 22-Dec-23 21-Feb-24 31-Jan-24 28-Mar-24 31 HK Hols - No B/O periods 310.C.FA.P060 WA 3310/4, 10, 10A - Vacate Work Area (Portion) (was C01_7C3) d/w - 10h/d - No HK 0 21-Feb-24 25-Aug-24 186 Hols - No B/O periods (was Interface Work Area 3310/IA/7 (Pavement and AGL) C1) 455 20 08-Sep-22 19-Mar-24 04-Mar-23 24-Aug-24 128 3310/IA/7 455 20 08-Sep-22 19-Mar-24 04-Mar-23 24-Aug-24 128 3310/IA/7 Pavement C11_6 d/w - 10h/d - With HK Hols 234- No B/O11 periods (was 08-Sep-22 C3) 24-Jun-23 04-Mar-23 31-Jul-23 30 310.C.FA.P015.B02 3310/IA/7 (Pavement) - Carry Out Survey to Check Level C11_6 d/w - 10h/d - With 6 2 08-Sep-22 15-Sep-22 04-Mar-23 10-Mar-23 144 HK Hols - No B/O periods 310.C.FA.P600 3310/IA/7 (Pavement) - Site Formation (7947 m3) (was C11_6C3) d/w - 10h/d - With 9 1 22-Dec-22 03-Jan-23 30-Mar-23 13-Apr-23 79 HK Hols - No B/O periods 310.C.FA.P603 3310/IA/7 (Pavement) - Subgrade Works (47661 m3) (114386.40 tonne) (was C11_6C3) d/w - 10h/d - With 50 2 03-Apr-23 06-Jun-23 14-Apr-23 13-Jun-23 6 HK Hols - No B/O periods 310.C.FA.P606 3310/IA/7 (Pavement) - CASB (18846m3) (45230.40 tonne) (was C11_6C3) d/w - 10h/d - With 45 2 19-Apr-23 12-Jun-23 26-Apr-23 19-Jun-23 6 HK Hols - No B/O periods 310.C.FA.P615 3310/IA/7 (Pavement) - CABC (18232m3) (43756.80 tonne) (was C11_6C3) d/w - 10h/d - With 45 2 02-May-23 24-Jun-23 07-Jun-23 31-Jul-23 30 HK Hols - No B/O periods 310.C.FA.P624 3310/IA/7 (Pavement) - Asphalt (MABC/MAWC/PMABC) (4039m3) (9693.6 tonne) (was C11_6C3) d/w - 10h/d - With 15 1 17-May-23 03-Jun-23 23-Jun-23 11-Jul-23 30 HK Hols - No B/O periods 310.C.FA.P636 3310/IA/7 (Pavement) - Asphalt (PMAWC) (2127m3) (5104.8 tonne) (was C11_6C3) d/w - 10h/d - With 8 1 05-Jun-23 13-Jun-23 12-Jul-23 20-Jul-23 30 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 31 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 3310/IA/7 AGL C11_6 d/w - 10h/d - With HK Hols 78- No B/O 7periods (was 19-Apr-23 C3) 22-Jul-23 26-Apr-23 29-Jul-23 6 310.C.FA.P612 3310/IA/7 (AGL) - AGL Ductbank (7003 m) C11_6 d/w - 10h/d - With 50 2 19-Apr-23 17-Jun-23 26-Apr-23 26-Jun-23 6 HK Hols - No B/O periods 310.C.FA.P609 3310/IA/7 (AGL) - AGL Drawpit/Earthpit/Base Can (328 nr) - 8 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 43 2 27-Apr-23 17-Jun-23 03-Jun-23 25-Jul-23 30 HK Hols - No B/O periods 310.C.FA.P618 3310/IA/7 (AGL) - AGL Mid Can (328 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 18 2 08-May-23 29-May-23 13-Jun-23 05-Jul-23 30 HK Hols - No B/O periods 310.C.FA.P639 3310/IA/7 (AGL) - AGL Top Can (328 nr) (was C11_6C3) d/w - 10h/d - With 8 1 14-Jul-23 22-Jul-23 21-Jul-23 29-Jul-23 6 HK Hols - No B/O periods 3310/IA/7 Interface Work Area Completion and Remaining Works (was C3) 226 2 19-Jun-23 19-Mar-24 27-Jun-23 24-Aug-24 128 310.C.FA.P852 3310/IA/7 - AGL Foundations/Earthing Rode C11_6 d/w - 10h/d - With 28 2 19-Jun-23 22-Jul-23 27-Jun-23 29-Jul-23 6 HK Hols - No B/O periods 310.C.FA.P540 Achieved KD-5C Complete all civil works for AGL Sys at IWA 3310/IA/7 & provide access (was C01_7C3) d/w - 10h/d - No HK 0 22-Jul-23 30-Jul-23 8 for Contract <3305> Hols - No B/O periods (was 310.C.FA.P555 Allow Access to Contract <3305> for AGL System Works for Interface Work Area C1) C01_7 d/w - 10h/d - No HK 0 22-Jul-23 01-Aug-23 10 3310/IA/7 Hols - No B/O periods (was 310.C.FA.P570 3310/IA/7 - AGL System Works (by Contract <3305>) (assumed 6 months) C1) C01_7 d/w - 10h/d - No HK 180 23-Jul-23 18-Jan-24 02-Aug-23 28-Jan-24 10 Hols - No B/O periods (was 310.C.FA.P648 3310/IA/7 - Runway Grooving C1) C11_6 d/w - 10h/d - With 2 19-Jan-24 20-Jan-24 29-Jan-24 30-Jan-24 8 HK Hols - No B/O periods 310.C.FA.P651 3310/IA/7 - Line Marking or defect remedial works (was C11_6C3) d/w - 10h/d - With 48 22-Jan-24 19-Mar-24 31-Jan-24 28-Mar-24 8 HK Hols - No B/O periods 310.C.FA.P654 3310/IA/7 - Stabilized subgrade and Soil mixed with Hydroseeding (was C11_6C3) d/w - 10h/d - With 47 23-Jan-24 19-Mar-24 01-Feb-24 28-Mar-24 8 HK Hols - No B/O periods 310.C.FA.P657 3310/IA/7 - Vacate Work Areas Portion of WA 3310/4 (was C11_6C3) d/w - 10h/d - With 0 19-Mar-24 24-Aug-24 128 HK Hols - No B/O periods Interface Work Area 3310/IA/8 (Pavement and AGL) (was C3) 369 29 16-Sep-22 11-Dec-23 11-Mar-23 24-Aug-24 208 3310/IA/8a (North) C11_6 d/w - 10h/d - With HK Hols 242- No B/O15 periods (was 16-Sep-22 C3) 12-Jul-23 11-Mar-23 11-Sep-23 52 3310/IA/8a (North) Pavement C11_6 d/w - 10h/d - With HK Hols 202- No B/O10 periods (was 16-Sep-22 C3) 23-May-23 11-Mar-23 11-Sep-23 92 310.C.FA.P020.B02 3310/IA/8 (Pavement) - Carry Out Survey to Check Level C11_6 d/w - 10h/d - With 6 2 16-Sep-22 22-Sep-22 11-Mar-23 17-Mar-23 144 HK Hols - No B/O periods 310.C.FA.P534 3310/IA/8a (Pavement North) - Subgrade Works (cut/fill:0; subrade:51243 m3) (was C11_6C3) d/w - 10h/d - With 43 2 09-Mar-23 03-May-23 31-May-23 21-Jul-23 65 HK Hols - No B/O periods 310.C.FA.P549 3310/IA/8a (Pavement North) - CASB (16054m3) (38529.60 tonne) (was C11_6C3) d/w - 10h/d - With 24 2 11-Apr-23 09-May-23 29-Jun-23 27-Jul-23 65 HK Hols - No B/O periods 310.C.FA.P564 3310/IA/8a (Pavement North) - CABC (20798m3) (49915.20 tonne) (was C11_6C3) d/w - 10h/d - With 31 2 14-Apr-23 20-May-23 07-Aug-23 11-Sep-23 94 HK Hols - No B/O periods 310.C.FA.P576 3310/IA/8a (Pavement North) - Asphalt (MABC/MAWC/PMABC) (5018m3) (12043.2 (was C11_6C3) d/w - 10h/d - With 10 1 04-May-23 15-May-23 11-Aug-23 22-Aug-23 82 tonne) HK Hols - No B/O periods 310.C.FA.P588 3310/IA/8a (Pavement North) - Asphalt (PMAWC) (1454m3) (3489.6 tonne) (was C11_6C3) d/w - 10h/d - With 2 1 22-May-23 23-May-23 21-Aug-23 22-Aug-23 75 HK Hols - No B/O periods 3310/IA/8a (North) AGL (was C11_6C3) d/w - 10h/d - With HK Hols 71- No B/O 5periods (was 17-Apr-23 C3) 12-Jul-23 06-Jul-23 26-Aug-23 39 310.C.FA.P552 3310/IA/8a (AGL North) - AGL Ductbank (230 m) C11_6 d/w - 10h/d - With 24 2 17-Apr-23 15-May-23 06-Jul-23 02-Aug-23 65 HK Hols - No B/O periods 310.C.FA.P537 3310/IA/8a (AGL North) - AGL Drawpit/Earthpit/Base Can (11 nr) - 8 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 3 1 12-May-23 15-May-23 11-Aug-23 14-Aug-23 75 HK Hols - No B/O periods 310.C.FA.P567 3310/IA/8a (AGL North) - AGL Mid Can (11 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 2 1 13-May-23 15-May-23 12-Aug-23 14-Aug-23 75 HK Hols - No B/O periods 310.C.FA.P582 3310/IA/8a (AGL North) - AGL Top Can (11 nr) (was C11_6C3) d/w - 10h/d - With 4 1 08-Jul-23 12-Jul-23 23-Aug-23 26-Aug-23 39 HK Hols - No B/O periods 3310/IA/8b (South) (was C3) 131 12 06-Mar-23 14-Aug-23 18-Mar-23 27-Aug-23 11
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 32 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.FA.P621 *** Completion of Reclamation Works of 3310/11 (South) *** C11_6 d/w - 10h/d - With 0 06-Mar-23 18-Mar-23 11 HK Hols - No B/O periods 3310/IA/8b (South) Pavement (was C11_6C3) d/w - 10h/d - With HK Hols 125- No B/O 8periods (was 06-Mar-23 C3) 07-Aug-23 18-Mar-23 19-Aug-23 11 310.C.FA.P531 Subgrade Works (fill: 16583m3; subgrade: 4195 m3) C11_6 d/w - 10h/d - With 36 2 06-Mar-23 20-Apr-23 18-Mar-23 04-May-23 11 HK Hols - No B/O periods 310.C.FA.P546 3310/IA/8b (South) - CASB (1053m3) (2527.20 tonne) (was C11_6C3) d/w - 10h/d - With 27 2 21-Apr-23 23-May-23 05-May-23 06-Jun-23 11 HK Hols - No B/O periods 310.C.FA.P561 3310/IA/8b (South) - CABC (10973m3) (26335.20 tonne) (was C11_6C3) d/w - 10h/d - With 30 2 08-Jun-23 14-Jul-23 21-Jun-23 27-Jul-23 11 HK Hols - No B/O periods 310.C.FA.P579 3310/IA/8b (South) - Asphalt (MABC/MAWC/PMABC) (4380m3) (10512 tonne) (was C11_6C3) d/w - 10h/d - With 18 1 15-Jul-23 04-Aug-23 28-Jul-23 17-Aug-23 11 HK Hols - No B/O periods 310.C.FA.P591 3310/IA/8b (South) - Asphalt (PMAWC) (4m3) (9.6 tonne) (was C11_6C3) d/w - 10h/d - With 2 1 05-Aug-23 07-Aug-23 18-Aug-23 19-Aug-23 11 HK Hols - No B/O periods 3310/IA/8b (South) AGL (was C3) 68 4 24-May-23 14-Aug-23 07-Jun-23 27-Aug-23 11 310.C.FA.P627 3310/IA/8b (South) - AGL Drawpit/Earthpit/Base Can (11 nr) - 8 no/d, 1 WF C11_6 d/w - 10h/d - With 6 1 24-May-23 31-May-23 14-Jun-23 20-Jun-23 17 HK Hols - No B/O periods 310.C.FA.P630 3310/IA/8b (South) - AGL Ductbank (230 m) (was C11_6C3) d/w - 10h/d - With 12 1 24-May-23 07-Jun-23 07-Jun-23 20-Jun-23 11 HK Hols - No B/O periods 310.C.FA.P633 3310/IA/8b (South) - AGL Mid Can (11 nr) (was C11_6C3) d/w - 10h/d - With 6 1 14-Jun-23 20-Jun-23 28-Jul-23 03-Aug-23 36 HK Hols - No B/O periods 310.C.FA.P642 3310/IA/8b (South) - AGL Top Can (11 nr) - 20 no/d, 1 WF (was C11_6C3) d/w - 10h/d - With 6 1 08-Aug-23 14-Aug-23 21-Aug-23 26-Aug-23 11 HK Hols - No B/O periods 310.C.FA.P645 3310/IA/8 - Achieve KD-5D (was C01_7C3) d/w - 10h/d - No HK 0 14-Aug-23 27-Aug-23 13 Hols - No B/O periods (was 3310/IA/8 Interface Work Area Completion and Remaining Works C1) 155 2 08-Jun-23 11-Dec-23 26-Jul-23 24-Aug-24 208 310.C.FA.P856 3310/IA/8 - AGL Foundations/Earthing Rode C11_6 d/w - 10h/d - With 28 2 08-Jun-23 12-Jul-23 26-Jul-23 26-Aug-23 39 HK Hols - No B/O periods 310.C.FA.P543 Achieved KD-5D Complete all civil works for AGL Sys at IWA 3310/IA/8 & provide access (was C01_7C3) d/w - 10h/d - No HK 0 14-Aug-23 27-Aug-23 13 for Contract <3305> Hols - No B/O periods (was 310.C.FA.P558 Allow Access to Contract <3305> for AGL System Works for Interface Work Area C1) C01_7 d/w - 10h/d - No HK 0 14-Aug-23 30-Nov-23 108 3310/IA/8 Hols - No B/O periods (was 310.C.FA.P573 3310/IA/8 - AGL System Works (by Contract <3305>) (assumed 6 months) C1) C01_7 d/w - 10h/d - No HK 90 15-Aug-23 12-Nov-23 01-Dec-23 28-Feb-24 108 Hols - No B/O periods (was 310.C.FA.P585 3310/IA/8 - Line Marking or defect remedial works C1) C11_6 d/w - 10h/d - With 25 13-Nov-23 11-Dec-23 29-Feb-24 28-Mar-24 88 HK Hols - No B/O periods 310.C.FA.P594 3310/IA/8 - Soil mixed with Hydroseeding (was C11_6C3) d/w - 10h/d - With 25 13-Nov-23 11-Dec-23 29-Feb-24 28-Mar-24 88 HK Hols - No B/O periods 310.C.FA.P597 3310/IA/8 - Vacate Work Areas Portion of WA 3310/11 (was C11_6C3) d/w - 10h/d - With 0 11-Dec-23 24-Aug-24 208 HK Hols - No B/O periods CC#3 ----- Testing and Commissioning (Pavement & AGL)----- (was C01_7C3) d/w - 10h/d - No HK Hols306 - No B/O periods 0 (was24-Aug-23 C1) 25-Jun-24 29-Mar-24 27-Jun-24 2 310.C.FA.X589 Allow Other Contractors Access for follow-on Works in AGL Vault C Annex and AGL Vault C01_7 d/w - 10h/d - No HK 0 24-Aug-23 29-Mar-24 218 D Annex Hols - No B/O periods (was 310.C.FA.X600 Airfield Pavement - Completion of Airfield Pavement Works C1) C01_7 d/w - 10h/d - No HK 0 05-Jan-24 29-Mar-24 84 Hols - No B/O periods (was 310.C.FA.X604 Airfield AGL - Completion of Airfield AGL (Base Can, Mid Can, Top Can) C1) C01_7 d/w - 10h/d - No HK 0 13-Jan-24 29-Mar-24 76 Hols - No B/O periods (was 310.C.FA.X620 Airfield AGL - Assumed Completion of AGL System by Contract <3305> C1) C01_7 d/w - 10h/d - No HK 0 13-Mar-24 29-Mar-24 16 Hols - No B/O periods (was 310.C.FA.X608 Airfield (Line Marking) - Completion of Runway Grooving C1) C01_7 d/w - 10h/d - No HK 0 22-Mar-24 29-Mar-24 7 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 33 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.FA.X624 Airfield - Completion of Landscaping/Hydroseeding C01_7 d/w - 10h/d - No HK 0 27-Mar-24 29-Mar-24 2 Hols - No B/O periods (was 310.C.FA.X628 Airfield (Line Marking) - Completion of Taxiways and Rapid Exist Line Marking C1) C01_7 d/w - 10h/d - No HK 0 28-Mar-24 29-Mar-24 2 Hols - No B/O periods (was 310.C.FA.X616 Airfield (T&C) - Testing and Commissioning C1) C01_7 d/w - 10h/d - No HK 90 28-Mar-24 25-Jun-24 30-Mar-24 27-Jun-24 2 Hols - No B/O periods (was 310.C.FA.P284 Achieved KD-7 Complete modification of the existing North Runway incl. line marking, C1) C01_7 d/w - 10h/d - No HK 0 25-Jun-24 27-Jun-24 2 T&C ready for CAD/AA flight check Hols - No B/O periods (was Cost Centre #04 - Airfield Infrastructure Works C1) 952 368 07-Jun-21 A 16-Aug-24 31-Jan-22 01-Sep-24 13 CC#4 ----- Design and Others ----- 539 0 14-Jun-21 A 02-Apr-23 27-Mar-22 01-Sep-24 420 CC#04 - Permanent Security Fence (PSF) and Interim Security Fence (IPSF) & Associated Works C01_7 d/w - 10h/d - No HK Hols600 - No B/O periods 0 (was 14-Jun-21 C1) A 03-Feb-23 20-Apr-22 20-Aug-23 198 CC#4 - Package 1 - Design of Interim Security Fence and Associated Works (ISF) C01_7 d/w - 10h/d - No HK Hols314 - No B/O periods 0 (was 14-Jun-21 C1) A 23-Apr-22 31-May-22 14-Jun-22 52 310.D.RC.C000 ISF - Prepare Design of Interim Security Fence and Associated Works C01_7 d/w - 10h/d - No HK 28 14-Jun-21 A 12-Jul-21 A 31-May-22 31-May-22 Hols - No B/O periods (was 310.D.RC.C008 ISF - Review by PM, AP, RSE, RGE Package 1 - Int. Sec. Fence and Associated Works C1) C01_7 d/w - 10h/d - No HK 28 13-Jul-21 A 14-Sep-21 A 31-May-22 31-May-22 Hols - No B/O periods (was 310.D.RC.C012 ISF - Review design by ICC, M&VC and issue check certificate of Package 1 - Int. Sec. C1) C01_7 d/w - 10h/d - No HK 21 15-Sep-21 A 24-Sep-21 A 31-May-22 31-May-22 Fence and Associated Works Hols - No B/O periods (was 310.D.RC.C023 ISF - Review design by ICC, M&VC and issue check certificate of Package 1 - Int. Sec. C1) C01_7 d/w - 10h/d - No HK 21 21-Oct-21 A 22-Nov-21 A 31-May-22 31-May-22 Fence&Associated Works 2nd Round Hols - No B/O periods (was 310.D.RC.C024 ISF - BD review and approved design of Package 1 - Int. Sec. Fence and Associated C1) d/w - 10h/d - No HK C01_7 60 22-Nov-21 A 27-Mar-22 31-May-22 31-May-22 65 Works Hols - No B/O periods (was 310.D.RC.C028 BA8 consent from ICC of Package 1 - Int. Sec. Fence and Associated Works C1) C01_7 d/w - 10h/d - No HK 7 28-Mar-22 03-Apr-22 01-Jun-22 07-Jun-22 65 Hols - No B/O periods (was 310.D.RC.C032 Submit Form BA10 for notification of work commencement of Int. Sec. Fence C1) C01_7 d/w - 10h/d - No HK 7 17-Apr-22 23-Apr-22 08-Jun-22 14-Jun-22 52 Hols - No B/O periods (was CC#4 - Package 2 - Design of Permanent Security Fence and Associated Works) (PSF) C1) C01_7 d/w - 10h/d - No HK Hols207 - No B/O periods 0 (was12-Jul-22 C1) 03-Feb-23 26-Jan-23 20-Aug-23 198 310.D.RC.C32 PSF - Prepare Design of Permanent Security Fence and Associated Works with ICE C01_7 d/w - 10h/d - No HK 21 12-Jul-22 01-Aug-22 26-Jan-23 15-Feb-23 198 Hols - No B/O periods (was 310.D.RC.C36 PSF - Review by PM, AP, RSE, RGE Package 2 - Permanent Sec. Fence and Associated C1) C01_7 d/w - 10h/d - No HK 28 02-Aug-22 29-Aug-22 16-Feb-23 15-Mar-23 198 Works Hols - No B/O periods (was 310.D.RC.C40 PSF - Review design by ICC, M&VC and issue check certificate of Package 2 - C1) C01_7 d/w - 10h/d - No HK 21 30-Aug-22 19-Sep-22 16-Mar-23 05-Apr-23 198 Permanent Sec. Fence and Associated Works Hols - No B/O periods (was 310.D.RC.C44 PSF - address comments of Package 2 - Int. Sec. Fence and Associated Works 2nd C1) C01_7 d/w - 10h/d - No HK 14 20-Sep-22 03-Oct-22 06-Apr-23 19-Apr-23 198 Round Hols - No B/O periods (was 310.D.RC.C48 PSF - Review by PM, AP, RSE, RGE Package 2 - Permanent Sec. Fence and Associated C1) C01_7 d/w - 10h/d - No HK 28 04-Oct-22 31-Oct-22 20-Apr-23 17-May-23 198 Works 2nd Round Hols - No B/O periods (was 310.D.RC.C52 PSF - Review design by ICC, M&VC and issue check certificate of Package 1 - Int. Sec. C1) C01_7 d/w - 10h/d - No HK 21 01-Nov-22 21-Nov-22 18-May-23 07-Jun-23 198 Fence&Associated Works 2nd Round Hols - No B/O periods (was 310.D.RC.C56 PSF - BD review and approved design of Package 2 - Permanent Sec. Fence and C1) C01_7 d/w - 10h/d - No HK 60 22-Nov-22 20-Jan-23 08-Jun-23 06-Aug-23 198 Associated Works Hols - No B/O periods (was 310.D.RC.C60 BA8 consent from BD of Package 2 - Permanent Sec. Fence and Associated Works C1) C01_7 d/w - 10h/d - No HK 7 21-Jan-23 27-Jan-23 07-Aug-23 13-Aug-23 198 Hols - No B/O periods (was 310.D.RC.C64 Submit Form BA10 for notification of work commencement of Permanent Sec. Fence C1) C01_7 d/w - 10h/d - No HK 7 28-Jan-23 03-Feb-23 14-Aug-23 20-Aug-23 198 Hols - No B/O periods (was CC#4 - MS no.13 - Shop Drawings for Interim/ Permanent Security Fence C1) C01_7 d/w - 10h/d - No HK Hols221 - No B/O periods 0 (was 13-Oct-21 C1) A 21-May-22 20-Apr-22 14-Jun-22 24 310.D.RC.C70 MS no.13 - Shop Drawings for Interim/ Permanent Security Fence - prepare design C01_7 d/w - 10h/d - No HK 21 13-Oct-21 A 16-Apr-22 20-Apr-22 10-May-22 24 Hols - No B/O periods (was 310.D.RC.C74 MS no.13 - Shop Drawings for Interim/ Permanent Security Fence - ICE check and issue C1) C01_7 d/w - 10h/d - No HK 7 17-Apr-22 23-Apr-22 11-May-22 17-May-22 24 check cert. Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 34 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.RC.C78 MS no.13 - Shop Drawings for Interim/ Permanent Security Fence - PM review and accept C01_7 d/w - 10h/d - No HK 28 24-Apr-22 21-May-22 18-May-22 14-Jun-22 24 Hols - No B/O periods (was CC#04 - ELS Design - Western Box Culvert (WBC) no. 3, 4, 18 C1) C01_7 d/w - 10h/d - No HK Hols445 - No B/O periods 0 (was 13-Aug-21 C1) A 08-Nov-22 27-Mar-22 18-Dec-22 40 CC#4 - ELS Design - WBC No. 3,4,18 (Zone 12A for Stage 1) Amendment Submission C01_7 d/w - 10h/d - No HK Hols203 - No B/O periods 0 (was 13-Aug-21 C1) A 04-Jan-22 A 27-Mar-22 10-May-22 310.D.R0.L010 ELS Design for WBC Zone 12A - Prepare Design & submit with ICE for reviewing C01_7 d/w - 10h/d - No HK 28 13-Aug-21 A 23-Aug-21 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.D.R0.L014 ELS Design for WBC Zone 12A - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 24-Aug-21 A 19-Sep-21 A 10-May-22 10-May-22 Hols - No B/O periods (was 310.D.R0.L022 ELS Design for WBC Zone 12A - address comments and resubmit 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 07-Sep-21 A 05-Nov-21 A 10-May-22 10-May-22 Hols - No B/O periods (was 310.D.R0.L018 ELS Design for WBC Zone 12A - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 05-Oct-21 A 21-Nov-21 A 10-May-22 10-May-22 Hols - No B/O periods (was 310.D.R0.L038 ELS Design for WBC Zone 12A - BD review and approve C1) C01_7 d/w - 10h/d - No HK 30 22-Nov-21 A 21-Dec-21 A 10-May-22 10-May-22 Hols - No B/O periods (was 310.D.R0.L040 ELS Design for WBC Zone 12A - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 22-Dec-21 A 28-Dec-21 A 10-May-22 10-May-22 Hols - No B/O periods (was 310.D.R0.L041 ELS Design for WBC Zone 12A - prepare and submit Form BA10 (with instrumentation C1) C01_7 d/w - 10h/d - No HK 7 29-Dec-21 A 04-Jan-22 A 10-May-22 10-May-22 readings) Hols - No B/O periods (was CC#4 - ELS Design - WBC No. 3,4,18 (Zone 12B, 12C for Stage 2,3) Amendment Submission C1) C01_7 d/w - 10h/d - No HK Hols121 - No B/O periods 0 (was 13-Aug-21 C1) A 03-May-22 27-Mar-22 17-Jul-22 75 310.D.R0.L700.B01 ELS Design for WBC Zone 12B,12C - Prepare Design & submit with ICE for reviewing C01_7 d/w - 10h/d - No HK 28 13-Aug-21 A 23-Aug-21 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.D.R0.L705.B01 ELS Design for WBC Zone 12B,12C - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 24-Aug-21 A 19-Sep-21 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.D.R0.L715.B01 ELS Design for WBC Zone 12B,12C - address comments and resubmit 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 07-Sep-21 A 05-Nov-21 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.D.R0.L710.B01 ELS Design for WBC Zone 12B,12C - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 05-Oct-21 A 21-Nov-21 A 27-Mar-22 27-Mar-22 certificate Hols - No B/O periods (was 310.D.R0.L730.B01 ELS Design for WBC Zone 12B,12C - BD review and approve C1) C01_7 d/w - 10h/d - No HK 30 22-Nov-21 A 21-Dec-21 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.D.R0.L735.B01 ELS Design for WBC Zone 12B - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 16-Mar-22 A 06-Apr-22 30-Apr-22 10-May-22 34 Hols - No B/O periods (was 310.D.R0.L740.B01 ELS Design for WBC Zone 12B - prepare and submit Form BA10 (with instrumentation C1) C01_7 d/w - 10h/d - No HK 7 06-Apr-22 12-Apr-22 10-May-22 16-May-22 34 readings) Hols - No B/O periods (was 310.D.R0.L747.B02 ELS Design for WBC Zone 12C - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 21-Apr-22 27-Apr-22 05-Jul-22 11-Jul-22 75 Hols - No B/O periods (was 310.D.R0.L749.B02 ELS Design for WBC Zone 12C - prepare and submit Form BA10 (with instrumentation C1) C01_7 d/w - 10h/d - No HK 7 27-Apr-22 03-May-22 11-Jul-22 17-Jul-22 75 readings) Hols - No B/O periods (was CC#4 - ELS Design - WBC No. 3,4,18 (Zones 12D, 12E, 12F for Stage 4,5,6) C1) C01_7 d/w - 10h/d - No HK Hols255 - No B/O periods 0 (was 16-Feb-22 C1) A 08-Nov-22 27-Mar-22 18-Dec-22 40 310.D.R0.L432 ELS Design for WBC Zone 12D, 12E, 12F - Prepare Design & submit with ICE for C01_7 d/w - 10h/d - No HK 28 16-Feb-22 A 30-Mar-22 27-Mar-22 30-Mar-22 0 reviewing Hols - No B/O periods (was 310.D.R0.L436 ELS Design for WBC Zone 12D, 12E, 12F - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 31-Mar-22 27-Apr-22 31-Mar-22 27-Apr-22 0 Hols - No B/O periods (was 310.D.R0.L440 ELS Design for WBC Zone 12D, 12E, 12F - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 28-Apr-22 18-May-22 28-Apr-22 18-May-22 0 certificate Hols - No B/O periods (was 310.D.R0.L444 ELS Design for WBC Zone 12D, 12E, 12F - address comments and resubmit 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 19-May-22 01-Jun-22 19-May-22 01-Jun-22 0 Hols - No B/O periods (was 310.D.R0.L448 ELS Design for WBC Zone 12D, 12E, 12F - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 02-Jun-22 29-Jun-22 02-Jun-22 29-Jun-22 0 Hols - No B/O periods (was 310.D.R0.L452 ELS Design for WBC Zone 12D, 12E, 12F - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 30-Jun-22 20-Jul-22 30-Jun-22 20-Jul-22 0 certificate 2nd Round Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 35 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.R0.L456 ELS Design for WBC Zone 12D, 12E, 12F - BD review and approve C01_7 d/w - 10h/d - No HK 60 21-Jul-22 18-Sep-22 21-Jul-22 18-Sep-22 0 Hols - No B/O periods (was 310.D.R0.L460 ELS Design for WBC Zone 12D, 12E - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 19-Sep-22 25-Sep-22 19-Sep-22 25-Sep-22 0 Hols - No B/O periods (was 310.D.R0.L464 ELS Design for WBC Zone 12D, 12E - prepare and submit Form BA10 (with C1) C01_7 d/w - 10h/d - No HK 7 26-Sep-22 02-Oct-22 26-Sep-22 02-Oct-22 0 instrumentation readings) Hols - No B/O periods (was 310.D.R0.L592.B02 ELS Design for WBC Zone 12F - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 26-Oct-22 01-Nov-22 05-Dec-22 11-Dec-22 40 Hols - No B/O periods (was 310.D.R0.L596.B02 ELS Design for WBC Zone 12F - prepare and submit Form BA10 (with instrumentation C1) C01_7 d/w - 10h/d - No HK 7 02-Nov-22 08-Nov-22 12-Dec-22 18-Dec-22 40 readings) Hols - No B/O periods (was CC#04 - Structural Plan Anticipated BD Approval and Consent Application - WBC no. 18 C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 20-Jun-21 C1) A 20-Jun-21 A 25-May-22 25-May-22 310.D.R0.L204 Box Culvert (18) - Consent application and grant Consent for Box Culvert Structure C01_7 d/w - 10h/d - No HK 0 20-Jun-21 A 25-May-22 construction Hols - No B/O periods (was CC#04 - Drainage Plan Anticipated BD Approval and Consent Application - WBC no. 18 C1) C01_7 d/w - 10h/d - No HK Hols174 - No B/O periods 0 (was 17-Oct-21 C1) A 10-Apr-22 08-Jun-22 22-Jun-22 73 310.D.R0.L216 Box Culvert (18) - grant Anticipated BD approval of Drainage Plan for Stormwater C01_7 d/w - 10h/d - No HK 0 17-Oct-21 A 08-Jun-22 Drainage & Box Culvert 18 Hols - No B/O periods (was 310.D.R0.L220 Box Culvert (18) - Consent application and grant Consent of Drainage Plan for Stormwater C1) C01_7 d/w - 10h/d - No HK 7 27-Mar-22 02-Apr-22 08-Jun-22 14-Jun-22 73 Drainage & Box Culvert 18 Hols - No B/O periods (was 310.D.R0.L224 Box Culvert (18) - Submit Form BA10 for notification of Stormwater Drainage Works & C1) C01_7 d/w - 10h/d - No HK 7 03-Apr-22 09-Apr-22 15-Jun-22 21-Jun-22 73 Box Culvert 18 Hols - No B/O periods (was 310.D.R0.L304 Remark - Commencement of stormwater drainage work @ 3310/IA/6-1 relating to Box C1) C01_7 d/w - 10h/d - No HK 0 10-Apr-22 22-Jun-22 73 Culvert 18 Hols - No B/O periods (was CC#04 - ELS Design - Eastern Box Culvert (EBC) no. 5, 6, 19 C1) C01_7 d/w - 10h/d - No HK Hols491 - No B/O periods 0 (was 05-Jul-21 C1) A 07-Nov-22 17-Apr-22 28-Nov-22 21 CC#4 - ELS Design - EBC No. 5,6, 19 (Ground Treatment Done) CH. 0+050 to 0+593 C01_7 d/w - 10h/d - No HK Hols250 - No B/O periods 0 (was 14-Jul-21 C1) A 26-Feb-22 A 17-Apr-22 23-Apr-22 310.D.R0.L046 ELS Design for EBC no. 5,6,19 (CH. 0+50 to CH. 0+593) - Prepare Design & submit with C01_7 d/w - 10h/d - No HK 28 14-Jul-21 A 10-Aug-21 A 17-Apr-22 17-Apr-22 ICE Hols - No B/O periods (was 310.D.R0.L048 ELS Design for EBC no. 5,6,19 (CH. 0+50 to CH. 0+593) - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 11-Aug-21 A 20-Aug-21 A 23-Apr-22 23-Apr-22 Hols - No B/O periods (was 310.D.R0.L050 ELS Design for EBC no. 5,6,19 (CH. 0+50 to CH. 0+593) - ICC, M&VC review design and C1) C01_7 d/w - 10h/d - No HK 21 22-Aug-21 A 20-Sep-21 A 23-Apr-22 23-Apr-22 issue check certificate Hols - No B/O periods (was 310.D.R0.L052 ELS Design for EBC no. 5,6,19 (CH. 0+50 to CH. 0+593) - address comments & resubmit C1) C01_7 d/w - 10h/d - No HK 4 21-Sep-21 A 29-Sep-21 A 23-Apr-22 23-Apr-22 2nd Round Hols - No B/O periods (was 310.D.R0.L054 ELS Design for EBC no. 5,6,19 (CH. 0+50 to CH. 0+593) - ICC, M&VC review design and C1) C01_7 d/w - 10h/d - No HK 21 30-Sep-21 A 02-Nov-21 A 23-Apr-22 23-Apr-22 issue check certificate 2nd Round Hols - No B/O periods (was 310.D.R0.L055 ELS Design for EBC no. 5,6,19 (CH. 0+50 to CH. 0+593) - BD review and approve C1) C01_7 d/w - 10h/d - No HK 60 03-Nov-21 A 18-Jan-22 A 23-Apr-22 23-Apr-22 Hols - No B/O periods (was 310.D.R0.L060 ELS Design for EBC no. 5,6,19 (CH. 0+50 to CH. 0+593) - prepare and submit Form BA8 C1) C01_7 d/w - 10h/d - No HK 7 31-Jan-22 A 18-Feb-22 A 23-Apr-22 23-Apr-22 and grant consent Hols - No B/O periods (was 310.D.R0.L062 ELS Design for EBC no. 5,6,19 (CH. 0+50 to CH. 0+593)9 - prepare and submit Form C1) C01_7 d/w - 10h/d - No HK 7 19-Feb-22 A 26-Feb-22 A 23-Apr-22 23-Apr-22 BA10 (with instrumentation readings) Hols - No B/O periods (was CC#4 - ELS Design - EBC No. 5,6, 19 (Need Ground Treatment) CH. 0+593 to 1262 C1) C01_7 d/w - 10h/d - No HK Hols230 - No B/O periods 0 (was 05-Jul-21 C1) A 27-Apr-22 17-Apr-22 03-Jun-22 37 310.D.R0.L360 ELS Design for EBC no. 5,6,19 (CH. 0+539 to 1262) - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 50 05-Jul-21 A 04-Aug-21 A 17-Apr-22 17-Apr-22 Hols - No B/O periods (was 310.D.R0.L364 ELS Design for EBC no. 5,6,19 (CH. 0+539 to 1262) - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 04-Aug-21 A 30-Aug-21 A 03-May-22 03-May-22 Hols - No B/O periods (was 310.D.R0.L368 ELS Design for EBC no. 5,6,19 (CH. 0+539 to 1262) - ICC, M&VC review design and C1) C01_7 d/w - 10h/d - No HK 21 30-Aug-21 A 12-Jan-22 A 03-May-22 03-May-22 issue check certificate Hols - No B/O periods (was 310.D.R0.L384 ELS Design for EBC no. 5,6,19 (CH. 0+539 to 1262) - BD review and approve C1) C01_7 d/w - 10h/d - No HK 60 13-Jan-22 A 13-Apr-22 03-May-22 20-May-22 37 Hols - No B/O periods (was 310.D.R0.L388 ELS Design for EBC no. 5,6,19 (CH. 0+539 to 1262) - prepare and submit Form BA8 and C1) C01_7 d/w - 10h/d - No HK 7 14-Apr-22 20-Apr-22 21-May-22 27-May-22 37 grant consent Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 36 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.R0.L392 ELS Design for EBC no. 5,6,19 (CH. 0+539 to 1262) - prepare and submit Form BA10 C01_7 d/w - 10h/d - No HK 7 21-Apr-22 27-Apr-22 28-May-22 03-Jun-22 37 (with instrumentation readings) Hols - No B/O periods (was CC#4 - ELS Design - EBC No. 5 & 6 (Outfall Connection) C1) C01_7 d/w - 10h/d - No HK Hols226 - No B/O periods 0 (was27-Mar-22 C1) 07-Nov-22 17-Apr-22 28-Nov-22 21 310.D.R0.L396 ELS Design for EBC no. 5,6 - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 50 27-Mar-22 15-May-22 17-Apr-22 05-Jun-22 21 Hols - No B/O periods (was 310.D.R0.L400 ELS Design for EBC no. 5,6 - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 16-May-22 12-Jun-22 06-Jun-22 03-Jul-22 21 Hols - No B/O periods (was 310.D.R0.L404 ELS Design for EBC no. 5,6 - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 13-Jun-22 03-Jul-22 04-Jul-22 24-Jul-22 21 Hols - No B/O periods (was 310.D.R0.L408 ELS Design for EBC no. 5,6 - address comments & resubmit 2nd Round C1) C01_7 d/w - 10h/d - No HK 4 04-Jul-22 07-Jul-22 25-Jul-22 28-Jul-22 21 Hols - No B/O periods (was 310.D.R0.L412 ELS Design for EBC no. 5,6 - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 08-Jul-22 04-Aug-22 29-Jul-22 25-Aug-22 21 Hols - No B/O periods (was 310.D.R0.L416 ELS Design for EBC no. 5,6 - ICC, M&VC review design and issue check certificate 2nd C1) C01_7 d/w - 10h/d - No HK 21 05-Aug-22 25-Aug-22 26-Aug-22 15-Sep-22 21 Round Hols - No B/O periods (was 310.D.R0.L420 ELS Design for EBC no. 5,6 - BD review and approve C1) C01_7 d/w - 10h/d - No HK 60 26-Aug-22 24-Oct-22 16-Sep-22 14-Nov-22 21 Hols - No B/O periods (was 310.D.R0.L424 ELS Design for EBC no. 5,6 - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 25-Oct-22 31-Oct-22 15-Nov-22 21-Nov-22 21 Hols - No B/O periods (was 310.D.R0.L428 ELS Design for EBC no. 5,6 - prepare and submit Form BA10 (with instrumentation C1) C01_7 d/w - 10h/d - No HK 7 01-Nov-22 07-Nov-22 22-Nov-22 28-Nov-22 21 readings) Hols - No B/O periods (was CC#04 - Structural Plan Anticipated BD Approval and Consent Application - WBC no. 19 C1) C01_7 d/w - 10h/d - No HK Hols 0- No B/O periods 0 (was 17-Oct-21 C1) A 17-Oct-21 A 16-May-22 16-May-22 310.D.R0.L256 Box Culvert (19) - grant BD approval for box culvert structural works C01_7 d/w - 10h/d - No HK 0 17-Oct-21 A 16-May-22 Hols - No B/O periods (was CC#04 - Drainage Plan Anticipated BD Approval and Consent Application - WBC no. 19 C1) 144 0 17-Oct-21 A 11-Apr-22 08-May-23 22-May-23 329 310.D.R0.L240 Box Culvert (19) - grant BD approval of Drainage Plan for Stormwater Drainage & Box C01_7 d/w - 10h/d - No HK 0 17-Oct-21 A 08-May-23 Culvert 19 Hols - No B/O periods (was 310.D.R0.L244 Box Culvert (19) - Consent application and grant Consent of Drainage Plan for Stormwater C1) C01_7 d/w - 10h/d - No HK 7 27-Mar-22 02-Apr-22 08-May-23 14-May-23 407 Drainage & Box Culvert 19 Hols - No B/O periods (was 310.D.R0.L248 Box Culvert (19) - Submit Form BA10 for notification of Stormwater Drainage Works & C1) C01_7 d/w - 10h/d - No HK 7 03-Apr-22 09-Apr-22 15-May-23 21-May-23 407 Box Culvert 19 Hols - No B/O periods (was 310.D.R0.L252 Remark - Commencement of stormwater drainage work at 3310/IA/2-1 (Airfield Infra and C1) C11_6 d/w - 10h/d - With 0 11-Apr-22 22-May-23 329 UU) xxxxxx HK Hols - No B/O periods CC#04 - AFHS Design (VE+ELS) (was C01_7C3) d/w - 10h/d - No HK Hols281 - No B/O periods 0 (was 29-Nov-21 C1) A 06-Nov-22 03-May-22 17-Dec-22 41 CC#04 - AFHS Design (ELS) - ISO Chamber C01_7 d/w - 10h/d - No HK Hols237 - No B/O periods 0 (was 28-Jan-22 C1) A 23-Sep-22 03-May-22 30-Oct-22 37 310.D.R0.L800.B01 ELS Design for ISO Chamber - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 28 28-Jan-22 A 31-Mar-22 03-May-22 07-May-22 37 Hols - No B/O periods (was 310.D.R0.L805.B01 ELS Design for ISO Chamber - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 01-Apr-22 28-Apr-22 08-May-22 04-Jun-22 37 Hols - No B/O periods (was 310.D.R0.L810.B01 ELS Design for ISO Chamber - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 29-Apr-22 19-May-22 05-Jun-22 25-Jun-22 37 Hols - No B/O periods (was 310.D.R0.L815.B01 ELS Design for ISO Chamber - address comments & resubmit 2nd Round C1) C01_7 d/w - 10h/d - No HK 4 20-May-22 23-May-22 26-Jun-22 29-Jun-22 37 Hols - No B/O periods (was 310.D.R0.L820.B01 ELS Design for ISO Chamber - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 24-May-22 20-Jun-22 30-Jun-22 27-Jul-22 37 Hols - No B/O periods (was 310.D.R0.L825.B01 ELS Design for ISO Chamber - ICC, M&VC review design and issue check certificate 2nd C1) C01_7 d/w - 10h/d - No HK 21 21-Jun-22 11-Jul-22 28-Jul-22 17-Aug-22 37 Round Hols - No B/O periods (was 310.D.R0.L830.B01 ELS Design for ISO Chamber - BD review and approve C1) C01_7 d/w - 10h/d - No HK 60 12-Jul-22 09-Sep-22 18-Aug-22 16-Oct-22 37 Hols - No B/O periods (was 310.D.R0.L835.B01 ELS Design for ISO Chamber - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 10-Sep-22 16-Sep-22 17-Oct-22 23-Oct-22 37 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 37 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.R0.L840.B01 ELS Design for ISO Chamber - prepare and submit Form BA10 (with instrumentation C01_7 d/w - 10h/d - No HK 7 17-Sep-22 23-Sep-22 24-Oct-22 30-Oct-22 37 readings) Hols - No B/O periods (was CC#04 - AFHS Design (VE+ELS) - Section 1 C1) C01_7 d/w - 10h/d - No HK Hols195 - No B/O periods 0 (was 29-Nov-21 C1) A 12-Aug-22 09-Jun-22 25-Oct-22 74 310.D.R0.L504 ELS Design Section 1 - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 28 29-Nov-21 A 18-Apr-22 09-Jun-22 01-Jul-22 74 Hols - No B/O periods (was 310.D.R0.L508 ELS Design Section 1 - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 19-Apr-22 16-May-22 02-Jul-22 29-Jul-22 74 Hols - No B/O periods (was 310.D.R0.L512 ELS Design Section 1 - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 17-May-22 06-Jun-22 30-Jul-22 19-Aug-22 74 Hols - No B/O periods (was 310.D.R0.L516 ELS Design Section 1 - address comments & resubmit 2nd Round C1) C01_7 d/w - 10h/d - No HK 4 07-Jun-22 10-Jun-22 20-Aug-22 23-Aug-22 74 Hols - No B/O periods (was 310.D.R0.L532 ELS Design Section 1 - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 11-Jun-22 08-Jul-22 24-Aug-22 20-Sep-22 74 Hols - No B/O periods (was 310.D.R0.L536 ELS Design Section 1 - ICC, M&VC review design and issue check certificate 2nd Round C1) C01_7 d/w - 10h/d - No HK 21 09-Jul-22 29-Jul-22 21-Sep-22 11-Oct-22 74 Hols - No B/O periods (was 310.D.R0.L524 ELS Design Section 1 - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 30-Jul-22 05-Aug-22 12-Oct-22 18-Oct-22 74 Hols - No B/O periods (was 310.D.R0.L528 ELS Design Section 1 - prepare and submit Form BA10 (with instrumentation readings) C1) C01_7 d/w - 10h/d - No HK 7 06-Aug-22 12-Aug-22 19-Oct-22 25-Oct-22 74 Hols - No B/O periods (was CC#04 - AFHS Design (VE+ELS) - Section 2 C1) C01_7 d/w - 10h/d - No HK Hols204 - No B/O periods 0 (was17-Apr-22 C1) 06-Nov-22 28-May-22 17-Dec-22 41 310.D.R0.L468 ELS Design Section 2 - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 28 17-Apr-22 14-May-22 28-May-22 24-Jun-22 41 Hols - No B/O periods (was 310.D.R0.L472 ELS Design Section 2 - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 15-May-22 11-Jun-22 25-Jun-22 22-Jul-22 41 Hols - No B/O periods (was 310.D.R0.L476 ELS Design Section 2 - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 12-Jun-22 02-Jul-22 23-Jul-22 12-Aug-22 41 Hols - No B/O periods (was 310.D.R0.L480 ELS Design Section 2 - address comments & resubmit 2nd Round C1) C01_7 d/w - 10h/d - No HK 4 03-Jul-22 06-Jul-22 13-Aug-22 16-Aug-22 41 Hols - No B/O periods (was 310.D.R0.L484 ELS Design Section 2 - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 07-Jul-22 03-Aug-22 17-Aug-22 13-Sep-22 41 Hols - No B/O periods (was 310.D.R0.L488 ELS Design Aviation Fuel Pipe - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 04-Aug-22 24-Aug-22 14-Sep-22 04-Oct-22 41 2nd Round Hols - No B/O periods (was 310.D.R0.L492 ELS Design Aviation Fuel Pipe - BD review and approve C1) C01_7 d/w - 10h/d - No HK 60 25-Aug-22 23-Oct-22 05-Oct-22 03-Dec-22 41 Hols - No B/O periods (was 310.D.R0.L496 ELS Design Aviation Fuel Pipe - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 24-Oct-22 30-Oct-22 04-Dec-22 10-Dec-22 41 Hols - No B/O periods (was 310.D.R0.L500 ELS Design Aviation Fuel Pipe - prepare and submit Form BA10 (with instrumentation C1) C01_7 d/w - 10h/d - No HK 7 31-Oct-22 06-Nov-22 11-Dec-22 17-Dec-22 41 readings) Hols - No B/O periods (was CC#04 - AFHS Testing and Commissioning Plan for Stage 1 & Stage 2 Aviation Fuel System C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was04-Feb-23 C1) 02-Apr-23 04-Feb-23 23-Apr-23 21 310.D.EX.G122 MS.28 - AFP - T&C Plan - Prepare and submit to PM C01_7 d/w - 10h/d - No HK 30 04-Feb-23 05-Mar-23 04-Feb-23 05-Mar-23 0 Hols - No B/O periods (was 310.D.EX.G126 MS.28 - AFP - T&C Plan - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 06-Mar-23 02-Apr-23 27-Mar-23 23-Apr-23 21 Hols - No B/O periods (was CC#4 - UU ELS Design (Airfield Statutory Submission) C1) C01_7 d/w - 10h/d - No HK Hols145 - No B/O periods 0 (was 22-Dec-21 C1) A 17-Aug-22 06-May-22 01-Sep-24 746 West Wrap Around Area -Design for ELS to underground utilities C01_7 d/w - 10h/d - No HK Hols128 - No B/O periods 0 (was 22-Dec-21 C1) A 19-Apr-22 08-Jul-22 01-Sep-24 824 310.D.EX.U101 UU ELS Design - Prepare design with ICE checked and submit to AA C01_7 d/w - 10h/d - No HK 30 22-Dec-21 A 20-Jan-22 A 01-Sep-24 01-Sep-24 Hols - No B/O periods (was 310.D.EX.U104 UU ELS Design - PM, Project AP/RSE endorse design and submit to ICC and M&VC C1) C01_7 d/w - 10h/d - No HK 28 21-Jan-22 A 13-Feb-22 A 01-Sep-24 01-Sep-24 Hols - No B/O periods (was 310.D.EX.U107 UU ELS Design - ICC & M&VC review and approved C1) C01_7 d/w - 10h/d - No HK 21 14-Feb-22 A 25-Mar-22 A 01-Sep-24 01-Sep-24 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 38 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.EX.U119 UU ELS Design - BA8 consent C01_7 d/w - 10h/d - No HK 7 24-Mar-22 A 12-Apr-22 08-Jul-22 24-Jul-22 103 Hols - No B/O periods (was 310.D.EX.U122 UU ELS Design - submit Form BA10 (west wrap around UU) C1) C01_7 d/w - 10h/d - No HK 7 13-Apr-22 19-Apr-22 25-Jul-22 31-Jul-22 103 Hols - No B/O periods (was Design for ELS to other UUs C1) C01_7 d/w - 10h/d - No HK Hols144 - No B/O periods 0 (was 01-Jan-22 C1) A 17-Aug-22 06-May-22 26-Sep-22 40 310.D.EX.U132.B02 Other UU ELS Design - Prepare design with ICE checked and submit to AA C01_7 d/w - 10h/d - No HK 30 01-Jan-22 A 30-Jan-22 A 06-May-22 06-May-22 Hols - No B/O periods (was 310.D.EX.U142.B02 Other UU ELS Design - PM, Project AP/RSE endorse design and submit to ICC and C1) C01_7 d/w - 10h/d - No HK 28 31-Jan-22 A 10-Feb-22 A 06-May-22 06-May-22 M&VC Hols - No B/O periods (was 310.D.EX.U152.B02 Other UU ELS Design - ICC & M&VC review and issue comments C1) C01_7 d/w - 10h/d - No HK 21 11-Feb-22 A 16-Apr-22 06-May-22 26-May-22 40 Hols - No B/O periods (was 310.D.EX.U162.B02 Other UU ELS Design - address ICC & M&VC comments and resubmit C1) C01_7 d/w - 10h/d - No HK 14 17-Apr-22 30-Apr-22 27-May-22 09-Jun-22 40 Hols - No B/O periods (was 310.D.EX.U172.B02 Other UU ELS Design - PM, Project AP/RSE endorse design and submit to ICC and C1) C01_7 d/w - 10h/d - No HK 28 01-May-22 28-May-22 10-Jun-22 07-Jul-22 40 M&VC 2nd round Hols - No B/O periods (was 310.D.EX.U182.B02 Other UU ELS Design - ICC & M&VC review and endorse design and submit to BD C1) C01_7 d/w - 10h/d - No HK 7 29-May-22 04-Jun-22 08-Jul-22 14-Jul-22 40 Hols - No B/O periods (was 310.D.EX.U192.B02 Other UU ELS Design - BD review & approve ELS design - review and approve C1) C01_7 d/w - 10h/d - No HK 60 05-Jun-22 03-Aug-22 15-Jul-22 12-Sep-22 40 Hols - No B/O periods (was 310.D.EX.U202.B02 Other UU ELS Design - BA8 consent C1) C01_7 d/w - 10h/d - No HK 7 04-Aug-22 10-Aug-22 13-Sep-22 19-Sep-22 40 Hols - No B/O periods (was 310.D.EX.U212.B02 Other UU ELS Design - submit Form BA10 (new UU inside existing north runway) C1) C01_7 d/w - 10h/d - No HK 7 11-Aug-22 17-Aug-22 20-Sep-22 26-Sep-22 40 Hols - No B/O periods (was CC#4 ----- Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols348 - No B/O periods 0 (was 10-Jul-21 C1) A 22-Jun-22 27-Mar-22 01-May-23 313 CC#04 - MS no. 8 - Method Statement for Box Culvert temporary works & ELS Construction C01_7 d/w - 10h/d - No HK Hols42 - No B/O periods 0 (was 23-Aug-21 C1) A 03-Dec-21 A 23-Apr-22 23-Apr-22 310.D.TX.A212 MS no.8 - Method Statement for Box Culvert temporary works & ELS Construction - C01_7 d/w - 10h/d - No HK 14 23-Aug-21 A 09-Sep-21 A 23-Apr-22 23-Apr-22 prepare document Hols - No B/O periods (was 310.D.TX.A216 MS no.8 - Method Statement for Box Culvert temporary works & ELS - PM review and C1) C01_7 d/w - 10h/d - No HK 28 10-Sep-21 A 03-Dec-21 A 23-Apr-22 23-Apr-22 accept Hols - No B/O periods (was CC#04 - MS no.12 - AFP - Method Statement for Stage 1 Aviation Fuel Direct Buried Pipe Installation C1) C01_7 d/w - 10h/d - No HK Hols42 - No B/O periods 0 (was 25-Oct-21 C1) A 06-Apr-22 27-Mar-22 13-Jun-22 68 310.D.EX.G106 MS no.12 - AFP - MS for Stage 1 AFP Installation - prepare and submit to PM for C01_7 d/w - 10h/d - No HK 14 25-Oct-21 A 12-Nov-21 A 27-Mar-22 27-Mar-22 reviewing Hols - No B/O periods (was 310.D.EX.G110 MS.12 - AFP - MS for Stage 1 AFP Installation - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 13-Nov-21 A 06-Apr-22 03-Jun-22 13-Jun-22 68 Hols - No B/O periods (was CC#04 - AFP - Method Statement for Stage 2 Aviation Fuel Pipe Installation through WVT C1) C01_7 d/w - 10h/d - No HK Hols42 - No B/O periods 0 (was12-May-22 C1) 22-Jun-22 12-May-22 17-Dec-22 178 310.D.EX.G114 MS no.24 - AFP - MS for Stage 2 AFP Installation - prepare and submit to PM for C01_7 d/w - 10h/d - No HK 14 12-May-22 25-May-22 12-May-22 25-May-22 0 reviewing Hols - No B/O periods (was 310.D.EX.G118 MS.24 - AFP - MS for Stage 2 AFP Installation - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 20-Nov-22 17-Dec-22 178 Hols - No B/O periods (was CC#04 - MS No. 16 - Method Statement for Installation and Tie-in of various Utilities to Ex. Network C1) C01_7 d/w - 10h/d - No HK Hols135 - No B/O periods 0 (was 27-Aug-21 C1) A 01-Apr-22 27-Mar-22 01-Apr-22 0 310.D.R0.L315 MS no. 16 - MS for Installation and Tie-in of Various Utilities to Ex. Network - liaison with C01_7 d/w - 10h/d - No HK 30 27-Aug-21 A 25-Sep-21 A 27-Mar-22 27-Mar-22 AA Hols - No B/O periods (was 310.D.R0.L316 MS no. 16 - MS for Installation and Tie-in of Various Utilities to Ex. Network - prepare C1) C01_7 d/w - 10h/d - No HK 30 05-Nov-21 A 22-Dec-21 A 27-Mar-22 27-Mar-22 document Hols - No B/O periods (was 310.D.R0.L320 MS no. 16 - MS for Installation and Tie-in of Various Utilities to Ex. Network - ICE issue C1) C01_7 d/w - 10h/d - No HK 7 17-Dec-21 A 23-Dec-21 A 27-Mar-22 27-Mar-22 check certificate Hols - No B/O periods (was 310.D.R0.L324 MS no. 16 - MS for Installation and Tie-in of Various Utilities to Ex. Network - PM review C1) C01_7 d/w - 10h/d - No HK 28 23-Dec-21 A 01-Apr-22 27-Mar-22 01-Apr-22 0 and accept Hols - No B/O periods (was CC#04 - MS no. 17 - Method Statement for Construction and Tie-in of Box Culvert no. 3, 4, 5, 6 C1) C01_7 d/w - 10h/d - No HK Hols240 - No B/O periods 0 (was 27-Aug-21 C1) A 25-Mar-22 A 03-Oct-22 11-Jan-23 310.D.R0.L85 MS no. 17 - MS for Construct Box Culvert Tie-in (no. 3,4,5,6) - liaison with AA C01_7 d/w - 10h/d - No HK 30 27-Aug-21 A 25-Sep-21 A 03-Oct-22 03-Oct-22 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 39 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.R0.L86 MS no. 17 - MS for Construct Box Culvert Tie-in (no. 3,4,5,6) - prepare document C01_7 d/w - 10h/d - No HK 30 05-Nov-21 A 02-Jan-22 A 11-Jan-23 11-Jan-23 Hols - No B/O periods (was 310.D.R0.L94 MS no. 17 - MS for Construct Box Culvert Tie-in (no. 3,4,5,6) - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 03-Jan-22 A 18-Mar-22 A 11-Jan-23 11-Jan-23 Hols - No B/O periods (was 310.D.R0.L90 MS no. 17 - MS for Construct Box Culvert Tie-in (no. 3,4,5,6) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 7 19-Mar-22 A 25-Mar-22 A 11-Jan-23 11-Jan-23 Hols - No B/O periods (was CC#04 - MS no. 21 - Method Statement for Construction and Tie-in of Stormwater Box Culvert no.18, 19 C1) C01_7 d/w - 10h/d - No HK Hols183 - No B/O periods 0 (was 30-Oct-21 C1) A 25-Mar-22 A 03-Oct-22 03-Oct-22 310.D.R0.L099 MS no. 21 - MS for Construct Box Culvert Tie-in (no. 18,19) - liaison with AA C01_7 d/w - 10h/d - No HK 60 30-Oct-21 A 20-Nov-21 A 03-Oct-22 03-Oct-22 Hols - No B/O periods (was 310.D.R0.L101 MS no. 21 - MS for Construct Box Culvert Tie-in (no. 18,19) - prepare document C1) C01_7 d/w - 10h/d - No HK 30 21-Nov-21 A 20-Dec-21 A 03-Oct-22 03-Oct-22 Hols - No B/O periods (was 310.D.R0.L106 MS no. 21 - MS for Construct Box Culvert Tie-in (no. 18,19) - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 21-Dec-21 A 18-Mar-22 A 03-Oct-22 03-Oct-22 Hols - No B/O periods (was 310.D.R0.L102 MS no. 21 - MS for Construct Box Culvert Tie-in (no. 18,19) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 7 19-Mar-22 A 25-Mar-22 A 03-Oct-22 03-Oct-22 Hols - No B/O periods (was CC#4 - MS no.5 - UU - MS for Ducting C1) C01_7 d/w - 10h/d - No HK Hols93 - No B/O periods 0 (was 10-Jul-21 C1) A 02-Dec-21 A 08-Jun-22 03-Nov-22 310.C.EX.U242 MS no.05 - MS for ducting & drawpit construction - prepare & submit method statement to C01_7 d/w - 10h/d - No HK 30 10-Jul-21 A 08-Aug-21 A 08-Jun-22 08-Jun-22 PM Hols - No B/O periods (was 310.C.EX.U245 MS no.05 - MS for ducting & drawpit construction - PM review and comment C1) C01_7 d/w - 10h/d - No HK 28 09-Aug-21 A 05-Sep-21 A 03-Nov-22 03-Nov-22 Hols - No B/O periods (was 310.C.EX.U248 MS no.05 - MS for ducting & drawpit - address PM's comments C1) C01_7 d/w - 10h/d - No HK 7 07-Oct-21 A 28-Nov-21 A 03-Nov-22 03-Nov-22 Hols - No B/O periods (was 310.C.EX.U251 MS no.05 - MS for ducting & drawpit - PM accept C1) C01_7 d/w - 10h/d - No HK 28 29-Nov-21 A 02-Dec-21 A 03-Nov-22 03-Nov-22 Hols - No B/O periods (was CC#4 - Method Statement for Plate Load Test C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was27-Mar-22 C1) 23-May-22 05-Mar-23 01-May-23 343 310.D.TX.A340 Method Statement for Plate Load Test - prepare document C01_7 d/w - 10h/d - No HK 30 27-Mar-22 25-Apr-22 05-Mar-23 03-Apr-23 343 Hols - No B/O periods (was 310.D.TX.A344 Method Statement for Plate Load Test - BD Acknowledge C1) C01_7 d/w - 10h/d - No HK 28 26-Apr-22 23-May-22 04-Apr-23 01-May-23 343 Hols - No B/O periods (was CC#4 ----- Procurement ----- C1) C01_7 d/w - 10h/d - No HK Hols203 - No B/O periods 0 (was 25-Oct-21 C1) A 20-Aug-22 11-Apr-22 16-Oct-22 57 Subletting C01_7 d/w - 10h/d - No HK Hols123 - No B/O periods 0 (was 25-Oct-21 C1) A 01-Jun-22 11-Apr-22 21-Jun-22 20 CC#4 - Interim Security Fence (ISF) C01_7 d/w - 10h/d - No HK Hols90 - No B/O periods 0 (was 30-Jan-22 C1) A 20-May-22 11-Apr-22 04-Jun-22 15 310.P.RC.C034 Subletting - Interim Security Fence (ISF) - Stage 1&2 Preparation,Submission& C01_7 d/w - 10h/d - No HK 90 30-Jan-22 A 20-May-22 11-Apr-22 04-Jun-22 15 Approval,Tender&Award sub-contract Hols - No B/O periods (was CC#4 - Box Culvert C1) C01_7 d/w - 10h/d - No HK Hols90 - No B/O periods 0 (was 25-Oct-21 C1) A 06-Jan-22 A 13-Jun-22 13-Jun-22 310.P.R0.L244 Subletting - Box Culvert - Formwork Supply - Award sub-contract C01_7 d/w - 10h/d - No HK 90 25-Oct-21 A 29-Dec-21 A 13-Jun-22 13-Jun-22 Hols - No B/O periods (was 310.P.R0.L268 Subletting - Box Culvert - Structural Works - Award sub-contract C1) C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 06-Jan-22 A 13-Jun-22 13-Jun-22 Hols - No B/O periods (was CC#4 - Jet Blast Screen C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was 04-Mar-22 C1) A 01-Jun-22 16-Apr-22 21-Jun-22 20 310.P.RC.D096 Subletting - Jet Blast Screen - Stage 1&2 Preparation,Submission& C01_7 d/w - 10h/d - No HK 67 04-Mar-22 A 01-Jun-22 16-Apr-22 21-Jun-22 20 Approval,Tender&Award sub-contract Hols - No B/O periods (was CC#4 - AGL Diversion C1) C01_7 d/w - 10h/d - No HK Hols90 - No B/O periods 0 (was 01-Nov-21 C1) A 15-Apr-22 11-Apr-22 30-Apr-22 15 310.P.RC.D551.B01 Subletting - AGL Diversion - Stage 1&2 Preparation,Submission& C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 15-Apr-22 11-Apr-22 30-Apr-22 15 Approval,Tender&Award sub-contract Hols - No B/O periods (was Procurement C1) C01_7 d/w - 10h/d - No HK Hols203 - No B/O periods 0 (was 30-Jan-22 C1) A 20-Aug-22 11-Apr-22 16-Oct-22 57 Major Long Lead Items - Aviation Fuel and Hydrant System (AFHS) C01_7 d/w - 10h/d - No HK Hols147 - No B/O periods 0 (was27-Mar-22 C1) 20-Aug-22 23-May-22 16-Oct-22 57 Major Long Lead Items - Pipe and Fittings C01_7 d/w - 10h/d - No HK Hols147 - No B/O periods 0 (was27-Mar-22 C1) 20-Aug-22 23-May-22 16-Oct-22 57 310.P.EX.U205 Procurement Major Long Lead Items - Preparation & Submission of Pipe and Fittings 1st C01_7 d/w - 10h/d - No HK 7 27-Mar-22 02-Apr-22 23-May-22 29-May-22 57 Round Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 40 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.EX.U208 Procurement Major Long Lead Items - Comments & Acceptance for Pipe and Fittings 1st C01_7 d/w - 10h/d - No HK 28 03-Apr-22 30-Apr-22 30-May-22 26-Jun-22 57 Round Hols - No B/O periods (was 310.P.EX.U218 Procurement Major Long Lead Items - Preparation & Submission of Pipe and Fittings 2nd C1) C01_7 d/w - 10h/d - No HK 7 01-May-22 07-May-22 27-Jun-22 03-Jul-22 57 Round Hols - No B/O periods (was 310.P.EX.U222 Procurement Major Long Lead Items - Comments & Acceptance for Pipe and Fittings C1) C01_7 d/w - 10h/d - No HK 28 08-May-22 04-Jun-22 04-Jul-22 31-Jul-22 57 2nd Round Hols - No B/O periods (was 310.P.EX.U211 Procurement Major Long Lead Items - Place Order & Manufacture for Pipe and Fittings C1) C01_7 d/w - 10h/d - No HK 72 05-Jun-22 15-Aug-22 01-Aug-22 11-Oct-22 57 (1st batch) Hols - No B/O periods (was 310.P.EX.U214 Procurement Major Long Lead Items - Delivery on Site for Pipe and Fittings (1st batch) C1) C01_7 d/w - 10h/d - No HK 5 16-Aug-22 20-Aug-22 12-Oct-22 16-Oct-22 57 Hols - No B/O periods (was Major Long Lead Items -Interim Security Fence C1) C01_7 d/w - 10h/d - No HK Hols137 - No B/O periods 0 (was 30-Jan-22 C1) A 31-May-22 11-Apr-22 15-Jun-22 15 310.P.EX.U226.B01 Procurement of Wire Mesh Fence and Barbed Tape- Preparation & Submission C01_7 d/w - 10h/d - No HK 14 30-Jan-22 A 12-Feb-22 A 02-May-22 02-May-22 Hols - No B/O periods (was 310.P.EX.U250.B01 Procurement Footing (Precast) - Preparation & Submission C1) C01_7 d/w - 10h/d - No HK 14 30-Jan-22 A 12-Feb-22 A 11-Apr-22 11-Apr-22 Hols - No B/O periods (was 310.P.EX.U240.B01 Procurement Marker Board - Preparation & Submission C1) C01_7 d/w - 10h/d - No HK 14 30-Jan-22 A 12-Feb-22 A 02-May-22 02-May-22 Hols - No B/O periods (was 310.P.EX.U230.B01 Procurement of Wire Mesh Fence and Barbed Tape - AAHK Comments & Acceptance C1) C01_7 d/w - 10h/d - No HK 21 13-Feb-22 A 05-Mar-22 A 02-May-22 02-May-22 Hols - No B/O periods (was 310.P.EX.U245.B01 Procurement Marker Board - AAHK Comments & Acceptance C1) C01_7 d/w - 10h/d - No HK 21 13-Feb-22 A 05-Mar-22 A 02-May-22 02-May-22 Hols - No B/O periods (was 310.P.EX.U255.B01 Procurement Footing (Precast) - AAHK Comments & Acceptance C1) C01_7 d/w - 10h/d - No HK 21 13-Feb-22 A 16-Apr-22 11-Apr-22 01-May-22 15 Hols - No B/O periods (was 310.P.EX.U260.B01 Procurement - Place order & manufacture/fabricate Wire Mesh, Barbed Tape, Marker C1) C01_7 d/w - 10h/d - No HK 60 06-Mar-22 A 22-May-22 02-May-22 06-Jun-22 15 Board and Precast Footing Hols - No B/O periods (was 310.P.EX.U265.B01 Procurement - Delivery on Site of Interim Fence Components and Marker Boards C1) C01_7 d/w - 10h/d - No HK 9 23-May-22 31-May-22 07-Jun-22 15-Jun-22 15 Hols - No B/O periods (was CC#4 ----- Construction ----- C1) 908 368 07-Jun-21 A 25-Jun-24 31-Jan-22 01-Sep-24 57 CC#4.1, 4.2, 4.4, 4.7 - 3310/11 - Area G1 & G2 - CC#4 Airside Road and Landside Road 590 0 24-Sep-21 A 20-Mar-24 08-Jun-22 01-Jun-24 57 CC#4.1, 4.2, 4.4, 4.7 - 3310/11 - Area G1 & G2 - Underground Utilities under ASR & LSR 319 0 24-Sep-21 A 25-Apr-23 08-Jun-22 05-Jul-23 57 310.C.G1.J115 3310/11 - Area G1&G2 (under ASR & LSR) - Plant Mobilization for u/g utilities works C11_6 d/w - 10h/d - With 14 24-Sep-21 A 24-Sep-21 A 08-Jun-22 08-Jun-22 HK Hols - No B/O periods 310.C.G1.J117 3310/11 - Area G1&G2 (under ASR & LSR) - GI for stormwater drain (was C11_6C3) d/w - 10h/d - With 10 24-Sep-21 A 21-Oct-21 A 04-Jul-22 04-Jul-22 HK Hols - No B/O periods 310.C.G1.J118 3310/11 - Area G1&G2 (under ASR & LSR) - carry out site survey & ascertain installation (was C11_6C3) d/w - 10h/d - With 21 28-Mar-22 25-Apr-22 08-Jun-22 02-Jul-22 56 level for UU HK Hols - No B/O periods 310.C.G1.J119 3310/11 - Area G1&G2 (under ASR & LSR) - confirm installation level with PM (was C01_7C3) d/w - 10h/d - No HK 28 26-Apr-22 23-May-22 04-Jul-22 31-Jul-22 69 Hols - No B/O periods (was 310.C.G1.J120 3310/11 - Area G1&G2 (under ASR & LSR) - stormwater drain and manholes [960m C1) C11_6 d/w - 10h/d - With 58 24-May-22 01-Aug-22 01-Aug-22 10-Oct-22 57 @10m/d/wf, 3WF; 19no.MH @4d/no/wf, 3WF] HK Hols - No B/O periods 310.C.G1.J132 3310/11 - Area G1&G2 (under ASR & LSR) - 132 kv CLP cable ducts and drawpits (L:721 (was C11_6C3) d/w - 10h/d - With 60 29-Jun-22 07-Sep-22 05-Sep-22 16-Nov-22 57 m) HK Hols - No B/O periods 310.C.G1.J122 3310/11 - Area G1&G2 (under ASR & LSR) - Gas main (702m) (was C11_6C3) d/w - 10h/d - With 58 04-Aug-22 13-Oct-22 13-Oct-22 19-Dec-22 57 HK Hols - No B/O periods 310.C.G1.J128 3310/11 - Area G1&G2 (under ASR & LSR) - Potable Water main for FS (was C11_6C3) d/w - 10h/d - With 60 15-Sep-22 25-Nov-22 23-Nov-22 06-Feb-23 57 HK Hols - No B/O periods 310.C.G1.J124 3310/11 - Area G1&G2 (under ASR & LSR) - Airport Systems ductings (was C11_6C3) d/w - 10h/d - With 60 26-Nov-22 09-Feb-23 07-Feb-23 21-Apr-23 57 HK Hols - No B/O periods 310.C.G1.J144 3310/11 - Area G1&G2 (under ASR & LSR) - Road Drainage (was C11_6C3) d/w - 10h/d - With 60 10-Feb-23 25-Apr-23 22-Apr-23 05-Jul-23 57 HK Hols - No B/O periods CC#4.10 - 3310/11 - Area G1 & G2 - Landside Road Roadwork (was C11_6C3) d/w - 10h/d - With HK Hols 149- No B/O 0periods (was 26-Apr-23 C3) 24-Oct-23 06-Jul-23 11-Apr-24 137
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 41 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RD.J100 3310/11 - Area G1&G2 - LSR - construct kerb and sub-base [650m @20m/d/wf; 2wf] C11_6 d/w - 10h/d - With 17 26-Apr-23 16-May-23 06-Jul-23 25-Jul-23 57 HK Hols - No B/O periods 310.C.RD.J101 3310/11 - Area G1&G2 - LSR - construct flexible pavement [650m @15m/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 22 17-May-23 12-Jun-23 26-Jul-23 19-Aug-23 57 HK Hols - No B/O periods 310.C.RD.J102 3310/11 - Area G1&G2 - LSR - install street lighting, road furniture (was C11_6C3) d/w - 10h/d - With 30 13-Jun-23 19-Jul-23 16-Feb-24 21-Mar-24 203 HK Hols - No B/O periods 310.C.RD.J103 3310/11 - Area G1&G2 - LSR - wearing course & road marking (was C11_6C3) d/w - 10h/d - With 14 07-Oct-23 24-Oct-23 22-Mar-24 11-Apr-24 137 HK Hols - No B/O periods CC#4.10 - 3310/11 - Area G1 & G2 - Airside Road Roadwork (was C11_6C3) d/w - 10h/d - With HK Hols 146- No B/O 0periods (was 17-May-23 C3) 09-Nov-23 01-Dec-23 27-Apr-24 137 310.C.RD.J116 3310/11 - Area G1&G2 - ASR - construct kerb and sub-base [650m @20m/d/wf; 2wf] C11_6 d/w - 10h/d - With 17 17-May-23 06-Jun-23 01-Dec-23 20-Dec-23 164 HK Hols - No B/O periods 310.C.RD.J120 3310/11 - Area G1&G2 - ASR - construct flexible pavement [650m @15m/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 22 13-Jun-23 10-Jul-23 21-Dec-23 18-Jan-24 159 HK Hols - No B/O periods 310.C.RD.J124 3310/11 - Area G1&G2 - ASR- install street lighting, road furniture (was C11_6C3) d/w - 10h/d - With 30 11-Jul-23 14-Aug-23 19-Jan-24 24-Feb-24 159 HK Hols - No B/O periods 310.C.RD.J128 3310/11 - Area G1&G2 - ASR - wearing course & road marking (was C11_6C3) d/w - 10h/d - With 14 25-Oct-23 09-Nov-23 12-Apr-24 27-Apr-24 137 HK Hols - No B/O periods CC#4.11 - 3310/11 - Area G1 & G2 - Security Fencing (was C11_6C3) d/w - 10h/d - With HK Hols 232- No B/O 0periods (was 13-Jun-23 C3) 20-Mar-24 21-Aug-23 01-Jun-24 57 3310/11 - Area G1 Security Fencing C11_6 d/w - 10h/d - With HK Hols 162- No B/O 0periods (was 13-Jun-23 C3) 23-Dec-23 21-Aug-23 01-Jun-24 127 310.C.RD.J112 3310/11 - Area G1 - Security Fence & Gate - construct footing [385mL x 2 rows; C11_6 d/w - 10h/d - With 70 13-Jun-23 04-Sep-23 21-Aug-23 13-Nov-23 57 @20m/7d/wf; 4WF] HK Hols - No B/O periods 310.C.RD.J140 3310/11 - Area G1 - Security Fence & Gate - metal works (was C11_6C3) d/w - 10h/d - With 40 05-Sep-23 24-Oct-23 07-Feb-24 26-Mar-24 127 HK Hols - No B/O periods 310.C.RD.J144 3310/11 - Area G1 - Security Fence & Gate - install security system (was C11_6C3) d/w - 10h/d - With 52 25-Oct-23 23-Dec-23 27-Mar-24 01-Jun-24 127 HK Hols - No B/O periods 3310/11 - Area G2 Security Fencing (was C11_6C3) d/w - 10h/d - With HK Hols 162- No B/O 0periods (was 05-Sep-23 C3) 20-Mar-24 14-Nov-23 01-Jun-24 57 310.C.RD.J145 3310/11 - Area G2 - Security Fence & Gate - construct footing [385mL x 2 rows; C11_6 d/w - 10h/d - With 70 05-Sep-23 28-Nov-23 14-Nov-23 06-Feb-24 57 @20m/7d/wf; 4WF] HK Hols - No B/O periods 310.C.RD.J146 3310/11 - Area G2 - Security Fence & Gate - metal works (was C11_6C3) d/w - 10h/d - With 40 29-Nov-23 17-Jan-24 07-Feb-24 26-Mar-24 57 HK Hols - No B/O periods 310.C.RD.J147 3310/11 - Area G2 - Security Fence & Gate - install security system (was C11_6C3) d/w - 10h/d - With 52 18-Jan-24 20-Mar-24 27-Mar-24 01-Jun-24 57 HK Hols - No B/O periods CC#4.10 - 3310/11 - Area G1 & G2 - Central Reserve Pavement (was C11_6C3) d/w - 10h/d - With HK Hols 34- No B/O 0periods (was 05-Sep-23 C3) 16-Oct-23 22-Apr-24 01-Jun-24 185 310.C.RD.J132 3310/11 - Area G1&G2 - Central Reserve - sub-base [650m; 100mm thk @50m/d/wf] C11_6 d/w - 10h/d - With 20 05-Sep-23 27-Sep-23 22-Apr-24 16-May-24 185 HK Hols - No B/O periods 310.C.RD.J136 3310/11 - Area G1&G2 - Central Reserve - verge [650m, 75mmthk] (was C11_6C3) d/w - 10h/d - With 14 28-Sep-23 16-Oct-23 17-May-24 01-Jun-24 185 HK Hols - No B/O periods CC#4 - 3310/11 - Area G4 - Airside Road and Landside Road (was C3) 513 49 28-Mar-22 15-Dec-23 07-May-22 01-Jun-24 134 CC#4.1, 4.2, 4.4, 4.7 - 3310/11 - Area G4 - Underground Utilities under ASR & LSR 256 14 28-Mar-22 06-Feb-23 07-May-22 19-Mar-23 35 310.C.G4.J123 3310/11 - Area G4 - (under LSR & ASR) - GI for utilities C11_6 d/w - 10h/d - With 14 28-Mar-22 13-Apr-22 07-May-22 23-May-22 30 HK Hols - No B/O periods 310.C.G4.J127 3310/11 - Area G4 - (under LSR & ASR) - PM agree utilities installation level (was C01_7C3) d/w - 10h/d - No HK 28 28-Mar-22 24-Apr-22 07-May-22 03-Jun-22 40 Hols - No B/O periods (was 310.C.G4.J127.B01 3310/11 - Area G4 - (under ASR & LSR) - Backfill up to form I.L. of SWD, CLP ducts, C1) C11_6 d/w - 10h/d - With 28 25-Apr-22 27-May-22 04-Jun-22 07-Jul-22 33 Gasmain and PWFH HK Hols - No B/O periods 310.C.G4.J128 3310/11 - Area G4 - LSR - stormwater drain pipe [394mL @10m/d/wf; 2wf; 10MH (was C3) C11_6 d/w - 10h/d - With 44 4 13-May-22 05-Jul-22 22-Jun-22 12-Aug-22 33 @4d/no/wf; 3wf] HK Hols - No B/O periods 310.C.G4.J132 3310/11 - Area G4 - LSR - Construct 132kv CLP duct (L=608m) and drawpits (was C11_6C3) d/w - 10h/d - With 62 2 07-Jun-22 18-Aug-22 16-Jul-22 27-Sep-22 33 HK Hols - No B/O periods 310.C.G4.J129 3310/11 - Area G4 - LSR - Pipe laying of Gasmain (L=556m) (was C11_6C3) d/w - 10h/d - With 42 2 30-Jun-22 18-Aug-22 09-Aug-22 27-Sep-22 33 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 42 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.G4.J131 3310/11 - Area G4 - LSR - Pipe laying of PWFH (Total L=731m) and chamber/pit C11_6 d/w - 10h/d - With 62 2 04-Aug-22 18-Oct-22 01-Sep-22 15-Nov-22 24 HK Hols - No B/O periods 310.C.G4.J130 3310/11 - Area G4 - LSR - Airport System ductings (was C11_6C3) d/w - 10h/d - With 62 2 16-Aug-22 29-Oct-22 14-Sep-22 26-Nov-22 24 HK Hols - No B/O periods 310.C.G4.J157 3310/11 - Area G4 - LSR - complete CLP cable duct to achieve KD-04 (was C01_7C3) d/w - 10h/d - No HK 0 18-Aug-22 19-Mar-23 213 Hols - No B/O periods (was 310.C.G4.J136 3310/11 - Area G4 - LSR - Road Drainage C1) C11_6 d/w - 10h/d - With 62 2 21-Nov-22 06-Feb-23 28-Nov-22 13-Feb-23 6 HK Hols - No B/O periods CC#4.10 - 3310/11 - Area G4 - Landside Road Roadwork (was C11_6C3) d/w - 10h/d - With HK Hols 143- No B/O11 periods (was 10-Jan-23 C3) 07-Jul-23 17-Jan-23 13-May-24 253 310.C.RD.J336 3310/11 - Area G4 - LSR - Lay kerb, sub-base + base course [540mL @15m/d/wf; 2wf] C11_6 d/w - 10h/d - With 36 3 10-Jan-23 23-Feb-23 17-Jan-23 02-Mar-23 6 HK Hols - No B/O periods 310.C.RD.J340 3310/11 - Area G4 - LSR - Lay flexible pavement [540mL @80m/6d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 45 4 17-Feb-23 14-Apr-23 22-Dec-23 17-Feb-24 253 HK Hols - No B/O periods 310.C.RD.J352 3310/11 - Area G4 - LSR - install street lighting, road furniture (was C11_6C3) d/w - 10h/d - With 52 2 15-Apr-23 16-Jun-23 19-Feb-24 23-Apr-24 253 HK Hols - No B/O periods 310.C.RD.J356 3310/11 - Area G4 - LSR - wearing course & road marking (was C11_6C3) d/w - 10h/d - With 16 2 17-Jun-23 07-Jul-23 24-Apr-24 13-May-24 253 HK Hols - No B/O periods CC#4.10 - 3310/11 - Area G4 - Airside Road Roadwork (was C11_6C3) d/w - 10h/d - With HK Hols 143- No B/O11 periods (was 13-Feb-23 C3) 07-Aug-23 20-Feb-23 01-Jun-24 243 310.C.RD.J308 3310/11 - Area G4 - ASR - Lay kerb, sub-base + base course [540mL @15m/d/wf; 2wf] C11_6 d/w - 10h/d - With 36 3 13-Feb-23 25-Mar-23 20-Feb-23 01-Apr-23 6 HK Hols - No B/O periods 310.C.RD.J348 3310/11 - Area G4 - ASR - Lay flexible pavement [540mL @80m/6d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 45 4 27-Mar-23 23-May-23 03-Apr-23 31-May-23 6 HK Hols - No B/O periods 310.C.RD.J360 3310/11 - Area G4 - ASR - install street lighting, road furniture (was C11_6C3) d/w - 10h/d - With 41 2 31-May-23 19-Jul-23 07-Jun-23 26-Jul-23 6 HK Hols - No B/O periods 310.C.RD.J364 3310/11 - Area G4 - ASR - wearing course & road marking (was C11_6C3) d/w - 10h/d - With 16 2 20-Jul-23 07-Aug-23 14-May-24 01-Jun-24 243 HK Hols - No B/O periods CC#4.11 - 3310/11 - Area G4 - Security Fencing (was C11_6C3) d/w - 10h/d - With HK Hols 105- No B/O 9periods (was 20-Jul-23 C3) 22-Nov-23 29-Dec-23 08-May-24 134 310.C.RD.J316 3310/11 - Area G4 - Security Fence - construct footing [650m @10m/7d/wf; 6wf] C11_6 d/w - 10h/d - With 78 3 20-Jul-23 20-Oct-23 29-Dec-23 05-Apr-24 134 HK Hols - No B/O periods 310.C.RD.J320 3310/11 - Area G4 - Security Fence - metal works (was C11_6C3) d/w - 10h/d - With 66 3 18-Aug-23 06-Nov-23 29-Jan-24 20-Apr-24 134 HK Hols - No B/O periods 310.C.RD.J324 3310/11 - Area G4 - Security Fence - install Security System (was C11_6C3) d/w - 10h/d - With 66 3 04-Sep-23 22-Nov-23 16-Feb-24 08-May-24 134 HK Hols - No B/O periods CC#4.10 - 3310/11 - Area G4 - Central Reserve Pavement (was C11_6C3) d/w - 10h/d - With HK Hols 47- No B/O 4periods (was 21-Oct-23 C3) 15-Dec-23 15-Apr-24 01-Jun-24 134 310.C.RD.J328 3310/11 - Area G4 - Central Resv - lay sub-base [540mL @15m/d/wf; 2wf] C11_6 d/w - 10h/d - With 20 2 21-Oct-23 14-Nov-23 15-Apr-24 08-May-24 141 HK Hols - No B/O periods 310.C.RD.J332 3310/11 - Area G4 - Central Resv - lay verge [540mL @30m/d/wf] (was C11_6C3) d/w - 10h/d - With 20 2 23-Nov-23 15-Dec-23 09-May-24 01-Jun-24 134 HK Hols - No B/O periods CC#4 - 3310/11 - Area G3 - Airside Road and Landside Road (was C3) 340 31 18-Nov-21 A 12-Dec-23 09-Dec-22 01-Jun-24 137 CC#4.1, 4.2, 4.4, 4.7 - 3310/11 - Area G3 - Underground Utilities under ASR & LSR 169 25 18-Nov-21 A 19-May-23 09-Dec-22 02-Nov-23 137 310.C.G3.J151 3310/11 - Area G3 - (under ASR & LSR) - GI for stormwater drain C01_7 d/w - 10h/d - No HK 7 18-Nov-21 A 20-Nov-21 A 09-Dec-22 09-Dec-22 Hols - No B/O periods (was 310.C.G3.J159 3310/11 - Area G3 - (under ASR & LSR) - confirm installation level with PM C1) C01_7 d/w - 10h/d - No HK 14 24-Oct-22 06-Nov-22 09-Dec-22 22-Dec-22 46 Hols - No B/O periods (was 310.C.G3.J255 3310/11 - Area G3 - (under ASR & LSR) - Backfill up to form I.L. of SWD and CLP ducts C1) C03_7 d/w - 10h/d - With 15 5 07-Nov-22 21-Nov-22 30-Dec-22 14-Jan-23 51 HK Hols - No B/O periods 310.C.G3.J252 3310/11 - Area G3 - (under ASR & LSR) - stormwater drain pipe [291mL @10m/d/wf; 2wf; C03_7 d/w - 10h/d - With 70 5 23-Nov-22 07-Feb-23 23-Dec-22 09-Mar-23 30 10MH @4d/no/wf; 3wf] Remaining HK Hols - No B/O periods 310.C.G3.J256 3310/11 - Area G3 - (under ASR & LSR) - 132kv CLP duct (L=284m) use 2 wf C03_7 d/w - 10h/d - With 60 1 13-Dec-22 17-Feb-23 15-Jan-23 19-Mar-23 30 HK Hols - No B/O periods
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 43 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.G3.J253 3310/11 - Area G3 - (under ASR & LSR) - Gas Main C03_7 d/w - 10h/d - With 70 5 17-Dec-22 03-Mar-23 08-Jun-23 18-Aug-23 159 HK Hols - No B/O periods 310.C.G3.J296 3310/11 - Area G3 - (under ASR & LSR) - Airport System ducting C11_6 d/w - 10h/d - With 70 3 17-Jan-23 15-Apr-23 08-Jul-23 27-Sep-23 137 HK Hols - No B/O periods 310.C.G3.J352 3310/11 - Area G3 - (under ASR & LSR) - Portable Water main for FS (was C11_6C3) d/w - 10h/d - With 70 3 06-Feb-23 03-May-23 25-Jul-23 16-Oct-23 137 HK Hols - No B/O periods 310.C.G3.J257 3310/11 - Area G3 - completion of CLP ducting to achieve KD-04 (was C01_7C3) d/w - 10h/d - No HK 0 17-Feb-23 19-Mar-23 30 Hols - No B/O periods (was 310.C.G3.J353 3310/11 - Area G3 - (under ASR & LSR) - Road Drainage C1) C11_6 d/w - 10h/d - With 70 3 22-Feb-23 19-May-23 10-Aug-23 02-Nov-23 137 HK Hols - No B/O periods CC#4.10 - 3310/11 - Area G3 - Landside Road Roadwork (was C11_6C3) d/w - 10h/d - With HK Hols 157- No B/O 4periods (was 20-May-23 C3) 25-Nov-23 03-Nov-23 16-May-24 137 310.C.G3.J260 3310/11 - Area G3 - LSR - Lay kerb & sub-base [270mL @15m/d/wf; 1wf] C11_6 d/w - 10h/d - With 20 2 20-May-23 13-Jun-23 03-Nov-23 25-Nov-23 137 HK Hols - No B/O periods 310.C.G3.J264 3310/11 - Area G3 - LSR - Lay flexible pavement [270m @80m/6d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 23 2 14-Jun-23 12-Jul-23 18-Jan-24 15-Feb-24 179 HK Hols - No B/O periods 310.C.RD.J148 3310/11 - Area G3 - LSR - install street lighting, road furniture (was C11_6C3) d/w - 10h/d - With 50 15-Aug-23 13-Oct-23 26-Feb-24 27-Apr-24 159 HK Hols - No B/O periods 310.C.RD.J152 3310/11 - Area G3 - LSR - wearing course & road marking (was C11_6C3) d/w - 10h/d - With 14 10-Nov-23 25-Nov-23 29-Apr-24 16-May-24 137 HK Hols - No B/O periods CC#4.10 - 3310/11 - Area G3 - Airside Road Roadwork (was C11_6C3) d/w - 10h/d - With HK Hols 151- No B/O 2periods (was 14-Jun-23 C3) 12-Dec-23 27-Nov-23 01-Jun-24 137 310.C.G3.J268 3310/11 - Area G3 - ASR - Lay kerb, sub-base + base course [270mL @15m/d/wf; 1wf] C11_6 d/w - 10h/d - With 19 1 14-Jun-23 07-Jul-23 27-Nov-23 18-Dec-23 137 HK Hols - No B/O periods 310.C.G3.J272 3310/11 - Area G3 - ASR - Lay flexible pavement [270m @80m/6d/wf; 1wf (was C11_6C3) d/w - 10h/d - With 22 1 13-Jul-23 07-Aug-23 16-Feb-24 12-Mar-24 179 HK Hols - No B/O periods 310.C.RD.J156 3310/11 - Area G3 - ASR - install street lighting, road furniture (was C11_6C3) d/w - 10h/d - With 50 08-Aug-23 06-Oct-23 13-Mar-24 16-May-24 179 HK Hols - No B/O periods 310.C.RD.J160 3310/11 - Area G3 - ASR - wearing course & road marking (was C11_6C3) d/w - 10h/d - With 14 27-Nov-23 12-Dec-23 17-May-24 01-Jun-24 137 HK Hols - No B/O periods CC#4.11 - 3310/11 - Area G3 - Security Fencing (was C11_6C3) d/w - 10h/d - With HK Hols 76- No B/O 0periods (was 08-Jul-23 C3) 06-Oct-23 19-Dec-23 21-Mar-24 137 310.C.G3.J276 3310/11 - Area G3 - Security Fence & Gate - construct footing [270m @10m/7d/wf; 4wf] C11_6 d/w - 10h/d - With 48 08-Jul-23 01-Sep-23 19-Dec-23 17-Feb-24 137 HK Hols - No B/O periods 310.C.G3.J280 3310/11 - Area G3 - Security Fence & Gate - metal works (was C11_6C3) d/w - 10h/d - With 48 25-Jul-23 18-Sep-23 08-Jan-24 05-Mar-24 137 HK Hols - No B/O periods 310.C.G3.J284 3310/11 - Area G3 - Security Fence & Gate - install Security System and provide power (was C11_6C3) d/w - 10h/d - With 48 10-Aug-23 06-Oct-23 24-Jan-24 21-Mar-24 137 HK Hols - No B/O periods CC#4.10 - 3310/11 - Area G3 - Central Reserve Pavement (was C11_6C3) d/w - 10h/d - With HK Hols 48- No B/O 0periods (was 02-Sep-23 C3) 31-Oct-23 15-Apr-24 01-Jun-24 173 310.C.G3.J288 3310/11 - Area G3 - Central Reserve - lay sub-base [270mL @15m/d/wf; 2wf] C11_6 d/w - 10h/d - With 20 02-Sep-23 25-Sep-23 15-Apr-24 08-May-24 181 HK Hols - No B/O periods 310.C.G3.J292 3310/11 - Area G3 - Central Reserve - lay verge [270mL @30m/d/wf] (was C11_6C3) d/w - 10h/d - With 20 07-Oct-23 31-Oct-23 09-May-24 01-Jun-24 173 HK Hols - No B/O periods CC#4 - Airfield UU, Drainage Works, Watermain (was C3) 718 8 07-Jun-21 A 02-Nov-23 27-Mar-22 31-Aug-24 247 Advance UU Works in relation to Interim Security Fence C11_6 d/w - 10h/d - With HK Hols 173- No B/O 0periods (was 31-Jan-22 C3) A 31-Aug-22 28-Mar-22 31-Aug-22 0 310.C.EX.U005.B01 Advance UU works for ISF 2RS (submissions/approvals/construction under NOTAM) C11_6 d/w - 10h/d - With 173 31-Jan-22 A 31-Aug-22 28-Mar-22 31-Aug-22 0 HK Hols - No B/O periods Interface Work Area 3310/IA/1 (Airfield Drainage and UU Works) (was C3) 539 8 07-Jun-21 A 26-Mar-23 27-Mar-22 08-Aug-23 108 310.C.EX.U005 WA 3310/3 - Site Access (starting date) C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 15-Sep-22 Hols - No B/O periods (was 310.C.EX.U025 Apply Work Permit (All Interface Areas) C1) C01_7 d/w - 10h/d - No HK 21 01-Sep-21 A 21-Sep-21 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.C.EX.U009 --- Closure of Existing North Runway (Commission Date of Interim 2RS) --- C1) C01_7 d/w - 10h/d - No HK 0 01-Sep-22 14-Sep-22 14 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 44 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.U013 3310/3 - Carry Out Survey Check and UU Detection at Area 3310/3 + submit report to PM C11_6 d/w - 10h/d - With 12 01-Sep-22 15-Sep-22 15-Sep-22 28-Sep-22 11 HK Hols - No B/O periods 310.C.EX.U017 3310/3 - Carry Out Trial Pits (was C11_6C3) d/w - 10h/d - With 20 01-Sep-22 24-Sep-22 15-Sep-22 10-Oct-22 11 HK Hols - No B/O periods 310.C.EX.U021 WA 3310/5A - Site Access (wk 92) (was C01_7C3) d/w - 10h/d - No HK 0 06-Mar-23* 06-Mar-23 0 Hols - No B/O periods (was 3310/IA/1-1 C1) 133 0 26-Sep-22 08-Mar-23 11-Oct-22 30-Apr-23 42 Area 7 (Interim Security Fence) - Potable Watermain and FH C23_4d/w - NOTAM (M,W,Th,Su-01:30-07:30) 36 0 - No HK 24-Nov-22 Hols - With B/O 08-Mar-23 Periods & Flight06-Feb-23 Checks 30-Apr-23 18 310.C.EX.U378.B01 3310/IA/1-1 (Interim Fence) PWFH - Trench Excavation and PW pipe laying DN250 C23_4d/w - NOTAM 30 24-Nov-22 26-Feb-23 06-Feb-23 29-Mar-23 18 (L=182m - 82m, 50m, 50m) [NOTAM] (M,W,Th,Su-01:30-07:30) - 310.C.EX.U381.B01 3310/IA/1-1 (Interim Fence) PWFH - Connect to existing Potable Watermain + No HK Hols- -NOTAM C23_4d/w With B/O 10 20-Feb-23 08-Mar-23 23-Mar-23 30-Apr-23 18 reinstatment work (NOTAM) (M,W,Th,Su-01:30-07:30) - Drainage - Stormwater and /Oil Separation (SWD/OS) No HK d/w C11_6 Hols- -10h/d With B/O - With HK Hols 40- No B/O 0periods (was 26-Sep-22 C3) 12-Nov-22 11-Oct-22 25-Nov-22 11 310.C.EX.U101 3310/IA/1-1 (SWD/OS) - Open-cut excavation + SW pipe laying (L=570m) @ 19m/d/wf; C11_6 d/w - 10h/d - With 15 26-Sep-22 14-Oct-22 11-Oct-22 27-Oct-22 11 use 2 wf HK Hols - No B/O periods 310.C.EX.U101.B02 3310/IA/1-1 (SWD/OS) -Concrete Surround of Existing Pipe; L:158m (was C11_6C3) d/w - 10h/d - With 15 26-Sep-22 14-Oct-22 09-Nov-22 25-Nov-22 36 HK Hols - No B/O periods 310.C.EX.U101.B2 3310/IA/1-1 (SWD/OS) - Abandon Existing SW and Modified to Suit Finish Ground Level (was C11_6C3) d/w - 10h/d - With 15 26-Sep-22 14-Oct-22 09-Nov-22 25-Nov-22 36 (FGL) HK Hols - No B/O periods 310.C.EX.U105 3310/IA/1-1 (SWD/OS) - Construction of MH (8 nos.) 15d/MH/wf; use 3 wf (was C11_6C3) d/w - 10h/d - With 40 26-Sep-22 12-Nov-22 11-Oct-22 25-Nov-22 11 HK Hols - No B/O periods Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 70- No B/O 0periods (was 14-Nov-22 C3) 08-Feb-23 26-Nov-22 21-Feb-23 11 310.C.EX.U115 3310/IA/1-1 (PWFH) - Trench excavation + PWP Pipe Laying 779m) C11_6 d/w - 10h/d - With 30 14-Nov-22 17-Dec-22 26-Nov-22 31-Dec-22 11 HK Hols - No B/O periods 310.C.EX.U115.B02 3310/IA/1-1 (PWFH) -Sleeve PW Pipe (336m) (was C11_6C3) d/w - 10h/d - With 30 14-Nov-22 17-Dec-22 03-Dec-22 09-Jan-23 17 HK Hols - No B/O periods 310.C.EX.U119 3310/IA/1-1 (PWFH) - Chamber (20 nr) (was C11_6C3) d/w - 10h/d - With 60 25-Nov-22 08-Feb-23 08-Dec-22 21-Feb-23 11 HK Hols - No B/O periods 3310/IA/1-2 (was C3) 169 8 01-Sep-22 26-Mar-23 27-Sep-22 08-Aug-23 108 Area 8 (Interim Security Fence) - Stormwater C03_7 d/w - 10h/d - With HK Hols 68- No B/O 0periods 26-Sep-22 04-Dec-22 12-Nov-22 22-Dec-22 18 310.C.EX.U310.B01 Area 8 (Outside of Interim Sec. Fence) - Install marker board C03_7 d/w - 10h/d - With 1 26-Sep-22 26-Sep-22 12-Nov-22 12-Nov-22 45 HK Hols - No B/O periods 310.C.EX.U315 Area 8 (Outside of Interim Sec. Fence) - ELS & excavation + SW pipe laying (L=174m C03_7 d/w - 10h/d - With 30 26-Oct-22 24-Nov-22 13-Nov-22 12-Dec-22 18 @ 10m/d/team; 2 wf HK Hols - No B/O periods 310.C.EX.U322.B01 3310/IA/1-2 -(more than 51.5m away from AOA) Abandoned existing SWD and modified C03_7 d/w - 10h/d - With 26 05-Nov-22 30-Nov-22 27-Nov-22 22-Dec-22 22 MH HK Hols - No B/O periods 310.C.EX.U319 Area 8 (Outside of Interim Sec. Fence) - Construction of SW MH (5nos.) 15d/MH/wf ; use C03_7 d/w - 10h/d - With 30 05-Nov-22 04-Dec-22 23-Nov-22 22-Dec-22 18 3 wf HK Hols - No B/O periods Area 8 (Interim Security Fence) - Potable Watermain and FH C23_4d/w - NOTAM (M,W,Th,Su-01:30-07:30) 51 0 - No HK 26-Oct-22 Hols - With B/O 26-Mar-23 Periods & Flight30-Nov-22 Checks 30-Apr-23 8 310.C.EX.U358.B01 Area 8 (Interim Sec. Fence) PWFH - Cary out existing UU survey, marker board C23_4d/w - NOTAM 2 26-Oct-22 27-Oct-22 30-Nov-22 01-Dec-22 8 (NOTAM) (M,W,Th,Su-01:30-07:30) - 310.C.EX.U309 Area 8 (Interim Sec. Fence) PWFH - Excavation and PW pipe laying DN250 x L=59m No HK Hols- -NOTAM C23_4d/w With B/O 45 27-Nov-22 26-Mar-23 11-Dec-22 30-Apr-23 8 [NOTAM] (M,W,Th,Su-01:30-07:30) - 310.C.EX.U318 Area 8 (Interim Sec. Fence) PWFH - Watermains Chamber (6 nr) + connect & No HK Hols- -NOTAM C23_4d/w With B/O 30 12-Jan-23 26-Mar-23 16-Feb-23 30-Apr-23 8 reinstatement works (NOTAM) (M,W,Th,Su-01:30-07:30) - Drainage - Stormwater and /Oil Separation (SWD/OS) No HK d/w C11_6 Hols- -10h/d With B/O - With HK Hols 75- No B/O 0periods (was 01-Sep-22 C3) 30-Nov-22 27-Sep-22 19-Dec-22 16 310.C.EX.U300.B01 3310/IA/1-2 -(Land Side) Open cut excavation for stormwater pipe laying and PWFH pipe C11_6 d/w - 10h/d - With 30 01-Sep-22 08-Oct-22 27-Sep-22 02-Nov-22 21 laying HK Hols - No B/O periods 310.C.EX.U300 3310/IA/1-2 -(Land Side) Pipe laying SW DN1500~1800 (L=501 m) (assume 10m/d for (was C11_6C3) d/w - 10h/d - With 45 26-Sep-22 18-Nov-22 17-Oct-22 07-Dec-22 16 pipe laying) HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 45 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.U312 3310/IA/1-2 - Stormwater Manhole (6 nr ) (assume 14d/MH, use 2 wf) + connect + test & C11_6 d/w - 10h/d - With 45 10-Oct-22 30-Nov-22 28-Oct-22 19-Dec-22 16 backfill HK Hols - No B/O periods Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 75- No B/O 8periods (was 01-Sep-22 C3) 30-Nov-22 27-Sep-22 24-Dec-22 21 310.C.EX.U303 310/IA/1-2 (Land Side)- Trench Excavation + PWFH pipe laying DN250 x L= 370 m) C11_6 d/w - 10h/d - With 65 4 01-Sep-22 18-Nov-22 27-Sep-22 13-Dec-22 21 HK Hols - No B/O periods 310.C.EX.U306 3310/IA/1-2 (Land Side) - Construction of Watermains Chamber (10 nr) + Connect to (was C11_6C3) d/w - 10h/d - With 45 4 10-Oct-22 30-Nov-22 03-Nov-22 24-Dec-22 21 existing PWFH HK Hols - No B/O periods Power System (was C11_6C3) d/w - 10h/d - With HK Hols 45- No B/O 0periods (was 10-Oct-22 C3) 01-Dec-22 03-Nov-22 08-Aug-23 202 310.C.EX.U322 3310/IA/1-2 - Above Ground Cable Duct + Pillar Box (3 nr) C11_6 d/w - 10h/d - With 45 10-Oct-22 30-Nov-22 03-Nov-22 24-Dec-22 21 HK Hols - No B/O periods 310.C.EX.U326 3310/IA/1-2 - Allow Contract <3802> Access at WA 3310/3 to remove existing seawall (was C11_6C3) d/w - 10h/d - With 0 01-Dec-22 08-Aug-23 202 HK Hols - No B/O periods Interface Work Area 3310/IA/6 (Airfield Drainage and UU Works) (was C3) 567 0 07-Jun-21 A 03-May-23 18-Sep-22 03-May-23 0 310.C.EX.U634 WA 3310/4 - Site Access (starting date) C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 19-Sep-22 Hols - No B/O periods (was 310.C.EX.U638 --- Closure of Existing North Runway (Commission Date of Interim 2RS) for Works at WA C1) C01_7 d/w - 10h/d - No HK 0 01-Sep-22 18-Sep-22 18 3310/4 Hols - No B/O periods (was 310.C.EX.U642 3310/4 - Carry Out Survey Check and UU Detection at Area 3310/3 + submit report to PM C1) C11_6 d/w - 10h/d - With 12 01-Sep-22 15-Sep-22 19-Sep-22 03-Oct-22 14 HK Hols - No B/O periods 310.C.EX.U646 3310/4 - Carry Out Trial Pits (was C11_6C3) d/w - 10h/d - With 20 01-Sep-22 24-Sep-22 19-Sep-22 13-Oct-22 14 HK Hols - No B/O periods 3310/IA/6-2 (Airfield UU) (was C3) 170 0 01-Sep-22 27-Mar-23 14-Oct-22 17-Apr-23 14 Drainage - Stormwater and /Oil Separation (SWD/OS) C11_6 d/w - 10h/d - With HK Hols 75- No B/O 0periods (was 26-Sep-22 C3) 23-Dec-22 31-Oct-22 27-Feb-23 51 310.C.EX.U560.B02 3310/6-2 (South of Runway) -Concrete Surround of Existing Pipe; L:106m C11_6 d/w - 10h/d - With 15 26-Sep-22 14-Oct-22 30-Dec-22 17-Jan-23 79 HK Hols - No B/O periods 310.C.EX.U542 3310/6-2 (North of Runway) - Open-cut excavation for SWD pipe laying DN 1050~1950 (was C11_6C3) d/w - 10h/d - With 56 26-Sep-22 01-Dec-22 31-Oct-22 05-Jan-23 28 (635 m) @ 10m/d/wf; 2 wf HK Hols - No B/O periods 310.C.EX.U560 3310/6-2 (South of Runway) - Excavation & SWD Pipe laying (1293 m) + Abandon/Modify (was C11_6C3) d/w - 10h/d - With 65 26-Sep-22 12-Dec-22 26-Nov-22 15-Feb-23 51 Ex. SWD @ 10m/d/team; 2 team HK Hols - No B/O periods 310.C.EX.U546 3310/6-2 (North of Runway) - SWD DN1050~1950 (L=635M @ 10m/d/wf) + construction (wasC11_6C3) d/w - 10h/d - With 56 10-Oct-22 13-Dec-22 11-Nov-22 17-Jan-23 28 of SW MH (8 nr ) @ 14d/MH/wf; 2 wf HK Hols - No B/O periods 310.C.EX.U564 3310/6-2 ( South of Runway) - Stormwater/OS Manhole + Abandon/Modify Existing MH (was C11_6C3) d/w - 10h/d - With 65 10-Oct-22 23-Dec-22 08-Dec-22 27-Feb-23 51 (14 nr ) @ 14d/MH/team; 3 wf HK Hols - No B/O periods Area 2a (Outside Interim Security Fence) - Potable Water and Fire Hydrant (PWFH) (was C3) 82 0 01-Sep-22 08-Dec-22 08-Nov-22 15-Jan-23 30 310.C.EX.U582.B01 3310/IA/6-2 (Area 2a & 2b) - Apply Work Permit C01_7 d/w - 10h/d - No HK 21 01-Sep-22 21-Sep-22 08-Nov-22 28-Nov-22 68 Hols - No B/O periods (was 310.C.EX.U584.B01 3310/IA/6-2 (Area 2a) - Install hoarding/marker board C1) C03_7 d/w - 10h/d - With 1 22-Sep-22 22-Sep-22 29-Nov-22 29-Nov-22 66 HK Hols - No B/O periods 310.C.EX.U580.B01 3310/IA/6-2 (Area 2a) - Trial Pit / UU Survey C03_7 d/w - 10h/d - With 4 26-Oct-22 29-Oct-22 30-Nov-22 03-Dec-22 35 HK Hols - No B/O periods 310.C.EX.U606 3310/IA/6-2 (Area 2a) - Construct PWPH pit/chamber (4 nos); 4 wf C03_7 d/w - 10h/d - With 28 30-Oct-22 26-Nov-22 04-Dec-22 03-Jan-23 35 HK Hols - No B/O periods 310.C.EX.U604 3310/IA/6-2 (Area 2a) - Open-cut excavation and PW pipe laying L=400m [assume 4wks C03_7 d/w - 10h/d - With 28 30-Oct-22 26-Nov-22 04-Dec-22 03-Jan-23 35 full closure] HK Hols - No B/O periods 310.C.EX.U738.B01 3310/IA/6-2 (Area 2a) - Connect to existing potable water line C03_7 d/w - 10h/d - With 2 27-Nov-22 28-Nov-22 04-Jan-23 05-Jan-23 35 HK Hols - No B/O periods 310.C.EX.U742.B01 3310/IA/6-2 (Area 2a) - Backfill and reinstatement works C03_7 d/w - 10h/d - With 10 29-Nov-22 08-Dec-22 06-Jan-23 15-Jan-23 35 HK Hols - No B/O periods Area 2b (Outside Interim Security Fence) - Potable Water and Fire Hydrant (PWFH) C03_7 d/w - 10h/d - With HK Hols 45- No B/O 0periods 09-Dec-22 29-Jan-23 16-Jan-23 05-Mar-23 35 310.C.EX.U590.B01 3310/IA/6-2 (Area 2b) - Install hoarding/marker board C03_7 d/w - 10h/d - With 1 09-Dec-22 09-Dec-22 16-Jan-23 16-Jan-23 35 HK Hols - No B/O periods
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 46 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.U595.B01 3310/IA/6-2 (Area 2b) - Trial Pit / UU Survey C03_7 d/w - 10h/d - With 4 10-Dec-22 13-Dec-22 17-Jan-23 20-Jan-23 35 HK Hols - No B/O periods 310.C.EX.U600.B01 3310/IA/6-2 (Area 2b) - Construct PWPH pit/chamber (5 nos); 4 wf C03_7 d/w - 10h/d - With 28 14-Dec-22 13-Jan-23 21-Jan-23 21-Feb-23 35 HK Hols - No B/O periods 310.C.EX.U605.B01 3310/IA/6-2 (Area 2b) - Open-cut excavation and PW pipe laying L=300m [assume 4wks C03_7 d/w - 10h/d - With 28 14-Dec-22 13-Jan-23 21-Jan-23 21-Feb-23 35 full closure] HK Hols - No B/O periods 310.C.EX.U610.B01 3310/IA/6-2 (Area 2b) - Connect to existing potable water line C03_7 d/w - 10h/d - With 2 14-Jan-23 15-Jan-23 22-Feb-23 23-Feb-23 35 HK Hols - No B/O periods 310.C.EX.U615.B01 3310/IA/6-2 (Area 2b) - Backfill and reinstatement works C03_7 d/w - 10h/d - With 10 16-Jan-23 29-Jan-23 24-Feb-23 05-Mar-23 35 HK Hols - No B/O periods Area 2a (Inside Interim Security Fence) - Potable Water and Fire Hydrant (PWFH) C11_6 d/w - 10h/d - With HK Hols 80- No B/O 0periods (was 26-Sep-22 C3) 30-Dec-22 14-Oct-22 27-Feb-23 46 310.C.EX.U601 3310/IA/6-2 (North of Runway) - Construction of PWFH Chamber (8 nr) C11_6 d/w - 10h/d - With 80 26-Sep-22 30-Dec-22 21-Nov-22 27-Feb-23 46 10d/chamber/team; use 1 team HK Hols - No B/O periods 310.C.EX.U599 3310/IA/6-2 (North of Runway) - Trench excavation + PWFH Pipe Laying (700 m) (was C11_6C3) d/w - 10h/d - With 80 26-Sep-22 30-Dec-22 14-Oct-22 17-Jan-23 14 HK Hols - No B/O periods Comms/Power Ducting (was C3) 101 0 24-Nov-22 27-Mar-23 18-Jan-23 17-Apr-23 14 310.C.EX.U633 3310/6-2 (Ducting/Sleeving-Outside Interim Fence) - Modify Comms/Power Cable C23_4d/w - NOTAM 0 24-Nov-22 24-Nov-22 02-Apr-23 02-Apr-23 50 Manhole & Drawpit Modify: 7 nos) [NOTAM] (M,W,Th,Su-01:30-07:30) - 310.C.EX.U625 3310/6-2 (Ducting/Sleeving) - Comms/Power Ducting Laying (288 m) @3310/IA/6-2 No HK d/w C11_6 Hols- -10h/d With B/O - With 60 31-Dec-22 15-Mar-23 18-Jan-23 31-Mar-23 14 HK Hols - No B/O periods 310.C.EX.U629 3310/6-2 (Ducting/Sleeving) - Comms/Power Cable Manhole & Drawpit (new: 6 nr), (was C11_6C3) d/w - 10h/d - With 60 13-Jan-23 27-Mar-23 02-Feb-23 17-Apr-23 14 Modify: 46 nos) HK Hols - No B/O periods 3310/IA/6-1 (was C3) 54 0 24-Feb-23 03-May-23 24-Feb-23 03-May-23 0 310.C.EX.U539 Commence Underground Works at Area 3310/IA/6-1 (Upon Completion of Backfilling to C01_7 d/w - 10h/d - No HK 0 24-Feb-23 24-Feb-23 0 pipe formation) Hols - No B/O periods (was Drainage - Stormwater and /Oil Separation (SWD/OS) C1) C11_6 d/w - 10h/d - With HK Hols 30- No B/O 0periods (was 24-Feb-23 C3) 30-Mar-23 24-Feb-23 30-Mar-23 0 310.C.EX.U537 3310/IA/6-1 - Open-cut excavation + Manhole (20 nr ) C11_6 d/w - 10h/d - With 30 24-Feb-23 30-Mar-23 24-Feb-23 30-Mar-23 0 HK Hols - No B/O periods 310.C.EX.U535 3310/IA/6-1 - Stormwater/OS Pipe; L:761m (was C11_6C3) d/w - 10h/d - With 30 24-Feb-23 30-Mar-23 24-Feb-23 30-Mar-23 0 HK Hols - No B/O periods Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 54- No B/O 0periods (was 24-Feb-23 C3) 03-May-23 24-Feb-23 03-May-23 0 310.C.EX.U591 3310/IA/6-1 - PWFH Chamber (27 nr) @ 10d/chamber/team; use 4 teams C11_6 d/w - 10h/d - With 54 24-Feb-23 03-May-23 24-Feb-23 03-May-23 0 HK Hols - No B/O periods 310.C.EX.U587 3310/IA/6-1 - Open cut excavation + PWFH Pipe Laying (920 m) (was C11_6C3) d/w - 10h/d - With 54 24-Feb-23 03-May-23 24-Feb-23 03-May-23 0 HK Hols - No B/O periods Interface Work Area 3310/IA/4 (Airfield Drainage and UU Works) (was C3) 548 0 07-Jun-21 A 06-Apr-23 04-Jul-22 08-Jul-23 73 310.C.EX.U694 WA 3310/3 - Site Access (starting date) at Interface WA 3310/IA/4 C11_6 d/w - 10h/d - With 0 07-Jun-21 A 18-Jan-23 HK Hols - No B/O periods 310.C.EX.U706 WA 3310/8 - Site Access (starting date) at Interface WA 3310/IA/4 (was C11_6C3) d/w - 10h/d - With 0 07-Jun-21 A 15-Dec-22 HK Hols - No B/O periods 310.C.EX.U718 WA 3310/8B - Site Access (wk 40) at Interface WA 3310/IA/4 (was C11_6C3) d/w - 10h/d - With 0 28-Mar-22* 15-Dec-22 215 HK Hols - No B/O periods 310.C.EX.U714 WA 3310/8A - Site Access (wk 57) at Interface WA 3310/IA/4 (was C11_6C3) d/w - 10h/d - With 0 04-Jul-22* 04-Jul-22 0 HK Hols - No B/O periods 310.C.EX.U700 *** Start Works (After Completion of Interim Security Fence) **** (was C11_6C3) d/w - 10h/d - With 0 26-Oct-22 15-Dec-22 43 HK Hols - No B/O periods 310.C.EX.U698 3310/8, 8A, 8B - Carry Out Survey Check and UU Detection + submit report to PM (was C11_6C3) d/w - 10h/d - With 21 26-Oct-22 18-Nov-22 15-Dec-22 10-Jan-23 43 HK Hols - No B/O periods 310.C.EX.U702 3310/8, 8A, 8B - Carry Out Trial Pits (was C11_6C3) d/w - 10h/d - With 20 27-Oct-22 18-Nov-22 16-Dec-22 10-Jan-23 43 HK Hols - No B/O periods 3310/IA/4-1 (was C11_6C3) d/w - 10h/d - With HK Hols 134- No B/O 0periods (was 26-Oct-22 C3) 06-Apr-23 21-Jan-23 08-Jul-23 73
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 47 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Area 4 - 3310/IA/4-1 Potable Water at Interim Security Fence C11_6 d/w - 10h/d - With HK Hols 62- No B/O 0periods (was 26-Oct-22 C3) 07-Jan-23 17-Feb-23 06-Jul-23 143 310.C.EX.U500 Area 4 (PWFH) - Open-cut Excavation and Watermains Pipe Laying L=146m C11_6 d/w - 10h/d - With 38 26-Oct-22 08-Dec-22 17-Feb-23 01-Apr-23 93 HK Hols - No B/O periods 310.C.EX.U504 Area 4 (PWFH) - ELS + Construction of Watermains Chamber + connect to existing (was C11_6C3) d/w - 10h/d - With 38 11-Nov-22 24-Dec-22 09-May-23 23-Jun-23 143 watermain HK Hols - No B/O periods 310.C.EX.U504.B01 Area 4 (PWFH) - Backfill and reinstatement work (was C11_6C3) d/w - 10h/d - With 10 27-Dec-22 07-Jan-23 24-Jun-23 06-Jul-23 143 HK Hols - No B/O periods Drainage (Stormwater and Oil Separation) (SW/OS) (was C11_6C3) d/w - 10h/d - With HK Hols 114- No B/O 0periods (was 26-Oct-22 C3) 13-Mar-23 21-Jan-23 08-Jul-23 93 310.C.EX.U452 Area 4 (Stormwater) - Open-cut excavation + Stormwater Pipe laying (L=472m) C11_6 d/w - 10h/d - With 38 26-Oct-22 08-Dec-22 21-Jan-23 09-Mar-23 73 HK Hols - No B/O periods 310.C.EX.U452.B01 Area 5 (Stormwater) - Open-cut excavation + Stormwater Pipe laying (L=120m) (was C11_6C3) d/w - 10h/d - With 20 09-Dec-22 03-Jan-23 10-Mar-23 01-Apr-23 73 HK Hols - No B/O periods 310.C.EX.U464 Area 4 (Stormwater) - Construct Stormwater Manhole (3 nr) + connect to existing (was C11_6C3) d/w - 10h/d - With 38 09-Dec-22 27-Jan-23 03-Apr-23 22-May-23 93 HK Hols - No B/O periods 310.C.EX.U464.B01 Area 5 (Stormwater) - Construct Stormwater Manhole (2 nr) + connect to existing (was C11_6C3) d/w - 10h/d - With 38 28-Jan-23 13-Mar-23 23-May-23 08-Jul-23 93 HK Hols - No B/O periods Area 5 - Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 76- No B/O 0periods (was 04-Jan-23 C3) 06-Apr-23 03-Apr-23 08-Jul-23 73 310.C.EX.U508 3310/IA/4-1 (PWFH) - ELS + Watermains Pipe Laying (364m) C11_6 d/w - 10h/d - With 38 04-Jan-23 20-Feb-23 03-Apr-23 22-May-23 73 HK Hols - No B/O periods 310.C.EX.U512 3310/IA/4-1 (PWFH) - Construction Watermains Chamber 6 nr) (was C11_6C3) d/w - 10h/d - With 38 21-Feb-23 06-Apr-23 23-May-23 08-Jul-23 73 HK Hols - No B/O periods 3310/IA/4-3 (was C11_6C3) d/w - 10h/d - With HK Hols 131- No B/O 0periods (was 10-Oct-22 C3) 16-Mar-23 18-Jan-23 12-Jun-23 69 Drainage - Stormwater and /Oil Separation (SWD/OS) C11_6 d/w - 10h/d - With HK Hols 94- No B/O 0periods (was 10-Oct-22 C3) 01-Feb-23 18-Jan-23 31-May-23 96 310.C.EX.U460 3310/IA/4-3 (SW/OS) - Stormwater/OS Manhole (5 nr ) @ 14d/MH/team; use 1 team C11_6 d/w - 10h/d - With 94 10-Oct-22 01-Feb-23 04-Feb-23 31-May-23 96 HK Hols - No B/O periods 310.C.EX.U456 3310/IA/4-3 (SW/OS) - Open-cut excavation + Stormwater/OS Pipe (489 m @ 10m/d; 1 (was C11_6C3) d/w - 10h/d - With 49 19-Nov-22 17-Jan-23 18-Jan-23 18-Mar-23 49 team) HK Hols - No B/O periods Area 6 - Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 96- No B/O 0periods (was 19-Nov-22 C3) 16-Mar-23 14-Feb-23 12-Jun-23 69 310.C.EX.U491 3310/IA/4-3 (PWFH) - Open cut excavation + Watermains Pipe Laying (701 m) C11_6 d/w - 10h/d - With 70 19-Nov-22 14-Feb-23 14-Feb-23 11-May-23 69 HK Hols - No B/O periods 310.C.EX.U496 3310/IA/4-3 (PWFH) - Watermains Chamber (12 nr) (was C11_6C3) d/w - 10h/d - With 96 19-Nov-22 16-Mar-23 14-Feb-23 12-Jun-23 69 HK Hols - No B/O periods 3310/IA/4-2 (was C3) 122 0 26-Oct-22 23-Mar-23 10-Jan-23 31-May-23 53 310.C.EX.U722 *** After Completion of Interim Security Fence **** C11_6 d/w - 10h/d - With 0 26-Oct-22 10-Jan-23 64 HK Hols - No B/O periods Drainage - Stormwater and /Oil Separation (SWD/OS) (was C3) - NOTAM (M,W,Th,Su-01:30-07:30) C23_4d/w 45 0 - No HK 24-Nov-22 Hols - With B/O 23-Mar-23 Periods & Flight11-Jan-23 Checks 31-May-23 15 310.C.EX.U454 3310/IA/4-1 SW/OS) - Existing Stormwater/OS Modification (84) @ Taxiway T [NOTAM] C23_4d/w - NOTAM 15 24-Nov-22 09-Jan-23 11-Jan-23 26-Feb-23 15 (M,W,Th,Su-01:30-07:30) - 310.C.EX.U457 3310/IA/4-1 SW/OS) - Existing Stormwater/OS Modification (84) @ Taxiway B6 [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 15 11-Jan-23 26-Feb-23 27-Feb-23 23-Mar-23 15 (M,W,Th,Su-01:30-07:30) - 310.C.EX.U726 3310/IA/4-1 SW/OS) - Existing Stormwater/OS Modification (89m) @ Taxiway A [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 15 27-Feb-23 23-Mar-23 26-Mar-23 31-May-23 15 (M,W,Th,Su-01:30-07:30) - Interface Work Area 3310/IA/2 (Airfield Drainage and UU Works) No HK Hols - With B/O 648 0 07-Jun-21 A 09-Aug-23 05-Sep-22 05-Oct-23 47 310.C.EX.U650 WA 3310/6 - Site Access (starting date) C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 13-Jan-23 Hols - No B/O periods (was 310.C.EX.U666 WA 3310/6A - Site Access (wk 18) C1) C11_6 d/w - 10h/d - With 0 04-Oct-21 A 03-Jun-23 HK Hols - No B/O periods 310.C.EX.U654 --- Closure of Existing North Runway (Commission Date of Interim 2RS) for Works at WA (was C01_7C3) d/w - 10h/d - No HK 0 01-Sep-22 13-Jan-23 135 3310/6 and 6A Hols - No B/O periods (was 310.C.EX.U670 WA 3310/7 - Site Access (wk 66) C1) C11_6 d/w - 10h/d - With 0 05-Sep-22* 05-Sep-22 0 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 48 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.U674 WA 3310/5 - Site Access (wk 83) C11_6 d/w - 10h/d - With 0 03-Jan-23* 03-Jan-23 0 HK Hols - No B/O periods 310.C.EX.U658 3310/5 - Carry Out Survey Check and UU Detection at Area 3310/3 + submit report to PM (was C11_6C3) d/w - 10h/d - With 21 03-Jan-23 30-Jan-23 03-Jun-23 28-Jun-23 121 HK Hols - No B/O periods 310.C.EX.U662 3310/5 - Carry Out Trial Pits (was C11_6C3) d/w - 10h/d - With 20 04-Jan-23 30-Jan-23 05-Jun-23 28-Jun-23 121 HK Hols - No B/O periods 3310/IA/2-2 (was C11_6C3) d/w - 10h/d - With HK Hols 65- No B/O 0periods (was 23-May-23 C3) 09-Aug-23 28-Jun-23 05-Oct-23 47 310.C.EX.U690 BC 5, 6, 19 Stage 1,2,3,4(3310/6 Area) Backfill drainge swale completed C11_6 d/w - 10h/d - With 0 27-Jun-23 28-Jun-23 1 HK Hols - No B/O periods 310.C.EX.U682 BC 5, 6, 19 Stage 5(3310/5 Area) Backfill drainge swale completed (was C11_6C3) d/w - 10h/d - With 0 07-Aug-23 08-Aug-23 2 HK Hols - No B/O periods Drainage - Stormwater and /Oil Separation (SWD/OS) (was C11_6C3) d/w - 10h/d - With HK Hols 26- No B/O 0periods (was 28-Jun-23 C3) 28-Jul-23 29-Jun-23 10-Aug-23 11 310.C.EX.U366 3310/IA/2-2 (SW/OS) - Open-cut excavation + pipe laying of SWD/OS (31 m), MH (1 nr) + C11_6 d/w - 10h/d - With 16 28-Jun-23 17-Jul-23 29-Jun-23 18-Jul-23 1 connect to existing stormwater HK Hols - No B/O periods 310.C.EX.U366.B02 3310/IA/2-2 (SWD/OS) -Concrete Surround of Existing Pipe; L:164m (was C11_6C3) d/w - 10h/d - With 16 28-Jun-23 17-Jul-23 29-Jun-23 18-Jul-23 1 HK Hols - No B/O periods 310.C.EX.U366.B01 3310/IA/2-2 (SWD/OS) - Abandon Existing SW and Modified to Suit Finish Ground Level (was C11_6C3) d/w - 10h/d - With 26 28-Jun-23 28-Jul-23 12-Jul-23 10-Aug-23 11 (FGL) HK Hols - No B/O periods Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 54- No B/O 0periods (was 23-May-23 C3) 27-Jul-23 29-Jun-23 31-Aug-23 30 310.C.EX.U378 3310/IA/2-2 (PWFH) - Watermains Chamber (9 nr) @ 12d/chamber/team; use 2 team C11_6 d/w - 10h/d - With 54 23-May-23 27-Jul-23 29-Jun-23 31-Aug-23 30 HK Hols - No B/O periods 310.C.EX.U373 3310/IA/2-2 (PWFH) - Open cut excavation + Watermains Pipe Laying (513 m) (was C11_6C3) d/w - 10h/d - With 54 23-May-23 27-Jul-23 29-Jun-23 31-Aug-23 30 HK Hols - No B/O periods Comms/Power Ducting (was C11_6C3) d/w - 10h/d - With HK Hols 36- No B/O 0periods (was 28-Jun-23 C3) 09-Aug-23 23-Aug-23 05-Oct-23 47 310.C.EX.U372 Comms/Power Cable Drawpit (8 nr) C11_6 d/w - 10h/d - With 32 28-Jun-23 04-Aug-23 23-Aug-23 28-Sep-23 47 HK Hols - No B/O periods 310.C.EX.U375 Comms/Power Ducting Laying (392 m) (was C11_6C3) d/w - 10h/d - With 36 28-Jun-23 09-Aug-23 23-Aug-23 05-Oct-23 47 HK Hols - No B/O periods 3310/IA/2-1 (was C11_6C3) d/w - 10h/d - With HK Hols 84- No B/O 0periods (was 03-Jan-23 C3) 19-Apr-23 20-May-23 30-Aug-23 110 310.C.EX.U678 *** Completion of Box Culvert and Backfill to +6.5mPD at 3310/7 *** C11_6 d/w - 10h/d - With 0 03-Jan-23 20-May-23 110 HK Hols - No B/O periods Drainage - Stormwater and /Oil Separation (SWD/OS) (was C11_6C3) d/w - 10h/d - With HK Hols 50- No B/O 0periods (was 04-Jan-23 C3) 06-Mar-23 22-May-23 21-Jul-23 110 310.C.EX.U342 3310/IA/2-1 -Open cut excavation + Stormwater/OS Pipe (765m @ 10m/d/team ; 2 teams C11_6 d/w - 10h/d - With 50 04-Jan-23 06-Mar-23 22-May-23 21-Jul-23 110 ) + connect to existing HK Hols - No B/O periods 310.C.EX.U345 3310/IA/2-1 - Stormwater/OS Manholes (7nos) @ 14d/MH/team; use 2 teams (was C11_6C3) d/w - 10h/d - With 50 04-Jan-23 06-Mar-23 22-May-23 21-Jul-23 110 HK Hols - No B/O periods Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 69- No B/O 0periods (was 21-Jan-23 C3) 19-Apr-23 09-Jun-23 30-Aug-23 110 310.C.EX.U321 3310/IA/2-1 - Watermains Chamber (23 nr) @ 12d/chamber/team; use 4 teams C11_6 d/w - 10h/d - With 69 21-Jan-23 19-Apr-23 09-Jun-23 30-Aug-23 110 HK Hols - No B/O periods 310.C.EX.U317 3310/IA/2-1 - Open cut excavation + Watermains Pipe Laying (1135 m) (was C11_6C3) d/w - 10h/d - With 69 21-Jan-23 19-Apr-23 09-Jun-23 30-Aug-23 110 HK Hols - No B/O periods Interface Work Area 3310/IA/3 (Airfield Drainage and UU Works) (was C3) 476 0 28-Mar-22 02-Nov-23 18-Jan-23 31-Aug-24 247 3310/IA/3-2 C11_6 d/w - 10h/d - With HK Hols 46- No B/O 0periods (was 07-Sep-23 C3) 02-Nov-23 11-Sep-23 06-Nov-23 3 Drainage - Stormwater and /Oil Separation (SWD/OS) C11_6 d/w - 10h/d - With HK Hols 41- No B/O 0periods (was 07-Sep-23 C3) 27-Oct-23 11-Sep-23 31-Oct-23 3 310.C.EX.U357 3310/IA/3-2a (SW/OS) - Open-cut excavation + Stormwater/OS Pipe (357 m @10m/d; use C11_6 d/w - 10h/d - With 36 07-Sep-23 20-Oct-23 11-Sep-23 25-Oct-23 3 1 team) HK Hols - No B/O periods 310.C.EX.U354 3310/IA/3-2a (SW/OS) - Stormwater/OS Manhole (7 nr ) (was C11_6C3) d/w - 10h/d - With 36 13-Sep-23 27-Oct-23 16-Sep-23 31-Oct-23 3 HK Hols - No B/O periods Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 29- No B/O 0periods (was 27-Sep-23 C3) 02-Nov-23 03-Oct-23 06-Nov-23 3 310.C.EX.U388 3310/IA/3-2a (PWFH) - Open-cut excavation + Watermains Pipe Laying (360 m) C11_6 d/w - 10h/d - With 24 27-Sep-23 27-Oct-23 03-Oct-23 31-Oct-23 3 @3310/IA/3-2a HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 49 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.U390 3310/IA/3-2a (PWFH) - Watermains Chamber (6 nr) @3310/IA/3-2a C11_6 d/w - 10h/d - With 24 05-Oct-23 02-Nov-23 09-Oct-23 06-Nov-23 3 HK Hols - No B/O periods 3310/IA/3-1 (was C3) 144 0 18-Nov-22 17-May-23 18-Jan-23 17-Jul-23 49 Drainage - Stormwater and /Oil Separation (SWD/OS) 64 0 18-Nov-22 07-Feb-23 18-Jan-23 06-Apr-23 49 310.C.FA.U370 Allow Access to Contract <3408> for Interface Work Area 3310/IA/2 C01_7 d/w - 10h/d - No HK 0 18-Nov-22 18-Jan-23 61 Hols - No B/O periods (was 310.C.FA.U371 3310/IA/3 - UU Works (by Contract <3408>) (assumed 2 months) C1) C01_7 d/w - 10h/d - No HK 60 19-Nov-22 17-Jan-23 19-Jan-23 19-Mar-23 61 Hols - No B/O periods (was 310.C.EX.U369 3310/IA/3-1 (SW/OS) - Open-cut excavation + Stormwater/OS Pipe (64 m) C1) C11_6 d/w - 10h/d - With 15 18-Jan-23 07-Feb-23 20-Mar-23 06-Apr-23 49 HK Hols - No B/O periods Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 80- No B/O 0periods (was 08-Feb-23 C3) 17-May-23 11-Apr-23 17-Jul-23 49 310.C.EX.U387 3310/IA/3-1 (PWFH) - Open-cut excavation + Watermains Pipe Laying (689 m) C11_6 d/w - 10h/d - With 70 08-Feb-23 05-May-23 11-Apr-23 05-Jul-23 49 HK Hols - No B/O periods 310.C.EX.U384 3310/IA/3-1 (PWFH) - Watermains Chamber (20 nr) (was C11_6C3) d/w - 10h/d - With 70 20-Feb-23 17-May-23 22-Apr-23 17-Jul-23 49 HK Hols - No B/O periods 3310/IA/3-3 (was C11_6C3) d/w - 10h/d - With HK Hols 276- No B/O 0periods (was 28-Mar-22 C3) 01-Mar-23 21-Mar-23 31-Aug-24 447 Drainage - Stormwater and /Oil Separation (SWD/OS) C11_6 d/w - 10h/d - With HK Hols 26- No B/O 0periods (was 26-Oct-22 C3) 24-Nov-22 21-Mar-23 28-Jul-23 198 310.C.EX.U351 3310/IA/3-3 (SW/OS) - Open-cut excavation + Stormwater/OS Pipe (160 m @ 10m/d; use C11_6 d/w - 10h/d - With 16 26-Oct-22 12-Nov-22 21-Mar-23 12-Apr-23 120 1 team) HK Hols - No B/O periods 310.C.EX.U351.B02 3310/IA/3-3 (SWD/OS) -Concrete Surround of Existing Pipe; L=82m (was C11_6C3) d/w - 10h/d - With 16 26-Oct-22 12-Nov-22 11-Jul-23 28-Jul-23 208 HK Hols - No B/O periods 310.C.EX.U360 3310/IA/3-3 (SW/OS) - Stormwater/OS Manhole (1 nr ) (was C11_6C3) d/w - 10h/d - With 10 14-Nov-22 24-Nov-22 13-Apr-23 24-Apr-23 120 HK Hols - No B/O periods Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 276- No B/O 0periods (was 28-Mar-22 C3) 01-Mar-23 25-Apr-23 31-Aug-24 447 310.C.EX.U745.B02 3310/IA/3-3 (Area 6) - ELS + Watermains Sleeve Pipe Laying (82 m) C11_6 d/w - 10h/d - With 30 28-Mar-22 06-May-22 29-Jul-24 31-Aug-24 693 HK Hols - No B/O periods 310.C.EX.U399 3310/IA/3-3 (PWFH) - Open-cut excavation + Watermains Pipe Laying (303 m) (was C11_6C3) d/w - 10h/d - With 30 25-Nov-22 30-Dec-22 25-Apr-23 31-May-23 120 HK Hols - No B/O periods 310.C.EX.U402 3310/IA/3-3 (PWFH) - Watermains Chamber (6 nr) (was C11_6C3) d/w - 10h/d - With 48 31-Dec-22 01-Mar-23 01-Jun-23 28-Jul-23 120 HK Hols - No B/O periods Interface Work Area 3310/IA/5 (Airfield Drainage and UU Works) (was C3) 303 0 26-Oct-22 01-Nov-23 18-May-23 05-Dec-23 29 3310/IA/5-2 C11_6 d/w - 10h/d - With HK Hols 50- No B/O 0periods (was 01-Sep-23 C3) 01-Nov-23 19-Sep-23 05-Dec-23 29 Drainage - Stormwater and /Oil Separation (SWD/OS) C11_6 d/w - 10h/d - With HK Hols 50- No B/O 0periods (was 01-Sep-23 C3) 01-Nov-23 19-Sep-23 18-Nov-23 15 310.C.EX.U472 3310/IA/5-2b (SW/OS) - Open-cut excavation + Stormwater/OS Pipe (180 m) @ WVT C11_6 d/w - 10h/d - With 30 01-Sep-23 07-Oct-23 19-Sep-23 26-Oct-23 15 Zone 5 Area HK Hols - No B/O periods 310.C.EX.U476 3310/IA/5-2b (SW/OS) - Stormwater/OS Manhole (2 nr ) @ WVT Zone 5 Area (was C11_6C3) d/w - 10h/d - With 30 13-Sep-23 19-Oct-23 03-Oct-23 07-Nov-23 15 HK Hols - No B/O periods 310.C.EX.U487 3310/IA/5-2b (SW/OS) - Open-cut excavation + Stormwater/OS Pipe (244 m) @ WVT (was C11_6C3) d/w - 10h/d - With 30 13-Sep-23 19-Oct-23 03-Oct-23 07-Nov-23 15 Zone 3 Area HK Hols - No B/O periods 310.C.EX.U484 3310/IA/5-2b (SW/OS) - Stormwater/OS Manhole (2 nr ) @ WVT Zone 3 Area (was C11_6C3) d/w - 10h/d - With 30 25-Sep-23 01-Nov-23 14-Oct-23 18-Nov-23 15 HK Hols - No B/O periods 310.C.EX.U435 3310/IA/5-2b (SW/OS) - WVT Completion of Zone 5 backfill to +3.0 (was C11_6C3) d/w - 10h/d - With 0 28-Sep-23 18-Oct-23 15 HK Hols - No B/O periods Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 48- No B/O 0periods (was 04-Sep-23 C3) 01-Nov-23 10-Oct-23 05-Dec-23 29 310.C.EX.U509 3310/IA/5-2b (PWPH) - Open-cut excavation + Watermains Pipe Laying (1195 m) C11_6 d/w - 10h/d - With 48 04-Sep-23 01-Nov-23 10-Oct-23 05-Dec-23 29 HK Hols - No B/O periods 310.C.EX.U514 3310/IA/5-2b (PWPH) - Watermains Chamber (12 nr) 8d/chamber/team; use 3 teams (was C11_6C3) d/w - 10h/d - With 32 22-Sep-23 01-Nov-23 30-Oct-23 05-Dec-23 29 HK Hols - No B/O periods 3310/IA/5-3 (was C3) 196 0 26-Oct-22 25-Jun-23 18-May-23 24-Sep-23 77 Area 3 (To Cross Interim Security Fence) - Potable Water and Fire Hydrant (PWFH) 196 0 26-Oct-22 25-Jun-23 18-May-23 24-Sep-23 77
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 50 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.U670.B01 3310/IA/5-3 (Area 3) - Construct PWPH pit/chamber (1 nos); 1 wf C03_7 d/w - 10h/d - With 14 26-Oct-22 08-Nov-22 18-May-23 01-Jun-23 191 HK Hols - No B/O periods 310.C.EX.U665.B01 3310/IA/5-3 (Area 3) - ELS + PW pipe laying L=20m [assume 2wks full closure] C03_7 d/w - 10h/d - With 14 26-Oct-22 08-Nov-22 18-May-23 01-Jun-23 191 HK Hols - No B/O periods 310.C.EX.U675.B01 3310/IA/5-3 (Area 3) - Backfill and reinstatement works C03_7 d/w - 10h/d - With 10 09-Nov-22 18-Nov-22 02-Jun-23 11-Jun-23 191 HK Hols - No B/O periods 310.C.EX.U507 3310/IA/5-1 (Area 3) - Open cut excavation + Watermains Pipe Laying (371 m) (airside C23_4d/w - NOTAM 30 09-Jan-23 22-Mar-23 12-Jun-23 02-Aug-23 52 operational area) [NOTAM] (M,W,Th,Su-01:30-07:30) - 310.C.EX.U511 3310/IA/5-1 (Area 3) - Watermains Chamber 7nr) (airside operational area) [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 30 23-Mar-23 25-Jun-23 03-Aug-23 24-Sep-23 52 (M,W,Th,Su-01:30-07:30) - Drainage - Stormwater and /Oil Separation (SWD/OS) No HK d/w C11_6 Hols- -10h/d With B/O - With HK Hols 28- No B/O 0periods (was 02-Feb-23 C3) 06-Mar-23 26-Jun-23 28-Jul-23 116 310.C.EX.U528 3310/IA/5-3 (SW/OS) - Open-cut excavation + Stormwater/OS Pipe laying (434 m) C11_6 d/w - 10h/d - With 22 02-Feb-23 27-Feb-23 26-Jun-23 21-Jul-23 116 @3310/IA/5-3 HK Hols - No B/O periods 310.C.EX.U531 3310/IA/5-3 (SW/OS) - Construction of Stormwater/OS Manhole (6 nr ) (was C11_6C3) d/w - 10h/d - With 22 09-Feb-23 06-Mar-23 04-Jul-23 28-Jul-23 116 HK Hols - No B/O periods Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 40- No B/O 0periods (was 06-Mar-23 C3) 26-Apr-23 29-Jul-23 13-Sep-23 116 310.C.EX.U567 3310/IA/5-3 (PWFH) - Open-cut excavation + Watermains Pipe Laying (274 m) C11_6 d/w - 10h/d - With 30 06-Mar-23 14-Apr-23 29-Jul-23 01-Sep-23 116 HK Hols - No B/O periods 310.C.EX.U738,B02 3310/IA/5-3 (PWFH) - Concrete Sleeve Watermains Pipe (was C11_6C3) d/w - 10h/d - With 30 06-Mar-23 14-Apr-23 10-Aug-23 13-Sep-23 126 HK Hols - No B/O periods 310.C.EX.U579 3310/IA/5-3 (PWFH) - Construction of Watermains Chamber (5 nr) (was C11_6C3) d/w - 10h/d - With 30 17-Mar-23 26-Apr-23 10-Aug-23 13-Sep-23 116 HK Hols - No B/O periods Interface Work Area 3310/IA/7 (Airfield Drainage and UU Works) (was C11_6C3) d/w - 10h/d - With HK Hols 93- No B/O 0periods (was 01-Sep-22 C3) 21-Dec-22 19-Dec-22 29-Mar-23 79 3310/IA/7 C11_6 d/w - 10h/d - With HK Hols 93- No B/O 0periods (was 01-Sep-22 C3) 21-Dec-22 19-Dec-22 29-Mar-23 79 310.C.EX.U543.B02 3310/IA/7 - Carry Out Survey Check and UU Detection at Area 3310/3 + submit report to C11_6 d/w - 10h/d - With 21 01-Sep-22 26-Sep-22 19-Dec-22 13-Jan-23 90 PM HK Hols - No B/O periods Drainage - Stormwater and /Oil Separation (SWD/OS) (was C11_6C3) d/w - 10h/d - With HK Hols 41- No B/O 0periods (was 12-Oct-22 C3) 28-Nov-22 14-Jan-23 06-Mar-23 79 310.C.EX.U543 3310/IA/7 SW/OS) - Open-cut excavation + Stormwater/OS Pipe (365 m) C11_6 d/w - 10h/d - With 36 12-Oct-22 22-Nov-22 14-Jan-23 28-Feb-23 79 HK Hols - No B/O periods 310.C.EX.U549 3310/IA/7 (SW/OS) - Stormwater/OS Manhole (3 nr ) (was C11_6C3) d/w - 10h/d - With 36 18-Oct-22 28-Nov-22 20-Jan-23 06-Mar-23 79 HK Hols - No B/O periods Watermains (Seawater/Potable Water and Fire Hydrant (SPWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 53- No B/O 0periods (was 21-Oct-22 C3) 21-Dec-22 27-Jan-23 29-Mar-23 79 310.C.EX.U603 3310/IA/7 (PWFH) - Open-cut excavation + Watermains Pipe Laying (407 m) C11_6 d/w - 10h/d - With 48 21-Oct-22 15-Dec-22 27-Jan-23 23-Mar-23 79 HK Hols - No B/O periods 310.C.EX.U609 3310/IA/7 (PWFH) - Watermains Chamber (8 nr) (was C11_6C3) d/w - 10h/d - With 48 27-Oct-22 21-Dec-22 02-Feb-23 29-Mar-23 79 HK Hols - No B/O periods Interface Work Area 3310/IA/8 (Airfield Drainage and UU Works) (was C11_6C3) d/w - 10h/d - With HK Hols 194- No B/O 0periods (was 16-Jul-22 C3) 08-Mar-23 12-Jan-23 30-May-23 65 3310/IA/8 C11_6 d/w - 10h/d - With HK Hols 194- No B/O 0periods (was 16-Jul-22 C3) 08-Mar-23 12-Jan-23 30-May-23 65 310.C.EX.U562 *** Completion of Reclamation Works of 3310/11 (North) *** C11_6 d/w - 10h/d - With 0 05-Jan-23 29-Apr-23 91 HK Hols - No B/O periods Drainage - Stormwater and /Oil Separation (SWD/OS) (was C11_6C3) d/w - 10h/d - With HK Hols 25- No B/O 0periods (was 08-Feb-23 C3) 08-Mar-23 29-Apr-23 30-May-23 65 310.C.EX.U541 3310/IA/8 (G4 - SW/OS) - Pipe laying Stormwater/OS Pipe (78 m) C11_6 d/w - 10h/d - With 20 08-Feb-23 02-Mar-23 29-Apr-23 23-May-23 65 HK Hols - No B/O periods 310.C.EX.U555 3310/IA/8 (G4 -SW/OS) - Stormwater/OS Manhole (3 nr ) @ 14d/MH/team; (was C11_6C3) d/w - 10h/d - With 20 14-Feb-23 08-Mar-23 06-May-23 30-May-23 65 HK Hols - No B/O periods Area 1 - Watermain (PWFH) (was C11_6C3) d/w - 10h/d - With HK Hols 53- No B/O 0periods (was 16-Jul-22 C3) 16-Sep-22 12-Jan-23 17-Mar-23 149 310.C.EX.U755.B02 3310/IA/8 (Area 1) - Open-cut excavation + Watermains Pipe Laying (407 m) C11_6 d/w - 10h/d - With 48 16-Jul-22 09-Sep-22 12-Jan-23 11-Mar-23 149 HK Hols - No B/O periods 310.C.EX.U765.B02 3310/IA/8 (Area) - Watermains Chamber (6 nr) (was C11_6C3) d/w - 10h/d - With 48 22-Jul-22 16-Sep-22 18-Jan-23 17-Mar-23 149 HK Hols - No B/O periods CC#04 - 3310/10,10A,9 - Western Box Culvert (WBC) no. 3, 4, 18 (was C3) 677 128 09-Aug-21 A 15-Nov-23 31-Jan-22 01-Sep-24 236 Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 51 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S CC#4.7 - 3310/10,10A,9 - WBC no. 3,4,18 - Steel Formwork Fabrication C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was27-Mar-22 C1) 01-Jun-22 04-Apr-23 09-Jun-23 373 310.C.R0.L100 WBC no. 3,4,18 - Steel Formwork Fabrication C01_7 d/w - 10h/d - No HK 60 27-Mar-22 25-May-22 04-Apr-23 02-Jun-23 373 Hols - No B/O periods (was 310.C.R0.L104 WBC no. 3,4,18 - Steel Formwork delivery C1) C01_7 d/w - 10h/d - No HK 7 26-May-22 01-Jun-22 03-Jun-23 09-Jun-23 373 Hols - No B/O periods (was CC#4.7 - 3310/10,10A,9 - WBC no. 3,4,18 - Site Preparation Works C1) 321 0 09-Aug-21 A 05-Sep-22 31-Jan-22 01-Sep-24 592 310.C.R0.L112 WBC - access to Works Area 3310/10A C01_7 d/w - 10h/d - No HK 0 09-Aug-21 A 01-Sep-24 Hols - No B/O periods (was 310.C.R0.L108 WBC - access to Works Area 3310/10 C1) C01_7 d/w - 10h/d - No HK 0 27-Mar-22* 31-Jan-22 -55 Hols - No B/O periods (was 310.C.R0.L1266 WBC - Access Date of 3310/9A C1) C11_6 d/w - 10h/d - With 0 04-Jul-22 03-Oct-22 76 HK Hols - No B/O periods 310.C.R0.L781 WBC - Access Date of 3310/9 (was C11_6C3) d/w - 10h/d - With 0 05-Sep-22 24-Oct-22 39 HK Hols - No B/O periods CC#4.7 - 3310/10,10A,9 - WBC no. 3,4,18 - Ground Investigation & Instrumentation Monitoring (was C11_6C3) d/w - 10h/d - With HK Hols 122- No B/O 0periods (was 13-Jan-23 C3) 14-Jun-23 27-May-23 24-Jun-23 8 310.C.R0.L218 3310/10,10A - WBC no. 18 - install surface movement marker on top of box culvert [5 nos. C11_6 d/w - 10h/d - With 12 13-Jan-23 30-Jan-23 10-Jun-23 24-Jun-23 118 @7d/nos.; 2wf] HK Hols - No B/O periods 310.C.R0.L128 3310/10,10A - WBC no. 3 & 4 - install surface movement marker on top of box culvert [6 (was C11_6C3) d/w - 10h/d - With 12 17-May-23 31-May-23 27-May-23 09-Jun-23 8 nos. @7d/nos.; 2wf] HK Hols - No B/O periods 310.C.R0.L217 3310/10,10A - WBC no. 18 - install settlement marker on ground [2nos. @7d/nos.; 1wf] (was C11_6C3) d/w - 10h/d - With 12 17-May-23 31-May-23 10-Jun-23 24-Jun-23 20 HK Hols - No B/O periods 310.C.R0.L124 3310/10,10A - WBC no. 3 & 4 - install surface movement marker on ground [4nos. (was C11_6C3) d/w - 10h/d - With 12 01-Jun-23 14-Jun-23 10-Jun-23 24-Jun-23 8 @7d/nos.; 2wf] HK Hols - No B/O periods CC#4.7 - 3310/10,10A,9 - WBC no. 3,4,18 - R.C. Structure + Backfill (was C3) 325 82 08-Dec-21 A 06-Mar-23 10-May-22 12-May-23 53 CC#4.7 - WBC no. 3,4,18a/18b (12A) - Stage 1 [Ch.0+21 to 0+100] (and connect to new outfall by 3206) 220 16 08-Dec-21 A 28-Oct-22 10-May-22 09-Jan-23 60 310.C.R0.X998 WBC no. 3,4,18a/18b - Mobilization & Instrumentation C01_7 d/w - 10h/d - No HK 48 08-Dec-21 A 03-Jan-22 A 10-May-22 10-May-22 Hols - No B/O periods (was 310.C.R0.L1052.B01 WBC no. 3,4,18a/18b - Stage 1 Pre-grouting works [116no. @4 no./d, 1wf] C1) C11_6 d/w - 10h/d - With 29 04-Jan-22 A 16-Mar-22 A 10-May-22 10-May-22 HK Hols - No B/O periods 310.C.R0.L1056.B01 WBC no. 3,4,18a/18b - Stage 1 Pre-boring works [470no. @7 no./d, 2wf] (was C11_6C3) d/w - 10h/d - With 37 3 14-Mar-22 A 29-Apr-22 10-May-22 08-Jun-22 32 HK Hols - No B/O periods 310.C.R0.L1046 WBC no. 3,4,18a/18b - Stage1 Sheet Piling installation [235no. @6no./d/rig, use 2 rig] (was C11_6C3) d/w - 10h/d - With 24 2 04-Apr-22 06-May-22 17-May-22 14-Jun-22 32 HK Hols - No B/O periods 310.C.R0.L1050 WBC no. 3,4,18a/18b - Stage 1 Curtain grout [107no. @3 no./d, 2wf] (was C11_6C3) d/w - 10h/d - With 18 0 07-May-22 27-May-22 15-Jun-22 06-Jul-22 32 HK Hols - No B/O periods 310.C.R0.L234 WBC no. 3,4,18a/18b - Stage 1 Submit Form BA14 for vertical element (was C01_7C3) d/w - 10h/d - No HK 7 28-May-22 03-Jun-22 07-Jul-22 13-Jul-22 40 Hols - No B/O periods (was 310.C.R0.L1054 WBC no. 3,4,18a/18b - Stage 1 Submit Form BA8 for excavation works C1) C01_7 d/w - 10h/d - No HK 7 04-Jun-22 10-Jun-22 14-Jul-22 20-Jul-22 40 Hols - No B/O periods (was 310.C.R0.L607.B02 WBC no. 3,4,18a/18b - Submit Form BA8 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 04-Jun-22 10-Jun-22 22-Sep-22 28-Sep-22 110 Hols - No B/O periods (was 310.C.R0.L1058 WBC no. 3,4,18a/18b - Stage 1 Submit Form BA10 for excav. works - connection works C1) C01_7 d/w - 10h/d - No HK 7 11-Jun-22 17-Jun-22 21-Jul-22 27-Jul-22 40 at outfall 1(constructed by <3206>) Hols - No B/O periods (was 310.C.R0.L609.B02 WBC no. 3,4,18a/18b - Submit Form BA10 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 11-Jun-22 17-Jun-22 29-Sep-22 05-Oct-22 110 Hols - No B/O periods (was 310.C.R0.L779 Contract <3206> complete Outfall and ready for Contract 3310 box culvert connection C1) C11_6 d/w - 10h/d - With 0 17-Jun-22 27-Jul-22 33 HK Hols - No B/O periods 310.C.R0.L164 WBC no. 3,4,18a/18b - Stage 1 open excavation [Vol.=18,827m3, @450m3/d] @3WF+ (was C11_6C3) d/w - 10h/d - With 30 3 18-Jun-22 23-Jul-22 28-Jul-22 31-Aug-22 33 plate load test (if required) HK Hols - No B/O periods 310.C.R0.L606 WBC no. 3,4,18a/18b - Stage 1 (2~6 cells | 8 bays) - construct slab, Wall & Roof Slab, (was C11_6C3) d/w - 10h/d - With 62 6 25-Jul-22 07-Oct-22 06-Oct-22 16-Dec-22 60 @21d/bay, @ 3 WF HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 52 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.R1.L930 WBC no. 3,4,18a/18b - Backfill Stage 1 area after RC Structure completed C11_6 d/w - 10h/d - With 18 2 08-Oct-22 28-Oct-22 17-Dec-22 09-Jan-23 60 HK Hols - No B/O periods CC#4.7 - WBC no. 18a (12B) - Stage 1a [Ch.0+100 - 0+296] (was C3) 157 9 31-Mar-22 11-Oct-22 29-May-22 23-Feb-23 111 310.C.R0.L357.B02 WBC no. 18a - Submit Form BA8 and grant consent for RC works C01_7 d/w - 10h/d - No HK 7 31-Mar-22 06-Apr-22 08-Jun-22 14-Jun-22 69 Hols - No B/O periods (was 310.C.R0.L359.B02 WBC no. 18a - Submit Form BA10 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 06-Apr-22 12-Apr-22 14-Jun-22 20-Jun-22 69 Hols - No B/O periods (was 310.C.R0.L1074 WBC no. 18a - Stage 1a open excavation [Vol.=6,028m3, @450/m3/d] C1) C01_7 d/w - 10h/d - No HK 15 1 25-Apr-22 09-May-22 29-May-22 12-Jun-22 34 Hols - No B/O periods (was 310.C.R0.L350 WBC no. 18a - Stage 1a (2 cells | 13 bays) - construct slab, Wall & Roof Slab @12d/bay; C1) C11_6 d/w - 10h/d - With 86 8 17-May-22 26-Aug-22 21-Jun-22 30-Sep-22 29 @ 2WF HK Hols - No B/O periods 310.C.R0.L168 WBC no. 18a - Backfill Stage 2 area after RC Structure completed (was C11_6C3) d/w - 10h/d - With 36 27-Aug-22 11-Oct-22 10-Jan-23 23-Feb-23 111 HK Hols - No B/O periods CC#4.7 - WBC no. 3,4,18b (12B) - Stage 2 [Ch.0+78 to 0+158] (was C3) 157 10 31-Mar-22 11-Oct-22 17-May-22 23-Feb-23 111 310.C.R0.L367.B02 WBC no. 3,4,18b - Submit Form BA8 and grant consent for RC works C01_7 d/w - 10h/d - No HK 7 31-Mar-22 06-Apr-22 25-May-22 31-May-22 55 Hols - No B/O periods (was 310.C.R0.L369.B02 WBC no. 3,4,18b - Submit Form BA10 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 06-Apr-22 12-Apr-22 31-May-22 06-Jun-22 55 Hols - No B/O periods (was 310.C.R0.L1076.B02 WBC no. 3,4,18b - Stage 2 open excavation [Vol.=7,077m3, @450/m3/d] C1) C01_7 d/w - 10h/d - No HK 18 2 13-Apr-22 30-Apr-22 17-May-22 03-Jun-22 34 Hols - No B/O periods (was 310.C.R0.L352.B02 WBC no. 3,4,18b - Stage 2 (2~6 cells | 12 bays) - construct slab, Wall & Roof Slab C1) C11_6 d/w - 10h/d - With 98 8 03-May-22 26-Aug-22 07-Jun-22 30-Sep-22 29 @21d/bay; @ 3 WF HK Hols - No B/O periods 310.C.R0.L169.B02 WBC no. 3,4,18b - Backfill Stage 2 area after RC Structure completed (was C11_6C3) d/w - 10h/d - With 36 27-Aug-22 11-Oct-22 10-Jan-23 23-Feb-23 111 HK Hols - No B/O periods CC#4.7 - WBC no. 3,4,18b (12C) - Stage 3 [Ch.0+158 to 0+450] (was C3) 218 32 14-Apr-22 05-Jan-23 30-May-22 23-Feb-23 39 310.B01.100 3310/10 - DJM (Area E5) - Submit Form BA8 (after BA14) C01_7 d/w - 10h/d - No HK 7 14-Apr-22 20-Apr-22 30-May-22 05-Jun-22 46 Hols - No B/O periods (was 310.C.R0.L1098 3310/10 - DJM (Area E5) - Submit Form BA10 (after BA14) C1) C01_7 d/w - 10h/d - No HK 7 21-Apr-22 27-Apr-22 06-Jun-22 12-Jun-22 46 Hols - No B/O periods (was 310.C.R0.L1267.B02 WBC no. 3,4,18b - Submit Form BA8 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 21-Apr-22 27-Apr-22 05-Jul-22 11-Jul-22 75 Hols - No B/O periods (was 310.C.R0.L1269.B02 WBC no. 3,4,18b - Submit Form BA10 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 27-Apr-22 03-May-22 11-Jul-22 17-Jul-22 75 Hols - No B/O periods (was 310.C.R0.L1078 WBC no. 3,4,18b - Stage 3 open excavation [Vol.=51798m3, @450m3/d, 3 WF] + plate C1) C11_6 d/w - 10h/d - With 43 4 10-May-22 29-Jun-22 13-Jun-22 02-Aug-22 28 load test (if required) HK Hols - No B/O periods 310.C.R0.L1262 WBC no. 3,4,18b - Stage 3 (2~6 cells | 21 bays) - construct slab, Wall & Roof Slab (was C11_6C3) d/w - 10h/d - With 81 14 14-Jun-22 17-Sep-22 18-Jul-22 22-Oct-22 28 @21d/bay; @ 6 WF HK Hols - No B/O periods 310.C.R0.L394 WBC no. 4,18b - Stage 3 (6 cells | 20 bays) - construct slab, Wall & Roof Slab @21d/bay; (was C11_6C3) d/w - 10h/d - With 77 14 22-Aug-22 22-Nov-22 10-Oct-22 09-Jan-23 39 @ 6 WF HK Hols - No B/O periods 310.C.R0.L758 WBC no. 3,4,18b - Backfill Stage 3 after RC Structure completed (was C11_6C3) d/w - 10h/d - With 36 23-Nov-22 05-Jan-23 10-Jan-23 23-Feb-23 39 HK Hols - No B/O periods CC#4.7 - WBC no. 18a (12D) - Stage 4 [Ch.0+296 to 0+316] & connect to BC18A by 3303 (was C3) 57 3 26-Aug-22 04-Nov-22 30-Sep-22 04-Nov-22 0 310.C.R0.L1086 BC18A Contract <3303> complete box culvert and ready for 3310 box culvert connection C11_6 d/w - 10h/d - With 0 26-Aug-22 30-Sep-22 29 HK Hols - No B/O periods 310.C.R0.L667.B02 WBC no. 18a - Submit Form BA8 and grant consent for RC works (was C01_7C3) d/w - 10h/d - No HK 7 19-Sep-22 25-Sep-22 02-Oct-22 08-Oct-22 13 Hols - No B/O periods (was 310.C.R0.L669.B02 WBC no. 18a - Submit Form BA10 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 25-Sep-22 01-Oct-22 08-Oct-22 14-Oct-22 13 Hols - No B/O periods (was 310.C.R0.L1082 WBC no. 18a - Stage 4 open excavation [Vol.=1,472m3, @450m3/d] C1) C11_6 d/w - 10h/d - With 10 1 03-Oct-22 14-Oct-22 03-Oct-22 14-Oct-22 0 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 53 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.R0.L663 WBC no.18a - Stage 4 (2 cells | 2 bays)-construct slab,Wall & Roof Slab @12d/bay; @1 C11_6 d/w - 10h/d - With 18 2 15-Oct-22 04-Nov-22 15-Oct-22 04-Nov-22 0 WF(Comp. Permanent Diversion BC18A) HK Hols - No B/O periods CC#4.7 - WBC no. 4,18b (12E) - Stage 5 [Ch.0+438 to 0+460] & connect to BC4 & 18B by 3303 (was C3) 96 5 17-Sep-22 12-Jan-23 18-Oct-22 12-May-23 95 310.C.R0.L1090 BC 4, 18B Contract <3303> complete box culvert and ready for 3310 box culvert C11_6 d/w - 10h/d - With 0 17-Sep-22 22-Oct-22 28 connection HK Hols - No B/O periods 310.C.R0.L867.B02 WBC no. 4,18b - Submit Form BA8 and grant consent for RC works (was C01_7C3) d/w - 10h/d - No HK 7 19-Sep-22 25-Sep-22 18-Oct-22 24-Oct-22 29 Hols - No B/O periods (was 310.C.R0.L869.B02 WBC no. 4,18b - Submit Form BA10 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 25-Sep-22 01-Oct-22 24-Oct-22 30-Oct-22 29 Hols - No B/O periods (was 310.C.R0.L1242 WBC no. 4,18b - Stage 5 open excavation [Vol.=1,791m3, @450m3/d] C1) C11_6 d/w - 10h/d - With 6 1 24-Oct-22 29-Oct-22 24-Oct-22 29-Oct-22 0 HK Hols - No B/O periods 310.C.R0.L865 WBC no. 4,18b - Stage 5 (6 cells | 2 bays) - construct slab Wall & Roof Slab @21d/bay; @ (was C11_6C3) d/w - 10h/d - With 42 4 31-Oct-22 17-Dec-22 31-Oct-22 17-Dec-22 0 1 WF HK Hols - No B/O periods 310.C.R0.L1254 BC4 & 18B Complete connection with 3303 (Complete Permanent Diversion BC4&18B) (was C11_6C3) d/w - 10h/d - With 0 17-Dec-22 17-Dec-22 0 HK Hols - No B/O periods 310.C.R0.L889 WBC no. 4,18b - Backfilling and removal of Armour Rock (Swale Area) (was C11_6C3) d/w - 10h/d - With 20 19-Dec-22 12-Jan-23 19-Apr-23 12-May-23 95 HK Hols - No B/O periods 310.C.R0.L887.B02 WBC no. 4,18b - Backfilling at RC structure (was C11_6C3) d/w - 10h/d - With 20 19-Dec-22 12-Jan-23 19-Apr-23 12-May-23 95 HK Hols - No B/O periods CC#4.7 - WBC no. 3 (12F) - Stage 6 [Ch.0+210 to Extg. Outfall] & connect to extg. Outfall No.3 (was C3) 108 7 26-Oct-22 06-Mar-23 19-Dec-22 06-Mar-23 0 310.C.R0.L787.B02 WBC no. 3 - Submit Form BA8 and grant consent for RC works C01_7 d/w - 10h/d - No HK 7 26-Oct-22 01-Nov-22 29-Dec-22 04-Jan-23 64 Hols - No B/O periods (was 310.C.R0.L789.B02 WBC no. 3 - Submit Form BA10 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 01-Nov-22 07-Nov-22 04-Jan-23 10-Jan-23 64 Hols - No B/O periods (was 310.C.R0.L1094 WBC no. 3 - Stage 6 temp drainage diversion works (starts after dry season 1 Nov) C1) C11_6 d/w - 10h/d - With 12 19-Dec-22 03-Jan-23 19-Dec-22 03-Jan-23 0 HK Hols - No B/O periods 310.C.R0.L1246 WBC no. 3 - Stage 6 open excavation [Vol.=352m3, @93m3/d] (was C11_6C3) d/w - 10h/d - With 6 1 04-Jan-23 10-Jan-23 04-Jan-23 10-Jan-23 0 HK Hols - No B/O periods 310.C.R0.L786 WBC no. 3 - Stage 6 (2 cells | 2 bays) - construct slab, Wall & Roof Slab @12d/bay; @ 1 (was C11_6C3) d/w - 10h/d - With 24 4 11-Jan-23 10-Feb-23 11-Jan-23 10-Feb-23 0 WF HK Hols - No B/O periods 310.C.R0.L1258 BC3 Complete connection with Outfall 3 (Complete Permanent Diversion BC3) (was C11_6C3) d/w - 10h/d - With 0 10-Feb-23 10-Feb-23 0 HK Hols - No B/O periods 310.C.R0.L885 WBC no. 3 - Backfilling and removal of Armour Rock (Swale Area) (was C11_6C3) d/w - 10h/d - With 20 1 11-Feb-23 06-Mar-23 11-Feb-23 06-Mar-23 0 HK Hols - No B/O periods 310.C.R0.L883.B02 WBC no. 3 - Backfilling at RC structure (was C11_6C3) d/w - 10h/d - With 20 1 11-Feb-23 06-Mar-23 11-Feb-23 06-Mar-23 0 HK Hols - No B/O periods CC#4.7 - 3310/10,10A,9 - WBC no. 3,4,18 - Metal Works for Desilting Chamber & Spill Trap (was C11_6C3) d/w - 10h/d - With HK Hols 103- No B/O 0periods (was 08-Oct-22 C3) 11-Feb-23 13-Jan-23 12-May-23 73 310.C.R0.L909 WBC no. 3,4,18A,18B - metal work for desilting chamber, spill trap, stop log opening in C11_6 d/w - 10h/d - With 75 08-Oct-22 05-Jan-23 13-Jan-23 18-Apr-23 81 3310/10 HK Hols - No B/O periods 310.C.R0.L900 WBC no. 3,4, 18A - metal work for desilting chamber in 3310/9 & 9A (was C11_6C3) d/w - 10h/d - With 20 16-Jan-23 11-Feb-23 19-Apr-23 12-May-23 73 HK Hols - No B/O periods CC#4 - 3310/10,10A - Landside Road and Airside Road (was C3) 438 46 30-May-22 15-Nov-23 18-Aug-22 01-Jun-24 160 CC#4.1, 4.2, 4.4, 4.7 - 3310/10,10A - Underground Utilities along Land Side Road 266 33 30-May-22 20-Apr-23 18-Aug-22 22-Sep-23 129 3310/10,10A - Underground Utilities along Land Side Road (West) C11_6 d/w - 10h/d - With HK Hols 192- No B/O12 periods (was 30-May-22 C3) 16-Jan-23 18-Aug-22 24-Jun-23 127 310.C.R0.L910 3310/10,10A (west) - (UU under LSR & ASR) - GI for utilities C11_6 d/w - 10h/d - With 7 30-May-22 07-Jun-22 18-Aug-22 25-Aug-22 67 HK Hols - No B/O periods 310.C.R0.L913 3310/10,10A (west) - (UU under LSR & ASR) - PM agree utilities installation level (was C11_6C3) d/w - 10h/d - With 28 08-Jun-22 11-Jul-22 26-Aug-22 28-Sep-22 67 HK Hols - No B/O periods 310.C.R0.L919 3310/10,10A (west) - LSR - Gas main (was C11_6C3) d/w - 10h/d - With 60 2 12-Jul-22 20-Sep-22 29-Sep-22 09-Dec-22 67 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 54 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.R0.L916 3310/10,10A (west) - LSR - stormwater drain pipe [232mL @5m/d/wf; 2wf; 10MH C11_6 d/w - 10h/d - With 60 2 20-Jul-22 28-Sep-22 29-Sep-22 09-Dec-22 60 @4d/no/wf; 1wf] HK Hols - No B/O periods 310.C.R0.L922 3310/10,10A (west) - LSR - Airport System ductings (was C11_6C3) d/w - 10h/d - With 60 2 29-Sep-22 09-Dec-22 10-Dec-22 23-Feb-23 60 HK Hols - No B/O periods 310.C.R0.L925 3310/10,10A (west) - LSR - Potable Water main for FS (was C11_6C3) d/w - 10h/d - With HK Hols 60- No B/O 2periods (was 13-Oct-22 C3) 21-Dec-22 22-Dec-22 07-Mar-23 60 310.C.R0.L928 3310/10,10A (west) - LSR - 132kv CLP duct and drawpits (L=696 m) C11_6 d/w - 10h/d - With 60 2 25-Oct-22 04-Jan-23 05-Jan-23 18-Mar-23 60 HK Hols - No B/O periods 310.C.R0.L932 3310/10,10A (west) - LSR - Road Drainage works (was C11_6C3) d/w - 10h/d - With 60 2 05-Nov-22 16-Jan-23 13-Apr-23 24-Jun-23 127 HK Hols - No B/O periods 3310/10,10A - Underground Utilities along Land Side Road (East) (was C11_6C3) d/w - 10h/d - With HK Hols 173- No B/O12 periods (was 25-Jul-22 C3) 20-Feb-23 01-Sep-22 22-Sep-23 176 310.C.R0.L938 3310/10,10A (east) - (UU under LSR & ASR) - GI for utilities C11_6 d/w - 10h/d - With 7 25-Jul-22 01-Aug-22 01-Sep-22 08-Sep-22 33 HK Hols - No B/O periods 310.C.R0.L942 3310/10,10A (east) - (UU under LSR & ASR) - PM agree utilities installation level (was C11_6C3) d/w - 10h/d - With 28 02-Aug-22 02-Sep-22 09-Sep-22 14-Oct-22 33 HK Hols - No B/O periods 310.C.R0.L946 3310/10,10A (east) - LSR - stormwater drain pipe [40mL @5m/d/wf; 1wf; 2MH (was C11_6C3) d/w - 10h/d - With 48 2 03-Sep-22 01-Nov-22 15-Oct-22 09-Dec-22 33 @4d/no/wf; 1wf] HK Hols - No B/O periods 310.C.R0.L950 3310/10,10A (east) - LSR - Gas main (was C11_6C3) d/w - 10h/d - With 48 2 03-Sep-22 01-Nov-22 15-Oct-22 09-Dec-22 33 HK Hols - No B/O periods 310.C.R0.L954 3310/10,10A (east) - LSR - Airport System ductings (was C11_6C3) d/w - 10h/d - With 60 2 02-Nov-22 12-Jan-23 10-Dec-22 23-Feb-23 33 HK Hols - No B/O periods 310.C.R0.L958 3310/10,10A (east) - LSR - Potable Water main for FS (was C11_6C3) d/w - 10h/d - With 60 2 14-Nov-22 27-Jan-23 22-Dec-22 07-Mar-23 33 HK Hols - No B/O periods 310.C.R0.L962 3310/10,10A (east) - LSR - 132kv & 11kv CLP duct and drawpits (was C11_6C3) d/w - 10h/d - With 60 2 25-Nov-22 08-Feb-23 05-Jan-23 18-Mar-23 33 HK Hols - No B/O periods 310.C.R0.L963 3310/10,10A (east) - LSR - Road Drainage works (was C11_6C3) d/w - 10h/d - With 60 2 07-Dec-22 20-Feb-23 15-Jul-23 22-Sep-23 176 HK Hols - No B/O periods 3310/10,10A - Underground Utilities along Land Side Road (Swale & Outfall) (was C3) 36 9 06-Mar-23 20-Apr-23 06-Mar-23 02-May-23 9 310.C.R0.L966 3310/10,10A (swale & outfall) - LSR - stormwater drain pipe [225mL @10m/d/wf; 2wf; C11_6 d/w - 10h/d - With 18 06-Mar-23 25-Mar-23 06-Mar-23 25-Mar-23 0 5MH @4d/no/wf; 2wf] HK Hols - No B/O periods 310.C.R0.L970 3310/10,10A (swale & outfall) - LSR - Gas main (was C11_6C3) d/w - 10h/d - With 18 2 06-Mar-23 25-Mar-23 06-Mar-23 25-Mar-23 0 HK Hols - No B/O periods 310.C.R0.L982 3310/10,10A (swale & outfall) - LSR - 132 kv CLP duct and drawpits (was C11_6C3) d/w - 10h/d - With 6 2 13-Mar-23 18-Mar-23 13-Mar-23 18-Mar-23 0 HK Hols - No B/O periods 310.C.R0.L974 3310/10,10A (swale & outfall) - LSR - Airport System ductings (was C11_6C3) d/w - 10h/d - With 18 2 13-Mar-23 01-Apr-23 16-Mar-23 06-Apr-23 3 HK Hols - No B/O periods 310.C.R0.L978 3310/10,10A (swale & outfall) - LSR - Potable Water main for FS (was C11_6C3) d/w - 10h/d - With 18 2 13-Mar-23 01-Apr-23 16-Mar-23 06-Apr-23 3 HK Hols - No B/O periods 310.C.R0.L983 3310/10,10A (swale & outfall) - LSR - complete CLP duct and drawpits - Achieve KD-04 (was C01_7C3) d/w - 10h/d - No HK 0 18-Mar-23 19-Mar-23 1 Hols - No B/O periods (was 310.C.R0.L984 3310/10,10A (swale & outfall) - LSR - Road Drainage Works C1) C11_6 d/w - 10h/d - With 12 1 03-Apr-23 20-Apr-23 18-Apr-23 02-May-23 9 HK Hols - No B/O periods CC#4.10 - 3310/10,10A - Road Work for Landside Road (was C11_6C3) d/w - 10h/d - With HK Hols 140- No B/O 6periods (was 17-Jan-23 C3) 11-Jul-23 11-Apr-23 01-Jun-24 266 310.C.R0.X108 3310/10,10A - Allow Access Contract <3206> for final placing of seawall protection C11_6 d/w - 10h/d - With 0 17-Jan-23 24-Jun-23 127 armour (PS 10.2.69) HK Hols - No B/O periods 310.C.R0.L931 3310/10,10A (west) - LSR - lay kerb & sub-base [250mL @15m/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 19 1 17-Jan-23 10-Feb-23 19-Sep-23 12-Oct-23 199 HK Hols - No B/O periods 310.C.R0.L934 3310/10,10A (west) - LSR - Lay flexible pavement [250m @80m/6d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 20 1 11-Feb-23 06-Mar-23 13-Oct-23 06-Nov-23 199 HK Hols - No B/O periods 310.C.R0.L986 3310/10,10A (east) - LSR - lay kerb & sub-base [240mL @15m/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 17 1 21-Feb-23 11-Mar-23 23-Sep-23 14-Oct-23 176 HK Hols - No B/O periods 310.C.R0.L990 3310/10,10A (east) - LSR - Lay flexible pavement [240m @80m/6d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 19 1 13-Mar-23 03-Apr-23 16-Oct-23 07-Nov-23 176 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 55 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.R0.L994 3310/10,10A (swale & outfall) - LSR - lay kerb & sub-base [120mL @15m/d/wf; 2wf] C11_6 d/w - 10h/d - With 12 1 03-Apr-23 20-Apr-23 11-Apr-23 24-Apr-23 3 HK Hols - No B/O periods 310.C.R0.L998 3310/10,10A (swale & outfall) - LSR - Lay flexible pavement [120m @80m/6d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 12 1 21-Apr-23 05-May-23 25-Apr-23 09-May-23 3 HK Hols - No B/O periods 310.C.R0.X100 3310/10,10A - LSR - install street lighting and provide power, road furniture (was C11_6C3) d/w - 10h/d - With 40 06-May-23 23-Jun-23 25-Mar-24 16-May-24 266 HK Hols - No B/O periods 310.C.R0.X104 3310/10,10A - LSR - wearing course & road marking (was C11_6C3) d/w - 10h/d - With 14 24-Jun-23 11-Jul-23 17-May-24 01-Jun-24 266 HK Hols - No B/O periods CC#4.10 - 3310/10,10A - Road Work for Airside Road (was C3) 133 7 11-Feb-23 25-Jul-23 25-Apr-23 01-Jun-24 254 310.C.R0.X120 3310/10,10A (west) - ASR - lay kerb & sub-base [250mL @15m/d/wf; 2wf] C11_6 d/w - 10h/d - With 18 1 11-Feb-23 03-Mar-23 16-Oct-23 06-Nov-23 201 HK Hols - No B/O periods 310.C.R0.X124 3310/10,10A (west) - ASR - Lay flexible pavement [250m @80m/6d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 20 1 07-Mar-23 29-Mar-23 07-Nov-23 29-Nov-23 199 HK Hols - No B/O periods 310.C.R0.X128 3310/10,10A (east) - ASR - lay kerb & sub-base [240mL @15m/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 17 1 13-Mar-23 31-Mar-23 18-Oct-23 07-Nov-23 178 HK Hols - No B/O periods 310.C.R0.X132 3310/10,10A (east) - ASR - Lay flexible pavement [240m @80m/6d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 19 1 04-Apr-23 29-Apr-23 08-Nov-23 29-Nov-23 176 HK Hols - No B/O periods 310.C.R0.X136 3310/10,10A (swale & outfall) - ASR - lay kerb & sub-base [120mL @15m/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 12 1 21-Apr-23 05-May-23 25-Apr-23 09-May-23 3 HK Hols - No B/O periods 310.C.R0.X140 3310/10,10A (swale & outfall) - ASR - Lay flexible pavement [120m @80m/6d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 12 1 06-May-23 19-May-23 10-May-23 23-May-23 3 HK Hols - No B/O periods 310.C.R0.X141 3310/10, 10A - divert temp landside road from south side to new paved road along north (was C11_6C3) d/w - 10h/d - With 0 19-May-23 23-May-23 3 seawall HK Hols - No B/O periods 310.C.R0.X142 3310/10,10A - remaining AGL, Pavement along old temp landside road (was C11_6C3) d/w - 10h/d - With 26 1 20-May-23 20-Jun-23 24-May-23 24-Jun-23 3 HK Hols - No B/O periods 310.C.R0.X144 3310/10,10A - ASR - install street lighting, road furniture (was C11_6C3) d/w - 10h/d - With 40 20-May-23 08-Jul-23 25-Mar-24 16-May-24 254 HK Hols - No B/O periods 310.C.R0.X143 3310/10,10A - Complete Airfield pavement to achieve KD-5B (was C01_7C3) d/w - 10h/d - No HK 0 20-Jun-23 25-Jun-23 5 Hols - No B/O periods (was 310.C.R0.X148 3310/10,10A - ASR - wearing course & road marking [610mL] C1) C11_6 d/w - 10h/d - With 14 10-Jul-23 25-Jul-23 17-May-24 01-Jun-24 254 HK Hols - No B/O periods CC#4.11 - 3310/10,10A - Security Fence (was C11_6C3) d/w - 10h/d - With HK Hols 77- No B/O 0periods (was 20-May-23 C3) 21-Aug-23 30-Nov-23 04-Mar-24 160 310.C.R0.X152 3310/10,10A - Security Fence - construct footing [610m @10m/7d/wf; 6wf] C11_6 d/w - 10h/d - With 63 20-May-23 04-Aug-23 30-Nov-23 16-Feb-24 160 HK Hols - No B/O periods 310.C.R0.X156 3310/10,10A - Security Fence - metal works (was C11_6C3) d/w - 10h/d - With 63 07-Jun-23 21-Aug-23 16-Dec-23 04-Mar-24 160 HK Hols - No B/O periods CC#4.10 - 3310/10,10A - Central Reserve Pavement (was C11_6C3) d/w - 10h/d - With HK Hols 85- No B/O 0periods (was 05-Aug-23 C3) 15-Nov-23 16-Mar-24 01-Jun-24 160 310.C.R0.X164 3310/10,10A - Area G4 - Central Resv - lay sub-base [612mL @15m/d/wf] C11_6 d/w - 10h/d - With 40 05-Aug-23 20-Sep-23 16-Mar-24 07-May-24 184 HK Hols - No B/O periods 310.C.R0.X168 3310/10,10A - Area G4 - Central Resv - lay verge [612mL @30m/d/wf] (was C11_6C3) d/w - 10h/d - With 21 21-Oct-23 15-Nov-23 08-May-24 01-Jun-24 160 HK Hols - No B/O periods CC#04 - 3310/5,6,6A,7 - Eastern Box Culvert (EBC) no. 5, 6, 19 (was C3) 734 59 07-Jun-21 A 21-Nov-23 30-Mar-22 25-Nov-23 4 CC#4.7 - 3310/5,6,6A,7 - EBC no. 5,6,19 - Steel Formwork Fabrication C11_6 d/w - 10h/d - With HK Hols 67- No B/O 0periods (was 28-Mar-22 C3) 20-Jun-22 08-Sep-22 28-Nov-22 134 310.C.R0.X170 3310/5,6,6A - EBC no. 5,6,19 - Steel Formwork Fabrication C11_6 d/w - 10h/d - With 60 28-Mar-22 11-Jun-22 08-Sep-22 19-Nov-22 134 HK Hols - No B/O periods 310.C.R0.X174 3310/5,6,6A - EBC no. 5,6,19 - Steel Formwork Delivery (was C11_6C3) d/w - 10h/d - With 7 13-Jun-22 20-Jun-22 21-Nov-22 28-Nov-22 134 HK Hols - No B/O periods CC#4.7 - 3310/5,6,6A,7 - EBC no. 5,6,19 - Site Preparation Works (was C11_6C3) d/w - 10h/d - With HK Hols 478- No B/O 0periods (was 07-Jun-21 C3) A 10-Jan-23 30-Mar-22 25-Oct-23 233 CC#4.7 - 3310/5 - EBC no. 5,6,19 - Site Preparation Works C11_6 d/w - 10h/d - With HK Hols7 - No B/O 0periods (was 03-Jan-23 C3) 10-Jan-23 03-Jan-23 02-Feb-23 17 310.C.R0.X178 3310/5,6,6A - EBC no. 5,6,19 - Access to Works Area 3310/5 C11_6 d/w - 10h/d - With 0 03-Jan-23* 03-Jan-23 0 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 56 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.R0.X194 3310/5,6,6A - EBC no. 5,6,19 - Condition survey to Works Area 3310/5 C11_6 d/w - 10h/d - With 7 03-Jan-23 10-Jan-23 26-Jan-23 02-Feb-23 17 HK Hols - No B/O periods CC#4.7 - 3310/6 - EBC no. 5,6,19 - Site Preparation Works (was C11_6C3) d/w - 10h/d - With HK Hols 105- No B/O 0periods (was 07-Jun-21 C3) A 11-Oct-21 A 30-Mar-22 25-Oct-23 310.C.R0.X182 3310/5,6,6A - EBC no. 5,6,19 - Access to Works Area 3310/6 C11_6 d/w - 10h/d - With 0 07-Jun-21 A 30-Mar-22 HK Hols - No B/O periods 310.C.R0.X198 3310/5,6,6A - EBC no. 5,6,19 - Condition survey to Works Area 3310/6 (was C11_6C3) d/w - 10h/d - With 7 04-Oct-21 A 11-Oct-21 A 25-Oct-23 25-Oct-23 HK Hols - No B/O periods CC#4.7 - 3310/6A - EBC no. 5,6,19 - Site Preparation Works (was C11_6C3) d/w - 10h/d - With HK Hols7 - No B/O 0periods (was 04-Oct-21 C3) A 11-Oct-21 A 30-Mar-22 30-Mar-22 310.C.R0.X186 3310/5,6,6A - EBC no. 5,6,19 - Access to Works Area 3310/6A C11_6 d/w - 10h/d - With 0 04-Oct-21 A 30-Mar-22 HK Hols - No B/O periods 310.C.R0.X202 3310/5,6,6A - EBC no. 5,6,19 - Condition survey to Works Area 3310/6A (was C11_6C3) d/w - 10h/d - With 7 04-Oct-21 A 11-Oct-21 A 30-Mar-22 30-Mar-22 HK Hols - No B/O periods CC#4.7 - 3310/7 - EBC no. 5,6,19 - Site Preparation Works (was C11_6C3) d/w - 10h/d - With HK Hols7 - No B/O 0periods (was 05-Sep-22 C3) 13-Sep-22 05-Sep-22 25-Oct-23 331 310.C.R0.X190 3310/5,6,6A - EBC no. 5,6,19 - Access to Works Area 3310/7 C11_6 d/w - 10h/d - With 0 05-Sep-22* 05-Sep-22 0 HK Hols - No B/O periods 310.C.R0.X206 3310/5,6,6A - EBC no. 5,6,19 - Condition survey to Works Area 3310/7 (was C11_6C3) d/w - 10h/d - With 7 05-Sep-22 13-Sep-22 17-Oct-23 25-Oct-23 331 HK Hols - No B/O periods CC#4.7 - 3310/5,6,6A,7 - EBC no. 5,6,19 - Ground Investigation & Instrumentation Monitoring (was C3) 66 0 02-Sep-23 21-Nov-23 16-Oct-23 25-Nov-23 4 310.C.R0.X210 3310/5,6,6A - EBC no. 5,6,19 - Plant mobilization C11_6 d/w - 10h/d - With 4 02-Sep-23 06-Sep-23 25-Oct-23 28-Oct-23 42 HK Hols - No B/O periods 310.C.R0.X226 3310/5,6,6A - EBC no. 5,6,19 - install surface movement marker on ground [6nos. (was C3) C11_6 d/w - 10h/d - With 21 07-Sep-23 03-Oct-23 30-Oct-23 22-Nov-23 42 @7d/no.; 2wf] HK Hols - No B/O periods 310.C.R0.X246 3310/5,6,6A - EBC no. 5 & 6 - install surface movement marker on ground [10nos. (was C11_6C3) d/w - 10h/d - With 35 14-Sep-23 27-Oct-23 16-Oct-23 25-Nov-23 25 @7d/no.; 2wf] HK Hols - No B/O periods 310.C.R0.X230 3310/5,6,6A - EBC no. 19 - install surface movement marker on top of box culvert [5nos. (was C11_6C3) d/w - 10h/d - With 21 20-Sep-23 16-Oct-23 16-Oct-23 09-Nov-23 20 @7d/no.; 2wf] HK Hols - No B/O periods 310.C.R0.X250 3310/5,6,6A - EBC no. 5 & 6 - install surface movement marker on top of box culvert (was C11_6C3) d/w - 10h/d - With 14 25-Oct-23 09-Nov-23 07-Nov-23 22-Nov-23 11 [4nos. @7d/no.; 2wf] HK Hols - No B/O periods 310.C.R0.X222 3310/5,6,6A - EBC no. 19 - review and agree installation level with PM (was C01_7C3) d/w - 10h/d - No HK 28 25-Oct-23 21-Nov-23 26-Oct-23 22-Nov-23 1 Hols - No B/O periods (was CC#4.7 - 3310/5,6,6A,7 - EBC no. 5,6 - R.C. Structure + Backfill C1) 451 59 30-Jan-22 A 02-Sep-23 23-Apr-22 03-Oct-23 24 CC#4.7 - EBC no. 5,19 - Stage 1 [Ch.0+050 to 1+553] 254 20 30-Jan-22 A 03-Jan-23 23-Apr-22 20-May-23 110 310.C.R0.X994 Mobilization + Instrumentation (install dewatering wells + pump test) C01_7 d/w - 10h/d - No HK 48 4 30-Jan-22 A 27-Feb-22 A 23-Apr-22 23-Apr-22 Hols - No B/O periods (was 310.C.R0.X434 EBC no. 5,19 - Stage 1 - open excavation [50,375m3 @ 450/m3/d, use 3 WF) C1) C11_6 d/w - 10h/d - With 39 2 28-Feb-22 A 28-Apr-22 23-Apr-22 21-May-22 19 HK Hols - No B/O periods 310.D.R0.L591.B01 EBC no. 5,19 - Form BA8 and grant consent for RC works (Outside DJM) (was C01_7C3) d/w - 10h/d - No HK 7 20-Apr-22 27-Apr-22 16-May-22 22-May-22 26 Hols - No B/O periods (was 310.D.R0.L596.B01 EBC no. 5,19 - Form BA10 and grant consent for RC works (Outside DJM) C1) C01_7 d/w - 10h/d - No HK 7 27-Apr-22 03-May-22 23-May-22 29-May-22 26 Hols - No B/O periods (was 310.C.R0.X658 EBC no. 5,19 - Stage 1 - prepare Plate Load Test report to PM C1) C11_6 d/w - 10h/d - With 6 29-Apr-22 06-May-22 23-May-22 28-May-22 19 HK Hols - No B/O periods 310.C.R1.L898 EBC no. 5,19 - Stage 1 (5~6 cells | 36 bays) - construct base slab, @ 6d/bay, use 6 WF (was C11_6C3) d/w - 10h/d - With 40 4 07-May-22 23-Jun-22 30-May-22 16-Jul-22 19 HK Hols - No B/O periods 310.C.R1.L902 EBC no. 5,19 - Stage 1 (5~6 cells | 36 bays) - construct wall & roof slab, @ 21d/bay, use 6 (was C11_6C3) d/w - 10h/d - With 134 8 28-May-22 05-Nov-22 21-Jun-22 28-Nov-22 19 WF HK Hols - No B/O periods 310.C.R1.L854 EBC no. 5,19 - Backfill Zone 1 (was C11_6C3) d/w - 10h/d - With 48 2 07-Nov-22 03-Jan-23 21-Mar-23 20-May-23 110 HK Hols - No B/O periods CC#4.7 - EBC no. 5,6,19 - Stage 2 [Ch.0+553 to 1+230] (was C3) 260 19 19-May-22 29-Mar-23 21-May-22 03-Oct-23 151 310.D.R0.L328 EBC no. 5,6,19 - Form BA8 and grant consent for RC works (after Area E1 DJM BA14) C01_7 d/w - 10h/d - No HK 7 19-May-22 25-May-22 21-May-22 27-May-22 2 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 57 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.R0.L332 EBC no. 5,6,19 - Form BA10 and grant consent for RC works (after Area E1 DJM BA14) C01_7 d/w - 10h/d - No HK 7 26-May-22 01-Jun-22 28-May-22 03-Jun-22 2 Hols - No B/O periods (was 310.C.R0.X970 EBC no. 5,6,19 - Stage 2 - open excavation [52,299m3 @ 450/m3/d, use 3 WF) C1) C11_6 d/w - 10h/d - With 43 2 02-Jun-22 23-Jul-22 04-Jun-22 25-Jul-22 1 HK Hols - No B/O periods 310.C.R0.X986 EBC no. 5,6,19 - Stage 2 - prepare Plate Load Test report to PM (was C11_6C3) d/w - 10h/d - With 6 25-Jul-22 30-Jul-22 26-Jul-22 01-Aug-22 1 HK Hols - No B/O periods 310.C.R1.L906 EBC no. 5,6,19 - Stage 2 (6~9 cells | 39 bays) - construct base slab, @ 6d/bay, use 6 WF (was C11_6C3) d/w - 10h/d - With 40 4 01-Aug-22 16-Sep-22 02-Aug-22 17-Sep-22 1 HK Hols - No B/O periods 310.C.R1.L910 EBC no. 5,6,19 - Stage 2 (6~9 cells | 39 bays) - construct wall & roof slab, @ 21d/bay, use (was C11_6C3) d/w - 10h/d - With 137 11 17-Aug-22 01-Feb-23 18-Aug-22 02-Feb-23 1 6 WF HK Hols - No B/O periods 310.C.R1.L850 EBC no. 5,6,19 - Backfill Zone 2 (was C11_6C3) d/w - 10h/d - With 48 2 02-Feb-23 29-Mar-23 07-Aug-23 03-Oct-23 151 HK Hols - No B/O periods CC#4.7 - EBC no. 5 - Stage 3 [Ch.0+030 to extg. outfall] BC Connection to Existing Outfall 5 (was C3) 141 9 25-Oct-22 17-Apr-23 29-Nov-22 08-Aug-23 93 310.C.R0.L1207.B02 EBC no. 5 - Form BA8 and grant consent for RC works C01_7 d/w - 10h/d - No HK 7 25-Oct-22 31-Oct-22 20-Dec-22 26-Dec-22 56 Hols - No B/O periods (was 310.C.R0.L1209.B02 EBC no. 5 - Form BA10 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 01-Nov-22 07-Nov-22 27-Dec-22 02-Jan-23 56 Hols - No B/O periods (was 310.C.R0.L1190 EBC no. 5 - Stage 3 - temporary drainage diversion works (starts after dry season 1 Nov) C1) C11_6 d/w - 10h/d - With 16 08-Nov-22 25-Nov-22 29-Nov-22 16-Dec-22 18 HK Hols - No B/O periods 310.C.R0.X974 EBC no. 5 - Stage 3 - excavation [2323m3 @ 150/m3/d, use 1 WF) + Plate load test (was C11_6C3) d/w - 10h/d - With 12 2 26-Nov-22 09-Dec-22 17-Dec-22 31-Dec-22 18 HK Hols - No B/O periods 310.C.R0.L1202 Stage 3 (3 cells|4 bays) - construct base slab,Wall & Roof Slab @21d/bay;@2 WF (Comp. (was C11_6C3) d/w - 10h/d - With 24 3 10-Dec-22 09-Jan-23 03-Jan-23 02-Feb-23 18 connection with extg. Outfall 5) HK Hols - No B/O periods 310.C.R0.L1226 Complete Connection to Outfall No. 5 (after RC Culvert at Stage 1 and Stage 2 (was C11_6C3) d/w - 10h/d - With 12 02-Feb-23 15-Feb-23 03-Feb-23 16-Feb-23 1 completed) HK Hols - No B/O periods 310.C.R1.L842 EBC no. 5 - Backfill Zone 3 (was C11_6C3) d/w - 10h/d - With 12 2 16-Feb-23 01-Mar-23 12-Jun-23 26-Jun-23 93 HK Hols - No B/O periods 310.C.R1.L830 Remove armour rock & Backfill drainage swale in 3310/6 (after outfall 5 diversion) (was C11_6C3) d/w - 10h/d - With 48 2 16-Feb-23 17-Apr-23 12-Jun-23 08-Aug-23 93 HK Hols - No B/O periods CC#4.7 - EBC no. 6 - Stage 4 [S13 to extg. outfall] BC Connection to Existing Outfall 6 (was C3) 199 6 25-Oct-22 27-Jun-23 17-Feb-23 28-Jun-23 1 310.C.R0.L1217.B02 EBC no. 6 - Form BA8 and grant consent for RC works C01_7 d/w - 10h/d - No HK 7 25-Oct-22 31-Oct-22 07-Mar-23 13-Mar-23 133 Hols - No B/O periods (was 310.C.R0.L1219.B02 EBC no. 6 - Form BA10 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 01-Nov-22 07-Nov-22 14-Mar-23 20-Mar-23 133 Hols - No B/O periods (was 310.C.R0.L1210 EBC no. 6 - Stage 4 - temporary drainage diversion work C1) C11_6 d/w - 10h/d - With 16 16-Feb-23 06-Mar-23 17-Feb-23 07-Mar-23 1 HK Hols - No B/O periods 310.C.R0.X978 EBC no. 6 - Stage 4 - excavation [2,073m3 @ 150/m3/d, use 1 WF) (was C11_6C3) d/w - 10h/d - With 12 2 07-Mar-23 20-Mar-23 08-Mar-23 21-Mar-23 1 HK Hols - No B/O periods 310.C.R0.L1218 Stage 4 (2~3 cells | 4 bays)-construct base slab,Wall & Roof Slab @21d/bay; @2 (was C11_6C3) d/w - 10h/d - With 25 1 20-Mar-23 21-Apr-23 21-Mar-23 22-Apr-23 1 WF(Comp. connection with extg. Outfall 6) HK Hols - No B/O periods 310.C.R0.L1230 Complete Connection to Outfall No. 6 (was C11_6C3) d/w - 10h/d - With 12 15-Apr-23 28-Apr-23 17-Apr-23 29-Apr-23 1 HK Hols - No B/O periods 310.C.R1.L846 EBC no. 6 - Backfill Zone 4 (was C11_6C3) d/w - 10h/d - With 12 2 29-Apr-23 13-May-23 02-May-23 15-May-23 1 HK Hols - No B/O periods 310.C.R1.L858 Remove armour rock & Backfill drainage swale in 3310/6A (after outfall 6 diversion) (was C11_6C3) d/w - 10h/d - With 48 1 29-Apr-23 27-Jun-23 02-May-23 28-Jun-23 1 HK Hols - No B/O periods CC#4.7 - EBC no. 5,6,19 - Stage 5 [Ch.0+428 to 1+215] BC Connection to Extg. done by 3802 at 3310/5 (was C3) 413 5 14-Apr-22 02-Sep-23 03-Feb-23 05-Sep-23 2 310.C.R1.L917.B02 EBC no. 5,6,19 - Form BA8 and grant consent for RC works C01_7 d/w - 10h/d - No HK 7 14-Apr-22 20-Apr-22 04-Apr-23 10-Apr-23 355 Hols - No B/O periods (was 310.C.R1.L919.B02 EBC no. 5,6,19 - Form BA10 and grant consent for RC works C1) C01_7 d/w - 10h/d - No HK 7 21-Apr-22 27-Apr-22 11-Apr-23 17-Apr-23 355 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 58 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.R0.L1234 Area 3310/5 Start works C01_7 d/w - 10h/d - No HK 1 11-Jan-23 11-Jan-23 03-Feb-23 03-Feb-23 23 Hols - No B/O periods (was 310.D.R0.L340 Box culvert by Contract <3802> completed in 3310/5 C1) C01_7 d/w - 10h/d - No HK 0 11-Jan-23 03-Feb-23 23 Hols - No B/O periods (was 310.C.R0.L1222 EBC no. 5,6,19 - Stage 5 - temporary diversion works C1) C11_6 d/w - 10h/d - With 33 02-Feb-23 11-Mar-23 04-Feb-23 14-Mar-23 2 HK Hols - No B/O periods 310.C.R0.X990 EBC no. 5,6,19 - Stage 5 - excavation [6,816m3 @ 300/m3/d, use 1 WF) (was C11_6C3) d/w - 10h/d - With 25 2 13-Mar-23 14-Apr-23 15-Mar-23 17-Apr-23 2 HK Hols - No B/O periods 310.C.R1.L918 EBC no. 5,6,19 - Stage 5 (9 cells | 7 bays) - construct base slab, wall & roof @ 21d/bay, (was C11_6C3) d/w - 10h/d - With 81 15-Apr-23 22-Jul-23 18-Apr-23 25-Jul-23 2 use 2 WF HK Hols - No B/O periods 310.C.R0.L1238 Complete Connection to 3802 (Comp Permanent Diversion of BC5,6,19 to BC by Contract (was C11_6C3) d/w - 10h/d - With 12 24-Jul-23 05-Aug-23 26-Jul-23 08-Aug-23 2 <3802>) HK Hols - No B/O periods 310.C.R1.L926 Remove armour rock & Backfill drainage swale in 3310/5 (after diversion to BC by (was C11_6C3) d/w - 10h/d - With 24 2 07-Aug-23 02-Sep-23 08-Aug-23 05-Sep-23 2 Contract <3802>) HK Hols - No B/O periods 310.C.R1.L838 EBC no. 5,6,19 - Backfill Zone 5 (was C11_6C3) d/w - 10h/d - With 24 1 07-Aug-23 02-Sep-23 08-Aug-23 05-Sep-23 2 HK Hols - No B/O periods CC#4.7 - 3310/5,6,6A,7 - EBC no. 5,6,19 - Metal Work and Gate Installation (was C11_6C3) d/w - 10h/d - With HK Hols 60- No B/O 0periods (was 09-Jun-23 C3) 19-Aug-23 27-Jul-23 06-Oct-23 39 310.C.R1.L894 EBC no. 5,6,19 - metal work/ gate installation for desilting chamber C11_6 d/w - 10h/d - With 60 09-Jun-23 19-Aug-23 27-Jul-23 06-Oct-23 39 HK Hols - No B/O periods CC#04 - 3310/4,9,9A - Aviation Fuel and Hydrant System (AFHS) | Interface Work Area 3310/IA/5-2 (was C3) 547 88 07-Apr-22 06-Feb-24 14-Jun-22 15-Feb-24 6 CC#4 - AFHS - Site Preparation C11_6 d/w - 10h/d - With HK Hols 58- No B/O 0periods (was 07-Apr-22 C3) 18-Jun-22 14-Jun-22 20-Aug-22 53 310.C.EX.U519 3310/IA/5-1 (AFHS Section 1) - Site preparation and liaison with AA for Permit to Work C11_6 d/w - 10h/d - With 58 07-Apr-22 18-Jun-22 14-Jun-22 20-Aug-22 53 HK Hols - No B/O periods CC#4 - AFHS Section 1 - AFHS [Before Commissioning of the Interim 2RS] (was C3) 165 6 19-Jun-22 04-Jan-23 22-Aug-22 21-Feb-23 37 CC#4 - AFHS Section 1 -South - ISO Chamber C23_4d/w - NOTAM (M,W,Th,Su-01:30-07:30) 20 0 - No HK 25-Sep-22 Hols - With B/O 08-Dec-22 Periods & Flight31-Oct-22 Checks 15-Jan-23 9 310.C.EX.U520 3310/IA/5-1 (AFHS Section 1) - ISO Chamber (ISO-AFL-1) (airside operational area) C23_4d/w - NOTAM 20 25-Sep-22 08-Dec-22 31-Oct-22 15-Jan-23 9 [NOTAM] (M,W,Th,Su-01:30-07:30) - 310.C.EX.U523 3310/IA/5-1 (AFHS Section 1) - ISO Chamber (ISO-AFM-1) (airside operational area) No HK Hols- -NOTAM C23_4d/w With B/O 20 25-Sep-22 08-Dec-22 31-Oct-22 15-Jan-23 9 [NOTAM] (M,W,Th,Su-01:30-07:30) - CC#4 - AFHS Section 1 -South - AFHS Pipe (AF-L969 to AF-L820 and AF-M920 to AF-M830) No HK Hols - With B/O 165 6 19-Jun-22 04-Jan-23 22-Aug-22 21-Feb-23 37 CC#4 - AFHS Section 1 -South - AFHS Pipe - VE+ELS Installation 109 6 19-Jun-22 28-Oct-22 22-Aug-22 16-Feb-23 90 310.C.EX.H100.B01 3310/IA/5-1 (AFHS Section 1) - Mobilization + instrumentation + UU Detection (NOTAM) C23_4d/w - NOTAM 12 19-Jun-22 07-Jul-22 22-Aug-22 11-Sep-22 37 (M,W,Th,Su-01:30-07:30) - 310.C.EX.H110.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Install Sheet Pile (746 nos. @15no./day/rig; use No HK Hols- -NOTAM C23_4d/w With B/O 28 3 10-Jul-22 25-Aug-22 12-Sep-22 11-Dec-22 37 2rigs)(NOTAM) (M,W,Th,Su-01:30-07:30) - 310.C.EX.H125.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Submit Form BA14 No HK d/w C01_7 Hols- -10h/d With B/O - No HK 12 25-Aug-22 05-Sep-22 11-Dec-22 23-Dec-22 109 Hols - No B/O periods (was 310.C.EX.H130.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 06-Sep-22 12-Sep-22 23-Dec-22 30-Dec-22 109 Hols - No B/O periods (was 310.C.EX.H135.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 13-Sep-22 19-Sep-22 30-Dec-22 06-Jan-23 109 Hols - No B/O periods (was 310.C.EX.H140.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Excavation and struts installation [6,043m3 C1) C11_6 d/w - 10h/d - With 32 3 20-Sep-22 28-Oct-22 06-Jan-23 16-Feb-23 90 @200m3/d/2wf, 3 layers @ 6d/layer] HK Hols - No B/O periods CC#4 - AFHS Section 1 -South - AFHS Pipe - Pipe laying (was C11_6C3) d/w - 10h/d - With HK Hols 22- No B/O 0periods (was 08-Dec-22 C3) 04-Jan-23 26-Jan-23 21-Feb-23 37 310.C.EX.U526 3310/IA/5-1 (AFHS Section 1) - AFHS Pipe laying DN600 (AF-L969 to AF-L820) (airside C11_6 d/w - 10h/d - With 22 08-Dec-22 04-Jan-23 26-Jan-23 21-Feb-23 37 operational area) HK Hols - No B/O periods 310.C.EX.U526.B01 3310/IA/5-1 (AFHS Section 1) - AFHS Pipe laying DN600 (AF-M920 to AF-M830) (airside (was C11_6C3) d/w - 10h/d - With 22 08-Dec-22 04-Jan-23 26-Jan-23 21-Feb-23 37 operational area) HK Hols - No B/O periods CC#4 - AFHS Section 1 - North Section - Temporary Filling Point (Outside Works Area) (was C3) 91 0 26-Oct-22 15-Feb-23 26-Oct-22 22-Mar-23 30 310.C.EX.U488 Commencement of Works (after the Interim Security Fence Completion) C11_6 d/w - 10h/d - With 0 26-Oct-22 26-Oct-22 0 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 59 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.U480 AFHS Section 1 - Construction of Temporary Filling Point at Contract 3310 Area (airside C23_4d/w - NOTAM 28 27-Oct-22 15-Feb-23 12-Jan-23 22-Mar-23 20 operational area) [NOTAM] (M,W,Th,Su-01:30-07:30) - CC#4 - AFHS Section 1 - Middle Section - AFHS Pipe (AF-L820 to AF-L150 and AF-M830 to AF-M150) No HK Hols - With B/O 107 21 26-Oct-22 04-Mar-23 26-Oct-22 04-Mar-23 0 CC#4 - AFHS Section 1 -Middle - AFHS Pipe - VE+ELS Installation 93 9 26-Oct-22 16-Feb-23 26-Oct-22 16-Feb-23 0 310.C.EX.H200.B01 3310/IA/5-1 (AFHS Section 1) - Mobilization + instrumentation + UU Detection C11_6 d/w - 10h/d - With 12 26-Oct-22 08-Nov-22 26-Oct-22 08-Nov-22 0 HK Hols - No B/O periods 310.C.EX.H207.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Excavation [8,434m3 @600m3/d/wf] (was C11_6C3) d/w - 10h/d - With 16 2 09-Nov-22 26-Nov-22 13-Dec-22 31-Dec-22 29 HK Hols - No B/O periods 310.C.EX.H203.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Install Sheet Pile Ch.579-830 (1,255 no. (was C11_6C3) d/w - 10h/d - With 25 2 09-Nov-22 07-Dec-22 09-Nov-22 07-Dec-22 0 @15no./d/rig; 4rigs) HK Hols - No B/O periods 310.C.EX.H209.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 8 28-Nov-22 07-Dec-22 16-Dec-22 27-Dec-22 16 HK Hols - No B/O periods 310.C.EX.H211.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Pumping test and submit report (was C01_7C3) d/w - 10h/d - No HK 6 2 08-Dec-22 13-Dec-22 28-Dec-22 02-Jan-23 20 Hols - No B/O periods (was 310.C.EX.H212.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 12 08-Dec-22 19-Dec-22 08-Dec-22 19-Dec-22 0 Hols - No B/O periods (was 310.C.EX.H213.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 20-Dec-22 26-Dec-22 20-Dec-22 26-Dec-22 0 Hols - No B/O periods (was 310.C.EX.H214.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 27-Dec-22 02-Jan-23 27-Dec-22 02-Jan-23 0 Hols - No B/O periods (was 310.C.EX.H216.B01 3310/IA/5-1 (AFHS Section 1) - ELS - Excavation [43,656m3 @600m3/d/4wf, 3 layers @ C1) C11_6 d/w - 10h/d - With 36 3 03-Jan-23 16-Feb-23 03-Jan-23 16-Feb-23 0 6d/layer] HK Hols - No B/O periods CC#4 - AFHS Section 1 -Middle - AFHS Pipe - Pipe laying (was C11_6C3) d/w - 10h/d - With HK Hols 34- No B/O12 periods (was 21-Jan-23 C3) 04-Mar-23 21-Jan-23 04-Mar-23 0 310.C.EX.H215.B01 3310/IA/5-1 (AFHS Section 1) - AFHS Pipe laying DN600 (AF-L820 to AF-L150) C11_6 d/w - 10h/d - With 34 6 21-Jan-23 04-Mar-23 21-Jan-23 04-Mar-23 0 HK Hols - No B/O periods 310.C.EX.H220.B01 3310/IA/5-1 (AFHS Section 1) - AFHS Pipe laying DN600 (AF-M830 to AF-M150) (was C11_6C3) d/w - 10h/d - With 34 6 21-Jan-23 04-Mar-23 21-Jan-23 04-Mar-23 0 HK Hols - No B/O periods CC#4 - AFHS Section 1 - North Section - (AF-L150 to AF-L0 & AF-M150 to AF-M0) (was C3) 145 9 26-Oct-22 24-Apr-23 26-Oct-22 24-Apr-23 0 CC#4 - AFHS Section 1 -North - AFHS Pipe - VE+ELS Installation 79 7 26-Oct-22 31-Jan-23 26-Oct-22 31-Jan-23 0 310.C.EX.H225.B01 3310/IA/5-2a (AFHS Section 1) - Mobilization + instrumentation + UU Detection C11_6 d/w - 10h/d - With 8 26-Oct-22 03-Nov-22 26-Oct-22 03-Nov-22 0 HK Hols - No B/O periods 310.C.EX.H232.B01 3310/IA/5-2a (AFHS Section 1) - ELS - Install Sheet Pile (750 no. @15no./d/rig; 3rigs) (was C11_6C3) d/w - 10h/d - With 19 2 04-Nov-22 25-Nov-22 04-Nov-22 25-Nov-22 0 HK Hols - No B/O periods 310.C.EX.H233.B01 3310/IA/5-2a (AFHS Section 1) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 8 16-Nov-22 25-Nov-22 06-Dec-22 15-Dec-22 17 HK Hols - No B/O periods 310.C.EX.H234.B01 3310/IA/5-2a (AFHS Section 1) - ELS - Pumping test and submit report (was C01_7C3) d/w - 10h/d - No HK 6 2 26-Nov-22 01-Dec-22 16-Dec-22 21-Dec-22 20 Hols - No B/O periods (was 310.C.EX.H236.B01 3310/IA/5-2a (AFHS Section 1) - ELS - Submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 12 26-Nov-22 07-Dec-22 26-Nov-22 07-Dec-22 0 Hols - No B/O periods (was 310.C.EX.H237.B01 3310/IA/5-2a (AFHS Section 1) - ELS - Submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 08-Dec-22 14-Dec-22 08-Dec-22 14-Dec-22 0 Hols - No B/O periods (was 310.C.EX.H238.B01 3310/IA/5-2a (AFHS Section 1) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 15-Dec-22 21-Dec-22 15-Dec-22 21-Dec-22 0 Hols - No B/O periods (was 310.C.EX.H230.B01 3310/IA/5-2a (AFHS Section 1) - ELS - Excavation [7,331m3 @800m3/d/wf, 3 layers @ C1) C11_6 d/w - 10h/d - With 30 3 22-Dec-22 31-Jan-23 22-Dec-22 31-Jan-23 0 6d/layer] HK Hols - No B/O periods CC#4 - AFHS Section 1 -North - AFHS Pipe - Pipe laying (was C3) 72 2 21-Jan-23 24-Apr-23 21-Jan-23 24-Apr-23 0 310.C.EX.U421 3310/IA/5-2a ( AFHS Section 1) - AFHS Pipe DN600 (AF-L150 to AF-L0) + Connect to C11_6 d/w - 10h/d - With 49 21-Jan-23 22-Mar-23 21-Jan-23 22-Mar-23 0 ISO-AFH-2 HK Hols - No B/O periods 310.C.EX.U451 3310/IA/5-2a (AFHS Section 1) - AFHS Pipe DN600 (AF-M150 to AF-M0) + Connect to (was C11_6C3) d/w - 10h/d - With 49 21-Jan-23 22-Mar-23 21-Jan-23 22-Mar-23 0 ISO AFA-2 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 60 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.U530 3310/IA/5-2a (AFHS Section 1) - AFHS cabling works, install control panels, and Connect C23_4d/w - NOTAM 28 2 15-Feb-23 24-Apr-23 15-Feb-23 24-Apr-23 0 to ex. sys at ISO-AFL-1 (NOTAM) (M,W,Th,Su-01:30-07:30) - 310.C.EX.U534 3310/IA/5-2a (AFHS Section 1) - Complete of the whole Section 1 Connection (NOTAM) No HK Hols- -NOTAM C23_4d/w With B/O 0 24-Apr-23 24-Apr-23 0 (M,W,Th,Su-01:30-07:30) - CC#4 - AFHS Section 2 - AFHS [Before Commissioning of the Interim 2RS] No HK Hols- -NOTAM C23_4d/w With B/O(M,W,Th,Su-01:30-07:30) 110 12 - No HK 24-Nov-22 Hols - With B/O 27-Aug-23 Periods & Flight18-Dec-22 Checks 18-Sep-23 13 CC#4 - AFHS Section 2 - South - AFHS Pipe (AF-H0 to AF-H60 and AF-A0 to AF-A50) C23_4d/w - NOTAM (M,W,Th,Su-01:30-07:30) 110 12 - No HK 24-Nov-22 Hols - With B/O 27-Aug-23 Periods & Flight18-Dec-22 Checks 18-Sep-23 13 CC#4 - AFHS Section 2 - South - AFHS Pipe - VE+ELS Installation (AF-H0 to AF-H60) C23_4d/w - NOTAM (M,W,Th,Su-01:30-07:30) 52 4 - No HK 24-Nov-22 Hols - With B/O26-Apr-23 Periods & Flight18-Dec-22 Checks 20-Jul-23 37 310.C.EX.H300.B01 3310/IA/5-1 (AFHS Section 2) - Mobilization + instrumentation + UU Detection (NOTAM) C23_4d/w - NOTAM 12 24-Nov-22 14-Dec-22 18-Dec-22 16-Feb-23 13 (M,W,Th,Su-01:30-07:30) - 310.C.EX.H325.B01 3310/IA/5-1 (AFHS Section 2) - ELS - Install Sheet Piles (300 nos. @15no./day/rig; 1 rig) No HK Hols- -NOTAM C23_4d/w With B/O 22 2 15-Dec-22 05-Mar-23 19-Feb-23 27-Mar-23 13 (NOTAM) (M,W,Th,Su-01:30-07:30) - 310.C.EX.H330.B01 3310/IA/5-1 (AFHS Section 2) - ELS - Excavation and struts installation [525m3 No HK Hols- -NOTAM C23_4d/w With B/O 18 2 06-Mar-23 26-Apr-23 21-Jun-23 20-Jul-23 37 @200m3/d/wf, 2 layers @ 6d/layer] (NOTAM) (M,W,Th,Su-01:30-07:30) - CC#4 - AFHS Section 2 - South - AFHS Pipe - VE+ELS Installation (AF-A0 to AF-A50) No HK Hols- -NOTAM C23_4d/w With B/O(M,W,Th,Su-01:30-07:30) 60 4 - No HK 06-Mar-23 Hols - With B/O30-Jul-23 Periods & Flight29-Mar-23 Checks 21-Aug-23 13 310.C.EX.H310.B01 3310/IA/5-2a (AFHS Section 2) - ELS - Install Sheet Piles (250 nos. @15no./day/rig; 1 C23_4d/w - NOTAM 35 2 06-Mar-23 15-Jun-23 29-Mar-23 09-Jul-23 13 rigs) (NOTAM) (M,W,Th,Su-01:30-07:30) - 310.C.EX.H315.B01 3310/IA/5-2a (AFHS Section 2) - ELS - Excavation and struts installation [875m3 No HK Hols- -NOTAM C23_4d/w With B/O 25 2 18-Jun-23 30-Jul-23 10-Jul-23 21-Aug-23 13 @200m3/d/wf, 2 layers @ 6d/layer] (NOTAM (M,W,Th,Su-01:30-07:30) - CC#4 - AFHS Section 2 - South - AFHS Pipe - Pipe laying No HK Hols- -NOTAM C23_4d/w With B/O(M,W,Th,Su-01:30-07:30) 58 4 - No HK 27-Apr-23 Hols - With B/O 27-Aug-23 Periods & Flight23-Jul-23 Checks 18-Sep-23 13 310.C.EX.U449 3310/IA/5-1 (AFHS Section 2) - o/s WVT -AFHS Pipe laying DN600 (AF-H0 to AF-H60) C23_4d/w - NOTAM 18 2 27-Apr-23 18-Jun-23 23-Jul-23 21-Aug-23 37 (NOTAM (M,W,Th,Su-01:30-07:30) - 310.C.EX.U529 3310/IA/5-2a (AFHS Section 2) - o/s WVT - AFHS Pipe laying DN600 (AF-A0 to AF-A50) No HK Hols- -NOTAM C23_4d/w With B/O 16 2 31-Jul-23 27-Aug-23 23-Aug-23 18-Sep-23 13 (NOTAM (M,W,Th,Su-01:30-07:30) - CC#4 - AFHS Section 2 - South Section - AFHS Pipe (AF-H60 to AF-H230 and AF-A50 to AF-A180) No HK Hols - With B/O 316 16 28-Nov-22 19-Dec-23 21-Feb-23 14-Jan-24 19 AFHS Section 2 - South - AFHS Pipe - VE+ELS Installation (AF-H100 to AF-H230 and AF-A50 to AF-A180) 177 14 28-Nov-22 06-Jul-23 21-Feb-23 28-Aug-23 45 310.C.EX.H610.B1 3310/IA/5-2a (AFHS Section 2) - ELS - Pipe Piles (182 nos. @2days/no./rig; 4rigs) C11_6 d/w - 10h/d - With 100 9 28-Nov-22 29-Mar-23 21-Feb-23 24-Jun-23 68 HK Hols - No B/O periods 310.C.EX.H209.B1 3310/IA/5-2a (AFHS Section 2) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 8 20-Mar-23 29-Mar-23 06-Jul-23 15-Jul-23 85 HK Hols - No B/O periods 310.C.EX.H211.B1 3310/IA/5-2a (AFHS Section 2) - ELS - Pumping test and submit report (was C01_7C3) d/w - 10h/d - No HK 6 2 30-Mar-23 04-Apr-23 16-Jul-23 21-Jul-23 108 Hols - No B/O periods (was 310.C.EX.H625.B1 3310/IA/5-2a (AFHS Section 2) - ELS - Submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 12 30-Mar-23 10-Apr-23 26-Jun-23 07-Jul-23 88 Hols - No B/O periods (was 310.C.EX.H630.B1 3310/IA/5-2a (AFHS Section 2) - ELS - Submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 14-May-23 20-May-23 08-Jul-23 14-Jul-23 55 Hols - No B/O periods (was 310.C.EX.H635.B1 3310/IA/5-2a (AFHS Section 2) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 21-May-23 27-May-23 15-Jul-23 21-Jul-23 55 Hols - No B/O periods (was 310.C.EX.H640.B1 3310/IA/5-2a (AFHS Section 2) - ELS - Excavation and struts installation [3,613m3 C1) C11_6 d/w - 10h/d - With 32 3 29-May-23 06-Jul-23 22-Jul-23 28-Aug-23 45 @800m3/d/wf, 4 layers @ 6d/layer] HK Hols - No B/O periods CC#4 - AFHS Section 2 - South - AFHS Pipe - Pipe laying (was C3) 139 2 07-Jul-23 19-Dec-23 29-Aug-23 14-Jan-24 19 310.C.EX.U533.B01 3310/IA/5-2a (AFHS Section 2) - o/s WVT - AFHS Pipe laying (AF-H100 to AF-H195) C11_6 d/w - 10h/d - With 40 07-Jul-23 22-Aug-23 29-Aug-23 16-Oct-23 45 HK Hols - No B/O periods 310.C.EX.U535.B01 3310/IA/5-2a (AFHS Section 2) - o/s WVT - AFHS Pipe laying (AF-A50 to AF-A145) (was C11_6C3) d/w - 10h/d - With 40 28-Aug-23 14-Oct-23 19-Sep-23 07-Nov-23 19 HK Hols - No B/O periods 310.C.EX.U533 3310/IA/5-2a (AFHS Section 2) - o/s WVT - AFHS Pipe laying (AF-H60 to AF-H100) (was C11_6C3) d/w - 10h/d - With 8 2 19-Sep-23 27-Sep-23 23-Nov-23 01-Dec-23 53 HK Hols - No B/O periods 310.C.EX.U453 3310/IA/5-2a - South ELS backfill to +6.5 (was C11_6C3) d/w - 10h/d - With 30 16-Oct-23 20-Nov-23 08-Nov-23 12-Dec-23 19 HK Hols - No B/O periods 310.C.EX.U730 3310/IA/5-2a - South ELS Area - complete remaining AGL and Pavement (was C11_6C3) d/w - 10h/d - With 25 21-Nov-23 19-Dec-23 13-Dec-23 13-Jan-24 19 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 61 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.U734 3310/IA/5-2a - South ELS Area - achieve KD-5H C01_7 d/w - 10h/d - No HK 0 19-Dec-23 14-Jan-24 26 Hols - No B/O periods (was CC#4 - AFHS Section 2 - Inside WVT - AFHS Pipe (AF-A180 to AF-A595 and AF-H230 to AF-H645) C1) C11_6 d/w - 10h/d - With HK Hols 90- No B/O 0periods (was 03-Oct-23 C3) 19-Jan-24 28-Oct-23 15-Feb-24 21 CC#4 - AFHS Section 2 - Inside WVT - AFHS Pipe - Pipe laying C11_6 d/w - 10h/d - With HK Hols 90- No B/O 0periods (was 03-Oct-23 C3) 19-Jan-24 28-Oct-23 15-Feb-24 21 310.C.EX.U430 3310/IA/5-2a (AFHS Section 2) - Plinth for 2 x DN600 AFHS Pipe (inside WVT) C11_6 d/w - 10h/d - With 30 03-Oct-23 07-Nov-23 28-Oct-23 01-Dec-23 21 HK Hols - No B/O periods 310.C.EX.U433 3310/IA/5-2a (AFHS Section 2) - Pipe Laying DN600 AFHS Pipe (AF-A180 ~ A595 ) (was C11_6C3) d/w - 10h/d - With 60 08-Nov-23 19-Jan-24 02-Dec-23 15-Feb-24 21 (inside WVT) HK Hols - No B/O periods 310.C.EX.U433.B01 3310/IA/5-2a (AFHS Section 2) - Pipe Laying DN600 AFHS Pipe (AF-H230 ~ H645 ) (was C11_6C3) d/w - 10h/d - With 60 08-Nov-23 19-Jan-24 02-Dec-23 15-Feb-24 21 (inside WVT) HK Hols - No B/O periods CC#4 - AFHS Section 2 - North Section - (AF-H645 to AF-H700 & AF-A595 to AF-A650) (was C3) 267 18 17-Jan-23 09-Dec-23 10-Mar-23 16-Dec-23 6 CC#4 - AFHS Section 2 - North - AFHS Pipe - VE+ELS Installation 153 12 17-Jan-23 26-Jul-23 10-Mar-23 18-Aug-23 20 310.C.EX.H810.B01 3310/IA/5-2a (AFHS Section 2) - ELS - Install Pipe Pile (154 no. @2day/no./rig; 3rigs) C11_6 d/w - 10h/d - With 85 8 17-Jan-23 04-May-23 10-Mar-23 24-Jun-23 42 HK Hols - No B/O periods 310.C.EX.H815.B01 3310/IA/5-2a (AFHS Section 2) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 12 20-Apr-23 04-May-23 03-Jul-23 15-Jul-23 59 HK Hols - No B/O periods 310.C.EX.H820.B01 3310/IA/5-2a (AFHS Section 2) - ELS - Pumping test and submit report (was C01_7C3) d/w - 10h/d - No HK 6 2 05-May-23 10-May-23 16-Jul-23 21-Jul-23 72 Hols - No B/O periods (was 310.C.EX.H825.B01 3310/IA/5-2a (AFHS Section 2) - ELS - Submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 12 05-May-23 16-May-23 26-Jun-23 07-Jul-23 52 Hols - No B/O periods (was 310.C.EX.H830.B01 3310/IA/5-2a (AFHS Section 2) - ELS - Submit Form BA8 for excavation C1) d/w - 10h/d - No HK C01_7 7 14-Jun-23 20-Jun-23 08-Jul-23 14-Jul-23 24 Hols - No B/O periods (was 310.C.EX.H836.B01 3310/IA/5-2a (AFHS Section 2) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 21-Jun-23 27-Jun-23 15-Jul-23 21-Jul-23 24 Hols - No B/O periods (was 310.C.EX.H840.B01 3310/IA/5-2a (AFHS Section 2) - ELS - Excavation and struts installation [3,168m3 C1) C11_6 d/w - 10h/d - With 24 2 28-Jun-23 26-Jul-23 22-Jul-23 18-Aug-23 20 @200m3/d/wf, 3 layers @ 6d/layer] HK Hols - No B/O periods CC#4 - AFHS Section 2 - North - AFHS Pipe - Pipe laying (was C11_6C3) d/w - 10h/d - With HK Hols 33- No B/O 6periods (was 01-Nov-23 C3) 09-Dec-23 08-Nov-23 16-Dec-23 6 310.C.EX.U427 AFHS - WVT Completion of Zone 6 backfill to +6.0 C11_6 d/w - 10h/d - With 0 01-Nov-23 08-Nov-23 6 HK Hols - No B/O periods 310.C.EX.U443 3310/IA/5-2a (AFHS Section 2) - (o/s WVT) Pipe Laying (AF-H645 ~ H700) + WT-AFH-1 (was C11_6C3) d/w - 10h/d - With 33 3 02-Nov-23 09-Dec-23 09-Nov-23 16-Dec-23 6 HK Hols - No B/O periods 310.C.EX.U443.B01 3310/IA/5-2a (AFHS Section 2) - (o/s WVT) Pipe Laying (AF-A595 ~ A650) + WT-AFH-2 (was C11_6C3) d/w - 10h/d - With 33 3 02-Nov-23 09-Dec-23 09-Nov-23 16-Dec-23 6 HK Hols - No B/O periods CC#4 - AFHS Section 2 - North Section - (AF-H700 to AF-H910 & AF-A650 to AF-A854) (was C11_6C3) d/w - 10h/d - With HK Hols 161- No B/O 6periods (was 27-Jul-23 C3) 06-Feb-24 19-Aug-23 15-Feb-24 6 CC#4 - AFHS Section 2 - North - AFHS Pipe - ELS Installation C11_6 d/w - 10h/d - With HK Hols 32- No B/O 2periods (was 27-Jul-23 C3) 01-Sep-23 19-Aug-23 25-Sep-23 20 310.C.EX.H850.B02 3310/IA/5-2a (AFHS Section 2) - Preparation and Mobilization C11_6 d/w - 10h/d - With 8 27-Jul-23 04-Aug-23 19-Aug-23 28-Aug-23 20 HK Hols - No B/O periods 310.C.EX.H860.B02 3310/IA/5-2a (AFHS Section 2) - ELS - Excavation [2,457m3 @600m3/d/wf, Assumed 3 (was C11_6C3) d/w - 10h/d - With 24 2 05-Aug-23 01-Sep-23 29-Aug-23 25-Sep-23 20 layers @ 6d/layer] HK Hols - No B/O periods CC#4 - AFHS Section 2 - North - AFHS Pipe - Pipe laying (was C11_6C3) d/w - 10h/d - With HK Hols 129- No B/O 4periods (was 02-Sep-23 C3) 06-Feb-24 26-Sep-23 15-Feb-24 6 310.C.EX.H900.B02 3310/IA/5-2a (AFHS Section 2) - Construction of WT-AF & VT-AF Pit box C11_6 d/w - 10h/d - With 28 02-Sep-23 06-Oct-23 26-Sep-23 31-Oct-23 20 HK Hols - No B/O periods 310.C.EX.H870.B02 3310/IA/5-2a (AFHS Section 2) - (o/s WVT) Pipe Laying (AF-H700 ~ H910) + ISO-AFH-2 (was C11_6C3) d/w - 10h/d - With 23 2 16-Sep-23 14-Oct-23 12-Oct-23 08-Nov-23 20 HK Hols - No B/O periods 310.C.EX.H880.B02 3310/IA/5-2a (AFHS Section 2) - (o/s WVT) Pipe Laying (AF-A650 ~ A854) + ISO-AFA-1 (was C11_6C3) d/w - 10h/d - With 22 2 18-Sep-23 14-Oct-23 13-Oct-23 08-Nov-23 20 HK Hols - No B/O periods 310.C.EX.U447 3310/IA/5-2a (AFHS Section 2) - connection to ISO-AFA-1 and ISO-AFH-2 (was C11_6C3) d/w - 10h/d - With 30 11-Dec-23 17-Jan-24 18-Dec-23 24-Jan-24 6 HK Hols - No B/O periods 310.C.EX.U444 3310/IA/5-2a (AFHS Section 2) - North ELS backfill to +6.5 (was C11_6C3) d/w - 10h/d - With 25 09-Jan-24 06-Feb-24 16-Jan-24 15-Feb-24 6 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 62 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.U461 3310/IA/5-2a (AFHS Section 2) - connection to existing AFHS at ISO-269-17 C11_6 d/w - 10h/d - With 10 18-Jan-24 29-Jan-24 25-Jan-24 05-Feb-24 6 HK Hols - No B/O periods 310.C.EX.U455 3310/IA/5-2a (AFHS Section 2) - Complete connection of AFHS at WVT North (was C11_6C3) d/w - 10h/d - With 0 06-Feb-24 15-Feb-24 6 HK Hols - No B/O periods 310.C.EX.U465 3310/IA/5-2a (AFHS Section 2) - complete connection of the whole Section 2 AFHS (was C11_6C3) d/w - 10h/d - With 0 06-Feb-24 15-Feb-24 6 HK Hols - No B/O periods AGL Diversion Works (PS 10.2.41) (was C3) 413 5 07-Jun-21 A 24-Oct-22 01-Jun-22 28-Mar-24 426 Step A - AGL Diversion (Before the Closure of Existing North Runway) 363 5 07-Jun-21 A 24-Aug-22 01-Jun-22 01-Sep-22 7 310.C.EX.L100 Coordinate with AAHK and CAD for Site Access of the Area C11_6 d/w - 10h/d - With 20 07-Jun-21 A 30-Jun-21 A 01-Jun-22 01-Jun-22 HK Hols - No B/O periods 310.C.EX.L110 Step A - 1st Round - Submit Method Statement of Detection of Existing UU Detection and (was C11_6C3) d/w - 10h/d - With 25 02-Jul-21 A 10-Aug-21 A 01-Jun-22 01-Jun-22 Existing AGL Diversion Works HK Hols - No B/O periods 310.C.EX.L114 Step A - 1st Round - PM Review Method Statement of Detection of Existing UU Detection (was C11_6C3) d/w - 10h/d - With 28 11-Aug-21 A 24-Aug-21 A 01-Jun-22 01-Jun-22 and Existing AGL Diversion Works HK Hols - No B/O periods 310.C.EX.L294 Step A - 2nd Round - Submit Method Statement of Detection of Existing UU Detection (was C11_6C3) d/w - 10h/d - With 7 25-Aug-21 A 16-Sep-21 A 01-Jun-22 01-Jun-22 and Existing AGL Diversion Works HK Hols - No B/O periods 310.C.EX.L298 Step A - 2nd Round - PM Review/Approved MS of Detection of Existing UU Detection (was C11_6C3) d/w - 10h/d - With 28 17-Sep-21 A 14-Oct-21 A 01-Jun-22 01-Jun-22 and Existing AGL Diversion Works HK Hols - No B/O periods 310.C.EX.L302 Step A - Apply Work Permit (was C01_7C3) d/w - 10h/d - No HK 21 02-Oct-21 A 22-Oct-21 A 01-Jun-22 01-Jun-22 Hols - No B/O periods (was 310.C.EX.L306 Step A - Trial Pits & Initial Survey (NOTAM) C1) C23_4d/w - NOTAM 16 27-Feb-22 A 29-May-22 01-Jun-22 06-Jun-22 5 (M,W,Th,Su-01:30-07:30) - 310.C.EX.L310 Step A - Install New Cable Duct and Cabling (NOTAM) No HK Hols- -NOTAM C23_4d/w With B/O 50 5 30-May-22 24-Aug-22 08-Jun-22 01-Sep-22 5 (M,W,Th,Su-01:30-07:30) - 310.C.EX.L314 Step A - Ready for Cable Diversion after the Closure of the Existing North Runway No HK Hols- -NOTAM C23_4d/w With B/O 0 24-Aug-22 01-Sep-22 5 (NOTAM) (M,W,Th,Su-01:30-07:30) - Step B - AGL Diversion (Before the Closure of Existing North Runway) No HK Hols - With B/O 18 0 01-Sep-22 22-Sep-22 08-Oct-22 28-Oct-22 29 310.C.EX.L124 Step B - Closure of Existing North Runway C01_7 d/w - 10h/d - No HK 0 01-Sep-22 08-Oct-22 37 Hols - No B/O periods (was 310.C.EX.L120 Step B - Divert AGL Cable(Change-Over) + T&C C1) C11_6 d/w - 10h/d - With 18 01-Sep-22 22-Sep-22 08-Oct-22 28-Oct-22 29 HK Hols - No B/O periods Step C - AGL Diversion Back to Original Alignment (Before the Opening for 3RS) (was C11_6C3) d/w - 10h/d - With HK Hols 25- No B/O 0periods (was 23-Sep-22 C3) 24-Oct-22 29-Feb-24 28-Mar-24 426 310.C.EX.L130 Step C - Divert Back AGL to Original Alignment (after modification of centre runway is C11_6 d/w - 10h/d - With 25 23-Sep-22 24-Oct-22 29-Feb-24 28-Mar-24 426 completed) HK Hols - No B/O periods ES (Interconnect Cable for AGL System) - Power Cable bet, Vault C and D (was C3) 257 0 23-Apr-22 01-Mar-23 07-Jul-23 28-Mar-24 321 310.C.WS.U000.B02 Coordinate with AAHK and TSD for the Detailed Information of the Scope of Works (i.e. C01_7 d/w - 10h/d - No HK 120 23-Apr-22 20-Aug-22 07-Jul-23 03-Nov-23 440 Meetings, SQs) Hols - No B/O periods (was 310.C.WS.U001.B02 Cross Passage Taxiway B6 & T - Carry Out Survey Check for Cable Ducts and Pits C1) C23_4d/w - NOTAM 12 23-May-22 12-Jun-22 14-Aug-23 03-Sep-23 184 (NOTAM) (M,W,Th,Su-01:30-07:30) - 310.C.WS.U005.B02 Cross Passage Taxiway B6 & T - Carry Out Cable Detection and Trial Pits (NOTAM) No HK Hols- -NOTAM C23_4d/w With B/O 12 13-Jun-22 03-Jul-22 04-Sep-23 24-Sep-23 184 (M,W,Th,Su-01:30-07:30) - West Side Area No HK d/w C11_6 Hols- -10h/d With B/O - With HK Hols 148- No B/O 0periods (was 01-Sep-22 C3) 01-Mar-23 29-Sep-23 28-Mar-24 321 310.C.WS.U010.B02 West Side Area - Carry Out Survey Check for Cable Ducts and Pits C11_6 d/w - 10h/d - With 14 01-Sep-22 17-Sep-22 29-Sep-23 17-Oct-23 321 HK Hols - No B/O periods 310.C.WS.U015.B02 West Side Area - Carry Out Cable Detection and Trial Pits (was C11_6C3) d/w - 10h/d - With 14 19-Sep-22 06-Oct-22 18-Oct-23 03-Nov-23 321 HK Hols - No B/O periods 310.C.WS.U020.B02 West Side Area - ES - New Power Cable to Vault D (was C11_6C3) d/w - 10h/d - With 120 07-Oct-22 01-Mar-23 04-Nov-23 28-Mar-24 321 HK Hols - No B/O periods East Side Area (was C11_6C3) d/w - 10h/d - With HK Hols 148- No B/O 0periods (was 01-Sep-22 C3) 01-Mar-23 29-Sep-23 28-Mar-24 321 310.C.WS.U025.B02 East Side Area - Carry Out Survey Check for Cable Ducts and Pits C11_6 d/w - 10h/d - With 14 01-Sep-22 17-Sep-22 29-Sep-23 17-Oct-23 321 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 63 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.WS.U030.B02 East Side Area - Carry Out Cable Detection and Trial Pits C11_6 d/w - 10h/d - With 14 19-Sep-22 06-Oct-22 18-Oct-23 03-Nov-23 321 HK Hols - No B/O periods 310.C.WS.U035.B02 East Side Area - ES - New Power Cable to Vault C (was C11_6C3) d/w - 10h/d - With 120 07-Oct-22 01-Mar-23 04-Nov-23 28-Mar-24 321 HK Hols - No B/O periods CC#4 - 3310/12 - West Support Area Civil Works (was C3) 415 0 04-Jul-22 21-Nov-23 04-Jul-22 24-Aug-24 225 310.C.WS.U002 3310/12 - Site Access C11_6 d/w - 10h/d - With 0 04-Jul-22* 04-Jul-22 0 HK Hols - No B/O periods 310.C.WS.U005 WSA DN - GI works & submit report (was C11_6C3) d/w - 10h/d - With 21 04-Jul-22 27-Jul-22 25-Jul-22 17-Aug-22 18 HK Hols - No B/O periods 310.C.WS.U006 WSA DN - GI works - PM review (was C11_6C3) d/w - 10h/d - With 28 28-Jul-22 29-Aug-22 18-Aug-22 20-Sep-22 18 HK Hols - No B/O periods 310.C.WS.U010 WSA DN - Submit BA8 consent application (was C01_7C3) d/w - 10h/d - No HK 7 30-Aug-22 05-Sep-22 21-Sep-22 27-Sep-22 22 Hols - No B/O periods (was 310.C.WS.U014 WSA DN - Submit BA10 notice of commencement of work C1) C01_7 d/w - 10h/d - No HK 7 06-Sep-22 12-Sep-22 28-Sep-22 04-Oct-22 22 Hols - No B/O periods (was CC#4 - 3310/12 - Zone 16DD C1) C11_6 d/w - 10h/d - With HK Hols 95- No B/O 0periods (was 13-Sep-22 C3) 05-Jan-23 05-Oct-22 18-Mar-23 59 Zone 16DD - Drainage C11_6 d/w - 10h/d - With HK Hols 80- No B/O 0periods (was 13-Sep-22 C3) 16-Dec-22 05-Oct-22 07-Jan-23 17 310.C.WS.U018 WSA DN - drainage DN2100 (L: 175m) + manholes (5 Nos) at GSE Area C11_6 d/w - 10h/d - With 60 13-Sep-22 23-Nov-22 05-Oct-22 13-Dec-22 17 HK Hols - No B/O periods 310.C.WS.U022 WSA DN - drainage DN1200/1050 (L:215m; DN750 (L: 48m) + manholes (3 nos) at (was C11_6C3) d/w - 10h/d - With 70 13-Sep-22 05-Dec-22 05-Oct-22 24-Dec-22 17 Forecourt Area HK Hols - No B/O periods 310.C.WS.U026 WSA DN - drainage DN2100/1800/1650/1350/900 (L:233m) + manholes (9 nos) @ (was C11_6C3) d/w - 10h/d - With 70 24-Sep-22 16-Dec-22 17-Oct-22 07-Jan-23 17 Landside Road HK Hols - No B/O periods Zone 16DD - Hydraulic Services (was C11_6C3) d/w - 10h/d - With HK Hols 30- No B/O 0periods (was 12-Nov-22 C3) 16-Dec-22 08-Dec-22 13-Jan-23 22 310.C.WS.U124 WSA PSFH - DN150 pipe laying + PWGV + PWSH & connect to Contract <3303> water C11_6 d/w - 10h/d - With 30 12-Nov-22 16-Dec-22 08-Dec-22 13-Jan-23 22 pipe HK Hols - No B/O periods Zone 16DD - CLP (was C11_6C3) d/w - 10h/d - With HK Hols 85- No B/O 0periods (was 13-Sep-22 C3) 22-Dec-22 19-Oct-22 18-Mar-23 69 310.C.WS.U082 WSA CLP - 132KV CLP Cable Duct ( 2x 234m) w/ Joint Bay C11_6 d/w - 10h/d - With 70 13-Sep-22 05-Dec-22 25-Oct-22 16-Jan-23 34 HK Hols - No B/O periods 310.C.WS.U062 WSA CLP - 11KV CLP Cable Duct (2 x 385m) (was C11_6C3) d/w - 10h/d - With 50 24-Sep-22 23-Nov-22 19-Oct-22 15-Dec-22 19 HK Hols - No B/O periods 310.C.WS.U066 WSA CLP - 11KV CLP Cable Duct (2 x 285m) (was C11_6C3) d/w - 10h/d - With 50 08-Oct-22 05-Dec-22 31-Oct-22 28-Dec-22 19 HK Hols - No B/O periods 310.C.WS.U070 WSA CLP - 11KV CLP Cable Duct (2 x 328m) (was C11_6C3) d/w - 10h/d - With 50 08-Oct-22 05-Dec-22 31-Oct-22 28-Dec-22 19 HK Hols - No B/O periods 310.C.WS.U074 WSA CLP - 11KV CLP Cable Duct (1 x 443m) (was C11_6C3) d/w - 10h/d - With 45 26-Oct-22 16-Dec-22 17-Nov-22 10-Jan-23 19 HK Hols - No B/O periods 310.C.WS.U078 WSA CLP - 11KV CLP Cable Duct (1 x 130m) (was C11_6C3) d/w - 10h/d - With 30 18-Nov-22 22-Dec-22 10-Dec-22 16-Jan-23 19 HK Hols - No B/O periods 310.C.WS.U332.B01 Achieved KD-04 - WSA 132kv CLP ducts and drawpits (was C11_6C3) d/w - 10h/d - With 0 05-Dec-22 18-Mar-23 84 HK Hols - No B/O periods Zone 16DD - Power/Comms/Tel (was C11_6C3) d/w - 10h/d - With HK Hols 60- No B/O 0periods (was 26-Oct-22 C3) 05-Jan-23 17-Nov-22 31-Jan-23 19 310.C.WS.U104 WSA Comm/Tel - duct with concrete surround and drawpits C11_6 d/w - 10h/d - With 50 26-Oct-22 22-Dec-22 17-Nov-22 16-Jan-23 19 HK Hols - No B/O periods 310.C.WS.U102 WSA Power - 2x2 200mm Power Cable Duct and drawpits (was C11_6C3) d/w - 10h/d - With 50 26-Oct-22 22-Dec-22 17-Nov-22 16-Jan-23 19 HK Hols - No B/O periods 310.C.WS.U136 WSA Comm/Tel - System Cable installation and connection (was C11_6C3) d/w - 10h/d - With 30 30-Nov-22 05-Jan-23 22-Dec-22 31-Jan-23 19 HK Hols - No B/O periods CC#4 - 3310/12 - Zone 16DB (was C11_6C3) d/w - 10h/d - With HK Hols 110- No B/O 0periods (was 24-Sep-22 C3) 07-Feb-23 17-Oct-22 07-Mar-23 24 Zone 16DB - Drainage C11_6 d/w - 10h/d - With HK Hols 90- No B/O 0periods (was 24-Sep-22 C3) 11-Jan-23 17-Oct-22 17-Feb-23 29
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 64 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.WS.U038 WSA DN - drainage DN1950/1350 (L:315m) + manholes (3nos) C11_6 d/w - 10h/d - With 75 24-Sep-22 22-Dec-22 17-Oct-22 13-Jan-23 17 HK Hols - No B/O periods 310.C.WS.U042 WSA DN - drainage DN450/1350 (L:29m) + manholes (2nos) (was C11_6C3) d/w - 10h/d - With 30 18-Nov-22 22-Dec-22 08-Dec-22 13-Jan-23 17 HK Hols - No B/O periods 310.C.WS.U046 WSA DN - drainage DN900/750 (L:55m) + manholes (3nos) (was C11_6C3) d/w - 10h/d - With 45 18-Nov-22 11-Jan-23 22-Dec-22 17-Feb-23 29 HK Hols - No B/O periods Zone 16DD - Hydraulic Services (was C11_6C3) d/w - 10h/d - With HK Hols 20- No B/O 0periods (was 23-Dec-22 C3) 17-Jan-23 14-Jan-23 09-Feb-23 17 310.C.WS.U128 WSA PSFH - DN150 pipe laying + PWGV + PWSH & connect to Contract <3303> water C11_6 d/w - 10h/d - With 20 23-Dec-22 17-Jan-23 14-Jan-23 09-Feb-23 17 pipe HK Hols - No B/O periods Zone 16DB - CLP (was C11_6C3) d/w - 10h/d - With HK Hols 60- No B/O 0periods (was 24-Nov-22 C3) 07-Feb-23 22-Dec-22 07-Mar-23 24 310.C.WS.U058 WSA CLP - 11KV CLP Cable Duct (L:695m) C11_6 d/w - 10h/d - With 60 24-Nov-22 07-Feb-23 22-Dec-22 07-Mar-23 24 HK Hols - No B/O periods Zone 16DB - Power/Comms/Tel (was C11_6C3) d/w - 10h/d - With HK Hols 65- No B/O 0periods (was 01-Nov-22 C3) 17-Jan-23 25-Nov-22 09-Feb-23 17 310.C.WS.U108 WSA Power - 2x2 200mm Power Cable Duct and drawpits C11_6 d/w - 10h/d - With 45 01-Nov-22 22-Dec-22 25-Nov-22 18-Jan-23 21 HK Hols - No B/O periods 310.C.WS.U112 WSA Comm/Tel - duct with concrete surround and drawpits (was C11_6C3) d/w - 10h/d - With 45 10-Nov-22 03-Jan-23 05-Dec-22 31-Jan-23 21 HK Hols - No B/O periods 310.C.WS.U132 WSA Comm/Tel - System Cable installation and connection (was C11_6C3) d/w - 10h/d - With 20 23-Dec-22 17-Jan-23 14-Jan-23 09-Feb-23 17 HK Hols - No B/O periods CC#4 - 3310/12 - Zone 17CC (was C11_6C3) d/w - 10h/d - With HK Hols 137- No B/O 0periods (was 13-Sep-22 C3) 27-Feb-23 13-Oct-22 18-Mar-23 17 Zone 17CC - Drainage C11_6 d/w - 10h/d - With HK Hols 80- No B/O 0periods (was 13-Sep-22 C3) 16-Dec-22 13-Oct-22 16-Jan-23 24 310.C.WS.U030 WSA DN - drainage DN1800/1350/1050 (L:571m) + manhole (6 nos) at Maintenance C11_6 d/w - 10h/d - With 80 13-Sep-22 16-Dec-22 13-Oct-22 16-Jan-23 24 Hanger HK Hols - No B/O periods Zone 17CC - CLP (was C11_6C3) d/w - 10h/d - With HK Hols 80- No B/O 0periods (was 24-Sep-22 C3) 29-Dec-22 17-Nov-22 31-Jan-23 24 310.C.WS.U090 WSA CLP - 11KV CLP Cable Duct ( 2 x 150m) C11_6 d/w - 10h/d - With 60 24-Sep-22 05-Dec-22 17-Nov-22 31-Jan-23 44 HK Hols - No B/O periods 310.C.WS.U034 WSA DN - Oil Separator DN450 (L:169m) + manhole (4 nos) at Maintenance Apron (was C11_6C3) d/w - 10h/d - With 60 20-Oct-22 29-Dec-22 17-Nov-22 31-Jan-23 24 HK Hols - No B/O periods 310.C.WS.U094 WSA CLP - 11KV CLP Cable Duct ( 1 x 171m) (was C11_6C3) d/w - 10h/d - With 45 07-Nov-22 29-Dec-22 05-Dec-22 31-Jan-23 24 HK Hols - No B/O periods Zone 17CC- Power/Comms/Tel (was C11_6C3) d/w - 10h/d - With HK Hols 65- No B/O 0periods (was 08-Dec-22 C3) 27-Feb-23 07-Jan-23 18-Mar-23 17 310.C.WS.U116 WSA Power - 1x1 200mm Power Cable Duct and drawpits C11_6 d/w - 10h/d - With 18 08-Dec-22 29-Dec-22 07-Jan-23 31-Jan-23 24 HK Hols - No B/O periods 310.C.WS.U120 WSA Comm/Tel - duct with concrete surround and drawpits (was C11_6C3) d/w - 10h/d - With 30 04-Jan-23 10-Feb-23 01-Feb-23 07-Mar-23 21 HK Hols - No B/O periods 310.C.WS.U118 WSA Power - 2x2- 150mm Power Cable Duct and drawpits (was C11_6C3) d/w - 10h/d - With 14 18-Jan-23 06-Feb-23 10-Feb-23 25-Feb-23 17 HK Hols - No B/O periods 310.C.WS.U140 WSA Comm/Tel - System Cable installation and connection (was C11_6C3) d/w - 10h/d - With 18 07-Feb-23 27-Feb-23 27-Feb-23 18-Mar-23 17 HK Hols - No B/O periods CC#4 - 3310/12 - Zone 17CA (was C11_6C3) d/w - 10h/d - With HK Hols 30- No B/O 0periods (was 23-Dec-22 C3) 01-Feb-23 19-Jan-23 25-Feb-23 21 310.C.WS.U050 WSA DN - drainage DN1200/1050 (L:170m) + manholes (1 nos) C11_6 d/w - 10h/d - With 30 23-Dec-22 01-Feb-23 19-Jan-23 25-Feb-23 21 HK Hols - No B/O periods 310.C.WS.U054 WSA DN - drainage DN450 (L:203m) + manholes (4 nos) (was C11_6C3) d/w - 10h/d - With 30 23-Dec-22 01-Feb-23 19-Jan-23 25-Feb-23 21 HK Hols - No B/O periods 3310/12 Airside and Landside Road Works (was C11_6C3) d/w - 10h/d - With HK Hols 165- No B/O 0periods (was 06-May-23 C3) 21-Nov-23 03-Feb-24 24-Aug-24 225 310.C.WS.U300 3310/12 (Zone 16D) - Landside WSA 003 Road - kerb, SB, BC, WC (L: 450m; 1710m3) C11_6 d/w - 10h/d - With 30 06-May-23 10-Jun-23 03-Feb-24 11-Mar-24 225 HK Hols - No B/O periods 310.C.WS.U308 3310/12 (Zone 16D) - Landside WSA 006 Road - kerb,SB, BC, WC (L: 55m; 284m3) (was C11_6C3) d/w - 10h/d - With 20 12-Jun-23 06-Jul-23 12-Mar-24 08-Apr-24 225 HK Hols - No B/O periods 310.C.WS.U304 3310/12 (Zone 16D) - Landside WSA 003 Road - road lighting, road markings (was C11_6C3) d/w - 10h/d - With 45 12-Jun-23 04-Aug-23 18-Mar-24 14-May-24 230 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 65 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.WS.U312 3310/12 (Zone 16D) - Landside WSA 006 Road - road lighting, road markings C11_6 d/w - 10h/d - With 30 07-Jul-23 10-Aug-23 09-Apr-24 14-May-24 225 HK Hols - No B/O periods 310.C.WS.U316 3310/12 (Zone 16D) - Airside WSA 002 Road - kerb,SB, BC, WC (L: 417m; 1963m3) (was C11_6C3) d/w - 10h/d - With 30 11-Aug-23 14-Sep-23 16-May-24 20-Jun-24 225 HK Hols - No B/O periods 310.C.WS.U324 3310/12 (Zone 16D) - Airside WSA 005 Road - kerb, SB, BC, WC (L: 112m; 717m3) (was C11_6C3) d/w - 10h/d - With 20 15-Sep-23 10-Oct-23 21-Jun-24 15-Jul-24 225 HK Hols - No B/O periods 310.C.WS.U320 3310/12 (Zone 16D) - Airside WSA 002 Road - road lighting, road markings (was C11_6C3) d/w - 10h/d - With 45 15-Sep-23 09-Nov-23 04-Jul-24 24-Aug-24 235 HK Hols - No B/O periods 310.C.WS.U328 3310/12 (Zone 16D) - Airside WSA 005 Road - road lighting, road markings (was C11_6C3) d/w - 10h/d - With 35 11-Oct-23 21-Nov-23 16-Jul-24 24-Aug-24 225 HK Hols - No B/O periods CC#4 - Interim Security Fence (Interim 2RS) (was C3) 902 0 14-Jun-21 A 25-Jun-24 06-Apr-22 25-Aug-24 51 CC#4 - Submission and Permit 319 0 14-Jun-21 A 16-Jun-22 16-May-22 10-Jul-22 19 310.U.RC.C002 Prepare and submit Method Statement of Installation of Int. Sec. Fence and associated C01_7 d/w - 10h/d - No HK 28 14-Jun-21 A 20-Sep-21 A 08-Jun-22 08-Jun-22 works Hols - No B/O periods (was 310.U.RC.C004 PM. AP. RSE. RGE review and approve Method Statement of Installation of Int. Sec. C1) C01_7 d/w - 10h/d - No HK 28 18-Aug-21 A 29-Sep-21 A 15-Jun-22 15-Jun-22 Fence and associated works Hols - No B/O periods (was 310.U.RC.C008 Prepare and submit proposed alignment of Int. Sec. Fence and location of Guard Post to C1) C01_7 d/w - 10h/d - No HK 28 24-Mar-22 A 27-Apr-22 16-May-22 12-Jun-22 46 PM,AP,RSE, RGE Hols - No B/O periods (was 310.U.RC.C016 Prepare and submit proposed monitoring points location to PM. AP. RSE. RGE C1) C01_7 d/w - 10h/d - No HK 28 31-Mar-22 27-Apr-22 16-May-22 12-Jun-22 46 Hols - No B/O periods (was 310.U.RC.C012 PM, AP, RSE, RGE, review and approve proposed alignment of Int. Sec. Fence and C1) C01_7 d/w - 10h/d - No HK 28 28-Apr-22 25-May-22 13-Jun-22 10-Jul-22 46 location of Guard Post Hols - No B/O periods (was 310.U.RC.C020 PM. AP. RSE. RGE. review and approve propose location of monitoring points C1) C01_7 d/w - 10h/d - No HK 28 28-Apr-22 25-May-22 13-Jun-22 10-Jul-22 46 Hols - No B/O periods (was 310.U.RC.C026 Apply Work Permit (Int. Security Fence) C1) C11_6 d/w - 10h/d - With 21 23-May-22 16-Jun-22 15-Jun-22 09-Jul-22 19 HK Hols - No B/O periods CC#4 - Preparation Works Before Interim 2RS (was C3) 131 0 17-Feb-22 A 04-Sep-22 06-Apr-22 30-Oct-22 45 310.C.RC.C000 Carry out survey check of existing AGL,/MAGS and above ground structure [NOTAM] C23_4d/w - NOTAM 21 17-Feb-22 A 31-Mar-22 06-Apr-22 10-Apr-22 5 (M,W,Th,Su-01:30-07:30) - 310.C.RC.C014 Interim Sec. Fence - Delivery of Materials to site storage area No HK d/w C01_7 Hols- -10h/d With B/O - No HK 28 23-May-22 19-Jun-22 07-Jun-22 04-Jul-22 15 Hols - No B/O periods (was 310.C.RC.C008 Interim Sec. Fence - Setting out alignment of marker board and Interim Sec. Fence C1) C23_4d/w - NOTAM 30 19-Jun-22 08-Aug-22 11-Jul-22 31-Aug-22 13 [NOTAM] (M,W,Th,Su-01:30-07:30) - 310.C.RC.C004 Interim Sec. Fence - Install monitoring points [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 30 23-Jun-22 14-Aug-22 11-Jul-22 31-Aug-22 10 (M,W,Th,Su-01:30-07:30) - Area 2a No HK d/w C01_7 Hols- -10h/d With B/O - No HK Hols15 - No B/O periods 0 (was21-Aug-22 C1) 04-Sep-22 16-Oct-22 30-Oct-22 56 310.C.RC.C100.B01 Area 2a - Implement Closure to Taxiway B (bet. Taxiway A1 - Taxilane M & bet. Taxilane C01_7 d/w - 10h/d - No HK 0 21-Aug-22 16-Oct-22 56 M - Taxilane N) Hols - No B/O periods (was 310.C.RC.C105.B01 Area 2a - Install Marker Board C1) C01_7 d/w - 10h/d - No HK 1 21-Aug-22 21-Aug-22 16-Oct-22 16-Oct-22 56 Hols - No B/O periods (was 310.C.RC.C110.B01 Area 2a - Install Concrete Block ELS for Pit Hydrant C1) C01_7 d/w - 10h/d - No HK 5 22-Aug-22 26-Aug-22 17-Oct-22 21-Oct-22 56 Hols - No B/O periods (was 310.C.RC.C115.B01 Area 2a - Levelling Work + Footing Installation C1) C01_7 d/w - 10h/d - No HK 13 22-Aug-22 03-Sep-22 17-Oct-22 29-Oct-22 56 Hols - No B/O periods (was 310.C.RC.C145.B01 Area 2a - Remove Marker Board and Open Taxiway B (bet. Taxiway A1 - Taxilane M & C1) C01_7 d/w - 10h/d - No HK 1 04-Sep-22 04-Sep-22 30-Oct-22 30-Oct-22 56 bet. Taxilane M - Taxilane N) Hols - No B/O periods (was Area 2b C1) 70 0 29-May-22 20-Aug-22 12-Sep-22 15-Oct-22 45 310.C.RC.C120.B01 Trial Pit (Area 2a ~ 5) [NOTAM] C23_4d/w - NOTAM 8 29-May-22 09-Jun-22 12-Sep-22 25-Sep-22 61 (M,W,Th,Su-01:30-07:30) - 310.C.RC.C125.B01 Area 2b - Implement Closure to Taxiway B (bet. Taxiway A5 - Taxilane P) No HK d/w C01_7 Hols- -10h/d With B/O - No HK 0 17-Aug-22* 12-Oct-22 56 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 66 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.C130.B01 Area 2b - Install Marker Board C01_7 d/w - 10h/d - No HK 1 17-Aug-22 17-Aug-22 12-Oct-22 12-Oct-22 56 Hols - No B/O periods (was 310.C.RC.C135.B01 Area 2a - Levelling Work C1) C01_7 d/w - 10h/d - No HK 2 18-Aug-22 19-Aug-22 13-Oct-22 14-Oct-22 56 Hols - No B/O periods (was 310.C.RC.C140.B01 Area 2a - Remove Marker Board and Open Taxiway B (bet. Taxiway A5 - Taxilane P) C1) C01_7 d/w - 10h/d - No HK 1 20-Aug-22 20-Aug-22 15-Oct-22 15-Oct-22 56 Hols - No B/O periods (was Area 6, 7 and 8 C1) C23_4d/w - NOTAM (M,W,Th,Su-01:30-07:30) 56 0 - No HK 03-Apr-22 Hols - With B/O 18-Aug-22 Periods & Flight17-Jul-22 Checks 11-Sep-22 13 310.C.RC.C150.B01 Trial Pit (Area 6 ~ 8) [NOTAM] C23_4d/w - NOTAM 8 03-Apr-22 26-May-22 29-Aug-22 11-Sep-22 61 (M,W,Th,Su-01:30-07:30) - 310.C.RC.C155.B01 Area 6 ~ 8 - Levelling works [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 28 03-Jul-22 18-Aug-22 17-Jul-22 01-Sep-22 8 (M,W,Th,Su-01:30-07:30) - CC#4 - Stage 1 - Installation Works No HK Hols - With B/O 44 0 01-Sep-22 25-Oct-22 01-Sep-22 26-Oct-22 1 310.C.RC.C012 Commissioning of New North Runway Change Over (Assumed 1 Sep 22 1:30am) C23_4d/w - NOTAM 0 01-Sep-22* 01-Sep-22 0 (NOTAM (M,W,Th,Su-01:30-07:30) - 310.C.RC.C016 ESA - Interim Sec. Fence - install Marker Boards (ESA: 5 WFs) [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 1 01-Sep-22 01-Sep-22 01-Sep-22 01-Sep-22 0 (M,W,Th,Su-01:30-07:30) - 310.C.RC.C016.B01 WSA - Interim Sec. Fence - install Marker Boards (WSA: 5 WFs) [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 1 01-Sep-22 01-Sep-22 01-Sep-22 01-Sep-22 0 (M,W,Th,Su-01:30-07:30) - 310.C.RC.C032 WSA - Interim Sec. Fence (normal days) - install Int. Sec. Fence (approx. L= 2628M, 3 No HK d/w C01_7 Hols- -10h/d With B/O - No HK 20 01-Sep-22 20-Sep-22 01-Sep-22 20-Sep-22 0 WFs)(& form temporary airside rd) Hols - No B/O periods (was 310.C.RC.C068 ESA - Interim Sec. Fence (normal day) - install Int. Sec. Fence (approx. L=1798m, 2 C1) C01_7 d/w - 10h/d - No HK 20 01-Sep-22 20-Sep-22 01-Sep-22 20-Sep-22 0 WFs)(& form temporary airside rd) Hols - No B/O periods (was 310.C.RC.C020 WSA - Interim Sec. Fence (NOTAM) - install Int. Sec. Fence (approx. L=364m, 2 WF) C1) C23_4d/w - NOTAM 13 04-Sep-22 25-Sep-22 04-Sep-22 25-Sep-22 0 [NOTAM](& form temporary airside rd) (M,W,Th,Su-01:30-07:30) - 310.C.RC.C064 ESA - Interim Sec. Fence (NOTAM) - install Int. Sec. Fence (approx. L=825m, 4 WFs) No HK Hols- -NOTAM C23_4d/w With B/O 13 04-Sep-22 25-Sep-22 04-Sep-22 25-Sep-22 0 [NOTAM](& form temporary airside rd) (M,W,Th,Su-01:30-07:30) - 310.C.RC.C073 WSA - Commencement of Interim Sec. Fence - IDSS No HK d/w C01_7 Hols- -10h/d With B/O - No HK 0 21-Sep-22 21-Sep-22 0 Hols - No B/O periods (was 310.C.RC.C074 ESA - Commencement of Interim Sec. Fence - IDSS C1) C01_7 d/w - 10h/d - No HK 0 21-Sep-22 21-Sep-22 0 Hols - No B/O periods (was 310.C.RC.C075 WSA - Completion of Interim Sec. Fence - IDSS C1) C01_7 d/w - 10h/d - No HK 0 11-Oct-22 11-Oct-22 0 Hols - No B/O periods (was 310.C.RC.C096 ESA - Completion of Interim Sec. Fence - IDSS C1) C01_7 d/w - 10h/d - No HK 0 11-Oct-22 11-Oct-22 0 Hols - No B/O periods (was 310.C.RC.C056 Interim Sec. Fence - Testing and Commissioning C1) C01_7 d/w - 10h/d - No HK 14 12-Oct-22 25-Oct-22 12-Oct-22 25-Oct-22 0 Hols - No B/O periods (was 310.C.RC.C060 Achieved Interim Security Fence (PS 10.2.47 within 8wks after commissioning of new C1) C01_7 d/w - 10h/d - No HK 0 25-Oct-22 26-Oct-22 1 North Runway) Hols - No B/O periods (was CC#4 - Stage 2 - Installation Works C1) 47 0 14-Oct-23 10-Dec-23 06-Nov-23 25-Aug-24 209 310.C.RC.C080 3310/3 EVT - Completion of Backfill of Zone 2 Eastern Vehicular Tunnel for Stage 2 C11_6 d/w - 10h/d - With 0 14-Oct-23 06-Nov-23 18 Interim Security Fence HK Hols - No B/O periods 310.C.RC.C088 Interim Sec. Fence (Stage 2) - remove Stage 1 Interim Sec, Fence and make good of the (was C3) - NOTAM C23_4d/w 2 23-Nov-23 26-Nov-23 10-Dec-23 11-Dec-23 9 area [NOTAM] (M,W,Th,Su-01:30-07:30) - 310.C.RC.C092 c. Fence (Stage 2) - Complete Stage 2 Interim Security Fence & continue pavement /AGL No HK d/w C11_6 Hols- -10h/d With B/O - With 0 27-Nov-23 11-Dec-23 13 works 2 EVT South HK Hols - No B/O periods 310.C.EX.W512 Remove temporary deck along Taxiway B (3302 interface) PS 10.2.58) (NOTAM) (was C3) - NOTAM C23_4d/w 7 29-Nov-23 10-Dec-23 14-Aug-24 25-Aug-24 100 (M,W,Th,Su-01:30-07:30) - CC#4 - Demolish Interim Security Fence No HK d/w C01_7 Hols- -10h/d With B/O - No HK Hols56 - No B/O periods 0 (was01-May-24 C1) 25-Jun-24 03-May-24 25-Aug-24 61 310.C.RC.C067 Remove Interim Security Fence and Marker Boards and reinstate the area (8 wks before C01_7 d/w - 10h/d - No HK 56 01-May-24 25-Jun-24 03-May-24 27-Jun-24 2 commissioning of Centre Runway) Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 67 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.C071 Vacate Work Area 3310/2 C01_7 d/w - 10h/d - No HK 0 25-Jun-24 25-Aug-24 61 Hols - No B/O periods (was CC#4 - Permanent Security Fence (Area 9 and 12) C1) C11_6 d/w - 10h/d - With HK Hols 24- No B/O 0periods (was 20-May-23 C3) 17-Jun-23 29-Jul-24 24-Aug-24 354 310.C.B01.104.B01 Construct Permanent security fence at Area 9 & 12. + Metal Works C11_6 d/w - 10h/d - With 24 20-May-23 17-Jun-23 29-Jul-24 24-Aug-24 354 HK Hols - No B/O periods CC#4 - Jet Blast Screens (was C3) 721 0 07-Jun-21 A 06-Nov-23 22-Jun-22 17-Dec-23 35 Design (Jet Blast Screens) C01_7 d/w - 10h/d - No HK Hols214 - No B/O periods 0 (was07-Jul-22 C1) 05-Feb-23 27-Jul-22 25-Feb-23 20 310.D.R0.L268 Jet Blast Screen & Foundation - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 28 07-Jul-22 03-Aug-22 27-Jul-22 23-Aug-22 20 Hols - No B/O periods (was 310.D.R0.L272 Jet Blast Screen & Foundation - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 04-Aug-22 31-Aug-22 24-Aug-22 20-Sep-22 20 Hols - No B/O periods (was 310.D.R0.L276 Jet Blast Screen & Foundation - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 01-Sep-22 21-Sep-22 21-Sep-22 11-Oct-22 20 Hols - No B/O periods (was 310.D.R0.L280 Jet Blast Screen & Foundation- address comments & resubmit 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 22-Sep-22 05-Oct-22 12-Oct-22 25-Oct-22 20 Hols - No B/O periods (was 310.D.R0.L284 Jet Blast Screen & Foundation- PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 06-Oct-22 02-Nov-22 26-Oct-22 22-Nov-22 20 Hols - No B/O periods (was 310.D.R0.L288 Jet Blast Screen & Foundation - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 03-Nov-22 23-Nov-22 23-Nov-22 13-Dec-22 20 2nd Round Hols - No B/O periods (was 310.D.R0.L292 Jet Blast Screen & Foundation - BD review and approve C1) C01_7 d/w - 10h/d - No HK 60 24-Nov-22 22-Jan-23 14-Dec-22 11-Feb-23 20 Hols - No B/O periods (was 310.D.R0.L296 Jet Blast Screen & Foundation - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 23-Jan-23 29-Jan-23 12-Feb-23 18-Feb-23 20 Hols - No B/O periods (was 310.D.R0.L300 Jet Blast Screen & Foundation - prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 30-Jan-23 05-Feb-23 19-Feb-23 25-Feb-23 20 commencement Hols - No B/O periods (was Procurement (Jet Blast Screens) C1) 148 0 13-Oct-21 A 26-Nov-22 22-Jun-22 15-Jun-23 161 Procurement - Major Long Lead Materials 148 0 13-Oct-21 A 26-Nov-22 22-Jun-22 15-Jun-23 161 310.P.RC.D58 Procurement Major Long Lead Items - Jet Blast Screen - submit metal works materials, C01_7 d/w - 10h/d - No HK 30 13-Oct-21 A 11-Nov-21 A 22-Jun-22 22-Jun-22 concrete for foundation Hols - No B/O periods (was 310.P.RC.D74 Procurement Major Long Lead Items - Jet Blast Screen - PM reviews of metal works C1) C01_7 d/w - 10h/d - No HK 28 12-Nov-21 A 06-Dec-21 A 22-Jun-22 22-Jun-22 materials and concrete for foundation Hols - No B/O periods (was 310.P.RC.D58.B02 Procurement Major Long Lead Items - Jet Blast Screen - resubmit metal works materials, C1) C01_7 d/w - 10h/d - No HK 14 07-Dec-21 A 13-Dec-21 A 22-Jun-22 22-Jun-22 concrete for foundation(2nd rnd.) Hols - No B/O periods (was 310.P.RC.D78 Procurement Major Long Lead Items - Jet Blast Screen - PM review and approved C1) C01_7 d/w - 10h/d - No HK 28 14-Dec-21 A 06-Jul-22 22-Jun-22 26-Jul-22 20 Hols - No B/O periods (was 310.P.RC.D82 Procurement Major Long Lead Items - Jet Blast Screen - procurement, fabricate and C1) C11_6 d/w - 10h/d - With 120 07-Jul-22 26-Nov-22 17-Jan-23 15-Jun-23 161 delivery to site HK Hols - No B/O periods Construction (Jet Blast Screens) (was C3) 714 0 07-Jun-21 A 29-Oct-23 27-Jul-22 07-Dec-23 33 Initial Work (Jet Blast Screens) C11_6 d/w - 10h/d - With HK Hols0 - No B/O 0periods (was 07-Jun-21 C3) A 07-Jun-21 A 27-Jul-22 27-Jul-22 310.C.RC.L116 Jet Blast Screen - access to work area 3310/1 C11_6 d/w - 10h/d - With 0 07-Jun-21 A 27-Jul-22 HK Hols - No B/O periods JBS-05 (West Side) and JBS-06 (East Side) (was C11_6C3) d/w - 10h/d - With HK Hols 149- No B/O 0periods (was 29-Oct-22 C3) 02-May-23 02-May-23 01-Nov-23 151 310.C.RC.L148 Jet Blast Screen (JBS-05 Foundation) - excavate, plate load test, foundation works C11_6 d/w - 10h/d - With 24 29-Oct-22 25-Nov-22 02-May-23 30-May-23 148 HK Hols - No B/O periods 310.C.RC.L152 Jet Blast Screen (JBS-06 Foundation) - excavate, plate load test, foundation works (was C11_6C3) d/w - 10h/d - With 24 30-Mar-23 02-May-23 04-Oct-23 01-Nov-23 151 HK Hols - No B/O periods JBS-07 and JBS-08 (Air Side - NOTAM at WA3310/1) (was C3) - NOTAM (M,W,Th,Su-01:30-07:30) C23_4d/w 125 0 - No HK 25-Sep-22 Hols - With B/O 03-Sep-23 Periods & Flight24-Nov-22 Checks 21-Sep-23 11 310.C.RC.L104 Jet Blast Screen JBS-07 & 08 - carry out UU detection and trial pits [NOTAM] C23_4d/w - NOTAM 14 25-Sep-22 28-Nov-22 24-Nov-22 18-Dec-22 11 (M,W,Th,Su-01:30-07:30) - 310.C.RC.L108 Jet Blast Screen JBS-07 & 08 - UU diversions works [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 15 30-Nov-22 15-Jan-23 09-Jan-23 23-Feb-23 11 (M,W,Th,Su-01:30-07:30) - No HK Hols - With B/O Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 68 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.L112 Jet Blast Screen JBS-08 (Footing) - excavate, foundation works (total length=65m; 5 C23_4d/w - NOTAM 30 06-Feb-23 29-Mar-23 26-Feb-23 29-May-23 11 segment: 13m, @ 10d/segment [NOTAM] (M,W,Th,Su-01:30-07:30) - 310.C.RC.L172 Jet Blast Screen JBS-07(Footing) - excavate, foundation wks(total length=230m;18 No HK Hols- -NOTAM C23_4d/w With B/O 60 22-May-23 03-Sep-23 11-Jun-23 21-Sep-23 11 segment:13m, @ 10d/segment [NOTAM] (M,W,Th,Su-01:30-07:30) - Metal Works (Jet Blast Screen) No HK Hols - With B/O 273 0 26-Nov-22 29-Oct-23 31-May-23 07-Dec-23 33 310.C.RC.L100 Jet Blast Screen (JBS-05 Metal Structure) - erect jet blast screen steel structure C11_6 d/w - 10h/d - With 14 26-Nov-22 12-Dec-22 31-May-23 15-Jun-23 148 HK Hols - No B/O periods 310.C.RC.L136 Jet Blast Screen (JBS-06 Metal Structure) - erect jet blast screen steel structure (was C11_6C3) d/w - 10h/d - With 14 03-May-23 18-May-23 02-Nov-23 17-Nov-23 151 HK Hols - No B/O periods 310.C.RC.L120 Jet Blast Screen (JBS-07 & JBS-08 Metal Structure) - erect jet blast screen steel structure (was C3) - NOTAM C23_4d/w 20 04-Sep-23 29-Oct-23 24-Sep-23 07-Dec-23 11 [NOTAM] (M,W,Th,Su-01:30-07:30) - Testing and Commissioning (Jet Blast Screens) No HK Hols - With B/O 266 0 13-Dec-22 06-Nov-23 16-Jun-23 17-Dec-23 35 310.C.RC.L156 Jet Blast Screen JBS-05 (T&C) - Inspection and acceptance C11_6 d/w - 10h/d - With 7 13-Dec-22 20-Dec-22 16-Jun-23 24-Jun-23 148 HK Hols - No B/O periods 310.C.RC.L160 Jet Blast Screen - Achieved KD-5B (was C01_7C3) d/w - 10h/d - No HK 0 20-Dec-22 25-Jun-23 187 Hols - No B/O periods (was 310.C.RC.L176 Jet Blast Screen JBS-06 (T&C) - Inspection and acceptance C1) C11_6 d/w - 10h/d - With 7 19-May-23 27-May-23 18-Nov-23 25-Nov-23 151 HK Hols - No B/O periods 310.C.RC.L168 Jet Blast Screen - Achieved KD-5F (was C01_7C3) d/w - 10h/d - No HK 0 27-May-23 26-Nov-23 183 Hols - No B/O periods (was 310.C.RC.L180 Jet Blast Screen JBS-07 and JBS-08 (T&C) - Inspection and acceptance C1) C11_6 d/w - 10h/d - With 7 30-Oct-23 06-Nov-23 09-Dec-23 16-Dec-23 35 HK Hols - No B/O periods 310.C.RC.L164 Jet Blast Screen - Achieved KD-5G (was C01_7C3) d/w - 10h/d - No HK 0 06-Nov-23 17-Dec-23 41 Hols - No B/O periods (was CC#4 ----- Testing and Commissioning ----- C1) 675 0 13-May-22 16-Aug-24 11-Jun-22 25-Aug-24 7 CC#4 - T&C - (Airfield UU, Drainage Works, Watermain, AFPH) 675 0 13-May-22 16-Aug-24 11-Jun-22 25-Aug-24 7 T&C - Aviation Fuel and Hydrant System (AFHS) 341 0 24-Apr-23 15-Jun-24 24-Apr-23 30-Jun-24 12 T&C - AFHS Section 1 110 0 24-Apr-23 03-Sep-23 24-Apr-23 03-Sep-23 0 310.C.AF.F404 T&C (AFHS Section 1) - Fuel Pipe completed C23_4d/w - NOTAM 0 24-Apr-23 24-Apr-23 0 (M,W,Th,Su-01:30-07:30) - 310.C.AF.F492 T&C (AFHS Section 1) - Fuel Filling (526m3) No HK d/w C01_7 Hols- -10h/d With B/O - No HK 21 24-Apr-23 14-May-23 24-Apr-23 14-May-23 0 Hols - No B/O periods (was 310.C.AF.F496 T&C (AFHS Section 1) - Soak & Pressure Test C1) C01_7 d/w - 10h/d - No HK 10 15-May-23 24-May-23 15-May-23 24-May-23 0 Hols - No B/O periods (was 310.C.AF.F512 T&C (AFHS Section 1) - AFHS DG Application (Part I and Part II) C1) C01_7 d/w - 10h/d - No HK 90 23-May-23 20-Aug-23 23-May-23 20-Aug-23 0 Hols - No B/O periods (was 310.C.AF.F500 T&C (AFHS Section 1) - Defueling & Fuel Top-up C1) C01_7 d/w - 10h/d - No HK 10 25-May-23 03-Jun-23 28-Jul-23 06-Aug-23 64 Hols - No B/O periods (was 310.C.AF.F504 T&C (AFHS Section 1) - SAT for Power & SCADA C1) C01_7 d/w - 10h/d - No HK 12 04-Jun-23 15-Jun-23 07-Aug-23 18-Aug-23 64 Hols - No B/O periods (was 310.C.AF.F508 T&C (AFHS Section 1) - Loop Flushing & Riser Flushing C1) C01_7 d/w - 10h/d - No HK 2 16-Jun-23 17-Jun-23 19-Aug-23 20-Aug-23 64 Hols - No B/O periods (was 310.C.AF.F516 T&C (AFHS Section 1) - Submission & Inspection (ALD/CAD) C1) C01_7 d/w - 10h/d - No HK 14 21-Aug-23 03-Sep-23 21-Aug-23 03-Sep-23 0 Hols - No B/O periods (was 310.C.AF.F520 T&C (AFHS Section 1) - Achieved KD-8 C1) C01_7 d/w - 10h/d - No HK 0 03-Sep-23 03-Sep-23 0 Hols - No B/O periods (was T&C - AFHS Section 2 C1) C01_7 d/w - 10h/d - No HK Hols130 - No B/O periods 0 (was06-Feb-24 C1) 15-Jun-24 15-Feb-24 30-Jun-24 15 310.C.AF.F400 T&C (AFHS Section 2) - Fuel Pipe completed C01_7 d/w - 10h/d - No HK 0 06-Feb-24 15-Feb-24 9 Hols - No B/O periods (was 310.C.AF.F464 T&C (AFHS Section 2) - Fuel Filling (377m3) C1) C01_7 d/w - 10h/d - No HK 16 07-Feb-24 22-Feb-24 16-Feb-24 02-Mar-24 9 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 69 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.AF.F468 T&C (AFHS Section 2) - Soak & Pressure Test C01_7 d/w - 10h/d - No HK 10 23-Feb-24 03-Mar-24 03-Mar-24 12-Mar-24 9 Hols - No B/O periods (was 310.C.AF.F472 T&C (AFHS Section 2) - Defueling & Fuel Top-up C1) C01_7 d/w - 10h/d - No HK 10 04-Mar-24 13-Mar-24 18-May-24 27-May-24 75 Hols - No B/O periods (was 310.C.AF.F484 T&C (AFHS Section 2) - AFHS DG Application (Part I and Part II) C1) C01_7 d/w - 10h/d - No HK 90 04-Mar-24 01-Jun-24 13-Mar-24 10-Jun-24 9 Hols - No B/O periods (was 310.C.AF.F476 T&C (AFHS Section 2) - SAT for Power & SCADA C1) C01_7 d/w - 10h/d - No HK 12 14-Mar-24 25-Mar-24 28-May-24 08-Jun-24 75 Hols - No B/O periods (was 310.C.AF.F480 T&C (AFHS Section 2) - Loop Flushing & Riser Flushing C1) C01_7 d/w - 10h/d - No HK 2 26-Mar-24 27-Mar-24 09-Jun-24 10-Jun-24 75 Hols - No B/O periods (was 310.C.AF.F488 T&C (AFHS Section 2) - Submission & Inspection (ALD/CAD) C1) C01_7 d/w - 10h/d - No HK 14 02-Jun-24 15-Jun-24 11-Jun-24 24-Jun-24 9 Hols - No B/O periods (was 310.C.AF.F524 T&C (AFHS Section 2) - Achieved KD-9 C1) C01_7 d/w - 10h/d - No HK 0 15-Jun-24 30-Jun-24 15 Hols - No B/O periods (was Potable Water and Fire Hydrant (PWFH) C1) C11_6 d/w - 10h/d - With HK Hols 499- No B/O 0periods (was 13-May-22 C3) 12-Jan-24 11-Jun-22 24-Aug-24 183 310.T.ES.P740.B02 Prepare for Watermain Materials (Potable and Seawater) for Submission C11_6 d/w - 10h/d - With 17 13-May-22 01-Jun-22 11-Jun-22 30-Jun-22 24 HK Hols - No B/O periods 310.T.ES.P744.B02 Submit Watermain Materials (Potable and Seawater) for PM Acceptance (was C11_6C3) d/w - 10h/d - With 0 02-Jun-22 02-Jul-22 24 HK Hols - No B/O periods 310.T.ES.P748.B02 PM Acceptance (was C11_6C3) d/w - 10h/d - With 48 02-Jun-22 29-Jul-22 02-Jul-22 26-Aug-22 24 HK Hols - No B/O periods WSD Inspection Potable Water and Fire Hydrant (PWFH) (West Area) (was C11_6C3) d/w - 10h/d - With HK Hols 415- No B/O 0periods (was 30-Jul-22 C3) 18-Dec-23 27-Aug-22 24-Jun-24 150 310.S.EX.U101 Form WWO 46 (Part I & Part II) & Annex Submission for WSD Approval (Plumbing / FS / C11_6 d/w - 10h/d - With 0 30-Jul-22 27-Aug-22 24 WP) HK Hols - No B/O periods 310.S.EX.U104 Obtain Form WWO 46 (Part III) - WSD Approval, Endorsed & Return to Licensed Plumber (was C11_6C3) d/w - 10h/d - With 4 30-Jul-22 03-Aug-22 27-Aug-22 31-Aug-22 24 HK Hols - No B/O periods 310.C.AF.F408 WWO46 Part IV with pressure test (last portion) (PWFH) (was C11_6C3) d/w - 10h/d - With 12 02-Nov-23 15-Nov-23 07-May-24 21-May-24 150 HK Hols - No B/O periods 310.C.AF.F412 WSD Inspection and WWO46 Part V(a) (PWFH) (was C11_6C3) d/w - 10h/d - With 6 16-Nov-23 22-Nov-23 22-May-24 28-May-24 150 HK Hols - No B/O periods 310.C.AF.F416 T&C (Pipe flushing and Sterilization) (PWFH) (was C11_6C3) d/w - 10h/d - With 6 23-Nov-23 29-Nov-23 29-May-24 04-Jun-24 150 HK Hols - No B/O periods 310.C.AF.F420 Water Sampling (PWFH) (was C11_6C3) d/w - 10h/d - With 3 30-Nov-23 02-Dec-23 05-Jun-24 07-Jun-24 150 HK Hols - No B/O periods 310.C.AF.F424 Results of lab test to WSD (PWFH) (was C11_6C3) d/w - 10h/d - With 6 04-Dec-23 09-Dec-23 08-Jun-24 15-Jun-24 150 HK Hols - No B/O periods 310.C.AF.F428 WSD to issue WWO part V (b) (PWFH) (was C11_6C3) d/w - 10h/d - With 6 11-Dec-23 16-Dec-23 17-Jun-24 22-Jun-24 150 HK Hols - No B/O periods 310.C.AF.F432 Connect to Existing Pipe (PWFH-West) (was C11_6C3) d/w - 10h/d - With 1 18-Dec-23 18-Dec-23 24-Jun-24 24-Jun-24 150 HK Hols - No B/O periods FSD Inspection Fire Hydrant (PWFH) (West Area) (was C11_6C3) d/w - 10h/d - With HK Hols 18- No B/O 0periods (was 19-Dec-23 C3) 11-Jan-24 05-Aug-24 24-Aug-24 184 310.T.ES.P745.B02 F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 19-Dec-23 05-Aug-24 184 HK Hols - No B/O periods 310.T.ES.P751.B02 F.S. Inspection Application (Form FSI / 501 & 251 Submission) (was C11_6C3) d/w - 10h/d - With 0 19-Dec-23 05-Aug-24 184 HK Hols - No B/O periods 310.T.ES.P760.B02 F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 19-Dec-23 27-Dec-23 05-Aug-24 10-Aug-24 184 HK Hols - No B/O periods 310.T.ES.P765.B02 FSD Comment (was C11_6C3) d/w - 10h/d - With 0 27-Dec-23 10-Aug-24 184 HK Hols - No B/O periods 310.T.ES.P770.B02 Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 28-Dec-23 04-Jan-24 12-Aug-24 17-Aug-24 184 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 70 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.ES.P775.B02 F.S. Re-inspection C11_6 d/w - 10h/d - With 6 05-Jan-24 11-Jan-24 19-Aug-24 24-Aug-24 184 HK Hols - No B/O periods 310.T.ES.P781.B02 Issue F.S. Certificate (Form FS172) (West Area) (was C11_6C3) d/w - 10h/d - With 0 11-Jan-24 24-Aug-24 184 HK Hols - No B/O periods WSD Inspection Potable Water and Fire Hydrant (PWFH) (East Area) (was C11_6C3) d/w - 10h/d - With HK Hols 416- No B/O 0periods (was 30-Jul-22 C3) 19-Dec-23 22-Sep-22 24-Jun-24 149 310.T.ES.P753.B02 Form WWO 46 (Part I & Part II) & Annex Submission for WSD Approval (Plumbing / FS / C11_6 d/w - 10h/d - With 0 30-Jul-22 22-Sep-22 45 WP) HK Hols - No B/O periods 310.T.ES.P757.B02 Obtain Form WWO 46 (Part III) - WSD Approval, Endorsed & Return to Licensed Plumber (was C11_6C3) d/w - 10h/d - With 4 30-Jul-22 03-Aug-22 22-Sep-22 26-Sep-22 45 HK Hols - No B/O periods 310.C.AF.F436.B02 WWO46 Part IV with pressure test (last portion) (PWFH) (was C11_6C3) d/w - 10h/d - With 12 03-Nov-23 16-Nov-23 07-May-24 21-May-24 149 HK Hols - No B/O periods 310.C.AF.F440 WSD Inspection and WWO46 Part V(a) (PWFH) (was C11_6C3) d/w - 10h/d - With 6 17-Nov-23 23-Nov-23 22-May-24 28-May-24 149 HK Hols - No B/O periods 310.C.AF.F444 T&C (Pipe flushing and Sterilization) (PWFH) (was C11_6C3) d/w - 10h/d - With 6 24-Nov-23 30-Nov-23 29-May-24 04-Jun-24 149 HK Hols - No B/O periods 310.C.AF.F448 Water Sampling (PWFH) (was C11_6C3) d/w - 10h/d - With 3 01-Dec-23 04-Dec-23 05-Jun-24 07-Jun-24 149 HK Hols - No B/O periods 310.C.AF.F452 Results of lab test to WSD (PWFH) (was C11_6C3) d/w - 10h/d - With 6 05-Dec-23 11-Dec-23 08-Jun-24 15-Jun-24 149 HK Hols - No B/O periods 310.C.AF.F456 WSD to issue WWO part V (b) (PWFH) (was C11_6C3) d/w - 10h/d - With 6 12-Dec-23 18-Dec-23 17-Jun-24 22-Jun-24 149 HK Hols - No B/O periods 310.C.AF.F460 Connect to Existing Pipe (PWFH - East) (was C11_6C3) d/w - 10h/d - With 1 19-Dec-23 19-Dec-23 24-Jun-24 24-Jun-24 149 HK Hols - No B/O periods FSD Inspection Fire Hydrant (PWFH) (East Area) (was C11_6C3) d/w - 10h/d - With HK Hols 18- No B/O 0periods (was 20-Dec-23 C3) 12-Jan-24 05-Aug-24 24-Aug-24 183 310.T.ES.P768.B02 F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 20-Dec-23 05-Aug-24 183 HK Hols - No B/O periods 310.T.ES.P772.B02 F.S. Inspection Application (Form FSI / 501 & 251 Submission) (was C11_6C3) d/w - 10h/d - With 0 20-Dec-23 05-Aug-24 183 HK Hols - No B/O periods 310.T.ES.P776.B02 F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 20-Dec-23 28-Dec-23 05-Aug-24 10-Aug-24 183 HK Hols - No B/O periods 310.T.ES.P780.B02 FSD Comment (was C11_6C3) d/w - 10h/d - With 0 28-Dec-23 10-Aug-24 183 HK Hols - No B/O periods 310.T.ES.P784.B02 Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 29-Dec-23 05-Jan-24 12-Aug-24 17-Aug-24 183 HK Hols - No B/O periods 310.T.ES.P788.B02 F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 06-Jan-24 12-Jan-24 19-Aug-24 24-Aug-24 183 HK Hols - No B/O periods 310.T.ES.P792.B02 Issue F.S. Certificate (Form FS172) (East Area) (was C11_6C3) d/w - 10h/d - With 0 12-Jan-24 24-Aug-24 183 HK Hols - No B/O periods Stormwater Drainage System and Box Culvert (was C3) 249 0 12-Jan-23 15-Nov-23 12-May-23 25-Aug-24 230 Stormwater Drainage System C01_7 d/w - 10h/d - No HK Hols14 - No B/O periods 0 (was01-Nov-23 C1) 15-Nov-23 11-Aug-24 25-Aug-24 284 310.C.R0.Y408 Stormwater Drainage System - completion of stormwater drain pipes and manholes C01_7 d/w - 10h/d - No HK 0 01-Nov-23 11-Aug-24 284 construction Hols - No B/O periods (was 310.C.R0.Y412 Stormwater Drainage System - submit form BA14 for completion of stormwater drainage C1) C01_7 d/w - 10h/d - No HK 14 02-Nov-23 15-Nov-23 12-Aug-24 25-Aug-24 284 works Hols - No B/O periods (was Box Culvert 3, 4 & 18 C1) C01_7 d/w - 10h/d - No HK Hols146 - No B/O periods 0 (was12-Jan-23 C1) 07-Jun-23 12-May-23 25-Jun-23 18 310.C.R0.Y102 Stormwater Drainage System and Box Culvert - complete box culvert 3,4,18 backfill C01_7 d/w - 10h/d - No HK 0 12-Jan-23 12-May-23 120 Hols - No B/O periods (was 310.C.R0.Y100 Stormwater Drainage System and Box Culvert - complete box culvert 3,4,18 metal work C1) C01_7 d/w - 10h/d - No HK 0 11-Feb-23 12-May-23 91 Hols - No B/O periods (was 310.C.R0.Y103 Stormwater Drainage System and Box Culvert - Box Culvert 3,4 - Prepare as-built C1) C01_7 d/w - 10h/d - No HK 30 25-Apr-23 24-May-23 13-May-23 11-Jun-23 18 drawings Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 71 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.R0.Y105 Stormwater Drainage System and Box Culvert - Box Culvert 18 - Prepare as-built C01_7 d/w - 10h/d - No HK 30 25-Apr-23 24-May-23 13-May-23 11-Jun-23 18 drawings Hols - No B/O periods (was 310.C.R0.Y110 Stormwater Drainage System and Box Culvert - submit Form BA14 for completion of Box C1) C01_7 d/w - 10h/d - No HK 14 25-May-23 07-Jun-23 12-Jun-23 25-Jun-23 18 Culverts 3,4,18 Hols - No B/O periods (was Box Culvert 5, 6, & 19 C1) 134 0 13-May-23 24-Oct-23 06-Oct-23 26-Nov-23 28 310.C.R0.Y400 Stormwater Drainage System and Box Culvert - complete box culvert 5,6,19 backfill C01_7 d/w - 10h/d - No HK 0 13-May-23 06-Oct-23 146 Hols - No B/O periods (was 310.C.R0.Y396 Stormwater Drainage System and Box Culvert - complete box culvert 5,6,19 fit out C1) C01_7 d/w - 10h/d - No HK 0 19-Aug-23 06-Oct-23 48 Hols - No B/O periods (was 310.C.R0.Y401 Stormwater Drainage System and Box Culvert - Box Culvert 5,6 - prepare as-built C1) C11_6 d/w - 10h/d - With 30 04-Sep-23 10-Oct-23 07-Oct-23 11-Nov-23 27 drawings HK Hols - No B/O periods 310.C.R0.Y402 Stormwater Drainage System and Box Culvert - Box Culvert 19 - prepare as-built (was C11_6C3) d/w - 10h/d - With 30 04-Sep-23 10-Oct-23 07-Oct-23 11-Nov-23 27 drawings HK Hols - No B/O periods 310.C.R0.Y405 Stormwater Drainage System and Box Culvert - submit Form BA14 for completion of Box (was C01_7C3) d/w - 10h/d - No HK 14 11-Oct-23 24-Oct-23 13-Nov-23 26-Nov-23 33 Culverts 5,6,19 Hols - No B/O periods (was Statutory Submission C1) 52 0 17-Jun-24 16-Aug-24 25-Jun-24 25-Aug-24 7 310.C.AF.F463 Prepare and submit for Full Set of Material & Mill Certificates, as built records,etc, for all C11_6 d/w - 10h/d - With 28 17-Jun-24 19-Jul-24 25-Jun-24 27-Jul-24 7 apron works HK Hols - No B/O periods 310.C.AF.F467 Submit BA14 to BD for Apron Works (was C01_7C3) d/w - 10h/d - No HK 28 20-Jul-24 16-Aug-24 29-Jul-24 25-Aug-24 9 Hols - No B/O periods (was CC#4.7 - 3310/10,10A,9 - BC3,4,18 - Notification of Works Completion to BD C1) 459 0 24-Jul-22 05-Feb-24 30-Mar-23 25-Aug-24 163 CC#4 - ELS and Open Cut Excavation C01_7 d/w - 10h/d - No HK Hols14 - No B/O periods 0 (was24-Jul-22 C1) 06-Aug-22 30-Mar-23 12-Apr-23 249 310.C.R0.L165 3310/10,10A - Box Culvert 3,4,18 - Submit Form BA14 for completion of excavation work C01_7 d/w - 10h/d - No HK 14 24-Jul-22 06-Aug-22 30-Mar-23 12-Apr-23 249 Hols - No B/O periods (was CC#4 - Stormwater Drainage Works C1) C01_7 d/w - 10h/d - No HK Hols30 - No B/O periods 0 (was26-Mar-23 C1) 24-Apr-23 13-Apr-23 12-May-23 18 310.C.WS.F460 3310/10,10A - Prepare as-built drawings and submit Form BA14 for partial completion of C01_7 d/w - 10h/d - No HK 30 26-Mar-23 24-Apr-23 13-Apr-23 12-May-23 18 Stormwater Drainage Works Hols - No B/O periods (was CC#4 - Road Drainage Works C1) C01_7 d/w - 10h/d - No HK Hols30 - No B/O periods 0 (was21-Apr-23 C1) 20-May-23 13-Jul-24 11-Aug-24 449 310.C.WS.F464 3310/10,10A - Prepare as-built drawings and submit Form BA14 for partial completion of C01_7 d/w - 10h/d - No HK 30 21-Apr-23 20-May-23 13-Jul-24 11-Aug-24 449 Road Drainage Works Hols - No B/O periods (was CC#4 - Roadwork for Landside Road and Airside Road in 3310/10,10A C1) 67 0 15-Nov-23 05-Feb-24 01-Jun-24 25-Aug-24 163 310.C.R0.X172 3310/10,10A - LSR & ASR - complete wearing course, road marking, central reserve C11_6 d/w - 10h/d - With 0 15-Nov-23 01-Jun-24 160 HK Hols - No B/O periods 310.C.R0.X750 3310/10,10A - LSR & ASR - testing and commissioning (was C11_6C3) d/w - 10h/d - With 30 16-Nov-23 20-Dec-23 03-Jun-24 09-Jul-24 160 HK Hols - No B/O periods 310.C.R0.X754 3310/10,10A - LSR & ASR - submit Form BA14 for completion of work (was C01_7C3) d/w - 10h/d - No HK 14 21-Dec-23 03-Jan-24 10-Jul-24 23-Jul-24 202 Hols - No B/O periods (was 310.C.R0.X758 3310/10,10A - LSR & ASR - Statutory Inspection C1) C11_6 d/w - 10h/d - With 28 04-Jan-24 05-Feb-24 24-Jul-24 24-Aug-24 163 HK Hols - No B/O periods 310.C.R0.X762 3310/10,10A - LSR & ASR - Achieve KD-12 (was C01_7C3) d/w - 10h/d - No HK 0 05-Feb-24 25-Aug-24 202 Hols - No B/O periods (was Cost Centre #05 - Airport System C1) 662 85 01-Nov-21 A 19-Mar-24 27-Mar-22 08-Jun-24 64 CC#5 ----- Design & Other Submission ----- C01_7 d/w - 10h/d - No HK Hols315 - No B/O periods 0 (was 05-Feb-22 C1) A 13-Jan-23 27-Mar-22 08-Jan-24 360 CC#5 - MS no.20 - Method Statement for Installation Works of Airport/Airfield Systems and equipment C01_7 d/w - 10h/d - No HK Hols100 - No B/O periods 0 (was 05-Feb-22 C1) A 12-Jun-22 27-Mar-22 12-Jun-22 0 310.D.WS.L328 MS no. 20 - MS for Installation Works of Airport/ Airfield System and Equipment - prepare C01_7 d/w - 10h/d - No HK 28 05-Feb-22 A 01-Apr-22 27-Mar-22 01-Apr-22 0 document Hols - No B/O periods (was 310.D.WS.L332 MS no. 20 - MS for Installation Works of Airport/ Airfield System and Equipment - ICE C1) C01_7 d/w - 10h/d - No HK 3 08-Apr-22 10-Apr-22 08-Apr-22 10-Apr-22 0 issue check certificate Hols - No B/O periods (was 310.D.WS.L333 MS no. 20 - MS for Installation Works of Airport/ Airfield System and Equipment - PM C1) C01_7 d/w - 10h/d - No HK 28 11-Apr-22 08-May-22 11-Apr-22 08-May-22 0 review and accept 1st Round Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 72 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L334 MS no. 20 - MS for Installation Works of Airport/ Airfield System and Equipment - address C01_7 d/w - 10h/d - No HK 7 09-May-22 15-May-22 09-May-22 15-May-22 0 comments 2nd Submission Hols - No B/O periods (was 310.D.WS.L336 MS no. 20 - MS for Installation Works of Airport/ Airfield System and Equipment - PM C1) C01_7 d/w - 10h/d - No HK 28 16-May-22 12-Jun-22 16-May-22 12-Jun-22 0 review and accept 2nd Round Hols - No B/O periods (was CC#5 - MS no.25 - Testing and Commissioning Plan for Airport Authority Ancillary Buildings C1) C01_7 d/w - 10h/d - No HK Hols100 - No B/O periods 0 (was06-Oct-22 C1) 13-Jan-23 06-Oct-22 08-Jan-24 360 310.D.WS.L340 MS no. 25 - T&C Plan for Airport Authority Ancillary Buildings - prepare document C01_7 d/w - 10h/d - No HK 28 06-Oct-22 02-Nov-22 06-Oct-22 02-Nov-22 0 Hols - No B/O periods (was 310.D.WS.L344 MS no. 25 - T&C Plan for Airport Authority Ancillary Buildings - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 3 09-Nov-22 11-Nov-22 04-Nov-23 06-Nov-23 360 Hols - No B/O periods (was 310.D.WS.L345 MS no. 25 - T&C Plan for Airport Authority Ancillary Buildings - PM review and accept 1st C1)C01_7 d/w - 10h/d - No HK 28 12-Nov-22 09-Dec-22 07-Nov-23 04-Dec-23 360 Round Hols - No B/O periods (was 310.D.WS.L346 MS no. 25 - T&C Plan for Airport Authority Ancillary Buildings - address comments 2nd C1) C01_7 d/w - 10h/d - No HK 7 10-Dec-22 16-Dec-22 05-Dec-23 11-Dec-23 360 Submission Hols - No B/O periods (was 310.D.WS.L348 MS no. 25 - T&C Plan for Airport Authority Ancillary Buildings - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 17-Dec-22 13-Jan-23 12-Dec-23 08-Jan-24 360 Round Hols - No B/O periods (was CC#5 - Airport System - Access Control System (ACS) C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was11-May-22 C1) 05-Jul-22 11-May-22 19-Sep-22 76 Airport System - ACS Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was11-May-22 C1) 05-Jul-22 26-Jul-22 19-Sep-22 76 310.D.WS.L352 Airport System - ACS Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 26-Jul-22 08-Aug-22 76 Hols - No B/O periods (was 310.D.WS.L353 Airport System - ACS Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 09-Aug-22 29-Aug-22 76 Hols - No B/O periods (was 310.D.WS.L354 Airport System - ACS Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 30-Aug-22 05-Sep-22 76 Hols - No B/O periods (was 310.D.WS.L356 Airport System - ACS Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 22-Jun-22 05-Jul-22 06-Sep-22 19-Sep-22 76 Hols - No B/O periods (was Airport System - ACS Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was11-May-22 C1) 05-Jul-22 26-Jul-22 19-Sep-22 76 310.D.WS.L360 Airport System - ACS Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 26-Jul-22 08-Aug-22 76 Hols - No B/O periods (was 310.D.WS.L361 Airport System - ACS Method Statement Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 09-Aug-22 29-Aug-22 76 Hols - No B/O periods (was 310.D.WS.L362 Airport System - ACS Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 30-Aug-22 05-Sep-22 76 Hols - No B/O periods (was 310.D.WS.L364 Airport System - ACS Method Statement Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 22-Jun-22 05-Jul-22 06-Sep-22 19-Sep-22 76 Hols - No B/O periods (was Airport System - ACS Material Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 11-May-22 28-Jun-22 0 310.D.WS.L368 Airport System - ACS Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 11-May-22 24-May-22 0 Hols - No B/O periods (was 310.D.WS.L369 Airport System - ACS Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 25-May-22 14-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L370 Airport System - ACS Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 15-Jun-22 21-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L372 Airport System - ACS Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 22-Jun-22 28-Jun-22 0 Hols - No B/O periods (was CC#5 - Airport System - Airport Lightning Warnings System (ALWS) C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was11-May-22 C1) 21-Jul-22 11-May-22 14-Nov-22 116 Airport System - ALWS Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was27-May-22 C1) 21-Jul-22 20-Sep-22 14-Nov-22 116 310.D.WS.L376 Airport System - ALWS Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 20-Sep-22 03-Oct-22 116 Hols - No B/O periods (was 310.D.WS.L377 Airport System - ALWS Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 04-Oct-22 24-Oct-22 116 Hols - No B/O periods (was 310.D.WS.L378 Airport System - ALWS Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 25-Oct-22 31-Oct-22 116 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 73 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L380 Airport System - ALWS Drawing Submission - PM review and accept 2nd Round C01_7 d/w - 10h/d - No HK 14 08-Jul-22 21-Jul-22 01-Nov-22 14-Nov-22 116 Hols - No B/O periods (was Airport System - ALWS Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was27-May-22 C1) 21-Jul-22 20-Sep-22 14-Nov-22 116 310.D.WS.L384 Airport System - ALWS Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 20-Sep-22 03-Oct-22 116 Hols - No B/O periods (was 310.D.WS.L385 Airport System - ALWS Method Statement Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 04-Oct-22 24-Oct-22 116 Hols - No B/O periods (was 310.D.WS.L386 Airport System - ALWS Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 25-Oct-22 31-Oct-22 116 Hols - No B/O periods (was 310.D.WS.L388 Airport System - ALWS Method Statement Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 14 08-Jul-22 21-Jul-22 01-Nov-22 14-Nov-22 116 Round Hols - No B/O periods (was Airport System - ALWS Material Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 11-May-22 28-Jun-22 0 310.D.WS.L392 Airport System - ALWS Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 11-May-22 24-May-22 0 Hols - No B/O periods (was 310.D.WS.L393 Airport System - ALWS Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 25-May-22 14-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L394 Airport System - ALWS Material Submission - prepare resubmission 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 15-Jun-22 21-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L396 Airport System - ALWS Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 22-Jun-22 28-Jun-22 0 Hols - No B/O periods (was CC#5 - Airport System - Bird Control System (BCS) C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was10-Jul-22 C1) 01-Oct-22 18-Dec-22 14-May-23 225 Airport System - BCS Drawing Submission C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was10-Jul-22 C1) 01-Oct-22 20-Feb-23 14-May-23 225 310.D.WS.L400 Airport System - BCS Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 10-Jul-22 23-Jul-22 20-Feb-23 05-Mar-23 225 Hols - No B/O periods (was 310.D.WS.L401 Airport System - BCS Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 24-Jul-22 20-Aug-22 06-Mar-23 02-Apr-23 225 Hols - No B/O periods (was 310.D.WS.L402 Airport System - BCS Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 21-Aug-22 03-Sep-22 03-Apr-23 16-Apr-23 225 Hols - No B/O periods (was 310.D.WS.L404 Airport System - BCS Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 04-Sep-22 01-Oct-22 17-Apr-23 14-May-23 225 Hols - No B/O periods (was Airport System - BSC Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was10-Jul-22 C1) 01-Oct-22 20-Feb-23 14-May-23 225 310.D.WS.L408 Airport System - BCS Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 10-Jul-22 23-Jul-22 20-Feb-23 05-Mar-23 225 Hols - No B/O periods (was 310.D.WS.L409 Airport System - BCS Method Statement Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 24-Jul-22 20-Aug-22 06-Mar-23 02-Apr-23 225 Hols - No B/O periods (was 310.D.WS.L410 Airport System - BCS Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 21-Aug-22 03-Sep-22 03-Apr-23 16-Apr-23 225 Hols - No B/O periods (was 310.D.WS.L412 Airport System - BCS Method Statement Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 04-Sep-22 01-Oct-22 17-Apr-23 14-May-23 225 Hols - No B/O periods (was Airport System - BSC Material Submission C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was10-Jul-22 C1) 01-Oct-22 18-Dec-22 11-Mar-23 161 310.D.WS.L416 Airport System - BCS Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 10-Jul-22 23-Jul-22 18-Dec-22 31-Dec-22 161 Hols - No B/O periods (was 310.D.WS.L417 Airport System - BCS Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 24-Jul-22 20-Aug-22 01-Jan-23 28-Jan-23 161 Hols - No B/O periods (was 310.D.WS.L418 Airport System - BCS Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 21-Aug-22 03-Sep-22 29-Jan-23 11-Feb-23 161 Hols - No B/O periods (was 310.D.WS.L420 Airport System - BCS Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 04-Sep-22 01-Oct-22 12-Feb-23 11-Mar-23 161 Hols - No B/O periods (was CC#5 - Airport System - Closed Circuit Television System (CCTV) C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was11-May-22 C1) 21-Jul-22 11-May-22 19-Sep-22 60 Airport System - CCTV Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was27-May-22 C1) 21-Jul-22 26-Jul-22 19-Sep-22 60
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 74 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L424 Airport System - CCTV Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 26-Jul-22 08-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L425 Airport System - CCTV Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 09-Aug-22 29-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L426 Airport System - CCTV Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 30-Aug-22 05-Sep-22 60 Hols - No B/O periods (was 310.D.WS.L428 Airport System - CCTV Drawing Submission - PM review and accept 2nd Round' C1) C01_7 d/w - 10h/d - No HK 14 08-Jul-22 21-Jul-22 06-Sep-22 19-Sep-22 60 Hols - No B/O periods (was Airport System - CCTV Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was27-May-22 C1) 21-Jul-22 26-Jul-22 19-Sep-22 60 310.D.WS.L432 Airport System - CCTV Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 26-Jul-22 08-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L433 Airport System - CCTV Method Statement Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 09-Aug-22 29-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L434 Airport System - CCTV Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 30-Aug-22 05-Sep-22 60 Hols - No B/O periods (was 310.D.WS.L436 Airport System - CCTV Method Statement Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 14 08-Jul-22 21-Jul-22 06-Sep-22 19-Sep-22 60 Round Hols - No B/O periods (was Airport System - CCTV Material Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 11-May-22 28-Jun-22 0 310.D.WS.L440 Airport System - CCTV Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 11-May-22 24-May-22 0 Hols - No B/O periods (was 310.D.WS.L441 Airport System - CCTV Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 25-May-22 14-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L442 Airport System - CCTV Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 15-Jun-22 21-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L444 Airport System - CCTV Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 22-Jun-22 28-Jun-22 0 Hols - No B/O periods (was CC#5 - Airport System - Intrusion Detection & Surveillance System (IDSS) C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was06-May-22 C1) 30-Jun-22 12-May-22 20-Sep-22 82 Airport System - IDSS Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was06-May-22 C1) 30-Jun-22 27-Jul-22 20-Sep-22 82 310.D.WS.L448 Airport System - IDSS Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 06-May-22 19-May-22 27-Jul-22 09-Aug-22 82 Hols - No B/O periods (was 310.D.WS.L449 Airport System - IDSS Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 20-May-22 09-Jun-22 10-Aug-22 30-Aug-22 82 Hols - No B/O periods (was 310.D.WS.L450 Airport System - IDSS Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 10-Jun-22 16-Jun-22 31-Aug-22 06-Sep-22 82 Hols - No B/O periods (was 310.D.WS.L452 Airport System - IDSS Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 17-Jun-22 30-Jun-22 07-Sep-22 20-Sep-22 82 Hols - No B/O periods (was Airport System - IDSS Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was06-May-22 C1) 30-Jun-22 27-Jul-22 20-Sep-22 82 310.D.WS.L456 Airport System - IDSS Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 06-May-22 19-May-22 27-Jul-22 09-Aug-22 82 Hols - No B/O periods (was 310.D.WS.L457 Airport System - IDSS Method Statement Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 20-May-22 09-Jun-22 10-Aug-22 30-Aug-22 82 Hols - No B/O periods (was 310.D.WS.L458 Airport System - IDSS Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 10-Jun-22 16-Jun-22 31-Aug-22 06-Sep-22 82 Hols - No B/O periods (was 310.D.WS.L460 Airport System - IDSS Method Statement Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 17-Jun-22 30-Jun-22 07-Sep-22 20-Sep-22 82 Hols - No B/O periods (was Airport System - IDSS Material Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was06-May-22 C1) 30-Jun-22 12-May-22 06-Jul-22 6 310.D.WS.L464 Airport System - IDSS Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 06-May-22 19-May-22 12-May-22 25-May-22 6 Hols - No B/O periods (was 310.D.WS.L465 Airport System - IDSS Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 20-May-22 09-Jun-22 26-May-22 15-Jun-22 6 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 75 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L466 Airport System - IDSS Material Submission - prepare resubmission C01_7 d/w - 10h/d - No HK 7 10-Jun-22 16-Jun-22 16-Jun-22 22-Jun-22 6 Hols - No B/O periods (was 310.D.WS.L468 Airport System - IDSS Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 17-Jun-22 30-Jun-22 23-Jun-22 06-Jul-22 6 Hols - No B/O periods (was CC#5 - Airport System - Airfield Supervisory Control & Data Acquisition (SCADA) C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was11-May-22 C1) 05-Jul-22 11-May-22 19-Sep-22 76 Airport System - SCADA Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was11-May-22 C1) 05-Jul-22 26-Jul-22 19-Sep-22 76 310.D.WS.L472 Airport System - SCADA Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 26-Jul-22 08-Aug-22 76 Hols - No B/O periods (was 310.D.WS.L473 Airport System - SCADA Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 09-Aug-22 29-Aug-22 76 Hols - No B/O periods (was 310.D.WS.L474 Airport System - SCADA Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 30-Aug-22 05-Sep-22 76 Hols - No B/O periods (was 310.D.WS.L476 Airport System - SCADA Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 22-Jun-22 05-Jul-22 06-Sep-22 19-Sep-22 76 Hols - No B/O periods (was Airport System - SCADA Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was11-May-22 C1) 05-Jul-22 26-Jul-22 19-Sep-22 76 310.D.WS.L480 Airport System - SCADA Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 26-Jul-22 08-Aug-22 76 Hols - No B/O periods (was 310.D.WS.L481 Airport System - SCADA Method Statement Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 09-Aug-22 29-Aug-22 76 Round Hols - No B/O periods (was 310.D.WS.L482 Airport System - SCADA Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 30-Aug-22 05-Sep-22 76 Hols - No B/O periods (was 310.D.WS.L484 Airport System - SCADA Method Statement Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 14 22-Jun-22 05-Jul-22 06-Sep-22 19-Sep-22 76 Round Hols - No B/O periods (was Airport System - SCADA Material Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 11-May-22 28-Jun-22 0 310.D.WS.L488 Airport System - SCADA Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 11-May-22 24-May-22 0 Hols - No B/O periods (was 310.D.WS.L489 Airport System - SCADA Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 25-May-22 14-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L490 Airport System - SCADA Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 15-Jun-22 21-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L492 Airport System - SCADA Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 22-Jun-22 28-Jun-22 0 Hols - No B/O periods (was CC#5 - Airport System - Sub-Pavement Monitoring System (SPMS) C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was11-May-22 C1) 21-Jul-22 11-May-22 04-Oct-22 75 Airport System - SPMS Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was27-May-22 C1) 21-Jul-22 10-Aug-22 04-Oct-22 75 310.D.WS.L496 Airport System - SPMS Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 10-Aug-22 23-Aug-22 75 Hols - No B/O periods (was 310.D.WS.L497 Airport System - SPMS Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 24-Aug-22 13-Sep-22 75 Hols - No B/O periods (was 310.D.WS.L498 Airport System - SPMS Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 14-Sep-22 20-Sep-22 75 Hols - No B/O periods (was 310.D.WS.L500 Airport System - SPMS Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 08-Jul-22 21-Jul-22 21-Sep-22 04-Oct-22 75 Hols - No B/O periods (was Airport System - SPMS Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was27-May-22 C1) 21-Jul-22 10-Aug-22 04-Oct-22 75 310.D.WS.L504 Airport System - SPMS Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 10-Aug-22 23-Aug-22 75 Hols - No B/O periods (was 310.D.WS.L505 Airport System - SPMS Method Statement Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 24-Aug-22 13-Sep-22 75 Hols - No B/O periods (was 310.D.WS.L506 Airport System - SPMS Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 14-Sep-22 20-Sep-22 75 Hols - No B/O periods (was 310.D.WS.L508 Airport System - SPMS Method Statement Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 14 08-Jul-22 21-Jul-22 21-Sep-22 04-Oct-22 75 Round Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 76 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Airport System - SPMS Material Submission C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 11-May-22 28-Jun-22 0 310.D.WS.L512 Airport System - SPMS Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 11-May-22 24-May-22 0 Hols - No B/O periods (was 310.D.WS.L513 Airport System - SPMS Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 25-May-22 14-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L514 Airport System - SPMS Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 15-Jun-22 21-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L516 Airport System - SPMS Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 22-Jun-22 28-Jun-22 0 Hols - No B/O periods (was CC#5 - Airport System - Airport Network System (AANET) & Time of Day Clock System (TODC) C1) C01_7 d/w - 10h/d - No HK Hols65 - No B/O periods 0 (was11-May-22 C1) 14-Jul-22 25-May-22 31-Oct-22 109 Airport System - AANET Drawing Submission C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was27-May-22 C1) 14-Jul-22 13-Sep-22 31-Oct-22 109 310.D.WS.L520 Airport System - AANET Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 13-Sep-22 26-Sep-22 109 Hols - No B/O periods (was 310.D.WS.L521 Airport System - AANET Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 27-Sep-22 17-Oct-22 109 Hols - No B/O periods (was 310.D.WS.L522 Airport System - AANET Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 18-Oct-22 24-Oct-22 109 Hols - No B/O periods (was 310.D.WS.L524 Airport System - AANET Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 08-Jul-22 14-Jul-22 25-Oct-22 31-Oct-22 109 Hols - No B/O periods (was Airport System - AANET Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was27-May-22 C1) 14-Jul-22 13-Sep-22 31-Oct-22 109 310.D.WS.L528 Airport System - AANET Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 13-Sep-22 26-Sep-22 109 Hols - No B/O periods (was 310.D.WS.L529 Airport System - AANET Method Statement Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 27-Sep-22 17-Oct-22 109 Round Hols - No B/O periods (was 310.D.WS.L530 Airport System - AANET Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 18-Oct-22 24-Oct-22 109 Hols - No B/O periods (was 310.D.WS.L532 Airport System - AANET Method Statement Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 7 08-Jul-22 14-Jul-22 25-Oct-22 31-Oct-22 109 Round Hols - No B/O periods (was Airport System - AANET Material Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 25-May-22 12-Jul-22 14 310.D.WS.L536 Airport System - AANET Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 25-May-22 07-Jun-22 14 Hols - No B/O periods (was 310.D.WS.L537 Airport System - AANET Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 08-Jun-22 28-Jun-22 14 Hols - No B/O periods (was 310.D.WS.L538 Airport System - AANET Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 29-Jun-22 05-Jul-22 14 Hols - No B/O periods (was 310.D.WS.L540 Airport System - AANET Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 06-Jul-22 12-Jul-22 14 Hols - No B/O periods (was CC#5 - Airport System - Airport Private Automatic Branch Exchange System (APABX) C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was11-May-22 C1) 21-Jul-22 11-May-22 19-Sep-22 60 Airport System - APABX Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was27-May-22 C1) 21-Jul-22 26-Jul-22 19-Sep-22 60 310.D.WS.L544 Airport System - APABX Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 26-Jul-22 08-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L545 Airport System - APABX Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 09-Aug-22 29-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L546 Airport System - APABX Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 30-Aug-22 05-Sep-22 60 Hols - No B/O periods (was 310.D.WS.L548 Airport System - APABX Drawing Submission - PM review and accept 2nd Round C1) d/w - 10h/d - No HK C01_7 14 08-Jul-22 21-Jul-22 06-Sep-22 19-Sep-22 60 Hols - No B/O periods (was Airport System - APABX Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was27-May-22 C1) 21-Jul-22 26-Jul-22 19-Sep-22 60 310.D.WS.L552 Airport System - APABX Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 26-Jul-22 08-Aug-22 60 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 77 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L553 Airport System - APABX Method Statement Submission - PM review and accept 1st C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 09-Aug-22 29-Aug-22 60 Round Hols - No B/O periods (was 310.D.WS.L554 Airport System - APABX Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 30-Aug-22 05-Sep-22 60 Hols - No B/O periods (was 310.D.WS.L556 Airport System - APABX Method Statement Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 14 08-Jul-22 21-Jul-22 06-Sep-22 19-Sep-22 60 Round Hols - No B/O periods (was Airport System - APABX Material Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 11-May-22 28-Jun-22 0 310.D.WS.L560 Airport System - APABX Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 11-May-22 24-May-22 0 Hols - No B/O periods (was 310.D.WS.L561 Airport System - APABX Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 25-May-22 14-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L562 Airport System - APABX Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 15-Jun-22 21-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L564 Airport System - APABX Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 22-Jun-22 28-Jun-22 0 Hols - No B/O periods (was CC#5 - Airport System - Trunked Mobile Radio System (TMR) C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was11-May-22 C1) 21-Jul-22 11-May-22 19-Sep-22 60 Airport System - TMR Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was27-May-22 C1) 21-Jul-22 26-Jul-22 19-Sep-22 60 310.D.WS.L568 Airport System - TMR Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 26-Jul-22 08-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L569 Airport System - TMR Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 09-Aug-22 29-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L570 Airport System - TMR Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 30-Aug-22 05-Sep-22 60 Hols - No B/O periods (was 310.D.WS.L572 Airport System - TMR Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 08-Jul-22 21-Jul-22 06-Sep-22 19-Sep-22 60 Hols - No B/O periods (was Airport System - TMR Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was27-May-22 C1) 21-Jul-22 26-Jul-22 19-Sep-22 60 310.D.WS.L576 Airport System - TMR Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 27-May-22 09-Jun-22 26-Jul-22 08-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L577 Airport System - TMR Method Statement Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-Jun-22 30-Jun-22 09-Aug-22 29-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L578 Airport System - TMR Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 01-Jul-22 07-Jul-22 30-Aug-22 05-Sep-22 60 Hols - No B/O periods (was 310.D.WS.L580 Airport System - TMR Method Statement Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 08-Jul-22 21-Jul-22 06-Sep-22 19-Sep-22 60 Hols - No B/O periods (was Airport System - TMR Material Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 11-May-22 28-Jun-22 0 310.D.WS.L584 Airport System - TMR Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 11-May-22 24-May-22 0 Hols - No B/O periods (was 310.D.WS.L585 Airport System - TMR Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 25-May-22 14-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L586 Airport System - TMR Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 15-Jun-22 21-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L588 Airport System - TMR Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 22-Jun-22 28-Jun-22 0 Hols - No B/O periods (was CC#5 - Airport System - Voice & Data Cabling System (VDC) C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was26-Apr-22 C1) 06-Jul-22 26-Apr-22 19-Sep-22 75 Airport System - VDC Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was12-May-22 C1) 06-Jul-22 26-Jul-22 19-Sep-22 75 310.D.WS.L592 Airport System - VDC Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 12-May-22 25-May-22 26-Jul-22 08-Aug-22 75 Hols - No B/O periods (was 310.D.WS.L593 Airport System - VDC Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 26-May-22 15-Jun-22 09-Aug-22 29-Aug-22 75 Hols - No B/O periods (was 310.D.WS.L594 Airport System - VDC Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 16-Jun-22 22-Jun-22 30-Aug-22 05-Sep-22 75 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 78 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L596 Airport System - VDC Drawing Submission - PM review and accept 2nd Round C01_7 d/w - 10h/d - No HK 14 23-Jun-22 06-Jul-22 06-Sep-22 19-Sep-22 75 Hols - No B/O periods (was Airport System - VDC Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was12-May-22 C1) 06-Jul-22 26-Jul-22 19-Sep-22 75 310.D.WS.L600 Airport System - VDC Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 12-May-22 25-May-22 26-Jul-22 08-Aug-22 75 Hols - No B/O periods (was 310.D.WS.L601 Airport System - VDC Method Statement Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 26-May-22 15-Jun-22 09-Aug-22 29-Aug-22 75 Hols - No B/O periods (was 310.D.WS.L602 Airport System - VDC Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 16-Jun-22 22-Jun-22 30-Aug-22 05-Sep-22 75 Hols - No B/O periods (was 310.D.WS.L604 Airport System - VDC Method Statement Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 23-Jun-22 06-Jul-22 06-Sep-22 19-Sep-22 75 Hols - No B/O periods (was Airport System - VDC Material Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was26-Apr-22 C1) 13-Jun-22 26-Apr-22 13-Jun-22 0 310.D.WS.L608 Airport System - VDC Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 26-Apr-22 09-May-22 26-Apr-22 09-May-22 0 Hols - No B/O periods (was 310.D.WS.L609 Airport System - VDC Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-May-22 30-May-22 10-May-22 30-May-22 0 Hols - No B/O periods (was 310.D.WS.L610 Airport System - VDC Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 31-May-22 06-Jun-22 31-May-22 06-Jun-22 0 Hols - No B/O periods (was 310.D.WS.L612 Airport System - VDC Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 07-Jun-22 13-Jun-22 07-Jun-22 13-Jun-22 0 Hols - No B/O periods (was CC#5 - Airport System - Apron Wireless LAN System (WNET) C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was11-May-22 C1) 05-Jul-22 13-May-22 19-Sep-22 76 Airport System - WNET Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was11-May-22 C1) 05-Jul-22 26-Jul-22 19-Sep-22 76 310.D.WS.L616 Airport System - WNET Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 26-Jul-22 08-Aug-22 76 Hols - No B/O periods (was 310.D.WS.L617 Airport System - WNET Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 09-Aug-22 29-Aug-22 76 Hols - No B/O periods (was 310.D.WS.L618 Airport System - WNET Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 30-Aug-22 05-Sep-22 76 Hols - No B/O periods (was 310.D.WS.L620 Airport System - WNET Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 22-Jun-22 05-Jul-22 06-Sep-22 19-Sep-22 76 Hols - No B/O periods (was Airport System - WNET Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 02-Aug-22 19-Sep-22 83 310.D.WS.L624 Airport System - WNET Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 02-Aug-22 15-Aug-22 83 Hols - No B/O periods (was 310.D.WS.L625 Airport System - WNET Method Statement Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 16-Aug-22 05-Sep-22 83 Hols - No B/O periods (was 310.D.WS.L626 Airport System - WNET Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 06-Sep-22 12-Sep-22 83 Hols - No B/O periods (was 310.D.WS.L628 Airport System - WNET Method Statement Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 13-Sep-22 19-Sep-22 83 Round Hols - No B/O periods (was Airport System - WNET Material Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 13-May-22 30-Jun-22 2 310.D.WS.L632 Airport System - WNET Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 13-May-22 26-May-22 2 Hols - No B/O periods (was 310.D.WS.L633 Airport System - WNET Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 27-May-22 16-Jun-22 2 Hols - No B/O periods (was 310.D.WS.L634 Airport System - WNET Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 17-Jun-22 23-Jun-22 2 Hols - No B/O periods (was 310.D.WS.L636 Airport System - WNET Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 24-Jun-22 30-Jun-22 2 Hols - No B/O periods (was CC#5 - Airport System - Tunnel Traffic Lane Control System (TTLCS) C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was11-May-22 C1) 05-Jul-22 13-May-22 04-Oct-22 91 Airport System - TTLCS Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was11-May-22 C1) 05-Jul-22 10-Aug-22 04-Oct-22 91
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 79 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L2032.B01 Airport System - TTLCS Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 10-Aug-22 23-Aug-22 91 Hols - No B/O periods (was 310.D.WS.L2044.B01 Airport System - TTLCS Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 24-Aug-22 13-Sep-22 91 Hols - No B/O periods (was 310.D.WS.L2040.B01 Airport System - TTLCS Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 14-Sep-22 20-Sep-22 91 Hols - No B/O periods (was 310.D.WS.L2036.B01 Airport System - TTLCS Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 22-Jun-22 05-Jul-22 21-Sep-22 04-Oct-22 91 Hols - No B/O periods (was Airport System - TTLCS Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 17-Aug-22 04-Oct-22 98 310.D.WS.L2048.B01 Airport System - TTLCS Method Statement Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 17-Aug-22 30-Aug-22 98 Hols - No B/O periods (was 310.D.WS.L2060.B01 Airport System - TTLCS Method Statement Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 31-Aug-22 20-Sep-22 98 Round Hols - No B/O periods (was 310.D.WS.L2056.B01 Airport System - TTLCS Method Statement Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 21-Sep-22 27-Sep-22 98 Hols - No B/O periods (was 310.D.WS.L2052.B01 Airport System - TTLCS Method Statement Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 28-Sep-22 04-Oct-22 98 Round Hols - No B/O periods (was Airport System - TTLCS Material Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was11-May-22 C1) 28-Jun-22 13-May-22 30-Jun-22 2 310.D.WS.L2064.B01 Airport System - TTLCS Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 13-May-22 26-May-22 2 Hols - No B/O periods (was 310.D.WS.L2076.B01 Airport System - TTLCS Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 25-May-22 14-Jun-22 27-May-22 16-Jun-22 2 Hols - No B/O periods (was 310.D.WS.L2072.B01 Airport System - TTLCS Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 15-Jun-22 21-Jun-22 17-Jun-22 23-Jun-22 2 Hols - No B/O periods (was 310.D.WS.L2068.B01 Airport System - TTLCS Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 22-Jun-22 28-Jun-22 24-Jun-22 30-Jun-22 2 Hols - No B/O periods (was CC#5 ----- Procurement ----- C1) C01_7 d/w - 10h/d - No HK Hols428 - No B/O periods 0 (was 01-Nov-21 C1) A 26-Feb-23 27-Mar-22 06-Aug-23 161 Subletting C01_7 d/w - 10h/d - No HK Hols125 - No B/O periods 0 (was 01-Nov-21 C1) A 10-May-22 27-Mar-22 18-Oct-22 161 310.P.AF.F564.B01 Subletting - Airport System IDSS - Stage 1&2 Preparation, Submission & Approval, C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 19-Apr-22 02-Apr-22 25-Apr-22 6 Tender & Award sub-contract Hols - No B/O periods (was 310.P.AF.F532.B01 Subletting - Airport System VDC & LAN- Stage 1&2 Preparation, Submission & Approval, C1) C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 25-Apr-22 27-Mar-22 25-Apr-22 0 Tender & Award sub-contract Hols - No B/O periods (was 310.P.AF.F528 Subletting - Airport System AANET & WNET - Stage 1&2 Preparation, Submission & C1) C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 10-May-22 29-Mar-22 12-May-22 2 Approval, Tender & Award sub-contract Hols - No B/O periods (was 310.P.AF.F536.B01 Subletting - Airport System SPMS - Stage 1&2 Preparation, Submission & Approval, C1) C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 10-May-22 27-Mar-22 10-May-22 0 Tender & Award sub-contract Hols - No B/O periods (was 310.P.AF.F540.B01 Subletting - Airport System BCS - Stage 1&2 Preparation, Submission & Approval, Tender C1) C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 10-May-22 04-Sep-22 18-Oct-22 161 & Award sub-contract Hols - No B/O periods (was 310.P.AF.F544.B01 Subletting - Airport System APABX - Stage 1&2 Preparation, Submission & Approval, C1) C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 10-May-22 27-Mar-22 10-May-22 0 Tender & Award sub-contract Hols - No B/O periods (was 310.P.AF.F548.B01 Subletting - Airport System ACS - Stage 1&2 Preparation, Submission & Approval, Tender C1) C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 10-May-22 27-Mar-22 10-May-22 0 & Award sub-contract Hols - No B/O periods (was 310.P.AF.F552.B01 Subletting - Airport System SCADA - Stage 1&2 Preparation, Submission & Approval, C1) C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 10-May-22 27-Mar-22 10-May-22 0 Tender & Award sub-contract Hols - No B/O periods (was 310.P.AF.F556.B01 Subletting - Airport System TMR - Stage 1&2 Preparation, Submission & Approval, C1) C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 10-May-22 27-Mar-22 10-May-22 0 Tender & Award sub-contract Hols - No B/O periods (was 310.P.AF.F560.B01 Subletting - Airport System ALWS - Stage 1&2 Preparation, Submission & Approval, C1) C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 10-May-22 27-Mar-22 10-May-22 0 Tender & Award sub-contract Hols - No B/O periods (was 310.P.AF.F568.B01 Subletting - Airport System CCTV - Stage 1&2 Preparation, Submission & Approval, C1) C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 10-May-22 27-Mar-22 10-May-22 0 Tender & Award sub-contract Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 80 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.AF.F569.B01 Subletting - Airport System TTLCS - Stage 1&2 Preparation, Submission & Approval, C01_7 d/w - 10h/d - No HK 90 01-Nov-21 A 10-May-22 29-Mar-22 12-May-22 2 Tender & Award sub-contract Hols - No B/O periods (was Procurement C1) C01_7 d/w - 10h/d - No HK Hols258 - No B/O periods 0 (was14-Jun-22 C1) 26-Feb-23 14-Jun-22 06-Aug-23 161 Airport System - Access Control System (ACS) C01_7 d/w - 10h/d - No HK Hols124 - No B/O periods 0 (was29-Jun-22 C1) 30-Oct-22 29-Jun-22 14-Nov-22 15 310.P.ES.P60 Airport System (Procurement ACS) - Access Control System ACS - Place Order for C01_7 d/w - 10h/d - No HK 4 29-Jun-22 02-Jul-22 29-Jun-22 02-Jul-22 0 Material Hols - No B/O periods (was 310.P.ES.P78 Airport System (Procurement ACS) - Access Control System ACS - FAT/ Mockup C1) C01_7 d/w - 10h/d - No HK 120 03-Jul-22 30-Oct-22 03-Jul-22 30-Oct-22 0 /Manufacturing of Material Hols - No B/O periods (was 310.P.ES.P98.B01 Airport System (Procurement ACS) - Access Control System ACS - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 14 06-Sep-22 19-Sep-22 06-Sep-22 19-Sep-22 0 for AGL Vault D Hols - No B/O periods (was 310.P.ES.P99.B01 Airport System (Procurement ACS) - Access Control System ACS - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 14 21-Sep-22 04-Oct-22 21-Sep-22 04-Oct-22 0 for PBB Comms Room Hols - No B/O periods (was 310.P.ES.P86 Airport System (Procurement ACS) - Access Control System ACS - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 7 24-Oct-22 30-Oct-22 08-Nov-22 14-Nov-22 15 Hols - No B/O periods (was Airport System - Airport Lightning Warnings System (ALWS) C1) C01_7 d/w - 10h/d - No HK Hols124 - No B/O periods 0 (was29-Jun-22 C1) 30-Oct-22 29-Jun-22 23-Nov-22 24 310.P.WS.M564 Airport System (Procurement ALWS) - Airport Lightning Warnings System ALWS - Place C01_7 d/w - 10h/d - No HK 4 29-Jun-22 02-Jul-22 29-Jun-22 02-Jul-22 0 Order for Material Hols - No B/O periods (was 310.P.WS.M568 Airport System (Procurement ALWS) - Airport Lightning Warnings System ALWS - FAT/ C1) C01_7 d/w - 10h/d - No HK 120 03-Jul-22 30-Oct-22 03-Jul-22 30-Oct-22 0 Mockup /Manufacturing of Material Hols - No B/O periods (was 310.P.WS.M572.B01 Airport System (Procurement ALWS) - Airport Lightning Warnings System ALWS - C1) C01_7 d/w - 10h/d - No HK 7 13-Sep-22 19-Sep-22 13-Sep-22 19-Sep-22 0 Delivery of Material for AGL Vault D Hols - No B/O periods (was 310.P.WS.M576 Airport System (Procurement ALWS) - Airport Lightning Warnings System ALWS - C1) C01_7 d/w - 10h/d - No HK 7 24-Oct-22 30-Oct-22 17-Nov-22 23-Nov-22 24 Delivery of Material Hols - No B/O periods (was Airport System - Bird Control System (BCS) C1) C01_7 d/w - 10h/d - No HK Hols148 - No B/O periods 0 (was02-Oct-22 C1) 26-Feb-23 12-Mar-23 06-Aug-23 161 310.P.WS.M580 Airport System - Bird Control System BCS - Place Order for Material C01_7 d/w - 10h/d - No HK 14 02-Oct-22 15-Oct-22 12-Mar-23 25-Mar-23 161 Hols - No B/O periods (was 310.P.WS.M596 Airport System - Bird Control System BCS - FAT/ Mockup /Manufacturing of Material C1) C01_7 d/w - 10h/d - No HK 120 16-Oct-22 12-Feb-23 26-Mar-23 23-Jul-23 161 Hols - No B/O periods (was 310.P.WS.M604 Airport System - Bird Control System BCS - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 14 13-Feb-23 26-Feb-23 24-Jul-23 06-Aug-23 161 Hols - No B/O periods (was Airport System - Closed Circuit Television System (CCTV) C1) C01_7 d/w - 10h/d - No HK Hols131 - No B/O periods 0 (was29-Jun-22 C1) 06-Nov-22 29-Jun-22 15-Nov-22 9 310.P.WS.M620 Airport System (Procurement CCTV) - Closed Circuit System CCTV - Place Order for C01_7 d/w - 10h/d - No HK 4 29-Jun-22 02-Jul-22 29-Jun-22 02-Jul-22 0 Material Hols - No B/O periods (was 310.P.WS.M624 Airport System (Procurement CCTV) - Closed Circuit System CCTV - FAT/ Mockup C1) C01_7 d/w - 10h/d - No HK 120 03-Jul-22 30-Oct-22 03-Jul-22 30-Oct-22 0 /Manufacturing of Material Hols - No B/O periods (was 310.P.WS.M628.B01 Airport System (Procurement CCTV) - Closed Circuit System CCTV - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 7 13-Sep-22 19-Sep-22 13-Sep-22 19-Sep-22 0 for AGL Vault D Hols - No B/O periods (was 310.P.WS.M684.B01 Airport System (Procurement CCTV) - Closed Circuit System CCTV - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 9 26-Sep-22 04-Oct-22 26-Sep-22 04-Oct-22 0 for PBB Comms Rm Hols - No B/O periods (was 310.P.WS.M632 Airport System (Procurement CCTV) - Closed Circuit System CCTV - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 7 31-Oct-22 06-Nov-22 09-Nov-22 15-Nov-22 9 Hols - No B/O periods (was Airport System - Intrusion Detection & Surveillance System (IDSS) C1) C01_7 d/w - 10h/d - No HK Hols131 - No B/O periods 0 (was01-Jul-22 C1) 08-Nov-22 07-Jul-22 14-Nov-22 6 310.P.ES.M637 Airport System - Intrusion Detection & Surveillance System - Place Order for Material C01_7 d/w - 10h/d - No HK 4 01-Jul-22 04-Jul-22 07-Jul-22 10-Jul-22 6 Hols - No B/O periods (was 310.P.ES.M641 Airport System - Intrusion Detection & Surveillance System - FAT/ Mockup Manufacturing C1) C01_7 d/w - 10h/d - No HK 120 05-Jul-22 01-Nov-22 11-Jul-22 07-Nov-22 6 of Material Hols - No B/O periods (was 310.P.ES.M649 Airport System - Intrusion Detection & Surveillance System - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 7 02-Nov-22 08-Nov-22 08-Nov-22 14-Nov-22 6 Hols - No B/O periods (was Airport System - Airfield Supervisory Control & Data Acquisition (SCADA) C1) C01_7 d/w - 10h/d - No HK Hols124 - No B/O periods 0 (was29-Jun-22 C1) 30-Oct-22 29-Jun-22 14-Nov-22 15 310.P.RC.D395 Airport System (Procurement SCADA) - Intrusion Detection & Surveillance System C01_7 d/w - 10h/d - No HK 4 29-Jun-22 02-Jul-22 29-Jun-22 02-Jul-22 0 SCADA - Place Order for Material Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 81 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.RC.D399 Airport System (Procurement SCADA)- Intrusion Detection & Surveillance Sys SCADA - C01_7 d/w - 10h/d - No HK 120 03-Jul-22 30-Oct-22 03-Jul-22 30-Oct-22 0 FAT/ Mockup Manufacturing of Material Hols - No B/O periods (was 310.P.RC.D403.B01 Airport System (Procurement SCADA) - Intrusion Detection & Surveillance Sys SCADA - C1) C01_7 d/w - 10h/d - No HK 7 13-Sep-22 19-Sep-22 13-Sep-22 19-Sep-22 0 Delivery of Material for AGL Vault D Hols - No B/O periods (was 310.P.RC.D419.B01 Airport System (Procurement SCADA) - Intrusion Detection & Surveillance Sys SCADA - C1) C01_7 d/w - 10h/d - No HK 9 26-Sep-22 04-Oct-22 26-Sep-22 04-Oct-22 0 Delivery of Material for PBB CommsRm Hols - No B/O periods (was 310.P.RC.D407 Airport System (Procurement SCADA) - Intrusion Detection & Surveillance Sys SCADA - C1) C01_7 d/w - 10h/d - No HK 7 24-Oct-22 30-Oct-22 08-Nov-22 14-Nov-22 15 Delivery of Material Hols - No B/O periods (was Airport System - Sub-Pavement Monitoring System (SPMS) C1) C01_7 d/w - 10h/d - No HK Hols131 - No B/O periods 0 (was29-Jun-22 C1) 06-Nov-22 29-Jun-22 20-Jan-23 75 310.P.RC.D367 Airport System - Sub-Pavement Monitoring System SPMS - Place Order for Material C01_7 d/w - 10h/d - No HK 4 29-Jun-22 02-Jul-22 29-Jun-22 02-Jul-22 0 Hols - No B/O periods (was 310.P.RC.D371 Airport System - Sub-Pavement Monitoring System SPMS - FAT/ Mockup Manufacturing C1) C01_7 d/w - 10h/d - No HK 120 03-Jul-22 30-Oct-22 03-Jul-22 30-Oct-22 0 of Material Hols - No B/O periods (was 310.P.RC.D383.B01 Airport System - Sub-Pavement Monitoring System SPMS - Delivery of Material for PBB C1) C01_7 d/w - 10h/d - No HK 9 26-Sep-22 04-Oct-22 26-Sep-22 04-Oct-22 0 Comms Rm Hols - No B/O periods (was 310.P.RC.D379 Airport System - Sub-Pavement Monitoring System SPMS - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 7 31-Oct-22 06-Nov-22 14-Jan-23 20-Jan-23 75 Hols - No B/O periods (was Airport System - Airport Network System (AANET) & Time of Day Clock System (TODC) C1) C01_7 d/w - 10h/d - No HK Hols111 - No B/O periods 0 (was29-Jun-22 C1) 17-Oct-22 13-Jul-22 31-Oct-22 14 310.P.RC.D411 Airport System - Airport Network System TODC/ AANET - Place Order for Material C01_7 d/w - 10h/d - No HK 4 29-Jun-22 02-Jul-22 13-Jul-22 16-Jul-22 14 Hols - No B/O periods (was 310.P.RC.D415 Airport System - Airport Network System TODC/ AANET - FAT/ Mockup Manufacturing of C1) C01_7 d/w - 10h/d - No HK 100 03-Jul-22 10-Oct-22 17-Jul-22 24-Oct-22 14 Material Hols - No B/O periods (was 310.P.RC.D423 Airport System - Airport Network System TODC/ AANET - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 7 11-Oct-22 17-Oct-22 25-Oct-22 31-Oct-22 14 Hols - No B/O periods (was Airport System - Airport Private Automatic Branch Exchange System (APABX) C1) C01_7 d/w - 10h/d - No HK Hols124 - No B/O periods 0 (was29-Jun-22 C1) 30-Oct-22 29-Jun-22 14-Nov-22 15 310.P.RC.P650 Airport System (Procurement APABX) - Airport Private Automatic Branch Exchange C01_7 d/w - 10h/d - No HK 4 29-Jun-22 02-Jul-22 29-Jun-22 02-Jul-22 0 System APABX - Place Order for Material Hols - No B/O periods (was 310.P.RC.P654 Airport System (Procurement APABX) - Airport Private Automatic Branch Exchange Sys C1) C01_7 d/w - 10h/d - No HK 120 03-Jul-22 30-Oct-22 03-Jul-22 30-Oct-22 0 APABX - FAT/ Mockup Manufacturing Hols - No B/O periods (was 310.P.RC.P710.B01 Airport System (Procurement APABX) - Airport Private Automatic Branch Exchange C1) C01_7 d/w - 10h/d - No HK 7 13-Sep-22 19-Sep-22 13-Sep-22 19-Sep-22 0 System APABX - Delivery for AGL Vault D Hols - No B/O periods (was 310.P.RC.P706.B01 Airport System (Procurement APABX) - Airport Private Automatic Branch Exchange C1) C01_7 d/w - 10h/d - No HK 9 26-Sep-22 04-Oct-22 26-Sep-22 04-Oct-22 0 System APABX - Delivery for PBB Comms Rm Hols - No B/O periods (was 310.P.RC.P658 Airport System (Procurement APABX) - Airport Private Automatic Branch Exchange C1) C01_7 d/w - 10h/d - No HK 7 24-Oct-22 30-Oct-22 08-Nov-22 14-Nov-22 15 System APABX - Delivery of Material Hols - No B/O periods (was Airport System - Trunked Mobile Radio System (TMR) C1) C01_7 d/w - 10h/d - No HK Hols131 - No B/O periods 0 (was29-Jun-22 C1) 06-Nov-22 29-Jun-22 15-Nov-22 9 310.P.RC.P590 Airport System (Procurement TMR) - Trucked Mobile Radio System TMR - Place Order C01_7 d/w - 10h/d - No HK 4 29-Jun-22 02-Jul-22 29-Jun-22 02-Jul-22 0 for Material Hols - No B/O periods (was 310.P.RC.P598 Airport System (Procurement TMR) - Trucked Mobile Radio System TMR - FAT/ Mockup C1) C01_7 d/w - 10h/d - No HK 120 03-Jul-22 30-Oct-22 03-Jul-22 30-Oct-22 0 Manufacturing of Material Hols - No B/O periods (was 310.P.RC.P602.B01 Airport System (Procurement TMR) - Trucked Mobile Radio System TMR - Delivery of C1) C01_7 d/w - 10h/d - No HK 7 13-Sep-22 19-Sep-22 13-Sep-22 19-Sep-22 0 Material for AGL Vault D Hols - No B/O periods (was 310.P.RC.P610.B01 Airport System (Procurement TMR) - Trucked Mobile Radio System TMR - Delivery of C1) C01_7 d/w - 10h/d - No HK 9 26-Sep-22 04-Oct-22 26-Sep-22 04-Oct-22 0 Material for PBB Comms Rm Hols - No B/O periods (was 310.P.RC.P606 Airport System (Procurement TMR) - Trucked Mobile Radio System TMR - Delivery of C1) C01_7 d/w - 10h/d - No HK 7 31-Oct-22 06-Nov-22 09-Nov-22 15-Nov-22 9 Material Hols - No B/O periods (was Airport System - Voice & Data Cabling System (VDC) C1) C01_7 d/w - 10h/d - No HK Hols131 - No B/O periods 0 (was14-Jun-22 C1) 22-Oct-22 14-Jun-22 31-Oct-22 9 310.P.RC.P618 Airport System (Procurement VDC) - Voice & Data Cabling System VDC - Place Order for C01_7 d/w - 10h/d - No HK 4 14-Jun-22 17-Jun-22 14-Jun-22 17-Jun-22 0 Material Hols - No B/O periods (was 310.P.RC.P626 Airport System (Procurement VDC) - Voice & Data Cabling System VDC - FAT/ Mockup C1) C01_7 d/w - 10h/d - No HK 120 18-Jun-22 15-Oct-22 18-Jun-22 15-Oct-22 0 Manufacturing of Material Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 82 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.RC.P630.B01 Airport System (Procurement VDC) - Voice & Data Cabling System VDC - Delivery of C01_7 d/w - 10h/d - No HK 9 11-Sep-22 19-Sep-22 11-Sep-22 19-Sep-22 0 Material for AGL Vault D Hols - No B/O periods (was 310.P.RC.P698.B01 Airport System (Procurement VDC) - Voice & Data Cabling System VDC - Delivery of C1) C01_7 d/w - 10h/d - No HK 14 16-Sep-22 29-Sep-22 21-Sep-22 04-Oct-22 5 Material for PBB Comms Rm Hols - No B/O periods (was 310.P.RC.P702.B01 Airport System (Procurement VDC) - Voice & Data Cabling System VDC - Delivery of C1) C01_7 d/w - 10h/d - No HK 9 21-Sep-22 29-Sep-22 29-Sep-22 07-Oct-22 8 Material for GSE Vehicle Wash Facility Hols - No B/O periods (was 310.P.RC.P634 Airport System (Procurement VDC) - Voice & Data Cabling System VDC - Delivery of C1) C01_7 d/w - 10h/d - No HK 7 16-Oct-22 22-Oct-22 25-Oct-22 31-Oct-22 9 Material Hols - No B/O periods (was Airport System - Apron Wireless LAN System (WNET) C1) C01_7 d/w - 10h/d - No HK Hols111 - No B/O periods 0 (was29-Jun-22 C1) 17-Oct-22 01-Jul-22 31-Oct-22 14 310.P.RC.P638 Airport System (Procurement WNET) - Apron Wireless LAN System WNET - Place Order C01_7 d/w - 10h/d - No HK 4 29-Jun-22 02-Jul-22 01-Jul-22 04-Jul-22 2 for Material Hols - No B/O periods (was 310.P.RC.P642 Airport System (Procurement WNET) - Apron Wireless LAN System WNET - FAT/ C1) C01_7 d/w - 10h/d - No HK 100 03-Jul-22 10-Oct-22 05-Jul-22 12-Oct-22 2 Mockup Manufacturing of Material Hols - No B/O periods (was 310.P.RC.P698 Airport System (Procurement WNET) - Apron Wireless LAN System WNET - Delivery of C1) C01_7 d/w - 10h/d - No HK 7 26-Sep-22 02-Oct-22 28-Sep-22 04-Oct-22 2 Material for PBB Comms Rm Hols - No B/O periods (was 310.P.RC.P646 Airport System (Procurement WNET) - Apron Wireless LAN System WNET - Delivery of C1) C01_7 d/w - 10h/d - No HK 7 11-Oct-22 17-Oct-22 25-Oct-22 31-Oct-22 14 Material Hols - No B/O periods (was Airport System - Tunnel Traffic Lane Control System (TTLCS) C1) C01_7 d/w - 10h/d - No HK Hols111 - No B/O periods 0 (was29-Jun-22 C1) 17-Oct-22 01-Jul-22 31-Oct-22 14 310.P.ES.P166.B01 Airport System (Procurement TTLCS) - Tunnel Traffic Lane Control System - Place Order C01_7 d/w - 10h/d - No HK 4 29-Jun-22 02-Jul-22 01-Jul-22 04-Jul-22 2 for Material Hols - No B/O periods (was 310.P.ES.P170.B01 Airport System (Procurement TTLCS) - Tunnel Traffic Lane Control System - FAT/ C1) C01_7 d/w - 10h/d - No HK 100 03-Jul-22 10-Oct-22 05-Jul-22 12-Oct-22 2 Mockup /Manufacturing of Material Hols - No B/O periods (was 310.P.ES.P174.B05 Airport System (Procurement TTLCS) - Tunnel Traffic Lane Control System - Delivery of C1) C01_7 d/w - 10h/d - No HK 7 26-Sep-22 02-Oct-22 28-Sep-22 04-Oct-22 2 Material for PBB Comms Rm Hols - No B/O periods (was 310.P.ES.P174.B01 Airport System (Procurement TTLCS) - Tunnel Traffic Lane Control System - Delivery of C1) C01_7 d/w - 10h/d - No HK 7 11-Oct-22 17-Oct-22 25-Oct-22 31-Oct-22 14 Material Hols - No B/O periods (was CC#5 ----- Construction ----- C1) 446 85 20-Sep-22 19-Mar-24 20-Sep-22 08-Jun-24 64 Airfield (West & East Area) 359 32 04-Jan-23 19-Mar-24 21-Jan-23 08-Jun-24 64 Airport System - EVT C11_6 d/w - 10h/d - With HK Hols 264- No B/O 8periods (was 09-Mar-23 C3) 26-Jan-24 17-Mar-23 08-Feb-24 11 310.C.EX.W2440 EVT (EU) Eastern Approach Ramp - Airport System cabling & equipment Inst'n C11_6 d/w - 10h/d - With 75 2 09-Mar-23 10-Jun-23 17-Mar-23 19-Jun-23 7 (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.W2444 EVT (EA) Eastern Roundabout - Airport System cabling & equipment Inst'n (was C11_6C3) d/w - 10h/d - With 75 2 12-Jun-23 08-Sep-23 20-Jun-23 16-Sep-23 7 (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.W2448 EVT (ES) Eastern Switch Ramp - Airport System cabling & equipment Inst'n (was C11_6C3) d/w - 10h/d - With 75 2 09-Sep-23 08-Dec-23 18-Sep-23 16-Dec-23 7 (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.W2452 EVT (ET) Eastern Tunnel - Airport System cabling & equipment Inst'n (was C11_6C3) d/w - 10h/d - With 40 2 08-Dec-23 26-Jan-24 21-Dec-23 08-Feb-24 11 (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods Airport System - WVT (was C11_6C3) d/w - 10h/d - With HK Hols 339- No B/O22 periods (was 04-Jan-23 C3) 24-Feb-24 21-Jan-23 26-Mar-24 26 310.C.EX.W2460 WVT (WA02) Western Roundabout - North-Bound - Airport System cabling & equipment C11_6 d/w - 10h/d - With 30 2 04-Jan-23 10-Feb-23 11-Feb-23 17-Mar-23 30 Inst'n (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.W2456 WVT (WR) Western Ramp - North-Bound - Airport System cabling & equipment Inst'n (was C11_6C3) d/w - 10h/d - With 45 2 04-Jan-23 28-Feb-23 21-Jan-23 17-Mar-23 15 (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.W2464 WVT (WU) Western Underpass - North-Bound - Airport System cabling & equipment Inst'n (was C11_6C3) d/w - 10h/d - With 45 2 24-Feb-23 21-Apr-23 03-Mar-23 28-Apr-23 6 (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.W2468 WVT (WA01) Western Roundabout - North-Bound - Airport System cabling & equipment (wasC11_6C3) d/w - 10h/d - With 30 2 03-Apr-23 12-May-23 15-May-23 19-Jun-23 31 Inst'n (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.W2472 WVT (WUR) Western Underpass Ramp - North-Bound - Airport System cabling & eqpt (was C11_6C3) d/w - 10h/d - With 45 2 16-May-23 10-Jul-23 05-Jun-23 28-Jul-23 16 Inst'n (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.X708 WVT (WR) Western Ramp - South-Bound - Airport System cabling & equipment Inst'n (was C11_6C3) d/w - 10h/d - With 45 2 07-Jul-23 28-Aug-23 14-Jul-23 04-Sep-23 6 (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 83 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.X712 WVT (WA02) Western Roundabout - South-Bound - Airport System cabling & equipment C11_6 d/w - 10h/d - With 30 2 02-Aug-23 05-Sep-23 19-Sep-23 26-Oct-23 41 Inst'n (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.X716 WVT (WU) Western Underpass - South-Bound - Airport System cabling & equipment (was C11_6C3) d/w - 10h/d - With 45 2 04-Oct-23 25-Nov-23 11-Oct-23 02-Dec-23 6 Inst'n (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.X720 WVT (WA01) Western Roundabout - South-Bound - Airport System cabling & equipment (was C11_6C3) d/w - 10h/d - With 30 2 11-Nov-23 15-Dec-23 15-Dec-23 22-Jan-24 29 Inst'n (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.W2476 WVT (WT) Western Vehicular Tunnel - Airport System cabling & equipment Inst'n (was C11_6C3) d/w - 10h/d - With 60 2 12-Dec-23 24-Feb-24 15-Jan-24 26-Mar-24 26 (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods 310.C.EX.X724 WVT (WUR) Western Underpass Ramp - South-Bound - Airport System cabling & eqpt (was C11_6C3) d/w - 10h/d - With 45 2 19-Dec-23 14-Feb-24 05-Jan-24 28-Feb-24 12 Inst'n (VDC,CCTV,SCADA,TMR,TTLCS,APABX) HK Hols - No B/O periods Airport System - Airfield (West & East Area) - Testing & Commissioning (was C3) 43 2 27-Jan-24 19-Mar-24 04-May-24 08-Jun-24 64 310.T.EX.L500 EVT (T&C) - Airport System T&C C11_6 d/w - 10h/d - With 21 2 27-Jan-24 22-Feb-24 04-May-24 29-May-24 77 HK Hols - No B/O periods 310.T.EX.L504 WVT (T&C) - Airport System Test (was C01_7C3) d/w - 10h/d - No HK 24 25-Feb-24 19-Mar-24 16-May-24 08-Jun-24 81 Hols - No B/O periods (was Airport System - Security Fence C1) 346 12 21-Sep-22 18-Nov-23 21-Sep-22 07-May-24 136 Stage 1 Installation Works C01_7 d/w - 10h/d - No HK Hols21 - No B/O periods 2 (was21-Sep-22 C1) 11-Oct-22 21-Sep-22 11-Oct-22 0 310.C.RC.C072 WSA - Interim Sec. Fence (normal days) - install IDSS C01_7 d/w - 10h/d - No HK 21 1 21-Sep-22 11-Oct-22 21-Sep-22 11-Oct-22 0 Hols - No B/O periods (was 310.C.RC.C076 ESA - Interim Sec. Fence (normal days) - install IDSS C1) C01_7 d/w - 10h/d - No HK 21 1 21-Sep-22 11-Oct-22 21-Sep-22 11-Oct-22 0 Hols - No B/O periods (was Stage 2 Installation Works C1) C11_6 d/w - 10h/d - With HK Hols 29- No B/O 1periods (was 16-Oct-23 C3) 18-Nov-23 07-Nov-23 09-Dec-23 18 310.C.RC.C084 Interim Sec. Fence (Stage 2) - install Interim Sec. Fence, IDSS, CCTV C11_6 d/w - 10h/d - With 29 1 16-Oct-23 18-Nov-23 07-Nov-23 09-Dec-23 18 HK Hols - No B/O periods Permanent Security Fence (was C11_6C3) d/w - 10h/d - With HK Hols 99- No B/O 9periods (was 24-Jun-23 C3) 20-Oct-23 05-Jan-24 07-May-24 160 310.C.R0.X160 3310/10,10A - Security Fence - install Security System C11_6 d/w - 10h/d - With 99 9 24-Jun-23 20-Oct-23 05-Jan-24 07-May-24 160 HK Hols - No B/O periods Airport System - Ancillary Buildings (was C3) 330 41 20-Sep-22 30-Oct-23 20-Sep-22 30-May-24 172 Airport System - Security Gate House C11_6 d/w - 10h/d - With HK Hols 79- No B/O 4periods (was 15-May-23 C3) 17-Aug-23 26-Jul-23 28-Oct-23 59 310.C.WS.S233 Gatehouse B/Vehicle Search Bay, C&ED - (1st-Final Fix)-Airport C11_6 d/w - 10h/d - With 79 4 15-May-23 17-Aug-23 26-Jul-23 28-Oct-23 59 System-VDC,CCTV,ALWS,SCADA,TMR,ACS,WNET,APABX HK Hols - No B/O periods Airport System - Maintenance Facilities Forecourt & Coach Staging A, & Bus Stop (was C11_6C3) d/w - 10h/d - With HK Hols 25- No B/O 1periods (was 26-Jul-23 C3) 23-Aug-23 15-Feb-24 14-Mar-24 167 310.C.D.WS.M130 WSA - MFF and Bus Stop (Airport System) - cabling & equipment Inst'n for CCTV C11_6 d/w - 10h/d - With 25 1 26-Jul-23 23-Aug-23 15-Feb-24 14-Mar-24 167 HK Hols - No B/O periods Airport System - Communication Equipment Building D (was C11_6C3) d/w - 10h/d - With HK Hols 32- No B/O 2periods (was 09-Nov-22 C3) 15-Dec-22 15-Nov-22 21-Dec-22 5 310.C.TC.M332 WSA - Comm Eqpt Bldg D (Airport System) - cabling & equipment Inst'n for C11_6 d/w - 10h/d - With 32 2 09-Nov-22 15-Dec-22 15-Nov-22 21-Dec-22 5 VDC,CCTV,ALWS,SCADA,TMR,ACS,WNET,IDSS,APABX HK Hols - No B/O periods Airport System - C&ED Operational Office & Kennel Area (was C11_6C3) d/w - 10h/d - With HK Hols 79- No B/O 4periods (was 07-Jul-23 C3) 09-Oct-23 08-Sep-23 12-Dec-23 54 310.C.ES.P636 C&ED Op. Office & Kennel Area - (1st Fix - Final Fix) - Airport System - cabling & C11_6 d/w - 10h/d - With 79 4 07-Jul-23 09-Oct-23 08-Sep-23 12-Dec-23 54 equipment Inst'n for VDC,APABX HK Hols - No B/O periods Airport System - GSE Battery Charging B (was C11_6C3) d/w - 10h/d - With HK Hols 40- No B/O 4periods (was 31-Oct-22 C3) 15-Dec-22 24-Nov-22 11-Jan-23 21 310.C.TC.N410 GSE Battery Charging B (Airport System) - cabling & equipment Inst'n for C11_6 d/w - 10h/d - With 40 2 31-Oct-22 15-Dec-22 24-Nov-22 11-Jan-23 21 VDC,ALWS,SCADA,ACS,APABX HK Hols - No B/O periods 310.C.ES.P608 GSE Battery Charging B - 1st Fix - Final Fix) - Airport System - cabling & eqpt Inst'n (was C11_6C3) d/w - 10h/d - With 40 2 31-Oct-22 15-Dec-22 24-Nov-22 11-Jan-23 21 VDC,ALWS,SCADA,ACS,APABX HK Hols - No B/O periods Airport System - Screening Facility (was C11_6C3) d/w - 10h/d - With HK Hols 60- No B/O 3periods (was 26-Nov-22 C3) 09-Feb-23 16-Dec-22 01-Mar-23 17 310.C.WS.R094 WSA - Screening Facility (Airport System) - cabling & equipment Inst'n for C11_6 d/w - 10h/d - With 60 3 26-Nov-22 09-Feb-23 16-Dec-22 01-Mar-23 17 VDC,CCTV,SCADA,TMR,ACS,WNET,APABX HK Hols - No B/O periods Airport System - GSE Vehicle Wash Facility (was C11_6C3) d/w - 10h/d - With HK Hols 32- No B/O 2periods (was 30-Sep-22 C3) 08-Nov-22 08-Oct-22 14-Nov-22 5
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 84 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.TC.M408 GSE Wash Facility (Airport System) - cabling & equipment Inst'n for C11_6 d/w - 10h/d - With 32 2 30-Sep-22 08-Nov-22 08-Oct-22 14-Nov-22 5 VDC,SCADA,ACS,APABX HK Hols - No B/O periods Airport System - AGL Vault C & D Annexes (was C11_6C3) d/w - 10h/d - With HK Hols 142- No B/O10 periods (was 20-Sep-22 C3) 11-Mar-23 20-Sep-22 18-Feb-23 -18 310.D.RC.D503 AGL Vault D Annex (Airport System) - cabling & equipment Inst'n for VDC, CCTV,C11_6 d/w - 10h/d - With 75 5 20-Sep-22 17-Dec-22 20-Sep-22 17-Dec-22 0 SCADA, TMRS, ACS, AWLS, APABX HK Hols - No B/O periods 310.C.RC.D128 AGL Vault C Annex (Airport System) - cabling & equipment Inst'n for VDC, SCADA, TMR, (was C11_6C3) d/w - 10h/d - With 75 5 09-Dec-22 11-Mar-23 18-Nov-22 18-Feb-23 -18 ACS, APABX HK Hols - No B/O periods Airport System - Tunnel Plant Building A (was C3) 229 6 30-Dec-22 09-Oct-23 31-Dec-22 02-Mar-24 119 310.C.ES.P420 PBA (Comms Room 1st Fix - Final Fix) - Airport System C11_6 d/w - 10h/d - With 45 2 30-Dec-22 24-Feb-23 31-Dec-22 25-Feb-23 1 VDC,CCTV,SCADA,WNET,TMR,ACS,AANET,TTLCS,APABX HK Hols - No B/O periods 310.C.ES.P424 Achieved KD-3 (Stage 3) - Complete all works for CR305 w/in Plant Bldg A incl. all ABWF, (was C01_7C3) d/w - 10h/d - No HK 0 24-Feb-23 26-Feb-23 2 BS, and AS to final fix Hols - No B/O periods (was 310.C.ES.P392 PBA (1st Fix - Final Fix) - Airport System - cabling & eqpt Inst'n C1) C11_6 d/w - 10h/d - With 79 4 07-Jul-23 09-Oct-23 27-Nov-23 02-Mar-24 119 VDC,CCTV,SCADA,WNET,TMR,ACS,AANET,TTLCS,APABX HK Hols - No B/O periods Airport System - Tunnel Plant Building B (was C11_6C3) d/w - 10h/d - With HK Hols 21- No B/O 2periods (was 05-Oct-22 C3) 28-Oct-22 05-Oct-22 28-Oct-22 0 310.C.ES.P528 PBB (Comms Room 1st Fix - Final Fix) - Airport System cabling & eqpt Inst'n C11_6 d/w - 10h/d - With 21 1 05-Oct-22 28-Oct-22 05-Oct-22 28-Oct-22 0 VDC,CCTV,SCADA,TMR,ACS,WNET,TTLCS,APABX,SPMS HK Hols - No B/O periods 310.C.ES.P552 PBB (1st Fix - Final Fix) - Airport System - cabling & eqpt Inst'n (was C11_6C3) d/w - 10h/d - With 21 1 05-Oct-22 28-Oct-22 05-Oct-22 28-Oct-22 0 VDC,CCTV,SCADA,TMR,ACS,WNET,TTLCS,APABX,SPMS HK Hols - No B/O periods Airport System - Tunnel Plant Building C (was C11_6C3) d/w - 10h/d - With HK Hols 35- No B/O 3periods (was 24-Oct-22 C3) 02-Dec-22 01-Nov-22 10-Dec-22 7 310.C.EX.P150 PBC (Ground Floor, AS) - VDC,CCTV,SCADA,TMR,ACS,WNET,AANET,TTLCS,APABX C11_6 d/w - 10h/d - With 21 1 24-Oct-22 16-Nov-22 01-Nov-22 24-Nov-22 7 HK Hols - No B/O periods 310.C.ES.P472 PBC (Comms Room 1st Fix - Final Fix) -Airport System cabling & eqpt Inst'n (was C11_6C3) d/w - 10h/d - With 21 1 07-Nov-22 30-Nov-22 16-Nov-22 09-Dec-22 8 VDC,CCTV,SCADA,TMR,ACS,WNET,AANET,TTLCS,APABX HK Hols - No B/O periods 310.C.EX.P158 PBC (1st Floor, AS) - VDC,CCTV,SCADA,TMR,ACS,WNET,AANET,TTLCS,APABX (was C11_6C3) d/w - 10h/d - With 21 1 09-Nov-22 02-Dec-22 17-Nov-22 10-Dec-22 7 HK Hols - No B/O periods Airport System - Ancillary Building - Testing & Commissioning (was C01_7C3) d/w - 10h/d - No HK Hols367 - No B/O periods 0 (was29-Oct-22 C1) 30-Oct-23 29-Oct-22 30-May-24 213 310.C.ES.P776 PBB - Airport System T&C - VDC,CCTV,SCADA,TMR,ACS,WNET,TTLCS,APABX,SPMS C01_7 d/w - 10h/d - No HK 21 29-Oct-22 18-Nov-22 29-Oct-22 18-Nov-22 0 Hols - No B/O periods (was 310.C.ES.P760 GSE Wash Facility - Airport System T&C - VDC,SCADA,ACS,APABX C1) C01_7 d/w - 10h/d - No HK 21 09-Nov-22 29-Nov-22 26-Dec-22 15-Jan-23 47 Hols - No B/O periods (was 310.C.ES.P804 PBC - Airport System T&C - C1) C01_7 d/w - 10h/d - No HK 21 03-Dec-22 23-Dec-22 12-Dec-22 01-Jan-23 9 VDC,CCTV,SCADA,TMR,ACS,WNET,AANET,TTLCS,APABX Hols - No B/O periods (was 310.C.ES.P748 WSA - Comm Eqpt Bldg D - Airport System T&C - C1) C01_7 d/w - 10h/d - No HK 21 16-Dec-22 05-Jan-23 16-Jan-23 05-Feb-23 31 VDC,CCTV,ALWS,SCADA,TMR,ACS,WNET,IDSS,APABX Hols - No B/O periods (was 310.C.ES.P752 GSE Battery Charging B - Airport System T&C - VDC,ALWS,SCADA,ACS,APABX C1) C01_7 d/w - 10h/d - No HK 21 16-Dec-22 05-Jan-23 15-Jul-23 04-Aug-23 211 Hols - No B/O periods (was 310.C.ES.P764 AGL Vault D Annex - Airport System T&C - VDC, CCTV, SCADA, TMRS, ACS, AWLS, C1) C01_7 d/w - 10h/d - No HK 21 18-Dec-22 07-Jan-23 19-Oct-23 08-Nov-23 305 APABX Hols - No B/O periods (was 310.C.ES.P756 WSA - Screening Facility - Airport System T&C - C1) C01_7 d/w - 10h/d - No HK 21 10-Feb-23 02-Mar-23 27-Apr-23 17-May-23 76 VDC,CCTV,SCADA,TMR,ACS,WNET,APABX Hols - No B/O periods (was 310.C.ES.P768 AGL Vault C Annex - Airport System T&C - VDC, SCADA, TMR, ACS, APABX C1) C01_7 d/w - 10h/d - No HK 21 12-Mar-23 01-Apr-23 23-Nov-23 13-Dec-23 256 Hols - No B/O periods (was 310.C.ES.P740 WSA - Gatehouse B/Vehicle Search Bay, C&ED - Airport System C1) C01_7 d/w - 10h/d - No HK 21 18-Aug-23 07-Sep-23 28-Nov-23 18-Dec-23 102 T&C-VDC,CCTV,ALWS,SCADA,TMR,ACS,WNET,APABX Hols - No B/O periods (was 310.C.ES.P744 WSA - MFF and Bus Stop - Airport System T&C - CCTV C1) C01_7 d/w - 10h/d - No HK 21 24-Aug-23 13-Sep-23 10-May-24 30-May-24 260 Hols - No B/O periods (was 310.C.ES.P772 PBA - Airport System T&C - C1) C01_7 d/w - 10h/d - No HK 21 10-Oct-23 30-Oct-23 04-Mar-24 24-Mar-24 146 VDC,CCTV,SCADA,WNET,TMR,ACS,AANET,TTLCS,APABX Hols - No B/O periods (was 310.C.ES.P796 C&ED Op. Office & Kennel Area Annex - Airport System T&C - VDC,APABX C1) C01_7 d/w - 10h/d - No HK 21 10-Oct-23 30-Oct-23 05-Jan-24 25-Jan-24 87 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 85 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Cost Centre #06 - East Vehicular Tunnels & Plant Building A & C 930 307 07-Jun-21 A 22-Jul-24 07-Mar-22 28-Jul-24 5 CC#06 ----- Design & Other Submission ----- C01_7 d/w - 10h/d - No HK Hols553 - No B/O periods 0 (was 27-Jun-21 C1) A 31-Dec-22 28-Mar-22 25-Apr-23 115 CC#06 - EVT - Statutory Submission and Consent Application C01_7 d/w - 10h/d - No HK Hols553 - No B/O periods 0 (was 27-Jun-21 C1) A 31-Dec-22 29-Mar-22 25-Apr-23 115 CC#06 - EVT - Ground Investigation Plan for ELS Design C01_7 d/w - 10h/d - No HK Hols391 - No B/O periods 0 (was 09-Jul-21 C1) A 01-Sep-22 19-Apr-22 01-Sep-22 1 310.D.EX.H010 EVT - SI Plan for ELS Design - prepare and submit to PM C01_7 d/w - 10h/d - No HK 21 09-Jul-21 A 29-Jul-21 A 19-Apr-22 19-Apr-22 Hols - No B/O periods (was 310.D.EX.H034 EVT - SI Plan for ELS Design - prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 14-Aug-21 A 20-Aug-21 A 19-Apr-22 19-Apr-22 commencement (Zone 6 & 7) Hols - No B/O periods (was 310.D.EX.H517 EVT - SI Plan for ELS Design - prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 25-Aug-22 01-Sep-22 26-Aug-22 01-Sep-22 1 commencement (Other Zones) Hols - No B/O periods (was CC#06 - EVT - Consent Application for DJM Works C1) C01_7 d/w - 10h/d - No HK Hols21 - No B/O periods 0 (was 26-Aug-21 C1) A 15-Sep-21 A 08-Nov-22 08-Nov-22 310.D.EX.H325 EVT - DJM Works - prepare and submit Form BA8 C01_7 d/w - 10h/d - No HK 7 26-Aug-21 A 01-Sep-21 A 08-Nov-22 08-Nov-22 Hols - No B/O periods (was 310.D.EX.H329 EVT - DJM Works - BD review and grant Consent C1) C01_7 d/w - 10h/d - No HK 7 02-Sep-21 A 08-Sep-21 A 08-Nov-22 08-Nov-22 Hols - No B/O periods (was 310.D.EX.H333 EVT - DJM Works - prepare and submit form BA10 for Notification of Work C1) C01_7 d/w - 10h/d - No HK 7 09-Sep-21 A 15-Sep-21 A 08-Nov-22 08-Nov-22 Commencement Hols - No B/O periods (was CC#06 - EVT - ELS Design - Vertical Element C1) C01_7 d/w - 10h/d - No HK Hols474 - No B/O periods 0 (was 27-Jun-21 C1) A 13-Oct-22 29-Mar-22 07-Jan-23 86 ELS Design (Vertical Elements) - EVT Ch1027 to 1275 (Zones 6 &7) Pkg.1 C01_7 d/w - 10h/d - No HK Hols277 - No B/O periods 0 (was 27-Jun-21 C1) A 16-Apr-22 29-Mar-22 18-Apr-22 2 310.D.EX.H357 EVT - ELS design (Vertical Elements) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 74 27-Jun-21 A 08-Sep-21 A 29-Mar-22 29-Mar-22 Hols - No B/O periods (was 310.D.EX.H361 EVT - ELS design (Vertical Elements) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 1 09-Sep-21 A 09-Sep-21 A 29-Mar-22 29-Mar-22 Hols - No B/O periods (was 310.D.EX.H365 EVT - ELS design (Vertical Elements) - PM, AP, RSE reviewing 1st Round C1) C01_7 d/w - 10h/d - No HK 28 10-Sep-21 A 08-Nov-21 A 29-Mar-22 29-Mar-22 Hols - No B/O periods (was 310.D.EX.H393 EVT - ELS design (Vertical Elements) - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 09-Nov-21 A 07-Jan-22 A 29-Mar-22 29-Mar-22 certificates Hols - No B/O periods (was 310.D.EX.H373 EVT - ELS design (Vertical Elements) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 07-Jan-22 A 16-Apr-22 29-Mar-22 18-Apr-22 2 Hols - No B/O periods (was ELS Design (Vertical Elements) - EVT Ch532 to 562 (Zone 1) Pkg.3 C1) C01_7 d/w - 10h/d - No HK Hols214 - No B/O periods 0 (was 04-Dec-21 C1) A 31-Aug-22 03-Aug-22 07-Jan-23 129 310.D.EX.H437 EVT - ELS design (Vertical Elements) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 74 04-Dec-21 A 18-Mar-22 A 03-Aug-22 03-Aug-22 Hols - No B/O periods (was 310.D.EX.H441 EVT - ELS design (Vertical Elements) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 1 19-Mar-22 A 19-Mar-22 A 03-Aug-22 03-Aug-22 Hols - No B/O periods (was 310.D.EX.H445 EVT - ELS design (Vertical Elements) - PM, AP, RSE reviewing 1st Round C1) C01_7 d/w - 10h/d - No HK 28 20-Mar-22 A 16-Apr-22 03-Aug-22 23-Aug-22 129 Hols - No B/O periods (was 310.D.EX.H473 EVT - ELS design (Vertical Elements) - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 17-Apr-22 07-May-22 24-Aug-22 13-Sep-22 129 certificates Hols - No B/O periods (was 310.D.EX.H465 EVT - ELS design (Vertical Elements) - prepare and resubmit C1) C01_7 d/w - 10h/d - No HK 7 08-May-22 14-May-22 14-Sep-22 20-Sep-22 129 Hols - No B/O periods (was 310.D.EX.H469 EVT - ELS design (Vertical Elements) - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 15-May-22 11-Jun-22 21-Sep-22 18-Oct-22 129 Hols - No B/O periods (was 310.D.EX.H449 EVT - ELS design (Vertical Elements) - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 12-Jun-22 02-Jul-22 19-Oct-22 08-Nov-22 129 certificates 2nd Round Hols - No B/O periods (was 310.D.EX.H453 EVT - ELS design (Vertical Elements) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 03-Jul-22 31-Aug-22 09-Nov-22 07-Jan-23 129 Hols - No B/O periods (was ELS Design (Vertical Elements) - EVT Ch562 to 920 (Zones 2 &3) Pkg.4 C1) C01_7 d/w - 10h/d - No HK Hols257 - No B/O periods 0 (was 04-Dec-21 C1) A 13-Oct-22 28-Apr-22 16-Oct-22 3 310.D.EX.H477 EVT - ELS design (Vertical Elements) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 74 04-Dec-21 A 18-Mar-22 A 28-Apr-22 28-Apr-22 Hols - No B/O periods (was 310.D.EX.H481 EVT - ELS design (Vertical Elements) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 1 19-Mar-22 A 19-Mar-22 A 28-Apr-22 28-Apr-22 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 86 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.EX.H485 EVT - ELS design (Vertical Elements) - PM, AP, RSE reviewing 1st Round C01_7 d/w - 10h/d - No HK 28 20-Mar-22 A 16-Apr-22 28-Apr-22 18-May-22 32 Hols - No B/O periods (was 310.D.EX.H513 EVT - ELS design (Vertical Elements) - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 17-Apr-22 07-May-22 19-May-22 08-Jun-22 32 certificates Hols - No B/O periods (was 310.D.EX.H505 EVT - ELS design (Vertical Elements) - prepare and resubmit C1) C01_7 d/w - 10h/d - No HK 7 08-May-22 14-May-22 09-Jun-22 15-Jun-22 32 Hols - No B/O periods (was 310.D.EX.H509 EVT - ELS design (Vertical Elements) - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 15-May-22 11-Jun-22 16-Jun-22 13-Jul-22 32 Hols - No B/O periods (was 310.D.EX.H489 EVT - ELS design (Vertical Elements) - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 12-Jun-22 02-Jul-22 14-Jul-22 03-Aug-22 32 certificates 2nd Round Hols - No B/O periods (was 310.D.EX.H493 EVT - ELS design (Vertical Elements) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 03-Jul-22 31-Aug-22 04-Aug-22 02-Oct-22 32 Hols - No B/O periods (was 310.D.EX.H497 EVT - ELS design (Vertical Elements) - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 30-Sep-22 06-Oct-22 03-Oct-22 09-Oct-22 3 Hols - No B/O periods (was 310.D.EX.H501 EVT - ELS design (Vertical Elements) - prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 07-Oct-22 13-Oct-22 10-Oct-22 16-Oct-22 3 commencement Hols - No B/O periods (was ELS Design (Vertical Elements) - EVT Ch920 to 1027 (Zones 4 &5) Pkg.2 C1) C01_7 d/w - 10h/d - No HK Hols214 - No B/O periods 0 (was 04-Dec-21 C1) A 31-Aug-22 28-Apr-22 28-Oct-22 58 310.D.EX.H397 EVT - ELS design (Vertical Elements) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 74 04-Dec-21 A 18-Mar-22 A 28-Apr-22 28-Apr-22 Hols - No B/O periods (was 310.D.EX.H401 EVT - ELS design (Vertical Elements) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 1 19-Mar-22 A 19-Mar-22 A 24-May-22 24-May-22 Hols - No B/O periods (was 310.D.EX.H405 EVT - ELS design (Vertical Elements) - PM, AP, RSE reviewing 1st Round C1) C01_7 d/w - 10h/d - No HK 28 20-Mar-22 A 16-Apr-22 24-May-22 13-Jun-22 58 Hols - No B/O periods (was 310.D.EX.H433 EVT - ELS design (Vertical Elements) - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 17-Apr-22 07-May-22 14-Jun-22 04-Jul-22 58 certificates Hols - No B/O periods (was 310.D.EX.H425 EVT - ELS design (Vertical Elements) - prepare and resubmit C1) C01_7 d/w - 10h/d - No HK 7 08-May-22 14-May-22 05-Jul-22 11-Jul-22 58 Hols - No B/O periods (was 310.D.EX.H429 EVT - ELS design (Vertical Elements) - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 15-May-22 11-Jun-22 12-Jul-22 08-Aug-22 58 Hols - No B/O periods (was 310.D.EX.H409 EVT - ELS design (Vertical Elements) - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 12-Jun-22 02-Jul-22 09-Aug-22 29-Aug-22 58 certificates 2nd Round Hols - No B/O periods (was 310.D.EX.H413 EVT - ELS design (Vertical Elements) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 03-Jul-22 31-Aug-22 30-Aug-22 28-Oct-22 58 Hols - No B/O periods (was CC#06 - EVT - ELS Design - Excavation C1) C01_7 d/w - 10h/d - No HK Hols478 - No B/O periods 0 (was 01-Aug-21 C1) A 21-Nov-22 25-May-22 25-Apr-23 155 ELS Design (Excavation) - EVT Ch1027 to 1275 (Zones 6 &7) Pkg.1 C01_7 d/w - 10h/d - No HK Hols372 - No B/O periods 0 (was 01-Aug-21 C1) A 21-May-22 05-Jul-22 29-Aug-22 100 310.D.EX.H646 EVT - ELS design (Excavation) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 74 01-Aug-21 A 06-Dec-21 A 05-Jul-22 05-Jul-22 Hols - No B/O periods (was 310.D.EX.H651 EVT - ELS design (Excavation) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 1 07-Dec-21 A 07-Dec-21 A 05-Jul-22 05-Jul-22 Hols - No B/O periods (was 310.D.EX.H656 EVT - ELS design (Excavation) - PM, AP, RSE reviewing 1st Round C1) C01_7 d/w - 10h/d - No HK 28 08-Dec-21 A 26-Jan-22 A 05-Jul-22 05-Jul-22 Hols - No B/O periods (was 310.D.EX.H691 EVT - ELS design (Excavation) - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 27-Jan-22 A 10-Mar-22 A 05-Jul-22 05-Jul-22 Hols - No B/O periods (was 310.D.EX.H666 EVT - ELS design (Excavation) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 23-Mar-22 A 21-May-22 05-Jul-22 29-Aug-22 100 Hols - No B/O periods (was ELS Design (Excavation) - EVT Ch532 to 562 (Zone 1) Pkg.3 C1) C01_7 d/w - 10h/d - No HK Hols240 - No B/O periods 0 (was27-Mar-22 C1) 21-Nov-22 29-Aug-22 25-Apr-23 155 310.D.EX.H746 EVT - ELS design (Excavation) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 74 27-Mar-22 08-Jun-22 29-Aug-22 10-Nov-22 155 Hols - No B/O periods (was 310.D.EX.H751 EVT - ELS design (Excavation) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 1 09-Jun-22 09-Jun-22 11-Nov-22 11-Nov-22 155 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 87 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.EX.H756 EVT - ELS design (Excavation) - PM, AP, RSE reviewing 1st Round C01_7 d/w - 10h/d - No HK 28 10-Jun-22 07-Jul-22 12-Nov-22 09-Dec-22 155 Hols - No B/O periods (was 310.D.EX.H791 EVT - ELS design (Excavation) - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 08-Jul-22 28-Jul-22 10-Dec-22 30-Dec-22 155 Hols - No B/O periods (was 310.D.EX.H781 EVT - ELS design (Excavation) - prepare and resubmit C1) C01_7 d/w - 10h/d - No HK 7 29-Jul-22 04-Aug-22 31-Dec-22 06-Jan-23 155 Hols - No B/O periods (was 310.D.EX.H786 EVT - ELS design (Excavation) - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 05-Aug-22 01-Sep-22 07-Jan-23 03-Feb-23 155 Hols - No B/O periods (was 310.D.EX.H761 EVT - ELS design (Excavation) - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 02-Sep-22 22-Sep-22 04-Feb-23 24-Feb-23 155 2nd Round Hols - No B/O periods (was 310.D.EX.H766 EVT - ELS design (Excavation) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 23-Sep-22 21-Nov-22 25-Feb-23 25-Apr-23 155 Hols - No B/O periods (was ELS Design (Excavation) - EVT Ch562 to 920 (Zones 2 &3) Pkg.4 C1) C01_7 d/w - 10h/d - No HK Hols240 - No B/O periods 0 (was27-Mar-22 C1) 21-Nov-22 09-Jun-22 03-Feb-23 74 310.D.EX.H795.B01 EVT - ELS design (Excavation) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 74 27-Mar-22 08-Jun-22 09-Jun-22 21-Aug-22 74 Hols - No B/O periods (was 310.D.EX.H799.B01 EVT - ELS design (Excavation) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 1 09-Jun-22 09-Jun-22 22-Aug-22 22-Aug-22 74 Hols - No B/O periods (was 310.D.EX.H803.B01 EVT - ELS design (Excavation) - PM, AP, RSE reviewing 1st Round C1) C01_7 d/w - 10h/d - No HK 28 10-Jun-22 07-Jul-22 23-Aug-22 19-Sep-22 74 Hols - No B/O periods (was 310.D.EX.H807.B01 EVT - ELS design (Excavation) - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 08-Jul-22 28-Jul-22 20-Sep-22 10-Oct-22 74 Hols - No B/O periods (was 310.D.EX.H811.B01 EVT - ELS design (Excavation) - prepare and resubmit C1) C01_7 d/w - 10h/d - No HK 7 29-Jul-22 04-Aug-22 11-Oct-22 17-Oct-22 74 Hols - No B/O periods (was 310.D.EX.H815.B01 EVT - ELS design (Excavation) - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 05-Aug-22 01-Sep-22 18-Oct-22 14-Nov-22 74 Hols - No B/O periods (was 310.D.EX.H819.B01 EVT - ELS design (Excavation) - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 02-Sep-22 22-Sep-22 15-Nov-22 05-Dec-22 74 2nd Round Hols - No B/O periods (was 310.D.EX.H823.B01 EVT - ELS design (Excavation) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 23-Sep-22 21-Nov-22 06-Dec-22 03-Feb-23 74 Hols - No B/O periods (was ELS Design (Excavation) - EVT Ch920 to 1027 (Zones 4 &5) Pkg.2 C1) C01_7 d/w - 10h/d - No HK Hols240 - No B/O periods 0 (was27-Mar-22 C1) 21-Nov-22 25-May-22 19-Jan-23 59 310.D.EX.H696 EVT - ELS design (Excavation) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 74 27-Mar-22 08-Jun-22 25-May-22 06-Aug-22 59 Hols - No B/O periods (was 310.D.EX.H701 EVT - ELS design (Excavation) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 1 09-Jun-22 09-Jun-22 07-Aug-22 07-Aug-22 59 Hols - No B/O periods (was 310.D.EX.H706 EVT - ELS design (Excavation) - PM, AP, RSE reviewing 1st Round C1) C01_7 d/w - 10h/d - No HK 28 10-Jun-22 07-Jul-22 08-Aug-22 04-Sep-22 59 Hols - No B/O periods (was 310.D.EX.H741 EVT - ELS design (Excavation) - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 08-Jul-22 28-Jul-22 05-Sep-22 25-Sep-22 59 Hols - No B/O periods (was 310.D.EX.H731 EVT - ELS design (Excavation) - prepare and resubmit C1) C01_7 d/w - 10h/d - No HK 7 29-Jul-22 04-Aug-22 26-Sep-22 02-Oct-22 59 Hols - No B/O periods (was 310.D.EX.H736 EVT - ELS design (Excavation) - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 05-Aug-22 01-Sep-22 03-Oct-22 30-Oct-22 59 Hols - No B/O periods (was 310.D.EX.H711 EVT - ELS design (Excavation) - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 02-Sep-22 22-Sep-22 31-Oct-22 20-Nov-22 59 2nd Round Hols - No B/O periods (was 310.D.EX.H716 EVT - ELS design (Excavation) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 23-Sep-22 21-Nov-22 21-Nov-22 19-Jan-23 59 Hols - No B/O periods (was CC#06 - EVT/WVT - Temporary Utilities Support C1) C01_7 d/w - 10h/d - No HK Hols212 - No B/O periods 0 (was27-Mar-22 C1) 24-Oct-22 14-Apr-22 11-Nov-22 18 310.D.EX.H180 Temporary UU Support design - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 30 27-Mar-22 25-Apr-22 14-Apr-22 13-May-22 18 Hols - No B/O periods (was 310.D.EX.H184 Temporary UU Support design - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 3 26-Apr-22 28-Apr-22 14-May-22 16-May-22 18 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 88 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.EX.H188 Temporary UU Support design - PM, AP, RSE reviewing C01_7 d/w - 10h/d - No HK 28 29-Apr-22 26-May-22 17-May-22 13-Jun-22 18 Hols - No B/O periods (was 310.D.EX.H192 Temporary UU Support design - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 27-May-22 16-Jun-22 14-Jun-22 04-Jul-22 18 Hols - No B/O periods (was 310.D.EX.H196 Temporary UU Support design - address comments & resubmit 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 17-Jun-22 23-Jun-22 05-Jul-22 11-Jul-22 18 Hols - No B/O periods (was 310.D.EX.H200 Temporary UU Support design - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 24-Jun-22 21-Jul-22 12-Jul-22 08-Aug-22 18 Hols - No B/O periods (was 310.D.EX.H202 Temporary UU Support design - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 22-Jul-22 11-Aug-22 09-Aug-22 29-Aug-22 18 2nd Round Hols - No B/O periods (was 310.D.EX.H204 Temporary UU Support design - BD review and approve C1) C01_7 d/w - 10h/d - No HK 60 12-Aug-22 10-Oct-22 30-Aug-22 28-Oct-22 18 Hols - No B/O periods (was 310.D.EX.H208 Temporary UU Support design - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 11-Oct-22 17-Oct-22 29-Oct-22 04-Nov-22 18 Hols - No B/O periods (was 310.D.EX.H212 Temporary UU Support design - prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 18-Oct-22 24-Oct-22 05-Nov-22 11-Nov-22 18 commencement Hols - No B/O periods (was CC#06 - EVT - Testing and Commissioning Plan for EVT C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was04-Nov-22 C1) 31-Dec-22 04-Nov-22 05-Mar-23 64 310.D.EX.H124 EVT no.27 - Testing and Commissioning Plan for EVT - Prepare and submit to PM C01_7 d/w - 10h/d - No HK 30 04-Nov-22 03-Dec-22 04-Nov-22 03-Dec-22 0 Hols - No B/O periods (was 310.D.EX.H128 EVT no.27 - Testing and Commissioning Plan for EVT - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 04-Dec-22 31-Dec-22 06-Feb-23 05-Mar-23 64 Hols - No B/O periods (was CC#06 - EVT - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols113 - No B/O periods 0 (was28-Apr-22 C1) 18-Aug-22 20-Oct-22 09-Feb-23 175 EVT - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols113 - No B/O periods 0 (was28-Apr-22 C1) 18-Aug-22 20-Oct-22 09-Feb-23 175 310.D.WS.L664 EVT - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 50 28-Apr-22 16-Jun-22 20-Oct-22 08-Dec-22 175 Hols - No B/O periods (was 310.D.WS.L665 EVT - MEP - Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 50 19-May-22 07-Jul-22 10-Nov-22 29-Dec-22 175 Hols - No B/O periods (was 310.D.WS.L666 EVT - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 50 09-Jun-22 28-Jul-22 01-Dec-22 19-Jan-23 175 Hols - No B/O periods (was 310.D.WS.L668 EVT - MEP - Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 50 30-Jun-22 18-Aug-22 22-Dec-22 09-Feb-23 175 Hols - No B/O periods (was CC#06 - EVT - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was26-Apr-22 C1) 18-Jul-22 04-May-22 26-Jul-22 8 EVT - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was26-Apr-22 C1) 18-Jul-22 04-May-22 26-Jul-22 8 310.D.WS.L1400 EVT - ABWF - prepare document C01_7 d/w - 10h/d - No HK 14 26-Apr-22 09-May-22 04-May-22 17-May-22 8 Hols - No B/O periods (was 310.D.WS.L1668 EVT - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 10-May-22 06-Jun-22 18-May-22 14-Jun-22 8 Hols - No B/O periods (was 310.D.WS.L1664 EVT - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 07-Jun-22 20-Jun-22 15-Jun-22 28-Jun-22 8 Hols - No B/O periods (was 310.D.WS.L1404 EVT - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 21-Jun-22 18-Jul-22 29-Jun-22 26-Jul-22 8 Hols - No B/O periods (was EVT - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was26-Apr-22 C1) 18-Jul-22 04-May-22 26-Jul-22 8 310.D.WS.L1416 EVT - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 26-Apr-22 09-May-22 04-May-22 17-May-22 8 Hols - No B/O periods (was 310.D.WS.L1676 EVT - ABWF - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 10-May-22 06-Jun-22 18-May-22 14-Jun-22 8 Hols - No B/O periods (was 310.D.WS.L1672 EVT - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 07-Jun-22 20-Jun-22 15-Jun-22 28-Jun-22 8 Hols - No B/O periods (was 310.D.WS.L1420 EVT - ABWF - Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 21-Jun-22 18-Jul-22 29-Jun-22 26-Jul-22 8 Hols - No B/O periods (was CC#06 - PBA - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols174 - No B/O periods 0 (was02-Jun-22 C1) 22-Nov-22 10-Jul-22 30-Dec-22 38
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 89 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S PBA - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols174 - No B/O periods 0 (was02-Jun-22 C1) 22-Nov-22 10-Jul-22 30-Dec-22 38 310.D.WS.L688 PBA - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 90 02-Jun-22 30-Aug-22 10-Jul-22 07-Oct-22 38 Hols - No B/O periods (was 310.D.WS.L689 PBA - MEP - Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 90 30-Jun-22 27-Sep-22 07-Aug-22 04-Nov-22 38 Hols - No B/O periods (was 310.D.WS.L691 PBA - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 90 28-Jul-22 25-Oct-22 04-Sep-22 02-Dec-22 38 Hols - No B/O periods (was 310.D.WS.L692 PBA - MEP - Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 90 25-Aug-22 22-Nov-22 02-Oct-22 30-Dec-22 38 Hols - No B/O periods (was CC#06 - PBA - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols119 - No B/O periods 0 (was26-Apr-22 C1) 22-Aug-22 28-Apr-22 24-Aug-22 2 PBA - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols91 - No B/O periods 0 (was26-Apr-22 C1) 25-Jul-22 28-Apr-22 03-Aug-22 9 310.D.WS.L1424 PBA - ABWF - prepare document C01_7 d/w - 10h/d - No HK 28 26-Apr-22 23-May-22 28-Apr-22 25-May-22 2 Hols - No B/O periods (was 310.D.WS.L1684 PBA - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 24-May-22 20-Jun-22 02-Jun-22 29-Jun-22 9 Hols - No B/O periods (was 310.D.WS.L1680 PBA - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 21-Jun-22 04-Jul-22 30-Jun-22 13-Jul-22 9 Hols - No B/O periods (was 310.D.WS.L1428 PBA - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 21 05-Jul-22 25-Jul-22 14-Jul-22 03-Aug-22 9 Hols - No B/O periods (was PBA - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols91 - No B/O periods 0 (was24-May-22 C1) 22-Aug-22 26-May-22 24-Aug-22 2 310.D.WS.L1440 PBA - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 28 24-May-22 20-Jun-22 26-May-22 22-Jun-22 2 Hols - No B/O periods (was 310.D.WS.L1692 PBA - ABWF - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 21-Jun-22 18-Jul-22 23-Jun-22 20-Jul-22 2 Hols - No B/O periods (was 310.D.WS.L1688 PBA - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 19-Jul-22 01-Aug-22 21-Jul-22 03-Aug-22 2 Hols - No B/O periods (was 310.D.WS.L1444 PBA - ABWF - Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 21 02-Aug-22 22-Aug-22 04-Aug-22 24-Aug-22 2 Hols - No B/O periods (was CC#06 - PBC - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols82 - No B/O periods 0 (was 23-Mar-22 C1) A 18-Jun-22 19-Jun-22 08-Sep-22 82 PBC - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols82 - No B/O periods 0 (was 23-Mar-22 C1) A 18-Jun-22 19-Jun-22 08-Sep-22 82 310.D.WS.L712 PBC - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 40 23-Mar-22 A 07-May-22 19-Jun-22 28-Jul-22 82 Hols - No B/O periods (was 310.D.WS.L713 PBC - MEP - Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 40 12-Apr-22 21-May-22 03-Jul-22 11-Aug-22 82 Hols - No B/O periods (was 310.D.WS.L714 PBC - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 40 26-Apr-22 04-Jun-22 17-Jul-22 25-Aug-22 82 Hols - No B/O periods (was 310.D.WS.L716 PBC - MEP - Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 40 10-May-22 18-Jun-22 31-Jul-22 08-Sep-22 82 Hols - No B/O periods (was CC#06 - PBC - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols42 - No B/O periods 0 (was26-Apr-22 C1) 06-Jun-22 27-Apr-22 07-Jun-22 1 PBC - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols42 - No B/O periods 0 (was26-Apr-22 C1) 06-Jun-22 27-Apr-22 07-Jun-22 1 310.D.WS.L1448 PBC - ABWF - prepare document C01_7 d/w - 10h/d - No HK 7 26-Apr-22 02-May-22 27-Apr-22 03-May-22 1 Hols - No B/O periods (was 310.D.WS.L1700 PBC - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 14 03-May-22 16-May-22 04-May-22 17-May-22 1 Hols - No B/O periods (was 310.D.WS.L1696 PBC - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 17-May-22 23-May-22 18-May-22 24-May-22 1 Hols - No B/O periods (was 310.D.WS.L1452 PBC - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 24-May-22 06-Jun-22 25-May-22 07-Jun-22 1 Hols - No B/O periods (was PBC - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols42 - No B/O periods 0 (was26-Apr-22 C1) 06-Jun-22 27-Apr-22 07-Jun-22 1 310.D.WS.L1464 PBC - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 7 26-Apr-22 02-May-22 27-Apr-22 03-May-22 1 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 90 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1708 PBC - ABWF - Material Submission - PM review and accept 1st Round C01_7 d/w - 10h/d - No HK 14 03-May-22 16-May-22 04-May-22 17-May-22 1 Hols - No B/O periods (was 310.D.WS.L1704 PBC - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 17-May-22 23-May-22 18-May-22 24-May-22 1 Hols - No B/O periods (was 310.D.WS.L1468 PBC - ABWF - Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 24-May-22 06-Jun-22 25-May-22 07-Jun-22 1 Hols - No B/O periods (was CC#06 - EVT - Submission of Method Statement and Shop Drawings C1) C01_7 d/w - 10h/d - No HK Hols234 - No B/O periods 0 (was 13-Oct-21 C1) A 23-Apr-22 24-Apr-22 23-Dec-22 244 CC#06 - EVT - Method Statement of EVT Construction C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was 13-Oct-21 C1) A 18-Apr-22 24-Apr-22 16-May-22 28 310.D.TX.A204 MS no.15 - Method Statement for EVT Construction - prepare document C01_7 d/w - 10h/d - No HK 30 13-Oct-21 A 12-Nov-21 A 24-Apr-22 24-Apr-22 Hols - No B/O periods (was 310.D.TX.A208 MS no.15 - Method Statement for EVT Construction - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 13-Nov-21 A 18-Apr-22 24-Apr-22 16-May-22 28 Hols - No B/O periods (was CC#06 - EVT - Method Statement for Plate Load Test C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was 01-Nov-21 C1) A 23-Apr-22 26-Nov-22 23-Dec-22 244 310.D.TX.A324 Method Statement for Plate Load Test - prepare document C01_7 d/w - 10h/d - No HK 30 01-Nov-21 A 30-Nov-21 A 26-Nov-22 26-Nov-22 Hols - No B/O periods (was 310.D.TX.A328 Method Statement for Plate Load Test - BD Acknowledge C1) C01_7 d/w - 10h/d - No HK 28 01-Dec-21 A 23-Apr-22 26-Nov-22 23-Dec-22 244 Hols - No B/O periods (was CC#06 - General - MEP - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols292 - No B/O periods 0 (was 27-Jan-22 C1) A 14-Nov-22 28-Mar-22 02-Feb-23 80 Preliminaries C01_7 d/w - 10h/d - No HK Hols 7- No B/O periods 0 (was 27-Jan-22 C1) A 08-Feb-22 A 28-Mar-22 13-Apr-22 310.C.EX.S000.01aB02 Contract award (Tentative) C01_7 d/w - 10h/d - No HK 0 27-Jan-22 A 28-Mar-22 Hols - No B/O periods (was 310.C.EX.S000.02aB02 Mobilization C1) C01_7 d/w - 10h/d - No HK 0 27-Jan-22 A 02-Feb-22 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.C.EX.S000.03aB02 Prepare and submit O Chart C1) C01_7 d/w - 10h/d - No HK 0 03-Feb-22 A 07-Feb-22 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.C.EX.S000.04aB02 Prepare and submit Equipment/Material Submission Schedule C1) C01_7 d/w - 10h/d - No HK 0 03-Feb-22 A 08-Feb-22 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.C.EX.S000.05aB02 Prepare and submit Drawing Submission Shcedule C1) C01_7 d/w - 10h/d - No HK 0 03-Feb-22 A 08-Feb-22 A 13-Apr-22 13-Apr-22 Hols - No B/O periods (was Electrical C1) C01_7 d/w - 10h/d - No HK Hols103 - No B/O periods 0 (was 06-Mar-22 C1) A 16-Jun-22 11-Apr-22 01-Jul-22 15 Armoured Cable C01_7 d/w - 10h/d - No HK Hols53 - No B/O periods 0 (was 14-Mar-22 C1) A 18-May-22 10-May-22 01-Jul-22 44 310.D.WS.L992.01aB02Prepare and submit info. of Armoured Cable C01_7 d/w - 10h/d - No HK 0 14-Mar-22 A 07-Apr-22 10-May-22 21-May-22 44 Hols - No B/O periods (was 310.D.WS.L993.01aB02Review and comment info. of Armoured Cable C1) C01_7 d/w - 10h/d - No HK 23 08-Apr-22 30-Apr-22 22-May-22 13-Jun-22 44 Hols - No B/O periods (was 310.D.WS.L994.01aB02Prepare and re-submit info. of Armoured Cable C1) C01_7 d/w - 10h/d - No HK 9 01-May-22 09-May-22 14-Jun-22 22-Jun-22 44 Hols - No B/O periods (was 310.D.WS.L996.01aB02Obtain "No objection" of Armoured Cable C1) C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 23-Jun-22 01-Jul-22 44 Hols - No B/O periods (was FR Cable C1) C01_7 d/w - 10h/d - No HK Hols82 - No B/O periods 0 (was 14-Mar-22 C1) A 16-Jun-22 11-Apr-22 01-Jul-22 15 310.D.WS.L992.02aB02Prepare and submit info. of FR Cable C01_7 d/w - 10h/d - No HK 0 14-Mar-22 A 07-Apr-22 11-Apr-22 22-Apr-22 15 Hols - No B/O periods (was 310.D.WS.L993.02aB02Review and comment info. of FR Cable C1) C01_7 d/w - 10h/d - No HK 24 08-Apr-22 01-May-22 23-Apr-22 16-May-22 15 Hols - No B/O periods (was 310.D.WS.L994.02aB02Prepare and re-submit info. of FR Cable C1) C01_7 d/w - 10h/d - No HK 22 02-May-22 23-May-22 17-May-22 07-Jun-22 15 Hols - No B/O periods (was 310.D.WS.L996.02aB02Obtain "No objection" of FR Cable C1) C01_7 d/w - 10h/d - No HK 24 24-May-22 16-Jun-22 08-Jun-22 01-Jul-22 15 Hols - No B/O periods (was Single Core Cable C1) C01_7 d/w - 10h/d - No HK Hols46 - No B/O periods 0 (was 14-Mar-22 C1) A 19-May-22 09-May-22 01-Jul-22 43 310.D.WS.L992.03aB02Prepare and submit info. of Single Core Cable C01_7 d/w - 10h/d - No HK 0 14-Mar-22 A 07-Apr-22 09-May-22 20-May-22 43 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 91 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L993.03aB02Review and comment info. of Single Core Cable C01_7 d/w - 10h/d - No HK 24 08-Apr-22 01-May-22 21-May-22 13-Jun-22 43 Hols - No B/O periods (was 310.D.WS.L994.03aB02Prepare and re-submit info. of Single Core Cable C1) C01_7 d/w - 10h/d - No HK 9 02-May-22 10-May-22 14-Jun-22 22-Jun-22 43 Hols - No B/O periods (was 310.D.WS.L996.03aB02Obtain "No objection" of Single Core Cable C1) C01_7 d/w - 10h/d - No HK 9 11-May-22 19-May-22 23-Jun-22 01-Jul-22 43 Hols - No B/O periods (was General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK Hols60 - No B/O periods 0 (was 20-Mar-22 C1) A 19-May-22 09-May-22 01-Jul-22 43 310.D.WS.L992.04aB02Prepare and submit info. of General Lighting (included E-Lighting) C01_7 d/w - 10h/d - No HK 12 20-Mar-22 A 07-Apr-22 09-May-22 20-May-22 43 Hols - No B/O periods (was 310.D.WS.L993.04aB02Review and comment info. of General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK 24 08-Apr-22 01-May-22 21-May-22 13-Jun-22 43 Hols - No B/O periods (was 310.D.WS.L994.04aB02Prepare and re-submit info. of General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK 9 02-May-22 10-May-22 14-Jun-22 22-Jun-22 43 Hols - No B/O periods (was 310.D.WS.L996.04aB02Obtain "No objection" of General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK 9 11-May-22 19-May-22 23-Jun-22 01-Jul-22 43 Hols - No B/O periods (was Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK Hols68 - No B/O periods 0 (was 11-Mar-22 C1) A 17-May-22 11-May-22 01-Jul-22 45 310.D.WS.L992.05aB02Prepare and submit info. of Distribution Board for MCB, MCCB & Accessories C01_7 d/w - 10h/d - No HK 10 11-Mar-22 A 05-Apr-22 11-May-22 20-May-22 45 Hols - No B/O periods (was 310.D.WS.L993.05aB02Review and comment info. of Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 24 06-Apr-22 29-Apr-22 21-May-22 13-Jun-22 45 Hols - No B/O periods (was 310.D.WS.L994.05aB02Prepare and re-submit info. of Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 30-Apr-22 08-May-22 14-Jun-22 22-Jun-22 45 Hols - No B/O periods (was 310.D.WS.L996.05aB02Obtain "No objection" of Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 09-May-22 17-May-22 23-Jun-22 01-Jul-22 45 Hols - No B/O periods (was MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK Hols64 - No B/O periods 0 (was 11-Mar-22 C1) A 13-May-22 15-May-22 01-Jul-22 49 310.D.WS.L992.06aB02Prepare and submit info. of MCB, MCCB & Accessories C01_7 d/w - 10h/d - No HK 6 11-Mar-22 A 01-Apr-22 15-May-22 20-May-22 49 Hols - No B/O periods (was 310.D.WS.L993.06aB02Review and comment info. of MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 24 02-Apr-22 25-Apr-22 21-May-22 13-Jun-22 49 Hols - No B/O periods (was 310.D.WS.L994.06aB02Prepare and re-submit info. of MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 26-Apr-22 04-May-22 14-Jun-22 22-Jun-22 49 Hols - No B/O periods (was 310.D.WS.L996.06aB02Obtain "No objection" of MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 05-May-22 13-May-22 23-Jun-22 01-Jul-22 49 Hols - No B/O periods (was Busduct C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was04-Apr-22 C1) 04-Jun-22 01-May-22 01-Jul-22 27 310.D.WS.L992.07aB02Prepare and submit info. of Busduct C01_7 d/w - 10h/d - No HK 20 04-Apr-22 23-Apr-22 01-May-22 20-May-22 27 Hols - No B/O periods (was 310.D.WS.L993.07aB02Review and comment info. of Busduct C1) C01_7 d/w - 10h/d - No HK 24 24-Apr-22 17-May-22 21-May-22 13-Jun-22 27 Hols - No B/O periods (was 310.D.WS.L994.07aB02Prepare and re-submit info. of Busduct C1) C01_7 d/w - 10h/d - No HK 9 18-May-22 26-May-22 14-Jun-22 22-Jun-22 27 Hols - No B/O periods (was 310.D.WS.L996.07aB02Obtain "No objection" of Busduct C1) C01_7 d/w - 10h/d - No HK 9 27-May-22 04-Jun-22 23-Jun-22 01-Jul-22 27 Hols - No B/O periods (was Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was04-Apr-22 C1) 04-Jun-22 01-May-22 01-Jul-22 27 310.D.WS.L992.08aB02Prepare and submit info. of Water Leakage Detection System C01_7 d/w - 10h/d - No HK 20 04-Apr-22 23-Apr-22 01-May-22 20-May-22 27 Hols - No B/O periods (was 310.D.WS.L993.08aB02Review and comment info. of Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK 24 24-Apr-22 17-May-22 21-May-22 13-Jun-22 27 Hols - No B/O periods (was 310.D.WS.L994.08aB02Prepare and re-submit info. of Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK 9 18-May-22 26-May-22 14-Jun-22 22-Jun-22 27 Hols - No B/O periods (was 310.D.WS.L996.08aB02Obtain "No objection" of Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK 9 27-May-22 04-Jun-22 23-Jun-22 01-Jul-22 27 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 92 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S MICC Cable C01_7 d/w - 10h/d - No HK Hols76 - No B/O periods 0 (was 07-Mar-22 C1) A 21-May-22 07-May-22 01-Jul-22 41 310.D.WS.L992.09aB02Prepare and submit info. of MICC Cable C01_7 d/w - 10h/d - No HK 14 07-Mar-22 A 09-Apr-22 07-May-22 20-May-22 41 Hols - No B/O periods (was 310.D.WS.L993.09aB02Review and comment info. of MICC Cable C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-May-22 13-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L994.09aB02Prepare and re-submit info. of MICC Cable C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 14-Jun-22 22-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L996.09aB02Obtain "No objection" of MICC Cable C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 23-Jun-22 01-Jul-22 41 Hols - No B/O periods (was LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 07-May-22 01-Jul-22 41 310.D.WS.L992.10aB02Prepare and submit info. of LV Switchboards & Accessories C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 07-May-22 20-May-22 41 Hols - No B/O periods (was 310.D.WS.L993.10aB02Review and comment info. of LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-May-22 13-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L994.10aB02Prepare and re-submit info. of LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 14-Jun-22 22-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L996.10aB02Obtain "No objection" of LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 23-Jun-22 01-Jul-22 41 Hols - No B/O periods (was ACB & Accessories C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 07-May-22 01-Jul-22 41 310.D.WS.L992.11aB02Prepare and submit info. of ACB & Accessories C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 07-May-22 20-May-22 41 Hols - No B/O periods (was 310.D.WS.L993.11aB02Review and comment info. of ACB & Accessories C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-May-22 13-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L994.11aB02Prepare and re-submit info. of ACB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 14-Jun-22 22-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L996.11aB02Obtain "No objection" of ACB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 23-Jun-22 01-Jul-22 41 Hols - No B/O periods (was Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 07-May-22 01-Jul-22 41 310.D.WS.L992.12aB02Prepare and submit info. of Automatic Transfer Switch C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 07-May-22 20-May-22 41 Hols - No B/O periods (was 310.D.WS.L993.12aB02Review and comment info. of Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-May-22 13-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L994.12aB02Prepare and re-submit info. of Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 14-Jun-22 22-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L996.12aB02Obtain "No objection" of Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 23-Jun-22 01-Jul-22 41 Hols - No B/O periods (was Battery Set C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 07-May-22 01-Jul-22 41 310.D.WS.L992.13aB02Prepare and submit info. of Battery Set C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 07-May-22 20-May-22 41 Hols - No B/O periods (was 310.D.WS.L993.13aB02Review and comment info. of Battery Set C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-May-22 13-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L994.13aB02Prepare and re-submit info. of Battery Set C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 14-Jun-22 22-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L996.13aB02Obtain "No objection" of Battery Set C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 23-Jun-22 01-Jul-22 41 Hols - No B/O periods (was HRC Fuse for Fuse-switch C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was27-Mar-22 C1) 27-May-22 01-May-22 01-Jul-22 35 310.D.WS.L992.14aB02Prepare and submit info. of HRC Fuse for Fuse-switch C01_7 d/w - 10h/d - No HK 20 27-Mar-22 15-Apr-22 01-May-22 20-May-22 35 Hols - No B/O periods (was 310.D.WS.L993.14aB02Review and comment info. of HRC Fuse for Fuse-switch C1) C01_7 d/w - 10h/d - No HK 24 16-Apr-22 09-May-22 21-May-22 13-Jun-22 35 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 93 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L994.14aB02Prepare and re-submit info. of HRC Fuse for Fuse-switch C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 14-Jun-22 22-Jun-22 35 Hols - No B/O periods (was 310.D.WS.L996.14aB02Obtain "No objection" of HRC Fuse for Fuse-switch C1) C01_7 d/w - 10h/d - No HK 9 19-May-22 27-May-22 23-Jun-22 01-Jul-22 35 Hols - No B/O periods (was MCCB C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 07-May-22 01-Jul-22 41 310.D.WS.L992.15aB02Prepare and submit info. of MCCB C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 07-May-22 20-May-22 41 Hols - No B/O periods (was 310.D.WS.L993.15aB02Review and comment info. of MCCB C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-May-22 13-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L994.15aB02Prepare and re-submit info. of MCCB C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 14-Jun-22 22-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L996.15aB02Obtain "No objection" of MCCB C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 23-Jun-22 01-Jul-22 41 Hols - No B/O periods (was Digital Protection Device C1) C01_7 d/w - 10h/d - No HK Hols77 - No B/O periods 0 (was 06-Mar-22 C1) A 21-May-22 07-May-22 01-Jul-22 41 310.D.WS.L992.16aB02Prepare and submit info. of Digital Protection Device C01_7 d/w - 10h/d - No HK 14 06-Mar-22 A 09-Apr-22 07-May-22 20-May-22 41 Hols - No B/O periods (was 310.D.WS.L993.16aB02Review and comment info. of Digital Protection Device C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-May-22 13-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L994.16aB02Prepare and re-submit info. of Digital Protection Device C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 14-Jun-22 22-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L996.16aB02Obtain "No objection" of Digital Protection Device C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 23-Jun-22 01-Jul-22 41 Hols - No B/O periods (was Capacitor Bank C1) C01_7 d/w - 10h/d - No HK Hols77 - No B/O periods 0 (was 06-Mar-22 C1) A 21-May-22 07-May-22 01-Jul-22 41 310.D.WS.L992.17aB02Prepare and submit info. of Capacitor Bank C01_7 d/w - 10h/d - No HK 14 06-Mar-22 A 09-Apr-22 07-May-22 20-May-22 41 Hols - No B/O periods (was 310.D.WS.L993.17aB02Review and comment info. of Capacitor Bank C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-May-22 13-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L994.17aB02Prepare and re-submit info. of Capacitor Bank C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 14-Jun-22 22-Jun-22 41 Hols - No B/O periods (was 310.D.WS.L996.17aB02Obtain "No objection" of Capacitor Bank C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 23-Jun-22 01-Jul-22 41 Hols - No B/O periods (was UPS C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was29-Mar-22 C1) 23-May-22 07-May-22 01-Jul-22 39 310.D.WS.L992.18aB02Prepare and submit info. of UPS C01_7 d/w - 10h/d - No HK 14 29-Mar-22 11-Apr-22 07-May-22 20-May-22 39 Hols - No B/O periods (was 310.D.WS.L993.18aB02Review and comment info. of UPS C1) C01_7 d/w - 10h/d - No HK 24 12-Apr-22 05-May-22 21-May-22 13-Jun-22 39 Hols - No B/O periods (was 310.D.WS.L994.18aB02Prepare and re-submit info. of UPS C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 14-Jun-22 22-Jun-22 39 Hols - No B/O periods (was 310.D.WS.L996.18aB02Obtain "No objection" of UPS C1) C01_7 d/w - 10h/d - No HK 9 15-May-22 23-May-22 23-Jun-22 01-Jul-22 39 Hols - No B/O periods (was Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was29-Mar-22 C1) 23-May-22 07-May-22 01-Jul-22 39 310.D.WS.L992.19aB02Prepare and submit info. of Active Harmoice Filter C01_7 d/w - 10h/d - No HK 14 29-Mar-22 11-Apr-22 07-May-22 20-May-22 39 Hols - No B/O periods (was 310.D.WS.L993.19aB02Review and comment info. of Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK 24 12-Apr-22 05-May-22 21-May-22 13-Jun-22 39 Hols - No B/O periods (was 310.D.WS.L994.19aB02Prepare and re-submit info. of Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 14-Jun-22 22-Jun-22 39 Hols - No B/O periods (was 310.D.WS.L996.19aB02Obtain "No objection" of Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK 9 15-May-22 23-May-22 23-Jun-22 01-Jul-22 39 Hols - No B/O periods (was Isolation Transformer C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was29-Mar-22 C1) 23-May-22 07-May-22 01-Jul-22 39
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 94 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L992.20aB02Prepare and submit info. of Isolation Transformer C01_7 d/w - 10h/d - No HK 14 29-Mar-22 11-Apr-22 07-May-22 20-May-22 39 Hols - No B/O periods (was 310.D.WS.L993.20aB02Review and comment info. of Isolation Transformer C1) C01_7 d/w - 10h/d - No HK 24 12-Apr-22 05-May-22 21-May-22 13-Jun-22 39 Hols - No B/O periods (was 310.D.WS.L994.20aB02Prepare and re-submit info. of Isolation Transformer C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 14-Jun-22 22-Jun-22 39 Hols - No B/O periods (was 310.D.WS.L996.20aB02Obtain "No objection" of Isolation Transformer C1) C01_7 d/w - 10h/d - No HK 9 15-May-22 23-May-22 23-Jun-22 01-Jul-22 39 Hols - No B/O periods (was By-pass switch C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was27-Mar-22 C1) 27-May-22 01-May-22 01-Jul-22 35 310.D.WS.L992.21aB02Prepare and submit info. of By-pass switch C01_7 d/w - 10h/d - No HK 20 27-Mar-22 15-Apr-22 01-May-22 20-May-22 35 Hols - No B/O periods (was 310.D.WS.L993.21aB02Review and comment info. of By-pass switch C1) C01_7 d/w - 10h/d - No HK 24 16-Apr-22 09-May-22 21-May-22 13-Jun-22 35 Hols - No B/O periods (was 310.D.WS.L994.21aB02Prepare and re-submit info. of By-pass switch C1) C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 14-Jun-22 22-Jun-22 35 Hols - No B/O periods (was 310.D.WS.L996.21aB02Obtain "No objection" of By-pass switch C1) C01_7 d/w - 10h/d - No HK 9 19-May-22 27-May-22 23-Jun-22 01-Jul-22 35 Hols - No B/O periods (was LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 14-May-22 01-Jul-22 48 310.D.WS.L992.22aB02Prepare and submit info. of LV Generator Set (included Alternator & Diesel Engine) C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 14-May-22 20-May-22 48 Hols - No B/O periods (was 310.D.WS.L993.22aB02Review and comment info. of LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-May-22 13-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L994.22aB02Prepare and re-submit info. of LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 14-Jun-22 22-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L996.22aB02Obtain "No objection" of LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 23-Jun-22 01-Jul-22 48 Hols - No B/O periods (was Generator Controller C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 14-May-22 01-Jul-22 48 310.D.WS.L992.23aB02Prepare and submit info. of Generator Controller C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 14-May-22 20-May-22 48 Hols - No B/O periods (was 310.D.WS.L993.23aB02Review and comment info. of Generator Controller C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-May-22 13-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L994.23aB02Prepare and re-submit info. of Generator Controller C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 14-Jun-22 22-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L996.23aB02Obtain "No objection" of Generator Controller C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 23-Jun-22 01-Jul-22 48 Hols - No B/O periods (was Starting Battery System C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 14-May-22 01-Jul-22 48 310.D.WS.L992.24aB02Prepare and submit info. of Starting Battery System C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 14-May-22 20-May-22 48 Hols - No B/O periods (was 310.D.WS.L993.24aB02Review and comment info. of Starting Battery System C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-May-22 13-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L994.24aB02Prepare and re-submit info. of Starting Battery System C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 14-Jun-22 22-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L996.24aB02Obtain "No objection" of Starting Battery System C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 23-Jun-22 01-Jul-22 48 Hols - No B/O periods (was Battery Charger C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 14-May-22 01-Jul-22 48 310.D.WS.L992.25aB02Prepare and submit info. of Battery Charger C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 14-May-22 20-May-22 48 Hols - No B/O periods (was 310.D.WS.L993.25aB02Review and comment info. of Battery Charger C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-May-22 13-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L994.25aB02Prepare and re-submit info. of Battery Charger C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 14-Jun-22 22-Jun-22 48 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 95 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L996.25aB02Obtain "No objection" of Battery Charger C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 23-Jun-22 01-Jul-22 48 Hols - No B/O periods (was MVAC C1) C01_7 d/w - 10h/d - No HK Hols115 - No B/O periods 0 (was 08-Feb-22 C1) A 26-Jun-22 28-Mar-22 11-Oct-22 107 CRAC Unit C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 14-May-22 01-Jul-22 48 310.D.WS.L992.26aB02Prepare and submit info. of CRAC Unit C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 14-May-22 20-May-22 48 Hols - No B/O periods (was 310.D.WS.L993.26aB02Review and comment info. of CRAC Unit C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-May-22 13-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L994.26aB02Prepare and re-submit info. of CRAC Unit C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 14-Jun-22 22-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L996.26aB02Obtain "No objection" of CRAC Unit C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 23-Jun-22 01-Jul-22 48 Hols - No B/O periods (was Axial Fan C1) C01_7 d/w - 10h/d - No HK Hols69 - No B/O periods 0 (was 04-Mar-22 C1) A 11-May-22 28-Mar-22 12-May-22 1 310.D.WS.L992.27aB02Prepare and submit info. of Axial Fan C01_7 d/w - 10h/d - No HK 4 04-Mar-22 A 30-Mar-22 28-Mar-22 31-Mar-22 1 Hols - No B/O periods (was 310.D.WS.L993.27aB02Review and comment info. of Axial Fan C1) C01_7 d/w - 10h/d - No HK 24 31-Mar-22 23-Apr-22 01-Apr-22 24-Apr-22 1 Hols - No B/O periods (was 310.D.WS.L994.27aB02Prepare and re-submit info. of Axial Fan C1) C01_7 d/w - 10h/d - No HK 9 24-Apr-22 02-May-22 25-Apr-22 03-May-22 1 Hols - No B/O periods (was 310.D.WS.L996.27aB02Obtain "No objection" of Axial Fan C1) C01_7 d/w - 10h/d - No HK 9 03-May-22 11-May-22 04-May-22 12-May-22 1 Hols - No B/O periods (was Split Type & VRV AC Unit C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 14-May-22 01-Jul-22 48 310.D.WS.L992.30aB02Prepare and submit info. of Split Type & VRV AC Unit C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 14-May-22 20-May-22 48 Hols - No B/O periods (was 310.D.WS.L993.30aB02Review and comment info. of Split Type & VRV AC Unit C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-May-22 13-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L994.30aB02Prepare and re-submit info. of Split Type & VRV AC Unit C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 14-Jun-22 22-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L996.30aB02Obtain "No objection" of Split Type & VRV AC Unit C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 23-Jun-22 01-Jul-22 48 Hols - No B/O periods (was Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 04-Apr-22 C1) A 27-May-22 11-Aug-22 11-Oct-22 137 310.D.WS.L992.31aB02Prepare and submit info. of Tunnel Jet Fan C01_7 d/w - 10h/d - No HK 20 04-Apr-22 A 15-Apr-22 11-Aug-22 30-Aug-22 137 Hols - No B/O periods (was 310.D.WS.L993.31aB02Review and comment info. of Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK 24 16-Apr-22 09-May-22 31-Aug-22 23-Sep-22 137 Hols - No B/O periods (was 310.D.WS.L994.31aB02Prepare and re-submit info. of Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 24-Sep-22 02-Oct-22 137 Hols - No B/O periods (was 310.D.WS.L996.31aB02Obtain "No objection" of Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK 9 19-May-22 27-May-22 03-Oct-22 11-Oct-22 137 Hols - No B/O periods (was Motor Control Centre C1) C01_7 d/w - 10h/d - No HK Hols55 - No B/O periods 0 (was27-Mar-22 C1) 20-May-22 08-May-22 01-Jul-22 42 310.D.WS.L992.33aB02Prepare and submit info. of Motor Control Centre C01_7 d/w - 10h/d - No HK 13 27-Mar-22 08-Apr-22 08-May-22 20-May-22 42 Hols - No B/O periods (was 310.D.WS.L993.33aB02Review and comment info. of Motor Control Centre C1) C01_7 d/w - 10h/d - No HK 24 09-Apr-22 02-May-22 21-May-22 13-Jun-22 42 Hols - No B/O periods (was 310.D.WS.L994.33aB02Prepare and re-submit info. of Motor Control Centre C1) C01_7 d/w - 10h/d - No HK 9 03-May-22 11-May-22 14-Jun-22 22-Jun-22 42 Hols - No B/O periods (was 310.D.WS.L996.33aB02Obtain "No objection" of Motor Control Centre C1) C01_7 d/w - 10h/d - No HK 9 12-May-22 20-May-22 23-Jun-22 01-Jul-22 42 Hols - No B/O periods (was Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK Hols59 - No B/O periods 0 (was27-Mar-22 C1) 24-May-22 04-May-22 01-Jul-22 38 310.D.WS.L992.34aB02Prepare and submit info. of Local Motor Control Panel C01_7 d/w - 10h/d - No HK 17 27-Mar-22 12-Apr-22 04-May-22 20-May-22 38 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 96 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L993.34aB02Review and comment info. of Local Motor Control Panel C01_7 d/w - 10h/d - No HK 24 13-Apr-22 06-May-22 21-May-22 13-Jun-22 38 Hols - No B/O periods (was 310.D.WS.L994.34aB02Prepare and re-submit info. of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 9 07-May-22 15-May-22 14-Jun-22 22-Jun-22 38 Hols - No B/O periods (was 310.D.WS.L996.34aB02Obtain "No objection" of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 9 16-May-22 24-May-22 23-Jun-22 01-Jul-22 38 Hols - No B/O periods (was MFSD C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 14-May-22 01-Jul-22 48 310.D.WS.L992.35aB02Prepare and submit info. of MFSD C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 14-May-22 20-May-22 48 Hols - No B/O periods (was 310.D.WS.L993.35aB02Review and comment info. of MSD C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-May-22 13-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L994.35aB02Prepare and re-submit info. of MSD C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 14-Jun-22 22-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L996.35aB02Obtain "No objection" of MSD C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 23-Jun-22 01-Jul-22 48 Hols - No B/O periods (was Fire Damper C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 14-May-22 01-Jul-22 48 310.D.WS.L992.36aB02Prepare and submit info. of Fire Damper C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 14-May-22 20-May-22 48 Hols - No B/O periods (was 310.D.WS.L993.36aB02Review and comment info. of Fire Damper C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-May-22 13-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L994.36aB02Prepare and re-submit info. of Fire Damper C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 14-Jun-22 22-Jun-22 48 Hols - No B/O periods (was 310.D.WS.L996.36aB02Obtain "No objection" of Fire Damper C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 23-Jun-22 01-Jul-22 48 Hols - No B/O periods (was Air Grille & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was21-Apr-22 C1) 26-Jun-22 26-Apr-22 01-Jul-22 5 310.D.WS.L992.37aB02Prepare and submit info. of Air Grille & Accessories C01_7 d/w - 10h/d - No HK 25 21-Apr-22 15-May-22 26-Apr-22 20-May-22 5 Hols - No B/O periods (was 310.D.WS.L993.37aB02Review and comment info. of Air Grille & Accessories C1) C01_7 d/w - 10h/d - No HK 24 16-May-22 08-Jun-22 21-May-22 13-Jun-22 5 Hols - No B/O periods (was 310.D.WS.L994.37aB02Prepare and re-submit info. of Air Grille & Accessories C1) C01_7 d/w - 10h/d - No HK 9 09-Jun-22 17-Jun-22 14-Jun-22 22-Jun-22 5 Hols - No B/O periods (was 310.D.WS.L996.37aB02Obtain "No objection" of Air Grille & Accessories C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 23-Jun-22 01-Jul-22 5 Hols - No B/O periods (was G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was 08-Feb-22 C1) A 23-Mar-22 A 13-May-22 13-May-22 310.D.WS.L992.38aB02Prepare and submit info. of G.I. Sheet Ductwork & Accessories C01_7 d/w - 10h/d - No HK 0 08-Feb-22 A 04-Mar-22 A 13-May-22 13-May-22 Hols - No B/O periods (was 310.D.WS.L993.38aB02Review and comment info. of G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK 0 05-Mar-22 A 23-Mar-22 A 13-May-22 13-May-22 Hols - No B/O periods (was 310.D.WS.L994.38aB02Prepare and re-submit info. of G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK 0 23-Mar-22 A 23-Mar-22 A 13-May-22 13-May-22 Hols - No B/O periods (was 310.D.WS.L996.38aB02Obtain "No objection" of G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK 0 23-Mar-22 A 23-Mar-22 A 13-May-22 13-May-22 Hols - No B/O periods (was Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was07-Apr-22 C1) 12-Jun-22 26-Apr-22 01-Jul-22 19 310.D.WS.L992.39aB02Prepare and submit info. of Refrigerant Pipework & Fittings C01_7 d/w - 10h/d - No HK 25 07-Apr-22 01-May-22 26-Apr-22 20-May-22 19 Hols - No B/O periods (was 310.D.WS.L993.39aB02Review and comment info. of Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK 24 02-May-22 25-May-22 21-May-22 13-Jun-22 19 Hols - No B/O periods (was 310.D.WS.L994.39aB02Prepare and re-submit info. of Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK 9 26-May-22 03-Jun-22 14-Jun-22 22-Jun-22 19 Hols - No B/O periods (was 310.D.WS.L996.39aB02Obtain "No objection" of Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK 9 04-Jun-22 12-Jun-22 23-Jun-22 01-Jul-22 19 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 97 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Fire Services C01_7 d/w - 10h/d - No HK Hols219 - No B/O periods 0 (was10-Apr-22 C1) 14-Nov-22 22-May-22 02-Feb-23 80 Hose Reel Set C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 01-Jul-22 05-Sep-22 62 310.D.WS.L992.40aB02Prepare and submit info. of Hose Reel Set C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 01-Jul-22 25-Jul-22 62 Hols - No B/O periods (was 310.D.WS.L993.40aB02Review and comment info. of Hose Reel Set C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 26-Jul-22 18-Aug-22 62 Hols - No B/O periods (was 310.D.WS.L994.40aB02Prepare and re-submit info. of Hose Reel Set C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 19-Aug-22 27-Aug-22 62 Hols - No B/O periods (was 310.D.WS.L996.40aB02Obtain "No objection" of Hose Reel Set C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 28-Aug-22 05-Sep-22 62 Hols - No B/O periods (was Fire Hydrant C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 01-Jul-22 05-Sep-22 62 310.D.WS.L992.41aB02Prepare and submit info. of Fire Hydrant C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 01-Jul-22 25-Jul-22 62 Hols - No B/O periods (was 310.D.WS.L993.41aB02Review and comment info. of Fire Hydrant C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 26-Jul-22 18-Aug-22 62 Hols - No B/O periods (was 310.D.WS.L994.41aB02Prepare and re-submit info. of Fire Hydrant C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 19-Aug-22 27-Aug-22 62 Hols - No B/O periods (was 310.D.WS.L996.41aB02Obtain "No objection" of Fire Hydrant C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 28-Aug-22 05-Sep-22 62 Hols - No B/O periods (was MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was14-May-22 C1) 19-Jul-22 01-Jul-22 05-Sep-22 48 310.D.WS.L992.43aB02Prepare and submit info. of MCC/ LMCP C01_7 d/w - 10h/d - No HK 25 14-May-22 07-Jun-22 01-Jul-22 25-Jul-22 48 Hols - No B/O periods (was 310.D.WS.L993.43aB02Review and comment info. of MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK 24 08-Jun-22 01-Jul-22 26-Jul-22 18-Aug-22 48 Hols - No B/O periods (was 310.D.WS.L994.43aB02Prepare and re-submit info. of MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK 9 02-Jul-22 10-Jul-22 19-Aug-22 27-Aug-22 48 Hols - No B/O periods (was 310.D.WS.L996.43aB02Obtain "No objection" of MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK 9 11-Jul-22 19-Jul-22 28-Aug-22 05-Sep-22 48 Hols - No B/O periods (was FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was29-May-22 C1) 03-Aug-22 01-Jul-22 05-Sep-22 33 310.D.WS.L992.45aB02Prepare and submit info. of FS Jockey Pump C01_7 d/w - 10h/d - No HK 25 29-May-22 22-Jun-22 01-Jul-22 25-Jul-22 33 Hols - No B/O periods (was 310.D.WS.L993.45aB02Review and comment info. of FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK 24 23-Jun-22 16-Jul-22 26-Jul-22 18-Aug-22 33 Hols - No B/O periods (was 310.D.WS.L994.45aB02Prepare and re-submit info. of FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 17-Jul-22 25-Jul-22 19-Aug-22 27-Aug-22 33 Hols - No B/O periods (was 310.D.WS.L996.45aB02Obtain "No objection" of FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 26-Jul-22 03-Aug-22 28-Aug-22 05-Sep-22 33 Hols - No B/O periods (was Fixed Foam System Water Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was29-May-22 C1) 03-Aug-22 28-Nov-22 02-Feb-23 183 310.D.WS.L992.46aB02Prepare and submit info. of Fixed Foam System Water Pump C01_7 d/w - 10h/d - No HK 25 29-May-22 22-Jun-22 28-Nov-22 22-Dec-22 183 Hols - No B/O periods (was 310.D.WS.L993.46aB02Review and comment info. of Fixed Foam System Water Pump C1) C01_7 d/w - 10h/d - No HK 24 23-Jun-22 16-Jul-22 23-Dec-22 15-Jan-23 183 Hols - No B/O periods (was 310.D.WS.L994.46aB02Prepare and re-submit info. of Fixed Foam System Water Pump C1) C01_7 d/w - 10h/d - No HK 9 17-Jul-22 25-Jul-22 16-Jan-23 24-Jan-23 183 Hols - No B/O periods (was 310.D.WS.L996.46aB02Obtain "No objection" of Fixed Foam System Water Pump C1) C01_7 d/w - 10h/d - No HK 9 26-Jul-22 03-Aug-22 25-Jan-23 02-Feb-23 183 Hols - No B/O periods (was G.I. Pipe & Fittings C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was22-May-22 C1) 27-Jul-22 01-Jul-22 05-Sep-22 40 310.D.WS.L992.48aB02Prepare and submit info. of G.I. Pipe & Fittings C01_7 d/w - 10h/d - No HK 25 22-May-22 15-Jun-22 01-Jul-22 25-Jul-22 40 Hols - No B/O periods (was 310.D.WS.L993.48aB02Review and comment info. of G.I. Pipe & Fittings C1) C01_7 d/w - 10h/d - No HK 24 16-Jun-22 09-Jul-22 26-Jul-22 18-Aug-22 40 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 98 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L994.48aB02Prepare and re-submit info. of G.I. Pipe & Fittings C01_7 d/w - 10h/d - No HK 9 10-Jul-22 18-Jul-22 19-Aug-22 27-Aug-22 40 Hols - No B/O periods (was 310.D.WS.L996.48aB02Obtain "No objection" of G.I. Pipe & Fittings C1) C01_7 d/w - 10h/d - No HK 9 19-Jul-22 27-Jul-22 28-Aug-22 05-Sep-22 40 Hols - No B/O periods (was Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was10-Apr-22 C1) 15-Jun-22 22-May-22 27-Jul-22 42 310.D.WS.L992.49aB02Prepare and submit info. of Automatic Fire Alarm Control Panel C01_7 d/w - 10h/d - No HK 25 10-Apr-22 04-May-22 22-May-22 15-Jun-22 42 Hols - No B/O periods (was 310.D.WS.L993.49aB02Review and comment info. of Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK 24 05-May-22 28-May-22 16-Jun-22 09-Jul-22 42 Hols - No B/O periods (was 310.D.WS.L994.49aB02Prepare and re-submit info. of Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK 9 29-May-22 06-Jun-22 10-Jul-22 18-Jul-22 42 Hols - No B/O periods (was 310.D.WS.L996.49aB02Obtain "No objection" of Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK 9 07-Jun-22 15-Jun-22 19-Jul-22 27-Jul-22 42 Hols - No B/O periods (was Gas Flooding System C1) C01_7 d/w - 10h/d - No HK Hols46 - No B/O periods 0 (was13-Apr-22 C1) 28-May-22 22-Jul-22 05-Sep-22 100 310.D.WS.L992.50aB02Prepare and submit info. of Gas Flooding System C01_7 d/w - 10h/d - No HK 14 13-Apr-22 26-Apr-22 22-Jul-22 04-Aug-22 100 Hols - No B/O periods (was 310.D.WS.L993.50aB02Review and comment info. of Gas Flooding System C1) C01_7 d/w - 10h/d - No HK 14 27-Apr-22 10-May-22 05-Aug-22 18-Aug-22 100 Hols - No B/O periods (was 310.D.WS.L994.50aB02Prepare and re-submit info. of Gas Flooding System C1) C01_7 d/w - 10h/d - No HK 9 11-May-22 19-May-22 19-Aug-22 27-Aug-22 100 Hols - No B/O periods (was 310.D.WS.L996.50aB02Obtain "No objection" of Gas Flooding System C1) C01_7 d/w - 10h/d - No HK 9 20-May-22 28-May-22 28-Aug-22 05-Sep-22 100 Hols - No B/O periods (was Smoke Detector C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was10-May-22 C1) 15-Jul-22 29-Jun-22 03-Sep-22 50 310.D.WS.L992.53aB02Prepare and submit info. of Smoke Detector C01_7 d/w - 10h/d - No HK 25 10-May-22 03-Jun-22 29-Jun-22 23-Jul-22 50 Hols - No B/O periods (was 310.D.WS.L993.53aB02Review and comment info. of Smoke Detector C1) C01_7 d/w - 10h/d - No HK 24 04-Jun-22 27-Jun-22 24-Jul-22 16-Aug-22 50 Hols - No B/O periods (was 310.D.WS.L994.53aB02Prepare and re-submit info. of Smoke Detector C1) C01_7 d/w - 10h/d - No HK 9 28-Jun-22 06-Jul-22 17-Aug-22 25-Aug-22 50 Hols - No B/O periods (was 310.D.WS.L996.53aB02Obtain "No objection" of Smoke Detector C1) C01_7 d/w - 10h/d - No HK 9 07-Jul-22 15-Jul-22 26-Aug-22 03-Sep-22 50 Hols - No B/O periods (was Heat Detector C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was24-Jun-22 C1) 29-Aug-22 01-Jul-22 05-Sep-22 7 310.D.WS.L992.54aB02Prepare and submit info. of Heat Detector C01_7 d/w - 10h/d - No HK 25 24-Jun-22 18-Jul-22 01-Jul-22 25-Jul-22 7 Hols - No B/O periods (was 310.D.WS.L993.54aB02Review and comment info. of Heat Detector C1) C01_7 d/w - 10h/d - No HK 24 19-Jul-22 11-Aug-22 26-Jul-22 18-Aug-22 7 Hols - No B/O periods (was 310.D.WS.L994.54aB02Prepare and re-submit info. of Heat Detector C1) C01_7 d/w - 10h/d - No HK 9 12-Aug-22 20-Aug-22 19-Aug-22 27-Aug-22 7 Hols - No B/O periods (was 310.D.WS.L996.54aB02Obtain "No objection" of Heat Detector C1) C01_7 d/w - 10h/d - No HK 9 21-Aug-22 29-Aug-22 28-Aug-22 05-Sep-22 7 Hols - No B/O periods (was Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was24-Jun-22 C1) 29-Aug-22 01-Jul-22 05-Sep-22 7 310.D.WS.L992.55aB02Prepare and submit info. of Cable Tray & Accessories C01_7 d/w - 10h/d - No HK 25 24-Jun-22 18-Jul-22 01-Jul-22 25-Jul-22 7 Hols - No B/O periods (was 310.D.WS.L993.55aB02Review and comment info. of Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK 24 19-Jul-22 11-Aug-22 26-Jul-22 18-Aug-22 7 Hols - No B/O periods (was 310.D.WS.L994.55aB02Prepare and re-submit info. of Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK 9 12-Aug-22 20-Aug-22 19-Aug-22 27-Aug-22 7 Hols - No B/O periods (was 310.D.WS.L996.55aB02Obtain "No objection" of Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK 9 21-Aug-22 29-Aug-22 28-Aug-22 05-Sep-22 7 Hols - No B/O periods (was Linear Heat Detector C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was09-Sep-22 C1) 14-Nov-22 28-Nov-22 02-Feb-23 80
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 99 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L992.57aB02Prepare and submit info. of Linear Heat Detector C01_7 d/w - 10h/d - No HK 25 09-Sep-22 03-Oct-22 28-Nov-22 22-Dec-22 80 Hols - No B/O periods (was 310.D.WS.L993.57aB02Review and comment info. of Linear Heat Detector C1) C01_7 d/w - 10h/d - No HK 24 04-Oct-22 27-Oct-22 23-Dec-22 15-Jan-23 80 Hols - No B/O periods (was 310.D.WS.L994.57aB02Prepare and re-submit info. of Linear Heat Detector C1) C01_7 d/w - 10h/d - No HK 9 28-Oct-22 05-Nov-22 16-Jan-23 24-Jan-23 80 Hols - No B/O periods (was 310.D.WS.L996.57aB02Obtain "No objection" of Linear Heat Detector C1) C01_7 d/w - 10h/d - No HK 9 06-Nov-22 14-Nov-22 25-Jan-23 02-Feb-23 80 Hols - No B/O periods (was PLC C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was11-May-22 C1) 16-Jul-22 29-Jun-22 03-Sep-22 49 310.D.WS.L992.58aB02Prepare and submit info. of PLC C01_7 d/w - 10h/d - No HK 25 11-May-22 04-Jun-22 29-Jun-22 23-Jul-22 49 Hols - No B/O periods (was 310.D.WS.L993.58aB02Review and comment info. of PLC C1) C01_7 d/w - 10h/d - No HK 24 05-Jun-22 28-Jun-22 24-Jul-22 16-Aug-22 49 Hols - No B/O periods (was 310.D.WS.L994.58aB02Prepare and re-submit info. of PLC C1) C01_7 d/w - 10h/d - No HK 9 29-Jun-22 07-Jul-22 17-Aug-22 25-Aug-22 49 Hols - No B/O periods (was 310.D.WS.L996.58aB02Obtain "No objection" of PLC C1) C01_7 d/w - 10h/d - No HK 9 08-Jul-22 16-Jul-22 26-Aug-22 03-Sep-22 49 Hols - No B/O periods (was Plumbing and Drainage C1) C01_7 d/w - 10h/d - No HK Hols215 - No B/O periods 0 (was27-Mar-22 C1) 27-Oct-22 28-Mar-22 02-Feb-23 98 Fibreglass Tank C01_7 d/w - 10h/d - No HK Hols57 - No B/O periods 0 (was27-Mar-22 C1) 22-May-22 28-Mar-22 23-May-22 1 310.D.WS.L992.59aB02Prepare and submit info. of Fribreglass Tank C01_7 d/w - 10h/d - No HK 18 27-Mar-22 13-Apr-22 28-Mar-22 14-Apr-22 1 Hols - No B/O periods (was 310.D.WS.L993.59aB02Review and comment info. of Fribreglass Tank C1) C01_7 d/w - 10h/d - No HK 21 14-Apr-22 04-May-22 15-Apr-22 05-May-22 1 Hols - No B/O periods (was 310.D.WS.L994.59aB02Prepare and re-submit info. of Fribreglass Tank C1) C01_7 d/w - 10h/d - No HK 9 05-May-22 13-May-22 06-May-22 14-May-22 1 Hols - No B/O periods (was 310.D.WS.L996.59aB02Obtain "No objection" of Fribreglass Tank C1) C01_7 d/w - 10h/d - No HK 9 14-May-22 22-May-22 15-May-22 23-May-22 1 Hols - No B/O periods (was Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 28-Nov-22 02-Feb-23 212 310.D.WS.L992.64aB02Prepare and submit info. of Ductile Iron Pipe & Accessories C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 28-Nov-22 22-Dec-22 212 Hols - No B/O periods (was 310.D.WS.L993.64aB02Review and comment info. of Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 23-Dec-22 15-Jan-23 212 Hols - No B/O periods (was 310.D.WS.L994.64aB02Prepare and re-submit info. of Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 16-Jan-23 24-Jan-23 212 Hols - No B/O periods (was 310.D.WS.L996.64aB02Obtain "No objection" of Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 25-Jan-23 02-Feb-23 212 Hols - No B/O periods (was Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 01-Jul-22 05-Sep-22 62 310.D.WS.L992.65aB02Prepare and submit info. of Epoxy Cast Iron Pipe & Accessories C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 01-Jul-22 25-Jul-22 62 Hols - No B/O periods (was 310.D.WS.L993.65aB02Review and comment info. of Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 26-Jul-22 18-Aug-22 62 Hols - No B/O periods (was 310.D.WS.L994.65aB02Prepare and re-submit info. of Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 19-Aug-22 27-Aug-22 62 Hols - No B/O periods (was 310.D.WS.L996.65aB02Obtain "No objection" of Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 28-Aug-22 05-Sep-22 62 Hols - No B/O periods (was Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was13-Jun-22 C1) 18-Aug-22 28-Nov-22 02-Feb-23 168 310.D.WS.L992.66aB02Prepare and submit info. of Local Motor Control Panel C01_7 d/w - 10h/d - No HK 25 13-Jun-22 07-Jul-22 28-Nov-22 22-Dec-22 168 Hols - No B/O periods (was 310.D.WS.L993.66aB02Review and comment info. of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 24 08-Jul-22 31-Jul-22 23-Dec-22 15-Jan-23 168 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 100 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L994.66aB02Prepare and re-submit info. of Local Motor Control Panel C01_7 d/w - 10h/d - No HK 9 01-Aug-22 09-Aug-22 16-Jan-23 24-Jan-23 168 Hols - No B/O periods (was 310.D.WS.L996.66aB02Obtain "No objection" of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 9 10-Aug-22 18-Aug-22 25-Jan-23 02-Feb-23 168 Hols - No B/O periods (was Sump Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was22-Aug-22 C1) 27-Oct-22 28-Nov-22 02-Feb-23 98 310.D.WS.L992.67aB02Prepare and submit info. of Sump Pump C01_7 d/w - 10h/d - No HK 25 22-Aug-22 15-Sep-22 28-Nov-22 22-Dec-22 98 Hols - No B/O periods (was 310.D.WS.L993.67aB02Review and comment info. of Sump Pump C1) C01_7 d/w - 10h/d - No HK 24 16-Sep-22 09-Oct-22 23-Dec-22 15-Jan-23 98 Hols - No B/O periods (was 310.D.WS.L994.67aB02Prepare and re-submit info. of Sump Pump C1) C01_7 d/w - 10h/d - No HK 9 10-Oct-22 18-Oct-22 16-Jan-23 24-Jan-23 98 Hols - No B/O periods (was 310.D.WS.L996.67aB02Obtain "No objection" of Sump Pump C1) C01_7 d/w - 10h/d - No HK 9 19-Oct-22 27-Oct-22 25-Jan-23 02-Feb-23 98 Hols - No B/O periods (was CC#06 - General - MEP - Method Statement C1) C01_7 d/w - 10h/d - No HK Hols260 - No B/O periods 0 (was27-Mar-22 C1) 11-Dec-22 18-May-22 21-Feb-23 72 ELECT C01_7 d/w - 10h/d - No HK Hols210 - No B/O periods 0 (was27-Mar-22 C1) 22-Oct-22 26-Jun-22 21-Jan-23 91 310.D.WS.L984.05aB02 Prepare and submit Elect. Method Statement (15 nos.) C01_7 d/w - 10h/d - No HK 165 27-Mar-22 07-Sep-22 26-Jun-22 07-Dec-22 91 Hols - No B/O periods (was 310.D.WS.L985.05aB02 Review and comment Elect. Method Statement (15 nos.) C1) C01_7 d/w - 10h/d - No HK 165 11-Apr-22 22-Sep-22 11-Jul-22 22-Dec-22 91 Hols - No B/O periods (was 310.D.WS.L986.05aB02 Prepare and re-submit Elect. Method Statement (15 nos.) C1) C01_7 d/w - 10h/d - No HK 165 26-Apr-22 07-Oct-22 26-Jul-22 06-Jan-23 91 Hols - No B/O periods (was 310.D.WS.L988.05aB02 Obtain approval of Elect. Method Statement (15 nos.) C1) C01_7 d/w - 10h/d - No HK 165 11-May-22 22-Oct-22 10-Aug-22 21-Jan-23 91 Hols - No B/O periods (was MVAC C1) C01_7 d/w - 10h/d - No HK Hols260 - No B/O periods 0 (was27-Mar-22 C1) 11-Dec-22 07-Jun-22 21-Feb-23 72 310.D.WS.L984.06aB02 Prepare and submit MVAC Method Statement (13 nos.) C01_7 d/w - 10h/d - No HK 215 27-Mar-22 27-Oct-22 07-Jun-22 07-Jan-23 72 Hols - No B/O periods (was 310.D.WS.L985.06aB02 Review and comment MVAC Method Statement (13 nos.) C1) C01_7 d/w - 10h/d - No HK 215 11-Apr-22 11-Nov-22 22-Jun-22 22-Jan-23 72 Hols - No B/O periods (was 310.D.WS.L986.06aB02 Prepare and re-submit MVAC Method Statement (13 nos.) C1) C01_7 d/w - 10h/d - No HK 215 26-Apr-22 26-Nov-22 07-Jul-22 06-Feb-23 72 Hols - No B/O periods (was 310.D.WS.L988.06aB02 Obtain approval of MVAC Method Statement (13 nos.) C1) C01_7 d/w - 10h/d - No HK 215 11-May-22 11-Dec-22 22-Jul-22 21-Feb-23 72 Hols - No B/O periods (was FS C1) C01_7 d/w - 10h/d - No HK Hols138 - No B/O periods 0 (was01-May-22 C1) 15-Sep-22 18-May-22 02-Oct-22 17 310.D.WS.L984.07aB02 Prepare and submit FS Method Statement (12 nos.) C01_7 d/w - 10h/d - No HK 93 01-May-22 01-Aug-22 18-May-22 18-Aug-22 17 Hols - No B/O periods (was 310.D.WS.L985.07aB02 Review and comment FS Method Statement (12 nos.) C1) C01_7 d/w - 10h/d - No HK 93 16-May-22 16-Aug-22 02-Jun-22 02-Sep-22 17 Hols - No B/O periods (was 310.D.WS.L986.07aB02 Prepare and re-submit FS Method Statement (12 nos.) C1) C01_7 d/w - 10h/d - No HK 93 31-May-22 31-Aug-22 17-Jun-22 17-Sep-22 17 Hols - No B/O periods (was 310.D.WS.L988.07aB02 Obtain approval of FS Method Statement (12 nos.) C1) C01_7 d/w - 10h/d - No HK 93 15-Jun-22 15-Sep-22 02-Jul-22 02-Oct-22 17 Hols - No B/O periods (was P&D C1) C01_7 d/w - 10h/d - No HK Hols199 - No B/O periods 0 (was27-Mar-22 C1) 11-Oct-22 29-Jun-22 13-Jan-23 94 310.D.WS.L984.08aB02 Prepare and submit P&D Method Statement (5 nos.) C01_7 d/w - 10h/d - No HK 154 27-Mar-22 27-Aug-22 29-Jun-22 29-Nov-22 94 Hols - No B/O periods (was 310.D.WS.L985.08aB02 Review and comment P&D Method Statement (5 nos.) C1) C01_7 d/w - 10h/d - No HK 154 11-Apr-22 11-Sep-22 14-Jul-22 14-Dec-22 94 Hols - No B/O periods (was 310.D.WS.L986.08aB02 Prepare and re-submit P&D Method Statement (5 nos.) C1) C01_7 d/w - 10h/d - No HK 154 26-Apr-22 26-Sep-22 29-Jul-22 29-Dec-22 94 Hols - No B/O periods (was 310.D.WS.L988.08aB02 Obtain approval of P&D Method Statement (5 nos.) C1) C01_7 d/w - 10h/d - No HK 154 11-May-22 11-Oct-22 13-Aug-22 13-Jan-23 94 Hols - No B/O periods (was CC#06 ----- Procurement ----- C1) C01_7 d/w - 10h/d - No HK Hols484 - No B/O periods 0 (was 30-Oct-21 C1) A 31-Jan-23 28-Mar-22 09-Feb-23 9
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 101 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S CC#06 - Subletting - East Vehicular Tunnel (EVT) C01_7 d/w - 10h/d - No HK Hols300 - No B/O periods 0 (was 30-Oct-21 C1) A 31-Jul-22 28-Mar-22 23-Dec-22 145 310.P.EX.H198 Subletting - EVT, Plant A & Plant C MEP - Award sub-contract C01_7 d/w - 10h/d - No HK 90 30-Oct-21 A 18-Jan-22 A 17-Jun-22 17-Jun-22 Hols - No B/O periods (was 310.P.EX.H140 Subletting - EVT - Earthwork - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 04-Dec-21 A 14-Apr-22 28-Apr-22 16-May-22 32 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.H206 Subletting - ABWF (Plastering) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 20-Apr-22 02-Apr-22 26-Apr-22 6 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.H227.B01 Subletting - ABWF (Painting) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 28-Mar-22 26-Apr-22 1 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.H231.B01 Subletting - ABWF (Door) - Stage 1&2 Preparation,Submission& Approval,Tender&Award C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 28-Mar-22 26-Apr-22 1 sub-contract Hols - No B/O periods (was 310.P.EX.H235.B01 Subletting - ABWF (Louver,Window,etc) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 28-Mar-22 26-Apr-22 1 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.H239.B01 Subletting - ABWF (Steel&Metal) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 28-Mar-22 26-Apr-22 1 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.H188 Subletting - EVT - RC Structural Works - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-May-22 31-Jul-22 25-Sep-22 23-Dec-22 145 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.H222 Subletting - EVT - Waterproofing - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-May-22 31-Jul-22 25-Sep-22 23-Dec-22 145 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.H164 Subletting - EVT - Plant Building RC Works - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-May-22 31-Jul-22 30-May-22 27-Aug-22 27 Approval,Tender&Award sub-contract Hols - No B/O periods (was CC#06 - Procurement - East Vehicular Tunnel (EVT) C1) C01_7 d/w - 10h/d - No HK Hols265 - No B/O periods 0 (was12-May-22 C1) 31-Jan-23 27-Jul-22 09-Feb-23 9 EVT - Procurement - MEP C01_7 d/w - 10h/d - No HK Hols265 - No B/O periods 0 (was12-May-22 C1) 31-Jan-23 28-Jul-22 09-Feb-23 9 310.P.RC.D435 EVT - (Procurement Electrical & MVAC and Other Materials) - Place Order for Material C01_7 d/w - 10h/d - No HK 50 12-May-22 30-Jun-22 23-Aug-22 11-Oct-22 103 Hols - No B/O periods (was 310.P.RC.D443 EVT - (Procurement Electrical & MVAC and Other Materials) - Manufacturing of Material C1) C01_7 d/w - 10h/d - No HK 150 19-May-22 15-Oct-22 30-Aug-22 26-Jan-23 103 Hols - No B/O periods (was 310.P.RC.D431 EVT - (Procurement FS and P&D Materials) - Place Order for Material C1) C01_7 d/w - 10h/d - No HK 190 16-Jun-22 22-Dec-22 28-Jul-22 02-Feb-23 42 Hols - No B/O periods (was 310.P.RC.D439 EVT - (Procurement FS and P&D Materials) - Manufacturing of Material C1) C01_7 d/w - 10h/d - No HK 190 26-Jul-22 31-Jan-23 04-Aug-22 09-Feb-23 9 Hols - No B/O periods (was 310.P.RC.D447 EVT - (Procurement) - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 14 18-Jan-23 31-Jan-23 27-Jan-23 09-Feb-23 9 Hols - No B/O periods (was EVT - Procurement - ABWF C1) C01_7 d/w - 10h/d - No HK Hols134 - No B/O periods 0 (was19-Jul-22 C1) 29-Nov-22 27-Jul-22 07-Dec-22 8 310.P.RC.D427 EVT - (Procurement ABWF) - Place Order for Materials C01_7 d/w - 10h/d - No HK 7 19-Jul-22 25-Jul-22 27-Jul-22 02-Aug-22 8 Hols - No B/O periods (was 310.P.RC.D451 EVT - (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 120 26-Jul-22 22-Nov-22 03-Aug-22 30-Nov-22 8 Hols - No B/O periods (was 310.P.RC.D459 EVT - (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 7 23-Nov-22 29-Nov-22 01-Dec-22 07-Dec-22 8 Hols - No B/O periods (was CC#06 ----- Construction ----- C1) 856 287 07-Jun-21 A 22-Apr-24 07-Mar-22 27-Jul-24 79 CC#06 - East Vehicular Tunnel - EVT (HYBRID METHOD) 856 272 07-Jun-21 A 22-Apr-24 07-Mar-22 27-Jul-24 79 CC#06 - EVT - Site Preparation and Establishment C11_6 d/w - 10h/d - With HK Hols 394- No B/O 0periods (was 07-Jun-21 C3) A 29-Sep-22 07-Mar-22 11-Jan-23 84 310.C.EX.H093 EVT - tentative date of closure of existing N-Runway C11_6 d/w - 10h/d - With 0 01-Sep-22 01-Sep-22 1 HK Hols - No B/O periods CC#06 - EVT - 3310/3 Site Preparation and Establishment (was C3) C11_6 d/w - 10h/d - With HK Hols 394- No B/O 0periods (was 07-Jun-21 C3) A 29-Sep-22 16-Sep-22 05-Nov-22 30 310.C.EX.H021 EVT - 3310/3 - access to Works Area C11_6 d/w - 10h/d - With 0 07-Jun-21 A 16-Sep-22 HK Hols - No B/O periods 310.C.EX.H034 EVT - 3310/3 - carry out condition survey and reporting (was C11_6C3) d/w - 10h/d - With 6 01-Sep-22 07-Sep-22 10-Oct-22 15-Oct-22 30 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 102 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.H030 EVT - 3310/3 - instrumentation works C11_6 d/w - 10h/d - With 24 01-Sep-22 29-Sep-22 16-Sep-22 15-Oct-22 12 HK Hols - No B/O periods 310.C.EX.H026 EVT - 3310/3 - underground utilities survey and reporting + carry out topographic survey (was C11_6C3) d/w - 10h/d - With 6 03-Sep-22 12-Sep-22 31-Oct-22 05-Nov-22 46 and reporting HK Hols - No B/O periods CC#06 - EVT - 3310/6 Site Preparation and Establishment (was C11_6C3) d/w - 10h/d - With HK Hols 266- No B/O 0periods (was 07-Jun-21 C3) A 28-Apr-22 14-Apr-22 11-Jan-23 212 310.C.EX.H049 EVT - 3310/6 - access to Works Area C11_6 d/w - 10h/d - With 0 07-Jun-21 A 14-Apr-22 HK Hols - No B/O periods 310.C.EX.H054 EVT - 3310/6 - underground utilities survey and reporting + carry out topographic survey (was C11_6C3) d/w - 10h/d - With 6 29-Jun-21 A 06-Jul-21 A 22-May-22 22-May-22 and reporting HK Hols - No B/O periods 310.C.EX.H062 EVT - 3310/6 - carry out condition survey and reporting (was C11_6C3) d/w - 10h/d - With 6 07-Jul-21 A 13-Jul-21 A 11-Jan-23 11-Jan-23 HK Hols - No B/O periods 310.C.EX.H058 EVT - 3310/6 - instrumentation works (was C11_6C3) d/w - 10h/d - With 24 28-Mar-22 28-Apr-22 14-Apr-22 16-May-22 14 HK Hols - No B/O periods CC#06 - EVT - 3310/6C Site Preparation and Establishment (was C11_6C3) d/w - 10h/d - With HK Hols 24- No B/O 0periods (was 28-Mar-22 C3) 28-Apr-22 07-Mar-22 16-May-22 14 310.C.EX.H078 EVT - 3310/6C - access to Works Area C11_6 d/w - 10h/d - With 0 28-Mar-22* 07-Mar-22 -18 HK Hols - No B/O periods 310.C.EX.H082 EVT - 3310/6C - underground utilities survey and reporting (was C11_6C3) d/w - 10h/d - With 6 28-Mar-22 02-Apr-22 10-May-22 16-May-22 32 HK Hols - No B/O periods 310.C.EX.H090 EVT - 3310/6C - carry out condition survey and reporting (was C11_6C3) d/w - 10h/d - With 6 28-Mar-22 02-Apr-22 10-May-22 16-May-22 32 HK Hols - No B/O periods 310.C.EX.H086 EVT - 3310/6C - instrumentation works (was C11_6C3) d/w - 10h/d - With 24 28-Mar-22 28-Apr-22 14-Apr-22 16-May-22 14 HK Hols - No B/O periods CC#06 - EVT - 3310/7 Site Preparation and Establishment (was C11_6C3) d/w - 10h/d - With HK Hols6 - No B/O 0periods (was 05-Sep-22 C3) 12-Sep-22 05-Sep-22 12-Sep-22 0 310.C.EX.H094 EVT - 3310/7 - access to Works Area C11_6 d/w - 10h/d - With 0 05-Sep-22 05-Sep-22 0 HK Hols - No B/O periods 310.C.EX.H102 EVT - 3310/7 - instrumentation works (was C11_6C3) d/w - 10h/d - With 6 05-Sep-22 12-Sep-22 05-Sep-22 12-Sep-22 0 HK Hols - No B/O periods CC#06 - EVT - Existing UU - temporary support (and/or diversion as necessary) (was C01_7C3) d/w - 10h/d - No HK Hols168 - No B/O periods 0 (was27-Mar-22 C1) 10-Sep-22 22-May-22 05-Nov-22 56 Submissions and Application C01_7 d/w - 10h/d - No HK Hols155 - No B/O periods 0 (was27-Mar-22 C1) 28-Aug-22 22-May-22 24-Oct-22 56 310.C.EX.H913 UU Support Works - Prepare Presentation of Propose Temporary Diversion of Existing UU C01_7 d/w - 10h/d - No HK 45 27-Mar-22 10-May-22 22-May-22 06-Jul-22 56 to CAD Hols - No B/O periods (was 310.C.EX.H917 UU Support Works - PM 1st review Presentation of Propose Temporary Diversion of C1) C01_7 d/w - 10h/d - No HK 28 11-May-22 07-Jun-22 06-Jul-22 03-Aug-22 56 Existing UU to CAD Hols - No B/O periods (was 310.C.EX.H921 UU Support Works - Revise Presentation of Propose Temporary Diversion of Existing UU C1) C01_7 d/w - 10h/d - No HK 8 08-Jun-22 15-Jun-22 21-Aug-22 29-Aug-22 74 to CAD Hols - No B/O periods (was 310.C.EX.H933 UU Support Works - Method Statement C1) C01_7 d/w - 10h/d - No HK 21 08-Jun-22 28-Jun-22 03-Aug-22 24-Aug-22 56 Hols - No B/O periods (was 310.C.EX.H1013 UU Support Works - PM 2nd review Presentation of Propose Temporary Diversion of C1) C01_7 d/w - 10h/d - No HK 28 16-Jun-22 13-Jul-22 29-Aug-22 26-Sep-22 74 Existing UU to CAD Hols - No B/O periods (was 310.C.EX.H937 UU Support Works - PM 1st review and approved Method Statement C1) C01_7 d/w - 10h/d - No HK 28 29-Jun-22 26-Jul-22 24-Aug-22 21-Sep-22 56 Hols - No B/O periods (was 310.C.EX.H1009 UU Support Works - Revise Method Statement C1) C01_7 d/w - 10h/d - No HK 5 27-Jul-22 31-Jul-22 21-Sep-22 26-Sep-22 56 Hols - No B/O periods (was 310.C.EX.H1017 UU Support Works - PM 2nd review and approved Method Statement C1) C01_7 d/w - 10h/d - No HK 28 01-Aug-22 28-Aug-22 26-Sep-22 24-Oct-22 56 Hols - No B/O periods (was Existing UU - temporary support (and/or diversion as necessary) C1) C01_7 d/w - 10h/d - No HK Hols13 - No B/O periods 0 (was29-Aug-22 C1) 10-Sep-22 24-Oct-22 05-Nov-22 56 310.C.EX.H947 UU temporary support and/ or Diversion Works - Work Permit C01_7 d/w - 10h/d - No HK 13 29-Aug-22 10-Sep-22 24-Oct-22 05-Nov-22 56 Hols - No B/O periods (was CC#06 - EVT - Ground Investigation C1) C11_6 d/w - 10h/d - With HK Hols 655- No B/O 4periods (was 27-Aug-21 C3) A 15-Nov-23 19-Apr-22 16-Dec-23 27 EVT - Instrumentation (before tunnel construction commence) C11_6 d/w - 10h/d - With HK Hols 10- No B/O 0periods (was 30-Sep-22 C3) 13-Oct-22 11-Jan-23 21-Jan-23 84
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 103 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.H038 EVT - Install background ground surface markers [8 nos. @5d/no./wf; 4wf] C11_6 d/w - 10h/d - With 10 30-Sep-22 13-Oct-22 11-Jan-23 21-Jan-23 84 HK Hols - No B/O periods EVT - Instrumentation (after tunnel construction complete) (was C11_6C3) d/w - 10h/d - With HK Hols 26- No B/O 0periods (was 16-Oct-23 C3) 15-Nov-23 17-Nov-23 16-Dec-23 27 310.C.EX.H042 EVT - install instruments outside tunnel [17 nos. @10d/nos; 3WF] C11_6 d/w - 10h/d - With 26 16-Oct-23 15-Nov-23 17-Nov-23 16-Dec-23 27 HK Hols - No B/O periods EVT - GI for ELS Design (was C11_6C3) d/w - 10h/d - With HK Hols 320- No B/O 4periods (was 27-Aug-21 C3) A 29-Sep-22 19-Apr-22 30-Sep-22 1 310.C.EX.H046 EVT - GI for ELS design - Carry out GI (Zones 6 & 7) C11_6 d/w - 10h/d - With 21 2 27-Aug-21 A 11-Nov-21 A 19-Apr-22 19-Apr-22 HK Hols - No B/O periods 310.C.EX.H050 EVT - GI for ELS design - prepare report and submit (Zones 6 & 7) (was C11_6C3) d/w - 10h/d - With 3 11-Nov-21 A 14-Nov-21 A 19-Apr-22 19-Apr-22 HK Hols - No B/O periods 310.C.EX.H1233 EVT - GI for ELS design - Carry out GI (Other Zones) (was C11_6C3) d/w - 10h/d - With 21 2 01-Sep-22 26-Sep-22 02-Sep-22 27-Sep-22 1 HK Hols - No B/O periods 310.C.EX.H1237 EVT - GI for ELS design - prepare report and submit (Other Zones) (was C11_6C3) d/w - 10h/d - With 3 27-Sep-22 29-Sep-22 28-Sep-22 30-Sep-22 1 HK Hols - No B/O periods CC#06 - EVT - VE+ELS Installation (was C3) 341 102 17-Apr-22 09-Jun-23 19-Apr-22 11-Jul-23 25 CC#06 - EVT - Zone 6 (3310/6, 6C) - ELS Stage 1 202 19 17-Apr-22 16-Dec-22 19-Apr-22 16-Dec-22 0 310.D.EX.H417 EVT - ELS design (Vertical Elements) - Prepare and submit Form BA8 and grant consent C01_7 d/w - 10h/d - No HK 7 17-Apr-22 23-Apr-22 19-Apr-22 25-Apr-22 2 Hols - No B/O periods (was 310.D.EX.H421 EVT - ELS design (Vertical Elements) - Prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 24-Apr-22 30-Apr-22 26-Apr-22 02-May-22 2 commencement Hols - No B/O periods (was 310.D.EX.H795.B02 ne 6 (3310/6,6c) - mobilization and preparation C1) d/w - 10h/d - With C11_6 12 03-May-22 16-May-22 03-May-22 16-May-22 0 HK Hols - No B/O periods 310.C.EX.H126 EVT - Zone 6 (3310/6,6c) - ELS - Trial pile & install Pipe Pile (395nos. @2days/no./rig; (was C11_6C3) d/w - 10h/d - With 78 4 17-May-22 17-Aug-22 17-May-22 17-Aug-22 0 use 11 rigs) HK Hols - No B/O periods 310.C.EX.H126.B01 EVT - Zone 6 (3310/6,6c) - ELS - Install Sheet Pile (3,878m. @56m/d/rig; use 2 rigs) (was C11_6C3) d/w - 10h/d - With 38 3 05-Jul-22 17-Aug-22 05-Jul-22 17-Aug-22 0 HK Hols - No B/O periods 310.C.EX.H1037 EVT - Zone 6 (3310/6,6c) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 24 2 21-Jul-22 17-Aug-22 29-Aug-22 26-Sep-22 33 HK Hols - No B/O periods 310.C.EX.H1033 EVT - Zone 6 (3310/6,6c) - ELS - Submit Form BA14 (was C01_7C3) d/w - 10h/d - No HK 12 18-Aug-22 29-Aug-22 18-Aug-22 29-Aug-22 0 Hols - No B/O periods (was 310.C.EX.H1297 EVT - Zone 6 (3310/6,6c) - ELS - Pumping test and submit report C1) C11_6 d/w - 10h/d - With 12 2 18-Aug-22 31-Aug-22 27-Sep-22 12-Oct-22 33 HK Hols - No B/O periods 310.C.EX.H1041 EVT - Zone 6 (3310/6,6c) - ELS - Submit Form BA8 for excavation (was C01_7C3) d/w - 10h/d - No HK 7 30-Aug-22 05-Sep-22 30-Aug-22 05-Sep-22 0 Hols - No B/O periods (was 310.C.EX.H1045 EVT - Zone 6 (3310/6,6c) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 06-Sep-22 12-Sep-22 06-Sep-22 12-Sep-22 0 Hols - No B/O periods (was 310.C.EX.H985 EVT - Zone 6 (3310/6,6c) - ELS 1st layer, GL to +3mPD [22,950 @1000m3/d/wf, 4wf C1) C11_6 d/w - 10h/d - With 24 2 13-Sep-22 12-Oct-22 13-Sep-22 12-Oct-22 0 +18d/layer of strut; 1 Layer] HK Hols - No B/O periods 310.C.EX.H985.B01 EVT - Zone 6 (3310/6,6c) - ELS - Remaining layer, +3mPD to FEL+ [68,850 (was C11_6C3) d/w - 10h/d - With 56 6 13-Oct-22 16-Dec-22 13-Oct-22 16-Dec-22 0 @1000m3/d/wf, 4wf +18d/layer of strut; 3 layers] HK Hols - No B/O periods CC#06 - EVT - Zone 7 (3310/7) - ELS Stage 2 (was C3) 282 23 17-Apr-22 25-Mar-23 22-Aug-22 25-Mar-23 0 310.D.EX.H377 EVT - ELS design (Vertical Elements) - Prepare and submit Form BA8 and grant consent C01_7 d/w - 10h/d - No HK 7 17-Apr-22 23-Apr-22 22-Aug-22 28-Aug-22 127 Hols - No B/O periods (was 310.D.EX.H381 EVT - ELS design (Vertical Elements) - Prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 24-Apr-22 30-Apr-22 29-Aug-22 04-Sep-22 127 commencement Hols - No B/O periods (was 310.C.EX.H144 Site Access 3310/07 and Assumed Contract <3408> complete EVT (Northern Portion) C1) C11_6 d/w - 10h/d - With 0 05-Sep-22 05-Sep-22 0 structure HK Hols - No B/O periods 310.C.EX.H146 EVT - Zone 7 (3310/7) - ELS - Install Sheet pile (8,201m. @56m/d/rig; use 2 rigs) (was C11_6C3) d/w - 10h/d - With 80 7 13-Sep-22 16-Dec-22 13-Sep-22 16-Dec-22 0 HK Hols - No B/O periods 310.C.EX.H1301 EVT - Zone 7 (3310/7) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 24 2 19-Nov-22 16-Dec-22 22-Dec-22 20-Jan-23 28 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 104 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.H1049 EVT - Zone 7 (3310/7) - ELS - Submit Form BA14 C01_7 d/w - 10h/d - No HK 12 17-Dec-22 28-Dec-22 17-Dec-22 28-Dec-22 0 Hols - No B/O periods (was 310.C.EX.H1053 EVT - Zone 7 (3310/7) - ELS - Pumping test and submit report C1) C11_6 d/w - 10h/d - With 12 2 17-Dec-22 31-Dec-22 21-Jan-23 07-Feb-23 28 HK Hols - No B/O periods 310.C.EX.H1057 EVT - Zone 7 (3310/7) - ELS - Submit Form BA8 for excavation (was C01_7C3) d/w - 10h/d - No HK 7 29-Dec-22 04-Jan-23 29-Dec-22 04-Jan-23 0 Hols - No B/O periods (was 310.C.EX.H1061 EVT - Zone 7 (3310/7) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 05-Jan-23 11-Jan-23 05-Jan-23 11-Jan-23 0 Hols - No B/O periods (was 310.C.EX.H989 EVT - Zone 7 (3310/7) - ELS - 1st layer, GL to +3mPD [16,167m3 @600m3/d/wf; 2wf + C1) C11_6 d/w - 10h/d - With 20 6 12-Jan-23 07-Feb-23 12-Jan-23 07-Feb-23 0 18d/layer of strut; 1 Layer] HK Hols - No B/O periods 310.C.EX.H989.B01 EVT - Zone 7 (3310/7) - ELS - Remaining 2 layer,+3mPD to FEL+ (was C11_6C3) d/w - 10h/d - With 40 6 08-Feb-23 25-Mar-23 08-Feb-23 25-Mar-23 0 PLT[32,333m3@600m3/d/wf; 2wf+18d/layer of strut; 2 Layers] HK Hols - No B/O periods CC#06 - EVT - Zones 1-5 (3310/3) - ELS Stage 3 (Start after North Runway closure) (was C3) 228 60 01-Sep-22 09-Jun-23 16-Sep-22 11-Jul-23 25 CC#06 - EVT - Zone 1 (3310/3) - ELS 170 11 01-Sep-22 27-Mar-23 09-Dec-22 11-Jul-23 83 310.C.EX.H109 EVT - Zone 1 (3310/3) - Mobilization + instrumentation C11_6 d/w - 10h/d - With 24 01-Sep-22 29-Sep-22 09-Dec-22 07-Jan-23 82 HK Hols - No B/O periods 310.D.EX.H138.B01 EVT - ELS design (Vertical Elements) - Prepare and submit Form BA8 and grant consent (was C01_7C3) d/w - 10h/d - No HK 7 30-Sep-22 06-Oct-22 08-Jan-23 14-Jan-23 100 Hols - No B/O periods (was 310.C.EX.H137 EVT - Zone 1 (3310/3) - UU detection C1) C11_6 d/w - 10h/d - With 12 30-Sep-22 15-Oct-22 09-Jan-23 21-Jan-23 82 HK Hols - No B/O periods 310.D.EX.H831.B01 EVT - ELS design (Vertical Elements) - Prepare and submit Form BA10 to notify work (was C01_7C3) d/w - 10h/d - No HK 7 07-Oct-22 13-Oct-22 15-Jan-23 21-Jan-23 100 commencement Hols - No B/O periods (was 310.C.EX.H105 Contract <3302> complete EVT Southern Portion tunnel structure for cofferdam C1) C11_6 d/w - 10h/d - With 0 13-Oct-22 21-Jan-23 84 connection HK Hols - No B/O periods 310.C.EX.H106 EVT - Zone 1 (3310/3) - ELS - Install vertical element (87 nos. @2day/no./rig; use 3 rigs) (was C11_6C3) d/w - 10h/d - With 63 5 17-Oct-22 29-Dec-22 26-Jan-23 13-Apr-23 82 HK Hols - No B/O periods 310.C.EX.H162 EVT - Zone 1 (3310/3) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 24 01-Dec-22 29-Dec-22 31-Mar-23 03-May-23 98 HK Hols - No B/O periods 310.C.EX.H110 EVT - Zone 1 (3310/3) - ELS - Pumping test and submit report (was C01_7C3) d/w - 10h/d - No HK 6 2 30-Dec-22 04-Jan-23 04-May-23 09-May-23 125 Hols - No B/O periods (was 310.C.EX.H121 EVT - Zone 1 (3310/3) - ELS - Submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 12 30-Dec-22 10-Jan-23 14-Apr-23 25-Apr-23 105 Hols - No B/O periods (was 310.C.EX.H129 EVT - Zone 1 (3310/3) - ELS - Submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 11-Jan-23 17-Jan-23 26-Apr-23 02-May-23 105 Hols - No B/O periods (was 310.C.EX.H139 EVT - Zone 1 (3310/3) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 18-Jan-23 24-Jan-23 03-May-23 09-May-23 105 Hols - No B/O periods (was 310.C.EX.H158 EVT - Zone 1 (3310/3) - ELS - Excavation and struts installation [15,900m3 @600m3/d/wf, C1) C11_6 d/w - 10h/d - With 42 2 26-Jan-23 15-Mar-23 10-May-23 29-Jun-23 84 1wf + 6d/layer; 2 layers] HK Hols - No B/O periods 310.C.EX.H1145 EVT - Zone 1 (3310/3) - ELS - Make good FEL + PLT (Install remaining struts if any) (was C01_7C3) d/w - 10h/d - No HK 12 2 16-Mar-23 27-Mar-23 30-Jun-23 11-Jul-23 106 Hols - No B/O periods (was CC#06 - EVT - Zone 2 (3310/3) - ELS C1) 211 9 01-Sep-22 19-May-23 30-Sep-22 09-Jun-23 17 310.C.EX.H1078 EVT - Zone 2 (3310/3) - Mobilization + instrumentation + UU detection C11_6 d/w - 10h/d - With 24 01-Sep-22 29-Sep-22 30-Sep-22 29-Oct-22 24 HK Hols - No B/O periods 310.C.EX.H114 EVT - Zone 2 (3310/3) - ELS - Install Pipe Piles (269nos. @2day/no./rig; use 8 rigs) (was C11_6C3) d/w - 10h/d - With 72 3 14-Oct-22 07-Jan-23 31-Oct-22 27-Jan-23 14 HK Hols - No B/O periods 310.C.EX.H1357.B01 EVT - Zone 2 (3310/3) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 18 2 16-Dec-22 07-Jan-23 18-Jan-23 10-Feb-23 26 HK Hols - No B/O periods 310.C.EX.H1065 EVT - Zone 2 (3310/3) - ELS - Submit Form BA14 (was C01_7C3) d/w - 10h/d - No HK 12 08-Jan-23 19-Jan-23 28-Jan-23 08-Feb-23 20 Hols - No B/O periods (was 310.C.EX.H1361.B01 EVT - Zone 2 (3310/3) - ELS - Pumping test and submit report C1) C01_7 d/w - 10h/d - No HK 12 2 08-Jan-23 19-Jan-23 11-Feb-23 22-Feb-23 34 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 105 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.H1073 EVT - Zone 2 (3310/3) - ELS - Submit Form BA8 for excavation C01_7 d/w - 10h/d - No HK 7 20-Jan-23 26-Jan-23 09-Feb-23 15-Feb-23 20 Hols - No B/O periods (was 310.C.EX.H1077 EVT - Zone 2 (3310/3) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 27-Jan-23 02-Feb-23 16-Feb-23 22-Feb-23 20 Hols - No B/O periods (was 310.C.EX.H170 EVT - Zone 2 (3310/3) - Excavation and struts installation [64,131m3, @600m3/d/wf, 3wf C1) C11_6 d/w - 10h/d - With 74 0 03-Feb-23 05-May-23 23-Feb-23 25-May-23 17 + 18d/ layer of strut; 2 layers] HK Hols - No B/O periods 310.C.EX.H172.B01 EVT - Zone 2 (3310/3) - ELS - Make good FEL + PLT (assumed) (was C11_6C3) d/w - 10h/d - With 12 2 06-May-23 19-May-23 27-May-23 09-Jun-23 17 HK Hols - No B/O periods CC#06 - EVT - Zone 3 (3310/3) - ELS (was C3) 228 14 01-Sep-22 09-Jun-23 16-Sep-22 13-Jun-23 3 310.C.EX.H167 EVT - Zone 3 (3310/3) - Mobilization + instrumentation + UU detection C11_6 d/w - 10h/d - With 24 01-Sep-22 29-Sep-22 16-Sep-22 15-Oct-22 12 HK Hols - No B/O periods 310.C.EX.H168.B01 EVT - Zone 3 (3310/3) - ELS - Install pipe pile (777 nos. @2day/no./rig; use 20 rigs) (was C11_6C3) d/w - 10h/d - With 82 3 14-Oct-22 19-Jan-23 17-Oct-22 21-Jan-23 2 HK Hols - No B/O periods 310.C.EX.H174.B01 EVT - Zone 3 (3310/3) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 18 2 29-Dec-22 19-Jan-23 12-Jan-23 04-Feb-23 11 HK Hols - No B/O periods 310.C.EX.H175.B01 EVT - Zone 3 (3310/3) - ELS - Submit Form BA14 (was C01_7C3) d/w - 10h/d - No HK 12 20-Jan-23 31-Jan-23 23-Jan-23 03-Feb-23 3 Hols - No B/O periods (was 310.C.EX.H1365.B01 EVT - Zone 3 (3310/3) - ELS - Pumping test and submit report C1) C01_7 d/w - 10h/d - No HK 12 2 20-Jan-23 31-Jan-23 06-Feb-23 17-Feb-23 17 Hols - No B/O periods (was 310.C.EX.H176.B01 EVT - Zone 3 (3310/3) - ELS - Submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 01-Feb-23 07-Feb-23 04-Feb-23 10-Feb-23 3 Hols - No B/O periods (was 310.C.EX.H177.B01 EVT - Zone 3 (3310/3) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 08-Feb-23 14-Feb-23 11-Feb-23 17-Feb-23 3 Hols - No B/O periods (was 310.C.EX.H173 EVT - Zone 3 (3310/3) - Initial excavation + UU hanger support + divert existing UU to C1) C11_6 d/w - 10h/d - With 24 15-Feb-23 14-Mar-23 18-Feb-23 17-Mar-23 3 hanger support HK Hols - No B/O periods 310.C.EX.H178 EVT - Zone 3 (3310/3) - ELS [132,081m3, @800m3/d/wf; 12wf+ 12d/ layer of strut; (was C11_6C3) d/w - 10h/d - With 55 5 15-Mar-23 23-May-23 18-Mar-23 27-May-23 3 assume 3 layers] HK Hols - No B/O periods 310.C.EX.H179.B01 EVT - Zone 3 (3310/3) - ELS - Make good FEL + PLT (assumed) (was C11_6C3) d/w - 10h/d - With 14 2 24-May-23 09-Jun-23 29-May-23 13-Jun-23 3 HK Hols - No B/O periods CC#06 - EVT - Zone 4 (3310/3) - ELS (was C3) 215 11 01-Sep-22 24-May-23 15-Oct-22 16-Jun-23 19 310.C.EX.H189 EVT - Zone 4 (3310/3) - Mobilization + instrumentation + UU detection C11_6 d/w - 10h/d - With 24 01-Sep-22 29-Sep-22 15-Oct-22 11-Nov-22 35 HK Hols - No B/O periods 310.D.EX.H835.B01 EVT - ELS design (Vertical Elements) - Prepare and submit Form BA8 and grant consent (was C01_7C3) d/w - 10h/d - No HK 7 30-Sep-22 06-Oct-22 29-Oct-22 04-Nov-22 29 Hols - No B/O periods (was 310.D.EX.H839.B01 EVT - ELS design (Vertical Elements) - Prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 07-Oct-22 13-Oct-22 05-Nov-22 11-Nov-22 29 commencement Hols - No B/O periods (was 310.C.EX.H122 EVT - Zone 4 (3310/3) - ELS - Install pipe pile (107 nos. @2day/no./rig; use 3 rigs) C1) C11_6 d/w - 10h/d - With 74 3 25-Oct-22 20-Jan-23 12-Nov-22 11-Feb-23 16 HK Hols - No B/O periods 310.C.EX.H1137 EVT - Zone 4 (3310/3) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 18 2 30-Dec-22 20-Jan-23 06-Feb-23 25-Feb-23 28 HK Hols - No B/O periods 310.C.EX.H1085 EVT - Zone 4 (3310/3) - ELS - Pumping test and submit report (was C01_7C3) d/w - 10h/d - No HK 12 2 21-Jan-23 01-Feb-23 26-Feb-23 09-Mar-23 36 Hols - No B/O periods (was 310.C.EX.H1081 EVT - Zone 4 (3310/3) - ELS - Submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 12 21-Jan-23 01-Feb-23 12-Feb-23 23-Feb-23 22 Hols - No B/O periods (was 310.C.EX.H1089 EVT - Zone 4 (3310/3) - ELS - Submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 02-Feb-23 08-Feb-23 24-Feb-23 02-Mar-23 22 Hols - No B/O periods (was 310.C.EX.H1093 EVT - Zone 4 (3310/3) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 09-Feb-23 15-Feb-23 03-Mar-23 09-Mar-23 22 Hols - No B/O periods (was 310.C.EX.H186 EVT - Zone 4 (3310/3) - Initial excavation + UU hanger support+ divert existing UU to C1) C11_6 d/w - 10h/d - With 24 16-Feb-23 15-Mar-23 10-Mar-23 11-Apr-23 19 hanger support HK Hols - No B/O periods 310.C.EX.H182 EVT - Zone 4 (3310/3) - Excavation and struts installation [21,200m3 @600m3/d/wf; 2wf + (was C11_6C3) d/w - 10h/d - With 45 2 16-Mar-23 12-May-23 12-Apr-23 05-Jun-23 19 12d/layer of strut; 2 layers] HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 106 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.H1149 EVT - Zone 4 (3310/3) - ELS - Make good FEL + PLT (Install remaining struts if any) C11_6 d/w - 10h/d - With 10 2 13-May-23 24-May-23 06-Jun-23 16-Jun-23 19 HK Hols - No B/O periods CC#06 - EVT - Zone 5 (3310/3) - ELS (was C3) 219 15 01-Sep-22 30-May-23 15-Oct-22 16-Jun-23 15 310.D.EX.H444 EVT - Zone 5 (3310/3) - Mobilization + instrumentation + UU detection C11_6 d/w - 10h/d - With 24 01-Sep-22 29-Sep-22 15-Oct-22 11-Nov-22 35 HK Hols - No B/O periods 310.D.EX.H457 EVT - ELS design (Vertical Elements) - Prepare and submit Form BA8 and grant consent (was C01_7C3) d/w - 10h/d - No HK 7 30-Sep-22 06-Oct-22 29-Oct-22 04-Nov-22 29 Hols - No B/O periods (was 310.D.EX.H461 EVT - ELS design (Vertical Elements) - Prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 07-Oct-22 13-Oct-22 05-Nov-22 11-Nov-22 29 commencement Hols - No B/O periods (was 310.C.EX.H134 EVT - Zone 5 (3310/3) - ELS - Install pipe pile (107nos. @2days/no./rig; use 5 rigs) C1) C11_6 d/w - 10h/d - With 47 4 25-Oct-22 17-Dec-22 12-Nov-22 07-Jan-23 16 HK Hols - No B/O periods 310.C.EX.H141 EVT - Zone 5 (3310/3) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 18 2 28-Nov-22 17-Dec-22 31-Dec-22 21-Jan-23 28 HK Hols - No B/O periods 310.C.EX.H161 EVT - Zone 5 (3310/3) - ELS - Pumping test and submit report (was C01_7C3) d/w - 10h/d - No HK 12 2 18-Dec-22 29-Dec-22 22-Jan-23 02-Feb-23 35 Hols - No B/O periods (was 310.C.EX.H151 EVT - Zone 5 (3310/3) - ELS - Submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 12 18-Dec-22 29-Dec-22 08-Jan-23 19-Jan-23 21 Hols - No B/O periods (was 310.C.EX.H171 EVT - Zone 5 (3310/3) - ELS - Submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 30-Dec-22 05-Jan-23 20-Jan-23 26-Jan-23 21 Hols - No B/O periods (was 310.C.EX.H181 EVT - Zone 5 (3310/3) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 06-Jan-23 12-Jan-23 27-Jan-23 02-Feb-23 21 Hols - No B/O periods (was 310.C.EX.H191 EVT - Zone 5 (3310/3) - Initial excavation + UU hanger support + divert existing UU to C1) C11_6 d/w - 10h/d - With 24 13-Jan-23 13-Feb-23 03-Feb-23 02-Mar-23 15 hanger support HK Hols - No B/O periods 310.C.EX.H981 EVT - Zone 5 (3310/3) - Excavation and struts installation [21,200m3 @600m3/d/wf, 2wf + (was C11_6C3) d/w - 10h/d - With 75 5 14-Feb-23 17-May-23 03-Mar-23 05-Jun-23 15 12d/layer of strut; 4 layers] HK Hols - No B/O periods 310.C.EX.H983.B01 EVT - Zone 5 (3310/3) - ELS - Make good FEL + PLT (assumed) (was C11_6C3) d/w - 10h/d - With 10 2 18-May-23 30-May-23 06-Jun-23 16-Jun-23 15 HK Hols - No B/O periods CC#06 - EVT - Tunnel Structure Construction (was C3) 365 33 06-Sep-22 27-Nov-23 10-Dec-22 14-Dec-23 15 CC#06 - EVT - Zone 6 (3310/6, 6C) - Tunnel Structure 145 6 06-Sep-22 02-Mar-23 10-Dec-22 02-Mar-23 0 310.C.EX.H280.B01 EVT - Zone 6 (3310/6,c) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 06-Sep-22 12-Sep-22 10-Dec-22 16-Dec-22 95 Hols - No B/O periods (was 310.C.EX.H282.B01 EVT - Zone 6 (3310/6,c) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 17-Dec-22 23-Dec-22 17-Dec-22 23-Dec-22 0 Hols - No B/O periods (was 310.C.EX.H284 EVT - Zone 6 (3310/6,c) - Bay 1 to 9 - Construct base slab [@6d/bay 2wf] C1) C11_6 d/w - 10h/d - With 36 2 24-Dec-22 09-Feb-23 24-Dec-22 09-Feb-23 0 HK Hols - No B/O periods 310.C.EX.H436 EVT - Zone 6 (3310/6,c) - Bay 1 to 9 - Construct wall & roof slab [@12d/bay; 3wf] (was C11_6C3) d/w - 10h/d - With 40 4 12-Jan-23 02-Mar-23 12-Jan-23 02-Mar-23 0 HK Hols - No B/O periods CC#06 - EVT - Zone 7 (3310/7) - Tunnel Structure (was C3) 120 6 05-Jan-23 03-Jun-23 20-Mar-23 03-Jun-23 0 310.C.EX.H603.B1 EVT - Zone 7 (3310/7) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 05-Jan-23 11-Jan-23 20-Mar-23 26-Mar-23 74 Hols - No B/O periods (was 310.C.EX.H605.B1 EVT - Zone 7 (3310/7) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 26-Mar-23 01-Apr-23 27-Mar-23 02-Apr-23 1 Hols - No B/O periods (was 310.C.EX.H607 EVT - Zone 7 (3310/7) - Bay 1 to 6 - Construct base slab [6d/bay; 2wf] C1) C11_6 d/w - 10h/d - With 36 3 03-Apr-23 19-May-23 03-Apr-23 19-May-23 0 HK Hols - No B/O periods 310.C.EX.H630 EVT - Zone 7 (3310/7) - Bay 1 to 6 - Construct wall & roof slab 12d/bay; 2wf] (PMS 14) (was C11_6C3) d/w - 10h/d - With 40 3 17-Apr-23 03-Jun-23 17-Apr-23 03-Jun-23 0 HK Hols - No B/O periods CC#06 - EVT - Zone 1 (3310/3) - Tunnel Structure (was C3) 102 6 18-Jan-23 25-May-23 05-Jul-23 02-Sep-23 83 310.C.EX.H204.B01 EVT - Zone 1 (3310/3) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 18-Jan-23 24-Jan-23 05-Jul-23 11-Jul-23 168 Hols - No B/O periods (was 310.C.EX.H206.B01 EVT - Zone 1 (3310/3) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 28-Mar-23 03-Apr-23 12-Jul-23 18-Jul-23 106 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 107 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.H208 EVT - Zone 1 (3310/3) - Bay 1 to 2 - Construct base slab [@6d/bay; 1wf] C11_6 d/w - 10h/d - With 14 1 04-Apr-23 24-Apr-23 19-Jul-23 03-Aug-23 83 HK Hols - No B/O periods 310.C.EX.H344 EVT - Zone 1 (3310/3) - Bay 1 to 2 - Construct wall & roof slab [@12d/bay; 1wf] (was C11_6C3) d/w - 10h/d - With 26 5 25-Apr-23 25-May-23 04-Aug-23 02-Sep-23 83 HK Hols - No B/O periods CC#06 - EVT - Zone 2 (3310/3) - Tunnel Structure (was C3) 162 2 27-Jan-23 12-Aug-23 03-Jun-23 02-Sep-23 18 310.C.EX.H127.B01 EVT - Zone 2 (3310/3) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 27-Jan-23 02-Feb-23 03-Jun-23 09-Jun-23 127 Hols - No B/O periods (was 310.C.EX.H129.B01 EVT - Zone 2 (3310/3) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 20-May-23 26-May-23 10-Jun-23 16-Jun-23 21 Hols - No B/O periods (was 310.C.EX.H131.B01 EVT - Zone 2 (3310/3) - Bay 1 to 7 - construct base slab [@6d/bay; 2wf] C1) C11_6 d/w - 10h/d - With 22 1 27-May-23 21-Jun-23 17-Jun-23 14-Jul-23 18 HK Hols - No B/O periods 310.C.EX.H133.B01 EVT - Zone 2 (3310/3) - Bay 1 to 7 - construct wall & roof slab [@12d/bay; 2wf] (was C11_6C3) d/w - 10h/d - With 43 1 23-Jun-23 12-Aug-23 15-Jul-23 02-Sep-23 18 HK Hols - No B/O periods CC#06 - EVT - Zone 3 (3310/3) - Tunnel Structure (was C3) 161 5 08-Feb-23 23-Aug-23 07-Jun-23 02-Sep-23 9 310.C.EX.H829.B01 EVT - Zone 3 (3310/3) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 08-Feb-23 14-Feb-23 07-Jun-23 13-Jun-23 119 Hols - No B/O periods (was 310.C.EX.H831.B01 EVT - Zone 3 (3310/3) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 10-Jun-23 16-Jun-23 14-Jun-23 20-Jun-23 4 Hols - No B/O periods (was 310.C.EX.H833.B01 EVT - Zone 3 (3310/3) - Bay 1 to 14 - Construct base slab [@6d/bay; 5wf] C1) C11_6 d/w - 10h/d - With 18 1 17-Jun-23 10-Jul-23 21-Jun-23 13-Jul-23 3 HK Hols - No B/O periods 310.C.EX.H835.B01 EVT - Zone 3 (3310/3) - Bay 1 to 14 - Construct wall & roof slab [@12d/bay; 5wf] (was C11_6C3) d/w - 10h/d - With 38 4 11-Jul-23 23-Aug-23 14-Jul-23 26-Aug-23 3 HK Hols - No B/O periods 310.C.EX.W315 EVT - Tunnel R.C. Structure completed (PMS 15) (was C11_6C3) d/w - 10h/d - With 0 23-Aug-23 02-Sep-23 9 HK Hols - No B/O periods CC#06 - EVT - Zone 4 (3310/3) - Tunnel Structure (was C3) 150 4 09-Feb-23 11-Aug-23 10-Jun-23 02-Sep-23 19 310.C.EX.H244.B01 EVT - Zone 4 (3310/3) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 09-Feb-23 15-Feb-23 10-Jun-23 16-Jun-23 121 Hols - No B/O periods (was 310.C.EX.H246.B01 EVT - Zone 4 (3310/3) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 25-May-23 31-May-23 17-Jun-23 23-Jun-23 23 Hols - No B/O periods (was 310.C.EX.H248 EVT - Zone 4 (3310/3) - Bay 1 to 3 - Construct base slab [@6d/bay; 1wf] C1) C11_6 d/w - 10h/d - With 20 2 01-Jun-23 24-Jun-23 24-Jun-23 18-Jul-23 19 HK Hols - No B/O periods 310.C.EX.H364 EVT - Zone 4 (3310/3) - Bay 1 to 3 - Construct wall & roof slab [@12d/bay; 1wf] (was C11_6C3) d/w - 10h/d - With 40 2 26-Jun-23 11-Aug-23 19-Jul-23 02-Sep-23 19 HK Hols - No B/O periods CC#06 - EVT - Zone 5 (3310/3) - Tunnel Structure (was C3) 181 4 06-Jan-23 17-Aug-23 10-Jun-23 02-Sep-23 14 310.C.EX.H224.B01 EVT - Zone 5 (3310/3) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 06-Jan-23 12-Jan-23 10-Jun-23 16-Jun-23 155 Hols - No B/O periods (was 310.C.EX.H226.B01 EVT - Zone 5 (3310/3) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 31-May-23 06-Jun-23 17-Jun-23 23-Jun-23 17 Hols - No B/O periods (was 310.C.EX.H228 EVT - Zone 5 (3310/3) - bay 1 to 3 - Construct base slab [@6d/bay; 1wf] C1) C11_6 d/w - 10h/d - With 20 2 07-Jun-23 30-Jun-23 24-Jun-23 18-Jul-23 14 HK Hols - No B/O periods 310.C.EX.H384 EVT - Zone 5 (3310/3) - bay 1 to 3 - Construct wall & roof slab [@12d/bay; 1wf] (was C11_6C3) d/w - 10h/d - With 40 2 03-Jul-23 17-Aug-23 19-Jul-23 02-Sep-23 14 HK Hols - No B/O periods CC#06 - EVT - Mass Concrete Fill inside Tunnel (Ballast Concrete) (was C11_6C3) d/w - 10h/d - With HK Hols 79- No B/O 0periods (was 24-Aug-23 C3) 27-Nov-23 11-Sep-23 14-Dec-23 15 CC#06 - EVT - North Section N1 C11_6 d/w - 10h/d - With HK Hols 30- No B/O 0periods (was 24-Aug-23 C3) 27-Sep-23 11-Sep-23 17-Oct-23 15 310.C.EX.Y556 EVT - North - Zone 6,7 - bay 1 to 29 & Zone 5 bay 1 - permanent mass concrete fill C11_6 d/w - 10h/d - With 30 24-Aug-23 27-Sep-23 11-Sep-23 17-Oct-23 15 [515m3/bay] HK Hols - No B/O periods CC#06 - EVT - North Section N2 (was C11_6C3) d/w - 10h/d - With HK Hols6 - No B/O 0periods (was 28-Sep-23 C3) 06-Oct-23 18-Oct-23 25-Oct-23 15 310.C.EX.Y624 EVT - North - Zone 4 & 5 - bay 2 to 7 - permanent mass concrete fill [515m3/bay] C11_6 d/w - 10h/d - With 6 28-Sep-23 06-Oct-23 18-Oct-23 25-Oct-23 15 HK Hols - No B/O periods CC#06 - EVT - Middle Section (was C11_6C3) d/w - 10h/d - With HK Hols 39- No B/O 0periods (was 07-Oct-23 C3) 22-Nov-23 26-Oct-23 09-Dec-23 15
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 108 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.Y692 EVT - Middle - Zone 3 - bay 1 to 13 - permanent mass concrete fill [1130 x 13m3] C11_6 d/w - 10h/d - With 39 07-Oct-23 22-Nov-23 26-Oct-23 09-Dec-23 15 HK Hols - No B/O periods CC#06 - EVT - South Section (was C11_6C3) d/w - 10h/d - With HK Hols4 - No B/O 0periods (was 23-Nov-23 C3) 27-Nov-23 11-Dec-23 14-Dec-23 15 310.C.EX.Y696 EVT - North - South bay 1 & 2 - permanent mass concrete fill [515m3] C11_6 d/w - 10h/d - With 2 23-Nov-23 24-Nov-23 11-Dec-23 12-Dec-23 15 HK Hols - No B/O periods 310.C.EX.Y700 EVT - North - South bay 3 - permanent mass concrete fill [515m3] (was C11_6C3) d/w - 10h/d - With 4 23-Nov-23 27-Nov-23 11-Dec-23 14-Dec-23 15 HK Hols - No B/O periods CC#06 - EVT - Earthwork - Backfilling (was C11_6C3) d/w - 10h/d - With HK Hols 184- No B/O13 periods (was 03-Mar-23 C3) 14-Oct-23 02-Aug-23 16-Dec-23 53 CC#06 - EVT - Zone 6 (3310/6, 6C) - Backfill C11_6 d/w - 10h/d - With HK Hols 40- No B/O 2periods (was 03-Mar-23 C3) 22-Apr-23 07-Aug-23 16-Nov-23 171 310.C.EX.W1000 EVT - Zone 6 - Backfill from FL to +3.0mPD [48,383m3 @350m3/d/wf; 4wf] C11_6 d/w - 10h/d - With 30 03-Mar-23 11-Apr-23 07-Aug-23 09-Sep-23 126 HK Hols - No B/O periods 310.C.EX.W1004 EVT - Zone 6 - Backfill from +3.0 to +6.5mPD [10,029m3 @350m3/d/wf; 4wf] (was C11_6C3) d/w - 10h/d - With 10 2 12-Apr-23 22-Apr-23 06-Nov-23 16-Nov-23 171 HK Hols - No B/O periods CC#06 - EVT - Zone 7 (3310/7) - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 54- No B/O 2periods (was 05-Jun-23 C3) 08-Aug-23 12-Sep-23 16-Nov-23 83 310.C.EX.W1008 EVT - Zone 7 - Backfill from FL to +3.0mPD [25,535m3 @350m3/d/wf; 2wf] C11_6 d/w - 10h/d - With 37 05-Jun-23 19-Jul-23 12-Sep-23 27-Oct-23 83 HK Hols - No B/O periods 310.C.EX.W1012 EVT - Zone 7 - Backfill from +3.0 to +6.5mPD [10,029m3 @350m3/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 17 2 20-Jul-23 08-Aug-23 28-Oct-23 16-Nov-23 83 HK Hols - No B/O periods CC#06 - EVT - Zone 1 (3310/3) - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 12- No B/O 1periods (was 27-May-23 C3) 09-Jun-23 04-Oct-23 17-Oct-23 107 310.C.EX.W288 EVT - Zone 1 - Backfill from FL to +3.0mPD [8,540m3 @350m3/d/wf; 3wf] C11_6 d/w - 10h/d - With 6 27-May-23 02-Jun-23 04-Oct-23 10-Oct-23 107 HK Hols - No B/O periods 310.C.EX.W292 EVT - Zone 1 - Backfill from +3.0 to +6.5mPD [1,770m3 @350m3/d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 6 1 03-Jun-23 09-Jun-23 11-Oct-23 17-Oct-23 107 HK Hols - No B/O periods CC#06 - EVT - Zone 2 (3310/3) - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 52- No B/O 2periods (was 14-Aug-23 C3) 14-Oct-23 04-Sep-23 06-Nov-23 18 310.C.EX.W312 EVT - Zone 2 - Backfill from FL to +3.0mPD [39,670m3 @350m3/d/wf; 4wf] C11_6 d/w - 10h/d - With 29 14-Aug-23 15-Sep-23 04-Sep-23 09-Oct-23 18 HK Hols - No B/O periods 310.C.EX.W316 EVT - Zone 2 - Backfill from +3.0 to +6.5mPD [29,247m3 @350m3/d/wf; 4wf] (was C11_6C3) d/w - 10h/d - With 23 2 16-Sep-23 14-Oct-23 10-Oct-23 06-Nov-23 18 HK Hols - No B/O periods CC#06 - EVT - Zone 3 (3310/3) - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 64- No B/O 2periods (was 29-Jul-23 C3) 13-Oct-23 02-Aug-23 16-Nov-23 28 310.C.EX.W304 EVT - Zone 3 - Backfill from FL to +3.0mPD [72,410m3 @350m3/d/wf; 6wf] C11_6 d/w - 10h/d - With 34 29-Jul-23 06-Sep-23 02-Aug-23 09-Sep-23 3 HK Hols - No B/O periods 310.C.EX.W308 EVT - Zone 3 - Backfill from +3.0 to +6.5mPD [57,285m3 @350m3/d/wf; 6wf] (was C11_6C3) d/w - 10h/d - With 30 2 07-Sep-23 13-Oct-23 12-Oct-23 16-Nov-23 28 HK Hols - No B/O periods CC#06 - EVT - Zone 4 (3310/3) - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 34- No B/O 2periods (was 12-Aug-23 C3) 20-Sep-23 08-Nov-23 16-Dec-23 72 310.C.EX.W296 EVT - Zone 4 - Backfill from FL to +3.0mPD [12,220m3 @350m3/d/wf; 2wf] C11_6 d/w - 10h/d - With 18 12-Aug-23 01-Sep-23 08-Nov-23 28-Nov-23 72 HK Hols - No B/O periods 310.C.EX.W300 EVT - Zone 4 - Backfill from +3.0 to +6.5mPD [9,668m3 @350m3/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 16 2 02-Sep-23 20-Sep-23 29-Nov-23 16-Dec-23 72 HK Hols - No B/O periods CC#06 - EVT - Zone 5 (3310/3) - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 47- No B/O 2periods (was 18-Aug-23 C3) 13-Oct-23 20-Sep-23 16-Nov-23 28 310.C.EX.W600 EVT - Zone 5 - Backfill from FL to +3.0mPD [10,750m3 @350m3/d/wf; 1wf] C11_6 d/w - 10h/d - With 31 18-Aug-23 22-Sep-23 20-Sep-23 28-Oct-23 28 HK Hols - No B/O periods 310.C.EX.W604 EVT - Zone 5 - Backfill from +3.0 to +6.5mPD [2,230m3 @350m3/d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 16 2 23-Sep-23 13-Oct-23 30-Oct-23 16-Nov-23 28 HK Hols - No B/O periods CC#06 - EVT - Internal ABWF Works (was C11_6C3) d/w - 10h/d - With HK Hols 462- No B/O48 periods (was 05-Sep-22 C3) 23-Mar-24 05-Sep-22 03-Jul-24 79 310.C.EX.W311 EVT - Access to Works Area 3310/7 C11_6 d/w - 10h/d - With 0 05-Sep-22* 05-Sep-22 0 HK Hols - No B/O periods 310.C.EX.W313 Contract <3408> complete EVT (EA, EU, ES); provide access to 3310 and ready for (was C11_6C3) d/w - 10h/d - With 0 05-Sep-22 07-Dec-22 78 internal ABWF & MEP works HK Hols - No B/O periods 310.C.EX.W327 Contract <3408> complete EVT (Northern Portion); provide access to 3310 and ready for (was C11_6C3) d/w - 10h/d - With 0 23-Aug-23 14-Sep-23 19 bulkhead removal HK Hols - No B/O periods CC#06 - EVT - ABWF - Eastern Approach Ramp (EU) (was C11_6C3) d/w - 10h/d - With HK Hols 201- No B/O12 periods (was 30-Nov-22 C3) 05-Aug-23 08-Dec-22 14-Feb-24 157 Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 109 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W368 EVT (EU) - brickwork and blockwork C11_6 d/w - 10h/d - With 50 2 30-Nov-22 01-Feb-23 08-Dec-22 09-Feb-23 7 HK Hols - No B/O periods 310.C.EX.W384 EVT (EU) - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 50 2 30-Nov-22 01-Feb-23 08-Dec-22 09-Feb-23 7 HK Hols - No B/O periods 310.C.EX.W372 EVT (EU) - steel and metalwork (was C11_6C3) d/w - 10h/d - With 50 2 12-Dec-22 13-Feb-23 03-Oct-23 30-Nov-23 238 HK Hols - No B/O periods 310.C.EX.W376 EVT (EU) - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 50 2 23-Dec-22 24-Feb-23 14-Oct-23 12-Dec-23 238 HK Hols - No B/O periods 310.C.EX.W380 EVT (EU) - Painting Works (was C11_6C3) d/w - 10h/d - With 50 2 06-Jan-23 08-Mar-23 27-Oct-23 23-Dec-23 238 HK Hols - No B/O periods 310.C.EX.W388 EVT (EU) - Road Paving works (was C11_6C3) d/w - 10h/d - With 36 2 24-Jun-23 05-Aug-23 02-Jan-24 14-Feb-24 157 HK Hols - No B/O periods CC#06 - EVT - ABWF - Eastern Roundabout (EA) (was C11_6C3) d/w - 10h/d - With HK Hols 230- No B/O12 periods (was 02-Feb-23 C3) 09-Nov-23 23-Mar-23 05-Apr-24 118 310.C.EX.W344 EVT (EA) - brickwork and blockwork C11_6 d/w - 10h/d - With 40 2 02-Feb-23 20-Mar-23 23-Mar-23 13-May-23 42 HK Hols - No B/O periods 310.C.EX.W360 EVT (EA) - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 40 2 02-Feb-23 20-Mar-23 23-Mar-23 13-May-23 42 HK Hols - No B/O periods 310.C.EX.W348 EVT (EA) - steel and metalwork (was C11_6C3) d/w - 10h/d - With 40 2 14-Feb-23 31-Mar-23 01-Dec-23 19-Jan-24 238 HK Hols - No B/O periods 310.C.EX.W352 EVT (EA) - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 40 2 25-Feb-23 17-Apr-23 13-Dec-23 31-Jan-24 238 HK Hols - No B/O periods 310.C.EX.W356 EVT (EA) - Painting Works (was C11_6C3) d/w - 10h/d - With 40 2 09-Mar-23 28-Apr-23 27-Dec-23 14-Feb-24 238 HK Hols - No B/O periods 310.C.EX.W364 EVT (EA) - Road Paving works (was C11_6C3) d/w - 10h/d - With 40 2 21-Sep-23 09-Nov-23 15-Feb-24 05-Apr-24 118 HK Hols - No B/O periods CC#06 - EVT - ABWF - Eastern Switch Ramp (ES) (was C11_6C3) d/w - 10h/d - With HK Hols 261- No B/O12 periods (was 21-Mar-23 C3) 03-Feb-24 27-Jun-23 20-May-24 83 310.C.EX.W392 EVT (ES) - brickwork and blockwork C11_6 d/w - 10h/d - With 40 2 21-Mar-23 11-May-23 27-Jun-23 12-Aug-23 77 HK Hols - No B/O periods 310.C.EX.W408 EVT (ES) - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 40 2 21-Mar-23 11-May-23 27-Jun-23 12-Aug-23 77 HK Hols - No B/O periods 310.C.EX.W396 EVT (ES) - steel and metalwork (was C11_6C3) d/w - 10h/d - With 40 2 01-Apr-23 23-May-23 20-Jan-24 08-Mar-24 238 HK Hols - No B/O periods 310.C.EX.W400 EVT (ES) - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 40 2 18-Apr-23 05-Jun-23 01-Feb-24 20-Mar-24 238 HK Hols - No B/O periods 310.C.EX.W404 EVT (ES) - Painting Works (was C11_6C3) d/w - 10h/d - With 40 2 29-Apr-23 16-Jun-23 15-Feb-24 05-Apr-24 238 HK Hols - No B/O periods 310.C.EX.W412 EVT (ES) - Road Paving works (was C11_6C3) d/w - 10h/d - With 36 2 21-Dec-23 03-Feb-24 06-Apr-24 20-May-24 83 HK Hols - No B/O periods CC#06 - EVT - ABWF - Eastern Tunnel (ET) (was C11_6C3) d/w - 10h/d - With HK Hols 175- No B/O12 periods (was 24-Aug-23 C3) 23-Mar-24 15-Sep-23 03-Jul-24 79 310.C.EX.W319 EVT (ET) - remove temporary bulkheads C11_6 d/w - 10h/d - With 14 2 24-Aug-23 08-Sep-23 15-Sep-23 03-Oct-23 19 HK Hols - No B/O periods 310.C.EX.W320 EVT (ET) - brickwork and blockwork (was C11_6C3) d/w - 10h/d - With 38 01-Sep-23 17-Oct-23 23-Sep-23 09-Nov-23 19 HK Hols - No B/O periods 310.C.EX.W336 EVT (ET) - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 40 2 01-Sep-23 19-Oct-23 06-Nov-23 21-Dec-23 53 HK Hols - No B/O periods 310.C.EX.W324 EVT (ET) - steel and metalwork (was C11_6C3) d/w - 10h/d - With 50 2 13-Sep-23 13-Nov-23 07-Oct-23 05-Dec-23 19 HK Hols - No B/O periods 310.C.EX.W328 EVT (ET) - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 50 2 25-Sep-23 24-Nov-23 19-Oct-23 16-Dec-23 19 HK Hols - No B/O periods 310.C.EX.W332 EVT (ET) - Painting Works (was C11_6C3) d/w - 10h/d - With 50 2 09-Oct-23 06-Dec-23 01-Nov-23 30-Dec-23 19 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 110 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W340 EVT (ET) - Road Paving works C11_6 d/w - 10h/d - With 36 2 09-Feb-24 23-Mar-24 21-May-24 03-Jul-24 79 HK Hols - No B/O periods CC#06 - EVT - Building Service Installation (was C11_6C3) d/w - 10h/d - With HK Hols 305- No B/O54 periods (was 02-Feb-23 C3) 08-Feb-24 10-Feb-23 29-May-24 87 CC#06 - EVT - MEP - Eastern Approach Ramp (EU) C11_6 d/w - 10h/d - With HK Hols 115- No B/O14 periods (was 02-Feb-23 C3) 23-Jun-23 10-Feb-23 06-Oct-23 87 310.C.EX.W464 EVT (EU) - Electrical Installation works C11_6 d/w - 10h/d - With 75 2 02-Feb-23 05-May-23 10-Feb-23 13-May-23 7 HK Hols - No B/O periods 310.C.EX.W484 EVT (EU) - Drainage Installation (was C11_6C3) d/w - 10h/d - With 75 2 02-Feb-23 05-May-23 10-Jul-23 06-Oct-23 127 HK Hols - No B/O periods 310.C.EX.W468 EVT (EU) - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 75 2 14-Feb-23 17-May-23 22-Feb-23 25-May-23 7 HK Hols - No B/O periods 310.C.EX.W472 EVT (EU) - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 75 2 25-Feb-23 30-May-23 06-Mar-23 07-Jun-23 7 HK Hols - No B/O periods 310.C.EX.W476 EVT (EU) - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 75 2 09-Mar-23 10-Jun-23 17-Mar-23 19-Jun-23 7 HK Hols - No B/O periods 310.C.EX.W480 EVT (EU) - FS Installation (was C11_6C3) d/w - 10h/d - With 75 2 21-Mar-23 23-Jun-23 29-Apr-23 29-Jul-23 30 HK Hols - No B/O periods 310.C.EX.W482 EVT (EU) - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 75 2 21-Mar-23 23-Jun-23 29-Mar-23 03-Jul-23 7 HK Hols - No B/O periods CC#06 - EVT - MEP - Eastern Roundabout (EA) (was C11_6C3) d/w - 10h/d - With HK Hols 115- No B/O14 periods (was 06-May-23 C3) 20-Sep-23 15-May-23 06-Jan-24 87 310.C.EX.W440 EVT (EA) - Electrical Installation works C11_6 d/w - 10h/d - With 75 2 06-May-23 04-Aug-23 15-May-23 12-Aug-23 7 HK Hols - No B/O periods 310.C.EX.W460 EVT (EA) - Drainage Installation (was C11_6C3) d/w - 10h/d - With 75 2 06-May-23 04-Aug-23 07-Oct-23 06-Jan-24 127 HK Hols - No B/O periods 310.C.EX.W444 EVT (EA) - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 75 2 18-May-23 16-Aug-23 27-May-23 24-Aug-23 7 HK Hols - No B/O periods 310.C.EX.W448 EVT (EA) - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 75 2 31-May-23 28-Aug-23 08-Jun-23 05-Sep-23 7 HK Hols - No B/O periods 310.C.EX.W452 EVT (EA) - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 75 2 12-Jun-23 08-Sep-23 20-Jun-23 16-Sep-23 7 HK Hols - No B/O periods 310.C.EX.W456 EVT (EA) - FS Installation (was C11_6C3) d/w - 10h/d - With 75 2 24-Jun-23 20-Sep-23 31-Jul-23 28-Oct-23 30 HK Hols - No B/O periods 310.C.EX.W458 EVT (EA) - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 75 2 24-Jun-23 20-Sep-23 04-Jul-23 28-Sep-23 7 HK Hols - No B/O periods CC#06 - EVT - MEP - Eastern Switch Ramp (ES) (was C11_6C3) d/w - 10h/d - With HK Hols 115- No B/O14 periods (was 05-Aug-23 C3) 20-Dec-23 14-Aug-23 10-Apr-24 87 310.C.EX.W488 EVT (ES) - Electrical Installation works C11_6 d/w - 10h/d - With 75 2 05-Aug-23 03-Nov-23 14-Aug-23 11-Nov-23 7 HK Hols - No B/O periods 310.C.EX.W508 EVT (ES) - Drainage Installation (was C11_6C3) d/w - 10h/d - With 75 2 05-Aug-23 03-Nov-23 08-Jan-24 10-Apr-24 127 HK Hols - No B/O periods 310.C.EX.W492 EVT (ES) - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 75 2 17-Aug-23 15-Nov-23 25-Aug-23 23-Nov-23 7 HK Hols - No B/O periods 310.C.EX.W496 EVT (ES) - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 75 2 29-Aug-23 27-Nov-23 06-Sep-23 05-Dec-23 7 HK Hols - No B/O periods 310.C.EX.W500 EVT (ES) - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 75 2 09-Sep-23 08-Dec-23 18-Sep-23 16-Dec-23 7 HK Hols - No B/O periods 310.C.EX.W504 EVT (ES) - FS Installation (was C11_6C3) d/w - 10h/d - With 75 2 21-Sep-23 20-Dec-23 30-Oct-23 27-Jan-24 30 HK Hols - No B/O periods 310.C.EX.W506 EVT (ES) - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 75 2 21-Sep-23 20-Dec-23 29-Sep-23 30-Dec-23 7 HK Hols - No B/O periods CC#06 - EVT - MEP - Eastern Tunnel (ET) (was C11_6C3) d/w - 10h/d - With HK Hols 80- No B/O12 periods (was 04-Nov-23 C3) 08-Feb-24 17-Nov-23 29-May-24 87 310.C.EX.W416 EVT (ET) - Electrical Installation works C11_6 d/w - 10h/d - With 38 04-Nov-23 18-Dec-23 17-Nov-23 03-Jan-24 11 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 111 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W420 EVT (ET) - Tunnel Ventilation System Installation C11_6 d/w - 10h/d - With 40 2 16-Nov-23 04-Jan-24 29-Nov-23 17-Jan-24 11 HK Hols - No B/O periods 310.C.EX.W424 EVT (ET) - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 40 2 28-Nov-23 16-Jan-24 11-Dec-23 29-Jan-24 11 HK Hols - No B/O periods 310.C.EX.W436 EVT (ET) - Drainage Installation (was C11_6C3) d/w - 10h/d - With 40 2 28-Nov-23 16-Jan-24 11-Apr-24 29-May-24 107 HK Hols - No B/O periods 310.C.EX.W428 EVT (ET) - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 40 2 09-Dec-23 27-Jan-24 21-Dec-23 08-Feb-24 10 HK Hols - No B/O periods 310.C.EX.W432 EVT (ET) - FS Installation (was C11_6C3) d/w - 10h/d - With 40 2 21-Dec-23 08-Feb-24 29-Jan-24 16-Mar-24 30 HK Hols - No B/O periods 310.C.EX.W434 EVT (ET) - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 40 2 21-Dec-23 08-Feb-24 02-Jan-24 19-Feb-24 7 HK Hols - No B/O periods CC#06 - EVT - External Works (was C11_6C3) d/w - 10h/d - With HK Hols 172- No B/O18 periods (was 21-Sep-23 C3) 22-Apr-24 24-Feb-24 27-Jul-24 79 CC#06 - EVT - High Mast Lighting C11_6 d/w - 10h/d - With HK Hols 172- No B/O 8periods (was 21-Sep-23 C3) 22-Apr-24 24-Feb-24 27-Jul-24 79 310.C.EX.W442 EVT - External Works - High Mast Lighting - construct footing [2 nos.] C11_6 d/w - 10h/d - With 14 2 21-Sep-23 09-Oct-23 24-Feb-24 11-Mar-24 126 HK Hols - No B/O periods 310.C.EX.W446 EVT - External Works - High Mast Lighting - cable ducting (was C11_6C3) d/w - 10h/d - With 10 2 10-Oct-23 20-Oct-23 12-Mar-24 22-Mar-24 126 HK Hols - No B/O periods 310.C.EX.W454 EVT - External Works - High Mast Lighting - install lighting post [2 nos.] (was C11_6C3) d/w - 10h/d - With 5 2 25-Mar-24 02-Apr-24 04-Jul-24 09-Jul-24 79 HK Hols - No B/O periods 310.C.EX.W462 EVT - External Works - High Mast Lighting - Cabling and Fixing (was C11_6C3) d/w - 10h/d - With 16 2 03-Apr-24 22-Apr-24 10-Jul-24 27-Jul-24 79 HK Hols - No B/O periods CC#06 - EVT - Concrete Pavement (was C11_6C3) d/w - 10h/d - With HK Hols 80- No B/O10 periods (was 21-Oct-23 C3) 26-Jan-24 23-Mar-24 03-Jul-24 126 310.C.EX.W438 EVT - External Works - Pavement (west side) - prepare sub-grade C11_6 d/w - 10h/d - With 16 2 21-Oct-23 09-Nov-23 23-Mar-24 15-Apr-24 126 HK Hols - No B/O periods 310.C.EX.W992 EVT - External Works - Pavement (east side) - prepare sub-grade (was C11_6C3) d/w - 10h/d - With 16 2 10-Nov-23 28-Nov-23 19-Apr-24 08-May-24 129 HK Hols - No B/O periods 310.C.EX.W450 EVT - External Works - Pavement (west side) - lay and compact 225thk sub-base (was C11_6C3) d/w - 10h/d - With 24 1 10-Nov-23 07-Dec-23 16-Apr-24 14-May-24 126 [4,580m2 @100m2/d/wf; 2wf] HK Hols - No B/O periods 310.C.EX.W990 EVT - External Works - Pavement (west side) - construct 6mx6m concrete pavement [130 (was C11_6C3) d/w - 10h/d - With 54 2 22-Nov-23 26-Jan-24 27-Apr-24 03-Jul-24 126 bays @2d/bay/wf; 5wf] HK Hols - No B/O periods 310.C.EX.W994 EVT - External Works - Pavement (east side) - lay and compact 225thk sub-base (was C11_6C3) d/w - 10h/d - With 19 1 29-Nov-23 20-Dec-23 09-May-24 31-May-24 129 [1,800m2 @100m2/d/wf; 1wf] HK Hols - No B/O periods 310.C.EX.W996 EVT - External Works - Pavement (east side) - construct 6mx6m concrete pavement [50 (was C11_6C3) d/w - 10h/d - With 35 2 11-Dec-23 23-Jan-24 22-May-24 03-Jul-24 129 bays @2d/bay/wf; 3wf] HK Hols - No B/O periods CC#06 - Tunnel Plant Building A - PBA (was C3) 549 8 08-Dec-21 A 30-Jan-24 19-Apr-22 01-Jun-24 98 CC#06 - PBA - ELS Design - Excavation C01_7 d/w - 10h/d - No HK Hols213 - No B/O periods 0 (was01-Aug-22 C1) 01-Mar-23 21-Apr-23 19-Nov-23 263 ELS Design (Excavation) - PBA U/G Fuel Chamber C01_7 d/w - 10h/d - No HK Hols213 - No B/O periods 0 (was01-Aug-22 C1) 01-Mar-23 21-Apr-23 19-Nov-23 263 310.D.EX.H796.B01 PBA U/G Fuel Chamber - ELS design (Excavation) - prepare and submit to ICE for C01_7 d/w - 10h/d - No HK 45 01-Aug-22 14-Sep-22 21-Apr-23 04-Jun-23 263 reviewing Hols - No B/O periods (was 310.D.EX.H800.B01 PBA U/G Fuel Chamber - ELS design (Excavation) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 3 15-Sep-22 17-Sep-22 05-Jun-23 07-Jun-23 263 Hols - No B/O periods (was 310.D.EX.H804.B01 PBA U/G Fuel Chamber - ELS design (Excavation) - PM, AP, RSE reviewing 1st Round C1) C01_7 d/w - 10h/d - No HK 28 18-Sep-22 15-Oct-22 08-Jun-23 05-Jul-23 263 Hols - No B/O periods (was 310.D.EX.H824.B01 PBA U/G Fuel Chamber - ELS design (Excavation) - ICC, M&VC review design and issue C1) C01_7 d/w - 10h/d - No HK 21 16-Oct-22 05-Nov-22 06-Jul-23 26-Jul-23 263 check certificates Hols - No B/O periods (was 310.D.EX.H816.B01 PBA U/G Fuel Chamber - ELS design (Excavation) - prepare and resubmit C1) C01_7 d/w - 10h/d - No HK 7 06-Nov-22 12-Nov-22 27-Jul-23 02-Aug-23 263 Hols - No B/O periods (was 310.D.EX.H820.B01 PBA U/G Fuel Chamber - ELS design (Excavation) - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 13-Nov-22 10-Dec-22 03-Aug-23 30-Aug-23 263 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 112 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.EX.H808.B01 PBA U/G Fuel Chamber - ELS design (Excavation) - ICC, M&VC review design and issue C01_7 d/w - 10h/d - No HK 21 11-Dec-22 31-Dec-22 31-Aug-23 20-Sep-23 263 check certificates 2nd Round Hols - No B/O periods (was 310.D.EX.H812.B01 PBA U/G Fuel Chamber - ELS design (Excavation) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 01-Jan-23 01-Mar-23 21-Sep-23 19-Nov-23 263 Hols - No B/O periods (was CC#06 - PBA - Submission of Method Statement C1) C01_7 d/w - 10h/d - No HK Hols30 - No B/O periods 0 (was 08-Dec-21 C1) A 23-Apr-22 19-Apr-22 10-Oct-22 170 Method Statement for Construction of Airport Authority C01_7 d/w - 10h/d - No HK Hols30 - No B/O periods 0 (was 08-Dec-21 C1) A 23-Apr-22 19-Apr-22 10-Oct-22 170 310.D.TX.A156 MS no.22 - Method Statement for Construction of Air Authority Ancillary Buildings - C01_7 d/w - 10h/d - No HK 30 08-Dec-21 A 25-Feb-22 A 19-Apr-22 19-Apr-22 prepare document Hols - No B/O periods (was 310.D.TX.A160 MS no.22 - Method Statement for Construction of Air Authority Ancillary Buildings - PM C1) C01_7 d/w - 10h/d - No HK 28 27-Mar-22 23-Apr-22 13-Sep-22 10-Oct-22 170 review and accept Hols - No B/O periods (was CC#06 - PBA - Procurement C1) C01_7 d/w - 10h/d - No HK Hols298 - No B/O periods 0 (was17-Jun-22 C1) 10-Apr-23 25-Aug-22 29-May-23 49 Procurement - MEP C01_7 d/w - 10h/d - No HK Hols298 - No B/O periods 0 (was17-Jun-22 C1) 10-Apr-23 04-Sep-22 29-May-23 49 310.P.RC.S66 PBA (Procurement Electrical & MVAC Major Equipment and Others) - Place Order for C01_7 d/w - 10h/d - No HK 30 17-Jun-22 16-Jul-22 09-Jan-23 07-Feb-23 206 Materials Hols - No B/O periods (was 310.P.RC.S78 PBA (Procurement Electrical & MVAC Major Equipment and Others) - Manufacturing of C1) C01_7 d/w - 10h/d - No HK 120 24-Jun-22 21-Oct-22 16-Jan-23 15-May-23 206 Materials Hols - No B/O periods (was 310.P.RC.S62 PBA (Procurement FS and P&D Major Equipment) - Place Order for Materials C1) C01_7 d/w - 10h/d - No HK 180 17-Jul-22 12-Jan-23 04-Sep-22 02-Mar-23 49 Hols - No B/O periods (was 310.P.RC.S74 PBA (Procurement FS and P&D Major Equipment) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 240 31-Jul-22 27-Mar-23 18-Sep-22 15-May-23 49 Hols - No B/O periods (was 310.P.RC.S82 PBA (Procurement MEP) - Delivery of Materials C1) d/w - 10h/d - No HK C01_7 14 28-Mar-23 10-Apr-23 16-May-23 29-May-23 49 Hols - No B/O periods (was Procurement - ABWF C1) C01_7 d/w - 10h/d - No HK Hols116 - No B/O periods 0 (was23-Aug-22 C1) 16-Dec-22 25-Aug-22 18-Dec-22 2 310.P.RC.S150 PBA (Procurement ABWF) - Place Order for Materials C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 25-Aug-22 07-Sep-22 2 Hols - No B/O periods (was 310.P.RC.S154 PBA (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 90 06-Sep-22 04-Dec-22 08-Sep-22 06-Dec-22 2 Hols - No B/O periods (was 310.P.RC.S162 PBA (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 12 05-Dec-22 16-Dec-22 07-Dec-22 18-Dec-22 2 Hols - No B/O periods (was CC#06 - PBA - Site Preparation and Establishment C1) 72 0 12-Jul-22 06-Oct-22 06-Aug-22 26-Oct-22 17 310.C.ES.P052 PBA (Coordination) - Interface meeting and coordination with other Contract for the Site C01_7 d/w - 10h/d - No HK 30 12-Jul-22 10-Aug-22 06-Aug-22 04-Sep-22 25 Access Hols - No B/O periods (was 310.C.ES.P060 PBA (Initial Works) - Site Access of WA3310/7 C1) C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 05-Sep-22 0 Hols - No B/O periods (was 310.C.ES.P064 PBA (Initial Works) - Site handover by other Contract at +3.0mPD C1) C01_7 d/w - 10h/d - No HK 0 05-Sep-22 09-Sep-22 4 Hols - No B/O periods (was 310.C.ES.P072 PBA (Initial Works)- condition survey and carry out ground investigation (e.g. SI work and C1) C11_6 d/w - 10h/d - With 6 05-Sep-22 12-Sep-22 09-Sep-22 16-Sep-22 4 SRT test) HK Hols - No B/O periods 310.C.ES.P068 PBA (Initial Works)- erect hoarding (was C11_6C3) d/w - 10h/d - With 6 05-Sep-22 12-Sep-22 20-Oct-22 26-Oct-22 36 HK Hols - No B/O periods 310.C.ES.P076 PBA (Initial Works)- carry out existing UU detection (i.e. existing drainage, UUs) (was C11_6C3) d/w - 10h/d - With 1 12-Sep-22 12-Sep-22 10-Oct-22 10-Oct-22 22 HK Hols - No B/O periods 310.C.ES.P108.B01 PBA (Initial Works)- diversion of underground utilities (if any) (was C01_7C3) d/w - 10h/d - No HK 24 13-Sep-22 06-Oct-22 17-Sep-22 10-Oct-22 4 Hols - No B/O periods (was CC#06 - PBA - Earthwork C1) 18 0 25-Sep-22 18-Oct-22 26-Sep-22 19-Oct-22 1 310.C.ES.P078 PBA - Anticipated BD approval of Foundation, superstructure and drainage plan C01_7 d/w - 10h/d - No HK 0 25-Sep-22 26-Sep-22 1 Hols - No B/O periods (was 310.C.ES.P080 PBA (Foundation, superstructure, fuel chamber and drainage - BD Submission)- submit C1) C01_7 d/w - 10h/d - No HK 7 26-Sep-22 02-Oct-22 27-Sep-22 03-Oct-22 1 BA8 consent application Hols - No B/O periods (was 310.C.ES.P084 PBA (Foundation, superstructure, fuel chamber and drainage - BD Submission)- BD C1) C01_7 d/w - 10h/d - No HK 0 02-Oct-22 03-Oct-22 1 issued consent (BA8) Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 113 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.ES.P088 PBA (Foundation - BD Submission) - submit BA10 commencement of work and C01_7 d/w - 10h/d - No HK 7 03-Oct-22 09-Oct-22 04-Oct-22 10-Oct-22 1 acknowledgement Hols - No B/O periods (was 310.C.ES.P092 PBA (Earthworks)- Excavation down to formation level C1) C11_6 d/w - 10h/d - With 5 10-Oct-22 14-Oct-22 11-Oct-22 15-Oct-22 1 HK Hols - No B/O periods 310.C.ES.P096 PBA (Instrumentation) - install Instrumentation (settlement monitoring) (was C11_6C3) d/w - 10h/d - With 3 15-Oct-22 18-Oct-22 17-Oct-22 19-Oct-22 1 HK Hols - No B/O periods CC#06 - PBA - Structural Works (was C11_6C3) d/w - 10h/d - With HK Hols 183- No B/O 2periods (was 19-Oct-22 C3) 01-Jun-23 20-Oct-22 24-Jan-24 195 PBA - Initial Works C11_6 d/w - 10h/d - With HK Hols6 - No B/O 0periods (was 19-Oct-22 C3) 25-Oct-22 20-Oct-22 26-Oct-22 1 310.C.ES.P100 PBA (Foundation)- plate load test C11_6 d/w - 10h/d - With 6 19-Oct-22 25-Oct-22 20-Oct-22 26-Oct-22 1 HK Hols - No B/O periods PBA - Grid 3-5/A-D (was C11_6C3) d/w - 10h/d - With HK Hols 76- No B/O 2periods (was 26-Oct-22 C3) 27-Jan-23 27-Oct-22 07-Feb-23 9 310.C.ES.P112 PBA Grid 3-5/A-D(Foundation) - construction of foundation/base slab C11_6 d/w - 10h/d - With 16 26-Oct-22 12-Nov-22 27-Oct-22 14-Nov-22 1 HK Hols - No B/O periods 310.C.ES.P128 PBA Grid 3-5/A-D (1F Comms Room & associated rooms) - construct 1F columns, (was C11_6C3) d/w - 10h/d - With 14 1 14-Nov-22 29-Nov-22 15-Nov-22 30-Nov-22 1 beams, slabs, walls HK Hols - No B/O periods 310.C.ES.P132 PBA Grid 3-5/A-D (RF Comms Room & associated rooms) - construct RF columns, (was C11_6C3) d/w - 10h/d - With 15 1 30-Nov-22 16-Dec-22 01-Dec-22 17-Dec-22 1 beams, slab, walls HK Hols - No B/O periods 310.C.ES.P136 PBA Grid 3-5/A-D (GF) - remove falsework for 1F and construct upstand wall, mass fill (was C11_6C3) d/w - 10h/d - With 10 06-Dec-22 16-Dec-22 08-Dec-22 19-Dec-22 2 HK Hols - No B/O periods 310.C.ES.P140 PBA Grid 3-5/A-D (GF) - construct GF slab, beams (was C11_6C3) d/w - 10h/d - With 10 17-Dec-22 29-Dec-22 20-Dec-22 31-Dec-22 2 HK Hols - No B/O periods 310.C.ES.P144 PBA Grid 3-5/A-D (GF) - construct staircases (was C11_6C3) d/w - 10h/d - With 14 30-Dec-22 16-Jan-23 03-Jan-23 18-Jan-23 2 HK Hols - No B/O periods 310.C.ES.P148 PBA (Water Tanks) - construction of FS water tank, Foam Sys Water Tank, (was C11_6C3) d/w - 10h/d - With 21 30-Dec-22 27-Jan-23 11-Jan-23 07-Feb-23 9 HK Hols - No B/O periods PBA - Grid 1-3/A-D (was C11_6C3) d/w - 10h/d - With HK Hols 86- No B/O 0periods (was 30-Dec-22 C3) 18-Apr-23 11-Jan-23 28-Apr-23 9 310.C.ES.P164 PBA Grid 1-3/A-D(Foundation ) - construction of foundation/base slab C11_6 d/w - 10h/d - With 16 30-Dec-22 18-Jan-23 11-Jan-23 01-Feb-23 9 HK Hols - No B/O periods 310.C.ES.P168 PBA Grid 1-3/A-D (GF) - construct upstand wall, column and mass fill (was C11_6C3) d/w - 10h/d - With 16 19-Jan-23 09-Feb-23 02-Feb-23 20-Feb-23 9 HK Hols - No B/O periods 310.C.ES.P172 PBA (1F - Grid 1-3, A-D) - construction of double slab below FF, hanging walls, beams, (was C11_6C3) d/w - 10h/d - With 18 10-Feb-23 02-Mar-23 21-Feb-23 13-Mar-23 9 FF slab, FF walls HK Hols - No B/O periods 310.C.ES.P176 PBA Grid 1-3/A-D (1F) - construct columns, beams, slab, and external walls (was C11_6C3) d/w - 10h/d - With 18 03-Mar-23 23-Mar-23 14-Mar-23 03-Apr-23 9 HK Hols - No B/O periods 310.C.ES.P180 PBA Grid 1-3/A-D (RF) - construct columns, beams, roof slab (was C11_6C3) d/w - 10h/d - With 18 24-Mar-23 18-Apr-23 04-Apr-23 28-Apr-23 9 HK Hols - No B/O periods PBA - UG Fuel Chamber (was C11_6C3) d/w - 10h/d - With HK Hols 54- No B/O 0periods (was 24-Mar-23 C3) 01-Jun-23 20-Nov-23 24-Jan-24 195 310.C.ES.P832.B01 PBA (UG Fuel Chamber) - ELS down to formation level C11_6 d/w - 10h/d - With 24 24-Mar-23 25-Apr-23 20-Nov-23 16-Dec-23 195 HK Hols - No B/O periods 310.C.ES.P448 PBA (UG Fuel Chamber) - construction of Underground Fuel Chamber (was C11_6C3) d/w - 10h/d - With 30 26-Apr-23 01-Jun-23 18-Dec-23 24-Jan-24 195 HK Hols - No B/O periods PBA - Others (was C11_6C3) d/w - 10h/d - With HK Hols 12- No B/O 0periods (was 19-Apr-23 C3) 03-May-23 02-May-23 15-May-23 10 310.C.ES.P184 PBA (Roof Top) - dog house structure C11_6 d/w - 10h/d - With 12 19-Apr-23 03-May-23 02-May-23 15-May-23 10 HK Hols - No B/O periods CC#06 - PBA - ABWF (was C11_6C3) d/w - 10h/d - With HK Hols 198- No B/O 0periods (was 08-May-23 C3) 04-Jan-24 17-Jun-23 18-Apr-24 84 310.C.EX.W160 PBA Structure completed, curing and complete removal of falseworks C11_6 d/w - 10h/d - With 0 08-May-23 17-Jun-23 34 HK Hols - No B/O periods 310.C.EX.W112 PBA Partition Wall & Door Subframe (was C11_6C3) d/w - 10h/d - With 128 09-May-23 10-Oct-23 12-Aug-23 15-Jan-24 79 HK Hols - No B/O periods 310.C.EX.W144 PBA Plastering & Screeding (was C11_6C3) d/w - 10h/d - With 128 20-May-23 21-Oct-23 24-Aug-23 26-Jan-24 79 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 114 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W148 PBA Tiling & Stonework C11_6 d/w - 10h/d - With 128 02-Jun-23 03-Nov-23 05-Sep-23 07-Feb-24 79 HK Hols - No B/O periods 310.C.EX.W152 PBA Suspended Ceiling Framework (was C11_6C3) d/w - 10h/d - With 124 14-Jun-23 10-Nov-23 16-Sep-23 16-Feb-24 79 HK Hols - No B/O periods 310.C.EX.W156 PBA Sanitary Ware & Fixtures (was C11_6C3) d/w - 10h/d - With 124 27-Jun-23 22-Nov-23 28-Sep-23 28-Feb-24 79 HK Hols - No B/O periods 310.C.EX.W172 PBA Door Sets & Ironmongery (was C11_6C3) d/w - 10h/d - With 124 10-Jul-23 04-Dec-23 18-Oct-23 16-Mar-24 84 HK Hols - No B/O periods 310.C.EX.W176 PBA Glazing (was C11_6C3) d/w - 10h/d - With 124 21-Jul-23 15-Dec-23 31-Oct-23 28-Mar-24 84 HK Hols - No B/O periods 310.C.EX.W180 PBA Ceiling Panels & Finishes (was C11_6C3) d/w - 10h/d - With 124 02-Aug-23 29-Dec-23 11-Nov-23 13-Apr-24 84 HK Hols - No B/O periods 310.C.EX.W184 PBA Painting, Graphics & Signage (was C11_6C3) d/w - 10h/d - With 124 07-Aug-23 04-Jan-24 16-Nov-23 18-Apr-24 84 HK Hols - No B/O periods CC#06 - PBA - MEP Installation Works (was C11_6C3) d/w - 10h/d - With HK Hols 332- No B/O 6periods (was 17-Dec-22 C3) 30-Jan-24 19-Dec-22 18-Apr-24 62 CC#06 - PBA - Transformers (CLP) C11_6 d/w - 10h/d - With HK Hols 149- No B/O 2periods (was 19-Apr-23 C3) 16-Oct-23 29-Apr-23 27-Oct-23 9 310.C.EX.W100 PBA Complete Transformer Room Structure C11_6 d/w - 10h/d - With 0 19-Apr-23 29-Apr-23 9 HK Hols - No B/O periods 310.C.EX.W108 PBA Builder Works in Transformer Room (was C11_6C3) d/w - 10h/d - With 42 19-Apr-23 08-Jun-23 29-Apr-23 19-Jun-23 9 HK Hols - No B/O periods 310.C.EX.W2232 PBA MEP Works in Transformer Room (was C11_6C3) d/w - 10h/d - With 42 18-May-23 08-Jul-23 30-May-23 19-Jul-23 9 HK Hols - No B/O periods 310.C.EX.W164 PBA Inspection & Handover Transformer Room to CLP (was C11_6C3) d/w - 10h/d - With 18 10-Jul-23 29-Jul-23 20-Jul-23 09-Aug-23 9 HK Hols - No B/O periods 310.C.EX.W189 PBA Transformer Installation by CLP (was C11_6C3) d/w - 10h/d - With 65 31-Jul-23 16-Oct-23 10-Aug-23 27-Oct-23 9 HK Hols - No B/O periods 310.C.EX.W225 PBA Cable Laying by CLP (was C11_6C3) d/w - 10h/d - With 24 2 13-Sep-23 12-Oct-23 25-Sep-23 25-Oct-23 10 HK Hols - No B/O periods 310.C.EX.W236 PBA Energization of Transformers (was C11_6C3) d/w - 10h/d - With 0 16-Oct-23 27-Oct-23 9 HK Hols - No B/O periods CC#06 - PBA - Plumbing & Drainage Installation (was C11_6C3) d/w - 10h/d - With HK Hols 160- No B/O 0periods (was 07-Jul-23 C3) 16-Jan-24 24-Jul-23 01-Feb-24 14 310.C.EX.W124 PBA Plumbing & Drainage 1st Fix & Installation C11_6 d/w - 10h/d - With 96 07-Jul-23 30-Oct-23 24-Jul-23 15-Nov-23 14 HK Hols - No B/O periods 310.C.EX.W140 PBA Water Pump Installation (was C11_6C3) d/w - 10h/d - With 48 17-Jul-23 09-Sep-23 25-Sep-23 22-Nov-23 60 HK Hols - No B/O periods 310.C.EX.W201 PBA Plumbing & Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 72 01-Sep-23 27-Nov-23 18-Sep-23 13-Dec-23 14 HK Hols - No B/O periods 310.C.EX.W252 PBA Plumbing & Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 18 23-Dec-23 16-Jan-24 12-Jan-24 01-Feb-24 14 HK Hols - No B/O periods CC#06 - PBA - Electrical Installation (was C11_6C3) d/w - 10h/d - With HK Hols 159- No B/O 0periods (was 19-Jun-23 C3) 28-Dec-23 03-Jul-23 18-Apr-24 89 310.C.EX.W116 PBA Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 75 19-Jun-23 15-Sep-23 03-Jul-23 27-Sep-23 10 HK Hols - No B/O periods 310.C.EX.W104 PBA Switchgear Installation (was C11_6C3) d/w - 10h/d - With 48 19-Jul-23 12-Sep-23 31-Jul-23 23-Sep-23 10 HK Hols - No B/O periods 310.C.EX.W132 PBA Emergency Genset Installation (was C11_6C3) d/w - 10h/d - With 48 19-Jul-23 12-Sep-23 27-Nov-23 24-Jan-24 109 HK Hols - No B/O periods 310.C.EX.W193 PBA Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 72 22-Jul-23 16-Oct-23 12-Dec-23 09-Mar-24 119 HK Hols - No B/O periods 310.C.EX.W232 PBA Power On to All Floors (was C11_6C3) d/w - 10h/d - With 0 16-Oct-23 01-Feb-24 89 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 115 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W268 PBA Electrical Final Fix & Adjustment C11_6 d/w - 10h/d - With 18 06-Dec-23 28-Dec-23 25-Mar-24 18-Apr-24 89 HK Hols - No B/O periods CC#06 - PBA - Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 172- No B/O 0periods (was 07-Jul-23 C3) 30-Jan-24 10-Aug-23 06-Mar-24 29 310.C.EX.W128 PBA Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 96 07-Jul-23 30-Oct-23 10-Aug-23 02-Dec-23 29 HK Hols - No B/O periods 310.C.EX.W136 PBA FS Pump Installation (was C11_6C3) d/w - 10h/d - With 48 17-Jul-23 09-Sep-23 30-Oct-23 23-Dec-23 87 HK Hols - No B/O periods 310.C.EX.W209 PBA Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 72 01-Sep-23 27-Nov-23 07-Oct-23 03-Jan-24 29 HK Hols - No B/O periods 310.C.EX.W264 PBA Fire Service Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 18 10-Jan-24 30-Jan-24 15-Feb-24 06-Mar-24 29 HK Hols - No B/O periods CC#06 - PBA - MVAC Installation (was C11_6C3) d/w - 10h/d - With HK Hols 156- No B/O 0periods (was 07-Jul-23 C3) 11-Jan-24 12-Sep-23 20-Mar-24 57 310.C.EX.W120 PBA MVAC 1st Fix & Installation C11_6 d/w - 10h/d - With 96 07-Jul-23 30-Oct-23 12-Sep-23 08-Jan-24 57 HK Hols - No B/O periods 310.C.EX.W197 PBA MVAC 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 72 01-Sep-23 27-Nov-23 17-Nov-23 14-Feb-24 63 HK Hols - No B/O periods 310.C.EX.W260 PBA MVAC Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 18 19-Dec-23 11-Jan-24 29-Feb-24 20-Mar-24 57 HK Hols - No B/O periods CC#06 - PBA - Comms Room and Associated Rooms (was C11_6C3) d/w - 10h/d - With HK Hols 55- No B/O 4periods (was 17-Dec-22 C3) 24-Feb-23 19-Dec-22 25-Feb-23 1 310.C.ES.P104 PBA ABWF (Comms Room) - Commence ABWF works C11_6 d/w - 10h/d - With 0 17-Dec-22 19-Dec-22 1 HK Hols - No B/O periods 310.C.ES.P296 PBA (Comms Room 1st Degree - 3rd Degree) - ABWF Works (floor screed, partition (was C11_6C3) d/w - 10h/d - With 20 1 17-Dec-22 11-Jan-23 19-Dec-22 12-Jan-23 1 walls, installed conduits) HK Hols - No B/O periods 310.C.ES.P400 PBA (Novec 1234 Comms Room 1st Degree - 3rd Degree) - ABWF works Comms Rooms (was C11_6C3) d/w - 10h/d - With 20 1 23-Dec-22 17-Jan-23 24-Dec-22 18-Jan-23 1 (wall, floors, ceiling, doors) HK Hols - No B/O periods 310.C.ES.P404 PBA (Comms Room) - Commence Building Services works (was C11_6C3) d/w - 10h/d - With 0 30-Dec-22 31-Dec-22 1 HK Hols - No B/O periods 310.C.ES.P408 PBA (Comms Room 1st Fix - Final Fix) -Building Services Installations (was C11_6C3) d/w - 10h/d - With 45 2 30-Dec-22 24-Feb-23 31-Dec-22 25-Feb-23 1 HK Hols - No B/O periods CC#06 - PBA - External Works (was C11_6C3) d/w - 10h/d - With HK Hols 166- No B/O 0periods (was 04-May-23 C3) 20-Nov-23 16-May-23 01-Jun-24 156 CC#06 - PBA - External Building Finishes C11_6 d/w - 10h/d - With HK Hols 139- No B/O 0periods (was 04-May-23 C3) 18-Oct-23 16-May-23 01-Jun-24 183 310.C.ES.P188 PBA Roof Top waterproofing C11_6 d/w - 10h/d - With 28 04-May-23 06-Jun-23 16-May-23 17-Jun-23 10 HK Hols - No B/O periods 310.C.ES.P388 PBA External building finishes (was C11_6C3) d/w - 10h/d - With 72 07-Jun-23 31-Aug-23 28-Jun-23 20-Sep-23 17 HK Hols - No B/O periods 310.C.ES.P324 PBA Hard and soft landscape woks (was C11_6C3) d/w - 10h/d - With 21 22-Sep-23 18-Oct-23 08-May-24 01-Jun-24 183 HK Hols - No B/O periods CC#06 - PBA - Drainage and UU (was C11_6C3) d/w - 10h/d - With HK Hols 90- No B/O 0periods (was 07-Jun-23 C3) 21-Sep-23 28-Jun-23 27-Oct-23 28 310.C.ES.P312 PBA Building drainage and watermain works C11_6 d/w - 10h/d - With 45 07-Jun-23 31-Jul-23 28-Jun-23 19-Aug-23 17 HK Hols - No B/O periods 310.C.ES.P315 PBA CLP Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 30 01-Aug-23 04-Sep-23 21-Aug-23 23-Sep-23 17 HK Hols - No B/O periods 310.C.ES.P316 PBA AS Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 45 01-Aug-23 21-Sep-23 02-Sep-23 27-Oct-23 28 HK Hols - No B/O periods 310.C.ES.P320 PBA cable ducting + drawpits (was C11_6C3) d/w - 10h/d - With 45 01-Aug-23 21-Sep-23 02-Sep-23 27-Oct-23 28 HK Hols - No B/O periods CC#06 - PBA - EVA Construction (was C11_6C3) d/w - 10h/d - With HK Hols 48- No B/O 0periods (was 22-Sep-23 C3) 20-Nov-23 19-Feb-24 18-Apr-24 120 310.C.ES.P330 PBA Site Formation Works and Road Works for EVA C11_6 d/w - 10h/d - With 48 22-Sep-23 20-Nov-23 19-Feb-24 18-Apr-24 120 HK Hols - No B/O periods CC#06 - Tunnel Plant Building C - PBC (was C3) 168 7 12-May-22 29-Nov-22 13-May-22 27-Dec-22 23 CC#06 - PBC - Procurement C01_7 d/w - 10h/d - No HK Hols130 - No B/O periods 0 (was12-May-22 C1) 18-Sep-22 13-May-22 19-Sep-22 1
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 116 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Procurement - MEP C01_7 d/w - 10h/d - No HK Hols119 - No B/O periods 0 (was12-May-22 C1) 07-Sep-22 13-May-22 08-Sep-22 1 310.P.RC.S90 PBC (Procurement Electrical & MVAC Major Equipment and Others) - Place Order for C01_7 d/w - 10h/d - No HK 50 12-May-22 30-Jun-22 13-May-22 01-Jul-22 1 Material Hols - No B/O periods (was 310.P.RC.S86 PBC (Procurement FS and P&D Major Equipment) - Place Order for Material C1) C01_7 d/w - 10h/d - No HK 105 23-May-22 04-Sep-22 24-May-22 05-Sep-22 1 Hols - No B/O periods (was 310.P.RC.S102 PBC (Procurement FS and P&D Major Equipment) - Manufacturing of Material C1) C01_7 d/w - 10h/d - No HK 105 26-May-22 07-Sep-22 27-May-22 08-Sep-22 1 Hols - No B/O periods (was 310.P.RC.S106 PBC (Procurement Electrical & MVAC Major Equipment and Others) - Manufacturing of C1) C01_7 d/w - 10h/d - No HK 90 03-Jun-22 31-Aug-22 04-Jun-22 01-Sep-22 1 Material Hols - No B/O periods (was 310.P.RC.S110 PBC (Procurement MEP) - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 7 01-Sep-22 07-Sep-22 02-Sep-22 08-Sep-22 1 Hols - No B/O periods (was Procurement - ABWF C1) C01_7 d/w - 10h/d - No HK Hols104 - No B/O periods 0 (was07-Jun-22 C1) 18-Sep-22 08-Jun-22 19-Sep-22 1 310.P.RC.S174 PBC (Procurement ABWF) - Place Order for Materials C01_7 d/w - 10h/d - No HK 4 07-Jun-22 10-Jun-22 08-Jun-22 11-Jun-22 1 Hols - No B/O periods (was 310.P.RC.S178 PBC (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 100 11-Jun-22 18-Sep-22 12-Jun-22 19-Sep-22 1 Hols - No B/O periods (was 310.P.RC.S186 PBC (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 7 12-Sep-22 18-Sep-22 13-Sep-22 19-Sep-22 1 Hols - No B/O periods (was CC#06 - PBC - Preparation and Initial Works C1) C11_6 d/w - 10h/d - With HK Hols0 - No B/O 0periods (was 05-Sep-22 C3) 05-Sep-22 03-Sep-22 05-Sep-22 0 310.C.EX.P002 PBC - Handover inspection and acceptance from Contract <3302> C11_6 d/w - 10h/d - With 0 05-Sep-22 03-Sep-22 0 HK Hols - No B/O periods 310.C.EX.P006 PBC - Access to Tunnel Plant Building C from Contract <3302> (was C11_6C3) d/w - 10h/d - With 0 05-Sep-22* 05-Sep-22 0 HK Hols - No B/O periods 310.C.EX.P010 PBC - Commence ABWF, MEP Works (was C11_6C3) d/w - 10h/d - With 0 05-Sep-22 05-Sep-22 0 HK Hols - No B/O periods CC#06 - PBC - ABWF (was C11_6C3) d/w - 10h/d - With HK Hols 61- No B/O 0periods (was 05-Sep-22 C3) 17-Nov-22 07-Sep-22 18-Nov-22 1 310.C.EX.W1136 PBC Plastering & Screeding C11_6 d/w - 10h/d - With 50 05-Sep-22 04-Nov-22 20-Sep-22 18-Nov-22 12 HK Hols - No B/O periods 310.C.EX.W1140 PBC Tiling & Stonework (was C11_6C3) d/w - 10h/d - With 50 05-Sep-22 04-Nov-22 20-Sep-22 18-Nov-22 12 HK Hols - No B/O periods 310.C.EX.W1144 PBC Suspended Ceiling Framework (was C11_6C3) d/w - 10h/d - With 50 05-Sep-22 04-Nov-22 20-Sep-22 18-Nov-22 12 HK Hols - No B/O periods 310.C.EX.W1148 PBC Sanitary Ware & Fixtures (was C11_6C3) d/w - 10h/d - With 50 05-Sep-22 04-Nov-22 08-Sep-22 08-Nov-22 3 HK Hols - No B/O periods 310.C.EX.W1152 PBC Door Sets & Ironmongery (was C11_6C3) d/w - 10h/d - With 50 05-Sep-22 04-Nov-22 20-Sep-22 18-Nov-22 12 HK Hols - No B/O periods 310.C.EX.W1156 PBC Glazing (was C11_6C3) d/w - 10h/d - With 50 05-Sep-22 04-Nov-22 20-Sep-22 18-Nov-22 12 HK Hols - No B/O periods 310.C.EX.W1160 PBC Ceiling Panels & Finishes (was C11_6C3) d/w - 10h/d - With 50 05-Sep-22 04-Nov-22 07-Sep-22 07-Nov-22 2 HK Hols - No B/O periods 310.C.EX.W1132 PBC Partition Wall & Door Subframe (was C11_6C3) d/w - 10h/d - With 50 19-Sep-22 17-Nov-22 20-Sep-22 18-Nov-22 1 HK Hols - No B/O periods 310.C.EX.W1164 PBC Painting, Graphics & Signage (was C11_6C3) d/w - 10h/d - With 50 19-Sep-22 17-Nov-22 20-Sep-22 18-Nov-22 1 HK Hols - No B/O periods 310.C.EX.W2240 PBC Material Hoist & Roller Shutter (was C11_6C3) d/w - 10h/d - With 30 14-Oct-22 17-Nov-22 15-Oct-22 18-Nov-22 1 HK Hols - No B/O periods CC#06 - PBC MEP Installation Works (was C11_6C3) d/w - 10h/d - With HK Hols 61- No B/O 7periods (was 05-Sep-22 C3) 17-Nov-22 06-Sep-22 27-Dec-22 33 Transformers (CLP) C11_6 d/w - 10h/d - With HK Hols 61- No B/O 3periods (was 05-Sep-22 C3) 17-Nov-22 06-Sep-22 18-Nov-22 1 310.C.EX.W1168 PBC Complete Transformer Room Structure C11_6 d/w - 10h/d - With 0 05-Sep-22 06-Sep-22 1 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 117 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W1092 PBC Builder Works in Transformer Room C11_6 d/w - 10h/d - With 12 05-Sep-22 19-Sep-22 06-Sep-22 20-Sep-22 1 HK Hols - No B/O periods 310.C.EX.W2236 PBC MEP Works in Transformer Room (was C11_6C3) d/w - 10h/d - With 12 08-Sep-22 22-Sep-22 09-Sep-22 23-Sep-22 1 HK Hols - No B/O periods 310.C.EX.W1096 PBC Inspection & Handover Transformer Room to CLP (was C11_6C3) d/w - 10h/d - With 6 23-Sep-22 29-Sep-22 24-Sep-22 30-Sep-22 1 HK Hols - No B/O periods 310.C.EX.W1100 PBC Transformer Installation by CLP (was C11_6C3) d/w - 10h/d - With 40 30-Sep-22 17-Nov-22 03-Oct-22 18-Nov-22 1 HK Hols - No B/O periods 310.C.EX.W1172 PBC Cable Laying by CLP (was C11_6C3) d/w - 10h/d - With 30 3 13-Oct-22 16-Nov-22 15-Oct-22 18-Nov-22 2 HK Hols - No B/O periods 310.C.EX.W1104 PBC Energization of Transformers (was C11_6C3) d/w - 10h/d - With 0 17-Nov-22 18-Nov-22 1 HK Hols - No B/O periods Plumbing & Drainage Installation (was C11_6C3) d/w - 10h/d - With HK Hols 41- No B/O 0periods (was 12-Sep-22 C3) 31-Oct-22 12-Sep-22 31-Oct-22 0 310.C.EX.W1116 PBC Water Pump Installation C11_6 d/w - 10h/d - With 10 12-Sep-22 22-Sep-22 12-Sep-22 22-Sep-22 0 HK Hols - No B/O periods 310.C.EX.W1108 PBC Plumbing & Drainage 1st Fix & Installation (was C11_6C3) d/w - 10h/d - With 15 12-Sep-22 28-Sep-22 12-Sep-22 28-Sep-22 0 HK Hols - No B/O periods 310.C.EX.W1112 PBC Plumbing & Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 15 15-Sep-22 03-Oct-22 17-Sep-22 06-Oct-22 2 HK Hols - No B/O periods 310.C.EX.W1128 PBC Plumbing & Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 24-Oct-22 31-Oct-22 24-Oct-22 31-Oct-22 0 HK Hols - No B/O periods Electrical Installation (was C11_6C3) d/w - 10h/d - With HK Hols 54- No B/O 0periods (was 14-Sep-22 C3) 17-Nov-22 15-Sep-22 18-Nov-22 1 310.C.EX.W1016 PBC Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 20 14-Sep-22 08-Oct-22 15-Sep-22 10-Oct-22 1 HK Hols - No B/O periods 310.C.EX.W1024 PBC Switchgear Installation (was C11_6C3) d/w - 10h/d - With 20 20-Sep-22 14-Oct-22 28-Sep-22 22-Oct-22 7 HK Hols - No B/O periods 310.C.EX.W1020 PBC Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 20 26-Sep-22 20-Oct-22 30-Sep-22 25-Oct-22 4 HK Hols - No B/O periods 310.C.EX.W1028 PBC Emergency Genset Installation (was C11_6C3) d/w - 10h/d - With 14 06-Oct-22 21-Oct-22 07-Oct-22 22-Oct-22 1 HK Hols - No B/O periods 310.C.EX.W1032 PBC Provide Temporary Power for Power On to All Floors (was C11_6C3) d/w - 10h/d - With 0 21-Oct-22 22-Oct-22 1 HK Hols - No B/O periods 310.C.EX.W1044 PBC Electrical Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 10-Nov-22 17-Nov-22 11-Nov-22 18-Nov-22 1 HK Hols - No B/O periods Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 48- No B/O 0periods (was 14-Sep-22 C3) 10-Nov-22 14-Sep-22 10-Nov-22 0 310.C.EX.W1048 PBC Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 18 14-Sep-22 06-Oct-22 14-Sep-22 06-Oct-22 0 HK Hols - No B/O periods 310.C.EX.W1052 PBC Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 18 22-Sep-22 14-Oct-22 22-Sep-22 14-Oct-22 0 HK Hols - No B/O periods 310.C.EX.W1056 PBC FS Pump Installation (was C11_6C3) d/w - 10h/d - With 10 23-Sep-22 06-Oct-22 03-Oct-22 14-Oct-22 7 HK Hols - No B/O periods 310.C.EX.W1068 PBC Fire Services Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 03-Nov-22 10-Nov-22 03-Nov-22 10-Nov-22 0 HK Hols - No B/O periods MVAC Installation (was C11_6C3) d/w - 10h/d - With HK Hols 46- No B/O 0periods (was 14-Sep-22 C3) 08-Nov-22 16-Sep-22 10-Nov-22 2 310.C.EX.W1072 PBC MVAC 1st Fix & Installation C11_6 d/w - 10h/d - With 15 14-Sep-22 30-Sep-22 16-Sep-22 05-Oct-22 2 HK Hols - No B/O periods 310.C.EX.W1076 PBC MVAC 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 15 23-Sep-22 12-Oct-22 26-Sep-22 14-Oct-22 2 HK Hols - No B/O periods 310.C.EX.W1088 PBC MVAC Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 01-Nov-22 08-Nov-22 03-Nov-22 10-Nov-22 2 HK Hols - No B/O periods Comms Room and Associated Rooms (was C11_6C3) d/w - 10h/d - With HK Hols 40- No B/O 4periods (was 05-Sep-22 C3) 24-Oct-22 10-Nov-22 27-Dec-22 54
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 118 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.ES.P460 ABWF (Comms Room) - Commence ABWF works C11_6 d/w - 10h/d - With 0 05-Sep-22 10-Nov-22 54 HK Hols - No B/O periods 310.C.ES.P452 PBC (Comms Room 1st Degree - 3rd Degree) - ABWF Works (floor screed, partition (was C11_6C3) d/w - 10h/d - With 40 1 05-Sep-22 24-Oct-22 10-Nov-22 27-Dec-22 54 walls, installed conduits) HK Hols - No B/O periods 310.C.ES.P456 PBC (Novec 1234 Comms Room 1st Degree - 3rd Degree) - ABWF works Comms (was C11_6C3) d/w - 10h/d - With 40 1 05-Sep-22 24-Oct-22 10-Nov-22 27-Dec-22 54 Rooms (wall, floors, ceiling, doors) HK Hols - No B/O periods 310.C.ES.P464 PBC (Comms Room) - Commence Building Services works (was C11_6C3) d/w - 10h/d - With 0 12-Sep-22 16-Nov-22 54 HK Hols - No B/O periods 310.C.ES.P468 PBC (Comms Room 1st Fix - Final Fix) -Building Services Installations (was C11_6C3) d/w - 10h/d - With 20 2 16-Sep-22 11-Oct-22 16-Nov-22 08-Dec-22 50 HK Hols - No B/O periods CC#06 - PBC External Works (was C11_6C3) d/w - 10h/d - With HK Hols 71- No B/O 0periods (was 05-Sep-22 C3) 29-Nov-22 07-Sep-22 09-Dec-22 9 External Building Finishes C11_6 d/w - 10h/d - With HK Hols 71- No B/O 0periods (was 05-Sep-22 C3) 29-Nov-22 07-Sep-22 09-Dec-22 9 310.C.ES.P500 PBC External building finishes C11_6 d/w - 10h/d - With 40 05-Sep-22 24-Oct-22 07-Sep-22 26-Oct-22 2 HK Hols - No B/O periods 310.C.ES.P496.B01 PBC Waterproofing and roof finishes (was C11_6C3) d/w - 10h/d - With 40 05-Sep-22 24-Oct-22 25-Oct-22 09-Dec-22 40 HK Hols - No B/O periods 310.C.ES.P492 PBC Hard and soft landscape works (was C11_6C3) d/w - 10h/d - With 21 05-Nov-22 29-Nov-22 16-Nov-22 09-Dec-22 9 HK Hols - No B/O periods Drainage and UU (was C11_6C3) d/w - 10h/d - With HK Hols 50- No B/O 0periods (was 05-Sep-22 C3) 04-Nov-22 07-Sep-22 15-Nov-22 9 310.C.ES.P480 PBC Building drainage and watermain works C11_6 d/w - 10h/d - With 30 05-Sep-22 12-Oct-22 07-Sep-22 14-Oct-22 2 HK Hols - No B/O periods 310.C.ES.P488 PBC cable ducting + drawpits (was C11_6C3) d/w - 10h/d - With 30 05-Sep-22 12-Oct-22 03-Oct-22 07-Nov-22 22 HK Hols - No B/O periods 310.C.ES.P504 PBC CLP Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 30 05-Sep-22 12-Oct-22 07-Sep-22 14-Oct-22 2 HK Hols - No B/O periods 310.C.ES.P484 PBC AS Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 30 29-Sep-22 04-Nov-22 12-Oct-22 15-Nov-22 9 HK Hols - No B/O periods EVA Construction (was C11_6C3) d/w - 10h/d - With HK Hols 15- No B/O 0periods (was 25-Oct-22 C3) 10-Nov-22 02-Nov-22 18-Nov-22 7 310.C.ES.P498 PBC Site Formation Works and Road Works for EVA C11_6 d/w - 10h/d - With 15 25-Oct-22 10-Nov-22 02-Nov-22 18-Nov-22 7 HK Hols - No B/O periods CC#06 ----- Testing and Commissioning ----- (was C3) 682 20 04-Apr-22 22-Jul-24 21-Jun-22 28-Jul-24 5 CC#06 - EVT - Testing and Commissioning 512 8 31-Oct-22 22-Jul-24 04-Jan-23 28-Jul-24 5 CC#06 - EVT - Testing and Commissioning C11_6 d/w - 10h/d - With HK Hols 86- No B/O 8periods (was 29-Jan-24 C3) 16-May-24 20-Feb-24 26-Jul-24 59 310.T.EX.L104 EVT (T&C) - Ventilation System T&C C11_6 d/w - 10h/d - With 35 2 29-Jan-24 11-Mar-24 17-Apr-24 29-May-24 62 HK Hols - No B/O periods 310.T.EX.L100 EVT (T&C) - FS System T&C (was C11_6C3) d/w - 10h/d - With 28 2 09-Feb-24 14-Mar-24 18-Mar-24 23-Apr-24 30 HK Hols - No B/O periods 310.T.EX.L090 EVT (T&C) - Plumbing System T&C (was C11_6C3) d/w - 10h/d - With 28 2 09-Feb-24 14-Mar-24 20-Feb-24 22-Mar-24 7 HK Hols - No B/O periods 310.T.EX.L112 EVT (T&C) - Systems Integration T&C (was C11_6C3) d/w - 10h/d - With 48 2 15-Mar-24 16-May-24 30-May-24 26-Jul-24 59 HK Hols - No B/O periods CC#06 - EVT - Statutory Inspection (was C3) 512 0 31-Oct-22 22-Jul-24 04-Jan-23 28-Jul-24 5 Water Supply Department (WSD) C11_6 d/w - 10h/d - With HK Hols 432- No B/O 0periods (was 31-Oct-22 C3) 15-Apr-24 04-Jan-23 23-Apr-24 7 310.T.EX.T300 EVT Prepare for Plumbing Material for Submission C11_6 d/w - 10h/d - With 17 31-Oct-22 18-Nov-22 04-Jan-23 26-Jan-23 54 HK Hols - No B/O periods 310.T.EX.T310 EVT Submit all Plumbing Material for PM Acceptance (was C11_6C3) d/w - 10h/d - With 0 19-Nov-22 27-Jan-23 54 HK Hols - No B/O periods 310.T.EX.T315 EVT PM Acceptance (was C11_6C3) d/w - 10h/d - With 48 19-Nov-22 16-Jan-23 27-Jan-23 23-Mar-23 54 HK Hols - No B/O periods 310.T.EX.T320 EVT Form WWO 46 (Part I & Part II) & Annex Submission for WSD Approval (Plumbing / (was C11_6C3) d/w - 10h/d - With 0 17-Jan-23 24-Mar-23 54 FS / WP) HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 119 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.EX.T325 EVT Obtain Form WWO 46 (Part III) - WSD Approval, Endorsed & Return to Licensed C11_6 d/w - 10h/d - With 4 17-Jan-23 20-Jan-23 24-Mar-23 28-Mar-23 54 Plumber HK Hols - No B/O periods 310.T.EX.T330 EVT Form WWO 46 (Part IV) Submission for WSD Inspection (Plumbing / FS / WP) (was C11_6C3) d/w - 10h/d - With 0 15-Mar-24 23-Mar-24 7 HK Hols - No B/O periods 310.T.EX.T335 EVT WSD Inspection for Water Supply System (was C11_6C3) d/w - 10h/d - With 10 23-Mar-24 08-Apr-24 05-Apr-24 16-Apr-24 7 HK Hols - No B/O periods 310.T.EX.T340 EVT Obtain Form WWO 46 (Part V) (was C11_6C3) d/w - 10h/d - With 0 08-Apr-24 16-Apr-24 7 HK Hols - No B/O periods 310.T.EX.T345 EVT Form WWO 132 (Part II) Submission for Water Supply Connection (was C11_6C3) d/w - 10h/d - With 0 08-Apr-24 16-Apr-24 7 HK Hols - No B/O periods 310.T.EX.T350 EVT Final Water Supply Connection (was C11_6C3) d/w - 10h/d - With 6 09-Apr-24 15-Apr-24 17-Apr-24 23-Apr-24 7 HK Hols - No B/O periods 310.T.EX.T355 EVT Obtain Water Certificate (Form WWO 1005) (was C11_6C3) d/w - 10h/d - With 0 15-Apr-24 23-Apr-24 7 HK Hols - No B/O periods Fire Services Department (FSD) (was C3) 200 0 16-Oct-23 19-Jun-24 20-Oct-23 24-Jun-24 4 310.T.EX.T365 EVT F.S. Inspection Plan (Form FSI / 314 Submission) (Tunnel VAC System) C11_6 d/w - 10h/d - With 0 16-Oct-23 20-Oct-23 4 HK Hols - No B/O periods 310.T.EX.T439 Completion of 1st FS Inspection of PBA (was C11_6C3) d/w - 10h/d - With 0 16-Apr-24 23-May-24 30 HK Hols - No B/O periods 310.T.EX.T370 EVT F.S. Inspection Application (Form FSI / 501 & 251 Submission) (was C11_6C3) d/w - 10h/d - With 0 19-Apr-24 24-Apr-24 4 HK Hols - No B/O periods 310.T.EX.T375 EVT F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 14 02-May-24 18-May-24 07-May-24 23-May-24 4 HK Hols - No B/O periods 310.T.EX.T389.B02 Completion of FS Re-inspection of PBA (was C01_7C3) d/w - 10h/d - No HK 0 16-May-24 24-Jun-24 39 Hols - No B/O periods (was 310.T.EX.T380 EVT FSD Comment C1) C11_6 d/w - 10h/d - With 0 18-May-24 23-May-24 4 HK Hols - No B/O periods 310.T.EX.T385 EVT Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 12 20-May-24 01-Jun-24 24-May-24 06-Jun-24 4 HK Hols - No B/O periods 310.T.EX.T390 EVT F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 14 03-Jun-24 19-Jun-24 07-Jun-24 24-Jun-24 4 HK Hols - No B/O periods 310.T.EX.T395 EVT Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 19-Jun-24 24-Jun-24 4 HK Hols - No B/O periods Building Department (BD) (was C3) 27 0 20-Jun-24 22-Jul-24 25-Jun-24 28-Jul-24 5 310.T.EX.T405 EVT BD Inspection Application for Occupation Permit (Form BA13 Submission) C11_6 d/w - 10h/d - With 0 20-Jun-24 25-Jun-24 4 HK Hols - No B/O periods 310.T.EX.T410 EVT BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 10 20-Jun-24 02-Jul-24 25-Jun-24 06-Jul-24 4 HK Hols - No B/O periods 310.T.EX.T415 EVT BD Comment (was C11_6C3) d/w - 10h/d - With 0 02-Jul-24 06-Jul-24 4 HK Hols - No B/O periods 310.T.EX.T420 EVT Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 10 03-Jul-24 13-Jul-24 08-Jul-24 18-Jul-24 4 HK Hols - No B/O periods 310.T.EX.T425 EVT BD Re-inspection (was C11_6C3) d/w - 10h/d - With 7 15-Jul-24 22-Jul-24 19-Jul-24 26-Jul-24 4 HK Hols - No B/O periods 310.T.EX.L136 EVT - Achieve KD-11 (was C01_7C3) d/w - 10h/d - No HK 0 22-Jul-24 28-Jul-24 6 Hols - No B/O periods (was 310.T.EX.T435 EVT Issue Occupation Permit (Form BD104) C1) C11_6 d/w - 10h/d - With 0 22-Jul-24 26-Jul-24 4 HK Hols - No B/O periods CC#06 - PBA - Testing and Commissioning (was C11_6C3) d/w - 10h/d - With HK Hols 376- No B/O 8periods (was 20-Mar-23 C3) 26-Jun-24 29-Apr-23 13-Jul-24 14 Preliminary Testing and Commissioning C11_6 d/w - 10h/d - With HK Hols 87- No B/O 0periods (was 23-Sep-23 C3) 09-Jan-24 23-Nov-23 01-Jun-24 116 Preliminary T&C - Plumbing and Drainage C11_6 d/w - 10h/d - With HK Hols 40- No B/O 0periods (was 07-Nov-23 C3) 22-Dec-23 23-Nov-23 11-Jan-24 14
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 120 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W213 PBA Plumbing & Drainage Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 30 07-Nov-23 11-Dec-23 23-Nov-23 29-Dec-23 14 HK Hols - No B/O periods 310.C.EX.W229 PBA Plumbing & Drainage Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 30 18-Nov-23 22-Dec-23 05-Dec-23 11-Jan-24 14 HK Hols - No B/O periods Preliminary T&C - Electrical (was C11_6C3) d/w - 10h/d - With HK Hols 60- No B/O 0periods (was 23-Sep-23 C3) 05-Dec-23 02-Feb-24 01-Jun-24 143 310.C.EX.W2480.B02 PBA Electrical Preliminary Inspection & Adjustment (Non-FSI) C11_6 d/w - 10h/d - With 30 23-Sep-23 31-Oct-23 18-Mar-24 25-Apr-24 143 HK Hols - No B/O periods 310.C.EX.W240 PBA Electrical Preliminary Inspection & Adjustment (was C11_6C3) d/w - 10h/d - With 30 17-Oct-23 21-Nov-23 02-Feb-24 09-Mar-24 89 HK Hols - No B/O periods 310.C.EX.W256 PBA Electrical Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 30 01-Nov-23 05-Dec-23 19-Feb-24 23-Mar-24 89 HK Hols - No B/O periods 310.C.EX.W2484.B02 PBA Electrical Preliminary Testing & Commissioning (Non-FSI) (was C11_6C3) d/w - 10h/d - With 30 01-Nov-23 05-Dec-23 26-Apr-24 01-Jun-24 143 HK Hols - No B/O periods Preliminary T&C - Fire Services (was C11_6C3) d/w - 10h/d - With HK Hols 40- No B/O 0periods (was 21-Nov-23 C3) 09-Jan-24 27-Dec-23 07-May-24 95 310.C.EX.W221 PBA Fire Service Preliminary Inspection & Adjustment (FSI) C11_6 d/w - 10h/d - With 30 21-Nov-23 27-Dec-23 27-Dec-23 31-Jan-24 29 HK Hols - No B/O periods 310.C.EX.W22.B01 PBA Fire Service Preliminary Inspection & Adjustment (Non-FSI) (was C11_6C3) d/w - 10h/d - With 30 21-Nov-23 27-Dec-23 16-Mar-24 24-Apr-24 95 HK Hols - No B/O periods 310.C.EX.W248 PBA Fire Service Preliminary Testing & Commissioning (FSI) (was C11_6C3) d/w - 10h/d - With 30 02-Dec-23 09-Jan-24 09-Jan-24 14-Feb-24 29 HK Hols - No B/O periods 310.C.EX.W249.B01 PBA Fire Service Preliminary Testing & Commissioning (Non-FSI) (was C11_6C3) d/w - 10h/d - With 30 02-Dec-23 09-Jan-24 28-Mar-24 07-May-24 95 HK Hols - No B/O periods Preliminary T&C - MVAC (was C11_6C3) d/w - 10h/d - With HK Hols 42- No B/O 0periods (was 31-Oct-23 C3) 18-Dec-23 09-Jan-24 28-Feb-24 57 310.C.EX.W217 PBA MVAC Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 30 31-Oct-23 04-Dec-23 09-Jan-24 14-Feb-24 57 HK Hols - No B/O periods 310.C.EX.W244 PBA MVAC Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 30 14-Nov-23 18-Dec-23 23-Jan-24 28-Feb-24 57 HK Hols - No B/O periods Testing and Commissioning (was C11_6C3) d/w - 10h/d - With HK Hols 87- No B/O 8periods (was 10-Jan-24 C3) 26-Apr-24 02-Feb-24 13-Jul-24 63 310.T.EX.L216.B01 PBA Fire Service T&C (Non-FSI) C11_6 d/w - 10h/d - With 21 10-Jan-24 02-Feb-24 08-May-24 01-Jun-24 95 HK Hols - No B/O periods 310.T.EX.L192 PBA MVAC T&C (was C11_6C3) d/w - 10h/d - With 21 2 12-Jan-24 05-Feb-24 21-Mar-24 18-Apr-24 57 HK Hols - No B/O periods 310.T.EX.L204 PBA Plumbing & Drainage T&C (was C11_6C3) d/w - 10h/d - With 21 2 17-Jan-24 09-Feb-24 02-Feb-24 28-Feb-24 14 HK Hols - No B/O periods 310.T.EX.L200 PBA Fire Service T&C (FSI) (was C11_6C3) d/w - 10h/d - With 21 2 31-Jan-24 26-Feb-24 07-Mar-24 03-Apr-24 29 HK Hols - No B/O periods 310.T.EX.L208 PBA System Integration T&C (was C11_6C3) d/w - 10h/d - With 48 2 27-Feb-24 26-Apr-24 17-May-24 13-Jul-24 63 HK Hols - No B/O periods Water Supply Department (WSD) (was C11_6C3) d/w - 10h/d - With HK Hols 294- No B/O 0periods (was 20-Mar-23 C3) 14-Mar-24 29-Apr-23 03-Apr-24 14 310.T.ES.P112 PBA Prepare for Plumbing Material for Submission C11_6 d/w - 10h/d - With 17 20-Mar-23 12-Apr-23 29-Apr-23 19-May-23 31 HK Hols - No B/O periods 310.T.ES.P144 PBA Submit all Plumbing Material for PM Acceptance (was C11_6C3) d/w - 10h/d - With 0 13-Apr-23 20-May-23 31 HK Hols - No B/O periods 310.T.ES.P148 PBA PM Acceptance (was C11_6C3) d/w - 10h/d - With 48 13-Apr-23 09-Jun-23 20-May-23 18-Jul-23 31 HK Hols - No B/O periods 310.T.ES.P192 PBA Form WWO 46 (Part I & Part II) & Annex Submission for WSD Approval (Plumbing / (was C11_6C3) d/w - 10h/d - With 0 10-Jun-23 19-Jul-23 31 FS / WP) HK Hols - No B/O periods 310.T.ES.P196 PBA Obtain Form WWO 46 (Part III) - WSD Approval, Endorsed & Return to Licensed (was C11_6C3) d/w - 10h/d - With 4 10-Jun-23 14-Jun-23 19-Jul-23 22-Jul-23 31 Plumber HK Hols - No B/O periods 310.T.ES.P104 PBA Form WWO 46 (Part IV) Submission for WSD Inspection (Plumbing / FS / WP) (was C11_6C3) d/w - 10h/d - With 0 10-Feb-24 29-Feb-24 14 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 121 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.ES.P108 PBA WSD Inspection for Water Supply System C11_6 d/w - 10h/d - With 14 21-Feb-24 07-Mar-24 08-Mar-24 23-Mar-24 14 HK Hols - No B/O periods 310.T.ES.P116 PBA Obtain Form WWO 46 (Part V) (was C11_6C3) d/w - 10h/d - With 0 07-Mar-24 23-Mar-24 14 HK Hols - No B/O periods 310.T.ES.P120 PBA Form WWO 132 (Part II) Submission for Water Supply Connection (was C11_6C3) d/w - 10h/d - With 0 07-Mar-24 23-Mar-24 14 HK Hols - No B/O periods 310.T.ES.P124 PBA Final Water Supply Connection (was C11_6C3) d/w - 10h/d - With 6 08-Mar-24 14-Mar-24 25-Mar-24 03-Apr-24 14 HK Hols - No B/O periods 310.T.ES.P128 PBA Obtain Water Certificate (Form WWO 1005) (was C11_6C3) d/w - 10h/d - With 0 14-Mar-24 03-Apr-24 14 HK Hols - No B/O periods Fire Services Department (FSD) (was C11_6C3) d/w - 10h/d - With HK Hols 198- No B/O 0periods (was 13-Sep-23 C3) 16-May-24 25-Jan-24 01-Jun-24 14 DG Application & Inspection C11_6 d/w - 10h/d - With HK Hols 55- No B/O 0periods (was 13-Sep-23 C3) 18-Nov-23 25-Jan-24 03-Apr-24 109 310.T.ES.P452 PBA DG Inspection Application (Form Submission) C11_6 d/w - 10h/d - With 0 13-Sep-23 25-Jan-24 109 HK Hols - No B/O periods 310.T.ES.P456 PBA DG 1st Inspection (was C11_6C3) d/w - 10h/d - With 12 13-Oct-23 27-Oct-23 24-Feb-24 08-Mar-24 109 HK Hols - No B/O periods 310.T.ES.P460 PBA DG FSD Comment (was C11_6C3) d/w - 10h/d - With 0 27-Oct-23 08-Mar-24 109 HK Hols - No B/O periods 310.T.ES.P464 PBA DG Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 12 28-Oct-23 10-Nov-23 09-Mar-24 22-Mar-24 109 HK Hols - No B/O periods 310.T.ES.P468 PBA DG Re-inspection (was C11_6C3) d/w - 10h/d - With 7 11-Nov-23 18-Nov-23 23-Mar-24 03-Apr-24 109 HK Hols - No B/O periods 310.T.ES.P472 PBA Issue DG Certificate (was C11_6C3) d/w - 10h/d - With 0 18-Nov-23 03-Apr-24 109 HK Hols - No B/O periods FS Application & Inspection (was C11_6C3) d/w - 10h/d - With HK Hols 63- No B/O 0periods (was 27-Feb-24 C3) 16-May-24 05-Apr-24 01-Jun-24 14 310.T.ES.P132 PBA F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 27-Feb-24 05-Apr-24 29 HK Hols - No B/O periods 310.T.ES.P136 PBA F.S. Inspection Application (Form FSI / 501 & 251 Submission) (was C11_6C3) d/w - 10h/d - With 0 15-Mar-24 05-Apr-24 14 HK Hols - No B/O periods 310.T.ES.P140 PBA F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 12 02-Apr-24 16-Apr-24 19-Apr-24 03-May-24 14 HK Hols - No B/O periods 310.T.ES.P152 PBA FSD Comment (was C11_6C3) d/w - 10h/d - With 0 16-Apr-24 03-May-24 14 HK Hols - No B/O periods 310.T.ES.P156 PBA Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 12 17-Apr-24 30-Apr-24 04-May-24 18-May-24 14 HK Hols - No B/O periods 310.T.ES.P160 PBA F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 12 02-May-24 16-May-24 20-May-24 01-Jun-24 14 HK Hols - No B/O periods 310.T.ES.P164 PBA Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 16-May-24 01-Jun-24 14 HK Hols - No B/O periods Environmental Protection Department (EDP) (was C11_6C3) d/w - 10h/d - With HK Hols 55- No B/O 0periods (was 13-Sep-23 C3) 18-Nov-23 25-Jan-24 03-Apr-24 109 EPD Application & Inspection C11_6 d/w - 10h/d - With HK Hols 55- No B/O 0periods (was 13-Sep-23 C3) 18-Nov-23 25-Jan-24 03-Apr-24 109 310.T.ES.P668 PBA - EPD Inspection Application C11_6 d/w - 10h/d - With 0 13-Sep-23 25-Jan-24 109 HK Hols - No B/O periods 310.T.ES.P672 PBA - EPD 1st Inspection (was C11_6C3) d/w - 10h/d - With 12 13-Oct-23 27-Oct-23 24-Feb-24 08-Mar-24 109 HK Hols - No B/O periods 310.T.ES.P676 PBA - EPD Comment (was C11_6C3) d/w - 10h/d - With 0 27-Oct-23 08-Mar-24 109 HK Hols - No B/O periods 310.T.ES.P680 PBA - EPD Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 12 28-Oct-23 10-Nov-23 09-Mar-24 22-Mar-24 109 HK Hols - No B/O periods 310.T.ES.P684 PBA - EPD Re-inspection (was C11_6C3) d/w - 10h/d - With 7 11-Nov-23 18-Nov-23 23-Mar-24 03-Apr-24 109 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 122 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.ES.P688 PBA - Issue License C11_6 d/w - 10h/d - With 0 18-Nov-23 03-Apr-24 109 HK Hols - No B/O periods Building Department (BD) (was C11_6C3) d/w - 10h/d - With HK Hols 34- No B/O 0periods (was 17-May-24 C3) 26-Jun-24 03-Jun-24 13-Jul-24 14 310.T.ES.P168 PBA BD Inspection Application for Occupation Permit (Form BA13 Submission) C11_6 d/w - 10h/d - With 0 17-May-24 03-Jun-24 14 HK Hols - No B/O periods 310.T.ES.P172 PBA BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 14 17-May-24 01-Jun-24 03-Jun-24 19-Jun-24 14 HK Hols - No B/O periods 310.T.ES.P176 PBA BD Comment (was C11_6C3) d/w - 10h/d - With 0 01-Jun-24 19-Jun-24 14 HK Hols - No B/O periods 310.T.ES.P180 PBA Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 03-Jun-24 08-Jun-24 20-Jun-24 26-Jun-24 14 HK Hols - No B/O periods 310.T.ES.P184 PBA BD Re-inspection (was C11_6C3) d/w - 10h/d - With 14 11-Jun-24 26-Jun-24 27-Jun-24 13-Jul-24 14 HK Hols - No B/O periods 310.T.ES.P037 PBA Achieved Completion and T&C of Tunnel Plant Building A (was C11_6C3) d/w - 10h/d - With 0 26-Jun-24 13-Jul-24 14 HK Hols - No B/O periods 310.T.ES.P188 PBA Issue Occupation Permit (Form BD104) (was C11_6C3) d/w - 10h/d - With 0 26-Jun-24 13-Jul-24 14 HK Hols - No B/O periods CC#06 - PBC - Testing and Commissioning (was C3) 223 4 04-Apr-22 31-Dec-22 21-Jun-22 01-Jan-23 0 Preliminary Testing and Commissioning C11_6 d/w - 10h/d - With HK Hols 44- No B/O 0periods (was 23-Sep-22 C3) 15-Nov-22 23-Sep-22 09-Dec-22 21 Preliminary T&C - Plumbing and Drainage C11_6 d/w - 10h/d - With HK Hols 24- No B/O 0periods (was 23-Sep-22 C3) 22-Oct-22 23-Sep-22 22-Oct-22 0 310.C.EX.W1120 PBC Plumbing & Drainage Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 10 23-Sep-22 06-Oct-22 23-Sep-22 06-Oct-22 0 HK Hols - No B/O periods 310.C.EX.W1124 PBC Plumbing & Drainage Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 14 07-Oct-22 22-Oct-22 07-Oct-22 22-Oct-22 0 HK Hols - No B/O periods Preliminary T&C - Electrical (was C11_6C3) d/w - 10h/d - With HK Hols 21- No B/O 0periods (was 22-Oct-22 C3) 15-Nov-22 24-Oct-22 09-Dec-22 21 310.C.EX.W1036 PBC Electrical Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 10 22-Oct-22 02-Nov-22 24-Oct-22 03-Nov-22 1 HK Hols - No B/O periods 310.C.EX.W1037.B02 PBC Electrical Preliminary Inspection & Adjustment (Non-FSI) (was C11_6C3) d/w - 10h/d - With 10 24-Oct-22 03-Nov-22 17-Nov-22 28-Nov-22 21 HK Hols - No B/O periods 310.C.EX.W1040 PBC Electrical Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 14 25-Oct-22 09-Nov-22 26-Oct-22 10-Nov-22 1 HK Hols - No B/O periods 310.C.EX.W1045.B02 PBC Electrical Preliminary Testing & Commissioning (Non-FSI) (was C11_6C3) d/w - 10h/d - With 10 04-Nov-22 15-Nov-22 29-Nov-22 09-Dec-22 21 HK Hols - No B/O periods Preliminary T&C - Fire Services (was C11_6C3) d/w - 10h/d - With HK Hols 16- No B/O 0periods (was 15-Oct-22 C3) 02-Nov-22 15-Oct-22 01-Dec-22 25 310.C.EX.W1060 PBC Fire Services Preliminary Inspection & Adjustment (FSI) C11_6 d/w - 10h/d - With 10 15-Oct-22 26-Oct-22 15-Oct-22 26-Oct-22 0 HK Hols - No B/O periods 310.C.EX.W1061.B01 PBC Fire Services Preliminary Inspection & Adjustment (Non-FSI) (was C11_6C3) d/w - 10h/d - With 10 15-Oct-22 26-Oct-22 14-Nov-22 24-Nov-22 25 HK Hols - No B/O periods 310.C.EX.W1064 PBC Fire Services Preliminary Testing & Commissioning (FSI) (was C11_6C3) d/w - 10h/d - With 14 18-Oct-22 02-Nov-22 18-Oct-22 02-Nov-22 0 HK Hols - No B/O periods 310.C.EX.W1065.B01 PBC Fire Services Preliminary Testing & Commissioning (Non-FSI) (was C11_6C3) d/w - 10h/d - With 14 18-Oct-22 02-Nov-22 16-Nov-22 01-Dec-22 25 HK Hols - No B/O periods Preliminary T&C - MVAC (was C11_6C3) d/w - 10h/d - With HK Hols 16- No B/O 0periods (was 13-Oct-22 C3) 31-Oct-22 15-Oct-22 02-Nov-22 2 310.C.EX.W1080 PBC MVAC Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 10 13-Oct-22 24-Oct-22 15-Oct-22 26-Oct-22 2 HK Hols - No B/O periods 310.C.EX.W1084 PBC MVAC Preliminary Testing & Commissioning (was C3) C11_6 d/w - 10h/d - With 14 15-Oct-22 31-Oct-22 18-Oct-22 02-Nov-22 2 HK Hols - No B/O periods Testing and Commissioning (was C11_6C3) d/w - 10h/d - With HK Hols 16- No B/O 4periods (was 01-Nov-22 C3) 18-Nov-22 01-Nov-22 09-Dec-22 18 310.T.EX.L224 PBC Plumbing and Drainage T&C C11_6 d/w - 10h/d - With 7 1 01-Nov-22 08-Nov-22 01-Nov-22 08-Nov-22 0 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 123 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.EX.L212 PBC MVAC T&C C11_6 d/w - 10h/d - With 7 1 09-Nov-22 16-Nov-22 11-Nov-22 18-Nov-22 2 HK Hols - No B/O periods 310.T.EX.L220 PBC Fire Services T&C (FSI) (was C11_6C3) d/w - 10h/d - With 7 1 11-Nov-22 18-Nov-22 11-Nov-22 18-Nov-22 0 HK Hols - No B/O periods 310.T.EX.L228.B01 PBC Fire Services T&C (Non-FSI) (was C11_6C3) d/w - 10h/d - With 7 1 11-Nov-22 18-Nov-22 02-Dec-22 09-Dec-22 18 HK Hols - No B/O periods Water Supply Department (WSD) (was C11_6C3) d/w - 10h/d - With HK Hols 187- No B/O 0periods (was 04-Apr-22 C3) 18-Nov-22 21-Jun-22 18-Nov-22 0 310.T.ES.P228 PBC Prepare for Plumbing Material for Submission C11_6 d/w - 10h/d - With 17 04-Apr-22 27-Apr-22 21-Jun-22 11-Jul-22 61 HK Hols - No B/O periods 310.T.ES.P232 PBC Submit all Plumbing Material for PM Acceptance (was C11_6C3) d/w - 10h/d - With 0 28-Apr-22 12-Jul-22 61 HK Hols - No B/O periods 310.T.ES.P236 PBC PM Acceptance (was C11_6C3) d/w - 10h/d - With 48 28-Apr-22 24-Jun-22 12-Jul-22 05-Sep-22 61 HK Hols - No B/O periods 310.T.ES.P240 PBC Form WWO 46 (Part I & Part II) & Annex Submission for WSD Approval (Plumbing / (was C11_6C3) d/w - 10h/d - With 0 25-Jun-22 06-Sep-22 61 FS / WP) HK Hols - No B/O periods 310.T.ES.P244 PBC Obtain Form WWO 46 (Part III) - WSD Approval, Endorsed & Return to Licensed (was C11_6C3) d/w - 10h/d - With 4 25-Jun-22 29-Jun-22 06-Sep-22 09-Sep-22 61 Plumber HK Hols - No B/O periods 310.T.ES.P204 PBC Form WWO 46 (Part IV) Submission for WSD Inspection (Plumbing / FS / WP) (was C11_6C3) d/w - 10h/d - With 0 09-Nov-22 09-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P208 PBC WSD Inspection for Water Supply System (was C11_6C3) d/w - 10h/d - With 6 09-Nov-22 15-Nov-22 09-Nov-22 15-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P212 PBC Obtain Form WWO 46 (Part V) (was C11_6C3) d/w - 10h/d - With 0 15-Nov-22 15-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P216 PBC Form WWO 132 (Part II) Submission for Water Supply Connection (was C11_6C3) d/w - 10h/d - With 0 15-Nov-22 15-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P220 PBC Final Water Supply Connection (was C11_6C3) d/w - 10h/d - With 3 16-Nov-22 18-Nov-22 16-Nov-22 18-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P224 PBC Obtain Water Certificate (Form WWO 1005) (was C11_6C3) d/w - 10h/d - With 0 18-Nov-22 18-Nov-22 0 HK Hols - No B/O periods Fire Services Department (FSD) (was C11_6C3) d/w - 10h/d - With HK Hols 42- No B/O 0periods (was 22-Oct-22 C3) 09-Dec-22 26-Oct-22 09-Dec-22 0 DG Application & Inspection C11_6 d/w - 10h/d - With HK Hols 21- No B/O 0periods (was 22-Oct-22 C3) 15-Nov-22 26-Oct-22 18-Nov-22 3 310.T.ES.P428 PBC DG Inspection Application (Form Submission) C11_6 d/w - 10h/d - With 0 22-Oct-22 26-Oct-22 3 HK Hols - No B/O periods 310.T.ES.P432 PBC DG 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 31-Oct-22 05-Nov-22 03-Nov-22 09-Nov-22 3 HK Hols - No B/O periods 310.T.ES.P436 PBC DG FSD Comment (was C11_6C3) d/w - 10h/d - With 0 05-Nov-22 09-Nov-22 3 HK Hols - No B/O periods 310.T.ES.P440 PBC DG Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 2 07-Nov-22 08-Nov-22 10-Nov-22 11-Nov-22 3 HK Hols - No B/O periods 310.T.ES.P444 PBC DG Re-inspection (was C11_6C3) d/w - 10h/d - With 6 09-Nov-22 15-Nov-22 12-Nov-22 18-Nov-22 3 HK Hols - No B/O periods 310.T.ES.P448 PBC Issue DG Certificate (was C11_6C3) d/w - 10h/d - With 0 15-Nov-22 18-Nov-22 3 HK Hols - No B/O periods FS Application & Inspection (was C11_6C3) d/w - 10h/d - With HK Hols 18- No B/O 0periods (was 19-Nov-22 C3) 09-Dec-22 19-Nov-22 09-Dec-22 0 310.T.ES.P248 PBC F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 19-Nov-22 19-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P252 PBC F.S. Inspection Application (Form FSI / 501 & 251 Submission) (was C11_6C3) d/w - 10h/d - With 0 19-Nov-22 19-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P256 PBC F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 19-Nov-22 25-Nov-22 19-Nov-22 25-Nov-22 0 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 124 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.ES.P260 PBC FSD Comment C11_6 d/w - 10h/d - With 0 25-Nov-22 25-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P264 PBC Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 26-Nov-22 02-Dec-22 26-Nov-22 02-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P268 PBC F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 03-Dec-22 09-Dec-22 03-Dec-22 09-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P272 PBC Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 09-Dec-22 09-Dec-22 0 HK Hols - No B/O periods Environmental Protection Department (EDP) (was C11_6C3) d/w - 10h/d - With HK Hols 18- No B/O 0periods (was 22-Oct-22 C3) 11-Nov-22 29-Oct-22 18-Nov-22 6 EPD Application & Inspection C11_6 d/w - 10h/d - With HK Hols 18- No B/O 0periods (was 22-Oct-22 C3) 11-Nov-22 29-Oct-22 18-Nov-22 6 310.T.ES.P692 PBC - EPD Inspection Application C11_6 d/w - 10h/d - With 0 22-Oct-22 29-Oct-22 6 HK Hols - No B/O periods 310.T.ES.P696 PBC - EPD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 22-Oct-22 28-Oct-22 29-Oct-22 04-Nov-22 6 HK Hols - No B/O periods 310.T.ES.P700 PBC - EPD Comment (was C11_6C3) d/w - 10h/d - With 0 28-Oct-22 04-Nov-22 6 HK Hols - No B/O periods 310.T.ES.P704 PBC - EPD Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 29-Oct-22 04-Nov-22 05-Nov-22 11-Nov-22 6 HK Hols - No B/O periods 310.T.ES.P708 PBC - EPD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 05-Nov-22 11-Nov-22 12-Nov-22 18-Nov-22 6 HK Hols - No B/O periods 310.T.ES.P712 PBC - Issue License (was C11_6C3) d/w - 10h/d - With 0 11-Nov-22 18-Nov-22 6 HK Hols - No B/O periods Building Department (BD) (was C3) 18 0 10-Dec-22 31-Dec-22 10-Dec-22 01-Jan-23 0 310.T.ES.P276 PBC BD Inspection Application for Occupation Permit (Form BA13 Submission) C11_6 d/w - 10h/d - With 0 10-Dec-22 10-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P280 PBC BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 10-Dec-22 16-Dec-22 10-Dec-22 16-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P284 PBC BD Comment (was C11_6C3) d/w - 10h/d - With 0 16-Dec-22 16-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P288 PBC Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 17-Dec-22 23-Dec-22 17-Dec-22 23-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P292 PBC BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 24-Dec-22 31-Dec-22 24-Dec-22 31-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P200 PBC Achieved Completion and T&C of Tunnel Plant Building C (was C11_6C3) d/w - 10h/d - With 0 31-Dec-22 31-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P296 PBC Issue Occupation Permit (Form BD104) (was C11_6C3) d/w - 10h/d - With 0 31-Dec-22 31-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P297 PMS24 - Comp all works for Road Tunnel PBC and stat. apprv, consents, ready for use [1 (was C01_7C3) d/w - 10h/d - No HK 0 31-Dec-22 01-Jan-23 1 Jan 23] Hols - No B/O periods (was Cost Centre #07 - West Vehicular Tunnels & Plant Building B C1) 931 457 07-Jun-21 A 23-Jul-24 27-Mar-22 24-Aug-24 28 CC#07 ----- Design & Other Submission ----- C01_7 d/w - 10h/d - No HK Hols518 - No B/O periods 0 (was 23-Jul-21 C1) A 26-Dec-22 27-Mar-22 21-Mar-24 451 CC#07 - WVT - Statutory Submission and Consent Application C01_7 d/w - 10h/d - No HK Hols518 - No B/O periods 0 (was 23-Jul-21 C1) A 26-Dec-22 27-Mar-22 21-Mar-24 451 CC#07 - WVT - Ground Investigation Plan for ELS Design C01_7 d/w - 10h/d - No HK Hols401 - No B/O periods 0 (was 23-Jul-21 C1) A 01-Sep-22 27-Mar-22 05-Sep-22 5 310.D.EX.H252 WVT - SI Plan for ELS Design - prepare and submit to PM C01_7 d/w - 10h/d - No HK 7 23-Jul-21 A 29-Jul-21 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.D.EX.H276 WVT - SI Plan for ELS Design - prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 25-Aug-22 01-Sep-22 30-Aug-22 05-Sep-22 5 commencement Hols - No B/O periods (was CC#07 - WVT - ELS Design - Vertical Element C1) C01_7 d/w - 10h/d - No HK Hols315 - No B/O periods 0 (was 01-Nov-21 C1) A 11-Sep-22 27-Mar-22 11-Sep-22 0 WVT - ELS Works Design - WVT Ch447 to 575 (Zone 5 & 6) Pkg.1 C01_7 d/w - 10h/d - No HK Hols291 - No B/O periods 0 (was 01-Nov-21 C1) A 18-Aug-22 27-Mar-22 07-Sep-22 20 310.D.EX.F174 WVT - ELS design (Vertical Elements) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 6 01-Nov-21 A 07-Jan-22 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 125 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.EX.F178 WVT - ELS design (Vertical Elements) - ICE issue check certificate C01_7 d/w - 10h/d - No HK 1 08-Jan-22 A 08-Jan-22 A 16-Apr-22 16-Apr-22 Hols - No B/O periods (was 310.D.EX.F182 WVT - ELS design (Vertical Elements) - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 08-Jan-22 A 06-Apr-22 16-Apr-22 26-Apr-22 20 Hols - No B/O periods (was 310.D.EX.F202 WVT - ELS design (Vertical Elements) - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 07-Apr-22 27-Apr-22 27-Apr-22 17-May-22 20 certificates Hols - No B/O periods (was 310.D.EX.H349 WVT - ELS design (Vertical Elements) - prepare and resubmit C1) C01_7 d/w - 10h/d - No HK 4 28-Apr-22 01-May-22 18-May-22 21-May-22 20 Hols - No B/O periods (was 310.D.EX.H353 WVT - ELS design (Vertical Elements) - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 02-May-22 29-May-22 22-May-22 18-Jun-22 20 Hols - No B/O periods (was 310.D.EX.F186 WVT - ELS design (Vertical Elements) - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 30-May-22 19-Jun-22 19-Jun-22 09-Jul-22 20 certificates 2nd Round Hols - No B/O periods (was 310.D.EX.F190 WVT - ELS design (Vertical Elements) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 20-Jun-22 18-Aug-22 10-Jul-22 07-Sep-22 20 Hols - No B/O periods (was WVT - ELS Works Design - WVT Ch0 to 447 (Zone 1, 2, 3 & 4) Pkg.2 C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was27-Mar-22 C1) 11-Sep-22 27-Mar-22 11-Sep-22 0 310.D.EX.F142 WVT - ELS design (Vertical Elements) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 6 27-Mar-22 01-Apr-22 27-Mar-22 01-Apr-22 0 Hols - No B/O periods (was 310.D.EX.F146 WVT - ELS design (Vertical Elements) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 1 02-Apr-22 02-Apr-22 02-Apr-22 02-Apr-22 0 Hols - No B/O periods (was 310.D.EX.F150 WVT - ELS design (Vertical Elements) - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 03-Apr-22 30-Apr-22 03-Apr-22 30-Apr-22 0 Hols - No B/O periods (was 310.D.EX.F170 WVT - ELS design (Vertical Elements) - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 01-May-22 21-May-22 01-May-22 21-May-22 0 certificates Hols - No B/O periods (was 310.D.EX.H341 WVT - ELS design (Vertical Elements) - prepare and resubmit C1) C01_7 d/w - 10h/d - No HK 4 22-May-22 25-May-22 22-May-22 25-May-22 0 Hols - No B/O periods (was 310.D.EX.H345 WVT - ELS design (Vertical Elements) - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 26-May-22 22-Jun-22 0 Hols - No B/O periods (was 310.D.EX.F154 WVT - ELS design (Vertical Elements) - ICC, M&VC review design and issue check C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 23-Jun-22 13-Jul-22 0 certificates 2nd Round Hols - No B/O periods (was 310.D.EX.F158 WVT - ELS design (Vertical Elements) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 14-Jul-22 11-Sep-22 0 Hols - No B/O periods (was CC#07 - WVT - ELS Design - Excavation C1) C01_7 d/w - 10h/d - No HK Hols204 - No B/O periods 0 (was21-Apr-22 C1) 10-Nov-22 25-Jun-22 20-Jan-23 71 WVT - ELS Works Design - WVT Ch450 to 575 (Zone 4, 5 & 6) Pkg.1 C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was21-Apr-22 C1) 06-Oct-22 05-Aug-22 20-Jan-23 106 310.D.EX.F262.B01 WVT - ELS design (Excavation) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 6 21-Apr-22 26-Apr-22 05-Aug-22 10-Aug-22 106 Hols - No B/O periods (was 310.D.EX.F266.B01 WVT - ELS design (Excavation) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 1 27-Apr-22 27-Apr-22 11-Aug-22 11-Aug-22 106 Hols - No B/O periods (was 310.D.EX.F270.B01 WVT - ELS design (Excavation) - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 28-Apr-22 25-May-22 12-Aug-22 08-Sep-22 106 Hols - No B/O periods (was 310.D.EX.F282.B01 WVT - ELS design (Excavation) - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 26-May-22 15-Jun-22 09-Sep-22 29-Sep-22 106 Hols - No B/O periods (was 310.D.EX.H851.B01 WVT - ELS design (Excavation) - prepare and resubmit C1) C01_7 d/w - 10h/d - No HK 4 16-Jun-22 19-Jun-22 30-Sep-22 03-Oct-22 106 Hols - No B/O periods (was 310.D.EX.H855.B01 WVT - ELS design (Excavation) - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 20-Jun-22 17-Jul-22 04-Oct-22 31-Oct-22 106 Hols - No B/O periods (was 310.D.EX.F274.B01 WVT - ELS design (Excavation) - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 18-Jul-22 07-Aug-22 01-Nov-22 21-Nov-22 106 2nd Round Hols - No B/O periods (was 310.D.EX.F278.B01 WVT - ELS design (Excavation) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 08-Aug-22 06-Oct-22 22-Nov-22 20-Jan-23 106 Hols - No B/O periods (was WVT - ELS Works Design - WVT Ch0 to 450 (Zone 1, 2, & 3) Pkg.2 C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-May-22 C1) 10-Nov-22 25-Jun-22 10-Dec-22 30
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 126 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.EX.F238.B01 WVT - ELS design (Excavation) - prepare and submit to ICE for reviewing C01_7 d/w - 10h/d - No HK 6 26-May-22 31-May-22 25-Jun-22 30-Jun-22 30 Hols - No B/O periods (was 310.D.EX.F242.B01 WVT - ELS design (Excavation) - ICE issue check certificate C1) C01_7 d/w - 10h/d - No HK 1 01-Jun-22 01-Jun-22 01-Jul-22 01-Jul-22 30 Hols - No B/O periods (was 310.D.EX.F246.B01 WVT - ELS design (Excavation) - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 02-Jun-22 29-Jun-22 02-Jul-22 29-Jul-22 30 Hols - No B/O periods (was 310.D.EX.F258.B01 WVT - ELS design (Excavation) - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 30-Jun-22 20-Jul-22 30-Jul-22 19-Aug-22 30 Hols - No B/O periods (was 310.D.EX.H843.B01 WVT - ELS design (Excavation) - prepare and resubmit C1) C01_7 d/w - 10h/d - No HK 4 21-Jul-22 24-Jul-22 20-Aug-22 23-Aug-22 30 Hols - No B/O periods (was 310.D.EX.H847.B01 WVT - ELS design (Excavation) - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 25-Jul-22 21-Aug-22 24-Aug-22 20-Sep-22 30 Hols - No B/O periods (was 310.D.EX.F250.B01 WVT - ELS design (Excavation) - ICC, M&VC review design and issue check certificates C1) C01_7 d/w - 10h/d - No HK 21 22-Aug-22 11-Sep-22 21-Sep-22 11-Oct-22 30 2nd Round Hols - No B/O periods (was 310.D.EX.F254.B01 WVT - ELS design (Excavation) - BD review and comment C1) C01_7 d/w - 10h/d - No HK 60 12-Sep-22 10-Nov-22 12-Oct-22 10-Dec-22 30 Hols - No B/O periods (was CC#07 - WVT - Testing and Commissioning Plan for WVT C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was30-Oct-22 C1) 26-Dec-22 30-Oct-22 21-Mar-24 451 310.D.TX.A148 WVT no.26 - Testing and Commissioning Plan for WVT - Prepare and submit to PM C01_7 d/w - 10h/d - No HK 30 30-Oct-22 28-Nov-22 30-Oct-22 28-Nov-22 0 Hols - No B/O periods (was 310.D.TX.A152 WVT no.26 - Testing and Commissioning Plan for WVT - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 29-Nov-22 26-Dec-22 23-Feb-24 21-Mar-24 451 Hols - No B/O periods (was CC#07 - WVT - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols144 - No B/O periods 0 (was 23-Mar-22 C1) A 20-Aug-22 10-Jul-22 30-Nov-22 102 WVT - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols144 - No B/O periods 0 (was 23-Mar-22 C1) A 20-Aug-22 10-Jul-22 30-Nov-22 102 310.D.WS.L736 WVT - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 23-Mar-22 A 28-May-22 10-Jul-22 07-Sep-22 102 Hols - No B/O periods (was 310.D.WS.L737 WVT - MEP - Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 60 27-Apr-22 25-Jun-22 07-Aug-22 05-Oct-22 102 Hols - No B/O periods (was 310.D.WS.L738 WVT - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 60 25-May-22 23-Jul-22 04-Sep-22 02-Nov-22 102 Hols - No B/O periods (was 310.D.WS.L740 WVT - MEP - Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 60 22-Jun-22 20-Aug-22 02-Oct-22 30-Nov-22 102 Hols - No B/O periods (was CC#07 - WVT - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was26-Apr-22 C1) 13-Jun-22 03-May-22 20-Jun-22 7 WVT - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was26-Apr-22 C1) 13-Jun-22 03-May-22 20-Jun-22 7 310.D.WS.L1472 WVT - ABWF - prepare document C01_7 d/w - 10h/d - No HK 14 26-Apr-22 09-May-22 03-May-22 16-May-22 7 Hols - No B/O periods (was 310.D.WS.L1716 WVT - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-May-22 30-May-22 17-May-22 06-Jun-22 7 Hols - No B/O periods (was 310.D.WS.L1712 WVT - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 31-May-22 06-Jun-22 07-Jun-22 13-Jun-22 7 Hols - No B/O periods (was 310.D.WS.L1476 WVT - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 07-Jun-22 13-Jun-22 14-Jun-22 20-Jun-22 7 Hols - No B/O periods (was WVT - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was26-Apr-22 C1) 13-Jun-22 03-May-22 20-Jun-22 7 310.D.WS.L1488 WVT - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 26-Apr-22 09-May-22 03-May-22 16-May-22 7 Hols - No B/O periods (was 310.D.WS.L1724 WVT - ABWF - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 10-May-22 30-May-22 17-May-22 06-Jun-22 7 Hols - No B/O periods (was 310.D.WS.L1720 WVT - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 31-May-22 06-Jun-22 07-Jun-22 13-Jun-22 7 Hols - No B/O periods (was 310.D.WS.L1492 WVT - ABWF - Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 07-Jun-22 13-Jun-22 14-Jun-22 20-Jun-22 7 Hols - No B/O periods (was CC#07 - PBB - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols82 - No B/O periods 0 (was 23-Mar-22 C1) A 19-Jun-22 19-Jun-22 08-Sep-22 81
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 127 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S PBB - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols82 - No B/O periods 0 (was 23-Mar-22 C1) A 19-Jun-22 19-Jun-22 08-Sep-22 81 310.D.WS.L760 PBB - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 7 23-Mar-22 A 08-May-22 19-Jun-22 28-Jul-22 81 Hols - No B/O periods (was 310.D.WS.L761 PBB - MEP - Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 40 13-Apr-22 22-May-22 03-Jul-22 11-Aug-22 81 Hols - No B/O periods (was 310.D.WS.L762 PBB - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 40 27-Apr-22 05-Jun-22 17-Jul-22 25-Aug-22 81 Hols - No B/O periods (was 310.D.WS.L764 PBB - MEP - Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 40 11-May-22 19-Jun-22 31-Jul-22 08-Sep-22 81 Hols - No B/O periods (was CC#07 - PBB - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols35 - No B/O periods 0 (was26-Apr-22 C1) 30-May-22 28-Apr-22 01-Jun-22 2 PBB - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols35 - No B/O periods 0 (was26-Apr-22 C1) 30-May-22 28-Apr-22 01-Jun-22 2 310.D.WS.L1496 PBB - ABWF - prepare document C01_7 d/w - 10h/d - No HK 7 26-Apr-22 02-May-22 28-Apr-22 04-May-22 2 Hols - No B/O periods (was 310.D.WS.L1732 PBB - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 14 03-May-22 16-May-22 05-May-22 18-May-22 2 Hols - No B/O periods (was 310.D.WS.L1728 PBB - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 17-May-22 23-May-22 19-May-22 25-May-22 2 Hols - No B/O periods (was 310.D.WS.L1500 PBB - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 24-May-22 30-May-22 26-May-22 01-Jun-22 2 Hols - No B/O periods (was PBB - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols35 - No B/O periods 0 (was26-Apr-22 C1) 30-May-22 28-Apr-22 01-Jun-22 2 310.D.WS.L1512 PBB - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 7 26-Apr-22 02-May-22 28-Apr-22 04-May-22 2 Hols - No B/O periods (was 310.D.WS.L1740 PBB - ABWF - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 14 03-May-22 16-May-22 05-May-22 18-May-22 2 Hols - No B/O periods (was 310.D.WS.L1736 PBB - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 17-May-22 23-May-22 19-May-22 25-May-22 2 Hols - No B/O periods (was 310.D.WS.L1516 PBB - ABWF - Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 24-May-22 30-May-22 26-May-22 01-Jun-22 2 Hols - No B/O periods (was CC#07 - WVT - Submission of Method Statement and Shop Drawings C1) C01_7 d/w - 10h/d - No HK Hols384 - No B/O periods 0 (was 09-Oct-21 C1) A 27-Oct-22 26-Jul-22 11-Jul-23 257 CC#07 - WVT - Method Statement of WVT Construction C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was 09-Oct-21 C1) A 23-Apr-22 26-Jul-22 21-Sep-22 151 310.D.TX.A196 MS no.14 - Method Statement for WVT Construction - prepare document C01_7 d/w - 10h/d - No HK 30 09-Oct-21 A 12-Nov-21 A 26-Jul-22 26-Jul-22 Hols - No B/O periods (was 310.D.TX.A200 MS no.14 - Method Statement for WVT Construction - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 13-Nov-21 A 23-Apr-22 25-Aug-22 21-Sep-22 151 Hols - No B/O periods (was CC#07 - WVT - Method Statement for Plate Load Test C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was31-Aug-22 C1) 27-Oct-22 15-May-23 11-Jul-23 257 310.D.TX.A332 Method Statement for Plate Load Test - prepare document C01_7 d/w - 10h/d - No HK 30 31-Aug-22 29-Sep-22 15-May-23 13-Jun-23 257 Hols - No B/O periods (was 310.D.TX.A336 Method Statement for Plate Load Test - BD Acknowledge C1) C01_7 d/w - 10h/d - No HK 28 30-Sep-22 27-Oct-22 14-Jun-23 11-Jul-23 257 Hols - No B/O periods (was CC#07 - General - MEP - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols294 - No B/O periods 0 (was 27-Jan-22 C1) A 16-Nov-22 28-Mar-22 19-Nov-22 3 Preliminaries C01_7 d/w - 10h/d - No HK Hols 7- No B/O periods 0 (was 27-Jan-22 C1) A 08-Feb-22 A 28-Mar-22 25-Apr-22 310.C.EX.S000.01bB02 Contract award (Tentative) C01_7 d/w - 10h/d - No HK 0 27-Jan-22 A 28-Mar-22 Hols - No B/O periods (was 310.C.EX.S000.02bB02 Mobilization C1) C01_7 d/w - 10h/d - No HK 0 27-Jan-22 A 02-Feb-22 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.C.EX.S000.03bB02 Prepare and submit O Chart C1) C01_7 d/w - 10h/d - No HK 0 03-Feb-22 A 07-Feb-22 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.C.EX.S000.04bB02 Prepare and submit Equipment/Material Submission Schedule C1) C01_7 d/w - 10h/d - No HK 0 03-Feb-22 A 08-Feb-22 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.C.EX.S000.05bB02 Prepare and submit Drawing Submission Shcedule C1) C01_7 d/w - 10h/d - No HK 0 03-Feb-22 A 08-Feb-22 A 25-Apr-22 25-Apr-22 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 128 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Electrical C01_7 d/w - 10h/d - No HK Hols103 - No B/O periods 0 (was 06-Mar-22 C1) A 16-Jun-22 23-Apr-22 01-Aug-22 46 Armoured Cable C01_7 d/w - 10h/d - No HK Hols53 - No B/O periods 0 (was 14-Mar-22 C1) A 18-May-22 22-May-22 13-Jul-22 56 310.D.WS.L992.01bB02Prepare and submit info. of Armoured Cable C01_7 d/w - 10h/d - No HK 0 14-Mar-22 A 07-Apr-22 22-May-22 02-Jun-22 56 Hols - No B/O periods (was 310.D.WS.L993.01bB02Review and comment info. of Armoured Cable C1) C01_7 d/w - 10h/d - No HK 23 08-Apr-22 30-Apr-22 03-Jun-22 25-Jun-22 56 Hols - No B/O periods (was 310.D.WS.L994.01bB02Prepare and re-submit info. of Armoured Cable C1) C01_7 d/w - 10h/d - No HK 9 01-May-22 09-May-22 26-Jun-22 04-Jul-22 56 Hols - No B/O periods (was 310.D.WS.L996.01bB02Obtain "No objection" of Armoured Cable C1) C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 05-Jul-22 13-Jul-22 56 Hols - No B/O periods (was FR Cable C1) C01_7 d/w - 10h/d - No HK Hols82 - No B/O periods 0 (was 14-Mar-22 C1) A 16-Jun-22 23-Apr-22 13-Jul-22 27 310.D.WS.L992.02bB02Prepare and submit info. of FR Cable C01_7 d/w - 10h/d - No HK 0 14-Mar-22 A 07-Apr-22 23-Apr-22 04-May-22 27 Hols - No B/O periods (was 310.D.WS.L993.02bB02Review and comment info. of FR Cable C1) C01_7 d/w - 10h/d - No HK 24 08-Apr-22 01-May-22 05-May-22 28-May-22 27 Hols - No B/O periods (was 310.D.WS.L994.02bB02Prepare and re-submit info. of FR Cable C1) C01_7 d/w - 10h/d - No HK 22 02-May-22 23-May-22 29-May-22 19-Jun-22 27 Hols - No B/O periods (was 310.D.WS.L996.02bB02Obtain "No objection" of FR Cable C1) C01_7 d/w - 10h/d - No HK 24 24-May-22 16-Jun-22 20-Jun-22 13-Jul-22 27 Hols - No B/O periods (was Single Core Cable C1) C01_7 d/w - 10h/d - No HK Hols46 - No B/O periods 0 (was 14-Mar-22 C1) A 19-May-22 21-May-22 13-Jul-22 55 310.D.WS.L992.03bB02Prepare and submit info. of Single Core Cable C01_7 d/w - 10h/d - No HK 0 14-Mar-22 A 07-Apr-22 21-May-22 01-Jun-22 55 Hols - No B/O periods (was 310.D.WS.L993.03bB02Review and comment info. of Single Core Cable C1) C01_7 d/w - 10h/d - No HK 24 08-Apr-22 01-May-22 02-Jun-22 25-Jun-22 55 Hols - No B/O periods (was 310.D.WS.L994.03bB02Prepare and re-submit info. of Single Core Cable C1) C01_7 d/w - 10h/d - No HK 9 02-May-22 10-May-22 26-Jun-22 04-Jul-22 55 Hols - No B/O periods (was 310.D.WS.L996.03bB02Obtain "No objection" of Single Core Cable C1) C01_7 d/w - 10h/d - No HK 9 11-May-22 19-May-22 05-Jul-22 13-Jul-22 55 Hols - No B/O periods (was General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK Hols60 - No B/O periods 0 (was 20-Mar-22 C1) A 19-May-22 21-May-22 13-Jul-22 55 310.D.WS.L992.04bB02Prepare and submit info. of General Lighting (included E-Lighting) C01_7 d/w - 10h/d - No HK 12 20-Mar-22 A 07-Apr-22 21-May-22 01-Jun-22 55 Hols - No B/O periods (was 310.D.WS.L993.04bB02Review and comment info. of General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK 24 08-Apr-22 01-May-22 02-Jun-22 25-Jun-22 55 Hols - No B/O periods (was 310.D.WS.L994.04bB02Prepare and re-submit info. of General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK 9 02-May-22 10-May-22 26-Jun-22 04-Jul-22 55 Hols - No B/O periods (was 310.D.WS.L996.04bB02Obtain "No objection" of General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK 9 11-May-22 19-May-22 05-Jul-22 13-Jul-22 55 Hols - No B/O periods (was Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK Hols68 - No B/O periods 0 (was 11-Mar-22 C1) A 17-May-22 23-May-22 13-Jul-22 57 310.D.WS.L992.05bB02Prepare and submit info. of Distribution Board for MCB, MCCB & Accessories C01_7 d/w - 10h/d - No HK 10 11-Mar-22 A 05-Apr-22 23-May-22 01-Jun-22 57 Hols - No B/O periods (was 310.D.WS.L993.05bB02Review and comment info. of Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 24 06-Apr-22 29-Apr-22 02-Jun-22 25-Jun-22 57 Hols - No B/O periods (was 310.D.WS.L994.05bB02Prepare and re-submit info. of Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 30-Apr-22 08-May-22 26-Jun-22 04-Jul-22 57 Hols - No B/O periods (was 310.D.WS.L996.05bB02Obtain "No objection" of Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 09-May-22 17-May-22 05-Jul-22 13-Jul-22 57 Hols - No B/O periods (was MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK Hols64 - No B/O periods 0 (was 11-Mar-22 C1) A 13-May-22 27-May-22 13-Jul-22 61 310.D.WS.L992.06bB02Prepare and submit info. of MCB, MCCB & Accessories C01_7 d/w - 10h/d - No HK 6 11-Mar-22 A 01-Apr-22 27-May-22 01-Jun-22 61 Hols - No B/O periods (was 310.D.WS.L993.06bB02Review and comment info. of MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 24 02-Apr-22 25-Apr-22 02-Jun-22 25-Jun-22 61 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 129 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L994.06bB02Prepare and re-submit info. of MCB, MCCB & Accessories C01_7 d/w - 10h/d - No HK 9 26-Apr-22 04-May-22 26-Jun-22 04-Jul-22 61 Hols - No B/O periods (was 310.D.WS.L996.06bB02Obtain "No objection" of MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 05-May-22 13-May-22 05-Jul-22 13-Jul-22 61 Hols - No B/O periods (was Busduct C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was04-Apr-22 C1) 04-Jun-22 01-Jun-22 01-Aug-22 58 310.D.WS.L992.07bB02Prepare and submit info. of Busduct C01_7 d/w - 10h/d - No HK 20 04-Apr-22 23-Apr-22 01-Jun-22 20-Jun-22 58 Hols - No B/O periods (was 310.D.WS.L993.07bB02Review and comment info. of Busduct C1) C01_7 d/w - 10h/d - No HK 24 24-Apr-22 17-May-22 21-Jun-22 14-Jul-22 58 Hols - No B/O periods (was 310.D.WS.L994.07bB02Prepare and re-submit info. of Busduct C1) C01_7 d/w - 10h/d - No HK 9 18-May-22 26-May-22 15-Jul-22 23-Jul-22 58 Hols - No B/O periods (was 310.D.WS.L996.07bB02Obtain "No objection" of Busduct C1) C01_7 d/w - 10h/d - No HK 9 27-May-22 04-Jun-22 24-Jul-22 01-Aug-22 58 Hols - No B/O periods (was Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was04-Apr-22 C1) 04-Jun-22 01-Jun-22 01-Aug-22 58 310.D.WS.L992.08bB02Prepare and submit info. of Water Leakage Detection System C01_7 d/w - 10h/d - No HK 20 04-Apr-22 23-Apr-22 01-Jun-22 20-Jun-22 58 Hols - No B/O periods (was 310.D.WS.L993.08bB02Review and comment info. of Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK 24 24-Apr-22 17-May-22 21-Jun-22 14-Jul-22 58 Hols - No B/O periods (was 310.D.WS.L994.08bB02Prepare and re-submit info. of Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK 9 18-May-22 26-May-22 15-Jul-22 23-Jul-22 58 Hols - No B/O periods (was 310.D.WS.L996.08bB02Obtain "No objection" of Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK 9 27-May-22 04-Jun-22 24-Jul-22 01-Aug-22 58 Hols - No B/O periods (was MICC Cable C1) C01_7 d/w - 10h/d - No HK Hols76 - No B/O periods 0 (was 07-Mar-22 C1) A 21-May-22 07-Jun-22 01-Aug-22 72 310.D.WS.L992.09bB02Prepare and submit info. of MICC Cable C01_7 d/w - 10h/d - No HK 14 07-Mar-22 A 09-Apr-22 07-Jun-22 20-Jun-22 72 Hols - No B/O periods (was 310.D.WS.L993.09bB02Review and comment info. of MICC Cable C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-Jun-22 14-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L994.09bB02Prepare and re-submit info. of MICC Cable C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 15-Jul-22 23-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L996.09bB02Obtain "No objection" of MICC Cable C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 24-Jul-22 01-Aug-22 72 Hols - No B/O periods (was LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 07-Jun-22 01-Aug-22 72 310.D.WS.L992.10bB02Prepare and submit info. of LV Switchboards & Accessories C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 07-Jun-22 20-Jun-22 72 Hols - No B/O periods (was 310.D.WS.L993.10bB02Review and comment info. of LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-Jun-22 14-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L994.10bB02Prepare and re-submit info. of LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 15-Jul-22 23-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L996.10bB02Obtain "No objection" of LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 24-Jul-22 01-Aug-22 72 Hols - No B/O periods (was ACB & Accessories C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 07-Jun-22 01-Aug-22 72 310.D.WS.L992.11bB02Prepare and submit info. of ACB & Accessories C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 07-Jun-22 20-Jun-22 72 Hols - No B/O periods (was 310.D.WS.L993.11bB02Review and comment info. of ACB & Accessories C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-Jun-22 14-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L994.11bB02Prepare and re-submit info. of ACB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 15-Jul-22 23-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L996.11bB02Obtain "No objection" of ACB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 24-Jul-22 01-Aug-22 72 Hols - No B/O periods (was Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 07-Jun-22 01-Aug-22 72
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 130 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L992.12bB02Prepare and submit info. of Automatic Transfer Switch C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 07-Jun-22 20-Jun-22 72 Hols - No B/O periods (was 310.D.WS.L993.12bB02Review and comment info. of Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-Jun-22 14-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L994.12bB02Prepare and re-submit info. of Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 15-Jul-22 23-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L996.12bB02Obtain "No objection" of Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 24-Jul-22 01-Aug-22 72 Hols - No B/O periods (was Battery Set C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 07-Jun-22 01-Aug-22 72 310.D.WS.L992.13bB02Prepare and submit info. of Battery Set C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 07-Jun-22 20-Jun-22 72 Hols - No B/O periods (was 310.D.WS.L993.13bB02Review and comment info. of Battery Set C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-Jun-22 14-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L994.13bB02Prepare and re-submit info. of Battery Set C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 15-Jul-22 23-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L996.13bB02Obtain "No objection" of Battery Set C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 24-Jul-22 01-Aug-22 72 Hols - No B/O periods (was HRC Fuse for Fuse-switch C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was27-Mar-22 C1) 27-May-22 01-Jun-22 01-Aug-22 66 310.D.WS.L992.14bB02Prepare and submit info. of HRC Fuse for Fuse-switch C01_7 d/w - 10h/d - No HK 20 27-Mar-22 15-Apr-22 01-Jun-22 20-Jun-22 66 Hols - No B/O periods (was 310.D.WS.L993.14bB02Review and comment info. of HRC Fuse for Fuse-switch C1) C01_7 d/w - 10h/d - No HK 24 16-Apr-22 09-May-22 21-Jun-22 14-Jul-22 66 Hols - No B/O periods (was 310.D.WS.L994.14bB02Prepare and re-submit info. of HRC Fuse for Fuse-switch C1) C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 15-Jul-22 23-Jul-22 66 Hols - No B/O periods (was 310.D.WS.L996.14bB02Obtain "No objection" of HRC Fuse for Fuse-switch C1) C01_7 d/w - 10h/d - No HK 9 19-May-22 27-May-22 24-Jul-22 01-Aug-22 66 Hols - No B/O periods (was MCCB C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 07-Jun-22 01-Aug-22 72 310.D.WS.L992.15bB02Prepare and submit info. of MCCB C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 07-Jun-22 20-Jun-22 72 Hols - No B/O periods (was 310.D.WS.L993.15bB02Review and comment info. of MCCB C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-Jun-22 14-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L994.15bB02Prepare and re-submit info. of MCCB C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 15-Jul-22 23-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L996.15bB02Obtain "No objection" of MCCB C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 24-Jul-22 01-Aug-22 72 Hols - No B/O periods (was Digital Protection Device C1) C01_7 d/w - 10h/d - No HK Hols77 - No B/O periods 0 (was 06-Mar-22 C1) A 21-May-22 07-Jun-22 01-Aug-22 72 310.D.WS.L992.16bB02Prepare and submit info. of Digital Protection Device C01_7 d/w - 10h/d - No HK 14 06-Mar-22 A 09-Apr-22 07-Jun-22 20-Jun-22 72 Hols - No B/O periods (was 310.D.WS.L993.16bB02Review and comment info. of Digital Protection Device C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-Jun-22 14-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L994.16bB02Prepare and re-submit info. of Digital Protection Device C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 15-Jul-22 23-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L996.16bB02Obtain "No objection" of Digital Protection Device C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 24-Jul-22 01-Aug-22 72 Hols - No B/O periods (was Capacitor Bank C1) C01_7 d/w - 10h/d - No HK Hols77 - No B/O periods 0 (was 06-Mar-22 C1) A 21-May-22 07-Jun-22 01-Aug-22 72 310.D.WS.L992.17bB02Prepare and submit info. of Capacitor Bank C01_7 d/w - 10h/d - No HK 14 06-Mar-22 A 09-Apr-22 07-Jun-22 20-Jun-22 72 Hols - No B/O periods (was 310.D.WS.L993.17bB02Review and comment info. of Capacitor Bank C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 21-Jun-22 14-Jul-22 72 Hols - No B/O periods (was 310.D.WS.L994.17bB02Prepare and re-submit info. of Capacitor Bank C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 15-Jul-22 23-Jul-22 72 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 131 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L996.17bB02Obtain "No objection" of Capacitor Bank C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 24-Jul-22 01-Aug-22 72 Hols - No B/O periods (was UPS C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was29-Mar-22 C1) 23-May-22 07-Jun-22 01-Aug-22 70 310.D.WS.L992.18bB02Prepare and submit info. of UPS C01_7 d/w - 10h/d - No HK 14 29-Mar-22 11-Apr-22 07-Jun-22 20-Jun-22 70 Hols - No B/O periods (was 310.D.WS.L993.18bB02Review and comment info. of UPS C1) C01_7 d/w - 10h/d - No HK 24 12-Apr-22 05-May-22 21-Jun-22 14-Jul-22 70 Hols - No B/O periods (was 310.D.WS.L994.18bB02Prepare and re-submit info. of UPS C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 15-Jul-22 23-Jul-22 70 Hols - No B/O periods (was 310.D.WS.L996.18bB02Obtain "No objection" of UPS C1) C01_7 d/w - 10h/d - No HK 9 15-May-22 23-May-22 24-Jul-22 01-Aug-22 70 Hols - No B/O periods (was Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was29-Mar-22 C1) 23-May-22 07-Jun-22 01-Aug-22 70 310.D.WS.L992.19bB02Prepare and submit info. of Active Harmoice Filter C01_7 d/w - 10h/d - No HK 14 29-Mar-22 11-Apr-22 07-Jun-22 20-Jun-22 70 Hols - No B/O periods (was 310.D.WS.L993.19bB02Review and comment info. of Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK 24 12-Apr-22 05-May-22 21-Jun-22 14-Jul-22 70 Hols - No B/O periods (was 310.D.WS.L994.19bB02Prepare and re-submit info. of Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 15-Jul-22 23-Jul-22 70 Hols - No B/O periods (was 310.D.WS.L996.19bB02Obtain "No objection" of Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK 9 15-May-22 23-May-22 24-Jul-22 01-Aug-22 70 Hols - No B/O periods (was Isolation Transformer C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was29-Mar-22 C1) 23-May-22 07-Jun-22 01-Aug-22 70 310.D.WS.L992.20bB02Prepare and submit info. of Isolation Transformer C01_7 d/w - 10h/d - No HK 14 29-Mar-22 11-Apr-22 07-Jun-22 20-Jun-22 70 Hols - No B/O periods (was 310.D.WS.L993.20bB02Review and comment info. of Isolation Transformer C1) C01_7 d/w - 10h/d - No HK 24 12-Apr-22 05-May-22 21-Jun-22 14-Jul-22 70 Hols - No B/O periods (was 310.D.WS.L994.20bB02Prepare and re-submit info. of Isolation Transformer C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 15-Jul-22 23-Jul-22 70 Hols - No B/O periods (was 310.D.WS.L996.20bB02Obtain "No objection" of Isolation Transformer C1) C01_7 d/w - 10h/d - No HK 9 15-May-22 23-May-22 24-Jul-22 01-Aug-22 70 Hols - No B/O periods (was By-pass switch C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was27-Mar-22 C1) 27-May-22 01-Jun-22 01-Aug-22 66 310.D.WS.L992.21bB02Prepare and submit info. of By-pass switch C01_7 d/w - 10h/d - No HK 20 27-Mar-22 15-Apr-22 01-Jun-22 20-Jun-22 66 Hols - No B/O periods (was 310.D.WS.L993.21bB02Review and comment info. of By-pass switch C1) C01_7 d/w - 10h/d - No HK 24 16-Apr-22 09-May-22 21-Jun-22 14-Jul-22 66 Hols - No B/O periods (was 310.D.WS.L994.21bB02Prepare and re-submit info. of By-pass switch C1) C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 15-Jul-22 23-Jul-22 66 Hols - No B/O periods (was 310.D.WS.L996.21bB02Obtain "No objection" of By-pass switch C1) C01_7 d/w - 10h/d - No HK 9 19-May-22 27-May-22 24-Jul-22 01-Aug-22 66 Hols - No B/O periods (was LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 14-Jun-22 01-Aug-22 79 310.D.WS.L992.22bB02Prepare and submit info. of LV Generator Set (included Alternator & Diesel Engine) C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 14-Jun-22 20-Jun-22 79 Hols - No B/O periods (was 310.D.WS.L993.22bB02Review and comment info. of LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-Jun-22 14-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L994.22bB02Prepare and re-submit info. of LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 15-Jul-22 23-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L996.22bB02Obtain "No objection" of LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 24-Jul-22 01-Aug-22 79 Hols - No B/O periods (was Generator Controller C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 14-Jun-22 01-Aug-22 79 310.D.WS.L992.23bB02Prepare and submit info. of Generator Controller C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 14-Jun-22 20-Jun-22 79 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 132 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L993.23bB02Review and comment info. of Generator Controller C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-Jun-22 14-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L994.23bB02Prepare and re-submit info. of Generator Controller C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 15-Jul-22 23-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L996.23bB02Obtain "No objection" of Generator Controller C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 24-Jul-22 01-Aug-22 79 Hols - No B/O periods (was Starting Battery System C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 14-Jun-22 01-Aug-22 79 310.D.WS.L992.24bB02Prepare and submit info. of Starting Battery System C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 14-Jun-22 20-Jun-22 79 Hols - No B/O periods (was 310.D.WS.L993.24bB02Review and comment info. of Starting Battery System C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-Jun-22 14-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L994.24bB02Prepare and re-submit info. of Starting Battery System C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 15-Jul-22 23-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L996.24bB02Obtain "No objection" of Starting Battery System C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 24-Jul-22 01-Aug-22 79 Hols - No B/O periods (was Battery Charger C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 14-Jun-22 01-Aug-22 79 310.D.WS.L992.25bB02Prepare and submit info. of Battery Charger C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 14-Jun-22 20-Jun-22 79 Hols - No B/O periods (was 310.D.WS.L993.25bB02Review and comment info. of Battery Charger C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-Jun-22 14-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L994.25bB02Prepare and re-submit info. of Battery Charger C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 15-Jul-22 23-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L996.25bB02Obtain "No objection" of Battery Charger C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 24-Jul-22 01-Aug-22 79 Hols - No B/O periods (was MVAC C1) C01_7 d/w - 10h/d - No HK Hols115 - No B/O periods 0 (was 08-Feb-22 C1) A 26-Jun-22 04-Apr-22 01-Aug-22 36 CRAC Unit C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 14-Jun-22 01-Aug-22 79 310.D.WS.L992.26bB02Prepare and submit info. of CRAC Unit C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 14-Jun-22 20-Jun-22 79 Hols - No B/O periods (was 310.D.WS.L993.26bB02Review and comment info. of CRAC Unit C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-Jun-22 14-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L994.26bB02Prepare and re-submit info. of CRAC Unit C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 15-Jul-22 23-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L996.26bB02Obtain "No objection" of CRAC Unit C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 24-Jul-22 01-Aug-22 79 Hols - No B/O periods (was Axial Fan C1) C01_7 d/w - 10h/d - No HK Hols69 - No B/O periods 0 (was 04-Mar-22 C1) A 11-May-22 04-Apr-22 19-May-22 8 310.D.WS.L992.27bB02Prepare and submit info. of Axial Fan C01_7 d/w - 10h/d - No HK 4 04-Mar-22 A 30-Mar-22 04-Apr-22 07-Apr-22 8 Hols - No B/O periods (was 310.D.WS.L993.27bB02Review and comment info. of Axial Fan C1) C01_7 d/w - 10h/d - No HK 24 31-Mar-22 23-Apr-22 08-Apr-22 01-May-22 8 Hols - No B/O periods (was 310.D.WS.L994.27bB02Prepare and re-submit info. of Axial Fan C1) C01_7 d/w - 10h/d - No HK 9 24-Apr-22 02-May-22 02-May-22 10-May-22 8 Hols - No B/O periods (was 310.D.WS.L996.27bB02Obtain "No objection" of Axial Fan C1) C01_7 d/w - 10h/d - No HK 9 03-May-22 11-May-22 11-May-22 19-May-22 8 Hols - No B/O periods (was Split Type & VRV AC Unit C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 14-Jun-22 01-Aug-22 79 310.D.WS.L992.30bB02Prepare and submit info. of Split Type & VRV AC Unit C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 14-Jun-22 20-Jun-22 79 Hols - No B/O periods (was 310.D.WS.L993.30bB02Review and comment info. of Split Type & VRV AC Unit C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-Jun-22 14-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L994.30bB02Prepare and re-submit info. of Split Type & VRV AC Unit C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 15-Jul-22 23-Jul-22 79 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 133 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L996.30bB02Obtain "No objection" of Split Type & VRV AC Unit C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 24-Jul-22 01-Aug-22 79 Hols - No B/O periods (was Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 04-Apr-22 C1) A 27-May-22 13-May-22 13-Jul-22 47 310.D.WS.L992.31bB02Prepare and submit info. of Tunnel Jet Fan C01_7 d/w - 10h/d - No HK 20 04-Apr-22 A 15-Apr-22 13-May-22 01-Jun-22 47 Hols - No B/O periods (was 310.D.WS.L993.31bB02Review and comment info. of Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK 24 16-Apr-22 09-May-22 02-Jun-22 25-Jun-22 47 Hols - No B/O periods (was 310.D.WS.L994.31bB02Prepare and re-submit info. of Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 26-Jun-22 04-Jul-22 47 Hols - No B/O periods (was 310.D.WS.L996.31bB02Obtain "No objection" of Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK 9 19-May-22 27-May-22 05-Jul-22 13-Jul-22 47 Hols - No B/O periods (was Motor Control Centre C1) C01_7 d/w - 10h/d - No HK Hols55 - No B/O periods 0 (was27-Mar-22 C1) 20-May-22 08-Jun-22 01-Aug-22 73 310.D.WS.L992.33bB02Prepare and submit info. of Motor Control Centre C01_7 d/w - 10h/d - No HK 13 27-Mar-22 08-Apr-22 08-Jun-22 20-Jun-22 73 Hols - No B/O periods (was 310.D.WS.L993.33bB02Review and comment info. of Motor Control Centre C1) C01_7 d/w - 10h/d - No HK 24 09-Apr-22 02-May-22 21-Jun-22 14-Jul-22 73 Hols - No B/O periods (was 310.D.WS.L994.33bB02Prepare and re-submit info. of Motor Control Centre C1) C01_7 d/w - 10h/d - No HK 9 03-May-22 11-May-22 15-Jul-22 23-Jul-22 73 Hols - No B/O periods (was 310.D.WS.L996.33bB02Obtain "No objection" of Motor Control Centre C1) C01_7 d/w - 10h/d - No HK 9 12-May-22 20-May-22 24-Jul-22 01-Aug-22 73 Hols - No B/O periods (was Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK Hols59 - No B/O periods 0 (was27-Mar-22 C1) 24-May-22 16-May-22 13-Jul-22 50 310.D.WS.L992.34bB02Prepare and submit info. of Local Motor Control Panel C01_7 d/w - 10h/d - No HK 17 27-Mar-22 12-Apr-22 16-May-22 01-Jun-22 50 Hols - No B/O periods (was 310.D.WS.L993.34bB02Review and comment info. of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 24 13-Apr-22 06-May-22 02-Jun-22 25-Jun-22 50 Hols - No B/O periods (was 310.D.WS.L994.34bB02Prepare and re-submit info. of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 9 07-May-22 15-May-22 26-Jun-22 04-Jul-22 50 Hols - No B/O periods (was 310.D.WS.L996.34bB02Obtain "No objection" of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 9 16-May-22 24-May-22 05-Jul-22 13-Jul-22 50 Hols - No B/O periods (was MFSD C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 26-May-22 13-Jul-22 60 310.D.WS.L992.35bB02Prepare and submit info. of MFSD C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 26-May-22 01-Jun-22 60 Hols - No B/O periods (was 310.D.WS.L993.35bB02Review and comment info. of MSD C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 02-Jun-22 25-Jun-22 60 Hols - No B/O periods (was 310.D.WS.L994.35bB02Prepare and re-submit info. of MSD C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 26-Jun-22 04-Jul-22 60 Hols - No B/O periods (was 310.D.WS.L996.35bB02Obtain "No objection" of MSD C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 05-Jul-22 13-Jul-22 60 Hols - No B/O periods (was Fire Damper C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 14-Jun-22 01-Aug-22 79 310.D.WS.L992.36bB02Prepare and submit info. of Fire Damper C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 14-Jun-22 20-Jun-22 79 Hols - No B/O periods (was 310.D.WS.L993.36bB02Review and comment info. of Fire Damper C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 21-Jun-22 14-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L994.36bB02Prepare and re-submit info. of Fire Damper C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 15-Jul-22 23-Jul-22 79 Hols - No B/O periods (was 310.D.WS.L996.36bB02Obtain "No objection" of Fire Damper C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 24-Jul-22 01-Aug-22 79 Hols - No B/O periods (was Air Grille & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was21-Apr-22 C1) 26-Jun-22 08-May-22 13-Jul-22 17 310.D.WS.L992.37bB02Prepare and submit info. of Air Grille & Accessories C01_7 d/w - 10h/d - No HK 25 21-Apr-22 15-May-22 08-May-22 01-Jun-22 17 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 134 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L993.37bB02Review and comment info. of Air Grille & Accessories C01_7 d/w - 10h/d - No HK 24 16-May-22 08-Jun-22 02-Jun-22 25-Jun-22 17 Hols - No B/O periods (was 310.D.WS.L994.37bB02Prepare and re-submit info. of Air Grille & Accessories C1) C01_7 d/w - 10h/d - No HK 9 09-Jun-22 17-Jun-22 26-Jun-22 04-Jul-22 17 Hols - No B/O periods (was 310.D.WS.L996.37bB02Obtain "No objection" of Air Grille & Accessories C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 05-Jul-22 13-Jul-22 17 Hols - No B/O periods (was G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was 08-Feb-22 C1) A 23-Mar-22 A 20-May-22 20-May-22 310.D.WS.L992.38bB02Prepare and submit info. of G.I. Sheet Ductwork & Accessories C01_7 d/w - 10h/d - No HK 0 08-Feb-22 A 04-Mar-22 A 20-May-22 20-May-22 Hols - No B/O periods (was 310.D.WS.L993.38bB02Review and comment info. of G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK 0 05-Mar-22 A 23-Mar-22 A 20-May-22 20-May-22 Hols - No B/O periods (was 310.D.WS.L994.38bB02Prepare and re-submit info. of G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK 0 23-Mar-22 A 23-Mar-22 A 20-May-22 20-May-22 Hols - No B/O periods (was 310.D.WS.L996.38bB02Obtain "No objection" of G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK 0 23-Mar-22 A 23-Mar-22 A 20-May-22 20-May-22 Hols - No B/O periods (was Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was07-Apr-22 C1) 12-Jun-22 08-May-22 13-Jul-22 31 310.D.WS.L992.39bB02Prepare and submit info. of Refrigerant Pipework & Fittings C01_7 d/w - 10h/d - No HK 25 07-Apr-22 01-May-22 08-May-22 01-Jun-22 31 Hols - No B/O periods (was 310.D.WS.L993.39bB02Review and comment info. of Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK 24 02-May-22 25-May-22 02-Jun-22 25-Jun-22 31 Hols - No B/O periods (was 310.D.WS.L994.39bB02Prepare and re-submit info. of Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK 9 26-May-22 03-Jun-22 26-Jun-22 04-Jul-22 31 Hols - No B/O periods (was 310.D.WS.L996.39bB02Obtain "No objection" of Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK 9 04-Jun-22 12-Jun-22 05-Jul-22 13-Jul-22 31 Hols - No B/O periods (was Fire Services C1) C01_7 d/w - 10h/d - No HK Hols221 - No B/O periods 0 (was10-Apr-22 C1) 16-Nov-22 08-May-22 19-Nov-22 3 Hose Reel Set C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 26-Jun-22 31-Aug-22 57 310.D.WS.L992.40bB02Prepare and submit info. of Hose Reel Set C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 26-Jun-22 20-Jul-22 57 Hols - No B/O periods (was 310.D.WS.L993.40bB02Review and comment info. of Hose Reel Set C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 21-Jul-22 13-Aug-22 57 Hols - No B/O periods (was 310.D.WS.L994.40bB02Prepare and re-submit info. of Hose Reel Set C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 14-Aug-22 22-Aug-22 57 Hols - No B/O periods (was 310.D.WS.L996.40bB02Obtain "No objection" of Hose Reel Set C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 23-Aug-22 31-Aug-22 57 Hols - No B/O periods (was Fire Hydrant C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 26-Jun-22 31-Aug-22 57 310.D.WS.L992.41bB02Prepare and submit info. of Fire Hydrant C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 26-Jun-22 20-Jul-22 57 Hols - No B/O periods (was 310.D.WS.L993.41bB02Review and comment info. of Fire Hydrant C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 21-Jul-22 13-Aug-22 57 Hols - No B/O periods (was 310.D.WS.L994.41bB02Prepare and re-submit info. of Fire Hydrant C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 14-Aug-22 22-Aug-22 57 Hols - No B/O periods (was 310.D.WS.L996.41bB02Obtain "No objection" of Fire Hydrant C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 23-Aug-22 31-Aug-22 57 Hols - No B/O periods (was Sprinkler Head (All type) C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was05-May-22 C1) 10-Jul-22 14-Sep-22 19-Nov-22 132 310.D.WS.L992.42bB02Prepare and submit info. of Sprinkler Head (All type) C01_7 d/w - 10h/d - No HK 25 05-May-22 29-May-22 14-Sep-22 08-Oct-22 132 Hols - No B/O periods (was 310.D.WS.L993.42bB02Review and comment info. of Sprinkler Head (All type) C1) C01_7 d/w - 10h/d - No HK 24 30-May-22 22-Jun-22 09-Oct-22 01-Nov-22 132 Hols - No B/O periods (was 310.D.WS.L994.42bB02Prepare and re-submit info. of Sprinkler Head (All type) C1) C01_7 d/w - 10h/d - No HK 9 23-Jun-22 01-Jul-22 02-Nov-22 10-Nov-22 132 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 135 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L996.42bB02Obtain "No objection" of Sprinkler Head (All type) C01_7 d/w - 10h/d - No HK 9 02-Jul-22 10-Jul-22 11-Nov-22 19-Nov-22 132 Hols - No B/O periods (was MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was14-May-22 C1) 19-Jul-22 26-Jun-22 31-Aug-22 43 310.D.WS.L992.43bB02Prepare and submit info. of MCC/ LMCP C01_7 d/w - 10h/d - No HK 25 14-May-22 07-Jun-22 26-Jun-22 20-Jul-22 43 Hols - No B/O periods (was 310.D.WS.L993.43bB02Review and comment info. of MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK 24 08-Jun-22 01-Jul-22 21-Jul-22 13-Aug-22 43 Hols - No B/O periods (was 310.D.WS.L994.43bB02Prepare and re-submit info. of MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK 9 02-Jul-22 10-Jul-22 14-Aug-22 22-Aug-22 43 Hols - No B/O periods (was 310.D.WS.L996.43bB02Obtain "No objection" of MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK 9 11-Jul-22 19-Jul-22 23-Aug-22 31-Aug-22 43 Hols - No B/O periods (was FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was29-May-22 C1) 03-Aug-22 26-Jun-22 31-Aug-22 28 310.D.WS.L992.45bB02Prepare and submit info. of FS Jockey Pump C01_7 d/w - 10h/d - No HK 25 29-May-22 22-Jun-22 26-Jun-22 20-Jul-22 28 Hols - No B/O periods (was 310.D.WS.L993.45bB02Review and comment info. of FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK 24 23-Jun-22 16-Jul-22 21-Jul-22 13-Aug-22 28 Hols - No B/O periods (was 310.D.WS.L994.45bB02Prepare and re-submit info. of FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 17-Jul-22 25-Jul-22 14-Aug-22 22-Aug-22 28 Hols - No B/O periods (was 310.D.WS.L996.45bB02Obtain "No objection" of FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 26-Jul-22 03-Aug-22 23-Aug-22 31-Aug-22 28 Hols - No B/O periods (was G.I. Pipe & Fittings C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was22-May-22 C1) 27-Jul-22 26-Jun-22 31-Aug-22 35 310.D.WS.L992.48bB02Prepare and submit info. of G.I. Pipe & Fittings C01_7 d/w - 10h/d - No HK 25 22-May-22 15-Jun-22 26-Jun-22 20-Jul-22 35 Hols - No B/O periods (was 310.D.WS.L993.48bB02Review and comment info. of G.I. Pipe & Fittings C1) C01_7 d/w - 10h/d - No HK 24 16-Jun-22 09-Jul-22 21-Jul-22 13-Aug-22 35 Hols - No B/O periods (was 310.D.WS.L994.48bB02Prepare and re-submit info. of G.I. Pipe & Fittings C1) C01_7 d/w - 10h/d - No HK 9 10-Jul-22 18-Jul-22 14-Aug-22 22-Aug-22 35 Hols - No B/O periods (was 310.D.WS.L996.48bB02Obtain "No objection" of G.I. Pipe & Fittings C1) C01_7 d/w - 10h/d - No HK 9 19-Jul-22 27-Jul-22 23-Aug-22 31-Aug-22 35 Hols - No B/O periods (was Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was10-Apr-22 C1) 15-Jun-22 26-Jun-22 31-Aug-22 77 310.D.WS.L992.49bB02Prepare and submit info. of Automatic Fire Alarm Control Panel C01_7 d/w - 10h/d - No HK 25 10-Apr-22 04-May-22 26-Jun-22 20-Jul-22 77 Hols - No B/O periods (was 310.D.WS.L993.49bB02Review and comment info. of Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK 24 05-May-22 28-May-22 21-Jul-22 13-Aug-22 77 Hols - No B/O periods (was 310.D.WS.L994.49bB02Prepare and re-submit info. of Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK 9 29-May-22 06-Jun-22 14-Aug-22 22-Aug-22 77 Hols - No B/O periods (was 310.D.WS.L996.49bB02Obtain "No objection" of Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK 9 07-Jun-22 15-Jun-22 23-Aug-22 31-Aug-22 77 Hols - No B/O periods (was Gas Flooding System C1) C01_7 d/w - 10h/d - No HK Hols46 - No B/O periods 0 (was13-Apr-22 C1) 28-May-22 08-May-22 22-Jun-22 25 310.D.WS.L992.50bB02Prepare and submit info. of Gas Flooding System C01_7 d/w - 10h/d - No HK 14 13-Apr-22 26-Apr-22 08-May-22 21-May-22 25 Hols - No B/O periods (was 310.D.WS.L993.50bB02Review and comment info. of Gas Flooding System C1) C01_7 d/w - 10h/d - No HK 14 27-Apr-22 10-May-22 22-May-22 04-Jun-22 25 Hols - No B/O periods (was 310.D.WS.L994.50bB02Prepare and re-submit info. of Gas Flooding System C1) C01_7 d/w - 10h/d - No HK 9 11-May-22 19-May-22 05-Jun-22 13-Jun-22 25 Hols - No B/O periods (was 310.D.WS.L996.50bB02Obtain "No objection" of Gas Flooding System C1) C01_7 d/w - 10h/d - No HK 9 20-May-22 28-May-22 14-Jun-22 22-Jun-22 25 Hols - No B/O periods (was Automatic Sprinkler Jockey Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was11-Sep-22 C1) 16-Nov-22 14-Sep-22 19-Nov-22 3 310.D.WS.L992.52bB02Prepare and submit info. of Automatic Sprinkler Jockey Pump C01_7 d/w - 10h/d - No HK 25 11-Sep-22 05-Oct-22 14-Sep-22 08-Oct-22 3 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 136 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L993.52bB02Review and comment info. of Automatic Sprinkler Jockey Pump C01_7 d/w - 10h/d - No HK 24 06-Oct-22 29-Oct-22 09-Oct-22 01-Nov-22 3 Hols - No B/O periods (was 310.D.WS.L994.52bB02Prepare and re-submit info. of Automatic Sprinkler Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 30-Oct-22 07-Nov-22 02-Nov-22 10-Nov-22 3 Hols - No B/O periods (was 310.D.WS.L996.52bB02Obtain "No objection" of Automatic Sprinkler Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 08-Nov-22 16-Nov-22 11-Nov-22 19-Nov-22 3 Hols - No B/O periods (was Smoke Detector C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was10-May-22 C1) 15-Jul-22 26-Jun-22 31-Aug-22 47 310.D.WS.L992.53bB02Prepare and submit info. of Smoke Detector C01_7 d/w - 10h/d - No HK 25 10-May-22 03-Jun-22 26-Jun-22 20-Jul-22 47 Hols - No B/O periods (was 310.D.WS.L993.53bB02Review and comment info. of Smoke Detector C1) C01_7 d/w - 10h/d - No HK 24 04-Jun-22 27-Jun-22 21-Jul-22 13-Aug-22 47 Hols - No B/O periods (was 310.D.WS.L994.53bB02Prepare and re-submit info. of Smoke Detector C1) C01_7 d/w - 10h/d - No HK 9 28-Jun-22 06-Jul-22 14-Aug-22 22-Aug-22 47 Hols - No B/O periods (was 310.D.WS.L996.53bB02Obtain "No objection" of Smoke Detector C1) C01_7 d/w - 10h/d - No HK 9 07-Jul-22 15-Jul-22 23-Aug-22 31-Aug-22 47 Hols - No B/O periods (was Heat Detector C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was24-Jun-22 C1) 29-Aug-22 26-Jun-22 31-Aug-22 2 310.D.WS.L992.54bB02Prepare and submit info. of Heat Detector C01_7 d/w - 10h/d - No HK 25 24-Jun-22 18-Jul-22 26-Jun-22 20-Jul-22 2 Hols - No B/O periods (was 310.D.WS.L993.54bB02Review and comment info. of Heat Detector C1) C01_7 d/w - 10h/d - No HK 24 19-Jul-22 11-Aug-22 21-Jul-22 13-Aug-22 2 Hols - No B/O periods (was 310.D.WS.L994.54bB02Prepare and re-submit info. of Heat Detector C1) C01_7 d/w - 10h/d - No HK 9 12-Aug-22 20-Aug-22 14-Aug-22 22-Aug-22 2 Hols - No B/O periods (was 310.D.WS.L996.54bB02Obtain "No objection" of Heat Detector C1) C01_7 d/w - 10h/d - No HK 9 21-Aug-22 29-Aug-22 23-Aug-22 31-Aug-22 2 Hols - No B/O periods (was Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was24-Jun-22 C1) 29-Aug-22 26-Jun-22 31-Aug-22 2 310.D.WS.L992.55bB02Prepare and submit info. of Cable Tray & Accessories C01_7 d/w - 10h/d - No HK 25 24-Jun-22 18-Jul-22 26-Jun-22 20-Jul-22 2 Hols - No B/O periods (was 310.D.WS.L993.55bB02Review and comment info. of Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK 24 19-Jul-22 11-Aug-22 21-Jul-22 13-Aug-22 2 Hols - No B/O periods (was 310.D.WS.L994.55bB02Prepare and re-submit info. of Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK 9 12-Aug-22 20-Aug-22 14-Aug-22 22-Aug-22 2 Hols - No B/O periods (was 310.D.WS.L996.55bB02Obtain "No objection" of Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK 9 21-Aug-22 29-Aug-22 23-Aug-22 31-Aug-22 2 Hols - No B/O periods (was PLC C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was11-May-22 C1) 16-Jul-22 26-Jun-22 31-Aug-22 46 310.D.WS.L992.58bB02Prepare and submit info. of PLC C01_7 d/w - 10h/d - No HK 25 11-May-22 04-Jun-22 26-Jun-22 20-Jul-22 46 Hols - No B/O periods (was 310.D.WS.L993.58bB02Review and comment info. of PLC C1) C01_7 d/w - 10h/d - No HK 24 05-Jun-22 28-Jun-22 21-Jul-22 13-Aug-22 46 Hols - No B/O periods (was 310.D.WS.L994.58bB02Prepare and re-submit info. of PLC C1) C01_7 d/w - 10h/d - No HK 9 29-Jun-22 07-Jul-22 14-Aug-22 22-Aug-22 46 Hols - No B/O periods (was 310.D.WS.L996.58bB02Obtain "No objection" of PLC C1) C01_7 d/w - 10h/d - No HK 9 08-Jul-22 16-Jul-22 23-Aug-22 31-Aug-22 46 Hols - No B/O periods (was Plumbing and Drainage C1) C01_7 d/w - 10h/d - No HK Hols215 - No B/O periods 0 (was27-Mar-22 C1) 27-Oct-22 28-Mar-22 19-Nov-22 23 Fibreglass Tank C01_7 d/w - 10h/d - No HK Hols57 - No B/O periods 0 (was27-Mar-22 C1) 22-May-22 28-Mar-22 23-May-22 1 310.D.WS.L992.59bB02Prepare and submit info. of Fribreglass Tank C01_7 d/w - 10h/d - No HK 18 27-Mar-22 13-Apr-22 28-Mar-22 14-Apr-22 1 Hols - No B/O periods (was 310.D.WS.L993.59bB02Review and comment info. of Fribreglass Tank C1) C01_7 d/w - 10h/d - No HK 21 14-Apr-22 04-May-22 15-Apr-22 05-May-22 1 Hols - No B/O periods (was 310.D.WS.L994.59bB02Prepare and re-submit info. of Fribreglass Tank C1) C01_7 d/w - 10h/d - No HK 9 05-May-22 13-May-22 06-May-22 14-May-22 1 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 137 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L996.59bB02Obtain "No objection" of Fribreglass Tank C01_7 d/w - 10h/d - No HK 9 14-May-22 22-May-22 15-May-22 23-May-22 1 Hols - No B/O periods (was Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 14-Sep-22 19-Nov-22 137 310.D.WS.L992.64bB02Prepare and submit info. of Ductile Iron Pipe & Accessories C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 14-Sep-22 08-Oct-22 137 Hols - No B/O periods (was 310.D.WS.L993.64bB02Review and comment info. of Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 09-Oct-22 01-Nov-22 137 Hols - No B/O periods (was 310.D.WS.L994.64bB02Prepare and re-submit info. of Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 02-Nov-22 10-Nov-22 137 Hols - No B/O periods (was 310.D.WS.L996.64bB02Obtain "No objection" of Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 11-Nov-22 19-Nov-22 137 Hols - No B/O periods (was Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 26-Jun-22 31-Aug-22 57 310.D.WS.L992.65bB02Prepare and submit info. of Epoxy Cast Iron Pipe & Accessories C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 26-Jun-22 20-Jul-22 57 Hols - No B/O periods (was 310.D.WS.L993.65bB02Review and comment info. of Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 21-Jul-22 13-Aug-22 57 Hols - No B/O periods (was 310.D.WS.L994.65bB02Prepare and re-submit info. of Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 14-Aug-22 22-Aug-22 57 Hols - No B/O periods (was 310.D.WS.L996.65bB02Obtain "No objection" of Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 23-Aug-22 31-Aug-22 57 Hols - No B/O periods (was Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was13-Jun-22 C1) 18-Aug-22 14-Sep-22 19-Nov-22 93 310.D.WS.L992.66bB02Prepare and submit info. of Local Motor Control Panel C01_7 d/w - 10h/d - No HK 25 13-Jun-22 07-Jul-22 14-Sep-22 08-Oct-22 93 Hols - No B/O periods (was 310.D.WS.L993.66bB02Review and comment info. of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 24 08-Jul-22 31-Jul-22 09-Oct-22 01-Nov-22 93 Hols - No B/O periods (was 310.D.WS.L994.66bB02Prepare and re-submit info. of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 9 01-Aug-22 09-Aug-22 02-Nov-22 10-Nov-22 93 Hols - No B/O periods (was 310.D.WS.L996.66bB02Obtain "No objection" of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 9 10-Aug-22 18-Aug-22 11-Nov-22 19-Nov-22 93 Hols - No B/O periods (was Sump Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was22-Aug-22 C1) 27-Oct-22 14-Sep-22 19-Nov-22 23 310.D.WS.L992.67bB02Prepare and submit info. of Sump Pump C01_7 d/w - 10h/d - No HK 25 22-Aug-22 15-Sep-22 14-Sep-22 08-Oct-22 23 Hols - No B/O periods (was 310.D.WS.L993.67bB02Review and comment info. of Sump Pump C1) C01_7 d/w - 10h/d - No HK 24 16-Sep-22 09-Oct-22 09-Oct-22 01-Nov-22 23 Hols - No B/O periods (was 310.D.WS.L994.67bB02Prepare and re-submit info. of Sump Pump C1) C01_7 d/w - 10h/d - No HK 9 10-Oct-22 18-Oct-22 02-Nov-22 10-Nov-22 23 Hols - No B/O periods (was 310.D.WS.L996.67bB02Obtain "No objection" of Sump Pump C1) C01_7 d/w - 10h/d - No HK 9 19-Oct-22 27-Oct-22 11-Nov-22 19-Nov-22 23 Hols - No B/O periods (was CC#07 - General - MEP - Method Statement C1) C01_7 d/w - 10h/d - No HK Hols260 - No B/O periods 0 (was27-Mar-22 C1) 11-Dec-22 25-Apr-22 09-Jan-23 29 ELECT C01_7 d/w - 10h/d - No HK Hols210 - No B/O periods 0 (was27-Mar-22 C1) 22-Oct-22 05-May-22 30-Nov-22 39 310.D.WS.L984.05bB02 Prepare and submit Elect. Method Statement (15 nos.) C01_7 d/w - 10h/d - No HK 165 27-Mar-22 07-Sep-22 05-May-22 16-Oct-22 39 Hols - No B/O periods (was 310.D.WS.L985.05bB02 Review and comment Elect. Method Statement (15 nos.) C1) C01_7 d/w - 10h/d - No HK 165 11-Apr-22 22-Sep-22 20-May-22 31-Oct-22 39 Hols - No B/O periods (was 310.D.WS.L986.05bB02 Prepare and re-submit Elect. Method Statement (15 nos.) C1) C01_7 d/w - 10h/d - No HK 165 26-Apr-22 07-Oct-22 04-Jun-22 15-Nov-22 39 Hols - No B/O periods (was 310.D.WS.L988.05bB02 Obtain approval of Elect. Method Statement (15 nos.) C1) C01_7 d/w - 10h/d - No HK 165 11-May-22 22-Oct-22 19-Jun-22 30-Nov-22 39 Hols - No B/O periods (was MVAC C1) C01_7 d/w - 10h/d - No HK Hols260 - No B/O periods 0 (was27-Mar-22 C1) 11-Dec-22 25-Apr-22 09-Jan-23 29 310.D.WS.L984.06bB02 Prepare and submit MVAC Method Statement (13 nos.) C01_7 d/w - 10h/d - No HK 215 27-Mar-22 27-Oct-22 25-Apr-22 25-Nov-22 29 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 138 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L985.06bB02 Review and comment MVAC Method Statement (13 nos.) C01_7 d/w - 10h/d - No HK 215 11-Apr-22 11-Nov-22 10-May-22 10-Dec-22 29 Hols - No B/O periods (was 310.D.WS.L986.06bB02 Prepare and re-submit MVAC Method Statement (13 nos.) C1) C01_7 d/w - 10h/d - No HK 215 26-Apr-22 26-Nov-22 25-May-22 25-Dec-22 29 Hols - No B/O periods (was 310.D.WS.L988.06bB02 Obtain approval of MVAC Method Statement (13 nos.) C1) C01_7 d/w - 10h/d - No HK 215 11-May-22 11-Dec-22 09-Jun-22 09-Jan-23 29 Hols - No B/O periods (was FS C1) C01_7 d/w - 10h/d - No HK Hols138 - No B/O periods 0 (was01-May-22 C1) 15-Sep-22 26-Jun-22 10-Nov-22 56 310.D.WS.L984.07bB02 Prepare and submit FS Method Statement (12 nos.) C01_7 d/w - 10h/d - No HK 93 01-May-22 01-Aug-22 26-Jun-22 26-Sep-22 56 Hols - No B/O periods (was 310.D.WS.L985.07bB02 Review and comment FS Method Statement (12 nos.) C1) C01_7 d/w - 10h/d - No HK 93 16-May-22 16-Aug-22 11-Jul-22 11-Oct-22 56 Hols - No B/O periods (was 310.D.WS.L986.07bB02 Prepare and re-submit FS Method Statement (12 nos.) C1) C01_7 d/w - 10h/d - No HK 93 31-May-22 31-Aug-22 26-Jul-22 26-Oct-22 56 Hols - No B/O periods (was 310.D.WS.L988.07bB02 Obtain approval of FS Method Statement (12 nos.) C1) C01_7 d/w - 10h/d - No HK 93 15-Jun-22 15-Sep-22 10-Aug-22 10-Nov-22 56 Hols - No B/O periods (was P&D C1) C01_7 d/w - 10h/d - No HK Hols199 - No B/O periods 0 (was27-Mar-22 C1) 11-Oct-22 28-May-22 12-Dec-22 62 310.D.WS.L984.08bB02 Prepare and submit P&D Method Statement (5 nos.) C01_7 d/w - 10h/d - No HK 154 27-Mar-22 27-Aug-22 28-May-22 28-Oct-22 62 Hols - No B/O periods (was 310.D.WS.L985.08bB02 Review and comment P&D Method Statement (5 nos.) C1) C01_7 d/w - 10h/d - No HK 154 11-Apr-22 11-Sep-22 12-Jun-22 12-Nov-22 62 Hols - No B/O periods (was 310.D.WS.L986.08bB02 Prepare and re-submit P&D Method Statement (5 nos.) C1) C01_7 d/w - 10h/d - No HK 154 26-Apr-22 26-Sep-22 27-Jun-22 27-Nov-22 62 Hols - No B/O periods (was 310.D.WS.L988.08bB02 Obtain approval of P&D Method Statement (5 nos.) C1) C01_7 d/w - 10h/d - No HK 154 11-May-22 11-Oct-22 12-Jul-22 12-Dec-22 62 Hols - No B/O periods (was CC#07 ----- Procurement ----- C1) C01_7 d/w - 10h/d - No HK Hols384 - No B/O periods 0 (was 30-Oct-21 C1) A 27-Nov-22 29-Mar-22 01-May-23 155 CC#07 - Subletting - West Vehicular Tunnel (WVT) C01_7 d/w - 10h/d - No HK Hols324 - No B/O periods 0 (was 30-Oct-21 C1) A 28-Sep-22 29-Mar-22 01-May-23 215 310.P.EX.H202 Subletting - WVT & Plant B MEP - Award sub-contract C01_7 d/w - 10h/d - No HK 90 30-Oct-21 A 18-Jan-22 A 16-Jun-22 16-Jun-22 Hols - No B/O periods (was 310.P.EX.H210 Subletting - ABWF (Plastering) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 20-Apr-22 03-Apr-22 27-Apr-22 7 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.H226.B01 Subletting - ABWF (Painting) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 29-Mar-22 27-Apr-22 2 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.H230.B01 Subletting - ABWF (Door) - Stage 1&2 Preparation,Submission& Approval,Tender&Award C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 29-Mar-22 27-Apr-22 2 sub-contract Hols - No B/O periods (was 310.P.EX.H234.B01 Subletting - ABWF (Louver,Window,etc) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 29-Mar-22 27-Apr-22 2 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.H238.B01 Subletting - ABWF (Steel&Metal) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 29-Mar-22 27-Apr-22 2 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F054 Subletting - WVT - Earthwork - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 01-May-22 29-Jul-22 01-Jul-22 28-Sep-22 61 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F096 Subletting - WVT - RC Structural Works - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 01-Jul-22 28-Sep-22 01-Feb-23 01-May-23 215 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F160 Subletting - WVT - Waterproofing - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 01-Jul-22 28-Sep-22 01-Feb-23 01-May-23 215 Approval,Tender&Award sub-contract Hols - No B/O periods (was CC#07 - Procurement - West Vehicular Tunnel (WVT) C1) C01_7 d/w - 10h/d - No HK Hols200 - No B/O periods 0 (was12-May-22 C1) 27-Nov-22 20-May-22 30-Nov-22 3 WVT - Procurement - MEP C01_7 d/w - 10h/d - No HK Hols200 - No B/O periods 0 (was12-May-22 C1) 27-Nov-22 20-May-22 30-Nov-22 3 310.P.RC.D467 WVT - (Procurement Electrical & MVAC and Others) - Place Order for Material C01_7 d/w - 10h/d - No HK 55 12-May-22 05-Jul-22 20-May-22 13-Jul-22 8 Hols - No B/O periods (was 310.P.RC.D475 WVT - (Procurement Electrical & MVAC and Others) - Manufacturing of Material C1) C01_7 d/w - 10h/d - No HK 160 02-Jun-22 08-Nov-22 10-Jun-22 16-Nov-22 8 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 139 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.RC.D463 WVT - (Procurement FS and P&D Materials) - Place Order for Material C01_7 d/w - 10h/d - No HK 150 20-Jun-22 16-Nov-22 23-Jun-22 19-Nov-22 3 Hols - No B/O periods (was 310.P.RC.D471 WVT - (Procurement FS and P&D Materials) - Manufacturing of Material C1) C01_7 d/w - 10h/d - No HK 150 01-Jul-22 27-Nov-22 04-Jul-22 30-Nov-22 3 Hols - No B/O periods (was 310.P.RC.D479 WVT - (Procurement) - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 14 14-Nov-22 27-Nov-22 17-Nov-22 30-Nov-22 3 Hols - No B/O periods (was WVT - Procurement - ABWF C1) C01_7 d/w - 10h/d - No HK Hols127 - No B/O periods 0 (was14-Jun-22 C1) 18-Oct-22 21-Jun-22 25-Oct-22 7 310.P.RC.D483 WVT - (Procurement ABWF) - Place Order for Materials C01_7 d/w - 10h/d - No HK 7 14-Jun-22 20-Jun-22 21-Jun-22 27-Jun-22 7 Hols - No B/O periods (was 310.P.RC.D487 WVT - (Procurement ABWF) - Manufacturing of Materials & Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 120 21-Jun-22 18-Oct-22 28-Jun-22 25-Oct-22 7 Hols - No B/O periods (was CC#07 ----- Construction ----- C1) 881 453 07-Jun-21 A 23-May-24 24-May-22 24-Aug-24 78 CC#07 - West Vehicular Tunnel - WVT (HYBRID METHOD) 881 443 07-Jun-21 A 23-May-24 04-Jul-22 24-Aug-24 78 CC#07 - WVT - Site Preparation and Establishment 397 0 07-Jun-21 A 05-Oct-22 04-Jul-22 21-Oct-22 14 310.C.EX.F010 WVT - Work Permit - Prepare and apply for Work Permit C01_7 d/w - 10h/d - No HK 30 27-Mar-22 25-Apr-22 26-Jul-22 24-Aug-22 121 Hols - No B/O periods (was 310.C.EX.F014 WVT - Work Permit - Review application by PM and Authorities C1) C01_7 d/w - 10h/d - No HK 28 26-Apr-22 23-May-22 25-Aug-22 21-Sep-22 121 Hols - No B/O periods (was 310.C.EX.F018 WVT - Work Permit - Work permit grant C1) C01_7 d/w - 10h/d - No HK 0 23-May-22 21-Sep-22 121 Hols - No B/O periods (was 310.C.EX.F020 WVT - tentative date of closure of existing N-Runway C1) d/w - 10h/d - With C11_6 0 01-Sep-22 05-Sep-22 4 HK Hols - No B/O periods CC#07 - WVT - 3310/4 Site Preparation and Establishment (was C11_6C3) d/w - 10h/d - With HK Hols 394- No B/O 0periods (was 07-Jun-21 C3) A 29-Sep-22 22-Sep-22 21-Oct-22 17 310.C.EX.F019 WVT - 3310/4 - access to Works Area C11_6 d/w - 10h/d - With 0 07-Jun-21 A 22-Sep-22 HK Hols - No B/O periods 310.C.EX.F026 WVT - 3310/4 - underground utilities survey and reporting (was C11_6C3) d/w - 10h/d - With 6 01-Sep-22 07-Sep-22 22-Sep-22 28-Sep-22 17 HK Hols - No B/O periods 310.C.EX.F030 WVT - 3310/4 - carry out topographic survey and reporting (was C11_6C3) d/w - 10h/d - With 6 01-Sep-22 07-Sep-22 22-Sep-22 28-Sep-22 17 HK Hols - No B/O periods 310.C.EX.F034 WVT - 3310/4 - instrumentation (was C11_6C3) d/w - 10h/d - With 24 01-Sep-22 29-Sep-22 22-Sep-22 21-Oct-22 17 HK Hols - No B/O periods CC#07 - WVT - 3310/9 Site Preparation and Establishment (was C11_6C3) d/w - 10h/d - With HK Hols 24- No B/O 0periods (was 05-Sep-22 C3) 05-Oct-22 05-Sep-22 21-Oct-22 14 310.C.EX.F482 WVT - 3310/9 - access to Works Area C11_6 d/w - 10h/d - With 0 05-Sep-22* 05-Sep-22 0 HK Hols - No B/O periods 310.C.EX.F494 WVT - 3310/9 - underground utilities survey and reporting (was C11_6C3) d/w - 10h/d - With 7 05-Sep-22 13-Sep-22 22-Sep-22 29-Sep-22 14 HK Hols - No B/O periods 310.C.EX.F502 WVT - 3310/9 - carry out condition survey and reporting (was C11_6C3) d/w - 10h/d - With 7 05-Sep-22 13-Sep-22 22-Sep-22 29-Sep-22 14 HK Hols - No B/O periods 310.C.EX.F498 WVT - 3310/9 - instrumentation (was C11_6C3) d/w - 10h/d - With 24 05-Sep-22 05-Oct-22 22-Sep-22 21-Oct-22 14 HK Hols - No B/O periods CC#07 - WVT - 3310/9A Site Preparation and Establishment (was C11_6C3) d/w - 10h/d - With HK Hols 24- No B/O 0periods (was 04-Jul-22 C3) 30-Jul-22 04-Jul-22 08-Oct-22 57 310.C.EX.F1044 WVT - 3310/9A - access to Works Area C11_6 d/w - 10h/d - With 0 04-Jul-22* 04-Jul-22 0 HK Hols - No B/O periods 310.C.EX.F1048 WVT - 3310/9A - underground utilities survey and reporting (was C11_6C3) d/w - 10h/d - With 14 04-Jul-22 19-Jul-22 21-Sep-22 08-Oct-22 67 HK Hols - No B/O periods 310.C.EX.F1056 WVT - 3310/9A - carry out condition survey and reporting (was C3) C11_6 d/w - 10h/d - With 14 04-Jul-22 19-Jul-22 21-Sep-22 08-Oct-22 67 HK Hols - No B/O periods 310.C.EX.F1052 WVT - 3310/9A - instrumentation (was C11_6C3) d/w - 10h/d - With 24 04-Jul-22 30-Jul-22 08-Sep-22 08-Oct-22 57 HK Hols - No B/O periods CC#07 - WVT - Ground Investigation (was C11_6C3) d/w - 10h/d - With HK Hols 431- No B/O 0periods (was 01-Aug-22 C3) 10-Jan-24 06-Sep-22 24-Aug-24 185 WVT - GI for ELS Design C11_6 d/w - 10h/d - With HK Hols 21- No B/O 0periods (was 01-Sep-22 C3) 26-Sep-22 06-Sep-22 30-Sep-22 4
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 140 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.H1001 WVT - GI for ELS design - Carry out GI C11_6 d/w - 10h/d - With 18 01-Sep-22 22-Sep-22 06-Sep-22 27-Sep-22 4 HK Hols - No B/O periods 310.C.EX.H1005 WVT - GI for ELS design - prepare report and submit (was C11_6C3) d/w - 10h/d - With 3 23-Sep-22 26-Sep-22 28-Sep-22 30-Sep-22 4 HK Hols - No B/O periods WVT - Instrumentation (before tunnel construction commence) (was C11_6C3) d/w - 10h/d - With HK Hols 36- No B/O 0periods (was 01-Aug-22 C3) 12-Sep-22 22-Sep-22 15-Oct-22 27 310.C.EX.F1060 WVT - 3310/9A - Install background ground surface markers [2 nos. @5d/no./wf; 1wf] C11_6 d/w - 10h/d - With 6 01-Aug-22 06-Aug-22 10-Oct-22 15-Oct-22 57 HK Hols - No B/O periods 310.C.EX.F038 WVT - 3310/4 - Install background ground surface markers [6 nos. @5d/no./wf; 3wf] (was C11_6C3) d/w - 10h/d - With 6 05-Sep-22 12-Sep-22 22-Sep-22 28-Sep-22 14 HK Hols - No B/O periods WVT - Instrumentation (after tunnel construction complete) (was C11_6C3) d/w - 10h/d - With HK Hols 57- No B/O 0periods (was 02-Nov-23 C3) 10-Jan-24 19-Jun-24 24-Aug-24 185 310.C.EX.F042 WVT - install instruments outside tunnel [17 nos. @10d/nos; 3WF] C11_6 d/w - 10h/d - With 57 02-Nov-23 10-Jan-24 19-Jun-24 24-Aug-24 185 HK Hols - No B/O periods CC#07 - WVT - Existing UU - temporary support (and/or diversion as necessary) (was C01_7C3) d/w - 10h/d - No HK Hols155 - No B/O periods 0 (was27-Mar-22 C1) 28-Aug-22 23-Jul-22 24-Dec-22 118 Submissions and Application C01_7 d/w - 10h/d - No HK Hols155 - No B/O periods 0 (was27-Mar-22 C1) 28-Aug-22 23-Jul-22 24-Dec-22 118 310.C.EX.H1241 UU Diversion Works - Prepare Presentation of Propose Temporary Diversion of Existing C01_7 d/w - 10h/d - No HK 45 27-Mar-22 10-May-22 23-Jul-22 05-Sep-22 118 UU to CAD Hols - No B/O periods (was 310.C.EX.H1245 UU Diversion Works - PM 1st review Presentation of Propose Temporary Diversion of C1) C01_7 d/w - 10h/d - No HK 28 11-May-22 07-Jun-22 06-Sep-22 03-Oct-22 118 Existing UU to CAD Hols - No B/O periods (was 310.C.EX.H1249 UU Diversion Works - Revise Presentation of Propose Temporary Diversion of Existing C1) C01_7 d/w - 10h/d - No HK 8 08-Jun-22 15-Jun-22 19-Nov-22 26-Nov-22 164 UU to CAD Hols - No B/O periods (was 310.C.EX.H1261 UU Diversion Works - Method Statement C1) d/w - 10h/d - No HK C01_7 21 08-Jun-22 28-Jun-22 04-Oct-22 24-Oct-22 118 Hols - No B/O periods (was 310.C.EX.H1289 UU Diversion Works - PM 2nd review Presentation of Propose Temporary Diversion of C1) C01_7 d/w - 10h/d - No HK 28 16-Jun-22 13-Jul-22 27-Nov-22 24-Dec-22 164 Existing UU to CAD Hols - No B/O periods (was 310.C.EX.H1265 UU Diversion Works - PM 1st review and approved Method Statement C1) C01_7 d/w - 10h/d - No HK 28 29-Jun-22 26-Jul-22 25-Oct-22 21-Nov-22 118 Hols - No B/O periods (was 310.C.EX.H1285 UU Diversion Works - Revise Method Statement C1) C01_7 d/w - 10h/d - No HK 5 27-Jul-22 31-Jul-22 22-Nov-22 26-Nov-22 118 Hols - No B/O periods (was 310.C.EX.H1293 UU Diversion Works - PM 2nd review and approved Method Statement C1) C01_7 d/w - 10h/d - No HK 28 01-Aug-22 28-Aug-22 27-Nov-22 24-Dec-22 118 Hols - No B/O periods (was CC#07 - WVT - VE+ELS Installation C1) 262 70 19-Aug-22 08-Jul-23 08-Sep-22 31-Jul-23 19 CC#07 - WVT - Zone 1 (3310/4) - VE + ELS Installation 230 21 27-Sep-22 08-Jul-23 15-Oct-22 25-Jul-23 14 310.D.EX.F162 WVT - ELS design (Vertical Elements) - prepare and submit Form BA8 and grant consent C01_7 d/w - 10h/d - No HK 7 27-Sep-22 03-Oct-22 15-Oct-22 21-Oct-22 18 Hols - No B/O periods (was 310.D.EX.F166 WVT - ELS design (Vertical Elements) - prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 04-Oct-22 10-Oct-22 22-Oct-22 28-Oct-22 18 commencement Hols - No B/O periods (was 310.C.EX.F474 WVT - Zone 1 (3310/4) - ELS - Install pipe pile (87nos. @2d/no./rig; use 2 rigs) C1) C11_6 d/w - 10h/d - With 96 9 11-Oct-22 04-Feb-23 29-Oct-22 23-Feb-23 16 HK Hols - No B/O periods 310.C.EX.H1153 WVT - Zone 1 (3310/4) - ELS - Install wells (was C11_6C3) d/w - 10h/d - With 26 2 03-Jan-23 04-Feb-23 02-Feb-23 03-Mar-23 23 HK Hols - No B/O periods 310.C.EX.H1157 WVT - Zone 1 (3310/4) - ELS - Submit Form BA14 (was C01_7C3) d/w - 10h/d - No HK 12 2 05-Feb-23 16-Feb-23 24-Feb-23 07-Mar-23 19 Hols - No B/O periods (was 310.C.EX.F478 WVT - Zone 1 (3310/4) - ELS - Pumping test and submit report C1) C01_7 d/w - 10h/d - No HK 18 05-Feb-23 22-Feb-23 04-Mar-23 21-Mar-23 27 Hols - No B/O periods (was 310.C.EX.H1161 WVT - Zone 1 (3310/4) - ELS - Submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 2 17-Feb-23 23-Feb-23 08-Mar-23 14-Mar-23 19 Hols - No B/O periods (was 310.C.EX.H1165 WVT - Zone 1 (3310/4) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 2 24-Feb-23 02-Mar-23 15-Mar-23 21-Mar-23 19 Hols - No B/O periods (was 310.C.EX.H1305 WVT - Zone 1 (3310/4) - ELS - Initial excavation + uu hanger support + hang UU C1) C01_7 d/w - 10h/d - No HK 24 2 03-Mar-23 26-Mar-23 22-Mar-23 14-Apr-23 19 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 141 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.F514 WVT - Zone 1 (3310/4) - ELS - Excavation, install struts [17,073m3, @600m3/d/wf, 2wf; 2 C11_6 d/w - 10h/d - With 60 2 27-Mar-23 10-Jun-23 15-Apr-23 27-Jun-23 13 layers struts @20d/layer] HK Hols - No B/O periods 310.C.EX.F738 WVT - Zone 1 (3310/4) - ELS - Make good FEL (and/or install remaining struts if any) (was C01_7C3) d/w - 10h/d - No HK 16 11-Jun-23 26-Jun-23 28-Jun-23 13-Jul-23 17 Hols - No B/O periods (was 310.C.EX.F522 WVT - Zone 1 (3310/4) - ELS (N) - Plate Load Test (1 nos.) C1) C01_7 d/w - 10h/d - No HK 12 27-Jun-23 08-Jul-23 14-Jul-23 25-Jul-23 17 Hols - No B/O periods (was CC#07 - WVT - Zone 2 (3310/4) - VE + ELS Installation C1) 164 13 12-Sep-22 29-Mar-23 03-Oct-22 24-Apr-23 18 310.D.EX.F222 WVT - ELS design (Vertical Elements) - prepare and submit Form BA8 and grant consent C01_7 d/w - 10h/d - No HK 7 12-Sep-22 18-Sep-22 03-Oct-22 09-Oct-22 21 Hols - No B/O periods (was 310.D.EX.F226 WVT - ELS design (Vertical Elements) - prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 19-Sep-22 25-Sep-22 10-Oct-22 16-Oct-22 21 commencement Hols - No B/O periods (was 310.C.EX.F298 WVT - Zone 2 (3310/4) - ELS - Install vertical element (29nos. @2d/no./rig; use 1 rig) C1) C11_6 d/w - 10h/d - With 66 7 26-Sep-22 13-Dec-22 17-Oct-22 03-Jan-23 16 HK Hols - No B/O periods 310.C.EX.F1128.B01 WVT - Zone 2 (3310/4) - ELS - Install wells (was C01_7C3) d/w - 10h/d - No HK 24 20-Nov-22 13-Dec-22 19-Dec-22 11-Jan-23 29 Hols - No B/O periods (was 310.C.EX.H1173 WVT - Zone 2 (3310/4) - ELS - Submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 12 14-Dec-22 25-Dec-22 04-Jan-23 15-Jan-23 21 Hols - No B/O periods (was 310.C.EX.F1132.B01 WVT - Zone 2 (3310/4) - ELS - Pumping test and submit report C1) C01_7 d/w - 10h/d - No HK 18 14-Dec-22 31-Dec-22 12-Jan-23 29-Jan-23 29 Hols - No B/O periods (was 310.C.EX.H1177 WVT - Zone 2 (3310/4) - ELS - Submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 26-Dec-22 01-Jan-23 16-Jan-23 22-Jan-23 21 Hols - No B/O periods (was 310.C.EX.H1181 WVT - Zone 2 (3310/4) - ELS - Submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 02-Jan-23 08-Jan-23 23-Jan-23 29-Jan-23 21 Hols - No B/O periods (was 310.C.EX.H1309 WVT - Zone 2 (3310/4) - ELS - Initial excavation + uu hanger support + hang UU C1) C01_7 d/w - 10h/d - No HK 24 2 09-Jan-23 01-Feb-23 30-Jan-23 22-Feb-23 21 Hols - No B/O periods (was 310.C.EX.F532 WVT - Zone 2 (3310/4) - ELS - Excavation, install struts [11,951m3 @600m3/d/wf; 2 layer C1) C11_6 d/w - 10h/d - With 36 2 02-Feb-23 15-Mar-23 23-Feb-23 06-Apr-23 18 struts @ 6d/strut, 1wf] HK Hols - No B/O periods 310.C.EX.F534.B01 WVT - Zone 2 (3310/4) - ELS - Make good FEL + PLT (assumed) (was C11_6C3) d/w - 10h/d - With 12 2 16-Mar-23 29-Mar-23 11-Apr-23 24-Apr-23 18 HK Hols - No B/O periods CC#07 - WVT - Zone 3 (3310/4) - VE + ELS Installation (was C3) 210 8 12-Sep-22 29-May-23 12-Sep-22 29-May-23 0 310.D.EX.F230 WVT - ELS design (Vertical Elements) - prepare and submit Form BA8 and grant consent C01_7 d/w - 10h/d - No HK 7 12-Sep-22 18-Sep-22 12-Sep-22 18-Sep-22 0 Hols - No B/O periods (was 310.D.EX.F234 WVT - ELS design (Vertical Elements) - prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 19-Sep-22 25-Sep-22 19-Sep-22 25-Sep-22 0 commencement Hols - No B/O periods (was 310.C.EX.F1088.B01 WVT - Zone 3 (3310/4) - ELS - trial pile & install vertical element (1,018nos. @2d/no./rig; C1) C11_6 d/w - 10h/d - With 52 1 26-Sep-22 26-Nov-22 26-Sep-22 26-Nov-22 0 use 10 rigs) HK Hols - No B/O periods 310.C.EX.F1092.B01 WVT - Zone 3 (3310/4) - ELS - install wells (was C01_7C3) d/w - 10h/d - No HK 24 03-Nov-22 26-Nov-22 13-Nov-22 06-Dec-22 10 Hols - No B/O periods (was 310.C.EX.H1345.B01 WVT - Zone 3 (3310/4) - ELS - submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 14 27-Nov-22 10-Dec-22 27-Nov-22 10-Dec-22 0 Hols - No B/O periods (was 310.C.EX.F1096.B01 WVT - Zone 3 (3310/4) - ELS - pumping test and submit report C1) C01_7 d/w - 10h/d - No HK 18 27-Nov-22 14-Dec-22 07-Dec-22 24-Dec-22 10 Hols - No B/O periods (was 310.C.EX.H1349.B01 WVT - Zone 3 (3310/4) - ELS - submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 11-Dec-22 17-Dec-22 11-Dec-22 17-Dec-22 0 Hols - No B/O periods (was 310.C.EX.H1353.B01 WVT - Zone 3 (3310/4) - ELS - submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 18-Dec-22 24-Dec-22 18-Dec-22 24-Dec-22 0 Hols - No B/O periods (was 310.C.EX.H1313 WVT - Zone 3 (3310/4) - ELS - Initial excavation + uu hanger support + hang UU C1) C01_7 d/w - 10h/d - No HK 60 2 25-Dec-22 22-Feb-23 25-Dec-22 22-Feb-23 0 Hols - No B/O periods (was 310.C.EX.F530 WVT - Zone 3 (3310/4) - ELS - excavation + strut installation [176,082m3 @1000m3/d/wf; C1) C11_6 d/w - 10h/d - With 64 5 23-Feb-23 13-May-23 23-Feb-23 13-May-23 0 3wf], assume 3 layers HK Hols - No B/O periods 310.C.EX.F532.B01 WVT - Zone 3 (3310/4) - ELS - Make good FEL + PLT (assumed) (was C11_6C3) d/w - 10h/d - With 12 0 15-May-23 29-May-23 15-May-23 29-May-23 0 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 142 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S CC#07 - WVT - Zone 4 (3310/4) - VE + ELS Installation 194 6 19-Aug-22 16-Apr-23 06-Dec-22 31-Jul-23 87 310.D.EX.F214 WVT - ELS design (Vertical Elements) - prepare and submit Form BA8 and grant consent C01_7 d/w - 10h/d - No HK 7 19-Aug-22 25-Aug-22 06-Dec-22 12-Dec-22 109 Hols - No B/O periods (was 310.D.EX.F218 WVT - ELS design (Vertical Elements) - prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 26-Aug-22 01-Sep-22 13-Dec-22 19-Dec-22 109 commencement Hols - No B/O periods (was 310.C.EX.F480 WVT - Zone 4 (3310/4) - ELS - install vertical element (91nos. @2d/no./rig; use 3 rigs) C1) C11_6 d/w - 10h/d - With 62 2 08-Sep-22 22-Nov-22 20-Dec-22 07-Mar-23 85 HK Hols - No B/O periods 310.C.EX.F1124.B01 WVT - Zone 4 (3310/4) - ELS - install wells (was C01_7C3) d/w - 10h/d - No HK 24 30-Oct-22 22-Nov-22 20-Feb-23 15-Mar-23 113 Hols - No B/O periods (was 310.C.EX.H1189 WVT - Zone 4 (3310/4) - ELS - submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 12 23-Nov-22 04-Dec-22 08-Mar-23 19-Mar-23 105 Hols - No B/O periods (was 310.C.EX.F497 WVT - Zone 4 (3310/4) - ELS - pumping test and submit report C1) C01_7 d/w - 10h/d - No HK 18 23-Nov-22 10-Dec-22 16-Mar-23 02-Apr-23 113 Hols - No B/O periods (was 310.C.EX.H1193 WVT - Zone 4 (3310/4) - ELS - submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 05-Dec-22 11-Dec-22 20-Mar-23 26-Mar-23 105 Hols - No B/O periods (was 310.C.EX.H1197 WVT - Zone 4 (3310/4) - ELS - submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 12-Dec-22 18-Dec-22 27-Mar-23 02-Apr-23 105 Hols - No B/O periods (was 310.C.EX.H1317 WVT - Zone 4 (3310/4) - ELS - Initial excavation + uu hanger support + hang UU C1) C01_7 d/w - 10h/d - No HK 24 2 19-Dec-22 11-Jan-23 03-Apr-23 26-Apr-23 105 Hols - No B/O periods (was 310.C.EX.X700 WVT - Zone 4 (3310/4) - Excavation, install struts [18,211m3 @500m3/d/wf; 1wf; 2 layers C1) C11_6 d/w - 10h/d - With 58 2 12-Jan-23 23-Mar-23 27-Apr-23 07-Jul-23 83 struts @12d/layer] HK Hols - No B/O periods 310.C.EX.F1072 WVT - Zone 4 (3310/4) - ELS - make good FEL (and/or install remaining struts if any) (was C01_7C3) d/w - 10h/d - No HK 12 24-Mar-23 04-Apr-23 08-Jul-23 19-Jul-23 106 Hols - No B/O periods (was 310.C.EX.F1076 WVT - Zone 4 (3310/4) - ELS - Plate Load Test (1 nos.) (if required) C1) C01_7 d/w - 10h/d - No HK 12 05-Apr-23 16-Apr-23 20-Jul-23 31-Jul-23 106 Hols - No B/O periods (was CC#07 - WVT - Zone 5 (3310/4) - VE + ELS Installation C1) 238 14 19-Aug-22 08-Jun-23 08-Sep-22 28-Jun-23 16 310.D.EX.F206 WVT - ELS design (Vertical Elements) - prepare and submit Form BA8 and grant consent C01_7 d/w - 10h/d - No HK 7 19-Aug-22 25-Aug-22 08-Sep-22 14-Sep-22 20 Hols - No B/O periods (was 310.D.EX.F210 WVT - ELS design (Vertical Elements) - prepare and submit Form BA10 to notify work C1) C01_7 d/w - 10h/d - No HK 7 26-Aug-22 01-Sep-22 15-Sep-22 21-Sep-22 20 commencement Hols - No B/O periods (was 310.C.EX.F1000 WVT - Zone 5 (3310/4) - ELS - install vertical element (163 nos. @2d/no./rig; use 4 rigs) C1) C11_6 d/w - 10h/d - With 89 8 05-Sep-22 20-Dec-22 22-Sep-22 07-Jan-23 14 HK Hols - No B/O periods 310.C.EX.F1084 WVT - Zone 5 (3310/4) - ELS - install wells (was C01_7C3) d/w - 10h/d - No HK 24 27-Nov-22 20-Dec-22 24-Dec-22 16-Jan-23 27 Hols - No B/O periods (was 310.C.EX.H1205 WVT - Zone 5 (3310/4) - ELS - submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 12 21-Dec-22 01-Jan-23 09-Jan-23 20-Jan-23 19 Hols - No B/O periods (was 310.C.EX.F1004 WVT - Zone 5 (3310/4) - ELS - pumping test and submit report C1) C01_7 d/w - 10h/d - No HK 18 21-Dec-22 07-Jan-23 17-Jan-23 03-Feb-23 27 Hols - No B/O periods (was 310.C.EX.H1209 WVT - Zone 5 (3310/4) - ELS - submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 02-Jan-23 08-Jan-23 21-Jan-23 27-Jan-23 19 Hols - No B/O periods (was 310.C.EX.H1213 WVT - Zone 5 (3310/4) - ELS - submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 09-Jan-23 15-Jan-23 28-Jan-23 03-Feb-23 19 Hols - No B/O periods (was 310.C.EX.H1321 WVT - Zone 5 (3310/4) - ELS - Initial excavation + uu hanger support + hang UU C1) C01_7 d/w - 10h/d - No HK 24 2 16-Jan-23 08-Feb-23 04-Feb-23 27-Feb-23 19 Hols - No B/O periods (was 310.C.EX.X704 WVT - Zone 5 (3310/4) - ELS - Excavation, install struts [38,699m3 @600m3/d/wf; 2wf; 4 C1) C11_6 d/w - 10h/d - With 87 2 09-Feb-23 27-May-23 28-Feb-23 15-Jun-23 16 layers struts @12d/layer] HK Hols - No B/O periods 310.C.EX.X706.B01 WVT - Zone 5 (3310/4) - ELS - Make good FEL + PLT (assumed) (was C11_6C3) d/w - 10h/d - With 10 2 29-May-23 08-Jun-23 16-Jun-23 28-Jun-23 16 HK Hols - No B/O periods CC#07 - WVT - Zone 6 (3310/9A) - VE + ELS Installation (was C3) 222 8 27-Sep-22 28-Jun-23 02-Oct-22 04-Jul-23 4 310.D.EX.F194 WVT - ELS design (Vertical Elements) - prepare and submit Form BA8 and grant consent C01_7 d/w - 10h/d - No HK 7 27-Sep-22 03-Oct-22 02-Oct-22 08-Oct-22 5 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 143 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.EX.F198 WVT - ELS design (Vertical Elements) - prepare and submit Form BA10 to notify work C01_7 d/w - 10h/d - No HK 7 04-Oct-22 10-Oct-22 09-Oct-22 15-Oct-22 5 commencement Hols - No B/O periods (was 310.C.EX.F1007 Site Access 3310/9A and Contract <3303> complete WVT (Northern Portion) and ready C1) C11_6 d/w - 10h/d - With 0 10-Oct-22 15-Oct-22 5 for 3310 ELS construction HK Hols - No B/O periods 310.C.EX.F1008 WVT - Zone 6 (3310/9A) - ELS - trial pile & install vertical element (147nos. @2d/no./rig; (was C11_6C3) d/w - 10h/d - With 82 2 11-Oct-22 16-Jan-23 17-Oct-22 21-Jan-23 5 use 4 rigs) HK Hols - No B/O periods 310.C.EX.F1080 WVT - Zone 6 (3310/9A) - ELS - install wells (was C01_7C3) d/w - 10h/d - No HK 24 24-Dec-22 16-Jan-23 06-Jan-23 29-Jan-23 13 Hols - No B/O periods (was 310.C.EX.H1221 WVT - Zone 6 (3310/9A) - ELS - submit Form BA14 C1) C01_7 d/w - 10h/d - No HK 12 17-Jan-23 28-Jan-23 22-Jan-23 02-Feb-23 5 Hols - No B/O periods (was 310.C.EX.F1012 WVT - Zone 6 (3310/9A) - ELS - pumping test and submit report C1) C01_7 d/w - 10h/d - No HK 18 17-Jan-23 03-Feb-23 30-Jan-23 16-Feb-23 13 Hols - No B/O periods (was 310.C.EX.H1225 WVT - Zone 6 (3310/9A) - ELS - submit Form BA8 for excavation C1) C01_7 d/w - 10h/d - No HK 7 29-Jan-23 04-Feb-23 03-Feb-23 09-Feb-23 5 Hols - No B/O periods (was 310.C.EX.H1229 WVT - Zone 6 (3310/9A) - ELS - submit Form BA10 for excavation C1) C01_7 d/w - 10h/d - No HK 7 05-Feb-23 11-Feb-23 10-Feb-23 16-Feb-23 5 Hols - No B/O periods (was 310.C.EX.H1325 WVT - Zone 6 (3310/9A) - ELS - Initial excavation + uu hanger support + hang UU C1) C01_7 d/w - 10h/d - No HK 24 2 12-Feb-23 07-Mar-23 17-Feb-23 12-Mar-23 5 Hols - No B/O periods (was 310.C.EX.F518 WVT - Zone 6 (3310/9A) - ELS [34,146m3, @600m3/d/wf, 2wf; 4 layers struts C1) C11_6 d/w - 10h/d - With 78 2 08-Mar-23 13-Jun-23 13-Mar-23 17-Jun-23 4 @12d/layer] HK Hols - No B/O periods 310.C.EX.F520.B01 WVT - Zone 6 (3310/9A) - ELS - Make good FEL + PLT (assumed) (was C11_6C3) d/w - 10h/d - With 12 2 14-Jun-23 28-Jun-23 19-Jun-23 04-Jul-23 4 HK Hols - No B/O periods CC#07 - WVT - Tunnel Structure Construction (was C3) 305 49 12-Dec-22 20-Dec-23 18-Apr-23 22-Feb-24 50 CC#07 - WVT - Zone 1 (3310/4) - Tunnel Structure 165 6 24-Feb-23 13-Sep-23 19-Jul-23 29-Sep-23 14 310.C.EX.F542.B01 WVT - Zone 1 (3310/4) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 24-Feb-23 02-Mar-23 19-Jul-23 25-Jul-23 145 Hols - No B/O periods (was 310.C.EX.F544.B01 WVT - Zone 1 (3310/4) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 09-Jul-23 15-Jul-23 26-Jul-23 01-Aug-23 17 Hols - No B/O periods (was 310.C.EX.F546 WVT - Zone 1 (3310/4) - Bay 1 to 2 - construct base slab [@6d/bay; 1wf] C1) C11_6 d/w - 10h/d - With 24 3 17-Jul-23 12-Aug-23 02-Aug-23 29-Aug-23 14 HK Hols - No B/O periods 310.C.EX.F614 WVT - Zone 1 (3310/4) - Bay 1 to 2 - construct walls & roof slab [9d/bay; 1wf] (was C11_6C3) d/w - 10h/d - With 27 3 14-Aug-23 13-Sep-23 30-Aug-23 29-Sep-23 14 HK Hols - No B/O periods CC#07 - WVT - Zone 2 (3310/4) - Tunnel Structure (was C3) 127 6 02-Jan-23 09-Jun-23 18-Apr-23 03-Jul-23 18 310.C.EX.F750.B01 WVT - Zone 2 (3310/4) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 02-Jan-23 08-Jan-23 18-Apr-23 24-Apr-23 106 Hols - No B/O periods (was 310.C.EX.F752.B01 WVT - Zone 2 (3310/4) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 30-Mar-23 05-Apr-23 25-Apr-23 01-May-23 26 Hols - No B/O periods (was 310.C.EX.F754.B01 WVT - Zone 2 (3310/4) - Bay 1 to 2 - construct base slab [@6d/bay; 1wf] C1) C11_6 d/w - 10h/d - With 24 3 06-Apr-23 08-May-23 02-May-23 30-May-23 18 HK Hols - No B/O periods 310.C.EX.F756.B01 WVT - Zone 2 (3310/4) - Bay 1 to 2 - construct walls & roof slab [9d/bay; 1wf] (was C11_6C3) d/w - 10h/d - With 27 3 09-May-23 09-Jun-23 31-May-23 03-Jul-23 18 HK Hols - No B/O periods CC#07 - WVT - Zone 3 (3310/4) - Tunnel Structure (was C3) 232 14 18-Dec-22 29-Sep-23 23-May-23 29-Sep-23 0 310.C.EX.F102.B01 WVT - Zone 3 (3310/4) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 18-Dec-22 24-Dec-22 23-May-23 29-May-23 156 Hols - No B/O periods (was 310.C.EX.F104.B01 WVT - Zone 3 (3310/4) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 30-May-23 05-Jun-23 30-May-23 05-Jun-23 0 Hols - No B/O periods (was 310.C.EX.F106.B01 WVT - Zone 3 (3310/4) - Bay 1 to 10 - Construct base slab [@6d/bay; 2wf] C1) C11_6 d/w - 10h/d - With 33 3 06-Jun-23 15-Jul-23 06-Jun-23 15-Jul-23 0 HK Hols - No B/O periods 310.C.EX.F110.B01 WVT - Zone 3 (3310/4) - Bay 1 to 10 - Construct walls & roof slab [12d/bay; 3wf] (was C11_6C3) d/w - 10h/d - With 45 4 30-Jun-23 22-Aug-23 30-Jun-23 22-Aug-23 0 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 144 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.F108.B01 WVT - Zone 3 (3310/4) - Bay 10 to 20 - Construct base slab [@6d/bay; 2wf] C11_6 d/w - 10h/d - With 33 3 17-Jul-23 23-Aug-23 17-Jul-23 23-Aug-23 0 HK Hols - No B/O periods 310.C.EX.F112.B01 WVT - Zone 3 (3310/4) - Bay 10 to 20 - Construct walls & roof slab [12d/bay; 3wf] (was C11_6C3) d/w - 10h/d - With 45 4 09-Aug-23 29-Sep-23 09-Aug-23 29-Sep-23 0 HK Hols - No B/O periods 310.C.EX.W088 WVT - Zone 3 - construct access tower (was C11_6C3) d/w - 10h/d - With 35 21-Aug-23 29-Sep-23 21-Aug-23 29-Sep-23 0 HK Hols - No B/O periods CC#07 - WVT - Zone 4 (3310/4) - Tunnel Structure (was C3) 147 7 12-Dec-22 13-Jun-23 25-Jul-23 25-Sep-23 87 310.C.EX.F722.B01 WVT - Zone 4 (3310/4) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 12-Dec-22 18-Dec-22 25-Jul-23 31-Jul-23 225 Hols - No B/O periods (was 310.C.EX.F724.B01 WVT - Zone 4 (3310/4) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 17-Apr-23 23-Apr-23 01-Aug-23 07-Aug-23 106 Hols - No B/O periods (was 310.C.EX.F726 WVT - Zone 4 (3310/4) - Bay 1 to 2 - Construct base slab [@6d/bay; 1wf] C1) C11_6 d/w - 10h/d - With 15 2 24-Apr-23 11-May-23 08-Aug-23 24-Aug-23 87 HK Hols - No B/O periods 310.C.EX.F758 WVT - Zone 4 (3310/4) - Bay 1 to 2 - Construct walls & roof [@12d/bay; 1wf] (was C11_6C3) d/w - 10h/d - With 27 5 12-May-23 13-Jun-23 25-Aug-23 25-Sep-23 87 HK Hols - No B/O periods CC#07 - WVT - Zone 5 (3310/4) - Tunnel Structure (was C3) 197 7 09-Jan-23 07-Sep-23 22-Jun-23 25-Sep-23 15 310.C.EX.F574.B01 WVT - Zone 5 (3310/4) -Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 09-Jan-23 15-Jan-23 22-Jun-23 28-Jun-23 164 Hols - No B/O periods (was 310.C.EX.F576.B01 WVT - Zone 5 (3310/4) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 09-Jun-23 15-Jun-23 29-Jun-23 05-Jul-23 20 Hols - No B/O periods (was 310.C.EX.F578 WVT - Zone 5 (3310/4) - Bay 1 to 4 - Construct base slab [@6d/bay; 2wf] C1) C11_6 d/w - 10h/d - With 30 2 16-Jun-23 22-Jul-23 06-Jul-23 09-Aug-23 15 HK Hols - No B/O periods 310.C.EX.F626 WVT - Zone 5 (3310/4) - Bay 1 to 4 - Construct wall & roof slab [@12d/bay; 2wf] (was C11_6C3) d/w - 10h/d - With 54 5 07-Jul-23 07-Sep-23 25-Jul-23 25-Sep-23 15 HK Hols - No B/O periods CC#07 - WVT - Zone 6 (3310/9A) - Tunnel Structure (was C3) 190 9 05-Feb-23 23-Sep-23 28-Jun-23 29-Sep-23 5 310.C.EX.F650.B01 WVT - Zone 6 (3310/9A) - Submit Form BA8 for RC works C01_7 d/w - 10h/d - No HK 7 05-Feb-23 11-Feb-23 28-Jun-23 04-Jul-23 143 Hols - No B/O periods (was 310.C.EX.F652.B01 WVT - Zone 6 (3310/9A) - Submit Form BA10 for RC works C1) C01_7 d/w - 10h/d - No HK 7 29-Jun-23 05-Jul-23 05-Jul-23 11-Jul-23 6 Hols - No B/O periods (was 310.C.EX.F654 WVT - Zone 6 (3310/9A) - Bay 1 to 4 - Construct base slab [@6d/bay; 2wf] C1) C11_6 d/w - 10h/d - With 30 4 06-Jul-23 09-Aug-23 12-Jul-23 15-Aug-23 5 HK Hols - No B/O periods 310.C.EX.F682 WVT - Zone 6 (3310/9A) - Bay 1 to 4 - Construct walls & roof slab [@12d/bay; 2wf] (was C11_6C3) d/w - 10h/d - With 54 5 24-Jul-23 23-Sep-23 29-Jul-23 29-Sep-23 5 HK Hols - No B/O periods CC#07 - WVT - Mass Concrete Fill inside Tunnel (was C11_6C3) d/w - 10h/d - With HK Hols 64- No B/O 0periods (was 06-Oct-23 C3) 20-Dec-23 31-Oct-23 22-Feb-24 50 CC#07 - WVT - North Zone 5,6 C11_6 d/w - 10h/d - With HK Hols 16- No B/O 0periods (was 06-Oct-23 C3) 25-Oct-23 31-Oct-23 17-Nov-23 20 310.C.EX.Y728 WVT - North Zone 5 & 6 - bay 1 to 15 - Permanent Mass concrete fill (780m3] C11_6 d/w - 10h/d - With 16 06-Oct-23 25-Oct-23 31-Oct-23 17-Nov-23 20 HK Hols - No B/O periods CC#07 - WVT - Middle Zone 3,4 (was C11_6C3) d/w - 10h/d - With HK Hols 42- No B/O 0periods (was 26-Oct-23 C3) 13-Dec-23 23-Dec-23 15-Feb-24 50 310.C.EX.Y796 WVT - Middle - Zone 3 & 4 - bay 1 to 14 - Permanent Mass concrete fill [1110m3/bay] C11_6 d/w - 10h/d - With 42 26-Oct-23 13-Dec-23 23-Dec-23 15-Feb-24 50 HK Hols - No B/O periods CC#07 - WVT - South Zone 1,2 (was C11_6C3) d/w - 10h/d - With HK Hols6 - No B/O 0periods (was 14-Dec-23 C3) 20-Dec-23 16-Feb-24 22-Feb-24 50 310.C.EX.Y768 WVT - South - Zone 5 & 6 - bay 1 to 5 - Permanent Mass concrete fill [780m3x2] C11_6 d/w - 10h/d - With 6 14-Dec-23 20-Dec-23 16-Feb-24 22-Feb-24 50 HK Hols - No B/O periods CC#07 - WVT - Earthwork - Backfilling (was C11_6C3) d/w - 10h/d - With HK Hols 142- No B/O18 periods (was 10-Jun-23 C3) 28-Nov-23 04-Jul-23 28-Nov-23 0 WVT - Zone 1 (3310/4) - Backfill C11_6 d/w - 10h/d - With HK Hols 26- No B/O 3periods (was 05-Sep-23 C3) 06-Oct-23 26-Sep-23 28-Oct-23 18 310.C.EX.F822 WVT - Zone 1 - Backfill from FL to +3.0mPD [3,650m3 @350m3/d/wf; 1wf] C11_6 d/w - 10h/d - With 12 1 05-Sep-23 18-Sep-23 26-Sep-23 11-Oct-23 18 HK Hols - No B/O periods 310.C.EX.F826 WVT - Zone 1 - Backfill from +3.0 to +6.5mPD [11,530m3 @350m3/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 18 2 14-Sep-23 06-Oct-23 07-Oct-23 28-Oct-23 18 HK Hols - No B/O periods WVT - Zone 2 (3310/4) - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 35- No B/O 4periods (was 10-Jun-23 C3) 22-Jul-23 04-Jul-23 12-Aug-23 18
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 145 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W084 WVT - Zone 2 - Backfill from FL to +3.0mPD [2,550m3 @350m3/d/wf; 1wf] C11_6 d/w - 10h/d - With 10 2 10-Jun-23 21-Jun-23 04-Jul-23 14-Jul-23 18 HK Hols - No B/O periods 310.C.EX.W84 WVT - Zone 2 - Backfill from +3.0 to +6.5mPD [8,070m3 @350m3/d/wf; 1wf] (was C11_6C3) d/w - 10h/d - With 25 2 23-Jun-23 22-Jul-23 15-Jul-23 12-Aug-23 18 HK Hols - No B/O periods WVT - Zone 3 (3310/4) - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 89- No B/O 2periods (was 14-Aug-23 C3) 28-Nov-23 14-Aug-23 28-Nov-23 0 310.C.EX.F830 WVT - Zone 3 - bay 1 to 10 - Backfill from FL to +3.0mPD [25,910m3 @350m3/d/wf; 3wf] C11_6 d/w - 10h/d - With 27 2 14-Aug-23 13-Sep-23 14-Aug-23 13-Sep-23 0 HK Hols - No B/O periods 310.C.EX.F834 WVT - Zone 3 - bay 1 to 10 - Backfill from +3.0 to +6.5mPD [217,180m3 @350m3/d/wf; (was C11_6C3) d/w - 10h/d - With 32 14-Sep-23 24-Oct-23 14-Sep-23 24-Oct-23 0 10wf] HK Hols - No B/O periods 310.C.EX.F836 WVT - Zone 3 - bay 10 to 20 - Backfill from FL to +3.0mPD [51,820m3 @350m3/d/wf; 5wf] (was C11_6C3) d/w - 10h/d - With 30 16-Sep-23 24-Oct-23 16-Sep-23 24-Oct-23 0 HK Hols - No B/O periods 310.C.EX.F839 WVT - Zone 3 - bay 10 to 20 - Backfill from +3.0 to +6.5mPD [217,180m3 @350m3/d/wf; (was C11_6C3) d/w - 10h/d - With 30 25-Oct-23 28-Nov-23 25-Oct-23 28-Nov-23 0 10wf] HK Hols - No B/O periods WVT - Zone 4 (3310/4) - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 47- No B/O 3periods (was 10-Jun-23 C3) 05-Aug-23 22-Sep-23 18-Nov-23 87 310.C.EX.F1020 WVT - Zone 4 - Backfill from FL to +3.0mPD [5,920m3 @350m3/d/wf; 1wf] C11_6 d/w - 10h/d - With 18 1 10-Jun-23 03-Jul-23 22-Sep-23 14-Oct-23 87 HK Hols - No B/O periods 310.C.EX.F1024 WVT - Zone 4 - Backfill from +3.0 to +6.5mPD [19,095m3 @350m3/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 29 2 04-Jul-23 05-Aug-23 16-Oct-23 18-Nov-23 87 HK Hols - No B/O periods WVT - Zone 5 (3310/4) - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 37- No B/O 2periods (was 08-Sep-23 C3) 24-Oct-23 26-Sep-23 14-Nov-23 18 310.C.EX.F1028 WVT - Zone 5 - Backfill from FL to +3.0mPD [6,220m3 @350m3/d/wf; 1wf] C11_6 d/w - 10h/d - With 18 1 08-Sep-23 28-Sep-23 26-Sep-23 18-Oct-23 15 HK Hols - No B/O periods 310.C.EX.F1032 WVT - Zone 5 - Backfill from +3.0 to +6.5mPD [17,370m3 @350m3/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 26 1 21-Sep-23 24-Oct-23 14-Oct-23 14-Nov-23 18 HK Hols - No B/O periods WVT - Zone 6 (3310/9A) - Backfill (was C11_6C3) d/w - 10h/d - With HK Hols 42- No B/O 4periods (was 11-Sep-23 C3) 01-Nov-23 18-Sep-23 08-Nov-23 6 310.C.EX.F1036 WVT - Zone 6 - Backfill from FL to +3.0mPD [5,490m3 @350m3/d/wf; 1wf] C11_6 d/w - 10h/d - With 18 2 11-Sep-23 03-Oct-23 18-Sep-23 10-Oct-23 6 HK Hols - No B/O periods 310.C.EX.F1040 WVT - Zone 6 - Backfill from +3.0 to +6.5mPD [15,330m3 @350m3/d/wf; 2wf] (was C11_6C3) d/w - 10h/d - With 24 2 04-Oct-23 01-Nov-23 11-Oct-23 08-Nov-23 6 HK Hols - No B/O periods CC#07 - WVT - Internal ABWF Works (was C11_6C3) d/w - 10h/d - With HK Hols 562- No B/O132 periods (was 04-Jul-22 C3) 23-May-24 04-Jul-22 27-May-24 3 310.C.EX.F837 WVT - access to Works Area 3310/9A C11_6 d/w - 10h/d - With 0 04-Jul-22* 04-Jul-22 0 HK Hols - No B/O periods 310.C.EX.F841 WVT - access to Works Area 3310/12 (was C11_6C3) d/w - 10h/d - With 0 04-Jul-22* 04-Jul-22 0 HK Hols - No B/O periods 310.C.EX.F842 WVT - Contract <3303> complete whole WVT and allow access into WUR, WA01, WU, (was C11_6C3) d/w - 10h/d - With 0 04-Jul-22 03-Sep-22 54 WA02, WR & WVT north portion HK Hols - No B/O periods 310.C.EX.F845 WVT - R.C. Structure completed (PMS 18) (was C11_6C3) d/w - 10h/d - With 0 29-Sep-23 29-Sep-23 0 HK Hols - No B/O periods WVT - ABWF - Western Ramp (WR) (was C11_6C3) d/w - 10h/d - With HK Hols 352- No B/O24 periods (was 29-Aug-22 C3) 03-Nov-23 05-Sep-22 07-Nov-23 3 WVT - TTM Stage 1 (WR) - Northbound C11_6 d/w - 10h/d - With HK Hols 172- No B/O12 periods (was 29-Aug-22 C3) 25-Mar-23 05-Sep-22 29-Mar-23 3 310.C.EX.W834 WVT - TTM Stage 1 (WR) - North-Bound - brickwork and blockwork C11_6 d/w - 10h/d - With 42 2 29-Aug-22 19-Oct-22 05-Sep-22 26-Oct-22 6 HK Hols - No B/O periods 310.C.EX.W850 WVT - TTM Stage 1 (WR) - North-Bound - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 42 2 29-Aug-22 19-Oct-22 05-Sep-22 26-Oct-22 6 HK Hols - No B/O periods 310.C.EX.W838 WVT - TTM Stage 1 (WR) - North-Bound - steel and metalwork (was C11_6C3) d/w - 10h/d - With 42 2 09-Sep-22 31-Oct-22 20-Sep-22 09-Nov-22 8 HK Hols - No B/O periods 310.C.EX.W842 WVT - TTM Stage 1 (WR) - North-Bound - plastering and screeding works (was C3) C11_6 d/w - 10h/d - With 42 2 22-Sep-22 11-Nov-22 03-Oct-22 21-Nov-22 8 HK Hols - No B/O periods 310.C.EX.W846 WVT - TTM Stage 1 (WR) - North-Bound - Painting Works (was C11_6C3) d/w - 10h/d - With 42 2 06-Oct-22 23-Nov-22 15-Oct-22 02-Dec-22 8 HK Hols - No B/O periods 310.C.EX.W854 WVT - TTM Stage 1 (WR) - North-Bound - Road Paving works (was C11_6C3) d/w - 10h/d - With 42 2 06-Feb-23 25-Mar-23 09-Feb-23 29-Mar-23 3 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 146 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S WVT - TTM Stage 2 (WR) - Southbound C11_6 d/w - 10h/d - With HK Hols 172- No B/O12 periods (was 06-Apr-23 C3) 03-Nov-23 17-Apr-23 07-Nov-23 3 310.C.EX.W914 WVT - TTM Stage 2 (WR) - South-Bound - brickwork and blockwork C11_6 d/w - 10h/d - With 42 2 06-Apr-23 30-May-23 17-Apr-23 06-Jun-23 6 HK Hols - No B/O periods 310.C.EX.W930 WVT - TTM Stage 2 (WR) - South-Bound - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 42 2 06-Apr-23 30-May-23 17-Apr-23 06-Jun-23 6 HK Hols - No B/O periods 310.C.EX.W918 WVT - TTM Stage 2 (WR) - South-Bound - steel and metalwork (was C11_6C3) d/w - 10h/d - With 42 2 21-Apr-23 10-Jun-23 02-May-23 20-Jun-23 8 HK Hols - No B/O periods 310.C.EX.W922 WVT - TTM Stage 2 (WR) - South-Bound - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 42 2 04-May-23 23-Jun-23 13-May-23 04-Jul-23 8 HK Hols - No B/O periods 310.C.EX.W926 WVT - TTM Stage 2 (WR) - South-Bound - Painting Works (was C11_6C3) d/w - 10h/d - With 42 2 16-May-23 06-Jul-23 25-May-23 15-Jul-23 8 HK Hols - No B/O periods 310.C.EX.W934 WVT - TTM Stage 2 (WR) - South-Bound - Road Paving works (was C11_6C3) d/w - 10h/d - With 42 2 13-Sep-23 03-Nov-23 16-Sep-23 07-Nov-23 3 HK Hols - No B/O periods WVT - ABWF - Western Roundabout (WA02) (was C11_6C3) d/w - 10h/d - With HK Hols 342- No B/O24 periods (was 20-Oct-22 C3) 11-Dec-23 27-Oct-22 14-Dec-23 3 WVT - TTM Stage 1 (WA02) - Northbound C11_6 d/w - 10h/d - With HK Hols 162- No B/O12 periods (was 20-Oct-22 C3) 08-May-23 27-Oct-22 11-May-23 3 310.C.EX.W626 WVT - TTM Stage 1 (WA02) - North-Bound - brickwork and blockwork C11_6 d/w - 10h/d - With 32 2 20-Oct-22 25-Nov-22 27-Oct-22 02-Dec-22 6 HK Hols - No B/O periods 310.C.EX.W642 WVT - TTM Stage 1 (WA02) - North-Bound - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 32 2 20-Oct-22 25-Nov-22 27-Oct-22 02-Dec-22 6 HK Hols - No B/O periods 310.C.EX.W630 WVT - TTM Stage 1 (WA02) - North-Bound - steel and metalwork (was C11_6C3) d/w - 10h/d - With 32 2 01-Nov-22 07-Dec-22 10-Nov-22 16-Dec-22 8 HK Hols - No B/O periods 310.C.EX.W634 WVT - TTM Stage 1 (WA02) - North-Bound - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 32 2 12-Nov-22 19-Dec-22 22-Nov-22 29-Dec-22 8 HK Hols - No B/O periods 310.C.EX.W638 WVT - TTM Stage 1 (WA02) - North-Bound - Painting Works (was C11_6C3) d/w - 10h/d - With 32 2 24-Nov-22 31-Dec-22 03-Dec-22 11-Jan-23 8 HK Hols - No B/O periods 310.C.EX.W646 WVT - TTM Stage 1 (WA02) - North-Bound - Road Paving works (was C11_6C3) d/w - 10h/d - With 32 2 27-Mar-23 08-May-23 30-Mar-23 11-May-23 3 HK Hols - No B/O periods WVT - TTM Stage 2 (WA02) - Southbound (was C11_6C3) d/w - 10h/d - With HK Hols 162- No B/O12 periods (was 31-May-23 C3) 11-Dec-23 07-Jun-23 14-Dec-23 3 310.C.EX.W938 WVT - TTM Stage 2 (WA02) - South-Bound - brickwork and blockwork C11_6 d/w - 10h/d - With 32 2 31-May-23 08-Jul-23 07-Jun-23 15-Jul-23 6 HK Hols - No B/O periods 310.C.EX.W954 WVT - TTM Stage 2 (WA02) - South-Bound - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 32 2 31-May-23 08-Jul-23 07-Jun-23 15-Jul-23 6 HK Hols - No B/O periods 310.C.EX.W942 WVT - TTM Stage 2 (WA02) - South-Bound - steel and metalwork (was C11_6C3) d/w - 10h/d - With 32 2 12-Jun-23 20-Jul-23 21-Jun-23 29-Jul-23 8 HK Hols - No B/O periods 310.C.EX.W946 WVT - TTM Stage 2 (WA02) - South-Bound - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 32 2 24-Jun-23 01-Aug-23 05-Jul-23 10-Aug-23 8 HK Hols - No B/O periods 310.C.EX.W950 WVT - TTM Stage 2 (WA02) - South-Bound - Painting Works (was C11_6C3) d/w - 10h/d - With 32 2 07-Jul-23 12-Aug-23 17-Jul-23 22-Aug-23 8 HK Hols - No B/O periods 310.C.EX.W958 WVT - TTM Stage 2 (WA02) - South-Bound - Road Paving works (was C11_6C3) d/w - 10h/d - With 32 2 04-Nov-23 11-Dec-23 08-Nov-23 14-Dec-23 3 HK Hols - No B/O periods WVT - ABWF - Western Underpass (WU) (was C11_6C3) d/w - 10h/d - With HK Hols 350- No B/O24 periods (was 26-Nov-22 C3) 30-Jan-24 03-Dec-22 02-Feb-24 3 WVT - TTM Stage 1 (WU) - Northbound C11_6 d/w - 10h/d - With HK Hols 172- No B/O12 periods (was 26-Nov-22 C3) 28-Jun-23 03-Dec-22 03-Jul-23 3 310.C.EX.W650 WVT - TTM Stage 1 (WU) - North-Bound - brickwork and blockwork C11_6 d/w - 10h/d - With 42 2 26-Nov-22 16-Jan-23 03-Dec-22 26-Jan-23 6 HK Hols - No B/O periods 310.C.EX.W666 WVT - TTM Stage 1 (WU) - North-Bound - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 42 2 26-Nov-22 16-Jan-23 03-Dec-22 26-Jan-23 6 HK Hols - No B/O periods 310.C.EX.W654 WVT - TTM Stage 1 (WU) - North-Bound - steel and metalwork (was C11_6C3) d/w - 10h/d - With 42 2 08-Dec-22 31-Jan-23 17-Dec-22 09-Feb-23 8 HK Hols - No B/O periods 310.C.EX.W658 WVT - TTM Stage 1 (WU) - North-Bound - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 42 2 20-Dec-22 11-Feb-23 30-Dec-22 21-Feb-23 8 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 147 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W662 WVT - TTM Stage 1 (WU) - North-Bound - Painting Works C11_6 d/w - 10h/d - With 42 2 03-Jan-23 23-Feb-23 12-Jan-23 04-Mar-23 8 HK Hols - No B/O periods 310.C.EX.W670 WVT - TTM Stage 1 (WU) - North-Bound - Road Paving works (was C11_6C3) d/w - 10h/d - With 42 2 09-May-23 28-Jun-23 12-May-23 03-Jul-23 3 HK Hols - No B/O periods WVT - TTM Stage 2 (WU) - Southbound (was C11_6C3) d/w - 10h/d - With HK Hols 170- No B/O12 periods (was 10-Jul-23 C3) 30-Jan-24 17-Jul-23 02-Feb-24 3 310.C.EX.W962 WVT - TTM Stage 2 (WU) - South-Bound - brickwork and blockwork C11_6 d/w - 10h/d - With 42 2 10-Jul-23 26-Aug-23 17-Jul-23 02-Sep-23 6 HK Hols - No B/O periods 310.C.EX.W978 WVT - TTM Stage 2 (WU) - South-Bound - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 42 2 10-Jul-23 26-Aug-23 17-Jul-23 02-Sep-23 6 HK Hols - No B/O periods 310.C.EX.W966 WVT - TTM Stage 2 (WU) - South-Bound - steel and metalwork (was C11_6C3) d/w - 10h/d - With 42 2 21-Jul-23 07-Sep-23 31-Jul-23 16-Sep-23 8 HK Hols - No B/O periods 310.C.EX.W970 WVT - TTM Stage 2 (WU) - South-Bound - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 42 2 02-Aug-23 19-Sep-23 11-Aug-23 28-Sep-23 8 HK Hols - No B/O periods 310.C.EX.W974 WVT - TTM Stage 2 (WU) - South-Bound - Painting Works (was C11_6C3) d/w - 10h/d - With 42 2 14-Aug-23 03-Oct-23 23-Aug-23 12-Oct-23 8 HK Hols - No B/O periods 310.C.EX.W982 WVT - TTM Stage 2 (WU) - South-Bound - Road Paving works (was C11_6C3) d/w - 10h/d - With 40 2 12-Dec-23 30-Jan-24 15-Dec-23 02-Feb-24 3 HK Hols - No B/O periods WVT - ABWF - Western Roundabout (WA01) (was C11_6C3) d/w - 10h/d - With HK Hols 338- No B/O24 periods (was 17-Jan-23 C3) 07-Mar-24 27-Jan-23 11-Mar-24 3 WVT - TTM Stage 1 (WA01) - Northbound C11_6 d/w - 10h/d - With HK Hols 162- No B/O12 periods (was 17-Jan-23 C3) 05-Aug-23 27-Jan-23 09-Aug-23 3 310.C.EX.W810 WVT - TTM Stage 1 (WA01) - North-Bound - brickwork and blockwork C11_6 d/w - 10h/d - With 32 2 17-Jan-23 25-Feb-23 27-Jan-23 04-Mar-23 6 HK Hols - No B/O periods 310.C.EX.W826 WVT - TTM Stage 1 (WA01) - North-Bound - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 32 2 17-Jan-23 25-Feb-23 27-Jan-23 04-Mar-23 6 HK Hols - No B/O periods 310.C.EX.W814 WVT - TTM Stage 1 (WA01) - North-Bound - steel and metalwork (was C11_6C3) d/w - 10h/d - With 32 2 01-Feb-23 09-Mar-23 10-Feb-23 18-Mar-23 8 HK Hols - No B/O periods 310.C.EX.W818 WVT - TTM Stage 1 (WA01) - North-Bound - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 32 2 13-Feb-23 21-Mar-23 22-Feb-23 30-Mar-23 8 HK Hols - No B/O periods 310.C.EX.W822 WVT - TTM Stage 1 (WA01) - North-Bound - Painting Works (was C11_6C3) d/w - 10h/d - With 32 2 24-Feb-23 01-Apr-23 06-Mar-23 15-Apr-23 8 HK Hols - No B/O periods 310.C.EX.W830 WVT - TTM Stage 1 (WA01) - North-Bound - Road Paving works (was C11_6C3) d/w - 10h/d - With 32 2 29-Jun-23 05-Aug-23 04-Jul-23 09-Aug-23 3 HK Hols - No B/O periods WVT - TTM Stage 2 (WA01) - Southbound (was C11_6C3) d/w - 10h/d - With HK Hols 158- No B/O12 periods (was 28-Aug-23 C3) 07-Mar-24 06-Sep-23 11-Mar-24 3 310.C.EX.W839 WVT - TTM Stage 2 (WA01) - South-Bound - brickwork and blockwork C11_6 d/w - 10h/d - With 32 2 28-Aug-23 05-Oct-23 06-Sep-23 14-Oct-23 8 HK Hols - No B/O periods 310.C.EX.W852 WVT - TTM Stage 2 (WA01) - South-Bound - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 32 2 28-Aug-23 05-Oct-23 11-Sep-23 19-Oct-23 12 HK Hols - No B/O periods 310.C.EX.W843 WVT - TTM Stage 2 (WA01) - South-Bound - steel and metalwork (was C11_6C3) d/w - 10h/d - With 32 2 08-Sep-23 17-Oct-23 18-Sep-23 27-Oct-23 8 HK Hols - No B/O periods 310.C.EX.W847 WVT - TTM Stage 2 (WA01) - South-Bound - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 32 2 20-Sep-23 30-Oct-23 29-Sep-23 08-Nov-23 8 HK Hols - No B/O periods 310.C.EX.W851 WVT - TTM Stage 2 (WA01) - South-Bound - Painting Works (was C11_6C3) d/w - 10h/d - With 32 2 04-Oct-23 10-Nov-23 13-Oct-23 20-Nov-23 8 HK Hols - No B/O periods 310.C.EX.W856 WVT - TTM Stage 2 (WA01) - South-Bound - Road Paving works (was C11_6C3) d/w - 10h/d - With 30 2 31-Jan-24 07-Mar-24 03-Feb-24 11-Mar-24 3 HK Hols - No B/O periods WVT - ABWF - Western Underpass Ramp (WUR) (was C11_6C3) d/w - 10h/d - With HK Hols 336- No B/O24 periods (was 27-Feb-23 C3) 16-Apr-24 06-Mar-23 19-Apr-24 3 WVT - TTM Stage 1 (WUR) - Northbound C11_6 d/w - 10h/d - With HK Hols 162- No B/O12 periods (was 27-Feb-23 C3) 12-Sep-23 06-Mar-23 15-Sep-23 3 310.C.EX.W602 WVT - TTM Stage 1 (WUR) - North-Bound - brickwork and blockwork C11_6 d/w - 10h/d - With 32 2 27-Feb-23 04-Apr-23 06-Mar-23 15-Apr-23 6 HK Hols - No B/O periods 310.C.EX.W618 WVT - TTM Stage 1 (WUR) - North-Bound - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 32 2 27-Feb-23 04-Apr-23 06-Mar-23 15-Apr-23 6 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 148 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W606 WVT - TTM Stage 1 (WUR) - North-Bound - steel and metalwork C11_6 d/w - 10h/d - With 32 2 10-Mar-23 20-Apr-23 20-Mar-23 29-Apr-23 8 HK Hols - No B/O periods 310.C.EX.W610 WVT - TTM Stage 1 (WUR) - North-Bound - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 32 2 22-Mar-23 03-May-23 31-Mar-23 12-May-23 8 HK Hols - No B/O periods 310.C.EX.W614 WVT - TTM Stage 1 (WUR) - North-Bound - Painting Works (was C11_6C3) d/w - 10h/d - With 32 2 03-Apr-23 15-May-23 17-Apr-23 24-May-23 8 HK Hols - No B/O periods 310.C.EX.W622 WVT - TTM Stage 1 (WUR) - North-Bound - Road Paving works (was C11_6C3) d/w - 10h/d - With 32 2 07-Aug-23 12-Sep-23 10-Aug-23 15-Sep-23 3 HK Hols - No B/O periods WVT - TTM Stage 2 (WUR) - Southbound (was C11_6C3) d/w - 10h/d - With HK Hols 156- No B/O12 periods (was 06-Oct-23 C3) 16-Apr-24 16-Oct-23 19-Apr-24 3 310.C.EX.W623 WVT - TTM Stage 2 (WUR) - South-Bound - brickwork and blockwork C11_6 d/w - 10h/d - With 32 2 06-Oct-23 13-Nov-23 16-Oct-23 22-Nov-23 8 HK Hols - No B/O periods 310.C.EX.W639 WVT - TTM Stage 2 (WUR) - South-Bound - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 32 2 06-Oct-23 13-Nov-23 20-Oct-23 27-Nov-23 12 HK Hols - No B/O periods 310.C.EX.W627 WVT - TTM Stage 2 (WUR) - South-Bound - steel and metalwork (was C11_6C3) d/w - 10h/d - With 32 2 18-Oct-23 24-Nov-23 28-Oct-23 04-Dec-23 8 HK Hols - No B/O periods 310.C.EX.W631 WVT - TTM Stage 2 (WUR) - South-Bound - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 32 2 31-Oct-23 06-Dec-23 09-Nov-23 15-Dec-23 8 HK Hols - No B/O periods 310.C.EX.W635 WVT - TTM Stage 2 (WUR) - South-Bound - Painting Works (was C11_6C3) d/w - 10h/d - With 32 2 11-Nov-23 18-Dec-23 21-Nov-23 29-Dec-23 8 HK Hols - No B/O periods 310.C.EX.W643 WVT - TTM Stage 2 (WUR) - South-Bound - Road Paving works (was C11_6C3) d/w - 10h/d - With 30 2 08-Mar-24 16-Apr-24 12-Mar-24 19-Apr-24 3 HK Hols - No B/O periods WVT - ABWF - Western Vehicular Tunnel (WT) (was C11_6C3) d/w - 10h/d - With HK Hols 189- No B/O12 periods (was 03-Oct-23 C3) 23-May-24 27-Oct-23 27-May-24 3 310.C.EX.W673 WVT (WT) - Remove Bulkhead Walls C11_6 d/w - 10h/d - With 3 2 03-Oct-23 05-Oct-23 27-Oct-23 30-Oct-23 20 HK Hols - No B/O periods 310.C.EX.W674 WVT (WT) - brickwork and blockwork (was C11_6C3) d/w - 10h/d - With 60 18-Oct-23 29-Dec-23 11-Nov-23 23-Jan-24 20 HK Hols - No B/O periods 310.C.EX.W690 WVT (WT) - Builder works in connection with BS (was C11_6C3) d/w - 10h/d - With 62 2 18-Oct-23 02-Jan-24 23-Nov-23 06-Feb-24 30 HK Hols - No B/O periods 310.C.EX.W678 WVT (WT) - steel and metalwork (was C11_6C3) d/w - 10h/d - With 62 2 11-Nov-23 25-Jan-24 05-Dec-23 20-Feb-24 20 HK Hols - No B/O periods 310.C.EX.W682 WVT (WT) - plastering and screeding works (was C11_6C3) d/w - 10h/d - With 62 2 19-Dec-23 05-Mar-24 30-Dec-23 14-Mar-24 8 HK Hols - No B/O periods 310.C.EX.W686 WVT (WT) - Painting Works (was C11_6C3) d/w - 10h/d - With 62 2 15-Jan-24 28-Mar-24 24-Jan-24 11-Apr-24 8 HK Hols - No B/O periods 310.C.EX.W694 WVT (WT) - Road Paving works (was C11_6C3) d/w - 10h/d - With 30 2 17-Apr-24 23-May-24 20-Apr-24 27-May-24 3 HK Hols - No B/O periods CC#07 - WVT - MEP Installation (was C11_6C3) d/w - 10h/d - With HK Hols 397- No B/O174 periods (was 28-Nov-22 C3) 28-Mar-24 01-Dec-22 29-Apr-24 23 WVT - MEP - Western Ramp (WR) C11_6 d/w - 10h/d - With HK Hols 232- No B/O32 periods (was 28-Nov-22 C3) 08-Sep-23 01-Dec-22 15-Sep-23 6 WVT - TTM Stage 1 (WR) - Northbound C11_6 d/w - 10h/d - With HK Hols 85- No B/O16 periods (was 28-Nov-22 C3) 11-Mar-23 01-Dec-22 29-Mar-23 15 310.C.EX.W886 WVT - TTM Stage 1 (WR) - North-Bound - Electrical Installation works C11_6 d/w - 10h/d - With 45 2 28-Nov-22 20-Jan-23 01-Dec-22 27-Jan-23 3 HK Hols - No B/O periods 310.C.EX.W910 WVT - TTM Stage 1 (WR) - North-Bound - Drainage Installation (was C11_6C3) d/w - 10h/d - With 45 2 28-Nov-22 20-Jan-23 13-Dec-22 08-Feb-23 13 HK Hols - No B/O periods 310.C.EX.W890 WVT - TTM Stage 1 (WR) - North-Bound - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 45 2 09-Dec-22 04-Feb-23 13-Dec-22 08-Feb-23 3 HK Hols - No B/O periods 310.C.EX.W894 WVT - TTM Stage 1 (WR) - North-Bound - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 45 2 21-Dec-22 16-Feb-23 10-Jan-23 06-Mar-23 15 HK Hols - No B/O periods 310.C.EX.W898 WVT - TTM Stage 1 (WR) - North-Bound - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 45 2 04-Jan-23 28-Feb-23 21-Jan-23 17-Mar-23 15 HK Hols - No B/O periods 310.C.EX.W899 WVT - TTM Stage 1 (WR) - North-Bound - Cabling Works (was C11_6C3) d/w - 10h/d - With 45 2 04-Jan-23 28-Feb-23 21-Jan-23 17-Mar-23 15 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 149 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W902 WVT - TTM Stage 1 (WR) - North-Bound - FS Installation C11_6 d/w - 10h/d - With 45 2 16-Jan-23 11-Mar-23 06-Feb-23 29-Mar-23 15 HK Hols - No B/O periods 310.C.EX.W906 WVT - TTM Stage 1 (WR) - North-Bound - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 45 2 16-Jan-23 11-Mar-23 06-Feb-23 29-Mar-23 15 HK Hols - No B/O periods WVT - TTM Stage 2 (WR) - Southbound (was C11_6C3) d/w - 10h/d - With HK Hols 85- No B/O16 periods (was 31-May-23 C3) 08-Sep-23 07-Jun-23 15-Sep-23 6 310.C.EX.X100 WVT - TTM Stage 2 (WR) - South-Bound - Electrical Installation works C11_6 d/w - 10h/d - With 45 2 31-May-23 24-Jul-23 07-Jun-23 31-Jul-23 6 HK Hols - No B/O periods 310.C.EX.X124 WVT - TTM Stage 2 (WR) - South-Bound - Drainage Installation (was C11_6C3) d/w - 10h/d - With 45 2 31-May-23 24-Jul-23 26-Jul-23 15-Sep-23 46 HK Hols - No B/O periods 310.C.EX.X104 WVT - TTM Stage 2 (WR) - South-Bound - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 45 2 12-Jun-23 04-Aug-23 19-Jun-23 11-Aug-23 6 HK Hols - No B/O periods 310.C.EX.X108 WVT - TTM Stage 2 (WR) - South-Bound - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 45 2 24-Jun-23 16-Aug-23 03-Jul-23 23-Aug-23 6 HK Hols - No B/O periods 310.C.EX.X112 WVT - TTM Stage 2 (WR) - South-Bound - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 45 2 07-Jul-23 28-Aug-23 14-Jul-23 04-Sep-23 6 HK Hols - No B/O periods 310.C.EX.X113 WVT - TTM Stage 2 (WR) - South-Bound - Cabling Works (was C11_6C3) d/w - 10h/d - With 45 2 07-Jul-23 28-Aug-23 14-Jul-23 04-Sep-23 6 HK Hols - No B/O periods 310.C.EX.X116 WVT - TTM Stage 2 (WR) - South-Bound - FS Installation (was C11_6C3) d/w - 10h/d - With 45 2 19-Jul-23 08-Sep-23 26-Jul-23 15-Sep-23 6 HK Hols - No B/O periods 310.C.EX.X120 WVT - TTM Stage 2 (WR) - South-Bound - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 45 2 19-Jul-23 08-Sep-23 26-Jul-23 15-Sep-23 6 HK Hols - No B/O periods WVT - MEP - Western Roundabout (WA02) (was C11_6C3) d/w - 10h/d - With HK Hols 249- No B/O32 periods (was 28-Nov-22 C3) 28-Sep-23 04-Jan-23 07-Nov-23 31 WVT - TTM Stage 1 (WA02) - Northbound C11_6 d/w - 10h/d - With HK Hols 70- No B/O16 periods (was 28-Nov-22 C3) 22-Feb-23 04-Jan-23 29-Mar-23 30 310.C.EX.W726 WVT - TTM Stage 1 (WA02) - North-Bound - Electrical Installation works C11_6 d/w - 10h/d - With 30 2 28-Nov-22 03-Jan-23 04-Jan-23 10-Feb-23 30 HK Hols - No B/O periods 310.C.EX.W750 WVT - TTM Stage 1 (WA02) - North-Bound - Drainage Installation (was C11_6C3) d/w - 10h/d - With 30 2 28-Nov-22 03-Jan-23 22-Feb-23 28-Mar-23 69 HK Hols - No B/O periods 310.C.EX.W730 WVT - TTM Stage 1 (WA02) - North-Bound - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 30 2 09-Dec-22 14-Jan-23 16-Jan-23 22-Feb-23 30 HK Hols - No B/O periods 310.C.EX.W734 WVT - TTM Stage 1 (WA02) - North-Bound - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 30 2 21-Dec-22 30-Jan-23 31-Jan-23 06-Mar-23 30 HK Hols - No B/O periods 310.C.EX.W738 WVT - TTM Stage 1 (WA02) - North-Bound - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 30 2 04-Jan-23 10-Feb-23 11-Feb-23 17-Mar-23 30 HK Hols - No B/O periods 310.C.EX.W739 WVT - TTM Stage 1 (WA02) - North-Bound - Cabling Works (was C11_6C3) d/w - 10h/d - With 30 2 04-Jan-23 10-Feb-23 11-Feb-23 17-Mar-23 30 HK Hols - No B/O periods 310.C.EX.W742 WVT - TTM Stage 1 (WA02) - North-Bound - FS Installation (was C11_6C3) d/w - 10h/d - With 30 2 16-Jan-23 22-Feb-23 23-Feb-23 29-Mar-23 30 HK Hols - No B/O periods 310.C.EX.W746 WVT - TTM Stage 1 (WA02) - North-Bound - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 30 2 16-Jan-23 22-Feb-23 23-Feb-23 29-Mar-23 30 HK Hols - No B/O periods WVT - TTM Stage 2 (WA02) - Southbound (was C11_6C3) d/w - 10h/d - With HK Hols 70- No B/O16 periods (was 10-Jul-23 C3) 28-Sep-23 15-Aug-23 07-Nov-23 31 310.C.EX.X130 WVT - TTM Stage 2 (WA02) - South-Bound - Electrical Installation works C11_6 d/w - 10h/d - With 30 2 10-Jul-23 12-Aug-23 15-Aug-23 18-Sep-23 31 HK Hols - No B/O periods 310.C.EX.X154 WVT - TTM Stage 2 (WA02) - South-Bound - Drainage Installation (was C11_6C3) d/w - 10h/d - With 30 2 10-Jul-23 12-Aug-23 03-Oct-23 07-Nov-23 71 HK Hols - No B/O periods 310.C.EX.X134 WVT - TTM Stage 2 (WA02) - South-Bound - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 30 2 21-Jul-23 24-Aug-23 26-Aug-23 29-Sep-23 31 HK Hols - No B/O periods 310.C.EX.X138 WVT - TTM Stage 2 (WA02) - South-Bound - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 30 2 02-Aug-23 05-Sep-23 07-Sep-23 13-Oct-23 31 HK Hols - No B/O periods 310.C.EX.X142 WVT - TTM Stage 2 (WA02) - South-Bound - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 30 2 14-Aug-23 16-Sep-23 19-Sep-23 26-Oct-23 31 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 150 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.X143 WVT - TTM Stage 2 (WA02) - South-Bound - Cabling Works C11_6 d/w - 10h/d - With 30 2 14-Aug-23 16-Sep-23 19-Sep-23 26-Oct-23 31 HK Hols - No B/O periods 310.C.EX.X146 WVT - TTM Stage 2 (WA02) - South-Bound - FS Installation (was C11_6C3) d/w - 10h/d - With 30 2 25-Aug-23 28-Sep-23 03-Oct-23 07-Nov-23 31 HK Hols - No B/O periods 310.C.EX.X150 WVT - TTM Stage 2 (WA02) - South-Bound - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 30 2 25-Aug-23 28-Sep-23 03-Oct-23 07-Nov-23 31 HK Hols - No B/O periods WVT - MEP - Western Underpass (WU) (was C11_6C3) d/w - 10h/d - With HK Hols 265- No B/O32 periods (was 17-Jan-23 C3) 07-Dec-23 27-Jan-23 14-Dec-23 6 WVT - TTM Stage 1 (WU) - Northbound C11_6 d/w - 10h/d - With HK Hols 85- No B/O16 periods (was 17-Jan-23 C3) 04-May-23 27-Jan-23 25-May-23 18 310.C.EX.W754 WVT - TTM Stage 1 (WU) - North-Bound - Electrical Installation works C11_6 d/w - 10h/d - With 45 2 17-Jan-23 13-Mar-23 27-Jan-23 20-Mar-23 6 HK Hols - No B/O periods 310.C.EX.W778 WVT - TTM Stage 1 (WU) - North-Bound - Drainage Installation (was C11_6C3) d/w - 10h/d - With 45 2 17-Jan-23 13-Mar-23 29-Mar-23 25-May-23 58 HK Hols - No B/O periods 310.C.EX.W758 WVT - TTM Stage 1 (WU) - North-Bound - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 45 2 01-Feb-23 24-Mar-23 08-Feb-23 31-Mar-23 6 HK Hols - No B/O periods 310.C.EX.W762 WVT - TTM Stage 1 (WU) - North-Bound - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 45 2 13-Feb-23 06-Apr-23 20-Feb-23 17-Apr-23 6 HK Hols - No B/O periods 310.C.EX.W766 WVT - TTM Stage 1 (WU) - North-Bound - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 45 2 24-Feb-23 21-Apr-23 03-Mar-23 28-Apr-23 6 HK Hols - No B/O periods 310.C.EX.W768 WVT - TTM Stage 1 (WU) - North-Bound - Cabling Works (was C11_6C3) d/w - 10h/d - With 45 2 24-Feb-23 21-Apr-23 03-Mar-23 28-Apr-23 6 HK Hols - No B/O periods 310.C.EX.W770 WVT - TTM Stage 1 (WU) - North-Bound - FS Installation (was C11_6C3) d/w - 10h/d - With 45 2 08-Mar-23 04-May-23 15-Mar-23 11-May-23 6 HK Hols - No B/O periods 310.C.EX.W774 WVT - TTM Stage 1 (WU) - North-Bound - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 45 2 08-Mar-23 04-May-23 15-Mar-23 11-May-23 6 HK Hols - No B/O periods WVT - TTM Stage 2 (WU) - Southbound (was C11_6C3) d/w - 10h/d - With HK Hols 85- No B/O16 periods (was 28-Aug-23 C3) 07-Dec-23 04-Sep-23 14-Dec-23 6 310.C.EX.X160 WVT - TTM Stage 2 (WU) - South-Bound - Electrical Installation works C11_6 d/w - 10h/d - With 45 2 28-Aug-23 20-Oct-23 04-Sep-23 28-Oct-23 6 HK Hols - No B/O periods 310.C.EX.X184 WVT - TTM Stage 2 (WU) - South-Bound - Drainage Installation (was C11_6C3) d/w - 10h/d - With 45 2 28-Aug-23 20-Oct-23 24-Oct-23 14-Dec-23 46 HK Hols - No B/O periods 310.C.EX.X164 WVT - TTM Stage 2 (WU) - South-Bound - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 45 2 08-Sep-23 02-Nov-23 15-Sep-23 09-Nov-23 6 HK Hols - No B/O periods 310.C.EX.X168 WVT - TTM Stage 2 (WU) - South-Bound - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 45 2 20-Sep-23 14-Nov-23 27-Sep-23 21-Nov-23 6 HK Hols - No B/O periods 310.C.EX.X172 WVT - TTM Stage 2 (WU) - South-Bound - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 45 2 04-Oct-23 25-Nov-23 11-Oct-23 02-Dec-23 6 HK Hols - No B/O periods 310.C.EX.X174 WVT - TTM Stage 2 (WU) - South-Bound - Cabling Works (was C11_6C3) d/w - 10h/d - With 45 2 04-Oct-23 25-Nov-23 11-Oct-23 02-Dec-23 6 HK Hols - No B/O periods 310.C.EX.X176 WVT - TTM Stage 2 (WU) - South-Bound - FS Installation (was C11_6C3) d/w - 10h/d - With 45 2 16-Oct-23 07-Dec-23 24-Oct-23 14-Dec-23 6 HK Hols - No B/O periods 310.C.EX.X180 WVT - TTM Stage 2 (WU) - South-Bound - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 45 2 16-Oct-23 07-Dec-23 24-Oct-23 14-Dec-23 6 HK Hols - No B/O periods WVT - MEP - Western Roundabout (WA01) (was C11_6C3) d/w - 10h/d - With HK Hols 250- No B/O32 periods (was 27-Feb-23 C3) 29-Dec-23 04-Apr-23 02-Feb-24 29 WVT - TTM Stage 1 (WA01) - Northbound C11_6 d/w - 10h/d - With HK Hols 70- No B/O16 periods (was 27-Feb-23 C3) 24-May-23 04-Apr-23 03-Jul-23 31 310.C.EX.W858 WVT - TTM Stage 1 (WA01) - North-Bound - Electrical Installation works C11_6 d/w - 10h/d - With 30 2 27-Feb-23 01-Apr-23 04-Apr-23 13-May-23 31 HK Hols - No B/O periods 310.C.EX.W862 WVT - TTM Stage 1 (WA01) - North-Bound - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 30 2 10-Mar-23 18-Apr-23 20-Apr-23 25-May-23 31 HK Hols - No B/O periods 310.C.EX.W882 WVT - TTM Stage 1 (WA01) - North-Bound - Drainage Installation (was C11_6C3) d/w - 10h/d - With 30 2 14-Mar-23 21-Apr-23 27-May-23 03-Jul-23 58 HK Hols - No B/O periods 310.C.EX.W866 WVT - TTM Stage 1 (WA01) - North-Bound - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 30 2 22-Mar-23 29-Apr-23 03-May-23 07-Jun-23 31 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 151 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W870 WVT - TTM Stage 1 (WA01) - North-Bound - Electrical and Control System C11_6 d/w - 10h/d - With 30 2 03-Apr-23 12-May-23 15-May-23 19-Jun-23 31 HK Hols - No B/O periods 310.C.EX.W872 WVT - TTM Stage 1 (WA01) - North-Bound - Cabling Works (was C11_6C3) d/w - 10h/d - With 30 2 03-Apr-23 12-May-23 15-May-23 19-Jun-23 31 HK Hols - No B/O periods 310.C.EX.W874 WVT - TTM Stage 1 (WA01) - North-Bound - FS Installation (was C11_6C3) d/w - 10h/d - With 30 2 19-Apr-23 24-May-23 27-May-23 03-Jul-23 31 HK Hols - No B/O periods 310.C.EX.W878 WVT - TTM Stage 1 (WA01) - North-Bound - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 30 2 19-Apr-23 24-May-23 27-May-23 03-Jul-23 31 HK Hols - No B/O periods WVT - TTM Stage 2 (WA01) - Southbound (was C11_6C3) d/w - 10h/d - With HK Hols 70- No B/O16 periods (was 06-Oct-23 C3) 29-Dec-23 10-Nov-23 02-Feb-24 29 310.C.EX.X200 WVT - TTM Stage 2 (WA01) - South-Bound - Electrical Installation works C11_6 d/w - 10h/d - With 30 2 06-Oct-23 10-Nov-23 10-Nov-23 14-Dec-23 29 HK Hols - No B/O periods 310.C.EX.X224 WVT - TTM Stage 2 (WA01) - South-Bound - Drainage Installation (was C11_6C3) d/w - 10h/d - With 30 2 06-Oct-23 10-Nov-23 29-Dec-23 02-Feb-24 69 HK Hols - No B/O periods 310.C.EX.X204 WVT - TTM Stage 2 (WA01) - South-Bound - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 30 2 18-Oct-23 22-Nov-23 22-Nov-23 28-Dec-23 29 HK Hols - No B/O periods 310.C.EX.X208 WVT - TTM Stage 2 (WA01) - South-Bound - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 30 2 31-Oct-23 04-Dec-23 04-Dec-23 10-Jan-24 29 HK Hols - No B/O periods 310.C.EX.X212 WVT - TTM Stage 2 (WA01) - South-Bound - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 30 2 11-Nov-23 15-Dec-23 15-Dec-23 22-Jan-24 29 HK Hols - No B/O periods 310.C.EX.X214 WVT - TTM Stage 2 (WA01) - South-Bound - Cabling Works (was C11_6C3) d/w - 10h/d - With 30 2 11-Nov-23 15-Dec-23 15-Dec-23 22-Jan-24 29 HK Hols - No B/O periods 310.C.EX.X216 WVT - TTM Stage 2 (WA01) - South-Bound - FS Installation (was C11_6C3) d/w - 10h/d - With 30 2 23-Nov-23 29-Dec-23 29-Dec-23 02-Feb-24 29 HK Hols - No B/O periods 310.C.EX.X220 WVT - TTM Stage 2 (WA01) - South-Bound - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 30 2 23-Nov-23 29-Dec-23 29-Dec-23 02-Feb-24 29 HK Hols - No B/O periods WVT - MEP - Western Underpass Ramp (WUR) (was C11_6C3) d/w - 10h/d - With HK Hols 265- No B/O32 periods (was 06-Apr-23 C3) 26-Feb-24 28-Apr-23 11-Mar-24 12 WVT - TTM Stage 1 (WUR) - Northbound C11_6 d/w - 10h/d - With HK Hols 85- No B/O16 periods (was 06-Apr-23 C3) 21-Jul-23 28-Apr-23 09-Aug-23 16 310.C.EX.W698 WVT - TTM Stage 1 (WUR) - North-Bound - Electrical Installation works C11_6 d/w - 10h/d - With 45 2 06-Apr-23 02-Jun-23 28-Apr-23 21-Jun-23 16 HK Hols - No B/O periods 310.C.EX.W722 WVT - TTM Stage 1 (WUR) - North-Bound - Drainage Installation (was C11_6C3) d/w - 10h/d - With 45 2 06-Apr-23 02-Jun-23 16-Jun-23 09-Aug-23 56 HK Hols - No B/O periods 310.C.EX.W702 WVT - TTM Stage 1 (WUR) - North-Bound - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 45 2 21-Apr-23 14-Jun-23 11-May-23 05-Jul-23 16 HK Hols - No B/O periods 310.C.EX.W706 WVT - TTM Stage 1 (WUR) - North-Bound - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 45 2 04-May-23 27-Jun-23 23-May-23 17-Jul-23 16 HK Hols - No B/O periods 310.C.EX.W710 WVT - TTM Stage 1 (WUR) - North-Bound - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 45 2 16-May-23 10-Jul-23 05-Jun-23 28-Jul-23 16 HK Hols - No B/O periods 310.C.EX.W712 WVT - TTM Stage 1 (WUR) - North-Bound - Cabling Works (was C11_6C3) d/w - 10h/d - With 45 2 16-May-23 10-Jul-23 05-Jun-23 28-Jul-23 16 HK Hols - No B/O periods 310.C.EX.W714 WVT - TTM Stage 1 (WUR) - North-Bound - FS Installation (was C11_6C3) d/w - 10h/d - With 45 2 29-May-23 21-Jul-23 16-Jun-23 09-Aug-23 16 HK Hols - No B/O periods 310.C.EX.W718 WVT - TTM Stage 1 (WUR) - North-Bound - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 45 2 29-May-23 21-Jul-23 16-Jun-23 09-Aug-23 16 HK Hols - No B/O periods WVT - TTM Stage 2 (WUR) - Southbound (was C11_6C3) d/w - 10h/d - With HK Hols 85- No B/O16 periods (was 14-Nov-23 C3) 26-Feb-24 28-Nov-23 11-Mar-24 12 310.C.EX.X230 WVT - TTM Stage 2 (WUR) - South-Bound - Electrical Installation works C11_6 d/w - 10h/d - With 45 2 14-Nov-23 08-Jan-24 28-Nov-23 22-Jan-24 12 HK Hols - No B/O periods 310.C.EX.X254 WVT - TTM Stage 2 (WUR) - South-Bound - Drainage Installation (was C11_6C3) d/w - 10h/d - With 45 2 14-Nov-23 08-Jan-24 17-Jan-24 11-Mar-24 52 HK Hols - No B/O periods 310.C.EX.X234 WVT - TTM Stage 2 (WUR) - South-Bound - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 45 2 25-Nov-23 19-Jan-24 09-Dec-23 02-Feb-24 12 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 152 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.X238 WVT - TTM Stage 2 (WUR) - South-Bound - Air Quality Monitoring System C11_6 d/w - 10h/d - With 45 2 07-Dec-23 31-Jan-24 21-Dec-23 16-Feb-24 12 HK Hols - No B/O periods 310.C.EX.X242 WVT - TTM Stage 2 (WUR) - South-Bound - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 45 2 19-Dec-23 14-Feb-24 05-Jan-24 28-Feb-24 12 HK Hols - No B/O periods 310.C.EX.X244 WVT - TTM Stage 2 (WUR) - South-Bound - Cabling Works (was C11_6C3) d/w - 10h/d - With 45 2 19-Dec-23 14-Feb-24 05-Jan-24 28-Feb-24 12 HK Hols - No B/O periods 310.C.EX.X246 WVT - TTM Stage 2 (WUR) - South-Bound - FS Installation (was C11_6C3) d/w - 10h/d - With 45 2 03-Jan-24 26-Feb-24 17-Jan-24 11-Mar-24 12 HK Hols - No B/O periods 310.C.EX.X250 WVT - TTM Stage 2 (WUR) - South-Bound - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 45 2 03-Jan-24 26-Feb-24 17-Jan-24 11-Mar-24 12 HK Hols - No B/O periods WVT - MEP - Western Vehicular Tunnel (WT) (was C11_6C3) d/w - 10h/d - With HK Hols 112- No B/O14 periods (was 14-Nov-23 C3) 28-Mar-24 09-Dec-23 29-Apr-24 23 310.C.EX.W782 WVT (WT) - Electrical Installation works C11_6 d/w - 10h/d - With 58 14-Nov-23 23-Jan-24 09-Dec-23 20-Feb-24 22 HK Hols - No B/O periods 310.C.EX.W786 WVT (WT) - Tunnel Ventilation System Installation (was C11_6C3) d/w - 10h/d - With 60 2 22-Nov-23 02-Feb-24 18-Dec-23 01-Mar-24 22 HK Hols - No B/O periods 310.C.EX.W790 WVT (WT) - Air Quality Monitoring System (was C11_6C3) d/w - 10h/d - With 60 2 30-Nov-23 10-Feb-24 28-Dec-23 09-Mar-24 22 HK Hols - No B/O periods 310.C.EX.W806 WVT (WT) - Drainage Installation (was C11_6C3) d/w - 10h/d - With 60 2 04-Dec-23 16-Feb-24 03-Feb-24 19-Apr-24 50 HK Hols - No B/O periods 310.C.EX.W794 WVT (WT) - Electrical and Control System (was C11_6C3) d/w - 10h/d - With 60 2 12-Dec-23 24-Feb-24 10-Jan-24 21-Mar-24 22 HK Hols - No B/O periods 310.C.EX.W796 WVT (WT) - Cabling Works (was C11_6C3) d/w - 10h/d - With 60 2 12-Dec-23 24-Feb-24 03-Feb-24 19-Apr-24 43 HK Hols - No B/O periods 310.C.EX.W798 WVT (WT) - FS Installation (was C11_6C3) d/w - 10h/d - With 60 2 21-Dec-23 05-Mar-24 15-Feb-24 29-Apr-24 43 HK Hols - No B/O periods 310.C.EX.W802 WVT (WT) - Plumbing System for FS (was C11_6C3) d/w - 10h/d - With 60 2 17-Jan-24 28-Mar-24 26-Jan-24 11-Apr-24 8 HK Hols - No B/O periods CC#07 - Tunnel Plant Building B - PBB (was C3) 210 10 12-May-22 19-Jan-23 24-May-22 06-Feb-23 12 CC#07 - PBB - Procurement C01_7 d/w - 10h/d - No HK Hols118 - No B/O periods 0 (was12-May-22 C1) 06-Sep-22 24-May-22 07-Sep-22 1 Major Materials MEP C01_7 d/w - 10h/d - No HK Hols118 - No B/O periods 0 (was12-May-22 C1) 06-Sep-22 24-May-22 07-Sep-22 1 310.P.RC.S118 PBB (Procurement Electrical & MVAC Major Equipment and Others)-Place Order for C01_7 d/w - 10h/d - No HK 60 12-May-22 10-Jul-22 03-Jun-22 01-Aug-22 22 Materials Hols - No B/O periods (was 310.P.RC.S134 PBB (Procurement Electrical & MVAC Major Equipment and Others)-Manufacturing of C1) C01_7 d/w - 10h/d - No HK 90 19-May-22 16-Aug-22 10-Jun-22 07-Sep-22 22 Materials Hols - No B/O periods (was 310.P.RC.S114 PBB (Procurement FS and P&D Major Equipment) - Place Order for Materials C1) C01_7 d/w - 10h/d - No HK 100 23-May-22 30-Aug-22 24-May-22 31-Aug-22 1 Hols - No B/O periods (was 310.P.RC.S130 PBB (Procurement FS and P&D Major Equipment) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 100 30-May-22 06-Sep-22 31-May-22 07-Sep-22 1 Hols - No B/O periods (was 310.P.RC.S138 PBB (Procurement) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 7 31-Aug-22 06-Sep-22 01-Sep-22 07-Sep-22 1 Hols - No B/O periods (was Major Materials ABWF C1) C01_7 d/w - 10h/d - No HK Hols96 - No B/O periods 0 (was31-May-22 C1) 03-Sep-22 02-Jun-22 05-Sep-22 2 310.P.RC.S122 PBB (Procurement ABWF) - Place Order for Materials C01_7 d/w - 10h/d - No HK 4 31-May-22 03-Jun-22 02-Jun-22 05-Jun-22 2 Hols - No B/O periods (was 310.P.RC.S190 PBB (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 90 04-Jun-22 01-Sep-22 06-Jun-22 03-Sep-22 2 Hols - No B/O periods (was 310.P.RC.S198 PBB (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 7 28-Aug-22 03-Sep-22 30-Aug-22 05-Sep-22 2 Hols - No B/O periods (was CC#07 - PBB - Preparation and Initial Works C1) 51 1 08-Jul-22 06-Sep-22 08-Jul-22 06-Sep-22 0 310.C.WS.P014 PBB - Handover inspection and acceptance FROM Contract <3303> C01_7 d/w - 10h/d - No HK 60 1 08-Jul-22 05-Sep-22 08-Jul-22 05-Sep-22 0 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 153 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.WS.P016 PBB - Access to Tunnel Plant Building B FROM Contract <3303> C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 05-Sep-22 0 Hols - No B/O periods (was 310.C.WS.P018 PBB - Commence ABWF, MEP Works C1) C11_6 d/w - 10h/d - With 0 06-Sep-22 06-Sep-22 0 HK Hols - No B/O periods CC#07 - PBB - ABWF (was C11_6C3) d/w - 10h/d - With HK Hols 49- No B/O 0periods (was 06-Sep-22 C3) 04-Nov-22 09-Sep-22 10-Nov-22 5 310.C.EX.W1308 PBB Sanitary Ware & Fixtures C11_6 d/w - 10h/d - With 33 06-Sep-22 17-Oct-22 09-Sep-22 20-Oct-22 3 HK Hols - No B/O periods 310.C.EX.W1292 PBB Partition Wall & Door Subframe (was C11_6C3) d/w - 10h/d - With 45 06-Sep-22 31-Oct-22 09-Sep-22 03-Nov-22 3 HK Hols - No B/O periods 310.C.EX.W1296 PBB Plastering & Screeding (was C11_6C3) d/w - 10h/d - With 45 06-Sep-22 31-Oct-22 09-Sep-22 03-Nov-22 3 HK Hols - No B/O periods 310.C.EX.W1300 PBB Tiling & Stonework (was C11_6C3) d/w - 10h/d - With 45 06-Sep-22 31-Oct-22 09-Sep-22 03-Nov-22 3 HK Hols - No B/O periods 310.C.EX.W1304 PBB Suspended Ceiling Framework (was C11_6C3) d/w - 10h/d - With 45 06-Sep-22 31-Oct-22 09-Sep-22 03-Nov-22 3 HK Hols - No B/O periods 310.C.EX.W1312 PBB Door Sets & Ironmongery (was C11_6C3) d/w - 10h/d - With 45 06-Sep-22 31-Oct-22 13-Sep-22 05-Nov-22 5 HK Hols - No B/O periods 310.C.EX.W1316 PBB Glazing (was C11_6C3) d/w - 10h/d - With 45 06-Sep-22 31-Oct-22 13-Sep-22 05-Nov-22 5 HK Hols - No B/O periods 310.C.EX.W1320 PBB Ceiling Panels & Finishes (was C11_6C3) d/w - 10h/d - With 45 06-Sep-22 31-Oct-22 13-Sep-22 05-Nov-22 5 HK Hols - No B/O periods 310.C.EX.W1324 PBB Painting, Graphics & Signage (was C11_6C3) d/w - 10h/d - With 42 15-Sep-22 04-Nov-22 21-Sep-22 10-Nov-22 5 HK Hols - No B/O periods CC#07 - PBB - MEP Installation Works (was C11_6C3) d/w - 10h/d - With HK Hols 112- No B/O 7periods (was 06-Sep-22 C3) 19-Jan-23 06-Sep-22 06-Feb-23 12 CC#07 - PBB - Transformers (CLP) C11_6 d/w - 10h/d - With HK Hols 48- No B/O 3periods (was 06-Sep-22 C3) 03-Nov-22 06-Sep-22 03-Nov-22 0 310.C.EX.W1328 PBB Complete Transformer Room Structure C11_6 d/w - 10h/d - With 0 06-Sep-22 06-Sep-22 0 HK Hols - No B/O periods 310.C.EX.W1252 PBB Builder Works in Transformer Room (was C11_6C3) d/w - 10h/d - With 12 06-Sep-22 20-Sep-22 06-Sep-22 20-Sep-22 0 HK Hols - No B/O periods 310.C.EX.W1253 PBB MEP Works in Transformer Room (was C11_6C3) d/w - 10h/d - With 12 09-Sep-22 23-Sep-22 09-Sep-22 23-Sep-22 0 HK Hols - No B/O periods 310.C.EX.W1256 PBB Inspection & Handover Transformer Room to CLP (was C11_6C3) d/w - 10h/d - With 3 24-Sep-22 27-Sep-22 24-Sep-22 27-Sep-22 0 HK Hols - No B/O periods 310.C.EX.W1260 PBB Transformer Installation by CLP (was C11_6C3) d/w - 10h/d - With 30 28-Sep-22 03-Nov-22 28-Sep-22 03-Nov-22 0 HK Hols - No B/O periods 310.C.EX.W1332 PBB Cable Laying by CLP (was C11_6C3) d/w - 10h/d - With 30 3 28-Sep-22 03-Nov-22 28-Sep-22 03-Nov-22 0 HK Hols - No B/O periods 310.C.EX.W1264 PBB Energization of Transformers (was C11_6C3) d/w - 10h/d - With 0 03-Nov-22 03-Nov-22 0 HK Hols - No B/O periods CC#07 - PBB - Plumbing & Drainage Installation (was C11_6C3) d/w - 10h/d - With HK Hols 23- No B/O 0periods (was 09-Sep-22 C3) 08-Oct-22 15-Sep-22 13-Oct-22 4 310.C.EX.W1268 PBB Plumbing & Drainage 1st Fix & Installation C11_6 d/w - 10h/d - With 10 09-Sep-22 21-Sep-22 15-Sep-22 26-Sep-22 4 HK Hols - No B/O periods 310.C.EX.W1276 PBB Water Pump Installation (was C11_6C3) d/w - 10h/d - With 15 09-Sep-22 27-Sep-22 16-Sep-22 05-Oct-22 5 HK Hols - No B/O periods 310.C.EX.W1272 PBB Plumbing & Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 15 14-Sep-22 30-Sep-22 19-Sep-22 07-Oct-22 4 HK Hols - No B/O periods 310.C.EX.W1288 PBB Plumbing & Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 29-Sep-22 08-Oct-22 06-Oct-22 13-Oct-22 4 HK Hols - No B/O periods CC#07 - PBB - Electrical Installation (was C11_6C3) d/w - 10h/d - With HK Hols 43- No B/O 0periods (was 09-Sep-22 C3) 01-Nov-22 13-Sep-22 03-Nov-22 2 310.C.EX.W1176 PBB Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 20 09-Sep-22 05-Oct-22 13-Sep-22 07-Oct-22 2 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 154 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W1184 PBB Switchgear Installation C11_6 d/w - 10h/d - With 20 15-Sep-22 10-Oct-22 17-Sep-22 12-Oct-22 2 HK Hols - No B/O periods 310.C.EX.W1188 PBB Emergency Genset Installation (was C11_6C3) d/w - 10h/d - With 14 20-Sep-22 07-Oct-22 22-Sep-22 10-Oct-22 2 HK Hols - No B/O periods 310.C.EX.W1180 PBB Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 14 06-Oct-22 21-Oct-22 08-Oct-22 24-Oct-22 2 HK Hols - No B/O periods 310.C.EX.W1192 PBB Provide Temporary Power for Power On to All Floors (was C11_6C3) d/w - 10h/d - With 0 10-Oct-22 12-Oct-22 2 HK Hols - No B/O periods 310.C.EX.W1204 PBB Electrical Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 25-Oct-22 01-Nov-22 27-Oct-22 03-Nov-22 2 HK Hols - No B/O periods CC#07 - PBB - Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 39- No B/O 0periods (was 08-Sep-22 C3) 26-Oct-22 09-Sep-22 27-Oct-22 1 310.C.EX.W1208 PBB Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 18 08-Sep-22 29-Sep-22 09-Sep-22 30-Sep-22 1 HK Hols - No B/O periods 310.C.EX.W1212 PBB Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 18 13-Sep-22 05-Oct-22 16-Sep-22 08-Oct-22 3 HK Hols - No B/O periods 310.C.EX.W1216 PBB FS Pump Installation (was C11_6C3) d/w - 10h/d - With 10 17-Sep-22 28-Sep-22 20-Sep-22 30-Sep-22 2 HK Hols - No B/O periods 310.C.EX.W1228 PBB Fire Services Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 19-Oct-22 26-Oct-22 20-Oct-22 27-Oct-22 1 HK Hols - No B/O periods CC#07 - PBB - MVAC Installation (was C11_6C3) d/w - 10h/d - With HK Hols 38- No B/O 0periods (was 09-Sep-22 C3) 26-Oct-22 12-Sep-22 27-Oct-22 1 310.C.EX.W1232 PBB MVAC 1st Fix & Installation C11_6 d/w - 10h/d - With 15 09-Sep-22 27-Sep-22 12-Sep-22 28-Sep-22 1 HK Hols - No B/O periods 310.C.EX.W1236 PBB MVAC 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 15 20-Sep-22 08-Oct-22 23-Sep-22 12-Oct-22 3 HK Hols - No B/O periods 310.C.EX.W1248 PBB MVAC Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 19-Oct-22 26-Oct-22 20-Oct-22 27-Oct-22 1 HK Hols - No B/O periods CC#07 - PBB - Comms Room and Associated Rooms (was C11_6C3) d/w - 10h/d - With HK Hols 112- No B/O 4periods (was 06-Sep-22 C3) 19-Jan-23 21-Sep-22 06-Feb-23 12 310.C.ES.P516 ABWF (Comms Room) - Commence ABWF works C11_6 d/w - 10h/d - With 0 06-Sep-22 21-Sep-22 12 HK Hols - No B/O periods 310.C.ES.P508 PBB (Comms Room 1st Degree - 3rd Degree) - ABWF Works (floor screed, partition (was C11_6C3) d/w - 10h/d - With 40 1 06-Sep-22 25-Oct-22 21-Sep-22 08-Nov-22 12 walls, installed conduits) HK Hols - No B/O periods 310.C.ES.P512 PBB (Novec 1234 Comms Room 1st Degree - 3rd Degree) - ABWF works Comms Rooms (was C11_6C3) d/w - 10h/d - With 107 1 13-Sep-22 19-Jan-23 27-Sep-22 06-Feb-23 12 (wall, floors, ceiling, doors) HK Hols - No B/O periods 310.C.ES.P520 PBB (Comms Room) - Commence Building Services works (was C11_6C3) d/w - 10h/d - With 0 19-Sep-22 05-Oct-22 12 HK Hols - No B/O periods 310.C.ES.P524 PBB (Comms Room 1st Fix - Final Fix) -Building Services Installations (was C11_6C3) d/w - 10h/d - With 20 2 19-Sep-22 13-Oct-22 05-Oct-22 27-Oct-22 12 HK Hols - No B/O periods CC#07 - PBB - External Works (was C11_6C3) d/w - 10h/d - With HK Hols 48- No B/O 2periods (was 06-Sep-22 C3) 03-Nov-22 08-Sep-22 18-Nov-22 13 CC#07 - PBB - External Building Finishes C11_6 d/w - 10h/d - With HK Hols 48- No B/O 0periods (was 06-Sep-22 C3) 03-Nov-22 08-Sep-22 18-Nov-22 13 310.C.ES.P556 PBB External building finishes C11_6 d/w - 10h/d - With 35 06-Sep-22 19-Oct-22 08-Sep-22 21-Oct-22 2 HK Hols - No B/O periods 310.C.ES.P564.B01 PBB Roof Waterproofing and roof finishes (was C11_6C3) d/w - 10h/d - With 35 06-Sep-22 19-Oct-22 10-Oct-22 18-Nov-22 26 HK Hols - No B/O periods 310.C.ES.P548 PBB Hard and soft landscape works (was C11_6C3) d/w - 10h/d - With 21 11-Oct-22 03-Nov-22 26-Oct-22 18-Nov-22 13 HK Hols - No B/O periods CC#07 - PBB - Drainage and UU (was C11_6C3) d/w - 10h/d - With HK Hols 46- No B/O 2periods (was 07-Sep-22 C3) 02-Nov-22 08-Sep-22 03-Nov-22 1 310.C.ES.P536 PBB Building drainage and watermain works C11_6 d/w - 10h/d - With 18 07-Sep-22 28-Sep-22 08-Sep-22 29-Sep-22 1 HK Hols - No B/O periods 310.C.ES.P540 PBB AS Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 18 17-Sep-22 10-Oct-22 19-Sep-22 11-Oct-22 1 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 155 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.ES.P544 PBB EL cable ducts + drawpits C11_6 d/w - 10h/d - With 18 17-Sep-22 10-Oct-22 19-Sep-22 11-Oct-22 1 HK Hols - No B/O periods 310.C.ES.P560 PBB CLP Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 18 17-Sep-22 10-Oct-22 19-Sep-22 11-Oct-22 1 HK Hols - No B/O periods 310.C.ES.P831.B01 PBB Cabling Works (was C11_6C3) d/w - 10h/d - With 20 2 11-Oct-22 02-Nov-22 12-Oct-22 03-Nov-22 1 HK Hols - No B/O periods CC#07 - PBB -- EVA Construction (was C11_6C3) d/w - 10h/d - With HK Hols8 - No B/O 0periods (was 25-Oct-22 C3) 02-Nov-22 26-Oct-22 03-Nov-22 1 310.C.EX.L290 PBB Site Formation Works and Road Works for EVA C11_6 d/w - 10h/d - With 8 25-Oct-22 02-Nov-22 26-Oct-22 03-Nov-22 1 HK Hols - No B/O periods CC#07 ----- Testing and Commissioning ----- (was C3) 646 4 23-May-22 23-Jul-24 24-Jun-22 28-Jul-24 4 CC#07 - WVT - Testing and Commissioning 621 0 22-Jun-22 23-Jul-24 21-Sep-22 28-Jul-24 4 CC#07 - WVT - Testing and Commissioning C01_7 d/w - 10h/d - No HK Hols109 - No B/O periods 0 (was25-Feb-24 C1) 12-Jun-24 22-Mar-24 26-Jul-24 44 310.T.EX.L148 WVT (T&C) - Ventilation System Test C01_7 d/w - 10h/d - No HK 35 25-Feb-24 30-Mar-24 22-Mar-24 25-Apr-24 26 Hols - No B/O periods (was 310.T.EX.L140 WVT (T&C) - Plumbing System Test C1) C01_7 d/w - 10h/d - No HK 24 29-Mar-24 21-Apr-24 12-Apr-24 05-May-24 14 Hols - No B/O periods (was 310.T.EX.L144 WVT (T&C) - FS System Test C1) C01_7 d/w - 10h/d - No HK 28 29-Mar-24 25-Apr-24 30-Apr-24 27-May-24 32 Hols - No B/O periods (was 310.T.EX.L156 WVT (T&C) - Systems Integration Test C1) C01_7 d/w - 10h/d - No HK 48 26-Apr-24 12-Jun-24 09-Jun-24 26-Jul-24 44 Hols - No B/O periods (was CC#07 - WVT - Statutory Inspection C1) 621 0 22-Jun-22 23-Jul-24 21-Sep-22 28-Jul-24 4 Water Supply Department (WSD) C11_6 d/w - 10h/d - With HK Hols 563- No B/O 0periods (was 22-Jun-22 C3) 13-May-24 21-Sep-22 27-May-24 11 310.T.WS.T100 WVT Prepare for Plumbing Material for Submission C11_6 d/w - 10h/d - With 17 22-Jun-22 12-Jul-22 21-Sep-22 12-Oct-22 76 HK Hols - No B/O periods 310.T.WS.T105 WVT Submit all Plumbing Material for PM Acceptance (was C11_6C3) d/w - 10h/d - With 0 13-Jul-22 13-Oct-22 76 HK Hols - No B/O periods 310.T.WS.T110 WVT PM Acceptance (was C11_6C3) d/w - 10h/d - With 48 13-Jul-22 06-Sep-22 13-Oct-22 07-Dec-22 76 HK Hols - No B/O periods 310.T.WS.T115 WVT Form WWO 46 (Part I & Part II) & Annex Submission for WSD Approval (Plumbing / (was C11_6C3) d/w - 10h/d - With 0 07-Sep-22 08-Dec-22 76 FS / WP) HK Hols - No B/O periods 310.T.WS.T120 WVT Obtain Form WWO 46 (Part III) - WSD Approval, Endorsed & Return to Licensed (was C11_6C3) d/w - 10h/d - With 4 07-Sep-22 12-Sep-22 08-Dec-22 12-Dec-22 76 Plumber HK Hols - No B/O periods 310.T.WS.T125 WVT Form WWO 46 (Part IV) Submission for WSD Inspection (Plumbing / FS / WP) (was C11_6C3) d/w - 10h/d - With 0 22-Apr-24 06-May-24 11 HK Hols - No B/O periods 310.T.WS.T130 WVT WSD Inspection for Water Supply System (was C11_6C3) d/w - 10h/d - With 12 22-Apr-24 06-May-24 06-May-24 20-May-24 11 HK Hols - No B/O periods 310.T.WS.T135 WVT Obtain Form WWO 46 (Part V) (was C11_6C3) d/w - 10h/d - With 0 06-May-24 20-May-24 11 HK Hols - No B/O periods 310.T.WS.T140 WVT Form WWO 132 (Part II) Submission for Water Supply Connection (was C11_6C3) d/w - 10h/d - With 0 06-May-24 20-May-24 11 HK Hols - No B/O periods 310.T.WS.T145 WVT Final Water Supply Connection (was C11_6C3) d/w - 10h/d - With 6 07-May-24 13-May-24 21-May-24 27-May-24 11 HK Hols - No B/O periods 310.T.WS.T150 WVT Obtain Water Certificate (Form WWO 1005) (was C11_6C3) d/w - 10h/d - With 0 13-May-24 27-May-24 11 HK Hols - No B/O periods Fire Services Department (FSD) (was C11_6C3) d/w - 10h/d - With HK Hols 194- No B/O 0periods (was 04-Nov-23 C3) 02-Jul-24 10-Nov-23 05-Jul-24 3 310.T.WS.T155 WVT F.S. Inspection Plan (Form FSI / 314 Submission) (VAC System) C11_6 d/w - 10h/d - With 0 04-Nov-23 10-Nov-23 5 HK Hols - No B/O periods 310.T.WS.T160 WVT F.S. Inspection Application (Form FSI / 501 & 251 Submission) (was C11_6C3) d/w - 10h/d - With 0 24-May-24 28-May-24 3 HK Hols - No B/O periods 310.T.WS.T165 WVT F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 8 05-Jun-24 14-Jun-24 08-Jun-24 18-Jun-24 3 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 156 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.WS.T170 WVT FSD Comment C11_6 d/w - 10h/d - With 0 14-Jun-24 18-Jun-24 3 HK Hols - No B/O periods 310.T.WS.T175 WVT Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 15-Jun-24 21-Jun-24 19-Jun-24 25-Jun-24 3 HK Hols - No B/O periods 310.T.WS.T180 WVT F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 8 22-Jun-24 02-Jul-24 26-Jun-24 05-Jul-24 3 HK Hols - No B/O periods 310.T.WS.T185 WVT Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 02-Jul-24 05-Jul-24 3 HK Hols - No B/O periods Building Department (BD) (was C3) 18 0 03-Jul-24 23-Jul-24 06-Jul-24 28-Jul-24 4 310.T.WS.T190 WVT BD Inspection Application for Occupation Permit (Form BA13 Submission) C11_6 d/w - 10h/d - With 0 03-Jul-24 06-Jul-24 3 HK Hols - No B/O periods 310.T.WS.T195 WVT BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 03-Jul-24 09-Jul-24 06-Jul-24 12-Jul-24 3 HK Hols - No B/O periods 310.T.WS.T200 WVT BD Comment (was C11_6C3) d/w - 10h/d - With 0 09-Jul-24 12-Jul-24 3 HK Hols - No B/O periods 310.T.WS.T205 WVT Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 10-Jul-24 16-Jul-24 13-Jul-24 19-Jul-24 3 HK Hols - No B/O periods 310.T.WS.T210 WVT BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 17-Jul-24 23-Jul-24 20-Jul-24 26-Jul-24 3 HK Hols - No B/O periods 310.T.EX.L184 WVT - Achieve KD-11 (was C01_7C3) d/w - 10h/d - No HK 0 23-Jul-24 28-Jul-24 5 Hols - No B/O periods (was 310.T.WS.T215 WVT Issue Occupation Permit (Form BD104) C1) C11_6 d/w - 10h/d - With 0 23-Jul-24 26-Jul-24 3 HK Hols - No B/O periods CC#07 - PBB -Testing and Commissioning (was C3) 163 4 23-May-22 04-Dec-22 24-Jun-22 04-Dec-22 0 Preliminary Testing & Commissioning C11_6 d/w - 10h/d - With HK Hols 36- No B/O 0periods (was 17-Sep-22 C3) 31-Oct-22 22-Sep-22 18-Nov-22 16 Preliminary T&C - Plumbing and Drainage C11_6 d/w - 10h/d - With HK Hols 24- No B/O 0periods (was 17-Sep-22 C3) 17-Oct-22 22-Sep-22 21-Oct-22 4 310.C.EX.W1284 PBB Plumbing & Drainage Preliminary Testing & Commissioning C11_6 d/w - 10h/d - With 10 17-Sep-22 28-Sep-22 22-Sep-22 05-Oct-22 4 HK Hols - No B/O periods 310.C.EX.W1280 PBB Plumbing & Drainage Preliminary Inspection & Adjustment (was C11_6C3) d/w - 10h/d - With 14 29-Sep-22 17-Oct-22 06-Oct-22 21-Oct-22 4 HK Hols - No B/O periods Preliminary T&C - Electrical (was C11_6C3) d/w - 10h/d - With HK Hols 20- No B/O 0periods (was 08-Oct-22 C3) 31-Oct-22 11-Oct-22 18-Nov-22 16 310.C.EX.W1200 PBB Electrical Preliminary Testing & Commissioning C11_6 d/w - 10h/d - With 14 08-Oct-22 24-Oct-22 11-Oct-22 26-Oct-22 2 HK Hols - No B/O periods 310.C.EX.W1196 PBB Electrical Preliminary Inspection & Adjustment (was C11_6C3) d/w - 10h/d - With 10 11-Oct-22 21-Oct-22 13-Oct-22 24-Oct-22 2 HK Hols - No B/O periods 310.C.EX.W1198.B02 PBB Electrical Preliminary Inspection & Adjustment (Non-FSI) (was C11_6C3) d/w - 10h/d - With 10 13-Oct-22 24-Oct-22 01-Nov-22 11-Nov-22 16 HK Hols - No B/O periods 310.C.EX.W1205.B02 PBB Electrical Preliminary Testing & Commissioning (Non-FSI) (was C11_6C3) d/w - 10h/d - With 14 15-Oct-22 31-Oct-22 03-Nov-22 18-Nov-22 16 HK Hols - No B/O periods Preliminary T&C - Fire Service (was C11_6C3) d/w - 10h/d - With HK Hols 17- No B/O 0periods (was 30-Sep-22 C3) 21-Oct-22 03-Oct-22 11-Nov-22 18 310.C.EX.W1220 PBB Fire Services Preliminary Inspection & Adjustment (FSI) C11_6 d/w - 10h/d - With 10 30-Sep-22 13-Oct-22 03-Oct-22 14-Oct-22 1 HK Hols - No B/O periods 310.C.EX.W1224 PBB Fire Services Preliminary Testing & Commissioning (FSI) (was C11_6C3) d/w - 10h/d - With 14 30-Sep-22 18-Oct-22 03-Oct-22 19-Oct-22 1 HK Hols - No B/O periods 310.C.EX.W1576.B01 PBB Fire Services Preliminary Inspection & Adjustment (Non -FSI) (was C11_6C3) d/w - 10h/d - With 10 06-Oct-22 17-Oct-22 27-Oct-22 07-Nov-22 18 HK Hols - No B/O periods 310.C.EX.W1577.B01 PBB Fire Services Preliminary Testing & Commissioning (Non -FSI) (was C11_6C3) d/w - 10h/d - With 14 06-Oct-22 21-Oct-22 27-Oct-22 11-Nov-22 18 HK Hols - No B/O periods Preliminary T&C - MVAC (was C11_6C3) d/w - 10h/d - With HK Hols 16- No B/O 0periods (was 28-Sep-22 C3) 18-Oct-22 29-Sep-22 19-Oct-22 1 310.C.EX.W1240 PBB MVAC Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 10 28-Sep-22 11-Oct-22 29-Sep-22 12-Oct-22 1 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 157 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W1244 PBB MVAC Preliminary Testing & Commissioning C11_6 d/w - 10h/d - With 14 30-Sep-22 18-Oct-22 03-Oct-22 19-Oct-22 1 HK Hols - No B/O periods Testing and Commissioning (was C11_6C3) d/w - 10h/d - With HK Hols 21- No B/O 4periods (was 10-Oct-22 C3) 02-Nov-22 14-Oct-22 18-Nov-22 14 310.T.EX.L248 PBB Plumbing and Drainage T&C C11_6 d/w - 10h/d - With 6 1 10-Oct-22 15-Oct-22 14-Oct-22 20-Oct-22 4 HK Hols - No B/O periods 310.T.EX.L232 PBB Fire Service T&C (FSI) (was C11_6C3) d/w - 10h/d - With 6 1 27-Oct-22 02-Nov-22 28-Oct-22 03-Nov-22 1 HK Hols - No B/O periods 310.T.EX.L236 PBB MVAC T&C (was C11_6C3) d/w - 10h/d - With 6 1 27-Oct-22 02-Nov-22 28-Oct-22 03-Nov-22 1 HK Hols - No B/O periods 310.T.EX.L240.B01 PBB Fire Service T&C (Non-FSI) (was C11_6C3) d/w - 10h/d - With 6 1 27-Oct-22 02-Nov-22 12-Nov-22 18-Nov-22 14 HK Hols - No B/O periods Water Supply Department (WSD) (was C11_6C3) d/w - 10h/d - With HK Hols 134- No B/O 0periods (was 23-May-22 C3) 31-Oct-22 24-Jun-22 03-Nov-22 3 310.T.ES.P328 PBB Prepare for Plumbing Material for Submission C11_6 d/w - 10h/d - With 17 23-May-22 11-Jun-22 24-Jun-22 14-Jul-22 27 HK Hols - No B/O periods 310.T.ES.P332 PBB Submit all Plumbing Material for PM Acceptance (was C11_6C3) d/w - 10h/d - With 0 11-Jun-22 15-Jul-22 27 HK Hols - No B/O periods 310.T.ES.P336 PBB PM Acceptance (was C11_6C3) d/w - 10h/d - With 48 11-Jun-22 08-Aug-22 15-Jul-22 08-Sep-22 27 HK Hols - No B/O periods 310.T.ES.P340 PBB Form WWO 46 (Part I & Part II) & Annex Submission for WSD Approval (Plumbing / (was C11_6C3) d/w - 10h/d - With 0 08-Aug-22 09-Sep-22 27 FS / WP) HK Hols - No B/O periods 310.T.ES.P344 PBB Obtain Form WWO 46 (Part III) - WSD Approval, Endorsed & Return to Licensed (was C11_6C3) d/w - 10h/d - With 4 08-Aug-22 12-Aug-22 09-Sep-22 14-Sep-22 27 Plumber HK Hols - No B/O periods 310.T.ES.P304 PBB Form WWO 46 (Part IV) Submission for WSD Inspection (Plumbing / FS / WP) (was C11_6C3) d/w - 10h/d - With 0 18-Oct-22 21-Oct-22 3 HK Hols - No B/O periods 310.T.ES.P308 PBB WSD Inspection for Water Supply System (was C11_6C3) d/w - 10h/d - With 6 18-Oct-22 24-Oct-22 21-Oct-22 27-Oct-22 3 HK Hols - No B/O periods 310.T.ES.P312 PBB Obtain Form WWO 46 (Part V) (was C11_6C3) d/w - 10h/d - With 0 24-Oct-22 27-Oct-22 3 HK Hols - No B/O periods 310.T.ES.P316 PBB Form WWO 132 (Part II) Submission for Water Supply Connection (was C11_6C3) d/w - 10h/d - With 0 24-Oct-22 27-Oct-22 3 HK Hols - No B/O periods 310.T.ES.P320 PBB Final Water Supply Connection (was C11_6C3) d/w - 10h/d - With 6 25-Oct-22 31-Oct-22 28-Oct-22 03-Nov-22 3 HK Hols - No B/O periods 310.T.ES.P324 PBB Obtain Water Certificate (Form WWO 1005) (was C11_6C3) d/w - 10h/d - With 0 31-Oct-22 03-Nov-22 3 HK Hols - No B/O periods Fire Services Department (FSD) (was C11_6C3) d/w - 10h/d - With HK Hols 36- No B/O 0periods (was 08-Oct-22 C3) 18-Nov-22 11-Oct-22 18-Nov-22 0 DG Application & Inspection C11_6 d/w - 10h/d - With HK Hols 21- No B/O 0periods (was 08-Oct-22 C3) 01-Nov-22 11-Oct-22 03-Nov-22 2 310.T.ES.P404 PBB DG Inspection Application (Form Submission) C11_6 d/w - 10h/d - With 0 08-Oct-22 11-Oct-22 2 HK Hols - No B/O periods 310.T.ES.P408 PBB DG 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 17-Oct-22 22-Oct-22 19-Oct-22 25-Oct-22 2 HK Hols - No B/O periods 310.T.ES.P412 PBB DG FSD Comment (was C11_6C3) d/w - 10h/d - With 0 22-Oct-22 25-Oct-22 2 HK Hols - No B/O periods 310.T.ES.P416 PBB DG Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 2 24-Oct-22 25-Oct-22 26-Oct-22 27-Oct-22 2 HK Hols - No B/O periods 310.T.ES.P420 PBB DG Re-inspection (was C11_6C3) d/w - 10h/d - With 6 26-Oct-22 01-Nov-22 28-Oct-22 03-Nov-22 2 HK Hols - No B/O periods 310.T.ES.P424 PBB Issue DG Certificate (was C11_6C3) d/w - 10h/d - With 0 01-Nov-22 03-Nov-22 2 HK Hols - No B/O periods FS Application & Inspection (was C11_6C3) d/w - 10h/d - With HK Hols 14- No B/O 0periods (was 03-Nov-22 C3) 18-Nov-22 04-Nov-22 18-Nov-22 0 310.T.ES.P348 PBB F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 03-Nov-22 04-Nov-22 1 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 158 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.ES.P352 PBB F.S. Inspection Application (Form FSI / 501 & 251 Submission) C11_6 d/w - 10h/d - With 0 03-Nov-22 04-Nov-22 1 HK Hols - No B/O periods 310.T.ES.P356 PBB F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 04-Nov-22 10-Nov-22 04-Nov-22 10-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P360 PBB FSD Comment (was C11_6C3) d/w - 10h/d - With 0 10-Nov-22 10-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P364 PBB Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 1 11-Nov-22 11-Nov-22 11-Nov-22 11-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P368 PBB F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 12-Nov-22 18-Nov-22 12-Nov-22 18-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P372 PBB Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 18-Nov-22 18-Nov-22 0 HK Hols - No B/O periods Environmental Protection Department (EDP) (was C11_6C3) d/w - 10h/d - With HK Hols 13- No B/O 0periods (was 08-Oct-22 C3) 22-Oct-22 20-Oct-22 03-Nov-22 10 EPD Application & Inspection C11_6 d/w - 10h/d - With HK Hols 13- No B/O 0periods (was 08-Oct-22 C3) 22-Oct-22 20-Oct-22 03-Nov-22 10 310.T.ES.P716 PBB- EPD Inspection Application C11_6 d/w - 10h/d - With 0 08-Oct-22 20-Oct-22 10 HK Hols - No B/O periods 310.T.ES.P720 PBB- EPD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 08-Oct-22 14-Oct-22 20-Oct-22 26-Oct-22 10 HK Hols - No B/O periods 310.T.ES.P724 PBB - EPD Comment (was C11_6C3) d/w - 10h/d - With 0 14-Oct-22 26-Oct-22 10 HK Hols - No B/O periods 310.T.ES.P728 PBB - EPD Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 1 15-Oct-22 15-Oct-22 27-Oct-22 27-Oct-22 10 HK Hols - No B/O periods 310.T.ES.P732 PBB - EPD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 17-Oct-22 22-Oct-22 28-Oct-22 03-Nov-22 10 HK Hols - No B/O periods 310.T.ES.P736 PBB - Issue License (was C11_6C3) d/w - 10h/d - With 0 22-Oct-22 03-Nov-22 10 HK Hols - No B/O periods Building Department (BD) (was C3) 13 0 19-Nov-22 04-Dec-22 19-Nov-22 04-Dec-22 0 310.T.ES.P376 PBB BD Inspection Application for Occupation Permit (Form BA13 Submission) C11_6 d/w - 10h/d - With 0 19-Nov-22 19-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P380 PBB BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 19-Nov-22 25-Nov-22 19-Nov-22 25-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P384 PBB BD Comment (was C11_6C3) d/w - 10h/d - With 0 25-Nov-22 25-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P388 PBB Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 1 26-Nov-22 26-Nov-22 26-Nov-22 26-Nov-22 0 HK Hols - No B/O periods 310.T.ES.P392 PBB BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 28-Nov-22 03-Dec-22 28-Nov-22 03-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P300 PBB Achieved Completion and T&C of Tunnel Plant Building B (was C11_6C3) d/w - 10h/d - With 0 03-Dec-22 03-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P396 PBB Issue Occupation Permit (Form BD104) (was C11_6C3) d/w - 10h/d - With 0 03-Dec-22 03-Dec-22 0 HK Hols - No B/O periods 310.T.ES.P397 PMS23 - Comp all works for Road Tunnel PBB and stat. apprv, consents, ready for use [4 (was C01_7C3) d/w - 10h/d - No HK 0 04-Dec-22* 04-Dec-22 0 Dec 22] Hols - No B/O periods (was Cost Centre #08 - Ancillary Buildings C1) 831 37 07-Jun-21 A 19-Mar-24 19-Feb-22 31-Aug-24 134 ------Design & Other Submission ------------- C01_7 d/w - 10h/d - No HK Hols598 - No B/O periods 0 (was 26-Aug-21 C1) A 15-Apr-23 26-Feb-22 26-Oct-23 194 CC#08 - General - MEP - Method Statement C01_7 d/w - 10h/d - No HK Hols260 - No B/O periods 0 (was27-Mar-22 C1) 11-Dec-22 05-Apr-22 03-Feb-23 54 ELECT C01_7 d/w - 10h/d - No HK Hols210 - No B/O periods 0 (was27-Mar-22 C1) 22-Oct-22 05-Apr-22 31-Oct-22 9 310.D.WS.L984.05.B02 Prepare and submit Elect. Method Statement (15 nos.) C01_7 d/w - 10h/d - No HK 165 27-Mar-22 07-Sep-22 05-Apr-22 16-Sep-22 9 Hols - No B/O periods (was 310.D.WS.L985.05.B02 Review and comment Elect. Method Statement (15 nos.) C1) C01_7 d/w - 10h/d - No HK 165 11-Apr-22 22-Sep-22 20-Apr-22 01-Oct-22 9 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 159 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L986.05.B02 Prepare and re-submit Elect. Method Statement (15 nos.) C01_7 d/w - 10h/d - No HK 165 26-Apr-22 07-Oct-22 05-May-22 16-Oct-22 9 Hols - No B/O periods (was 310.D.WS.L988.05.B02 Obtain approval of Elect. Method Statement (15 nos.) C1) C01_7 d/w - 10h/d - No HK 165 11-May-22 22-Oct-22 20-May-22 31-Oct-22 9 Hols - No B/O periods (was MVAC C1) C01_7 d/w - 10h/d - No HK Hols260 - No B/O periods 0 (was27-Mar-22 C1) 11-Dec-22 20-May-22 03-Feb-23 54 310.D.WS.L984.06.B02 Prepare and submit MVAC Method Statement (13 nos.) C01_7 d/w - 10h/d - No HK 215 27-Mar-22 27-Oct-22 20-May-22 20-Dec-22 54 Hols - No B/O periods (was 310.D.WS.L985.06.B02 Review and comment MVAC Method Statement (13 nos.) C1) C01_7 d/w - 10h/d - No HK 215 11-Apr-22 11-Nov-22 04-Jun-22 04-Jan-23 54 Hols - No B/O periods (was 310.D.WS.L986.06.B02 Prepare and re-submit MVAC Method Statement (13 nos.) C1) C01_7 d/w - 10h/d - No HK 215 26-Apr-22 26-Nov-22 19-Jun-22 19-Jan-23 54 Hols - No B/O periods (was 310.D.WS.L988.06.B02 Obtain approval of MVAC Method Statement (13 nos.) C1) C01_7 d/w - 10h/d - No HK 215 11-May-22 11-Dec-22 04-Jul-22 03-Feb-23 54 Hols - No B/O periods (was FS C1) C01_7 d/w - 10h/d - No HK Hols138 - No B/O periods 0 (was01-May-22 C1) 15-Sep-22 20-May-22 04-Oct-22 19 310.D.WS.L984.07.B02 Prepare and submit FS Method Statement (12 nos.) C01_7 d/w - 10h/d - No HK 93 01-May-22 01-Aug-22 20-May-22 20-Aug-22 19 Hols - No B/O periods (was 310.D.WS.L985.07.B02 Review and comment FS Method Statement (12 nos.) C1) C01_7 d/w - 10h/d - No HK 93 16-May-22 16-Aug-22 04-Jun-22 04-Sep-22 19 Hols - No B/O periods (was 310.D.WS.L986.07.B02 Prepare and re-submit FS Method Statement (12 nos.) C1) C01_7 d/w - 10h/d - No HK 93 31-May-22 31-Aug-22 19-Jun-22 19-Sep-22 19 Hols - No B/O periods (was 310.D.WS.L988.07.B02 Obtain approval of FS Method Statement (12 nos.) C1) C01_7 d/w - 10h/d - No HK 93 15-Jun-22 15-Sep-22 04-Jul-22 04-Oct-22 19 Hols - No B/O periods (was P&D C1) C01_7 d/w - 10h/d - No HK Hols199 - No B/O periods 0 (was27-Mar-22 C1) 11-Oct-22 16-Apr-22 31-Oct-22 20 310.D.WS.L984.08.B02 Prepare and submit P&D Method Statement (5 nos.) C01_7 d/w - 10h/d - No HK 154 27-Mar-22 27-Aug-22 16-Apr-22 16-Sep-22 20 Hols - No B/O periods (was 310.D.WS.L985.08.B02 Review and comment P&D Method Statement (5 nos.) C1) C01_7 d/w - 10h/d - No HK 154 11-Apr-22 11-Sep-22 01-May-22 01-Oct-22 20 Hols - No B/O periods (was 310.D.WS.L986.08.B02 Prepare and re-submit P&D Method Statement (5 nos.) C1) C01_7 d/w - 10h/d - No HK 154 26-Apr-22 26-Sep-22 16-May-22 16-Oct-22 20 Hols - No B/O periods (was 310.D.WS.L988.08.B02 Obtain approval of P&D Method Statement (5 nos.) C1) C01_7 d/w - 10h/d - No HK 154 11-May-22 11-Oct-22 31-May-22 31-Oct-22 20 Hols - No B/O periods (was CC#08 - General - MEP - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols294 - No B/O periods 0 (was 27-Jan-22 C1) A 16-Nov-22 26-Feb-22 11-Mar-23 115 Preliminaries C01_7 d/w - 10h/d - No HK Hols 7- No B/O periods 0 (was 27-Jan-22 C1) A 08-Feb-22 A 26-Feb-22 05-Apr-22 310.C.EX.S000.01.B02 Contract award (Tentative) C01_7 d/w - 10h/d - No HK 0 27-Jan-22 A 26-Feb-22 Hols - No B/O periods (was 310.C.EX.S000.02.B02 Mobilization C1) C01_7 d/w - 10h/d - No HK 0 27-Jan-22 A 02-Feb-22 A 26-Feb-22 26-Feb-22 Hols - No B/O periods (was 310.C.EX.S000.03.B02 Prepare and submit O Chart C1) C01_7 d/w - 10h/d - No HK 0 03-Feb-22 A 07-Feb-22 A 26-Feb-22 26-Feb-22 Hols - No B/O periods (was 310.C.EX.S000.04.B02 Prepare and submit Equipment/Material Submission Schedule C1) C01_7 d/w - 10h/d - No HK 0 03-Feb-22 A 08-Feb-22 A 26-Feb-22 26-Feb-22 Hols - No B/O periods (was 310.C.EX.S000.05.B02 Prepare and submit Drawing Submission Shcedule C1) C01_7 d/w - 10h/d - No HK 0 03-Feb-22 A 08-Feb-22 A 05-Apr-22 05-Apr-22 Hols - No B/O periods (was Electrical C1) C01_7 d/w - 10h/d - No HK Hols103 - No B/O periods 0 (was 06-Mar-22 C1) A 16-Jun-22 31-Mar-22 16-Aug-22 61 Armoured Cable C01_7 d/w - 10h/d - No HK Hols53 - No B/O periods 0 (was 14-Mar-22 C1) A 18-May-22 16-Apr-22 07-Jun-22 20 310.D.WS.L992.01.B02Prepare and submit info. of Armoured Cable C01_7 d/w - 10h/d - No HK 0 14-Mar-22 A 07-Apr-22 16-Apr-22 27-Apr-22 20 Hols - No B/O periods (was 310.D.WS.L993.01.B02Review and comment info. of Armoured Cable C1) C01_7 d/w - 10h/d - No HK 23 08-Apr-22 30-Apr-22 28-Apr-22 20-May-22 20 Hols - No B/O periods (was 310.D.WS.L994.01.B02Prepare and re-submit info. of Armoured Cable C1) C01_7 d/w - 10h/d - No HK 9 01-May-22 09-May-22 21-May-22 29-May-22 20 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 160 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L996.01.B02Obtain "No objection" of Armoured Cable C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 30-May-22 07-Jun-22 20 Hols - No B/O periods (was FR Cable C1) C01_7 d/w - 10h/d - No HK Hols82 - No B/O periods 0 (was 14-Mar-22 C1) A 16-Jun-22 27-May-22 16-Aug-22 61 310.D.WS.L992.02.B02Prepare and submit info. of FR Cable C01_7 d/w - 10h/d - No HK 0 14-Mar-22 A 07-Apr-22 27-May-22 07-Jun-22 61 Hols - No B/O periods (was 310.D.WS.L993.02.B02Review and comment info. of FR Cable C1) C01_7 d/w - 10h/d - No HK 24 08-Apr-22 01-May-22 08-Jun-22 01-Jul-22 61 Hols - No B/O periods (was 310.D.WS.L994.02.B02Prepare and re-submit info. of FR Cable C1) C01_7 d/w - 10h/d - No HK 22 02-May-22 23-May-22 02-Jul-22 23-Jul-22 61 Hols - No B/O periods (was 310.D.WS.L996.02.B02Obtain "No objection" of FR Cable C1) C01_7 d/w - 10h/d - No HK 24 24-May-22 16-Jun-22 24-Jul-22 16-Aug-22 61 Hols - No B/O periods (was Single Core Cable C1) C01_7 d/w - 10h/d - No HK Hols46 - No B/O periods 0 (was 14-Mar-22 C1) A 19-May-22 24-Jun-22 16-Aug-22 89 310.D.WS.L992.03.B02Prepare and submit info. of Single Core Cable C01_7 d/w - 10h/d - No HK 0 14-Mar-22 A 07-Apr-22 24-Jun-22 05-Jul-22 89 Hols - No B/O periods (was 310.D.WS.L993.03.B02Review and comment info. of Single Core Cable C1) C01_7 d/w - 10h/d - No HK 24 08-Apr-22 01-May-22 06-Jul-22 29-Jul-22 89 Hols - No B/O periods (was 310.D.WS.L994.03.B02Prepare and re-submit info. of Single Core Cable C1) C01_7 d/w - 10h/d - No HK 9 02-May-22 10-May-22 30-Jul-22 07-Aug-22 89 Hols - No B/O periods (was 310.D.WS.L996.03.B02Obtain "No objection" of Single Core Cable C1) C01_7 d/w - 10h/d - No HK 9 11-May-22 19-May-22 08-Aug-22 16-Aug-22 89 Hols - No B/O periods (was General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK Hols60 - No B/O periods 0 (was 20-Mar-22 C1) A 19-May-22 18-Apr-22 10-Jun-22 22 310.D.WS.L992.04.B02Prepare and submit info. of General Lighting (included E-Lighting) C01_7 d/w - 10h/d - No HK 12 20-Mar-22 A 07-Apr-22 18-Apr-22 29-Apr-22 22 Hols - No B/O periods (was 310.D.WS.L993.04.B02Review and comment info. of General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK 24 08-Apr-22 01-May-22 30-Apr-22 23-May-22 22 Hols - No B/O periods (was 310.D.WS.L994.04.B02Prepare and re-submit info. of General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK 9 02-May-22 10-May-22 24-May-22 01-Jun-22 22 Hols - No B/O periods (was 310.D.WS.L996.04.B02Obtain "No objection" of General Lighting (included E-Lighting) C1) C01_7 d/w - 10h/d - No HK 9 11-May-22 19-May-22 02-Jun-22 10-Jun-22 22 Hols - No B/O periods (was Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK Hols68 - No B/O periods 0 (was 11-Mar-22 C1) A 17-May-22 20-Apr-22 10-Jun-22 24 310.D.WS.L992.05.B02Prepare and submit info. of Distribution Board for MCB, MCCB & Accessories C01_7 d/w - 10h/d - No HK 10 11-Mar-22 A 05-Apr-22 20-Apr-22 29-Apr-22 24 Hols - No B/O periods (was 310.D.WS.L993.05.B02Review and comment info. of Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 24 06-Apr-22 29-Apr-22 30-Apr-22 23-May-22 24 Hols - No B/O periods (was 310.D.WS.L994.05.B02Prepare and re-submit info. of Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 30-Apr-22 08-May-22 24-May-22 01-Jun-22 24 Hols - No B/O periods (was 310.D.WS.L996.05.B02Obtain "No objection" of Distribution Board for MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 09-May-22 17-May-22 02-Jun-22 10-Jun-22 24 Hols - No B/O periods (was MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK Hols64 - No B/O periods 0 (was 11-Mar-22 C1) A 13-May-22 31-Mar-22 17-May-22 4 310.D.WS.L992.06.B02Prepare and submit info. of MCB, MCCB & Accessories C01_7 d/w - 10h/d - No HK 6 11-Mar-22 A 01-Apr-22 31-Mar-22 05-Apr-22 4 Hols - No B/O periods (was 310.D.WS.L993.06.B02Review and comment info. of MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 24 02-Apr-22 25-Apr-22 06-Apr-22 29-Apr-22 4 Hols - No B/O periods (was 310.D.WS.L994.06.B02Prepare and re-submit info. of MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 26-Apr-22 04-May-22 30-Apr-22 08-May-22 4 Hols - No B/O periods (was 310.D.WS.L996.06.B02Obtain "No objection" of MCB, MCCB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 05-May-22 13-May-22 09-May-22 17-May-22 4 Hols - No B/O periods (was Busduct C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was04-Apr-22 C1) 04-Jun-22 11-Apr-22 11-Jun-22 7 310.D.WS.L992.07.B02Prepare and submit info. of Busduct C01_7 d/w - 10h/d - No HK 20 04-Apr-22 23-Apr-22 11-Apr-22 30-Apr-22 7 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 161 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L993.07.B02Review and comment info. of Busduct C01_7 d/w - 10h/d - No HK 24 24-Apr-22 17-May-22 01-May-22 24-May-22 7 Hols - No B/O periods (was 310.D.WS.L994.07.B02Prepare and re-submit info. of Busduct C1) C01_7 d/w - 10h/d - No HK 9 18-May-22 26-May-22 25-May-22 02-Jun-22 7 Hols - No B/O periods (was 310.D.WS.L996.07.B02Obtain "No objection" of Busduct C1) C01_7 d/w - 10h/d - No HK 9 27-May-22 04-Jun-22 03-Jun-22 11-Jun-22 7 Hols - No B/O periods (was Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was04-Apr-22 C1) 04-Jun-22 10-Apr-22 10-Jun-22 6 310.D.WS.L992.08.B02Prepare and submit info. of Water Leakage Detection System C01_7 d/w - 10h/d - No HK 20 04-Apr-22 23-Apr-22 10-Apr-22 29-Apr-22 6 Hols - No B/O periods (was 310.D.WS.L993.08.B02Review and comment info. of Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK 24 24-Apr-22 17-May-22 30-Apr-22 23-May-22 6 Hols - No B/O periods (was 310.D.WS.L994.08.B02Prepare and re-submit info. of Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK 9 18-May-22 26-May-22 24-May-22 01-Jun-22 6 Hols - No B/O periods (was 310.D.WS.L996.08.B02Obtain "No objection" of Water Leakage Detection System C1) C01_7 d/w - 10h/d - No HK 9 27-May-22 04-Jun-22 02-Jun-22 10-Jun-22 6 Hols - No B/O periods (was MICC Cable C1) C01_7 d/w - 10h/d - No HK Hols76 - No B/O periods 0 (was 07-Mar-22 C1) A 21-May-22 17-Apr-22 11-Jun-22 21 310.D.WS.L992.09.B02Prepare and submit info. of MICC Cable C01_7 d/w - 10h/d - No HK 14 07-Mar-22 A 09-Apr-22 17-Apr-22 30-Apr-22 21 Hols - No B/O periods (was 310.D.WS.L993.09.B02Review and comment info. of MICC Cable C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 01-May-22 24-May-22 21 Hols - No B/O periods (was 310.D.WS.L994.09.B02Prepare and re-submit info. of MICC Cable C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 25-May-22 02-Jun-22 21 Hols - No B/O periods (was 310.D.WS.L996.09.B02Obtain "No objection" of MICC Cable C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 03-Jun-22 11-Jun-22 21 Hols - No B/O periods (was LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 16-Apr-22 10-Jun-22 20 310.D.WS.L992.10.B02Prepare and submit info. of LV Switchboards & Accessories C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 16-Apr-22 29-Apr-22 20 Hols - No B/O periods (was 310.D.WS.L993.10.B02Review and comment info. of LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 30-Apr-22 23-May-22 20 Hols - No B/O periods (was 310.D.WS.L994.10.B02Prepare and re-submit info. of LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 24-May-22 01-Jun-22 20 Hols - No B/O periods (was 310.D.WS.L996.10.B02Obtain "No objection" of LV Switchboards & Accessories C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 02-Jun-22 10-Jun-22 20 Hols - No B/O periods (was ACB & Accessories C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 17-Apr-22 11-Jun-22 21 310.D.WS.L992.11.B02Prepare and submit info. of ACB & Accessories C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 17-Apr-22 30-Apr-22 21 Hols - No B/O periods (was 310.D.WS.L993.11.B02Review and comment info. of ACB & Accessories C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 01-May-22 24-May-22 21 Hols - No B/O periods (was 310.D.WS.L994.11.B02Prepare and re-submit info. of ACB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 25-May-22 02-Jun-22 21 Hols - No B/O periods (was 310.D.WS.L996.11.B02Obtain "No objection" of ACB & Accessories C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 03-Jun-22 11-Jun-22 21 Hols - No B/O periods (was Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 16-Apr-22 10-Jun-22 20 310.D.WS.L992.12.B02Prepare and submit info. of Automatic Transfer Switch C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 16-Apr-22 29-Apr-22 20 Hols - No B/O periods (was 310.D.WS.L993.12.B02Review and comment info. of Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 30-Apr-22 23-May-22 20 Hols - No B/O periods (was 310.D.WS.L994.12.B02Prepare and re-submit info. of Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 24-May-22 01-Jun-22 20 Hols - No B/O periods (was 310.D.WS.L996.12.B02Obtain "No objection" of Automatic Transfer Switch C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 02-Jun-22 10-Jun-22 20 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 162 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Battery Set C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 17-Apr-22 11-Jun-22 21 310.D.WS.L992.13.B02Prepare and submit info. of Battery Set C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 17-Apr-22 30-Apr-22 21 Hols - No B/O periods (was 310.D.WS.L993.13.B02Review and comment info. of Battery Set C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 01-May-22 24-May-22 21 Hols - No B/O periods (was 310.D.WS.L994.13.B02Prepare and re-submit info. of Battery Set C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 25-May-22 02-Jun-22 21 Hols - No B/O periods (was 310.D.WS.L996.13.B02Obtain "No objection" of Battery Set C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 03-Jun-22 11-Jun-22 21 Hols - No B/O periods (was HRC Fuse for Fuse-switch C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was27-Mar-22 C1) 27-May-22 10-Apr-22 10-Jun-22 14 310.D.WS.L992.14.B02Prepare and submit info. of HRC Fuse for Fuse-switch C01_7 d/w - 10h/d - No HK 20 27-Mar-22 15-Apr-22 10-Apr-22 29-Apr-22 14 Hols - No B/O periods (was 310.D.WS.L993.14.B02Review and comment info. of HRC Fuse for Fuse-switch C1) C01_7 d/w - 10h/d - No HK 24 16-Apr-22 09-May-22 30-Apr-22 23-May-22 14 Hols - No B/O periods (was 310.D.WS.L994.14.B02Prepare and re-submit info. of HRC Fuse for Fuse-switch C1) C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 24-May-22 01-Jun-22 14 Hols - No B/O periods (was 310.D.WS.L996.14.B02Obtain "No objection" of HRC Fuse for Fuse-switch C1) C01_7 d/w - 10h/d - No HK 9 19-May-22 27-May-22 02-Jun-22 10-Jun-22 14 Hols - No B/O periods (was MCCB C1) C01_7 d/w - 10h/d - No HK Hols61 - No B/O periods 0 (was 22-Mar-22 C1) A 21-May-22 16-Apr-22 10-Jun-22 20 310.D.WS.L992.15.B02Prepare and submit info. of MCCB C01_7 d/w - 10h/d - No HK 14 22-Mar-22 A 09-Apr-22 16-Apr-22 29-Apr-22 20 Hols - No B/O periods (was 310.D.WS.L993.15.B02Review and comment info. of MCCB C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 30-Apr-22 23-May-22 20 Hols - No B/O periods (was 310.D.WS.L994.15.B02Prepare and re-submit info. of MCCB C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 24-May-22 01-Jun-22 20 Hols - No B/O periods (was 310.D.WS.L996.15.B02Obtain "No objection" of MCCB C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 02-Jun-22 10-Jun-22 20 Hols - No B/O periods (was Digital Protection Device C1) C01_7 d/w - 10h/d - No HK Hols77 - No B/O periods 0 (was 06-Mar-22 C1) A 21-May-22 16-Apr-22 10-Jun-22 20 310.D.WS.L992.16.B02Prepare and submit info. of Digital Protection Device C01_7 d/w - 10h/d - No HK 14 06-Mar-22 A 09-Apr-22 16-Apr-22 29-Apr-22 20 Hols - No B/O periods (was 310.D.WS.L993.16.B02Review and comment info. of Digital Protection Device C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 30-Apr-22 23-May-22 20 Hols - No B/O periods (was 310.D.WS.L994.16.B02Prepare and re-submit info. of Digital Protection Device C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 24-May-22 01-Jun-22 20 Hols - No B/O periods (was 310.D.WS.L996.16.B02Obtain "No objection" of Digital Protection Device C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 02-Jun-22 10-Jun-22 20 Hols - No B/O periods (was Capacitor Bank C1) C01_7 d/w - 10h/d - No HK Hols77 - No B/O periods 0 (was 06-Mar-22 C1) A 21-May-22 16-Apr-22 10-Jun-22 20 310.D.WS.L992.17.B02Prepare and submit info. of Capacitor Bank C01_7 d/w - 10h/d - No HK 14 06-Mar-22 A 09-Apr-22 16-Apr-22 29-Apr-22 20 Hols - No B/O periods (was 310.D.WS.L993.17.B02Review and comment info. of Capacitor Bank C1) C01_7 d/w - 10h/d - No HK 24 10-Apr-22 03-May-22 30-Apr-22 23-May-22 20 Hols - No B/O periods (was 310.D.WS.L994.17.B02Prepare and re-submit info. of Capacitor Bank C1) C01_7 d/w - 10h/d - No HK 9 04-May-22 12-May-22 24-May-22 01-Jun-22 20 Hols - No B/O periods (was 310.D.WS.L996.17.B02Obtain "No objection" of Capacitor Bank C1) C01_7 d/w - 10h/d - No HK 9 13-May-22 21-May-22 02-Jun-22 10-Jun-22 20 Hols - No B/O periods (was UPS C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was29-Mar-22 C1) 23-May-22 16-Apr-22 10-Jun-22 18 310.D.WS.L992.18.B02Prepare and submit info. of UPS C01_7 d/w - 10h/d - No HK 14 29-Mar-22 11-Apr-22 16-Apr-22 29-Apr-22 18 Hols - No B/O periods (was 310.D.WS.L993.18.B02Review and comment info. of UPS C1) C01_7 d/w - 10h/d - No HK 24 12-Apr-22 05-May-22 30-Apr-22 23-May-22 18 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 163 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L994.18.B02Prepare and re-submit info. of UPS C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 24-May-22 01-Jun-22 18 Hols - No B/O periods (was 310.D.WS.L996.18.B02Obtain "No objection" of UPS C1) C01_7 d/w - 10h/d - No HK 9 15-May-22 23-May-22 02-Jun-22 10-Jun-22 18 Hols - No B/O periods (was Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was29-Mar-22 C1) 23-May-22 16-Apr-22 10-Jun-22 18 310.D.WS.L992.19.B02Prepare and submit info. of Active Harmoice Filter C01_7 d/w - 10h/d - No HK 14 29-Mar-22 11-Apr-22 16-Apr-22 29-Apr-22 18 Hols - No B/O periods (was 310.D.WS.L993.19.B02Review and comment info. of Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK 24 12-Apr-22 05-May-22 30-Apr-22 23-May-22 18 Hols - No B/O periods (was 310.D.WS.L994.19.B02Prepare and re-submit info. of Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 24-May-22 01-Jun-22 18 Hols - No B/O periods (was 310.D.WS.L996.19.B02Obtain "No objection" of Active Harmoice Filter C1) C01_7 d/w - 10h/d - No HK 9 15-May-22 23-May-22 02-Jun-22 10-Jun-22 18 Hols - No B/O periods (was Isolation Transformer C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was29-Mar-22 C1) 23-May-22 17-Apr-22 11-Jun-22 19 310.D.WS.L992.20.B02Prepare and submit info. of Isolation Transformer C01_7 d/w - 10h/d - No HK 14 29-Mar-22 11-Apr-22 17-Apr-22 30-Apr-22 19 Hols - No B/O periods (was 310.D.WS.L993.20.B02Review and comment info. of Isolation Transformer C1) C01_7 d/w - 10h/d - No HK 24 12-Apr-22 05-May-22 01-May-22 24-May-22 19 Hols - No B/O periods (was 310.D.WS.L994.20.B02Prepare and re-submit info. of Isolation Transformer C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 25-May-22 02-Jun-22 19 Hols - No B/O periods (was 310.D.WS.L996.20.B02Obtain "No objection" of Isolation Transformer C1) C01_7 d/w - 10h/d - No HK 9 15-May-22 23-May-22 03-Jun-22 11-Jun-22 19 Hols - No B/O periods (was By-pass switch C1) C01_7 d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was27-Mar-22 C1) 27-May-22 11-Apr-22 11-Jun-22 15 310.D.WS.L992.21.B02Prepare and submit info. of By-pass switch C01_7 d/w - 10h/d - No HK 20 27-Mar-22 15-Apr-22 11-Apr-22 30-Apr-22 15 Hols - No B/O periods (was 310.D.WS.L993.21.B02Review and comment info. of By-pass switch C1) C01_7 d/w - 10h/d - No HK 24 16-Apr-22 09-May-22 01-May-22 24-May-22 15 Hols - No B/O periods (was 310.D.WS.L994.21.B02Prepare and re-submit info. of By-pass switch C1) C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 25-May-22 02-Jun-22 15 Hols - No B/O periods (was 310.D.WS.L996.21.B02Obtain "No objection" of By-pass switch C1) C01_7 d/w - 10h/d - No HK 9 19-May-22 27-May-22 03-Jun-22 11-Jun-22 15 Hols - No B/O periods (was LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 24-Apr-22 11-Jun-22 28 310.D.WS.L992.22.B02Prepare and submit info. of LV Generator Set (included Alternator & Diesel Engine) C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 24-Apr-22 30-Apr-22 28 Hols - No B/O periods (was 310.D.WS.L993.22.B02Review and comment info. of LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 01-May-22 24-May-22 28 Hols - No B/O periods (was 310.D.WS.L994.22.B02Prepare and re-submit info. of LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 25-May-22 02-Jun-22 28 Hols - No B/O periods (was 310.D.WS.L996.22.B02Obtain "No objection" of LV Generator Set (included Alternator & Diesel Engine) C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 03-Jun-22 11-Jun-22 28 Hols - No B/O periods (was Generator Controller C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 24-Apr-22 11-Jun-22 28 310.D.WS.L992.23.B02Prepare and submit info. of Generator Controller C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 24-Apr-22 30-Apr-22 28 Hols - No B/O periods (was 310.D.WS.L993.23.B02Review and comment info. of Generator Controller C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 01-May-22 24-May-22 28 Hols - No B/O periods (was 310.D.WS.L994.23.B02Prepare and re-submit info. of Generator Controller C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 25-May-22 02-Jun-22 28 Hols - No B/O periods (was 310.D.WS.L996.23.B02Obtain "No objection" of Generator Controller C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 03-Jun-22 11-Jun-22 28 Hols - No B/O periods (was Starting Battery System C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 24-Apr-22 11-Jun-22 28
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:44 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 164 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L992.24.B02Prepare and submit info. of Starting Battery System C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 24-Apr-22 30-Apr-22 28 Hols - No B/O periods (was 310.D.WS.L993.24.B02Review and comment info. of Starting Battery System C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 01-May-22 24-May-22 28 Hols - No B/O periods (was 310.D.WS.L994.24.B02Prepare and re-submit info. of Starting Battery System C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 25-May-22 02-Jun-22 28 Hols - No B/O periods (was 310.D.WS.L996.24.B02Obtain "No objection" of Starting Battery System C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 03-Jun-22 11-Jun-22 28 Hols - No B/O periods (was Battery Charger C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 22-Mar-22 C1) A 14-May-22 24-Apr-22 11-Jun-22 28 310.D.WS.L992.25.B02Prepare and submit info. of Battery Charger C01_7 d/w - 10h/d - No HK 7 22-Mar-22 A 02-Apr-22 24-Apr-22 30-Apr-22 28 Hols - No B/O periods (was 310.D.WS.L993.25.B02Review and comment info. of Battery Charger C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 01-May-22 24-May-22 28 Hols - No B/O periods (was 310.D.WS.L994.25.B02Prepare and re-submit info. of Battery Charger C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 25-May-22 02-Jun-22 28 Hols - No B/O periods (was 310.D.WS.L996.25.B02Obtain "No objection" of Battery Charger C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 03-Jun-22 11-Jun-22 28 Hols - No B/O periods (was MVAC C1) C01_7 d/w - 10h/d - No HK Hols115 - No B/O periods 0 (was 08-Feb-22 C1) A 26-Jun-22 02-Apr-22 23-Aug-22 58 CRAC Unit C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 03-May-22 20-Jun-22 37 310.D.WS.L992.26.B02Prepare and submit info. of CRAC Unit C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 03-May-22 09-May-22 37 Hols - No B/O periods (was 310.D.WS.L993.26.B02Review and comment info. of CRAC Unit C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 10-May-22 02-Jun-22 37 Hols - No B/O periods (was 310.D.WS.L994.26.B02Prepare and re-submit info. of CRAC Unit C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 03-Jun-22 11-Jun-22 37 Hols - No B/O periods (was 310.D.WS.L996.26.B02Obtain "No objection" of CRAC Unit C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 12-Jun-22 20-Jun-22 37 Hols - No B/O periods (was Axial Fan C1) C01_7 d/w - 10h/d - No HK Hols69 - No B/O periods 0 (was 04-Mar-22 C1) A 11-May-22 02-Apr-22 17-May-22 6 310.D.WS.L992.27.B02Prepare and submit info. of Axial Fan C01_7 d/w - 10h/d - No HK 4 04-Mar-22 A 30-Mar-22 02-Apr-22 05-Apr-22 6 Hols - No B/O periods (was 310.D.WS.L993.27.B02Review and comment info. of Axial Fan C1) C01_7 d/w - 10h/d - No HK 24 31-Mar-22 23-Apr-22 06-Apr-22 29-Apr-22 6 Hols - No B/O periods (was 310.D.WS.L994.27.B02Prepare and re-submit info. of Axial Fan C1) C01_7 d/w - 10h/d - No HK 9 24-Apr-22 02-May-22 30-Apr-22 08-May-22 6 Hols - No B/O periods (was 310.D.WS.L996.27.B02Obtain "No objection" of Axial Fan C1) C01_7 d/w - 10h/d - No HK 9 03-May-22 11-May-22 09-May-22 17-May-22 6 Hols - No B/O periods (was Centrifugal Fan C1) C01_7 d/w - 10h/d - No HK Hols71 - No B/O periods 0 (was 04-Mar-22 C1) A 13-May-22 07-Jul-22 23-Aug-22 102 310.D.WS.L992.28.B02Prepare and submit info. of Centrifugal Fan C01_7 d/w - 10h/d - No HK 6 04-Mar-22 A 01-Apr-22 07-Jul-22 12-Jul-22 102 Hols - No B/O periods (was 310.D.WS.L993.28.B02Review and comment info. of Centrifugal Fan C1) C01_7 d/w - 10h/d - No HK 24 02-Apr-22 25-Apr-22 13-Jul-22 05-Aug-22 102 Hols - No B/O periods (was 310.D.WS.L994.28.B02Prepare and re-submit info. of Centrifugal Fan C1) C01_7 d/w - 10h/d - No HK 9 26-Apr-22 04-May-22 06-Aug-22 14-Aug-22 102 Hols - No B/O periods (was 310.D.WS.L996.28.B02Obtain "No objection" of Centrifugal Fan C1) C01_7 d/w - 10h/d - No HK 9 05-May-22 13-May-22 15-Aug-22 23-Aug-22 102 Hols - No B/O periods (was In-line Fan C1) C01_7 d/w - 10h/d - No HK Hols59 - No B/O periods 0 (was27-Mar-22 C1) 24-May-22 08-May-22 05-Jul-22 42 310.D.WS.L992.29.B02Prepare and submit info. of In-line Fan C01_7 d/w - 10h/d - No HK 17 27-Mar-22 12-Apr-22 08-May-22 24-May-22 42 Hols - No B/O periods (was 310.D.WS.L993.29.B02Review and comment info. of In-line Fan C1) C01_7 d/w - 10h/d - No HK 24 13-Apr-22 06-May-22 25-May-22 17-Jun-22 42 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 165 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L994.29.B02Prepare and re-submit info. of In-line Fan C01_7 d/w - 10h/d - No HK 9 07-May-22 15-May-22 18-Jun-22 26-Jun-22 42 Hols - No B/O periods (was 310.D.WS.L996.29.B02Obtain "No objection" of In-line Fan C1) C01_7 d/w - 10h/d - No HK 9 16-May-22 24-May-22 27-Jun-22 05-Jul-22 42 Hols - No B/O periods (was Split Type & VRV AC Unit C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 19-Apr-22 06-Jun-22 23 310.D.WS.L992.30.B02Prepare and submit info. of Split Type & VRV AC Unit C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 19-Apr-22 25-Apr-22 23 Hols - No B/O periods (was 310.D.WS.L993.30.B02Review and comment info. of Split Type & VRV AC Unit C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 26-Apr-22 19-May-22 23 Hols - No B/O periods (was 310.D.WS.L994.30.B02Prepare and re-submit info. of Split Type & VRV AC Unit C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 20-May-22 28-May-22 23 Hols - No B/O periods (was 310.D.WS.L996.30.B02Obtain "No objection" of Split Type & VRV AC Unit C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 29-May-22 06-Jun-22 23 Hols - No B/O periods (was Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK Hols54 - No B/O periods 0 (was 04-Apr-22 C1) A 27-May-22 23-Jun-22 23-Aug-22 88 310.D.WS.L992.31.B02Prepare and submit info. of Tunnel Jet Fan C01_7 d/w - 10h/d - No HK 20 04-Apr-22 A 15-Apr-22 23-Jun-22 12-Jul-22 88 Hols - No B/O periods (was 310.D.WS.L993.31.B02Review and comment info. of Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK 24 16-Apr-22 09-May-22 13-Jul-22 05-Aug-22 88 Hols - No B/O periods (was 310.D.WS.L994.31.B02Prepare and re-submit info. of Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK 9 10-May-22 18-May-22 06-Aug-22 14-Aug-22 88 Hols - No B/O periods (was 310.D.WS.L996.31.B02Obtain "No objection" of Tunnel Jet Fan C1) C01_7 d/w - 10h/d - No HK 9 19-May-22 27-May-22 15-Aug-22 23-Aug-22 88 Hols - No B/O periods (was Package Fresh Air Processing Unit C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 19-Apr-22 06-Jun-22 23 310.D.WS.L992.32.B02Prepare and submit info. of Package Fresh Air Processing Unit C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 19-Apr-22 25-Apr-22 23 Hols - No B/O periods (was 310.D.WS.L993.32.B02Review and comment info. of Package Fresh Air Processing Unit C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 26-Apr-22 19-May-22 23 Hols - No B/O periods (was 310.D.WS.L994.32.B02Prepare and re-submit info. of Package Fresh Air Processing Unit C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 20-May-22 28-May-22 23 Hols - No B/O periods (was 310.D.WS.L996.32.B02Obtain "No objection" of Package Fresh Air Processing Unit C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 29-May-22 06-Jun-22 23 Hols - No B/O periods (was Motor Control Centre C1) C01_7 d/w - 10h/d - No HK Hols55 - No B/O periods 0 (was27-Mar-22 C1) 20-May-22 12-May-22 05-Jul-22 46 310.D.WS.L992.33.B02Prepare and submit info. of Motor Control Centre C01_7 d/w - 10h/d - No HK 13 27-Mar-22 08-Apr-22 12-May-22 24-May-22 46 Hols - No B/O periods (was 310.D.WS.L993.33.B02Review and comment info. of Motor Control Centre C1) C01_7 d/w - 10h/d - No HK 24 09-Apr-22 02-May-22 25-May-22 17-Jun-22 46 Hols - No B/O periods (was 310.D.WS.L994.33.B02Prepare and re-submit info. of Motor Control Centre C1) C01_7 d/w - 10h/d - No HK 9 03-May-22 11-May-22 18-Jun-22 26-Jun-22 46 Hols - No B/O periods (was 310.D.WS.L996.33.B02Obtain "No objection" of Motor Control Centre C1) C01_7 d/w - 10h/d - No HK 9 12-May-22 20-May-22 27-Jun-22 05-Jul-22 46 Hols - No B/O periods (was Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK Hols59 - No B/O periods 0 (was27-Mar-22 C1) 24-May-22 30-Apr-22 27-Jun-22 34 310.D.WS.L992.34.B02Prepare and submit info. of Local Motor Control Panel C01_7 d/w - 10h/d - No HK 17 27-Mar-22 12-Apr-22 30-Apr-22 16-May-22 34 Hols - No B/O periods (was 310.D.WS.L993.34.B02Review and comment info. of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 24 13-Apr-22 06-May-22 17-May-22 09-Jun-22 34 Hols - No B/O periods (was 310.D.WS.L994.34.B02Prepare and re-submit info. of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 9 07-May-22 15-May-22 10-Jun-22 18-Jun-22 34 Hols - No B/O periods (was 310.D.WS.L996.34.B02Obtain "No objection" of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 9 16-May-22 24-May-22 19-Jun-22 27-Jun-22 34 Hols - No B/O periods (was MFSD C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 10-May-22 27-Jun-22 44
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 166 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L992.35.B02Prepare and submit info. of MFSD C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 10-May-22 16-May-22 44 Hols - No B/O periods (was 310.D.WS.L993.35.B02Review and comment info. of MSD C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 17-May-22 09-Jun-22 44 Hols - No B/O periods (was 310.D.WS.L994.35.B02Prepare and re-submit info. of MSD C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 10-Jun-22 18-Jun-22 44 Hols - No B/O periods (was 310.D.WS.L996.35.B02Obtain "No objection" of MSD C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 19-Jun-22 27-Jun-22 44 Hols - No B/O periods (was Fire Damper C1) C01_7 d/w - 10h/d - No HK Hols72 - No B/O periods 0 (was 04-Mar-22 C1) A 14-May-22 19-Apr-22 06-Jun-22 23 310.D.WS.L992.36.B02Prepare and submit info. of Fire Damper C01_7 d/w - 10h/d - No HK 7 04-Mar-22 A 02-Apr-22 19-Apr-22 25-Apr-22 23 Hols - No B/O periods (was 310.D.WS.L993.36.B02Review and comment info. of Fire Damper C1) C01_7 d/w - 10h/d - No HK 24 03-Apr-22 26-Apr-22 26-Apr-22 19-May-22 23 Hols - No B/O periods (was 310.D.WS.L994.36.B02Prepare and re-submit info. of Fire Damper C1) C01_7 d/w - 10h/d - No HK 9 27-Apr-22 05-May-22 20-May-22 28-May-22 23 Hols - No B/O periods (was 310.D.WS.L996.36.B02Obtain "No objection" of Fire Damper C1) C01_7 d/w - 10h/d - No HK 9 06-May-22 14-May-22 29-May-22 06-Jun-22 23 Hols - No B/O periods (was Air Grille & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was21-Apr-22 C1) 26-Jun-22 22-Apr-22 27-Jun-22 1 310.D.WS.L992.37.B02Prepare and submit info. of Air Grille & Accessories C01_7 d/w - 10h/d - No HK 25 21-Apr-22 15-May-22 22-Apr-22 16-May-22 1 Hols - No B/O periods (was 310.D.WS.L993.37.B02Review and comment info. of Air Grille & Accessories C1) C01_7 d/w - 10h/d - No HK 24 16-May-22 08-Jun-22 17-May-22 09-Jun-22 1 Hols - No B/O periods (was 310.D.WS.L994.37.B02Prepare and re-submit info. of Air Grille & Accessories C1) C01_7 d/w - 10h/d - No HK 9 09-Jun-22 17-Jun-22 10-Jun-22 18-Jun-22 1 Hols - No B/O periods (was 310.D.WS.L996.37.B02Obtain "No objection" of Air Grille & Accessories C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 19-Jun-22 27-Jun-22 1 Hols - No B/O periods (was G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was 08-Feb-22 C1) A 23-Mar-22 A 18-May-22 18-May-22 310.D.WS.L992.38.B02Prepare and submit info. of G.I. Sheet Ductwork & Accessories C01_7 d/w - 10h/d - No HK 0 08-Feb-22 A 04-Mar-22 A 18-May-22 18-May-22 Hols - No B/O periods (was 310.D.WS.L993.38.B02Review and comment info. of G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK 0 05-Mar-22 A 23-Mar-22 A 18-May-22 18-May-22 Hols - No B/O periods (was 310.D.WS.L994.38.B02Prepare and re-submit info. of G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK 0 23-Mar-22 A 23-Mar-22 A 18-May-22 18-May-22 Hols - No B/O periods (was 310.D.WS.L996.38.B02Obtain "No objection" of G.I. Sheet Ductwork & Accessories C1) C01_7 d/w - 10h/d - No HK 0 23-Mar-22 A 23-Mar-22 A 18-May-22 18-May-22 Hols - No B/O periods (was Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was07-Apr-22 C1) 12-Jun-22 22-Apr-22 27-Jun-22 15 310.D.WS.L992.39.B02Prepare and submit info. of Refrigerant Pipework & Fittings C01_7 d/w - 10h/d - No HK 25 07-Apr-22 01-May-22 22-Apr-22 16-May-22 15 Hols - No B/O periods (was 310.D.WS.L993.39.B02Review and comment info. of Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK 24 02-May-22 25-May-22 17-May-22 09-Jun-22 15 Hols - No B/O periods (was 310.D.WS.L994.39.B02Prepare and re-submit info. of Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK 9 26-May-22 03-Jun-22 10-Jun-22 18-Jun-22 15 Hols - No B/O periods (was 310.D.WS.L996.39.B02Obtain "No objection" of Refrigerant Pipework & Fittings C1) C01_7 d/w - 10h/d - No HK 9 04-Jun-22 12-Jun-22 19-Jun-22 27-Jun-22 15 Hols - No B/O periods (was Fire Services C1) C01_7 d/w - 10h/d - No HK Hols221 - No B/O periods 0 (was10-Apr-22 C1) 16-Nov-22 13-Apr-22 11-Mar-23 115 Hose Reel Set C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 26-May-22 31-Jul-22 26 310.D.WS.L992.40.B02Prepare and submit info. of Hose Reel Set C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 26-May-22 19-Jun-22 26 Hols - No B/O periods (was 310.D.WS.L993.40.B02Review and comment info. of Hose Reel Set C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 20-Jun-22 13-Jul-22 26 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 167 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L994.40.B02Prepare and re-submit info. of Hose Reel Set C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 14-Jul-22 22-Jul-22 26 Hols - No B/O periods (was 310.D.WS.L996.40.B02Obtain "No objection" of Hose Reel Set C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 23-Jul-22 31-Jul-22 26 Hols - No B/O periods (was Fire Hydrant C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 26-May-22 31-Jul-22 26 310.D.WS.L992.41.B02Prepare and submit info. of Fire Hydrant C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 26-May-22 19-Jun-22 26 Hols - No B/O periods (was 310.D.WS.L993.41.B02Review and comment info. of Fire Hydrant C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 20-Jun-22 13-Jul-22 26 Hols - No B/O periods (was 310.D.WS.L994.41.B02Prepare and re-submit info. of Fire Hydrant C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 14-Jul-22 22-Jul-22 26 Hols - No B/O periods (was 310.D.WS.L996.41.B02Obtain "No objection" of Fire Hydrant C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 23-Jul-22 31-Jul-22 26 Hols - No B/O periods (was Sprinkler Head (All type) C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was05-May-22 C1) 10-Jul-22 26-May-22 31-Jul-22 21 310.D.WS.L992.42.B02Prepare and submit info. of Sprinkler Head (All type) C01_7 d/w - 10h/d - No HK 25 05-May-22 29-May-22 26-May-22 19-Jun-22 21 Hols - No B/O periods (was 310.D.WS.L993.42.B02Review and comment info. of Sprinkler Head (All type) C1) C01_7 d/w - 10h/d - No HK 24 30-May-22 22-Jun-22 20-Jun-22 13-Jul-22 21 Hols - No B/O periods (was 310.D.WS.L994.42.B02Prepare and re-submit info. of Sprinkler Head (All type) C1) C01_7 d/w - 10h/d - No HK 9 23-Jun-22 01-Jul-22 14-Jul-22 22-Jul-22 21 Hols - No B/O periods (was 310.D.WS.L996.42.B02Obtain "No objection" of Sprinkler Head (All type) C1) C01_7 d/w - 10h/d - No HK 9 02-Jul-22 10-Jul-22 23-Jul-22 31-Jul-22 21 Hols - No B/O periods (was MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was14-May-22 C1) 19-Jul-22 02-Jun-22 07-Aug-22 19 310.D.WS.L992.43.B02Prepare and submit info. of MCC/ LMCP C01_7 d/w - 10h/d - No HK 25 14-May-22 07-Jun-22 02-Jun-22 26-Jun-22 19 Hols - No B/O periods (was 310.D.WS.L993.43.B02Review and comment info. of MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK 24 08-Jun-22 01-Jul-22 27-Jun-22 20-Jul-22 19 Hols - No B/O periods (was 310.D.WS.L994.43.B02Prepare and re-submit info. of MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK 9 02-Jul-22 10-Jul-22 21-Jul-22 29-Jul-22 19 Hols - No B/O periods (was 310.D.WS.L996.43.B02Obtain "No objection" of MCC/ LMCP C1) C01_7 d/w - 10h/d - No HK 9 11-Jul-22 19-Jul-22 30-Jul-22 07-Aug-22 19 Hols - No B/O periods (was Fire Hydrant and Hosereel Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was29-May-22 C1) 03-Aug-22 12-Aug-22 17-Oct-22 75 310.D.WS.L992.44.B02Prepare and submit info. of Fire Hydrant and Hosereel Pump C01_7 d/w - 10h/d - No HK 25 29-May-22 22-Jun-22 12-Aug-22 05-Sep-22 75 Hols - No B/O periods (was 310.D.WS.L993.44.B02Review and comment info. of Fire Hydrant and Hosereel Pump C1) C01_7 d/w - 10h/d - No HK 24 23-Jun-22 16-Jul-22 06-Sep-22 29-Sep-22 75 Hols - No B/O periods (was 310.D.WS.L994.44.B02Prepare and re-submit info. of Fire Hydrant and Hosereel Pump C1) C01_7 d/w - 10h/d - No HK 9 17-Jul-22 25-Jul-22 30-Sep-22 08-Oct-22 75 Hols - No B/O periods (was 310.D.WS.L996.44.B02Obtain "No objection" of Fire Hydrant and Hosereel Pump C1) C01_7 d/w - 10h/d - No HK 9 26-Jul-22 03-Aug-22 09-Oct-22 17-Oct-22 75 Hols - No B/O periods (was FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was29-May-22 C1) 03-Aug-22 05-Jul-22 09-Sep-22 37 310.D.WS.L992.45.B02Prepare and submit info. of FS Jockey Pump C01_7 d/w - 10h/d - No HK 25 29-May-22 22-Jun-22 05-Jul-22 29-Jul-22 37 Hols - No B/O periods (was 310.D.WS.L993.45.B02Review and comment info. of FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK 24 23-Jun-22 16-Jul-22 30-Jul-22 22-Aug-22 37 Hols - No B/O periods (was 310.D.WS.L994.45.B02Prepare and re-submit info. of FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 17-Jul-22 25-Jul-22 23-Aug-22 31-Aug-22 37 Hols - No B/O periods (was 310.D.WS.L996.45.B02Obtain "No objection" of FS Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 26-Jul-22 03-Aug-22 01-Sep-22 09-Sep-22 37 Hols - No B/O periods (was Fixed Foam System Water Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was29-May-22 C1) 03-Aug-22 28-Jul-22 02-Oct-22 60
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 168 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L992.46.B02Prepare and submit info. of Fixed Foam System Water Pump C01_7 d/w - 10h/d - No HK 25 29-May-22 22-Jun-22 28-Jul-22 21-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L993.46.B02Review and comment info. of Fixed Foam System Water Pump C1) C01_7 d/w - 10h/d - No HK 24 23-Jun-22 16-Jul-22 22-Aug-22 14-Sep-22 60 Hols - No B/O periods (was 310.D.WS.L994.46.B02Prepare and re-submit info. of Fixed Foam System Water Pump C1) C01_7 d/w - 10h/d - No HK 9 17-Jul-22 25-Jul-22 15-Sep-22 23-Sep-22 60 Hols - No B/O periods (was 310.D.WS.L996.46.B02Obtain "No objection" of Fixed Foam System Water Pump C1) C01_7 d/w - 10h/d - No HK 9 26-Jul-22 03-Aug-22 24-Sep-22 02-Oct-22 60 Hols - No B/O periods (was Fixed Foam System Jockey Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was29-May-22 C1) 03-Aug-22 28-Jul-22 02-Oct-22 60 310.D.WS.L992.47.B02Prepare and submit info. of Fixed Foam System Jockey Pump C01_7 d/w - 10h/d - No HK 25 29-May-22 22-Jun-22 28-Jul-22 21-Aug-22 60 Hols - No B/O periods (was 310.D.WS.L993.47.B02Review and comment info. of Fixed Foam System Jockey Pump C1) C01_7 d/w - 10h/d - No HK 24 23-Jun-22 16-Jul-22 22-Aug-22 14-Sep-22 60 Hols - No B/O periods (was 310.D.WS.L994.47.B02Prepare and re-submit info. of Fixed Foam System Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 17-Jul-22 25-Jul-22 15-Sep-22 23-Sep-22 60 Hols - No B/O periods (was 310.D.WS.L996.47.B02Obtain "No objection" of Fixed Foam System Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 26-Jul-22 03-Aug-22 24-Sep-22 02-Oct-22 60 Hols - No B/O periods (was G.I. Pipe & Fittings C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was22-May-22 C1) 27-Jul-22 02-Jun-22 07-Aug-22 11 310.D.WS.L992.48.B02Prepare and submit info. of G.I. Pipe & Fittings C01_7 d/w - 10h/d - No HK 25 22-May-22 15-Jun-22 02-Jun-22 26-Jun-22 11 Hols - No B/O periods (was 310.D.WS.L993.48.B02Review and comment info. of G.I. Pipe & Fittings C1) C01_7 d/w - 10h/d - No HK 24 16-Jun-22 09-Jul-22 27-Jun-22 20-Jul-22 11 Hols - No B/O periods (was 310.D.WS.L994.48.B02Prepare and re-submit info. of G.I. Pipe & Fittings C1) C01_7 d/w - 10h/d - No HK 9 10-Jul-22 18-Jul-22 21-Jul-22 29-Jul-22 11 Hols - No B/O periods (was 310.D.WS.L996.48.B02Obtain "No objection" of G.I. Pipe & Fittings C1) C01_7 d/w - 10h/d - No HK 9 19-Jul-22 27-Jul-22 30-Jul-22 07-Aug-22 11 Hols - No B/O periods (was Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was10-Apr-22 C1) 15-Jun-22 16-Apr-22 21-Jun-22 6 310.D.WS.L992.49.B02Prepare and submit info. of Automatic Fire Alarm Control Panel C01_7 d/w - 10h/d - No HK 25 10-Apr-22 04-May-22 16-Apr-22 10-May-22 6 Hols - No B/O periods (was 310.D.WS.L993.49.B02Review and comment info. of Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK 24 05-May-22 28-May-22 11-May-22 03-Jun-22 6 Hols - No B/O periods (was 310.D.WS.L994.49.B02Prepare and re-submit info. of Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK 9 29-May-22 06-Jun-22 04-Jun-22 12-Jun-22 6 Hols - No B/O periods (was 310.D.WS.L996.49.B02Obtain "No objection" of Automatic Fire Alarm Control Panel C1) C01_7 d/w - 10h/d - No HK 9 07-Jun-22 15-Jun-22 13-Jun-22 21-Jun-22 6 Hols - No B/O periods (was Gas Flooding System C1) C01_7 d/w - 10h/d - No HK Hols46 - No B/O periods 0 (was13-Apr-22 C1) 28-May-22 13-Apr-22 28-May-22 0 310.D.WS.L992.50.B02Prepare and submit info. of Gas Flooding System C01_7 d/w - 10h/d - No HK 14 13-Apr-22 26-Apr-22 13-Apr-22 26-Apr-22 0 Hols - No B/O periods (was 310.D.WS.L993.50.B02Review and comment info. of Gas Flooding System C1) C01_7 d/w - 10h/d - No HK 14 27-Apr-22 10-May-22 27-Apr-22 10-May-22 0 Hols - No B/O periods (was 310.D.WS.L994.50.B02Prepare and re-submit info. of Gas Flooding System C1) C01_7 d/w - 10h/d - No HK 9 11-May-22 19-May-22 11-May-22 19-May-22 0 Hols - No B/O periods (was 310.D.WS.L996.50.B02Obtain "No objection" of Gas Flooding System C1) C01_7 d/w - 10h/d - No HK 9 20-May-22 28-May-22 20-May-22 28-May-22 0 Hols - No B/O periods (was Automatic Sprinkler Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was11-Sep-22 C1) 16-Nov-22 04-Jan-23 11-Mar-23 115 310.D.WS.L992.51.B02Prepare and submit info. of Automatic Sprinkler Pump C01_7 d/w - 10h/d - No HK 25 11-Sep-22 05-Oct-22 04-Jan-23 28-Jan-23 115 Hols - No B/O periods (was 310.D.WS.L993.51.B02Review and comment info. of Automatic Sprinkler Pump C1) C01_7 d/w - 10h/d - No HK 24 06-Oct-22 29-Oct-22 29-Jan-23 21-Feb-23 115 Hols - No B/O periods (was 310.D.WS.L994.51.B02Prepare and re-submit info. of Automatic Sprinkler Pump C1) C01_7 d/w - 10h/d - No HK 9 30-Oct-22 07-Nov-22 22-Feb-23 02-Mar-23 115 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 169 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L996.51.B02Obtain "No objection" of Automatic Sprinkler Pump C01_7 d/w - 10h/d - No HK 9 08-Nov-22 16-Nov-22 03-Mar-23 11-Mar-23 115 Hols - No B/O periods (was Automatic Sprinkler Jockey Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was11-Sep-22 C1) 16-Nov-22 25-Sep-22 30-Nov-22 14 310.D.WS.L992.52.B02Prepare and submit info. of Automatic Sprinkler Jockey Pump C01_7 d/w - 10h/d - No HK 25 11-Sep-22 05-Oct-22 25-Sep-22 19-Oct-22 14 Hols - No B/O periods (was 310.D.WS.L993.52.B02Review and comment info. of Automatic Sprinkler Jockey Pump C1) C01_7 d/w - 10h/d - No HK 24 06-Oct-22 29-Oct-22 20-Oct-22 12-Nov-22 14 Hols - No B/O periods (was 310.D.WS.L994.52.B02Prepare and re-submit info. of Automatic Sprinkler Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 30-Oct-22 07-Nov-22 13-Nov-22 21-Nov-22 14 Hols - No B/O periods (was 310.D.WS.L996.52.B02Obtain "No objection" of Automatic Sprinkler Jockey Pump C1) C01_7 d/w - 10h/d - No HK 9 08-Nov-22 16-Nov-22 22-Nov-22 30-Nov-22 14 Hols - No B/O periods (was Smoke Detector C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was10-May-22 C1) 15-Jul-22 15-May-22 20-Jul-22 5 310.D.WS.L992.53.B02Prepare and submit info. of Smoke Detector C01_7 d/w - 10h/d - No HK 25 10-May-22 03-Jun-22 15-May-22 08-Jun-22 5 Hols - No B/O periods (was 310.D.WS.L993.53.B02Review and comment info. of Smoke Detector C1) C01_7 d/w - 10h/d - No HK 24 04-Jun-22 27-Jun-22 09-Jun-22 02-Jul-22 5 Hols - No B/O periods (was 310.D.WS.L994.53.B02Prepare and re-submit info. of Smoke Detector C1) C01_7 d/w - 10h/d - No HK 9 28-Jun-22 06-Jul-22 03-Jul-22 11-Jul-22 5 Hols - No B/O periods (was 310.D.WS.L996.53.B02Obtain "No objection" of Smoke Detector C1) C01_7 d/w - 10h/d - No HK 9 07-Jul-22 15-Jul-22 12-Jul-22 20-Jul-22 5 Hols - No B/O periods (was Heat Detector C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was24-Jun-22 C1) 29-Aug-22 13-Jul-22 17-Sep-22 19 310.D.WS.L992.54.B02Prepare and submit info. of Heat Detector C01_7 d/w - 10h/d - No HK 25 24-Jun-22 18-Jul-22 13-Jul-22 06-Aug-22 19 Hols - No B/O periods (was 310.D.WS.L993.54.B02Review and comment info. of Heat Detector C1) C01_7 d/w - 10h/d - No HK 24 19-Jul-22 11-Aug-22 07-Aug-22 30-Aug-22 19 Hols - No B/O periods (was 310.D.WS.L994.54.B02Prepare and re-submit info. of Heat Detector C1) C01_7 d/w - 10h/d - No HK 9 12-Aug-22 20-Aug-22 31-Aug-22 08-Sep-22 19 Hols - No B/O periods (was 310.D.WS.L996.54.B02Obtain "No objection" of Heat Detector C1) C01_7 d/w - 10h/d - No HK 9 21-Aug-22 29-Aug-22 09-Sep-22 17-Sep-22 19 Hols - No B/O periods (was Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was24-Jun-22 C1) 29-Aug-22 05-Jul-22 09-Sep-22 11 310.D.WS.L992.55.B02Prepare and submit info. of Cable Tray & Accessories C01_7 d/w - 10h/d - No HK 25 24-Jun-22 18-Jul-22 05-Jul-22 29-Jul-22 11 Hols - No B/O periods (was 310.D.WS.L993.55.B02Review and comment info. of Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK 24 19-Jul-22 11-Aug-22 30-Jul-22 22-Aug-22 11 Hols - No B/O periods (was 310.D.WS.L994.55.B02Prepare and re-submit info. of Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK 9 12-Aug-22 20-Aug-22 23-Aug-22 31-Aug-22 11 Hols - No B/O periods (was 310.D.WS.L996.55.B02Obtain "No objection" of Cable Tray & Accessories C1) C01_7 d/w - 10h/d - No HK 9 21-Aug-22 29-Aug-22 01-Sep-22 09-Sep-22 11 Hols - No B/O periods (was Conventional Linear Heat Control Panel C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was09-Sep-22 C1) 14-Nov-22 04-Jan-23 11-Mar-23 117 310.D.WS.L992.56.B02Prepare and submit info. of Conventional Linear Heat Control Panel C01_7 d/w - 10h/d - No HK 25 09-Sep-22 03-Oct-22 04-Jan-23 28-Jan-23 117 Hols - No B/O periods (was 310.D.WS.L993.56.B02Review and comment info. of Conventional Linear Heat Control Panel C1) C01_7 d/w - 10h/d - No HK 24 04-Oct-22 27-Oct-22 29-Jan-23 21-Feb-23 117 Hols - No B/O periods (was 310.D.WS.L994.56.B02Prepare and re-submit info. of Conventional Linear Heat Control Panel C1) C01_7 d/w - 10h/d - No HK 9 28-Oct-22 05-Nov-22 22-Feb-23 02-Mar-23 117 Hols - No B/O periods (was 310.D.WS.L996.56.B02Obtain "No objection" of Conventional Linear Heat Control Panel C1) C01_7 d/w - 10h/d - No HK 9 06-Nov-22 14-Nov-22 03-Mar-23 11-Mar-23 117 Hols - No B/O periods (was Linear Heat Detector C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was09-Sep-22 C1) 14-Nov-22 04-Jan-23 11-Mar-23 117 310.D.WS.L992.57.B02Prepare and submit info. of Linear Heat Detector C01_7 d/w - 10h/d - No HK 25 09-Sep-22 03-Oct-22 04-Jan-23 28-Jan-23 117 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 170 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L993.57.B02Review and comment info. of Linear Heat Detector C01_7 d/w - 10h/d - No HK 24 04-Oct-22 27-Oct-22 29-Jan-23 21-Feb-23 117 Hols - No B/O periods (was 310.D.WS.L994.57.B02Prepare and re-submit info. of Linear Heat Detector C1) C01_7 d/w - 10h/d - No HK 9 28-Oct-22 05-Nov-22 22-Feb-23 02-Mar-23 117 Hols - No B/O periods (was 310.D.WS.L996.57.B02Obtain "No objection" of Linear Heat Detector C1) C01_7 d/w - 10h/d - No HK 9 06-Nov-22 14-Nov-22 03-Mar-23 11-Mar-23 117 Hols - No B/O periods (was PLC C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was11-May-22 C1) 16-Jul-22 15-May-22 20-Jul-22 4 310.D.WS.L992.58.B02Prepare and submit info. of PLC C01_7 d/w - 10h/d - No HK 25 11-May-22 04-Jun-22 15-May-22 08-Jun-22 4 Hols - No B/O periods (was 310.D.WS.L993.58.B02Review and comment info. of PLC C1) C01_7 d/w - 10h/d - No HK 24 05-Jun-22 28-Jun-22 09-Jun-22 02-Jul-22 4 Hols - No B/O periods (was 310.D.WS.L994.58.B02Prepare and re-submit info. of PLC C1) C01_7 d/w - 10h/d - No HK 9 29-Jun-22 07-Jul-22 03-Jul-22 11-Jul-22 4 Hols - No B/O periods (was 310.D.WS.L996.58.B02Obtain "No objection" of PLC C1) C01_7 d/w - 10h/d - No HK 9 08-Jul-22 16-Jul-22 12-Jul-22 20-Jul-22 4 Hols - No B/O periods (was Plumbing and Drainage C1) C01_7 d/w - 10h/d - No HK Hols215 - No B/O periods 0 (was27-Mar-22 C1) 27-Oct-22 08-Apr-22 24-Jan-23 89 Fibreglass Tank C01_7 d/w - 10h/d - No HK Hols57 - No B/O periods 0 (was27-Mar-22 C1) 22-May-22 08-Apr-22 03-Jun-22 12 310.D.WS.L992.59.B02Prepare and submit info. of Fribreglass Tank C01_7 d/w - 10h/d - No HK 18 27-Mar-22 13-Apr-22 08-Apr-22 25-Apr-22 12 Hols - No B/O periods (was 310.D.WS.L993.59.B02Review and comment info. of Fribreglass Tank C1) C01_7 d/w - 10h/d - No HK 21 14-Apr-22 04-May-22 26-Apr-22 16-May-22 12 Hols - No B/O periods (was 310.D.WS.L994.59.B02Prepare and re-submit info. of Fribreglass Tank C1) C01_7 d/w - 10h/d - No HK 9 05-May-22 13-May-22 17-May-22 25-May-22 12 Hols - No B/O periods (was 310.D.WS.L996.59.B02Obtain "No objection" of Fribreglass Tank C1) C01_7 d/w - 10h/d - No HK 9 14-May-22 22-May-22 26-May-22 03-Jun-22 12 Hols - No B/O periods (was Pressure Vessel C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was13-Jun-22 C1) 18-Aug-22 05-Jul-22 09-Sep-22 22 310.D.WS.L992.60.B02Prepare and submit info. of Pressure Vessel C01_7 d/w - 10h/d - No HK 25 13-Jun-22 07-Jul-22 05-Jul-22 29-Jul-22 22 Hols - No B/O periods (was 310.D.WS.L993.60.B02Review and comment info. of Pressure Vessel C1) C01_7 d/w - 10h/d - No HK 24 08-Jul-22 31-Jul-22 30-Jul-22 22-Aug-22 22 Hols - No B/O periods (was 310.D.WS.L994.60.B02Prepare and re-submit info. of Pressure Vessel C1) C01_7 d/w - 10h/d - No HK 9 01-Aug-22 09-Aug-22 23-Aug-22 31-Aug-22 22 Hols - No B/O periods (was 310.D.WS.L996.60.B02Obtain "No objection" of Pressure Vessel C1) C01_7 d/w - 10h/d - No HK 9 10-Aug-22 18-Aug-22 01-Sep-22 09-Sep-22 22 Hols - No B/O periods (was Potable Water Booster Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was29-May-22 C1) 03-Aug-22 19-Nov-22 24-Jan-23 174 310.D.WS.L992.61.B02Prepare and submit info. of Potable Water Booster Pump C01_7 d/w - 10h/d - No HK 25 29-May-22 22-Jun-22 19-Nov-22 13-Dec-22 174 Hols - No B/O periods (was 310.D.WS.L993.61.B02Review and comment info. of Potable Water Booster Pump C1) C01_7 d/w - 10h/d - No HK 24 23-Jun-22 16-Jul-22 14-Dec-22 06-Jan-23 174 Hols - No B/O periods (was 310.D.WS.L994.61.B02Prepare and re-submit info. of Potable Water Booster Pump C1) C01_7 d/w - 10h/d - No HK 9 17-Jul-22 25-Jul-22 07-Jan-23 15-Jan-23 174 Hols - No B/O periods (was 310.D.WS.L996.61.B02Obtain "No objection" of Potable Water Booster Pump C1) C01_7 d/w - 10h/d - No HK 9 26-Jul-22 03-Aug-22 16-Jan-23 24-Jan-23 174 Hols - No B/O periods (was Cleansing Water Booster Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was29-May-22 C1) 03-Aug-22 05-Jul-22 09-Sep-22 37 310.D.WS.L992.62.B02Prepare and submit info. of Cleansing Water Booster Pump C01_7 d/w - 10h/d - No HK 25 29-May-22 22-Jun-22 05-Jul-22 29-Jul-22 37 Hols - No B/O periods (was 310.D.WS.L993.62.B02Review and comment info. of Cleansing Water Booster Pump C1) C01_7 d/w - 10h/d - No HK 24 23-Jun-22 16-Jul-22 30-Jul-22 22-Aug-22 37 Hols - No B/O periods (was 310.D.WS.L994.62.B02Prepare and re-submit info. of Cleansing Water Booster Pump C1) C01_7 d/w - 10h/d - No HK 9 17-Jul-22 25-Jul-22 23-Aug-22 31-Aug-22 37 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 171 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L996.62.B02Obtain "No objection" of Cleansing Water Booster Pump C01_7 d/w - 10h/d - No HK 9 26-Jul-22 03-Aug-22 01-Sep-22 09-Sep-22 37 Hols - No B/O periods (was Flushing Water Booster Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was29-May-22 C1) 03-Aug-22 31-Jul-22 05-Oct-22 63 310.D.WS.L992.63.B02Prepare and submit info. of Flushing Water Booster Pump C01_7 d/w - 10h/d - No HK 25 29-May-22 22-Jun-22 31-Jul-22 24-Aug-22 63 Hols - No B/O periods (was 310.D.WS.L993.63.B02Review and comment info. of Flushing Water Booster Pump C1) C01_7 d/w - 10h/d - No HK 24 23-Jun-22 16-Jul-22 25-Aug-22 17-Sep-22 63 Hols - No B/O periods (was 310.D.WS.L994.63.B02Prepare and re-submit info. of Flushing Water Booster Pump C1) C01_7 d/w - 10h/d - No HK 9 17-Jul-22 25-Jul-22 18-Sep-22 26-Sep-22 63 Hols - No B/O periods (was 310.D.WS.L996.63.B02Obtain "No objection" of Flushing Water Booster Pump C1) C01_7 d/w - 10h/d - No HK 9 26-Jul-22 03-Aug-22 27-Sep-22 05-Oct-22 63 Hols - No B/O periods (was Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 20-Sep-22 25-Nov-22 143 310.D.WS.L992.64.B02Prepare and submit info. of Ductile Iron Pipe & Accessories C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 20-Sep-22 14-Oct-22 143 Hols - No B/O periods (was 310.D.WS.L993.64.B02Review and comment info. of Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 15-Oct-22 07-Nov-22 143 Hols - No B/O periods (was 310.D.WS.L994.64.B02Prepare and re-submit info. of Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 08-Nov-22 16-Nov-22 143 Hols - No B/O periods (was 310.D.WS.L996.64.B02Obtain "No objection" of Ductile Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 17-Nov-22 25-Nov-22 143 Hols - No B/O periods (was Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was30-Apr-22 C1) 05-Jul-22 08-May-22 13-Jul-22 8 310.D.WS.L992.65.B02Prepare and submit info. of Epoxy Cast Iron Pipe & Accessories C01_7 d/w - 10h/d - No HK 25 30-Apr-22 24-May-22 08-May-22 01-Jun-22 8 Hols - No B/O periods (was 310.D.WS.L993.65.B02Review and comment info. of Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 24 25-May-22 17-Jun-22 02-Jun-22 25-Jun-22 8 Hols - No B/O periods (was 310.D.WS.L994.65.B02Prepare and re-submit info. of Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 18-Jun-22 26-Jun-22 26-Jun-22 04-Jul-22 8 Hols - No B/O periods (was 310.D.WS.L996.65.B02Obtain "No objection" of Epoxy Cast Iron Pipe & Accessories C1) C01_7 d/w - 10h/d - No HK 9 27-Jun-22 05-Jul-22 05-Jul-22 13-Jul-22 8 Hols - No B/O periods (was Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was13-Jun-22 C1) 18-Aug-22 05-Jul-22 09-Sep-22 22 310.D.WS.L992.66.B02Prepare and submit info. of Local Motor Control Panel C01_7 d/w - 10h/d - No HK 25 13-Jun-22 07-Jul-22 05-Jul-22 29-Jul-22 22 Hols - No B/O periods (was 310.D.WS.L993.66.B02Review and comment info. of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 24 08-Jul-22 31-Jul-22 30-Jul-22 22-Aug-22 22 Hols - No B/O periods (was 310.D.WS.L994.66.B02Prepare and re-submit info. of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 9 01-Aug-22 09-Aug-22 23-Aug-22 31-Aug-22 22 Hols - No B/O periods (was 310.D.WS.L996.66.B02Obtain "No objection" of Local Motor Control Panel C1) C01_7 d/w - 10h/d - No HK 9 10-Aug-22 18-Aug-22 01-Sep-22 09-Sep-22 22 Hols - No B/O periods (was Sump Pump C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was22-Aug-22 C1) 27-Oct-22 20-Sep-22 25-Nov-22 29 310.D.WS.L992.67.B02Prepare and submit info. of Sump Pump C01_7 d/w - 10h/d - No HK 25 22-Aug-22 15-Sep-22 20-Sep-22 14-Oct-22 29 Hols - No B/O periods (was 310.D.WS.L993.67.B02Review and comment info. of Sump Pump C1) C01_7 d/w - 10h/d - No HK 24 16-Sep-22 09-Oct-22 15-Oct-22 07-Nov-22 29 Hols - No B/O periods (was 310.D.WS.L994.67.B02Prepare and re-submit info. of Sump Pump C1) C01_7 d/w - 10h/d - No HK 9 10-Oct-22 18-Oct-22 08-Nov-22 16-Nov-22 29 Hols - No B/O periods (was 310.D.WS.L996.67.B02Obtain "No objection" of Sump Pump C1) C01_7 d/w - 10h/d - No HK 9 19-Oct-22 27-Oct-22 17-Nov-22 25-Nov-22 29 Hols - No B/O periods (was Hammer Arrestor C1) C01_7 d/w - 10h/d - No HK Hols67 - No B/O periods 0 (was27-Jun-22 C1) 01-Sep-22 31-Jul-22 05-Oct-22 34 310.D.WS.L992.68.B02Prepare and submit info. of Hammer Arrestor C01_7 d/w - 10h/d - No HK 25 27-Jun-22 21-Jul-22 31-Jul-22 24-Aug-22 34 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 172 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L993.68.B02Review and comment info. of Hammer Arrestor C01_7 d/w - 10h/d - No HK 24 22-Jul-22 14-Aug-22 25-Aug-22 17-Sep-22 34 Hols - No B/O periods (was 310.D.WS.L994.68.B02Prepare and re-submit info. of Hammer Arrestor C1) C01_7 d/w - 10h/d - No HK 9 15-Aug-22 23-Aug-22 18-Sep-22 26-Sep-22 34 Hols - No B/O periods (was 310.D.WS.L996.68.B02Obtain "No objection" of Hammer Arrestor C1) C01_7 d/w - 10h/d - No HK 9 24-Aug-22 01-Sep-22 27-Sep-22 05-Oct-22 34 Hols - No B/O periods (was CC#8 - Plate Load Test Method Statement C1) C01_7 d/w - 10h/d - No HK Hols453 - No B/O periods 0 (was 31-Aug-21 C1) A 26-Nov-22 28-Mar-22 08-May-23 163 Method Statement for Plate Load Test for C&ED Operational Office and Kennel Area C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was23-May-22 C1) 19-Jul-22 30-Jul-22 25-Sep-22 68 310.D.TX.A220 Method Statement for Plate Load Test for C&ED Operational Office and Kennel Area - C01_7 d/w - 10h/d - No HK 30 23-May-22 21-Jun-22 30-Jul-22 28-Aug-22 68 prepare document Hols - No B/O periods (was 310.D.TX.A224 Method Statement for Plate Load Test for C&ED Operational Office and Kennel Area - BD C1) C01_7 d/w - 10h/d - No HK 28 22-Jun-22 19-Jul-22 29-Aug-22 25-Sep-22 68 Acknowledgement Hols - No B/O periods (was Method Statement for Plate Load Test for WSA Comm. Equipment Building D C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was23-May-22 C1) 19-Jul-22 03-Jul-22 29-Aug-22 41 310.D.TX.A228 Method Statement for Plate Load Test for WSA Comm. Equipment Building D - prepare C01_7 d/w - 10h/d - No HK 30 23-May-22 21-Jun-22 03-Jul-22 01-Aug-22 41 document Hols - No B/O periods (was 310.D.TX.A232 Method Statement for Plate Load Test for WSA Comm. Equipment Building D - BD C1) C01_7 d/w - 10h/d - No HK 28 22-Jun-22 19-Jul-22 02-Aug-22 29-Aug-22 41 Acknowledgement Hols - No B/O periods (was Method Statement for Plate Load Test for ESA - GSE Vehicle Wash Facility C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was12-Jul-22 C1) 07-Sep-22 20-Jul-22 15-Sep-22 8 310.D.TX.A236 Method Statement for Plate Load Test for ESA - GSE Wash Facility - prepare document C01_7 d/w - 10h/d - No HK 30 12-Jul-22 10-Aug-22 20-Jul-22 18-Aug-22 8 Hols - No B/O periods (was 310.D.TX.A240 Method Statement for Plate Load Test for ESA - GSE Wash Facility - BD C1) C01_7 d/w - 10h/d - No HK 28 11-Aug-22 07-Sep-22 19-Aug-22 15-Sep-22 8 Acknowledgement Hols - No B/O periods (was Method Statement for Plate Load Test for WSA - GSE Battery Charging B C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was03-Apr-22 C1) 30-May-22 13-Jun-22 09-Aug-22 71 310.D.TX.A244 Method Statement for Plate Load Test for WSA - GSE Battery Charging - prepare C01_7 d/w - 10h/d - No HK 30 03-Apr-22 02-May-22 13-Jun-22 12-Jul-22 71 document Hols - No B/O periods (was 310.D.TX.A248 Method Statement for Plate Load Test for WSA - GSE Battery Charging - BD C1) C01_7 d/w - 10h/d - No HK 28 03-May-22 30-May-22 13-Jul-22 09-Aug-22 71 Acknowledgement Hols - No B/O periods (was MS for Plate Load Test for WSA - Maintenance Facilities Forecourt & Coach Staging A and Bus Stop C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was30-Sep-22 C1) 26-Nov-22 12-Mar-23 08-May-23 163 310.D.TX.A252 Method Statement for Plate Load Test for Maintenance Facilities Forecourt & Coach C01_7 d/w - 10h/d - No HK 30 30-Sep-22 29-Oct-22 12-Mar-23 10-Apr-23 163 Staging A - prepare document Hols - No B/O periods (was 310.D.TX.A256 Method Statement for Plate Load Test for Maintenance Facilities Forecourt & Coach C1) C01_7 d/w - 10h/d - No HK 28 30-Oct-22 26-Nov-22 11-Apr-23 08-May-23 163 Staging A - BD Acknowledgement Hols - No B/O periods (was Method Statement for Plate Load Test for WSA - Gate House B C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was03-Apr-22 C1) 30-May-22 22-May-22 18-Jul-22 49 310.D.TX.A260 Method Statement for Plate Load Test for WSA - Gate House B - prepare document C01_7 d/w - 10h/d - No HK 30 03-Apr-22 02-May-22 22-May-22 20-Jun-22 49 Hols - No B/O periods (was 310.D.TX.A264 Method Statement for Plate Load Test for WSA - Gate House B - BD Acknowledgement C1) C01_7 d/w - 10h/d - No HK 28 03-May-22 30-May-22 21-Jun-22 18-Jul-22 49 Hols - No B/O periods (was Method Statement for Plate Load Test for WSA - Screen Facilities C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was03-Apr-22 C1) 30-May-22 10-Jun-22 06-Aug-22 68 310.D.TX.A268 Method Statement for Plate Load Test for WSA - Screen Facilities - prepare document C01_7 d/w - 10h/d - No HK 30 03-Apr-22 02-May-22 10-Jun-22 09-Jul-22 68 Hols - No B/O periods (was 310.D.TX.A272 Method Statement for Plate Load Test for WSA - Screen Facilities - BD Acknowledgement C1) C01_7 d/w - 10h/d - No HK 28 03-May-22 30-May-22 10-Jul-22 06-Aug-22 68 Hols - No B/O periods (was Method Statement for Plate Load Test for AGL Vault D Annex C1) C01_7 d/w - 10h/d - No HK Hols180 - No B/O periods 0 (was 31-Aug-21 C1) A 07-Feb-22 A 28-Mar-22 05-Apr-22 310.D.TX.A276 Method Statement for Plate Load Test for AGL Vault D Annex - prepare document C01_7 d/w - 10h/d - No HK 30 31-Aug-21 A 17-Nov-21 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.D.TX.A280.B01 Method Statement for Plate Load Test for AGL Vault D Annex - PM Review and C1) C01_7 d/w - 10h/d - No HK 28 18-Nov-21 A 20-Jan-22 A 28-Mar-22 28-Mar-22 Acceptance Hols - No B/O periods (was 310.D.TX.A280 Method Statement for Plate Load Test for AGL Vault D Annex - BD Acknowledgement C1) C01_7 d/w - 10h/d - No HK 28 20-Jan-22 A 07-Feb-22 A 05-Apr-22 05-Apr-22 Hols - No B/O periods (was Method Statement for Plate Load Test for AGL Vault C Annex C1) C01_7 d/w - 10h/d - No HK Hols87 - No B/O periods 0 (was 01-Nov-21 C1) A 02-Apr-22 15-Apr-22 10-May-22 38
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 173 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.TX.A284 Method Statement for Plate Load Test for AGL Vault C Annex - prepare document C01_7 d/w - 10h/d - No HK 30 01-Nov-21 A 17-Nov-21 A 15-Apr-22 15-Apr-22 Hols - No B/O periods (was 310.D.TX.A288.B01 Method Statement for Plate Load Test for AGL Vault C Annex - PM Review and C1) C01_7 d/w - 10h/d - No HK 28 18-Nov-21 A 20-Jan-22 A 15-Apr-22 15-Apr-22 Acceptance Hols - No B/O periods (was 310.D.TX.A288 Method Statement for Plate Load Test for AGL Vault C Annex - BD Acknowledgement C1) C01_7 d/w - 10h/d - No HK 28 20-Jan-22 A 02-Apr-22 04-May-22 10-May-22 38 Hols - No B/O periods (was CC#08 - C&ED Op.Office & Kennel Area - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols190 - No B/O periods 0 (was31-Aug-22 C1) 08-Mar-23 29-Dec-22 06-Jul-23 120 C&ED Op.Office & Kennel Area - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols190 - No B/O periods 0 (was31-Aug-22 C1) 08-Mar-23 29-Dec-22 06-Jul-23 120 310.D.WS.L784 C&ED Op.Office & Kennel Area - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 100 31-Aug-22 08-Dec-22 29-Dec-22 07-Apr-23 120 Hols - No B/O periods (was 310.D.WS.L785 C&ED Op.Office & Kennel Area - MEP - Drawing Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 100 30-Sep-22 07-Jan-23 28-Jan-23 07-May-23 120 Round Hols - No B/O periods (was 310.D.WS.L786 C&ED Op.Office & Kennel Area - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 100 30-Oct-22 06-Feb-23 27-Feb-23 06-Jun-23 120 Hols - No B/O periods (was 310.D.WS.L788 C&ED Op.Office & Kennel Area - MEP - Drawing Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 100 29-Nov-22 08-Mar-23 29-Mar-23 06-Jul-23 120 Round Hols - No B/O periods (was CC#08 - C&ED Op.Office & Kennel Area - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was31-Aug-22 C1) 15-Feb-23 13-Oct-22 23-Oct-23 250 C&ED Op.Office & Kennel Area - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols112 - No B/O periods 0 (was31-Aug-22 C1) 20-Dec-22 13-Oct-22 01-Feb-23 43 310.D.WS.L1072 C&ED Op.Office & Kennel Area - ABWF - prepare document C01_7 d/w - 10h/d - No HK 28 31-Aug-22 27-Sep-22 13-Oct-22 09-Nov-22 43 Hols - No B/O periods (was 310.D.WS.L1748 C&ED Op.Office & Kennel Area - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 28-Sep-22 25-Oct-22 10-Nov-22 07-Dec-22 43 Hols - No B/O periods (was 310.D.WS.L1744 C&ED Op.Office & Kennel Area - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 28 26-Oct-22 22-Nov-22 08-Dec-22 04-Jan-23 43 Hols - No B/O periods (was 310.D.WS.L1076 C&ED Op.Office & Kennel Area - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 23-Nov-22 20-Dec-22 05-Jan-23 01-Feb-23 43 Hols - No B/O periods (was C&ED Op.Office & Kennel Area - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols112 - No B/O periods 0 (was28-Sep-22 C1) 17-Jan-23 10-Nov-22 01-Mar-23 43 310.D.WS.L1088 C&ED Op.Office & Kennel Area - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 28 28-Sep-22 25-Oct-22 10-Nov-22 07-Dec-22 43 Hols - No B/O periods (was 310.D.WS.L1756 C&ED Op.Office & Kennel Area - ABWF - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 26-Oct-22 22-Nov-22 08-Dec-22 04-Jan-23 43 1st Round Hols - No B/O periods (was 310.D.WS.L1752 C&ED Op.Office & Kennel Area - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 28 23-Nov-22 20-Dec-22 05-Jan-23 01-Feb-23 43 Hols - No B/O periods (was 310.D.WS.L1092 C&ED Op.Office & Kennel Area - ABWF - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 21-Dec-22 17-Jan-23 02-Feb-23 01-Mar-23 43 2nd Round Hols - No B/O periods (was C&ED Op.Office & Kennel Area - BD Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was31-Aug-22 C1) 15-Feb-23 06-Mar-23 23-Oct-23 250 C&ED Op.Office & Kennel Area - BD Submission - Fire Shutter C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was31-Aug-22 C1) 15-Feb-23 06-Apr-23 21-Sep-23 218 310.D.WS.L1193.B02 C&ED Op.Office & Kennel Area - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 31-Aug-22 29-Sep-22 06-Apr-23 05-May-23 218 Hols - No B/O periods (was 310.D.WS.L1194.B02 C&ED Op.Office & Kennel Area - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 30-Sep-22 27-Oct-22 06-May-23 02-Jun-23 218 Hols - No B/O periods (was 310.D.WS.L1195.B02 C&ED Op.Office & Kennel Area - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 28-Oct-22 17-Nov-22 03-Jun-23 23-Jun-23 218 Hols - No B/O periods (was 310.D.WS.L1197.B02 C&ED Op.Office & Kennel Area - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 18-Nov-22 16-Jan-23 24-Jun-23 22-Aug-23 218 months) Hols - No B/O periods (was 310.D.WS.L1198.B02 C&ED Op.Office & Kennel Area - Consent Application and Acceptance C1) d/w - 10h/d - No HK C01_7 30 17-Jan-23 15-Feb-23 23-Aug-23 21-Sep-23 218 Hols - No B/O periods (was C&ED Op.Office & Kennel Area - BD Submission - Cladding C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was31-Aug-22 C1) 15-Feb-23 06-Mar-23 21-Aug-23 187 310.D.WS.L1199.B01 C&ED Op.Office & Kennel Area - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 31-Aug-22 29-Sep-22 06-Mar-23 04-Apr-23 187 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 174 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1200.B01 C&ED Op.Office & Kennel Area - PM, AP, RSE reviewing C01_7 d/w - 10h/d - No HK 28 30-Sep-22 27-Oct-22 05-Apr-23 02-May-23 187 Hols - No B/O periods (was 310.D.WS.L1201.B01 C&ED Op.Office & Kennel Area - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 28-Oct-22 17-Nov-22 03-May-23 23-May-23 187 Hols - No B/O periods (was 310.D.WS.L1202.B01 C&ED Op.Office & Kennel Area - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 18-Nov-22 16-Jan-23 24-May-23 22-Jul-23 187 months) Hols - No B/O periods (was 310.D.WS.L1203.B01 C&ED Op.Office & Kennel Area - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 17-Jan-23 15-Feb-23 23-Jul-23 21-Aug-23 187 Hols - No B/O periods (was C&ED Op.Office & Kennel Area - BD Submission - Signage C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was31-Aug-22 C1) 15-Feb-23 08-May-23 23-Oct-23 250 310.D.WS.L1199.B02 C&ED Op.Office & Kennel Area - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 31-Aug-22 29-Sep-22 08-May-23 06-Jun-23 250 Hols - No B/O periods (was 310.D.WS.L1200.B02 C&ED Op.Office & Kennel Area - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 30-Sep-22 27-Oct-22 07-Jun-23 04-Jul-23 250 Hols - No B/O periods (was 310.D.WS.L1201.B02 C&ED Op.Office & Kennel Area - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 28-Oct-22 17-Nov-22 05-Jul-23 25-Jul-23 250 Hols - No B/O periods (was 310.D.WS.L1202.B02 C&ED Op.Office & Kennel Area - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 18-Nov-22 16-Jan-23 26-Jul-23 23-Sep-23 250 months) Hols - No B/O periods (was 310.D.WS.L1203.B02 C&ED Op.Office & Kennel Area - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 17-Jan-23 15-Feb-23 24-Sep-23 23-Oct-23 250 Hols - No B/O periods (was C&ED Op.Office & Kennel Area - BD Submission - Louvre C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was31-Aug-22 C1) 15-Feb-23 06-Mar-23 21-Aug-23 187 310.D.WS.L1193.B01 C&ED Op.Office & Kennel Area - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 31-Aug-22 29-Sep-22 06-Mar-23 04-Apr-23 187 Hols - No B/O periods (was 310.D.WS.L1194.B01 C&ED Op.Office & Kennel Area - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 30-Sep-22 27-Oct-22 05-Apr-23 02-May-23 187 Hols - No B/O periods (was 310.D.WS.L1195.B01 C&ED Op.Office & Kennel Area - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 28-Oct-22 17-Nov-22 03-May-23 23-May-23 187 Hols - No B/O periods (was 310.D.WS.L1197.B01 C&ED Op.Office & Kennel Area - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 18-Nov-22 16-Jan-23 24-May-23 22-Jul-23 187 months) Hols - No B/O periods (was 310.D.WS.L1198.B01 C&ED Op.Office & Kennel Area - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 17-Jan-23 15-Feb-23 23-Jul-23 21-Aug-23 187 Hols - No B/O periods (was CC#08 - Comm. Equipment Building D - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols82 - No B/O periods 0 (was 20-Mar-22 C1) A 28-Jun-22 15-Aug-22 04-Nov-22 129 Comm. Equipment Building D - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols82 - No B/O periods 0 (was 20-Mar-22 C1) A 28-Jun-22 15-Aug-22 04-Nov-22 129 310.D.WS.L808 Comm. Equipment Building D - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 20-Mar-22 A 17-May-22 15-Aug-22 23-Sep-22 129 Hols - No B/O periods (was 310.D.WS.L809 Comm. Equipment Building D - MEP - Drawing Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 40 22-Apr-22 31-May-22 29-Aug-22 07-Oct-22 129 Round Hols - No B/O periods (was 310.D.WS.L810 Comm. Equipment Building D - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 40 06-May-22 14-Jun-22 12-Sep-22 21-Oct-22 129 Hols - No B/O periods (was 310.D.WS.L812 Comm. Equipment Building D - MEP - Drawing Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 40 20-May-22 28-Jun-22 26-Sep-22 04-Nov-22 129 Round Hols - No B/O periods (was CC#08 - Comm. Equipment Building D - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 04-May-22 23-Nov-22 43 Comm. Equipment Building D - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols42 - No B/O periods 0 (was26-Apr-22 C1) 06-Jun-22 04-May-22 14-Jun-22 8 310.D.WS.L1096 Comm. Equipment Building D - ABWF - prepare document C01_7 d/w - 10h/d - No HK 7 26-Apr-22 02-May-22 04-May-22 10-May-22 8 Hols - No B/O periods (was 310.D.WS.L1764 Comm. Equipment Building D - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 14 03-May-22 16-May-22 11-May-22 24-May-22 8 Hols - No B/O periods (was 310.D.WS.L1760 Comm. Equipment Building D - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 17-May-22 23-May-22 25-May-22 31-May-22 8 Hols - No B/O periods (was 310.D.WS.L1100 Comm. Equipment Building D - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 24-May-22 06-Jun-22 01-Jun-22 14-Jun-22 8 Hols - No B/O periods (was Comm. Equipment Building D - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols42 - No B/O periods 0 (was26-Apr-22 C1) 06-Jun-22 04-May-22 14-Jun-22 8
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 175 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1112 Comm. Equipment Building D - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 7 26-Apr-22 02-May-22 04-May-22 10-May-22 8 Hols - No B/O periods (was 310.D.WS.L1772 Comm. Equipment Building D - ABWF - Material Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 14 03-May-22 16-May-22 11-May-22 24-May-22 8 Round Hols - No B/O periods (was 310.D.WS.L1768 Comm. Equipment Building D - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 17-May-22 23-May-22 25-May-22 31-May-22 8 Hols - No B/O periods (was 310.D.WS.L1116 Comm. Equipment Building D - ABWF - Material Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 14 24-May-22 06-Jun-22 01-Jun-22 14-Jun-22 8 Round Hols - No B/O periods (was Comm. Equipment Building D - BD Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 08-Jun-22 23-Nov-22 43 Comm. Equipment Building D - BD Submission - Signage C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 08-Jun-22 23-Nov-22 43 310.D.WS.L1122.B02 Comm. Equipment Building D - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 08-Jun-22 07-Jul-22 43 Hols - No B/O periods (was 310.D.WS.L1125.B02 Comm. Equipment Building D - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 08-Jul-22 04-Aug-22 43 Hols - No B/O periods (was 310.D.WS.L1137.B02 Comm. Equipment Building D - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 05-Aug-22 25-Aug-22 43 Hols - No B/O periods (was 310.D.WS.L1129.B02 Comm. Equipment Building D - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 26-Aug-22 24-Oct-22 43 months) Hols - No B/O periods (was 310.D.WS.L1133.B02 Comm. Equipment Building D - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 25-Oct-22 23-Nov-22 43 Hols - No B/O periods (was Comm. Equipment Building D - BD Submission - Louvre C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 08-Jun-22 23-Nov-22 43 310.D.WS.L1111.B01 Comm. Equipment Building D - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 08-Jun-22 07-Jul-22 43 Hols - No B/O periods (was 310.D.WS.L1115.B01 Comm. Equipment Building D - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 08-Jul-22 04-Aug-22 43 Hols - No B/O periods (was 310.D.WS.L1119.B01 Comm. Equipment Building D - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 05-Aug-22 25-Aug-22 43 Hols - No B/O periods (was 310.D.WS.L1120.B01 Comm. Equipment Building D - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 26-Aug-22 24-Oct-22 43 months) Hols - No B/O periods (was 310.D.WS.L1121.B01 Comm. Equipment Building D - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 25-Oct-22 23-Nov-22 43 Hols - No B/O periods (was Comm. Equipment Building D - BD Submission - Cladding C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 08-Jun-22 23-Nov-22 43 310.D.WS.L1122.B01 Comm. Equipment Building D - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 08-Jun-22 07-Jul-22 43 Hols - No B/O periods (was 310.D.WS.L1125.B01 Comm. Equipment Building D - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 08-Jul-22 04-Aug-22 43 Hols - No B/O periods (was 310.D.WS.L1137.B01 Comm. Equipment Building D - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 05-Aug-22 25-Aug-22 43 Hols - No B/O periods (was 310.D.WS.L1129.B01 Comm. Equipment Building D - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 26-Aug-22 24-Oct-22 43 months) Hols - No B/O periods (was 310.D.WS.L1133.B01 Comm. Equipment Building D - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 25-Oct-22 23-Nov-22 43 Hols - No B/O periods (was CC#08 - GSE Vehicle Wash Facility - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols150 - No B/O periods 0 (was 14-Mar-22 C1) A 04-Sep-22 18-Jun-22 14-Nov-22 71 GSE Vehicle Wash Facility - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols150 - No B/O periods 0 (was 14-Mar-22 C1) A 04-Sep-22 18-Jun-22 14-Nov-22 71 310.D.WS.L832 GSE Vehicle Wash Facility - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 14 14-Mar-22 A 06-Jun-22 18-Jun-22 16-Aug-22 71 Hols - No B/O periods (was 310.D.WS.L833 GSE Vehicle Wash Facility - MEP - Drawing Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 60 08-May-22 06-Jul-22 18-Jul-22 15-Sep-22 71 Round Hols - No B/O periods (was 310.D.WS.L834 GSE Vehicle Wash Facility - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 60 07-Jun-22 05-Aug-22 17-Aug-22 15-Oct-22 71 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 176 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L836 GSE Vehicle Wash Facility - MEP - Drawing Submission - PM review and accept 2nd C01_7 d/w - 10h/d - No HK 60 07-Jul-22 04-Sep-22 16-Sep-22 14-Nov-22 71 Round Hols - No B/O periods (was CC#08 - GSE Vehicle Wash Facility - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 02-May-22 09-Dec-22 59 GSE Vehicle Wash Facility - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols49 - No B/O periods 0 (was26-Apr-22 C1) 13-Jun-22 02-May-22 19-Jun-22 6 310.D.WS.L1120 GSE Vehicle Wash Facility - ABWF - prepare document C01_7 d/w - 10h/d - No HK 7 26-Apr-22 02-May-22 02-May-22 08-May-22 6 Hols - No B/O periods (was 310.D.WS.L1780 GSE Vehicle Wash Facility - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 21 03-May-22 23-May-22 09-May-22 29-May-22 6 Hols - No B/O periods (was 310.D.WS.L1776 GSE Vehicle Wash Facility - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 24-May-22 30-May-22 30-May-22 05-Jun-22 6 Hols - No B/O periods (was 310.D.WS.L1124 GSE Vehicle Wash Facility - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 31-May-22 13-Jun-22 06-Jun-22 19-Jun-22 6 Hols - No B/O periods (was GSE Vehicle Wash Facility - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was03-May-22 C1) 27-Jun-22 16-May-22 03-Jul-22 6 310.D.WS.L1136 GSE Vehicle Wash Facility - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 7 03-May-22 09-May-22 16-May-22 22-May-22 13 Hols - No B/O periods (was 310.D.WS.L1788 GSE Vehicle Wash Facility - ABWF - Material Submission - PM review and accept1st C1) C01_7 d/w - 10h/d - No HK 21 10-May-22 30-May-22 23-May-22 12-Jun-22 13 Round Hols - No B/O periods (was 310.D.WS.L1784 GSE Vehicle Wash Facility - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 31-May-22 06-Jun-22 13-Jun-22 19-Jun-22 13 Hols - No B/O periods (was 310.D.WS.L1140 GSE Vehicle Wash Facility - ABWF - Material Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 14 14-Jun-22 27-Jun-22 20-Jun-22 03-Jul-22 6 Round Hols - No B/O periods (was GSE Vehicle Wash Facility - BD Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 22-Jun-22 09-Dec-22 59 GSE Vehicle Wash Facility - BD Submission - Signage C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 22-Jun-22 07-Dec-22 57 310.D.WS.L11421.B02 GSE Vehicle Wash Facility - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 22-Jun-22 21-Jul-22 57 Hols - No B/O periods (was 310.D.WS.L11425.B02 GSE Vehicle Wash Facility - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 22-Jul-22 18-Aug-22 57 Hols - No B/O periods (was 310.D.WS.L11437.B02 GSE Vehicle Wash Facility - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 19-Aug-22 08-Sep-22 57 Hols - No B/O periods (was 310.D.WS.L11429.B02 GSE Vehicle Wash Facility - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 09-Sep-22 07-Nov-22 57 months) Hols - No B/O periods (was 310.D.WS.L11433.B02 GSE Vehicle Wash Facility - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 08-Nov-22 07-Dec-22 57 Hols - No B/O periods (was GSE Vehicle Wash Facility - BD Submission - Louvre C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 24-Jun-22 09-Dec-22 59 310.D.WS.L1141.B01 GSE Vehicle Wash Facility - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 24-Jun-22 23-Jul-22 59 Hols - No B/O periods (was 310.D.WS.L1145.B01 GSE Vehicle Wash Facility - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 24-Jul-22 20-Aug-22 59 Hols - No B/O periods (was 310.D.WS.L1149.B01 GSE Vehicle Wash Facility - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 21-Aug-22 10-Sep-22 59 Hols - No B/O periods (was 310.D.WS.L11413.B01 GSE Vehicle Wash Facility - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 11-Sep-22 09-Nov-22 59 months) Hols - No B/O periods (was 310.D.WS.L11417.B01 GSE Vehicle Wash Facility - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 10-Nov-22 09-Dec-22 59 Hols - No B/O periods (was GSE Vehicle Wash Facility - BD Submission - Cladding C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 24-Jun-22 09-Dec-22 59 310.D.WS.L11421.B01 GSE Vehicle Wash Facility - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 24-Jun-22 23-Jul-22 59 Hols - No B/O periods (was 310.D.WS.L11425.B01 GSE Vehicle Wash Facility - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 24-Jul-22 20-Aug-22 59 Hols - No B/O periods (was 310.D.WS.L11437.B01 GSE Vehicle Wash Facility - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 21-Aug-22 10-Sep-22 59 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 177 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L11429.B01 GSE Vehicle Wash Facility - BD Review and Acceptance (1st Acceptance requires 2 C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 11-Sep-22 09-Nov-22 59 months) Hols - No B/O periods (was 310.D.WS.L11433.B01 GSE Vehicle Wash Facility - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 10-Nov-22 09-Dec-22 59 Hols - No B/O periods (was CC#08 - GSE Battery Charging B - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols210 - No B/O periods 0 (was 20-Mar-22 C1) A 22-Oct-22 18-May-22 13-Dec-22 52 GSE Battery Charging B - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols210 - No B/O periods 0 (was 20-Mar-22 C1) A 22-Oct-22 18-May-22 13-Dec-22 52 310.D.WS.L856 GSE Battery Charging B - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 21 20-Mar-22 A 24-Jul-22 18-May-22 14-Sep-22 52 Hols - No B/O periods (was 310.D.WS.L857 GSE Battery Charging B - MEP - Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 120 26-Apr-22 23-Aug-22 17-Jun-22 14-Oct-22 52 Hols - No B/O periods (was 310.D.WS.L858 GSE Battery Charging B - MEP - Drawing Submission - prepare resubmission 2nd Round C1) C01_7 d/w - 10h/d - No HK 120 26-May-22 22-Sep-22 17-Jul-22 13-Nov-22 52 Hols - No B/O periods (was 310.D.WS.L860 GSE Battery Charging B - MEP - Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 120 25-Jun-22 22-Oct-22 16-Aug-22 13-Dec-22 52 Hols - No B/O periods (was CC#08 - GSE Battery Charging B - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 23-May-22 22-Dec-22 72 GSE Battery Charging B - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was26-Apr-22 C1) 20-Jun-22 23-May-22 17-Jul-22 27 310.D.WS.L1144 GSE Battery Charging B - ABWF - prepare document C01_7 d/w - 10h/d - No HK 14 26-Apr-22 09-May-22 23-May-22 05-Jun-22 27 Hols - No B/O periods (was 310.D.WS.L1796 GSE Battery Charging B - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 10-May-22 06-Jun-22 06-Jun-22 03-Jul-22 27 Hols - No B/O periods (was 310.D.WS.L1792 GSE Battery Charging B - ABWF - prepare resubmission C1) d/w - 10h/d - No HK C01_7 7 07-Jun-22 13-Jun-22 04-Jul-22 10-Jul-22 27 Hols - No B/O periods (was 310.D.WS.L1148 GSE Battery Charging B - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 7 14-Jun-22 20-Jun-22 11-Jul-22 17-Jul-22 27 Hols - No B/O periods (was GSE Battery Charging B - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was26-Apr-22 C1) 20-Jun-22 23-May-22 17-Jul-22 27 310.D.WS.L1160 GSE Battery Charging B - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 26-Apr-22 09-May-22 23-May-22 05-Jun-22 27 Hols - No B/O periods (was 310.D.WS.L1804 GSE Battery Charging B - ABWF - Material Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 28 10-May-22 06-Jun-22 06-Jun-22 03-Jul-22 27 Round Hols - No B/O periods (was 310.D.WS.L1800 GSE Battery Charging B - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 07-Jun-22 13-Jun-22 04-Jul-22 10-Jul-22 27 Hols - No B/O periods (was 310.D.WS.L1164 GSE Battery Charging B - ABWF - Material Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 7 14-Jun-22 20-Jun-22 11-Jul-22 17-Jul-22 27 Round Hols - No B/O periods (was GSE Battery Charging B - BD Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 17-Jun-22 22-Dec-22 72 GSE Battery Charging B - BD Submission - Fire Shutter C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 17-Jun-22 02-Dec-22 52 310.D.WS.L11621.B02 GSE Battery Charging B - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 17-Jun-22 16-Jul-22 52 Hols - No B/O periods (was 310.D.WS.L11625.B02 GSE Battery Charging B - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 17-Jul-22 13-Aug-22 52 Hols - No B/O periods (was 310.D.WS.L11637.B02 GSE Battery Charging B - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 14-Aug-22 03-Sep-22 52 Hols - No B/O periods (was 310.D.WS.L11629.B02 GSE Battery Charging B - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 04-Sep-22 02-Nov-22 52 months) Hols - No B/O periods (was 310.D.WS.L11633.B02 GSE Battery Charging B - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 03-Nov-22 02-Dec-22 52 Hols - No B/O periods (was GSE Battery Charging B - BD Submission - Signage C1) d/w - 10h/d - No HK Hols169 C01_7 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 28-Jun-22 13-Dec-22 63 310.D.WS.L11622.B02 GSE Battery Charging B - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 28-Jun-22 27-Jul-22 63 Hols - No B/O periods (was 310.D.WS.L11626.B02 GSE Battery Charging B - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 28-Jul-22 24-Aug-22 63 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 178 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L11638.B02 GSE Battery Charging B - ICC, M&VC review design and issue check certificate C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 25-Aug-22 14-Sep-22 63 Hols - No B/O periods (was 310.D.WS.L11630.B02 GSE Battery Charging B - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 15-Sep-22 13-Nov-22 63 months) Hols - No B/O periods (was 310.D.WS.L11634.B02 GSE Battery Charging B - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 14-Nov-22 13-Dec-22 63 Hols - No B/O periods (was GSE Battery Charging B - BD Submission - Louvre C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 07-Jul-22 22-Dec-22 72 310.D.WS.L1161.B01 GSE Battery Charging B - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 07-Jul-22 05-Aug-22 72 Hols - No B/O periods (was 310.D.WS.L1165.B01 GSE Battery Charging B - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 06-Aug-22 02-Sep-22 72 Hols - No B/O periods (was 310.D.WS.L1169.B01 GSE Battery Charging B - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 03-Sep-22 23-Sep-22 72 Hols - No B/O periods (was 310.D.WS.L11613.B01 GSE Battery Charging B - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 24-Sep-22 22-Nov-22 72 months) Hols - No B/O periods (was 310.D.WS.L11617.B01 GSE Battery Charging B - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 23-Nov-22 22-Dec-22 72 Hols - No B/O periods (was GSE Battery Charging B - BD Submission - Cladding C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 07-Jul-22 22-Dec-22 72 310.D.WS.L11621.B01 GSE Battery Charging B - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 07-Jul-22 05-Aug-22 72 Hols - No B/O periods (was 310.D.WS.L11625.B01 GSE Battery Charging B - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 06-Aug-22 02-Sep-22 72 Hols - No B/O periods (was 310.D.WS.L11637.B01 GSE Battery Charging B - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 03-Sep-22 23-Sep-22 72 Hols - No B/O periods (was 310.D.WS.L11629.B01 GSE Battery Charging B - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 24-Sep-22 22-Nov-22 72 months) Hols - No B/O periods (was 310.D.WS.L11633.B01 GSE Battery Charging B - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 23-Nov-22 22-Dec-22 72 Hols - No B/O periods (was CC#08 - Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was08-Jan-23 C1) 15-Apr-23 21-Jul-23 26-Oct-23 194 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was08-Jan-23 C1) 15-Apr-23 21-Jul-23 26-Oct-23 194 310.D.WS.L880 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - MEP - Drawing C01_7 d/w - 10h/d - No HK 28 08-Jan-23 04-Feb-23 21-Jul-23 17-Aug-23 194 Submission - prepare document Hols - No B/O periods (was 310.D.WS.L881 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - MEP - Drawing C1) C01_7 d/w - 10h/d - No HK 28 05-Feb-23 04-Mar-23 18-Aug-23 14-Sep-23 194 Submission - PM review & accept 1st Round Hols - No B/O periods (was 310.D.WS.L882 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - MEP - Drawing C1) C01_7 d/w - 10h/d - No HK 14 05-Mar-23 18-Mar-23 15-Sep-23 28-Sep-23 194 Submission - prepare resubmission Hols - No B/O periods (was 310.D.WS.L884 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - MEP - Drawing C1) C01_7 d/w - 10h/d - No HK 28 19-Mar-23 15-Apr-23 29-Sep-23 26-Oct-23 194 Submission - PM review & accept 2nd Round Hols - No B/O periods (was CC#08 - Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols119 - No B/O periods 0 (was31-Aug-22 C1) 27-Dec-22 08-Feb-23 06-Jun-23 161 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols91 - No B/O periods 0 (was31-Aug-22 C1) 29-Nov-22 08-Feb-23 09-May-23 161 310.D.WS.L1168 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - ABWF - prepare C01_7 d/w - 10h/d - No HK 21 31-Aug-22 20-Sep-22 08-Feb-23 28-Feb-23 161 document Hols - No B/O periods (was 310.D.WS.L1812 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - ABWF - PM review and C1) C01_7 d/w - 10h/d - No HK 28 21-Sep-22 18-Oct-22 01-Mar-23 28-Mar-23 161 accept 1st Round Hols - No B/O periods (was 310.D.WS.L1808 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - ABWF - prepare C1) C01_7 d/w - 10h/d - No HK 14 19-Oct-22 01-Nov-22 29-Mar-23 11-Apr-23 161 resubmission Hols - No B/O periods (was 310.D.WS.L1172 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - ABWF - PM review and C1) C01_7 d/w - 10h/d - No HK 28 02-Nov-22 29-Nov-22 12-Apr-23 09-May-23 161 accept 2nd Round Hols - No B/O periods (was Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was21-Sep-22 C1) 27-Dec-22 08-Mar-23 06-Jun-23 161 310.D.WS.L1184 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - ABWF - Material C01_7 d/w - 10h/d - No HK 21 21-Sep-22 11-Oct-22 08-Mar-23 28-Mar-23 168 Submission - prepare document Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 179 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1820 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - ABWF - Material C01_7 d/w - 10h/d - No HK 28 12-Oct-22 08-Nov-22 29-Mar-23 25-Apr-23 168 Submission - PM review and accept Hols - No B/O periods (was 310.D.WS.L1816 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - ABWF - Material C1) C01_7 d/w - 10h/d - No HK 14 09-Nov-22 22-Nov-22 26-Apr-23 09-May-23 168 Submission - prepare resubmission Hols - No B/O periods (was 310.D.WS.L1188 Maintenance Facilities Forecourt & Coach Staging A & Bus Stop - ABWF - Material C1) C01_7 d/w - 10h/d - No HK 28 30-Nov-22 27-Dec-22 10-May-23 06-Jun-23 161 Submission - PM review&accept 2nd Round Hols - No B/O periods (was CC#08 - WSA - GSE Storage Area - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was31-Aug-22 C1) 06-Dec-22 11-May-23 16-Aug-23 253 WSA - GSE Storage Area - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was31-Aug-22 C1) 06-Dec-22 11-May-23 16-Aug-23 253 310.D.WS.L904 WSA - GSE Storage Area - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 28 31-Aug-22 27-Sep-22 11-May-23 07-Jun-23 253 Hols - No B/O periods (was 310.D.WS.L905 WSA - GSE Storage Area - MEP - Drawing Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 28 28-Sep-22 25-Oct-22 08-Jun-23 05-Jul-23 253 Round Hols - No B/O periods (was 310.D.WS.L906 WSA - GSE Storage Area - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 26-Oct-22 08-Nov-22 06-Jul-23 19-Jul-23 253 Hols - No B/O periods (was 310.D.WS.L908 WSA - GSE Storage Area - MEP - Drawing Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 09-Nov-22 06-Dec-22 20-Jul-23 16-Aug-23 253 Round Hols - No B/O periods (was CC#08 - WSA - GSE Storage Area - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols119 - No B/O periods 0 (was31-Aug-22 C1) 27-Dec-22 28-Feb-23 26-Jun-23 181 WSA - GSE Storage Area - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols91 - No B/O periods 0 (was31-Aug-22 C1) 29-Nov-22 28-Feb-23 29-May-23 181 310.D.WS.L1192 WSA - GSE Storage Area - ABWF - prepare document C01_7 d/w - 10h/d - No HK 21 31-Aug-22 20-Sep-22 28-Feb-23 20-Mar-23 181 Hols - No B/O periods (was 310.D.WS.L1828 WSA - GSE Storage Area - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 21-Sep-22 18-Oct-22 21-Mar-23 17-Apr-23 181 Hols - No B/O periods (was 310.D.WS.L1824 WSA - GSE Storage Area - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 19-Oct-22 01-Nov-22 18-Apr-23 01-May-23 181 Hols - No B/O periods (was 310.D.WS.L1196 WSA - GSE Storage Area - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 02-Nov-22 29-Nov-22 02-May-23 29-May-23 181 Hols - No B/O periods (was WSA - GSE Storage Area - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was21-Sep-22 C1) 27-Dec-22 28-Mar-23 26-Jun-23 181 310.D.WS.L1208 WSA - GSE Storage Area - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 21 21-Sep-22 11-Oct-22 28-Mar-23 17-Apr-23 188 Hols - No B/O periods (was 310.D.WS.L1836 WSA - GSE Storage Area - ABWF - Material Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 28 12-Oct-22 08-Nov-22 18-Apr-23 15-May-23 188 Round Hols - No B/O periods (was 310.D.WS.L1832 WSA - GSE Storage Area - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 09-Nov-22 22-Nov-22 16-May-23 29-May-23 188 Hols - No B/O periods (was 310.D.WS.L1212 WSA - GSE Storage Area - ABWF - Material Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 30-Nov-22 27-Dec-22 30-May-23 26-Jun-23 181 Round Hols - No B/O periods (was CC#08 - WSA - Gatehouse B - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols204 - No B/O periods 0 (was03-Apr-22 C1) 23-Oct-22 05-Sep-22 27-Mar-23 155 WSA - Gatehouse B - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols204 - No B/O periods 0 (was03-Apr-22 C1) 23-Oct-22 05-Sep-22 27-Mar-23 155 310.D.WS.L928 WSA - Gatehouse B - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 120 03-Apr-22 31-Jul-22 05-Sep-22 02-Jan-23 155 Hols - No B/O periods (was 310.D.WS.L929 WSA - Gatehouse B - MEP - Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 120 01-May-22 28-Aug-22 03-Oct-22 30-Jan-23 155 Hols - No B/O periods (was 310.D.WS.L930 WSA - Gatehouse B - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 120 29-May-22 25-Sep-22 31-Oct-22 27-Feb-23 155 Hols - No B/O periods (was 310.D.WS.L932 WSA - Gatehouse B - MEP - Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 120 26-Jun-22 23-Oct-22 28-Nov-22 27-Mar-23 155 Hols - No B/O periods (was CC#08 - WSA - Gatehouse B - ABWF Submission C1) d/w - 10h/d - No HK Hols169 C01_7 - No B/O periods 0 (was13-May-22 C1) 28-Oct-22 20-Sep-22 16-Jun-23 231 WSA - Gatehouse B - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols91 - No B/O periods 0 (was13-May-22 C1) 11-Aug-22 20-Sep-22 19-Dec-22 130 310.D.WS.L1216 WSA - Gatehouse B - ABWF - prepare document C01_7 d/w - 10h/d - No HK 21 13-May-22 02-Jun-22 20-Sep-22 10-Oct-22 130 Hols - No B/O periods (was 310.D.WS.L1844 WSA - Gatehouse B - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 03-Jun-22 30-Jun-22 11-Oct-22 07-Nov-22 130 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 180 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1840 WSA - Gatehouse B - ABWF - prepare resubmission C01_7 d/w - 10h/d - No HK 14 01-Jul-22 14-Jul-22 08-Nov-22 21-Nov-22 130 Hols - No B/O periods (was 310.D.WS.L1220 WSA - Gatehouse B - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 15-Jul-22 11-Aug-22 22-Nov-22 19-Dec-22 130 Hols - No B/O periods (was WSA - Gatehouse B - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was03-Jun-22 C1) 08-Sep-22 18-Oct-22 16-Jan-23 130 310.D.WS.L1232 WSA - Gatehouse B - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 21 03-Jun-22 23-Jun-22 18-Oct-22 07-Nov-22 137 Hols - No B/O periods (was 310.D.WS.L1852 WSA - Gatehouse B - ABWF - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 24-Jun-22 21-Jul-22 08-Nov-22 05-Dec-22 137 Hols - No B/O periods (was 310.D.WS.L1848 WSA - Gatehouse B - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 22-Jul-22 04-Aug-22 06-Dec-22 19-Dec-22 137 Hols - No B/O periods (was 310.D.WS.L1236 WSA - Gatehouse B - ABWF - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 12-Aug-22 08-Sep-22 20-Dec-22 16-Jan-23 130 Hols - No B/O periods (was WSA - Gatehouse B - BD Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was13-May-22 C1) 28-Oct-22 16-Nov-22 16-Jun-23 231 WSA - Gatehouse B - BD Submission - Signage C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was13-May-22 C1) 28-Oct-22 16-Nov-22 03-May-23 187 310.D.WS.L1261.B02 WSA - Gatehouse B - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 13-May-22 11-Jun-22 16-Nov-22 15-Dec-22 187 Hols - No B/O periods (was 310.D.WS.L1265.B02 WSA - Gatehouse B - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 12-Jun-22 09-Jul-22 16-Dec-22 12-Jan-23 187 Hols - No B/O periods (was 310.D.WS.L1277.B02 WSA - Gatehouse B - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 10-Jul-22 30-Jul-22 13-Jan-23 02-Feb-23 187 Hols - No B/O periods (was 310.D.WS.L1269.B02 WSA - Gatehouse B - BD Review and Acceptance (1st Acceptance requires 2 months) C1) C01_7 d/w - 10h/d - No HK 60 31-Jul-22 28-Sep-22 03-Feb-23 03-Apr-23 187 Hols - No B/O periods (was 310.D.WS.L1273.B02 WSA - Gatehouse B - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 29-Sep-22 28-Oct-22 04-Apr-23 03-May-23 187 Hols - No B/O periods (was WSA - Gatehouse B - BD Submission - Louvre C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was13-May-22 C1) 28-Oct-22 30-Dec-22 16-Jun-23 231 310.D.WS.L121.B01 WSA - Gatehouse B - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 13-May-22 11-Jun-22 30-Dec-22 28-Jan-23 231 Hols - No B/O periods (was 310.D.WS.L125.B01 WSA - Gatehouse B - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 12-Jun-22 09-Jul-22 29-Jan-23 25-Feb-23 231 Hols - No B/O periods (was 310.D.WS.L129.B01 WSA - Gatehouse B - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 10-Jul-22 30-Jul-22 26-Feb-23 18-Mar-23 231 Hols - No B/O periods (was 310.D.WS.L1213.B01 WSA - Gatehouse B - BD Review and Acceptance (1st Acceptance requires 2 months) C1) C01_7 d/w - 10h/d - No HK 60 31-Jul-22 28-Sep-22 19-Mar-23 17-May-23 231 Hols - No B/O periods (was 310.D.WS.L1217.B01 WSA - Gatehouse B - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 29-Sep-22 28-Oct-22 18-May-23 16-Jun-23 231 Hols - No B/O periods (was WSA - Gatehouse B - BD Submission - Canopy C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was13-May-22 C1) 28-Oct-22 30-Dec-22 16-Jun-23 231 310.D.WS.L1241.B01 WSA - Gatehouse B - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 13-May-22 11-Jun-22 30-Dec-22 28-Jan-23 231 Hols - No B/O periods (was 310.D.WS.L1245.B01 WSA - Gatehouse B - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 12-Jun-22 09-Jul-22 29-Jan-23 25-Feb-23 231 Hols - No B/O periods (was 310.D.WS.L1249.B01 WSA - Gatehouse B - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 10-Jul-22 30-Jul-22 26-Feb-23 18-Mar-23 231 Hols - No B/O periods (was 310.D.WS.L1253.B01 WSA - Gatehouse B - BD Review and Acceptance (1st Acceptance requires 2 months) C1) C01_7 d/w - 10h/d - No HK 60 31-Jul-22 28-Sep-22 19-Mar-23 17-May-23 231 Hols - No B/O periods (was 310.D.WS.L1257.B01 WSA - Gatehouse B - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 29-Sep-22 28-Oct-22 18-May-23 16-Jun-23 231 Hols - No B/O periods (was WSA - Gatehouse B - BD Submission - Cladding C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was13-May-22 C1) 28-Oct-22 30-Dec-22 16-Jun-23 231 310.D.WS.L1221.B01 WSA - Gatehouse B - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 13-May-22 11-Jun-22 30-Dec-22 28-Jan-23 231 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 181 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1225.B01 WSA - Gatehouse B - PM, AP, RSE reviewing C01_7 d/w - 10h/d - No HK 28 12-Jun-22 09-Jul-22 29-Jan-23 25-Feb-23 231 Hols - No B/O periods (was 310.D.WS.L1237.B01 WSA - Gatehouse B - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 10-Jul-22 30-Jul-22 26-Feb-23 18-Mar-23 231 Hols - No B/O periods (was 310.D.WS.L1229.B01 WSA - Gatehouse B - BD Review and Acceptance (1st Acceptance requires 2 months) C1) C01_7 d/w - 10h/d - No HK 60 31-Jul-22 28-Sep-22 19-Mar-23 17-May-23 231 Hols - No B/O periods (was 310.D.WS.L1233.B01 WSA - Gatehouse B - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 29-Sep-22 28-Oct-22 18-May-23 16-Jun-23 231 Hols - No B/O periods (was WSA - Gatehouse B - BD Submission - Skylight C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was13-May-22 C1) 28-Oct-22 30-Dec-22 16-Jun-23 231 310.D.WS.L1261.B01 WSA - Gatehouse B - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 13-May-22 11-Jun-22 30-Dec-22 28-Jan-23 231 Hols - No B/O periods (was 310.D.WS.L1265.B01 WSA - Gatehouse B - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 12-Jun-22 09-Jul-22 29-Jan-23 25-Feb-23 231 Hols - No B/O periods (was 310.D.WS.L1277.B01 WSA - Gatehouse B - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 10-Jul-22 30-Jul-22 26-Feb-23 18-Mar-23 231 Hols - No B/O periods (was 310.D.WS.L1269.B01 WSA - Gatehouse B - BD Review and Acceptance (1st Acceptance requires 2 months) C1) C01_7 d/w - 10h/d - No HK 60 31-Jul-22 28-Sep-22 19-Mar-23 17-May-23 231 Hols - No B/O periods (was 310.D.WS.L1273.B01 WSA - Gatehouse B - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 29-Sep-22 28-Oct-22 18-May-23 16-Jun-23 231 Hols - No B/O periods (was CC#08 - WSA - Screening Facilities - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols210 - No B/O periods 0 (was 20-Mar-22 C1) A 22-Oct-22 20-May-22 15-Dec-22 54 WSA - Screening Facilities - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols210 - No B/O periods 0 (was 20-Mar-22 C1) A 22-Oct-22 20-May-22 15-Dec-22 54 310.D.WS.L952 WSA - Screening Facilities - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 21 20-Mar-22 A 24-Jul-22 20-May-22 16-Sep-22 54 Hols - No B/O periods (was 310.D.WS.L953 WSA - Screening Facilities - MEP - Drawing Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 120 26-Apr-22 23-Aug-22 19-Jun-22 16-Oct-22 54 Round Hols - No B/O periods (was 310.D.WS.L954 WSA - Screening Facilities - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 120 26-May-22 22-Sep-22 19-Jul-22 15-Nov-22 54 Hols - No B/O periods (was 310.D.WS.L956 WSA - Screening Facilities - MEP - Drawing Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 120 25-Jun-22 22-Oct-22 18-Aug-22 15-Dec-22 54 Round Hols - No B/O periods (was CC#08 - WSA - Screening Facilities - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 27-May-22 27-Feb-23 139 WSA - Screening Facilities - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols70 - No B/O periods 0 (was26-Apr-22 C1) 04-Jul-22 27-May-22 04-Aug-22 31 310.D.WS.L1240 WSA - Screening Facilities - ABWF - prepare document C01_7 d/w - 10h/d - No HK 21 26-Apr-22 16-May-22 27-May-22 16-Jun-22 31 Hols - No B/O periods (was 310.D.WS.L1860 WSA - Screening Facilities - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 17-May-22 13-Jun-22 17-Jun-22 14-Jul-22 31 Hols - No B/O periods (was 310.D.WS.L1856 WSA - Screening Facilities - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 14-Jun-22 20-Jun-22 15-Jul-22 21-Jul-22 31 Hols - No B/O periods (was 310.D.WS.L1244 WSA - Screening Facilities - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 14 21-Jun-22 04-Jul-22 22-Jul-22 04-Aug-22 31 Hols - No B/O periods (was WSA - Screening Facilities - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 27-May-22 27-Feb-23 139 310.D.WS.L1256 WSA - Screening Facilities - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 21 26-Apr-22 16-May-22 27-May-22 16-Jun-22 31 Hols - No B/O periods (was 310.D.WS.L1868 WSA - Screening Facilities - ABWF - Material Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 28 17-May-22 13-Jun-22 17-Jun-22 14-Jul-22 31 Round Hols - No B/O periods (was 310.D.WS.L1864 WSA - Screening Facilities - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 7 14-Jun-22 20-Jun-22 15-Jul-22 21-Jul-22 31 Hols - No B/O periods (was 310.D.WS.L1260 WSA - Screening Facilities - ABWF - Material Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 14 21-Jun-22 04-Jul-22 22-Jul-22 04-Aug-22 31 Round Hols - No B/O periods (was WSA - Screening Facilities - BD Submission C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 01-Jun-22 27-Feb-23 139 WSA - Screening Facilities - BD Submission - Signage C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 01-Jun-22 16-Nov-22 36
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 182 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1281.B02 WSA - Screening Facilities - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 01-Jun-22 30-Jun-22 36 Hols - No B/O periods (was 310.D.WS.L1285.B02 WSA - Screening Facilities - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 01-Jul-22 28-Jul-22 36 Hols - No B/O periods (was 310.D.WS.L1289.B02 WSA - Screening Facilities - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 29-Jul-22 18-Aug-22 36 Hols - No B/O periods (was 310.D.WS.L1293.B02 WSA - Screening Facilities - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 19-Aug-22 17-Oct-22 36 months) Hols - No B/O periods (was 310.D.WS.L1297.B02 WSA - Screening Facilities - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 18-Oct-22 16-Nov-22 36 Hols - No B/O periods (was WSA - Screening Facilities - BD Submission - Louvre C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 12-Sep-22 27-Feb-23 139 310.D.WS.L1281.B01 WSA - Screening Facilities - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 12-Sep-22 11-Oct-22 139 Hols - No B/O periods (was 310.D.WS.L1285.B01 WSA - Screening Facilities - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 12-Oct-22 08-Nov-22 139 Hols - No B/O periods (was 310.D.WS.L1289.B01 WSA - Screening Facilities - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 09-Nov-22 29-Nov-22 139 Hols - No B/O periods (was 310.D.WS.L1293.B01 WSA - Screening Facilities - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 30-Nov-22 28-Jan-23 139 months) Hols - No B/O periods (was 310.D.WS.L1297.B01 WSA - Screening Facilities - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 29-Jan-23 27-Feb-23 139 Hols - No B/O periods (was WSA - Screening Facilities - BD Submission - Canopy C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 12-Sep-22 27-Feb-23 139 310.D.WS.L12121.B01WSA - Screening Facilities - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 12-Sep-22 11-Oct-22 139 Hols - No B/O periods (was 310.D.WS.L12125.B01WSA - Screening Facilities - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 12-Oct-22 08-Nov-22 139 Hols - No B/O periods (was 310.D.WS.L12129.B01WSA - Screening Facilities - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 09-Nov-22 29-Nov-22 139 Hols - No B/O periods (was 310.D.WS.L12133.B01WSA - Screening Facilities - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 30-Nov-22 28-Jan-23 139 months) Hols - No B/O periods (was 310.D.WS.L12137.B01WSA - Screening Facilities - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 29-Jan-23 27-Feb-23 139 Hols - No B/O periods (was WSA - Screening Facilities - BD Submission - Cladding C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 12-Sep-22 27-Feb-23 139 310.D.WS.L12101.B01WSA - Screening Facilities - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 12-Sep-22 11-Oct-22 139 Hols - No B/O periods (was 310.D.WS.L12105.B01WSA - Screening Facilities - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 12-Oct-22 08-Nov-22 139 Hols - No B/O periods (was 310.D.WS.L12117.B01WSA - Screening Facilities - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 09-Nov-22 29-Nov-22 139 Hols - No B/O periods (was 310.D.WS.L12109.B01WSA - Screening Facilities - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 30-Nov-22 28-Jan-23 139 months) Hols - No B/O periods (was 310.D.WS.L12113.B01WSA - Screening Facilities - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 29-Jan-23 27-Feb-23 139 Hols - No B/O periods (was WSA - Screening Facilities - BD Submission - Skylight C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-Apr-22 C1) 11-Oct-22 12-Sep-22 27-Feb-23 139 310.D.WS.L12141.B01WSA - Screening Facilities - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 12-Sep-22 11-Oct-22 139 Hols - No B/O periods (was 310.D.WS.L12145.B01WSA - Screening Facilities - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 26-May-22 22-Jun-22 12-Oct-22 08-Nov-22 139 Hols - No B/O periods (was 310.D.WS.L12157.B01WSA - Screening Facilities - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jun-22 13-Jul-22 09-Nov-22 29-Nov-22 139 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 183 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L12149.B01WSA - Screening Facilities - BD Review and Acceptance (1st Acceptance requires 2 C01_7 d/w - 10h/d - No HK 60 14-Jul-22 11-Sep-22 30-Nov-22 28-Jan-23 139 months) Hols - No B/O periods (was 310.D.WS.L12153.B01WSA - Screening Facilities - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Sep-22 11-Oct-22 29-Jan-23 27-Feb-23 139 Hols - No B/O periods (was CC#08 - AGL Vault D Annex - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols195 - No B/O periods 0 (was 28-Jan-22 C1) A 18-Jun-22 10-Jun-22 01-Sep-22 75 AGL Vault D Annex - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols195 - No B/O periods 0 (was 28-Jan-22 C1) A 18-Jun-22 10-Jun-22 01-Sep-22 75 AGL Vault D Annex - Drawing Submission for CSD & CBWD C01_7 d/w - 10h/d - No HK Hols104 - No B/O periods 0 (was 28-Jan-22 C1) A 16-May-22 10-Jun-22 01-Sep-22 108 310.D.WS.L976.0B01 AGL Vault D Annex - MEP - CSD/CBWD Shop Drawing Submission - prepare & C01_7 d/w - 10h/d - No HK 28 28-Jan-22 A 04-Apr-22 10-Jun-22 18-Jun-22 75 submission of document Hols - No B/O periods (was 310.D.WS.L976.1B01 AGL Vault D Annex - MEP - CSD/CBWD Shop Drawing Submission - PM review and C1) C01_7 d/w - 10h/d - No HK 14 05-Apr-22 18-Apr-22 24-Jun-22 07-Jul-22 80 accept Hols - No B/O periods (was 310.D.WS.L976.2B01 AGL Vault D Annex - MEP - CSD/CBWD + ISD Drawing Submission - prepare & C1) C01_7 d/w - 10h/d - No HK 14 19-Apr-22 02-May-22 08-Jul-22 21-Jul-22 80 submission of document Hols - No B/O periods (was 310.D.WS.L976.3B01 AGL Vault D Annex - MEP - CSD/CBWD + ISD Drawing Submission - PM review and C1) C01_7 d/w - 10h/d - No HK 14 03-May-22 16-May-22 19-Aug-22 01-Sep-22 108 accept Hols - No B/O periods (was AGL Vault D Annex - Drawing Submission for Electrical Services C1) C01_7 d/w - 10h/d - No HK Hols75 - No B/O periods 0 (was 20-Mar-22 C1) A 18-Jun-22 10-Jun-22 01-Sep-22 75 310.D.WS.L976 AGL Vault D Annex - MEP - Drawing Submission for Electrical Services - prepare C01_7 d/w - 10h/d - No HK 14 20-Mar-22 A 09-Apr-22 10-Jun-22 23-Jun-22 75 document Hols - No B/O periods (was 310.D.WS.L977 AGL Vault D Annex - MEP - Drawing Submission for Electrical Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 10-Apr-22 07-May-22 24-Jun-22 21-Jul-22 75 accept 1st Round Hols - No B/O periods (was 310.D.WS.L978 AGL Vault D Annex - MEP - Drawing Submission for Electrical Services - prepare C1) d/w - 10h/d - No HK C01_7 14 08-May-22 21-May-22 22-Jul-22 04-Aug-22 75 resubmission Hols - No B/O periods (was 310.D.WS.L980 AGL Vault D Annex - MEP - Drawing Submission for Electrical Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 22-May-22 18-Jun-22 05-Aug-22 01-Sep-22 75 accept 2nd Round Hols - No B/O periods (was AGL Vault D Annex - Drawing Submission for MVAC Services C1) C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was 20-Feb-22 C1) A 13-Jun-22 24-Jun-22 01-Sep-22 80 310.D.WS.L2031.B01 AGL Vault D Annex - MEP - Drawing Submission for MVAC Services - prepare document C01_7 d/w - 10h/d - No HK 14 20-Feb-22 A 17-Mar-22 A 24-Jun-22 24-Jun-22 Hols - No B/O periods (was 310.D.WS.L2043.B01 AGL Vault D Annex - MEP - Drawing Submission for MVAC Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 18-Mar-22 A 23-Apr-22 24-Jun-22 21-Jul-22 89 accept 1st Round Hols - No B/O periods (was 310.D.WS.L2039.B01 AGL Vault D Annex - MEP - Drawing Submission for MVAC Services - prepare C1) C01_7 d/w - 10h/d - No HK 14 03-May-22 16-May-22 22-Jul-22 04-Aug-22 80 resubmission Hols - No B/O periods (was 310.D.WS.L2035.B01 AGL Vault D Annex - MEP - Drawing Submission for MVAC Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 17-May-22 13-Jun-22 05-Aug-22 01-Sep-22 80 accept 2nd Round Hols - No B/O periods (was AGL Vault D Annex - Drawing Submission for Fire Services C1) C01_7 d/w - 10h/d - No HK Hols70 - No B/O periods 0 (was 04-Mar-22 C1) A 18-Jun-22 10-Jun-22 01-Sep-22 75 310.D.WS.L2047.B01 AGL Vault D Annex - MEP - Drawing Submission for Fire Services - prepare document C01_7 d/w - 10h/d - No HK 14 04-Mar-22 A 09-Apr-22 10-Jun-22 23-Jun-22 75 Hols - No B/O periods (was 310.D.WS.L2059.B01 AGL Vault D Annex - MEP - Drawing Submission for Fire Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 10-Apr-22 07-May-22 24-Jun-22 21-Jul-22 75 accept 1st Round Hols - No B/O periods (was 310.D.WS.L2055.B01 AGL Vault D Annex - MEP - Drawing Submission for Fire Services - prepare C1) C01_7 d/w - 10h/d - No HK 14 08-May-22 21-May-22 22-Jul-22 04-Aug-22 75 resubmission Hols - No B/O periods (was 310.D.WS.L2051.B01 AGL Vault D Annex - MEP - Drawing Submission for Fire Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 22-May-22 18-Jun-22 05-Aug-22 01-Sep-22 75 accept 2nd Round Hols - No B/O periods (was AGL Vault D Annex - Drawing Submission for Plumbing & Drainage C1) C01_7 d/w - 10h/d - No HK Hols105 - No B/O periods 0 (was 16-Feb-22 C1) A 13-Jun-22 24-Jun-22 01-Sep-22 80 310.D.WS.L2063.B01 AGL Vault D Annex - MEP - Drawing Submission for Plumbing & Drainage Services - C01_7 d/w - 10h/d - No HK 14 16-Feb-22 A 17-Mar-22 A 24-Jun-22 24-Jun-22 prepare document Hols - No B/O periods (was 310.D.WS.L2075.B01 AGL Vault D Annex - MEP - Drawing Submission for Plumbing & Drainage Services - PM C1) C01_7 d/w - 10h/d - No HK 28 18-Mar-22 A 23-Apr-22 24-Jun-22 21-Jul-22 89 review and accept 1st Round Hols - No B/O periods (was 310.D.WS.L2071.B01 AGL Vault D Annex - MEP - Drawing Submission for Plumbing & Drainage Services - C1) C01_7 d/w - 10h/d - No HK 14 03-May-22 16-May-22 22-Jul-22 04-Aug-22 80 prepare resubmission Hols - No B/O periods (was 310.D.WS.L2067.B01 AGL Vault D Annex - MEP - Drawing Submission for Plumbing & Drainage Services - PM C1) C01_7 d/w - 10h/d - No HK 28 17-May-22 13-Jun-22 05-Aug-22 01-Sep-22 80 review and accept 2nd Round Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 184 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S CC#08 - AGL Vault D Annex - ABWF Submission C01_7 d/w - 10h/d - No HK Hols153 - No B/O periods 0 (was26-Apr-22 C1) 25-Sep-22 11-Jun-22 10-Nov-22 46 AGL Vault D Annex - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols116 - No B/O periods 0 (was11-May-22 C1) 03-Sep-22 20-Jun-22 25-Oct-22 52 AGL Vault D Annex - Shop Drawing submission and Acceptance of Louvre C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was16-May-22 C1) 07-Aug-22 05-Jul-22 26-Sep-22 50 310.D.WS.L1264 AGL Vault D Annex - Louvre - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 16-May-22 29-May-22 05-Jul-22 18-Jul-22 50 Hols - No B/O periods (was 310.D.WS.L1876 AGL Vault D Annex - Louvre - Shop Drawing PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 30-May-22 26-Jun-22 19-Jul-22 15-Aug-22 50 Hols - No B/O periods (was 310.D.WS.L1872 AGL Vault D Annex - Louvre - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 27-Jun-22 10-Jul-22 16-Aug-22 29-Aug-22 50 Hols - No B/O periods (was 310.D.WS.L1268 AGL Vault D Annex - Louvre - Shop Drawing PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 11-Jul-22 07-Aug-22 30-Aug-22 26-Sep-22 50 Hols - No B/O periods (was AGL Vault D Annex - Shop Drawing submission and Acceptance of Cladding C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was16-May-22 C1) 07-Aug-22 05-Jul-22 26-Sep-22 50 310.D.WS.L1264.1.B01AGL Vault D Annex - Cladding - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 16-May-22 29-May-22 05-Jul-22 18-Jul-22 50 Hols - No B/O periods (was 310.D.WS.L1264.2.B01AGL Vault D Annex - Cladding - Shop Drawing PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 30-May-22 26-Jun-22 19-Jul-22 15-Aug-22 50 Hols - No B/O periods (was 310.D.WS.L1264.3.B01AGL Vault D Annex - Cladding - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 27-Jun-22 10-Jul-22 16-Aug-22 29-Aug-22 50 Hols - No B/O periods (was 310.D.WS.L1264.4.B01AGL Vault D Annex - Cladding - Shop Drawing PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 11-Jul-22 07-Aug-22 30-Aug-22 26-Sep-22 50 Hols - No B/O periods (was AGL Vault D Annex - Shop Drawing submission and Acceptance of Door C1) d/w - 10h/d - No HK Hols84 C01_7 - No B/O periods 0 (was12-Jun-22 C1) 03-Sep-22 03-Aug-22 25-Oct-22 52 310.D.WS.L1264.5.B01AGL Vault D Annex - Door - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 12-Jun-22 25-Jun-22 03-Aug-22 16-Aug-22 52 Hols - No B/O periods (was 310.D.WS.L1264.6.B01AGL Vault D Annex - Door - Shop Drawing PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 26-Jun-22 23-Jul-22 17-Aug-22 13-Sep-22 52 Hols - No B/O periods (was 310.D.WS.L1264.7.B01AGL Vault D Annex - Door - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 24-Jul-22 06-Aug-22 14-Sep-22 27-Sep-22 52 Hols - No B/O periods (was 310.D.WS.L1264.8.B01AGL Vault D Annex - Door - Shop Drawing PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 07-Aug-22 03-Sep-22 28-Sep-22 25-Oct-22 52 Hols - No B/O periods (was AGL Vault D Annex - Shop Drawing submission and Acceptance of Metal Cover at G/F (1 set) C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was11-May-22 C1) 02-Aug-22 20-Jun-22 11-Sep-22 40 310.D.WS.L1264.9.B01AGL Vault D Annex - Metal Cover - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 20-Jun-22 03-Jul-22 40 Hols - No B/O periods (was 310.D.WS.L1264.10B01AGL Vault D Annex - Metal Cover - Shop Drawing PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 25-May-22 21-Jun-22 04-Jul-22 31-Jul-22 40 Hols - No B/O periods (was 310.D.WS.L1264.11B01AGL Vault D Annex - Metal Cover - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 22-Jun-22 05-Jul-22 01-Aug-22 14-Aug-22 40 Hols - No B/O periods (was 310.D.WS.L1264.12B01AGL Vault D Annex - Metal Cover - Shop Drawing PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 06-Jul-22 02-Aug-22 15-Aug-22 11-Sep-22 40 Hols - No B/O periods (was AGL Vault D Annex - Shop Drawing submission and Acceptance of Cat Ladder C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was05-Jun-22 C1) 27-Aug-22 20-Jul-22 11-Oct-22 45 310.D.WS.L1264.13B01AGL Vault D Annex - Cat Ladder - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 05-Jun-22 18-Jun-22 20-Jul-22 02-Aug-22 45 Hols - No B/O periods (was 310.D.WS.L1264.14B01AGL Vault D Annex - Cat Ladder - Shop Drawing PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 19-Jun-22 16-Jul-22 03-Aug-22 30-Aug-22 45 Hols - No B/O periods (was 310.D.WS.L1264.15B01AGL Vault D Annex - Cat Ladder - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 17-Jul-22 30-Jul-22 31-Aug-22 13-Sep-22 45 Hols - No B/O periods (was 310.D.WS.L1264.16B01AGL Vault D Annex - Cat Ladder - Shop Drawing PM review and accept 2nd Round C1) d/w - 10h/d - No HK C01_7 28 31-Jul-22 27-Aug-22 14-Sep-22 11-Oct-22 45 Hols - No B/O periods (was AGL Vault D Annex - Shop Drawing submission and Acceptance of Fall Restraint System C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was26-May-22 C1) 17-Aug-22 25-Jun-22 16-Sep-22 30 310.D.WS.L1264.17B01AGL Vault D Annex - Fall Restraint System - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 25-Jun-22 08-Jul-22 30 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 185 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1264.18B01AGL Vault D Annex - Fall Restraint System - Shop Drawing PM review and accept 1st C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 09-Jul-22 05-Aug-22 30 Round Hols - No B/O periods (was 310.D.WS.L1264.19B01AGL Vault D Annex - Fall Restraint System - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 07-Jul-22 20-Jul-22 06-Aug-22 19-Aug-22 30 Hols - No B/O periods (was 310.D.WS.L1264.20B01AGL Vault D Annex - Fall Restraint System - Shop Drawing PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 21-Jul-22 17-Aug-22 20-Aug-22 16-Sep-22 30 Round Hols - No B/O periods (was AGL Vault D Annex - Shop Drawing submission and Acceptance of Drainage Channel at R/F C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was26-May-22 C1) 17-Aug-22 28-Jun-22 19-Sep-22 33 310.D.WS.L1264.21B01AGL Vault D Annex - Drainage Channel - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 28-Jun-22 11-Jul-22 33 Hols - No B/O periods (was 310.D.WS.L1264.22B01AGL Vault D Annex - Drainage Channel - Shop Drawing PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 12-Jul-22 08-Aug-22 33 Hols - No B/O periods (was 310.D.WS.L1264.23B01AGL Vault D Annex - Drainage Channel - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 07-Jul-22 20-Jul-22 09-Aug-22 22-Aug-22 33 Hols - No B/O periods (was 310.D.WS.L1264.24B01AGL Vault D Annex - Drainage Channel - Shop Drawing PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 21-Jul-22 17-Aug-22 23-Aug-22 19-Sep-22 33 Round Hols - No B/O periods (was AGL Vault D Annex - Shop Drawing submission and Acceptance of Raised Floor at Communication Room C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was26-May-22 C1) 17-Aug-22 05-Jul-22 26-Sep-22 40 310.D.WS.L1264.25B01AGL Vault D Annex - Raised Floor - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 05-Jul-22 18-Jul-22 40 Hols - No B/O periods (was 310.D.WS.L1264.26B01AGL Vault D Annex - Raised Floor - Shop Drawing PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 19-Jul-22 15-Aug-22 40 Hols - No B/O periods (was 310.D.WS.L1264.27B01AGL Vault D Annex - Raised Floor - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 07-Jul-22 20-Jul-22 16-Aug-22 29-Aug-22 40 Hols - No B/O periods (was 310.D.WS.L1264.28B01AGL Vault D Annex - Raised Floor - Shop Drawing PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 21-Jul-22 17-Aug-22 30-Aug-22 26-Sep-22 40 Hols - No B/O periods (was AGL Vault D Annex - ABWF Material Submission C1) C01_7 d/w - 10h/d - No HK Hols116 - No B/O periods 0 (was11-May-22 C1) 03-Sep-22 20-Jun-22 25-Oct-22 52 AGL Vault D Annex - Material Submission and Acceptance of Louvre C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was16-May-22 C1) 07-Aug-22 05-Jul-22 26-Sep-22 50 310.D.WS.L1280 AGL Vault D Annex - Louvre - Material Submission - prepare & submission of document C01_7 d/w - 10h/d - No HK 14 16-May-22 29-May-22 05-Jul-22 18-Jul-22 50 Hols - No B/O periods (was 310.D.WS.L1884 AGL Vault D Annex - Louvre - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 30-May-22 26-Jun-22 19-Jul-22 15-Aug-22 50 Hols - No B/O periods (was 310.D.WS.L1880 AGL Vault D Annex - Louvre - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 27-Jun-22 10-Jul-22 16-Aug-22 29-Aug-22 50 Hols - No B/O periods (was 310.D.WS.L1284 AGL Vault D Annex - Louvre - Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 11-Jul-22 07-Aug-22 30-Aug-22 26-Sep-22 50 Hols - No B/O periods (was AGL Vault D Annex - Material Submission and Acceptance of Cladding C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was16-May-22 C1) 07-Aug-22 05-Jul-22 26-Sep-22 50 310.D.WS.L1280.1B01 AGL Vault D Annex - Cladding - Material Submission - prepare & submission of document C01_7 d/w - 10h/d - No HK 14 16-May-22 29-May-22 05-Jul-22 18-Jul-22 50 Hols - No B/O periods (was 310.D.WS.L1884.2B01 AGL Vault D Annex - Cladding - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 30-May-22 26-Jun-22 19-Jul-22 15-Aug-22 50 Hols - No B/O periods (was 310.D.WS.L1880.3B01 AGL Vault D Annex - Cladding - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 27-Jun-22 10-Jul-22 16-Aug-22 29-Aug-22 50 Hols - No B/O periods (was 310.D.WS.L1284.4B01 AGL Vault D Annex - Cladding - Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 11-Jul-22 07-Aug-22 30-Aug-22 26-Sep-22 50 Hols - No B/O periods (was AGL Vault D Annex - Material Submission and Acceptance of Door C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jun-22 C1) 03-Sep-22 03-Aug-22 25-Oct-22 52 310.D.WS.L1280.5B01 AGL Vault D Annex - Door - Material Submission - prepare & submission of document C01_7 d/w - 10h/d - No HK 14 12-Jun-22 25-Jun-22 03-Aug-22 16-Aug-22 52 Hols - No B/O periods (was 310.D.WS.L1884.6B01 AGL Vault D Annex - Door - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 26-Jun-22 23-Jul-22 17-Aug-22 13-Sep-22 52 Hols - No B/O periods (was 310.D.WS.L1880.7B01 AGL Vault D Annex - Door - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 24-Jul-22 06-Aug-22 14-Sep-22 27-Sep-22 52 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 186 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1284.8B01 AGL Vault D Annex - Door - Material Submission - PM review and accept 2nd Round C01_7 d/w - 10h/d - No HK 28 07-Aug-22 03-Sep-22 28-Sep-22 25-Oct-22 52 Hols - No B/O periods (was AGL Vault D Annex - Material Submission and Acceptance of Cat Ladder C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was05-Jun-22 C1) 27-Aug-22 20-Jul-22 11-Oct-22 45 310.D.WS.L1280.13B01AGL Vault D Annex - Cat Ladder - Material Submission - prepare & submission of C01_7 d/w - 10h/d - No HK 14 05-Jun-22 18-Jun-22 20-Jul-22 02-Aug-22 45 document Hols - No B/O periods (was 310.D.WS.L1884.14B01AGL Vault D Annex - Cat Ladder - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 19-Jun-22 16-Jul-22 03-Aug-22 30-Aug-22 45 Hols - No B/O periods (was 310.D.WS.L1880.15B01AGL Vault D Annex - Cat Ladder - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 17-Jul-22 30-Jul-22 31-Aug-22 13-Sep-22 45 Hols - No B/O periods (was 310.D.WS.L1284.16B01AGL Vault D Annex - Cat Ladder - Material Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 31-Jul-22 27-Aug-22 14-Sep-22 11-Oct-22 45 Round Hols - No B/O periods (was AGL Vault D Annex - Material Submission and Acceptance of Fall Restraint System C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was26-May-22 C1) 17-Aug-22 25-Jun-22 16-Sep-22 30 310.D.WS.L1280.17B01AGL Vault D Annex - Fall Restraint System - Material Submission - prepare & submission C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 25-Jun-22 08-Jul-22 30 of document Hols - No B/O periods (was 310.D.WS.L1884.18B01AGL Vault D Annex - Fall Restraint System - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 09-Jul-22 05-Aug-22 30 1st Round Hols - No B/O periods (was 310.D.WS.L1880.19B01AGL Vault D Annex - Fall Restraint System - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 07-Jul-22 20-Jul-22 06-Aug-22 19-Aug-22 30 Hols - No B/O periods (was 310.D.WS.L1284.20B01AGL Vault D Annex - Fall Restraint System - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 21-Jul-22 17-Aug-22 20-Aug-22 16-Sep-22 30 2nd Round Hols - No B/O periods (was AGL Vault D Annex - Material Submission and Acceptance of Metal Cover at G/F (1 set) C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was11-May-22 C1) 02-Aug-22 20-Jun-22 11-Sep-22 40 310.D.WS.L1280.9B01 AGL Vault D Annex - Metal Cover - Material Submission - prepare & submission of C01_7 d/w - 10h/d - No HK 14 11-May-22 24-May-22 20-Jun-22 03-Jul-22 40 document Hols - No B/O periods (was 310.D.WS.L1884.10B01AGL Vault D Annex - Metal Cover - Material Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 28 25-May-22 21-Jun-22 04-Jul-22 31-Jul-22 40 Round Hols - No B/O periods (was 310.D.WS.L1880.11B01AGL Vault D Annex - Metal Cover - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 22-Jun-22 05-Jul-22 01-Aug-22 14-Aug-22 40 Hols - No B/O periods (was 310.D.WS.L1284.12B01AGL Vault D Annex - Metal Cover - Material Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 06-Jul-22 02-Aug-22 15-Aug-22 11-Sep-22 40 Round Hols - No B/O periods (was AGL Vault D Annex - Material Submission and Acceptance of Drainage Channel at R/F C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was26-May-22 C1) 17-Aug-22 28-Jun-22 19-Sep-22 33 310.D.WS.L1280.21B01AGL Vault D Annex - Drainage Channel - Material Submission - prepare & submission of C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 28-Jun-22 11-Jul-22 33 document Hols - No B/O periods (was 310.D.WS.L1884.22B01AGL Vault D Annex - Drainage Channel - Material Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 12-Jul-22 08-Aug-22 33 Round Hols - No B/O periods (was 310.D.WS.L1880.23B01AGL Vault D Annex - Drainage Channel - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 07-Jul-22 20-Jul-22 09-Aug-22 22-Aug-22 33 Hols - No B/O periods (was 310.D.WS.L1284.24B01AGL Vault D Annex - Drainage Channel - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 21-Jul-22 17-Aug-22 23-Aug-22 19-Sep-22 33 2nd Round Hols - No B/O periods (was AGL Vault D Annex - Material Submission and Acceptance of Raised Floor at Communication Room C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was26-May-22 C1) 17-Aug-22 05-Jul-22 26-Sep-22 40 310.D.WS.L1280.25B01AGL Vault D Annex - Raised Floor - Material Submission - prepare & submission of C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 05-Jul-22 18-Jul-22 40 document Hols - No B/O periods (was 310.D.WS.L1884.26B01AGL Vault D Annex - Raised Floor - Material Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 19-Jul-22 15-Aug-22 40 Round Hols - No B/O periods (was 310.D.WS.L1880.27B01AGL Vault D Annex - Raised Floor - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 07-Jul-22 20-Jul-22 16-Aug-22 29-Aug-22 40 Hols - No B/O periods (was 310.D.WS.L1284.28B01AGL Vault D Annex - Raised Floor - Material Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 21-Jul-22 17-Aug-22 30-Aug-22 26-Sep-22 40 Round Hols - No B/O periods (was AGL Vault D Annex - BD Submission - Signage C1) C01_7 d/w - 10h/d - No HK Hols153 - No B/O periods 0 (was26-Apr-22 C1) 25-Sep-22 11-Jun-22 10-Nov-22 46 310.D.WS.L1268.1.B02 AGL Vault D Annex - Louvre - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 14 26-Apr-22 09-May-22 11-Jun-22 24-Jun-22 46 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 187 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1268.2.B02 AGL Vault D Annex - Louvre - PM, AP, RSE reviewing C01_7 d/w - 10h/d - No HK 28 10-May-22 06-Jun-22 25-Jun-22 22-Jul-22 46 Hols - No B/O periods (was 310.D.WS.L1268.3.B02 AGL Vault D Annex - Louvre - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 07-Jun-22 27-Jun-22 23-Jul-22 12-Aug-22 46 Hols - No B/O periods (was 310.D.WS.L1268.5.B02 AGL Vault D Annex - Louvre - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 28-Jun-22 26-Aug-22 13-Aug-22 11-Oct-22 46 months) Hols - No B/O periods (was 310.D.WS.L1268.6.B02 AGL Vault D Annex - Louvre - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 27-Aug-22 25-Sep-22 12-Oct-22 10-Nov-22 46 Hols - No B/O periods (was AGL Vault D Annex - BD Submission - Louvre C1) C01_7 d/w - 10h/d - No HK Hols153 - No B/O periods 0 (was26-Apr-22 C1) 25-Sep-22 11-Jun-22 10-Nov-22 46 310.D.WS.L1268.1.B01 AGL Vault D Annex - Louvre - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 14 26-Apr-22 09-May-22 11-Jun-22 24-Jun-22 46 Hols - No B/O periods (was 310.D.WS.L1268.2.B01 AGL Vault D Annex - Louvre - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 10-May-22 06-Jun-22 25-Jun-22 22-Jul-22 46 Hols - No B/O periods (was 310.D.WS.L1268.3.B01 AGL Vault D Annex - Louvre - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 07-Jun-22 27-Jun-22 23-Jul-22 12-Aug-22 46 Hols - No B/O periods (was 310.D.WS.L1268.5.B01 AGL Vault D Annex - Louvre - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 28-Jun-22 26-Aug-22 13-Aug-22 11-Oct-22 46 months) Hols - No B/O periods (was 310.D.WS.L1268.6.B01 AGL Vault D Annex - Louvre - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 27-Aug-22 25-Sep-22 12-Oct-22 10-Nov-22 46 Hols - No B/O periods (was AGL Vault D Annex - BD Submission - Cladding C1) C01_7 d/w - 10h/d - No HK Hols153 - No B/O periods 0 (was26-Apr-22 C1) 25-Sep-22 11-Jun-22 10-Nov-22 46 310.D.WS.L1268.7.B01 AGL Vault D Annex - Cladding - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 14 26-Apr-22 09-May-22 11-Jun-22 24-Jun-22 46 Hols - No B/O periods (was 310.D.WS.L1268.8.B01 AGL Vault D Annex - Cladding - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 10-May-22 06-Jun-22 25-Jun-22 22-Jul-22 46 Hols - No B/O periods (was 310.D.WS.L1268.9.B01 AGL Vault D Annex - Cladding - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 07-Jun-22 27-Jun-22 23-Jul-22 12-Aug-22 46 Hols - No B/O periods (was 310.D.WS.L1268.11B01 AGL Vault D Annex - Cladding - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 28-Jun-22 26-Aug-22 13-Aug-22 11-Oct-22 46 months) Hols - No B/O periods (was 310.D.WS.L1268.12B01 AGL Vault D Annex - Cladding - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 27-Aug-22 25-Sep-22 12-Oct-22 10-Nov-22 46 Hols - No B/O periods (was CC#08 - AGL Vault C Annex - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols220 - No B/O periods 0 (was 19-Feb-22 C1) A 18-Jun-22 09-Aug-22 31-Oct-22 135 AGL Vault C Annex - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols220 - No B/O periods 0 (was 19-Feb-22 C1) A 18-Jun-22 09-Aug-22 31-Oct-22 135 AGL Vault C Annex - Drawing Submission for CSD & CBWD C01_7 d/w - 10h/d - No HK Hols122 - No B/O periods 0 (was 20-Mar-22 C1) A 31-May-22 27-Aug-22 31-Oct-22 153 310.D.WS.L1080.B01 AGL Vault C Annex - MEP - CSD/CBWD Shop Drawing Submission - prepare & C01_7 d/w - 10h/d - No HK 21 20-Mar-22 A 19-Apr-22 27-Aug-22 19-Sep-22 153 submission of document Hols - No B/O periods (was 310.D.WS.L1084.B01 AGL Vault C Annex - MEP - CSD/CBWD Shop Drawing Submission - PM review and C1) C01_7 d/w - 10h/d - No HK 14 20-Apr-22 03-May-22 20-Sep-22 03-Oct-22 153 accept Hols - No B/O periods (was 310.D.WS.L1104.B01 AGL Vault C Annex - MEP - CSD/CBWD + ISD Drawing Submission - prepare & C1) C01_7 d/w - 10h/d - No HK 14 04-May-22 17-May-22 04-Oct-22 17-Oct-22 153 submission of document Hols - No B/O periods (was 310.D.WS.L1108.B01 AGL Vault C Annex - MEP - CSD/CBWD + ISD Drawing Submission - PM review and C1) C01_7 d/w - 10h/d - No HK 14 18-May-22 31-May-22 18-Oct-22 31-Oct-22 153 accept Hols - No B/O periods (was AGL Vault C Annex - Drawing Submission for Electrical Services C1) C01_7 d/w - 10h/d - No HK Hols70 - No B/O periods 0 (was 20-Mar-22 C1) A 18-Jun-22 09-Aug-22 31-Oct-22 135 310.D.WS.L1000 AGL Vault C Annex - MEP - Drawing Submission for Electrical Services - prepare & C01_7 d/w - 10h/d - No HK 14 20-Mar-22 A 09-Apr-22 09-Aug-22 22-Aug-22 135 submission of document Hols - No B/O periods (was 310.D.WS.L1564 AGL Vault C Annex - MEP - Drawing Submission for Electrical Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 10-Apr-22 07-May-22 23-Aug-22 19-Sep-22 135 accept 1st Round Hols - No B/O periods (was 310.D.WS.L1560 AGL Vault C Annex - MEP - Drawing Submission for Electrical Services - prepare C1) C01_7 d/w - 10h/d - No HK 14 08-May-22 21-May-22 20-Sep-22 03-Oct-22 135 resubmission Hols - No B/O periods (was 310.D.WS.L1004 AGL Vault C Annex - MEP - Drawing Submission for Electrical Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 22-May-22 18-Jun-22 04-Oct-22 31-Oct-22 135 accept 2nd Round Hols - No B/O periods (was AGL Vault C Annex - Drawing Submission for MVAC Services C1) C01_7 d/w - 10h/d - No HK Hols150 - No B/O periods 0 (was 19-Feb-22 C1) A 04-Jun-22 23-Aug-22 31-Oct-22 149
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 188 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L2030.B01 AGL Vault C Annex - MEP - Drawing Submission for MVAC Services - prepare & C01_7 d/w - 10h/d - No HK 14 19-Feb-22 A 09-Apr-22 23-Aug-22 05-Sep-22 149 submission of document Hols - No B/O periods (was 310.D.WS.L2034.B01 AGL Vault C Annex - MEP - Drawing Submission for MVAC Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 15-Mar-22 A 23-Apr-22 23-Aug-22 19-Sep-22 149 accept 1st Round Hols - No B/O periods (was 310.D.WS.L2038.B01 AGL Vault C Annex - MEP - Drawing Submission for MVAC Services - prepare C1) C01_7 d/w - 10h/d - No HK 14 24-Apr-22 07-May-22 20-Sep-22 03-Oct-22 149 resubmission Hols - No B/O periods (was 310.D.WS.L2042.B01 AGL Vault C Annex - MEP - Drawing Submission for MVAC Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 08-May-22 04-Jun-22 04-Oct-22 31-Oct-22 149 accept 2nd Round Hols - No B/O periods (was AGL Vault C Annex - Drawing Submission for Fire Services C1) C01_7 d/w - 10h/d - No HK Hols66 - No B/O periods 0 (was 07-Mar-22 C1) A 04-Jun-22 23-Aug-22 31-Oct-22 149 310.D.WS.L2050.B01 AGL Vault C Annex - MEP - Drawing Submission for Fire Services - prepare & submission C01_7 d/w - 10h/d - No HK 14 07-Mar-22 A 09-Apr-22 23-Aug-22 05-Sep-22 149 of document Hols - No B/O periods (was 310.D.WS.L2054.B01 AGL Vault C Annex - MEP - Drawing Submission for Fire Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 17-Mar-22 A 23-Apr-22 23-Aug-22 19-Sep-22 149 accept 1st Round Hols - No B/O periods (was 310.D.WS.L2058.B01 AGL Vault C Annex - MEP - Drawing Submission for Fire Services - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 24-Apr-22 07-May-22 20-Sep-22 03-Oct-22 149 Hols - No B/O periods (was 310.D.WS.L2062.B01 AGL Vault C Annex - MEP - Drawing Submission for Fire Services - PM review and C1) C01_7 d/w - 10h/d - No HK 28 08-May-22 04-Jun-22 04-Oct-22 31-Oct-22 149 accept 2nd Round Hols - No B/O periods (was AGL Vault C Annex - Drawing Submission for Plumbing & Drainage Services C1) C01_7 d/w - 10h/d - No HK Hols136 - No B/O periods 0 (was 23-Feb-22 C1) A 04-Jun-22 23-Aug-22 31-Oct-22 149 310.D.WS.L2066.B01 AGL Vault C Annex - MEP - Drawing Submission for Plumbing & Drainage Services - C01_7 d/w - 10h/d - No HK 14 23-Feb-22 A 09-Apr-22 23-Aug-22 05-Sep-22 149 prepare & submission of document Hols - No B/O periods (was 310.D.WS.L2070.B01 AGL Vault C Annex - MEP - Drawing Submission for Plumbing & Drainage Services - PM C1) C01_7 d/w - 10h/d - No HK 28 11-Mar-22 A 23-Apr-22 23-Aug-22 19-Sep-22 149 review and accept 1st Round Hols - No B/O periods (was 310.D.WS.L2074.B01 AGL Vault C Annex - MEP - Drawing Submission for Plumbing & Drainage Services - C1) C01_7 d/w - 10h/d - No HK 14 24-Apr-22 07-May-22 20-Sep-22 03-Oct-22 149 prepare resubmission Hols - No B/O periods (was 310.D.WS.L2078.B01 AGL Vault C Annex - MEP - Drawing Submission for Plumbing & Drainage Services - PM C1) C01_7 d/w - 10h/d - No HK 28 08-May-22 04-Jun-22 04-Oct-22 31-Oct-22 149 review and accept 2nd Round Hols - No B/O periods (was CC#08 - AGL Vault C Annex - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols199 - No B/O periods 0 (was26-Apr-22 C1) 10-Nov-22 20-Apr-22 22-Aug-23 285 AGL Vault C Annex - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols199 - No B/O periods 0 (was26-Apr-22 C1) 10-Nov-22 20-Apr-22 22-Aug-23 285 310.D.WS.L1288.B01 AGL Vault C Annex - ABWF - prepare document C01_7 d/w - 10h/d - No HK 30 26-Apr-22 25-May-22 20-Apr-22 19-May-22 -6 Hols - No B/O periods (was AGL Vault C Annex - Shop Drawing submission and Acceptance of Louvre C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 16-Apr-23 08-Jul-23 278 310.D.WS.L1288 AGL Vault C Annex - Louvre - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 16-Apr-23 29-Apr-23 278 Hols - No B/O periods (was 310.D.WS.L1892 AGL Vault C Annex - Louvre - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 30-Apr-23 27-May-23 278 Hols - No B/O periods (was 310.D.WS.L1888 AGL Vault C Annex - Louvre - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 28-May-23 10-Jun-23 278 Hols - No B/O periods (was 310.D.WS.L1292 AGL Vault C Annex - Louvre - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 11-Jun-23 08-Jul-23 278 Hols - No B/O periods (was AGL Vault C Annex - Shop Drawing submission and Acceptance of Cladding C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 16-Apr-23 08-Jul-23 278 310.D.WS.L1288.20B01AGL Vault C Annex - Cladding - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 16-Apr-23 29-Apr-23 278 Hols - No B/O periods (was 310.D.WS.L1892.20B01AGL Vault C Annex - Cladding - Shop Drawing PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 30-Apr-23 27-May-23 278 Hols - No B/O periods (was 310.D.WS.L1888.20B01AGL Vault C Annex - Cladding - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 28-May-23 10-Jun-23 278 Hols - No B/O periods (was 310.D.WS.L1292.20B01AGL Vault C Annex - Cladding - Shop Drawing PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 11-Jun-23 08-Jul-23 278 Hols - No B/O periods (was AGL Vault C Annex - Shop Drawing submission and Acceptance of Door C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 16-Apr-23 08-Jul-23 278 310.D.WS.L1288.30B01AGL Vault C Annex - Door - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 16-Apr-23 29-Apr-23 278 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 189 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1892.30B01AGL Vault C Annex - Door - Shop Drawing PM review and accept 1st Round C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 30-Apr-23 27-May-23 278 Hols - No B/O periods (was 310.D.WS.L1888.30B01AGL Vault C Annex - Door - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 28-May-23 10-Jun-23 278 Hols - No B/O periods (was 310.D.WS.L1292.30B01AGL Vault C Annex - Door - Shop Drawing PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 11-Jun-23 08-Jul-23 278 Hols - No B/O periods (was AGL Vault C Annex - Shop Drawing submission and Acceptance of Stainless chequered plate G/F C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was26-May-22 C1) 17-Aug-22 07-Sep-22 29-Nov-22 104 310.D.WS.L1288.40B01AGL Vault C Annex - Stainless Chequered Plate - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 07-Sep-22 20-Sep-22 104 Hols - No B/O periods (was 310.D.WS.L1892.40B01AGL Vault C Annex - Stainless Chequered Plate - Shop Drawing PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 21-Sep-22 18-Oct-22 104 1st Round Hols - No B/O periods (was 310.D.WS.L1888.40B01AGL Vault C Annex - Stainless Chequered Plate - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 07-Jul-22 20-Jul-22 19-Oct-22 01-Nov-22 104 Hols - No B/O periods (was 310.D.WS.L1292.40B01AGL Vault C Annex - Stainless Chequered Plate - Shop Drawing PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 21-Jul-22 17-Aug-22 02-Nov-22 29-Nov-22 104 2nd Round Hols - No B/O periods (was AGL Vault C Annex - Shop Drawing submission and Acceptance of Cat Ladder C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 16-Apr-23 08-Jul-23 278 310.D.WS.L1288.50B01AGL Vault C Annex - Cat Ladder - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 16-Apr-23 29-Apr-23 278 Hols - No B/O periods (was 310.D.WS.L1892.50B01AGL Vault C Annex - Cat Ladder - Shop Drawing PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 30-Apr-23 27-May-23 278 Hols - No B/O periods (was 310.D.WS.L1888.50B01AGL Vault C Annex - Cat Ladder - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 28-May-23 10-Jun-23 278 Hols - No B/O periods (was 310.D.WS.L1292.50B01AGL Vault C Annex - Cat Ladder - Shop Drawing PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 11-Jun-23 08-Jul-23 278 Hols - No B/O periods (was AGL Vault C Annex - Shop Drawing submission and Acceptance of Fall Restraint System C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 29-Aug-22 20-Nov-22 48 310.D.WS.L1288.60B01AGL Vault C Annex - Fall Restraint System - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 29-Aug-22 11-Sep-22 48 Hols - No B/O periods (was 310.D.WS.L1892.60B01AGL Vault C Annex - Fall Restraint System - Shop Drawing PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 12-Sep-22 09-Oct-22 48 Round Hols - No B/O periods (was 310.D.WS.L1888.60B01AGL Vault C Annex - Fall Restraint System - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 10-Oct-22 23-Oct-22 48 Hols - No B/O periods (was 310.D.WS.L1292.60B01AGL Vault C Annex - Fall Restraint System - Shop Drawing PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 24-Oct-22 20-Nov-22 48 Round Hols - No B/O periods (was AGL Vault C Annex - Shop Drawing submission and Acceptance of Drainage Channel at R/F C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 29-Aug-22 20-Nov-22 48 310.D.WS.L1288.70B01AGL Vault C Annex - Drainage Channel - Shop Drawing Submission C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 29-Aug-22 11-Sep-22 48 Hols - No B/O periods (was 310.D.WS.L1892.70B01AGL Vault C Annex - Drainage Channel - Shop Drawing PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 12-Sep-22 09-Oct-22 48 Hols - No B/O periods (was 310.D.WS.L1888.70B01AGL Vault C Annex - Drainage Channel - Shop Drawing prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 10-Oct-22 23-Oct-22 48 Hols - No B/O periods (was 310.D.WS.L1264.70B01AGL Vault C Annex - Drainage Channel - Shop Drawing PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 24-Oct-22 20-Nov-22 48 Round Hols - No B/O periods (was AGL Vault C Annex - BD Submission - Signage C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-May-22 C1) 10-Nov-22 20-May-22 04-Nov-22 -6 310.D.WS.L1268.B02 AGL Vault C Annex - Louvre - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-May-22 24-Jun-22 20-May-22 18-Jun-22 -6 Hols - No B/O periods (was 310.D.WS.L1272.B02 AGL Vault C Annex - Louvre - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 25-Jun-22 22-Jul-22 19-Jun-22 16-Jul-22 -6 Hols - No B/O periods (was 310.D.WS.L1276.B02 AGL Vault C Annex - Louvre - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jul-22 12-Aug-22 17-Jul-22 06-Aug-22 -6 Hols - No B/O periods (was 310.D.WS.L1280.B02 AGL Vault C Annex - Louvre - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 13-Aug-22 11-Oct-22 07-Aug-22 05-Oct-22 -6 months) Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 190 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1284.B02 AGL Vault C Annex - Louvre - Consent Application and Acceptance C01_7 d/w - 10h/d - No HK 30 12-Oct-22 10-Nov-22 06-Oct-22 04-Nov-22 -6 Hols - No B/O periods (was AGL Vault C Annex - BD Submission - Louvre C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-May-22 C1) 10-Nov-22 07-Mar-23 22-Aug-23 285 310.D.WS.L1268.1B01 AGL Vault C Annex - Louvre - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-May-22 24-Jun-22 07-Mar-23 05-Apr-23 285 Hols - No B/O periods (was 310.D.WS.L1268.2B01 AGL Vault C Annex - Louvre - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 25-Jun-22 22-Jul-22 06-Apr-23 03-May-23 285 Hols - No B/O periods (was 310.D.WS.L1268.3B01 AGL Vault C Annex - Louvre - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jul-22 12-Aug-22 04-May-23 24-May-23 285 Hols - No B/O periods (was 310.D.WS.L1268.5B01 AGL Vault C Annex - Louvre - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 13-Aug-22 11-Oct-22 25-May-23 23-Jul-23 285 months) Hols - No B/O periods (was 310.D.WS.L1268.6B01 AGL Vault C Annex - Louvre - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Oct-22 10-Nov-22 24-Jul-23 22-Aug-23 285 Hols - No B/O periods (was AGL Vault C Annex - BD Submission - Cladding C1) C01_7 d/w - 10h/d - No HK Hols169 - No B/O periods 0 (was26-May-22 C1) 10-Nov-22 07-Mar-23 22-Aug-23 285 310.D.WS.L1268.7B01 AGL Vault C Annex - Cladding - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-May-22 24-Jun-22 07-Mar-23 05-Apr-23 285 Hols - No B/O periods (was 310.D.WS.L1268.8B01 AGL Vault C Annex - Cladding - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 25-Jun-22 22-Jul-22 06-Apr-23 03-May-23 285 Hols - No B/O periods (was 310.D.WS.L1268.24B01AGL Vault C Annex - Cladding - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 23-Jul-22 12-Aug-22 04-May-23 24-May-23 285 Hols - No B/O periods (was 310.D.WS.L1268.22B01AGL Vault C Annex - Cladding - BD Review and Acceptance (1st Acceptance requires 2 C1) C01_7 d/w - 10h/d - No HK 60 13-Aug-22 11-Oct-22 25-May-23 23-Jul-23 285 months) Hols - No B/O periods (was 310.D.WS.L1268.23B01AGL Vault C Annex - Cladding - Consent Application and Acceptance C1) C01_7 d/w - 10h/d - No HK 30 12-Oct-22 10-Nov-22 24-Jul-23 22-Aug-23 285 Hols - No B/O periods (was AGL Vault C Annex - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols131 - No B/O periods 0 (was26-May-22 C1) 03-Oct-22 04-Jun-22 08-Jul-23 278 AGL Vault C Annex - Material Submission and Acceptance of Louvre C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 16-Apr-23 08-Jul-23 278 310.D.WS.L2032.3B01 AGL Vault C Annex - Louvre - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 16-Apr-23 29-Apr-23 278 Hols - No B/O periods (was 310.D.WS.L2044.3B01 AGL Vault C Annex - Louvre - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 30-Apr-23 27-May-23 278 Hols - No B/O periods (was 310.D.WS.L2040.3B01 AGL Vault C Annex - Louvre - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 28-May-23 10-Jun-23 278 Hols - No B/O periods (was 310.D.WS.L2036.3B01 AGL Vault C Annex - Louvre - Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 11-Jun-23 08-Jul-23 278 Hols - No B/O periods (was AGL Vault C Annex - Material Submission and Acceptance of Cladding C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 16-Apr-23 08-Jul-23 278 310.D.WS.L1304 AGL Vault C Annex - Cladding - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 16-Apr-23 29-Apr-23 278 Hols - No B/O periods (was 310.D.WS.L1900 AGL Vault C Annex - Cladding - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 30-Apr-23 27-May-23 278 Hols - No B/O periods (was 310.D.WS.L1896 AGL Vault C Annex - Cladding - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 28-May-23 10-Jun-23 278 Hols - No B/O periods (was 310.D.WS.L1308 AGL Vault C Annex - Cladding - Material Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 11-Jun-23 08-Jul-23 278 Hols - No B/O periods (was AGL Vault C Annex - Material Submission and Acceptance of Door C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 16-Apr-23 08-Jul-23 278 310.D.WS.L2048.3B01 AGL Vault C Annex - Door - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 16-Apr-23 29-Apr-23 278 Hols - No B/O periods (was 310.D.WS.L2060.3B01 AGL Vault C Annex - Door - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 30-Apr-23 27-May-23 278 Hols - No B/O periods (was 310.D.WS.L2056.3B01 AGL Vault C Annex - Door - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 28-May-23 10-Jun-23 278 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 191 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L2052.3B01 AGL Vault C Annex - Door - Material Submission - PM review and accept 2nd Round C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 11-Jun-23 08-Jul-23 278 Hols - No B/O periods (was AGL Vault C Annex - Material Submission and Acceptance of Stainless chequered plate C1) C01_7 d/w - 10h/d - No HK Hols70 - No B/O periods 0 (was26-May-22 C1) 03-Aug-22 04-Jun-22 12-Aug-22 9 310.D.WS.L2064.3B01 AGL Vault C Annex - Stainless Chequered Plate - Material Submission - prepare C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 04-Jun-22 17-Jun-22 9 document Hols - No B/O periods (was 310.D.WS.L2076.3B01 AGL Vault C Annex - Stainless Chequered Plate - Material Submission - PM review and C1) C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 18-Jun-22 15-Jul-22 9 accept 1st Round Hols - No B/O periods (was 310.D.WS.L2072.3B01 AGL Vault C Annex - Stainless Chequered Plate - Material Submission - prepare C1) C01_7 d/w - 10h/d - No HK 14 07-Jul-22 20-Jul-22 16-Jul-22 29-Jul-22 9 resubmission Hols - No B/O periods (was 310.D.WS.L2068.3B01 AGL Vault C Annex - Stainless Chequered Plate - Material Submission - PM review and C1) C01_7 d/w - 10h/d - No HK 14 21-Jul-22 03-Aug-22 30-Jul-22 12-Aug-22 9 accept 2nd Round Hols - No B/O periods (was AGL Vault C Annex - Material Submission and Acceptance of Cat Ladder C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 16-Apr-23 08-Jul-23 278 310.D.WS.L2080.3B01 AGL Vault C Annex - Cat Ladder - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 16-Apr-23 29-Apr-23 278 Hols - No B/O periods (was 310.D.WS.L2092.3B01 AGL Vault C Annex - Cat Ladder - Material Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 30-Apr-23 27-May-23 278 Hols - No B/O periods (was 310.D.WS.L2088.3B01 AGL Vault C Annex - Cat Ladder - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 28-May-23 10-Jun-23 278 Hols - No B/O periods (was 310.D.WS.L2084.3B01 AGL Vault C Annex - Cat Ladder - Material Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 11-Jun-23 08-Jul-23 278 Round Hols - No B/O periods (was AGL Vault C Annex - Material Submission and Acceptance of Fall Restraint System C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 29-Aug-22 20-Nov-22 48 310.D.WS.L2096.3B01 AGL Vault C Annex - Fall Restraint System - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 29-Aug-22 11-Sep-22 48 Hols - No B/O periods (was 310.D.WS.L2108.3B01 AGL Vault C Annex - Fall Restraint System - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 12-Sep-22 09-Oct-22 48 1st Round Hols - No B/O periods (was 310.D.WS.L2104.3B01 AGL Vault C Annex - Fall Restraint System - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 10-Oct-22 23-Oct-22 48 Hols - No B/O periods (was 310.D.WS.L2100.3B01 AGL Vault C Annex - Fall Restraint System - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 24-Oct-22 20-Nov-22 48 2nd Round Hols - No B/O periods (was AGL Vault C Annex - Material Submission and Acceptance of Drainage Channel C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 29-Aug-22 20-Nov-22 48 310.D.WS.L2112.3B01 AGL Vault C Annex - Drainage Channel - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 14 12-Jul-22 25-Jul-22 29-Aug-22 11-Sep-22 48 Hols - No B/O periods (was 310.D.WS.L2124.3B01 AGL Vault C Annex - Drainage Channel - Material Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 28 26-Jul-22 22-Aug-22 12-Sep-22 09-Oct-22 48 Round Hols - No B/O periods (was 310.D.WS.L2120.3B01 AGL Vault C Annex - Drainage Channel - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 23-Aug-22 05-Sep-22 10-Oct-22 23-Oct-22 48 Hols - No B/O periods (was 310.D.WS.L2116.3B01 AGL Vault C Annex - Drainage Channel - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 24-Oct-22 20-Nov-22 48 2nd Round Hols - No B/O periods (was CC#8 - Hoarding Plan - AGL Vault D Annex C1) C01_7 d/w - 10h/d - No HK Hols139 - No B/O periods 0 (was 26-Aug-21 C1) A 17-Jan-22 A 09-May-22 09-May-22 310.D.R0.L540 Hoarding Plan AGL Vault D Annex - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 26-Aug-21 A 21-Sep-21 A 09-May-22 09-May-22 Hols - No B/O periods (was 310.D.R0.L544 Hoarding Plan AGL Vault D Annex - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 22-Sep-21 A 11-Oct-21 A 09-May-22 09-May-22 Hols - No B/O periods (was 310.D.R0.L548 Hoarding Plan AGL Vault D Annex - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 12-Oct-21 A 19-Nov-21 A 09-May-22 09-May-22 Hols - No B/O periods (was 310.D.R0.L556 Hoarding Plan AGL Vault D Annex - 1st BD review and Acceptance C1) C01_7 d/w - 10h/d - No HK 60 17-Nov-21 A 17-Jan-22 A 09-May-22 09-May-22 Hols - No B/O periods (was CC#8 - Hoarding Plan - AGL Vault C Annex C1) C01_7 d/w - 10h/d - No HK Hols274 - No B/O periods 0 (was 01-Sep-21 C1) A 09-Apr-22 03-May-22 16-May-22 37 310.D.R0.L568 Hoarding Plan AGL Vault C Annex - Prepare Design & submit with ICE C01_7 d/w - 10h/d - No HK 30 01-Sep-21 A 29-Sep-21 A 03-May-22 03-May-22 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 192 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.R0.L572 Hoarding Plan AGL Vault C Annex - PM, AP, RSE reviewing C01_7 d/w - 10h/d - No HK 28 30-Sep-21 A 24-Oct-21 A 03-May-22 03-May-22 Hols - No B/O periods (was 310.D.R0.L576 Hoarding Plan AGL Vault C Annex - ICC, M&VC review design and issue check certificate C1) C01_7 d/w - 10h/d - No HK 21 25-Oct-21 A 16-Nov-21 A 03-May-22 03-May-22 Hols - No B/O periods (was 310.D.R0.L580 Hoarding Plan AGL Vault C Annex - 1st BD review and accept C1) C01_7 d/w - 10h/d - No HK 60 17-Nov-21 A 17-Jan-22 A 03-May-22 03-May-22 Hols - No B/O periods (was 310.D.R0.L584 Hoarding Plan AGL Vault C Annex - prepare and submit Form BA8 and grant consent C1) C01_7 d/w - 10h/d - No HK 7 20-Jan-22 A 02-Apr-22 03-May-22 09-May-22 37 Hols - No B/O periods (was 310.D.R0.L588 Hoarding Plan AGL Vault C Annex - prepare and submit Form BA10 (with instrumentation C1) C01_7 d/w - 10h/d - No HK 7 03-Apr-22 09-Apr-22 10-May-22 16-May-22 37 readings) Hols - No B/O periods (was CC#08 ----- Procurement ----- C1) C01_7 d/w - 10h/d - No HK Hols301 - No B/O periods 0 (was 05-Oct-21 C1) A 01-Aug-22 21-Mar-22 01-Sep-22 31 CC#08 - Subletting - Ancillary Buildings C01_7 d/w - 10h/d - No HK Hols301 - No B/O periods 0 (was 05-Oct-21 C1) A 01-Aug-22 21-Mar-22 01-Sep-22 31 310.P.EX.F144 Subletting - Vault C & D Earthwork - Award sub-contract C01_7 d/w - 10h/d - No HK 90 05-Oct-21 A 28-Nov-21 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.P.EX.F144.B01 Subletting - Vault C Earthwork - Award sub-contract C1) C01_7 d/w - 10h/d - No HK 90 05-Oct-21 A 28-Nov-21 A 23-Apr-22 23-Apr-22 Hols - No B/O periods (was 310.P.EX.F96 Subletting - Vault C MEP - Award sub-contract C1) C01_7 d/w - 10h/d - No HK 90 30-Oct-21 A 18-Jan-22 A 21-Jun-22 21-Jun-22 Hols - No B/O periods (was 310.P.EX.F100 Subletting - Vault D MEP - Award sub-contract C1) C01_7 d/w - 10h/d - No HK 90 30-Oct-21 A 18-Jan-22 A 19-Apr-22 19-Apr-22 Hols - No B/O periods (was 310.P.EX.F104 Subletting - Ancillary Buildings MEP - Award sub-contract C1) C01_7 d/w - 10h/d - No HK 90 30-Oct-21 A 18-Jan-22 A 18-May-22 18-May-22 Hols - No B/O periods (was 310.P.EX.F152 Subletting - Vault C & D RC Structural Works - Award sub-contract C1) C01_7 d/w - 10h/d - No HK 90 04-Nov-21 A 28-Nov-21 A 19-Apr-22 19-Apr-22 Hols - No B/O periods (was 310.P.EX.F108 Subletting - ABWF (Plastering) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 20-Apr-22 26-Mar-22 19-Apr-22 -1 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F112 Subletting - ABWF (Painting) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 21-Mar-22 19-Apr-22 -6 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F165.B01 Subletting - ABWF (Door) - Stage 1&2 Preparation,Submission& Approval,Tender&Award C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 21-Mar-22 19-Apr-22 -6 sub-contract Hols - No B/O periods (was 310.P.EX.F169.B01 Subletting - ABWF (Louver,Window,etc) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 21-Mar-22 19-Apr-22 -6 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F173.B01 Subletting - ABWF (Steel&Metal) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 21-Mar-22 19-Apr-22 -6 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F136 Subletting - Ancillary Buildings Earthwork - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 01-May-22 29-Jul-22 22-May-22 19-Aug-22 21 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F148 Subletting-Ancillary Buildings&Government Facilities RC-Stage 1&2 C1) C01_7 d/w - 10h/d - No HK 62 01-Jun-22 01-Aug-22 02-Jul-22 01-Sep-22 31 Preparation,Submission& Approval,Tender&Award Hols - No B/O periods (was CC#08 ----- Construction ----- C1) 731 4 07-Jun-21 A 17-Nov-23 19-Feb-22 31-Aug-24 234 ESA - C&ED Operational Office and Kennel Area 363 0 30-Aug-22 17-Nov-23 05-Sep-22 04-Jan-24 38 Procurement C01_7 d/w - 10h/d - No HK Hols282 - No B/O periods 0 (was30-Aug-22 C1) 07-Jun-23 28-Oct-22 20-Jul-23 43 Major Materials ABWF C01_7 d/w - 10h/d - No HK Hols141 - No B/O periods 0 (was18-Jan-23 C1) 07-Jun-23 02-Mar-23 20-Jul-23 43 310.P.ES.M011 C&ED Op.Office & Kennel Area (Procurement ABWF)- C01_7 d/w - 10h/d - No HK 7 18-Jan-23 24-Jan-23 02-Mar-23 08-Mar-23 43 louvres,doors,windows,handrails,cladding&Others-Place Order Hols - No B/O periods (was 310.P.ES.M027 C&ED Op.Office & Kennel Area (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 120 25-Jan-23 24-May-23 09-Mar-23 06-Jul-23 43 Hols - No B/O periods (was 310.P.ES.M035 C&ED Op.Office & Kennel Area (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 14 25-May-23 07-Jun-23 07-Jul-23 20-Jul-23 43 Hols - No B/O periods (was Major Materials MEP C1) C01_7 d/w - 10h/d - No HK Hols252 - No B/O periods 0 (was30-Aug-22 C1) 08-May-23 28-Oct-22 06-Jul-23 59 310.P.ES.M015 C&ED Op.Office & Kennel Area (Procurement FS and P&D Materials) - NOVEC 1230, C01_7 d/w - 10h/d - No HK 180 30-Aug-22 25-Feb-23 28-Oct-22 25-Apr-23 59 FA system, Sprinkler&Others-Place Order Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 193 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.ES.M661 C&ED Op.Office & Kennel Area (Procurement FS and P&D Materials) - Manufacturing of C01_7 d/w - 10h/d - No HK 210 13-Sep-22 10-Apr-23 11-Nov-22 08-Jun-23 59 Material Hols - No B/O periods (was 310.P.ES.M023 C&ED Op.Office & Kennel Area (Procurement Electrical Materials) - cable trays, LV C1) C01_7 d/w - 10h/d - No HK 30 30-Sep-22 29-Oct-22 09-Mar-23 07-Apr-23 160 panels, generators&Others-Place Order Hols - No B/O periods (was 310.P.ES.M019 C&ED Op.Office & Kennel Area (Procurement MVAC)- ventilation fan, a/c units, air C1) C01_7 d/w - 10h/d - No HK 30 30-Oct-22 28-Nov-22 09-Mar-23 07-Apr-23 130 ducting & Others - Place Order Hols - No B/O periods (was 310.P.ES.M657 C&ED Op.Office & Kennel Area (Procurement Electrical Materials) - Manufacturing of C1) C01_7 d/w - 10h/d - No HK 90 30-Oct-22 27-Jan-23 08-Apr-23 06-Jul-23 160 Material Hols - No B/O periods (was 310.P.ES.M653 C&ED Op.Office & Kennel Area (Procurement MVAC)- Manufacturing of Material C1) C01_7 d/w - 10h/d - No HK 90 29-Nov-22 26-Feb-23 08-Apr-23 06-Jul-23 130 Hols - No B/O periods (was 310.P.ES.M665 C&ED Op.Office & Kennel Area (Procurement MEP) - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 28 11-Apr-23 08-May-23 09-Jun-23 06-Jul-23 59 Hols - No B/O periods (was Initial Works C1) 38 0 05-Sep-22 21-Oct-22 05-Sep-22 10-Nov-22 17 310.C.ES.M011 C&ED Op. Office & Kennel Area - Site access WA 3310/7 and WA 3310/7A C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 05-Sep-22 0 Hols - No B/O periods (was 310.C.ES.M015 C&ED Op. Office & Kennel Area - Hoarding C1) C11_6 d/w - 10h/d - With 5 05-Sep-22 09-Sep-22 25-Oct-22 29-Oct-22 40 HK Hols - No B/O periods 310.C.ES.M019 C&ED Op. Office & Kennel Area - Carry out site survey + Report (was C11_6C3) d/w - 10h/d - With 7 05-Sep-22 13-Sep-22 26-Sep-22 05-Oct-22 17 HK Hols - No B/O periods 310.C.ES.M023 C&ED Op. Office & Kennel Area - Install monitoring point (was C11_6C3) d/w - 10h/d - With 1 14-Sep-22 14-Sep-22 06-Oct-22 06-Oct-22 17 HK Hols - No B/O periods 310.C.ES.M027 C&ED Op. Office & Kennel Area - UU detection and trial pit (was C11_6C3) d/w - 10h/d - With 6 15-Sep-22 21-Sep-22 07-Oct-22 13-Oct-22 17 HK Hols - No B/O periods 310.D.ES.M011 Submit BA8 consent application (foundation works) (was C01_7C3) d/w - 10h/d - No HK 28 19-Sep-22 16-Oct-22 26-Sep-22 23-Oct-22 7 Hols - No B/O periods (was 310.C.ES.M047.B01 C&ED Op. Office & Kennel Area - diversion of underground utilities (if any) C1) C11_6 d/w - 10h/d - With 24 22-Sep-22 21-Oct-22 14-Oct-22 10-Nov-22 17 HK Hols - No B/O periods Structural Works (was C3) 174 0 17-Oct-22 18-May-23 24-Oct-22 25-May-23 6 310.C.ES.M031 C&ED Op. Office & Kennel Area - BA10 notice of commencement of works C01_7 d/w - 10h/d - No HK 7 17-Oct-22 23-Oct-22 24-Oct-22 30-Oct-22 7 Hols - No B/O periods (was 310.C.ES.M035 C&ED Op. Office & Kennel Area - SI works C1) C11_6 d/w - 10h/d - With 10 24-Oct-22 03-Nov-22 31-Oct-22 10-Nov-22 6 HK Hols - No B/O periods 310.C.ES.M039 C&ED Op. Office & Kennel Area - Open Cut Excavation to FL (4351 m3) (was C11_6C3) d/w - 10h/d - With 21 04-Nov-22 28-Nov-22 11-Nov-22 05-Dec-22 6 HK Hols - No B/O periods 310.C.ES.M041 C&ED Op. Office & Kennel Area - Plate Load Test (was C11_6C3) d/w - 10h/d - With 7 29-Nov-22 06-Dec-22 06-Dec-22 13-Dec-22 6 HK Hols - No B/O periods 310.C.ES.M043 C&ED Op. Office & Kennel Area - Foundation/footing, bearing wall, backfill (7002m3) (was C11_6C3) d/w - 10h/d - With 30 07-Dec-22 12-Jan-23 14-Dec-22 19-Jan-23 6 HK Hols - No B/O periods 310.C.ES.M051 C&ED Op. Office & Kennel Area (GF) - Construction of base slab, column and walls (was C11_6C3) d/w - 10h/d - With 50 13-Jan-23 15-Mar-23 20-Jan-23 22-Mar-23 6 (1827m3) HK Hols - No B/O periods 310.C.ES.M059 C&ED Op. Office & Kennel Area - Construction of Water Pump Room, Generator Room, (was C11_6C3) d/w - 10h/d - With 30 16-Mar-23 24-Apr-23 23-Mar-23 02-May-23 6 LV Switch Room, Water Tank (127m3) HK Hols - No B/O periods 310.C.ES.M063 C&ED Op. Office & Kennel Area - Roof Level - Construction of roof slab, RC beam (was C11_6C3) d/w - 10h/d - With 30 13-Apr-23 18-May-23 20-Apr-23 25-May-23 6 (547m3) HK Hols - No B/O periods ABWF (was C11_6C3) d/w - 10h/d - With HK Hols 135- No B/O 0periods (was 06-Jun-23 C3) 16-Nov-23 13-Jun-23 04-Jan-24 39 310.C.EX.W1660 C&ED Op. Office & Kennel Area - Structure completed and falsework removal C11_6 d/w - 10h/d - With 0 06-Jun-23 13-Jun-23 6 HK Hols - No B/O periods 310.C.EX.W1616 C&ED Op. Office & Kennel Area - Partition Wall & Door Subframe (was C11_6C3) d/w - 10h/d - With 60 08-Jun-23 18-Aug-23 21-Jul-23 28-Sep-23 35 HK Hols - No B/O periods 310.C.EX.W1620 C&ED Op. Office & Kennel Area - Plastering & Screeding (was C11_6C3) d/w - 10h/d - With 60 20-Jun-23 30-Aug-23 02-Aug-23 12-Oct-23 35 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 194 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W1624 C&ED Op. Office & Kennel Area - Tiling & Stonework C11_6 d/w - 10h/d - With 60 04-Jul-23 11-Sep-23 14-Aug-23 25-Oct-23 35 HK Hols - No B/O periods 310.C.EX.W1628 C&ED Op. Office & Kennel Area - Suspended Ceiling Framework (was C11_6C3) d/w - 10h/d - With 60 15-Jul-23 22-Sep-23 25-Aug-23 06-Nov-23 35 HK Hols - No B/O periods 310.C.EX.W1632 C&ED Op. Office & Kennel Area - Sanitary Ware & Fixtures (was C11_6C3) d/w - 10h/d - With 60 27-Jul-23 06-Oct-23 06-Sep-23 17-Nov-23 35 HK Hols - No B/O periods 310.C.EX.W1636 C&ED Op. Office & Kennel Area - Fire Shutter, Door Sets & Ironmongery (was C11_6C3) d/w - 10h/d - With 60 08-Aug-23 18-Oct-23 22-Sep-23 04-Dec-23 39 HK Hols - No B/O periods 310.C.EX.W1640 C&ED Op. Office & Kennel Area - Glazing (was C11_6C3) d/w - 10h/d - With 60 19-Aug-23 31-Oct-23 06-Oct-23 15-Dec-23 39 HK Hols - No B/O periods 310.C.EX.W1644 C&ED Op. Office & Kennel Area - Ceiling Panels & Finishes (was C11_6C3) d/w - 10h/d - With 60 31-Aug-23 11-Nov-23 18-Oct-23 29-Dec-23 39 HK Hols - No B/O periods 310.C.EX.W1648 C&ED Op. Office & Kennel Area - Painting, Graphics & Signage (was C11_6C3) d/w - 10h/d - With 60 05-Sep-23 16-Nov-23 24-Oct-23 04-Jan-24 39 HK Hols - No B/O periods MEP Installation Works (was C11_6C3) d/w - 10h/d - With HK Hols 118- No B/O 0periods (was 29-Jun-23 C3) 17-Nov-23 07-Jul-23 29-Nov-23 10 Plumbing & Drainage Installation C11_6 d/w - 10h/d - With HK Hols 94- No B/O 0periods (was 29-Jun-23 C3) 19-Oct-23 07-Jul-23 27-Oct-23 6 310.C.EX.W1592 C&ED Op. Office & Kennel Area - Plumbing & Drainage 1st Fix & Installation C11_6 d/w - 10h/d - With 48 29-Jun-23 24-Aug-23 07-Jul-23 31-Aug-23 6 HK Hols - No B/O periods 310.C.EX.W1600 C&ED Op. Office & Kennel Area - Water Pump Installation (was C11_6C3) d/w - 10h/d - With 48 10-Jul-23 02-Sep-23 21-Jul-23 14-Sep-23 10 HK Hols - No B/O periods 310.C.EX.W1596 C&ED Op. Office & Kennel Area - Plumbing & Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 48 21-Jul-23 14-Sep-23 28-Jul-23 21-Sep-23 6 HK Hols - No B/O periods 310.C.EX.W1612 C&ED Op. Office & Kennel Area - Plumbing & Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 6 13-Oct-23 19-Oct-23 20-Oct-23 27-Oct-23 6 HK Hols - No B/O periods Electrical Installation (was C11_6C3) d/w - 10h/d - With HK Hols 106- No B/O 0periods (was 07-Jul-23 C3) 10-Nov-23 19-Jul-23 22-Nov-23 10 310.C.EX.W1500 C&ED Op. Office & Kennel Area - Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 50 07-Jul-23 02-Sep-23 19-Jul-23 14-Sep-23 10 HK Hols - No B/O periods 310.C.EX.W1508 C&ED Op. Office & Kennel Area - Switchgear Installation (was C11_6C3) d/w - 10h/d - With 48 04-Aug-23 28-Sep-23 16-Aug-23 12-Oct-23 10 HK Hols - No B/O periods 310.C.EX.W1512 C&ED Op. Office & Kennel Area - Emergency Genset Installation (was C11_6C3) d/w - 10h/d - With 48 04-Aug-23 28-Sep-23 16-Aug-23 12-Oct-23 10 HK Hols - No B/O periods 310.C.EX.W1504 C&ED Op. Office & Kennel Area - Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 50 04-Aug-23 03-Oct-23 04-Sep-23 03-Nov-23 26 HK Hols - No B/O periods 310.C.EX.W1516 C&ED Op. Office & Kennel Area - Power On to All Floors (was C11_6C3) d/w - 10h/d - With 0 28-Sep-23 12-Oct-23 10 HK Hols - No B/O periods 310.C.EX.W1528 C&ED Op. Office & Kennel Area - Electrical Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 6 04-Nov-23 10-Nov-23 16-Nov-23 22-Nov-23 10 HK Hols - No B/O periods Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 116- No B/O 0periods (was 03-Jul-23 C3) 17-Nov-23 17-Jul-23 29-Nov-23 10 310.C.EX.W1532 C&ED Op. Office & Kennel Area - Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 50 03-Jul-23 29-Aug-23 17-Jul-23 12-Sep-23 12 HK Hols - No B/O periods 310.C.EX.W1540 C&ED Op. Office & Kennel Area - FS Pump Installation (was C11_6C3) d/w - 10h/d - With 48 12-Jul-23 05-Sep-23 23-Aug-23 19-Oct-23 36 HK Hols - No B/O periods 310.C.EX.W1536 C&ED Op. Office & Kennel Area - Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 50 31-Jul-23 26-Sep-23 14-Aug-23 12-Oct-23 12 HK Hols - No B/O periods 310.C.EX.W1552 C&ED Op. Office & Kennel Area - Fire Services Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 6 11-Nov-23 17-Nov-23 23-Nov-23 29-Nov-23 10 HK Hols - No B/O periods MVAC Installation (was C11_6C3) d/w - 10h/d - With HK Hols 90- No B/O 0periods (was 04-Jul-23 C3) 18-Oct-23 05-Aug-23 21-Nov-23 28 310.C.EX.W1556 C&ED Op. Office & Kennel Area - MVAC 1st Fix & Installation C11_6 d/w - 10h/d - With 50 04-Jul-23 30-Aug-23 05-Aug-23 04-Oct-23 28 HK Hols - No B/O periods 310.C.EX.W1560 C&ED Op. Office & Kennel Area - MVAC 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 50 01-Aug-23 27-Sep-23 02-Sep-23 02-Nov-23 28 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 195 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W1572 C&ED Op. Office & Kennel Area - MVAC Final Fix & Adjustment C11_6 d/w - 10h/d - With 6 12-Oct-23 18-Oct-23 15-Nov-23 21-Nov-23 28 HK Hols - No B/O periods External Works (was C11_6C3) d/w - 10h/d - With HK Hols 150- No B/O 0periods (was 19-May-23 C3) 16-Nov-23 04-Aug-23 04-Jan-24 39 External Building Finishes C11_6 d/w - 10h/d - With HK Hols 63- No B/O 0periods (was 19-May-23 C3) 03-Aug-23 04-Aug-23 18-Oct-23 63 310.C.ES.M067 C&ED Op. Office & Kennel Area - Roof waterproofing & Roof Finishes (1153 m2) C11_6 d/w - 10h/d - With 15 19-May-23 06-Jun-23 04-Aug-23 21-Aug-23 63 HK Hols - No B/O periods 310.C.ES.P640 C&ED Op. Office & Kennel Area - External building finishes (was C11_6C3) d/w - 10h/d - With 48 07-Jun-23 03-Aug-23 22-Aug-23 18-Oct-23 63 HK Hols - No B/O periods Drainage and UU (was C11_6C3) d/w - 10h/d - With HK Hols 78- No B/O 0periods (was 07-Jun-23 C3) 07-Sep-23 22-Aug-23 07-Dec-23 75 310.C.ES.P620 C&ED Op. Office & Kennel Area - Building drainage and watermain works C11_6 d/w - 10h/d - With 48 07-Jun-23 03-Aug-23 22-Aug-23 18-Oct-23 63 HK Hols - No B/O periods 310.C.ES.P624 C&ED Op. Office & Kennel Area - AS Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 21 04-Aug-23 28-Aug-23 14-Nov-23 07-Dec-23 84 HK Hols - No B/O periods 310.C.ES.P628 C&ED Op. Office & Kennel Area - EL cable ducting + drawpits (was C11_6C3) d/w - 10h/d - With 21 04-Aug-23 28-Aug-23 19-Oct-23 13-Nov-23 63 HK Hols - No B/O periods 310.C.ES.P644 C&ED Op. Office & Kennel Area - CLP Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 30 04-Aug-23 07-Sep-23 03-Nov-23 07-Dec-23 75 HK Hols - No B/O periods Soft and Hard landscape & EVA Construction (was C11_6C3) d/w - 10h/d - With HK Hols 57- No B/O 0periods (was 08-Sep-23 C3) 16-Nov-23 14-Nov-23 04-Jan-24 39 310.C.ES.P632 C&ED Op. Office & Kennel Area - Hard and soft landscape wroks C11_6 d/w - 10h/d - With 21 08-Sep-23 04-Oct-23 08-Dec-23 04-Jan-24 75 HK Hols - No B/O periods 310.C.ES.C100 C&ED Op. Office & Kennel Area - Site Formation Works and Road Works for EVA (was C3) C11_6 d/w - 10h/d - With 42 26-Sep-23 16-Nov-23 14-Nov-23 04-Jan-24 39 HK Hols - No B/O periods WSA - Comm. Equipment Building D (was C3) 217 0 29-May-22 17-Feb-23 11-Jun-22 18-Feb-23 1 Procurement C01_7 d/w - 10h/d - No HK Hols163 - No B/O periods 0 (was29-May-22 C1) 07-Nov-22 11-Jun-22 08-Nov-22 1 Major Materials ABWF C01_7 d/w - 10h/d - No HK Hols134 - No B/O periods 0 (was07-Jun-22 C1) 18-Oct-22 15-Jun-22 26-Oct-22 8 310.P.WS.M510 Comm Eqpt Bldg D (Procurement ABWF)- C01_7 d/w - 10h/d - No HK 7 07-Jun-22 13-Jun-22 15-Jun-22 21-Jun-22 8 louvres,doors,windows,handrails,cladding&Others-Place Order of Materials Hols - No B/O periods (was 310.P.WS.M522 Comm Eqpt Bldg D (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 120 14-Jun-22 11-Oct-22 22-Jun-22 19-Oct-22 8 Hols - No B/O periods (was 310.P.WS.M528 Comm Eqpt Bldg D (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 7 12-Oct-22 18-Oct-22 20-Oct-22 26-Oct-22 8 Hols - No B/O periods (was Major Materials MEP C1) C01_7 d/w - 10h/d - No HK Hols163 - No B/O periods 0 (was29-May-22 C1) 07-Nov-22 11-Jun-22 08-Nov-22 1 310.P.WS.M513 Comm Eqpt Bldg D (Procurement FS Materials) - NOVEC 1230, FA system, Sprinkler C01_7 d/w - 10h/d - No HK 70 29-May-22 06-Aug-22 11-Jun-22 19-Aug-22 13 system & Others -Place Order for Material Hols - No B/O periods (was 310.P.WS.M519 Comm Eqpt Bldg D (Procurement Electrical Materials) - cable trays,LV C1) C01_7 d/w - 10h/d - No HK 30 05-Jun-22 04-Jul-22 11-Jun-22 10-Jul-22 6 panels&Others-Place Order for Material Hols - No B/O periods (was 310.P.WS.M656 Comm Eqpt Bldg D (Procurement FS Materials) - NOVEC 1230, FA, Sprinkler & C1) C01_7 d/w - 10h/d - No HK 130 12-Jun-22 19-Oct-22 25-Jun-22 01-Nov-22 13 Others-Manufacturing of Material Hols - No B/O periods (was 310.P.WS.M664 Comm Eqpt Bldg D (Procurement Electrical Materials)-cable trays,LV C1) C01_7 d/w - 10h/d - No HK 130 19-Jun-22 26-Oct-22 25-Jun-22 01-Nov-22 6 panels,generators&Others-Manufacuting of Material Hols - No B/O periods (was 310.P.WS.M516 Comm Eqpt Bldg D (Procurement MVAC Materials) - ventilation fan, a/c units,air C1) C01_7 d/w - 10h/d - No HK 65 27-Jun-22 30-Aug-22 28-Jun-22 31-Aug-22 1 ducting&Others - Place Order for Material Hols - No B/O periods (was 310.P.WS.M660 Comm Eqpt Bldg D (Procurement MVAC Materials) - ventilation fan, a/c units, air C1) C01_7 d/w - 10h/d - No HK 120 04-Jul-22 31-Oct-22 05-Jul-22 01-Nov-22 1 ducting&Others-Manufacturing of Material Hols - No B/O periods (was 310.P.WS.M668 Comm Eqpt Bldg D (Procurement MEP) - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 7 01-Nov-22 07-Nov-22 02-Nov-22 08-Nov-22 1 Hols - No B/O periods (was Initial Works C1) 5 0 05-Sep-22 09-Sep-22 05-Sep-22 12-Sep-22 1 310.C.WS.M516 WSA - Comm Eqpt Bldg D - Site access WA 3310/9 C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 05-Sep-22 0 Hols - No B/O periods (was 310.C.WS.M522 WSA - Comm Eqpt Bldg D - Site survey, hoarding, UU detection/trial pits C1) C11_6 d/w - 10h/d - With 3 05-Sep-22 07-Sep-22 06-Sep-22 08-Sep-22 1 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 196 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.WS.M528 WSA - Comm Eqpt Bldg D - Install Instrumentation (piezometers, settlement markers, C11_6 d/w - 10h/d - With 3 05-Sep-22 07-Sep-22 08-Sep-22 12-Sep-22 3 groundwater checkpoint) HK Hols - No B/O periods 310.C.WS.M529.B01 WSA - Comm Eqpt Bldg D - Diversion of underground utilities (if any) (was C11_6C3) d/w - 10h/d - With 3 07-Sep-22 09-Sep-22 08-Sep-22 12-Sep-22 1 HK Hols - No B/O periods Structural Works (was C3) 79 0 20-Jul-22 22-Oct-22 30-Aug-22 14-Nov-22 19 310.C.WS.M510 WSA - Comm Eqpt Bldg D - Submit BA8 consent application (foundation works) C01_7 d/w - 10h/d - No HK 7 20-Jul-22 26-Jul-22 30-Aug-22 05-Sep-22 41 Hols - No B/O periods (was 310.C.WS.M513 WSA - Comm Eqpt Bldg D - Submit BA10 notice of commencement to work C1) C01_7 d/w - 10h/d - No HK 7 27-Jul-22 02-Aug-22 06-Sep-22 12-Sep-22 41 Hols - No B/O periods (was 310.C.WS.M531 WSA - Comm Eqpt Bldg D - SI works C1) C11_6 d/w - 10h/d - With 1 08-Sep-22 08-Sep-22 12-Sep-22 12-Sep-22 2 HK Hols - No B/O periods 310.C.WS.M534 WSA - Comm Eqpt Bldg D - Open cut excavation to foundation level (596m3) (was C11_6C3) d/w - 10h/d - With 2 12-Sep-22 13-Sep-22 13-Sep-22 14-Sep-22 1 HK Hols - No B/O periods 310.C.WS.M537 WSA - Comm Eqpt Bldg D - Foundation Works - Plate load test & Report (was C11_6C3) d/w - 10h/d - With 12 14-Sep-22 27-Sep-22 15-Sep-22 28-Sep-22 1 HK Hols - No B/O periods 310.C.WS.M541 WSA - Comm Eqpt Bldg D - Foundation Works - Footing & Backfilling (105m3) (was C11_6C3) d/w - 10h/d - With 6 28-Sep-22 06-Oct-22 29-Sep-22 07-Oct-22 1 HK Hols - No B/O periods 310.C.WS.M543 WSA - Comm Eqpt Bldg D - Ground Floor - construction of base slab and columns (was C11_6C3) d/w - 10h/d - With 6 07-Oct-22 13-Oct-22 08-Oct-22 14-Oct-22 1 (124m3) HK Hols - No B/O periods 310.C.WS.M546 WSA - Comm Eqpt Bldg D - Roof - construction of walls, RC beams and roof slab (was C11_6C3) d/w - 10h/d - With 10 12-Oct-22 22-Oct-22 03-Nov-22 14-Nov-22 19 (226m3) HK Hols - No B/O periods ABWF (was C11_6C3) d/w - 10h/d - With HK Hols 54- No B/O 0periods (was 25-Oct-22 C3) 28-Dec-22 26-Oct-22 29-Dec-22 1 310.C.EX.W1824 WSA - Comm Eqpt Bldg D - Structure completed and falsework removal C11_6 d/w - 10h/d - With 0 25-Oct-22 26-Oct-22 1 HK Hols - No B/O periods 310.C.EX.W1780 WSA - Comm Eqpt Bldg D - Partition Wall & Door Subframe (was C11_6C3) d/w - 10h/d - With 30 26-Oct-22 29-Nov-22 27-Oct-22 30-Nov-22 1 HK Hols - No B/O periods 310.C.EX.W1784 WSA - Comm Eqpt Bldg D - Plastering & Screeding (was C11_6C3) d/w - 10h/d - With 30 29-Oct-22 02-Dec-22 31-Oct-22 03-Dec-22 1 HK Hols - No B/O periods 310.C.EX.W1788 WSA - Comm Eqpt Bldg D - Tiling & Stonework (was C11_6C3) d/w - 10h/d - With 30 02-Nov-22 06-Dec-22 03-Nov-22 07-Dec-22 1 HK Hols - No B/O periods 310.C.EX.W1792 WSA - Comm Eqpt Bldg D - Suspended Ceiling Framework (was C11_6C3) d/w - 10h/d - With 30 05-Nov-22 09-Dec-22 07-Nov-22 10-Dec-22 1 HK Hols - No B/O periods 310.C.EX.W1796 WSA - Comm Eqpt Bldg D - Sanitary Ware & Fixtures (was C11_6C3) d/w - 10h/d - With 30 09-Nov-22 13-Dec-22 10-Nov-22 14-Dec-22 1 HK Hols - No B/O periods 310.C.EX.W1800 WSA - Comm Eqpt Bldg D - Door Sets & Ironmongery (was C11_6C3) d/w - 10h/d - With 30 12-Nov-22 16-Dec-22 14-Nov-22 17-Dec-22 1 HK Hols - No B/O periods 310.C.EX.W1804 WSA - Comm Eqpt Bldg D - Glazing (was C11_6C3) d/w - 10h/d - With 30 16-Nov-22 20-Dec-22 17-Nov-22 21-Dec-22 1 HK Hols - No B/O periods 310.C.EX.W1808 WSA - Comm Eqpt Bldg D - Ceiling Panels & Finishes (was C11_6C3) d/w - 10h/d - With 30 19-Nov-22 23-Dec-22 21-Nov-22 24-Dec-22 1 HK Hols - No B/O periods 310.C.EX.W1812 WSA - Comm Eqpt Bldg D - Painting, Graphics & Signage (was C11_6C3) d/w - 10h/d - With 30 23-Nov-22 28-Dec-22 24-Nov-22 29-Dec-22 1 HK Hols - No B/O periods MEP Installation Works (was C11_6C3) d/w - 10h/d - With HK Hols 63- No B/O 0periods (was 03-Nov-22 C3) 17-Jan-23 05-Nov-22 04-Feb-23 13 Drainage Installation C11_6 d/w - 10h/d - With HK Hols 53- No B/O 0periods (was 08-Nov-22 C3) 10-Jan-23 09-Nov-22 11-Jan-23 1 310.C.EX.W1756 WSA - Comm Eqpt Bldg D - Drainage 1st Fix & Installation C11_6 d/w - 10h/d - With 30 08-Nov-22 12-Dec-22 09-Nov-22 13-Dec-22 1 HK Hols - No B/O periods 310.C.EX.W1760 WSA - Comm Eqpt Bldg D - Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 30 22-Nov-22 27-Dec-22 25-Nov-22 30-Dec-22 3 HK Hols - No B/O periods 310.C.EX.W1776 WSA - Comm Eqpt Bldg D - Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 5 05-Jan-23 10-Jan-23 06-Jan-23 11-Jan-23 1 HK Hols - No B/O periods Electrical Installation (was C11_6C3) d/w - 10h/d - With HK Hols 63- No B/O 0periods (was 03-Nov-22 C3) 17-Jan-23 05-Nov-22 19-Jan-23 2
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 197 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W1664 WSA - Comm Eqpt Bldg D - Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 30 03-Nov-22 07-Dec-22 05-Nov-22 09-Dec-22 2 HK Hols - No B/O periods 310.C.EX.W1668 WSA - Comm Eqpt Bldg D - Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 30 15-Nov-22 19-Dec-22 17-Nov-22 21-Dec-22 2 HK Hols - No B/O periods 310.C.EX.W1672 WSA - Comm Eqpt Bldg D - Switchgear Installation (was C11_6C3) d/w - 10h/d - With 18 24-Nov-22 14-Dec-22 01-Dec-22 21-Dec-22 6 HK Hols - No B/O periods 310.C.EX.W1680 WSA - Comm Eqpt Bldg D - Power On to All Floors (was C11_6C3) d/w - 10h/d - With 0 19-Dec-22 21-Dec-22 2 HK Hols - No B/O periods 310.C.EX.W1692 WSA - Comm Eqpt Bldg D - Electrical Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 5 12-Jan-23 17-Jan-23 14-Jan-23 19-Jan-23 2 HK Hols - No B/O periods Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 63- No B/O 0periods (was 03-Nov-22 C3) 17-Jan-23 17-Nov-22 19-Jan-23 2 310.C.EX.W1696 WSA - Comm Eqpt Bldg D - Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 30 03-Nov-22 07-Dec-22 17-Nov-22 21-Dec-22 12 HK Hols - No B/O periods 310.C.EX.W1700 WSA - Comm Eqpt Bldg D - Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 30 19-Nov-22 23-Dec-22 03-Dec-22 09-Jan-23 12 HK Hols - No B/O periods 310.C.EX.W1716 WSA - Comm Eqpt Bldg D - Fire Service Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 5 12-Jan-23 17-Jan-23 14-Jan-23 19-Jan-23 2 HK Hols - No B/O periods MVAC Installation (was C11_6C3) d/w - 10h/d - With HK Hols 53- No B/O 0periods (was 03-Nov-22 C3) 05-Jan-23 30-Nov-22 04-Feb-23 23 310.C.EX.W1720 WSA - Comm Eqpt Bldg D - MVAC 1st Fix & Installation C11_6 d/w - 10h/d - With 30 03-Nov-22 07-Dec-22 30-Nov-22 05-Jan-23 23 HK Hols - No B/O periods 310.C.EX.W1724 WSA - Comm Eqpt Bldg D - MVAC 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 30 15-Nov-22 19-Dec-22 16-Dec-22 21-Jan-23 27 HK Hols - No B/O periods 310.C.EX.W1736 WSA - Comm Eqpt Bldg D - MVAC Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 5 30-Dec-22 05-Jan-23 31-Jan-23 04-Feb-23 23 HK Hols - No B/O periods External Works (was C11_6C3) d/w - 10h/d - With HK Hols 96- No B/O 0periods (was 24-Oct-22 C3) 17-Feb-23 22-Nov-22 18-Feb-23 1 External Building Finishes C11_6 d/w - 10h/d - With HK Hols 56- No B/O 0periods (was 24-Oct-22 C3) 28-Dec-22 22-Nov-22 29-Dec-22 1 310.C.WS.M549 WSA - Comm Eqpt Bldg D - Roof Slab - waterproofing & Roof Finishes (11 m2) C11_6 d/w - 10h/d - With 2 24-Oct-22 25-Oct-22 22-Nov-22 23-Nov-22 25 HK Hols - No B/O periods 310.C.ES.P668 WSA - Comm Eqpt Bldg D - External building finishes (was C11_6C3) d/w - 10h/d - With 30 23-Nov-22 28-Dec-22 24-Nov-22 29-Dec-22 1 HK Hols - No B/O periods Drainage and UU (was C11_6C3) d/w - 10h/d - With HK Hols 42- No B/O 0periods (was 23-Nov-22 C3) 12-Jan-23 24-Nov-22 04-Feb-23 17 310.C.ES.P648 WSA - Comm Eqpt Bldg D - Building drainage and watermain works C11_6 d/w - 10h/d - With 28 23-Nov-22 24-Dec-22 24-Nov-22 27-Dec-22 1 HK Hols - No B/O periods 310.C.ES.P652 WSA - Comm Eqpt Bldg D - AS Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 14 27-Dec-22 12-Jan-23 17-Jan-23 04-Feb-23 17 HK Hols - No B/O periods 310.C.ES.P656 WSA - Comm Eqpt Bldg D - EL cable ducting + drawpits (was C11_6C3) d/w - 10h/d - With 14 27-Dec-22 12-Jan-23 28-Dec-22 13-Jan-23 1 HK Hols - No B/O periods Soft and Hard landscape & EVA Construction (was C11_6C3) d/w - 10h/d - With HK Hols 28- No B/O 0periods (was 13-Jan-23 C3) 17-Feb-23 14-Jan-23 18-Feb-23 1 310.C.ES.P660 WSA - Comm Eqpt Bldg D - Hard and soft landscape works C11_6 d/w - 10h/d - With 12 13-Jan-23 30-Jan-23 06-Feb-23 18-Feb-23 17 HK Hols - No B/O periods 310.C.WS.C100 WSA - Comm Eqpt Bldg D - Site Formation Works and Road Works for EVA (was C11_6C3) d/w - 10h/d - With 28 13-Jan-23 17-Feb-23 14-Jan-23 18-Feb-23 1 HK Hols - No B/O periods ESA - GSE Vehicle Wash Facility (was C3) 199 0 28-May-22 26-Jan-23 22-Jun-22 28-Jan-23 2 Procurement C01_7 d/w - 10h/d - No HK Hols165 - No B/O periods 0 (was28-May-22 C1) 08-Nov-22 22-Jun-22 14-Nov-22 6 Major Materials ABWF C01_7 d/w - 10h/d - No HK Hols134 - No B/O periods 0 (was28-Jun-22 C1) 08-Nov-22 04-Jul-22 14-Nov-22 6 310.P.ES.M610 GSE Vehicle Wash Facility (Procurement ABWF)- louvres, doors, windows, handrails, C01_7 d/w - 10h/d - No HK 7 28-Jun-22 04-Jul-22 04-Jul-22 10-Jul-22 6 cladding&Others-Place Order Hols - No B/O periods (was 310.P.ES.M619 GSE Vehicle Wash Facility (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 120 05-Jul-22 01-Nov-22 11-Jul-22 07-Nov-22 6 Hols - No B/O periods (was 310.P.ES.M625 GSE Vehicle Wash Facility (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 7 02-Nov-22 08-Nov-22 08-Nov-22 14-Nov-22 6 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 198 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Major Materials MEP C01_7 d/w - 10h/d - No HK Hols165 - No B/O periods 0 (was28-May-22 C1) 08-Nov-22 22-Jun-22 14-Nov-22 6 310.P.ES.M616 GSE Vehicle Wash Facility (Procurement Electrical & MVAC C01_7 d/w - 10h/d - No HK 30 28-May-22 26-Jun-22 27-Jun-22 26-Jul-22 30 Materials)-power&lights&Others-Place Order for Material Hols - No B/O periods (was 310.P.ES.M673 GSE Vehicle Wash Facility (Procurement Electrical & MVAC Materials) - C1) C01_7 d/w - 10h/d - No HK 120 11-Jun-22 08-Oct-22 11-Jul-22 07-Nov-22 30 power&lights&Others-Manufacturing of Material Hols - No B/O periods (was 310.P.ES.M613 GSE Vehicle Wash Facility (Procurement FS and P&D Materials) - FA system,Hose C1) C01_7 d/w - 10h/d - No HK 80 16-Jun-22 03-Sep-22 22-Jun-22 09-Sep-22 6 Wheel&Others-Place Order for Material Hols - No B/O periods (was 310.P.ES.M669 GSE Vehicle Wash Facility (Procurement FS and P&D Materials) - FA system, Hose C1) C01_7 d/w - 10h/d - No HK 125 30-Jun-22 01-Nov-22 06-Jul-22 07-Nov-22 6 Wheel&Others-Manufacturing of Material Hols - No B/O periods (was 310.P.ES.M677 GSE Vehicle Wash Facility (Procurement MEP) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 7 02-Nov-22 08-Nov-22 08-Nov-22 14-Nov-22 6 Hols - No B/O periods (was Initial Works C1) 28 0 05-Sep-22 10-Oct-22 05-Sep-22 17-Oct-22 6 310.C.ES.M725 ESA - GSE Wash Facility - Site access WA 3310/7, 7A C01_7 d/w - 10h/d - No HK 0 05-Sep-22* 05-Sep-22 0 Hols - No B/O periods (was 310.C.ES.M731 ESA - GSE Wash Facility - Site survey, hoarding, UU detection/trial pit C1) C11_6 d/w - 10h/d - With 4 05-Sep-22 08-Sep-22 05-Sep-22 08-Sep-22 0 HK Hols - No B/O periods 310.C.ES.M737 ESA - GSE Wash Facility - Install Instrumentation (piezometers, settlement markers, (was C11_6C3) d/w - 10h/d - With 5 09-Sep-22 15-Sep-22 09-Sep-22 15-Sep-22 0 groundwater checkpoint) HK Hols - No B/O periods 310.C.ES.M735.B01 ESA - GSE Wash Facility - Diversion of underground utilities (if any) (was C11_6C3) d/w - 10h/d - With 24 09-Sep-22 10-Oct-22 17-Sep-22 17-Oct-22 6 HK Hols - No B/O periods Structural Works (was C3) 45 0 16-Sep-22 09-Nov-22 16-Sep-22 09-Nov-22 0 310.C.TC.M600 ESA - GSE Wash Facility - Submit BA8 consent application C01_7 d/w - 10h/d - No HK 7 16-Sep-22 22-Sep-22 16-Sep-22 22-Sep-22 0 Hols - No B/O periods (was 310.C.TC.M456 ESA - GSE Wash Facility - submit BA10 notice of commencement of work C1) C01_7 d/w - 10h/d - No HK 7 23-Sep-22 29-Sep-22 23-Sep-22 29-Sep-22 0 Hols - No B/O periods (was 310.C.TC.M420 ESA - GSE Wash Facility - SI works + reports C1) C11_6 d/w - 10h/d - With 3 30-Sep-22 05-Oct-22 30-Sep-22 05-Oct-22 0 HK Hols - No B/O periods 310.C.TC.M448 ESA - GSE Wash Facility - submit Geotechnical Assessment Report to PM (was C11_6C3) d/w - 10h/d - With 2 06-Oct-22 07-Oct-22 06-Oct-22 07-Oct-22 0 HK Hols - No B/O periods 310.C.TC.M424 ESA - GSE Wash Facility - backfill from +3.0mPD (handover level) to +5.65mPD (FL) (was C03_7C3) d/w - 10h/d - With 7 06-Oct-22 12-Oct-22 11-Oct-22 17-Oct-22 5 HK Hols - No B/O periods 310.C.TC.M452 ESA - GSE Wash Facility - PM submit Geotechnical Assessment Report to BD C01_7 d/w - 10h/d - No HK 10 08-Oct-22 17-Oct-22 08-Oct-22 17-Oct-22 0 Hols - No B/O periods (was 310.C.TC.M429 ESA - GSE Wash Facility - Foundation Works -plate load test, footing + backfill to GL C1) C03_7 d/w - 10h/d - With 12 18-Oct-22 29-Oct-22 18-Oct-22 29-Oct-22 0 (Exc=638m3, Conc=163m3) HK Hols - No B/O periods 310.C.TC.M436 ESA - GSE Wash Facility - Ground Floor - construction of base slab and columns (57m3) C03_7 d/w - 10h/d - With 5 30-Oct-22 03-Nov-22 30-Oct-22 03-Nov-22 0 HK Hols - No B/O periods 310.C.TC.M440 ESA - GSE Wash Facility - Roof - construction of walls, RC beams and roof slab (249m3) C03_7 d/w - 10h/d - With 6 04-Nov-22 09-Nov-22 04-Nov-22 09-Nov-22 0 HK Hols - No B/O periods ABWF C11_6 d/w - 10h/d - With HK Hols 50- No B/O 0periods (was 11-Nov-22 C3) 11-Jan-23 11-Nov-22 13-Jan-23 2 310.C.EX.W1964 ESA - GSE Wash Facility -Structure completed and falsework removal C11_6 d/w - 10h/d - With 0 11-Nov-22 11-Nov-22 0 HK Hols - No B/O periods 310.C.EX.W1928 ESA - GSE Wash Facility - Partition Wall & Door Subframe (was C11_6C3) d/w - 10h/d - With 30 12-Nov-22 16-Dec-22 15-Nov-22 19-Dec-22 2 HK Hols - No B/O periods 310.C.EX.W1932 ESA - GSE Wash Facility - Plastering & Screeding (was C11_6C3) d/w - 10h/d - With 30 17-Nov-22 21-Dec-22 19-Nov-22 23-Dec-22 2 HK Hols - No B/O periods 310.C.EX.W1936 ESA - GSE Wash Facility - Tiling & Stonework (was C11_6C3) d/w - 10h/d - With 30 22-Nov-22 27-Dec-22 24-Nov-22 29-Dec-22 2 HK Hols - No B/O periods 310.C.EX.W1948 ESA - GSE Wash Facility - Door Sets & Ironmongery (was C11_6C3) d/w - 10h/d - With 30 26-Nov-22 31-Dec-22 29-Nov-22 04-Jan-23 2 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 199 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W1956 ESA - GSE Wash Facility - Ceiling Finishes C11_6 d/w - 10h/d - With 30 01-Dec-22 06-Jan-23 03-Dec-22 09-Jan-23 2 HK Hols - No B/O periods 310.C.EX.W1960 ESA - GSE Wash Facility - Painting, Graphics & Signage (was C11_6C3) d/w - 10h/d - With 30 06-Dec-22 11-Jan-23 08-Dec-22 13-Jan-23 2 HK Hols - No B/O periods MEP Installation Works (was C11_6C3) d/w - 10h/d - With HK Hols 55- No B/O 0periods (was 15-Nov-22 C3) 19-Jan-23 15-Nov-22 19-Jan-23 0 Plumbing & Drainage Installation C11_6 d/w - 10h/d - With HK Hols 39- No B/O 0periods (was 15-Nov-22 C3) 30-Dec-22 15-Nov-22 30-Dec-22 0 310.C.EX.W1904 ESA - GSE Wash Facility - Plumbing & Drainage 1st Fix & Installation C11_6 d/w - 10h/d - With 22 15-Nov-22 09-Dec-22 15-Nov-22 09-Dec-22 0 HK Hols - No B/O periods 310.C.EX.W1912 ESA - GSE Wash Facility - Water Pump Installation (was C11_6C3) d/w - 10h/d - With 18 19-Nov-22 09-Dec-22 19-Nov-22 09-Dec-22 0 HK Hols - No B/O periods 310.C.EX.W1908 ESA - GSE Wash Facility - Plumbing & Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 24 21-Nov-22 17-Dec-22 22-Nov-22 19-Dec-22 1 HK Hols - No B/O periods 310.C.EX.W1924 ESA - GSE Wash Facility - Plumbing & Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 5 24-Dec-22 30-Dec-22 24-Dec-22 30-Dec-22 0 HK Hols - No B/O periods Electrical Installation (was C11_6C3) d/w - 10h/d - With HK Hols 52- No B/O 0periods (was 18-Nov-22 C3) 19-Jan-23 18-Nov-22 19-Jan-23 0 310.C.EX.W1828 ESA - GSE Wash Facility - Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 24 18-Nov-22 15-Dec-22 18-Nov-22 15-Dec-22 0 HK Hols - No B/O periods 310.C.EX.W1832 ESA - GSE Wash Facility - Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 24 26-Nov-22 23-Dec-22 26-Nov-22 23-Dec-22 0 HK Hols - No B/O periods 310.C.EX.W1844 ESA - GSE Wash Facility - Power On (was C11_6C3) d/w - 10h/d - With 0 23-Dec-22 23-Dec-22 0 HK Hols - No B/O periods 310.C.EX.W1856 ESA - GSE Wash Facility - Electrical Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 5 14-Jan-23 19-Jan-23 14-Jan-23 19-Jan-23 0 HK Hols - No B/O periods Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 52- No B/O 0periods (was 18-Nov-22 C3) 19-Jan-23 21-Nov-22 19-Jan-23 0 310.C.EX.W1860 ESA - GSE Wash Facility - Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 24 18-Nov-22 15-Dec-22 21-Nov-22 17-Dec-22 2 HK Hols - No B/O periods 310.C.EX.W1864 ESA - GSE Wash Facility - Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 24 26-Nov-22 23-Dec-22 29-Nov-22 27-Dec-22 2 HK Hols - No B/O periods 310.C.EX.W1868 ESA - GSE Wash Facility - FS Pump Installation (was C11_6C3) d/w - 10h/d - With 24 30-Nov-22 28-Dec-22 08-Dec-22 06-Jan-23 7 HK Hols - No B/O periods 310.C.EX.W1880 ESA - GSE Wash Facility - Fire Services Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 5 14-Jan-23 19-Jan-23 14-Jan-23 19-Jan-23 0 HK Hols - No B/O periods External Works (was C3) 105 0 19-Sep-22 26-Jan-23 26-Nov-22 28-Jan-23 2 External Building Finishes 52 0 10-Nov-22 11-Jan-23 09-Dec-22 13-Jan-23 2 310.C.TC.M444 ESA - GSE Wash Facility - Roof Slab - waterproofing & Roof Finishes C03_7 d/w - 10h/d - With 1 10-Nov-22 10-Nov-22 09-Dec-22 09-Dec-22 29 HK Hols - No B/O periods 310.C.ES.P692 ESA - GSE Wash Facility - External building finishes C11_6 d/w - 10h/d - With 28 08-Dec-22 11-Jan-23 10-Dec-22 13-Jan-23 2 HK Hols - No B/O periods Drainage and UU (was C3) 95 0 19-Sep-22 11-Jan-23 26-Nov-22 13-Jan-23 2 310.C.TC.M604.B01 ESA - GSE Wash Facility - Submit BA8 consent application (Drainage Works) C01_7 d/w - 10h/d - No HK 7 19-Sep-22 25-Sep-22 26-Nov-22 02-Dec-22 68 Hols - No B/O periods (was 310.C.TC.M608.B01 ESA - GSE Wash Facility - submit BA10 notice of commencement of work (Drainage C1) C01_7 d/w - 10h/d - No HK 7 26-Sep-22 02-Oct-22 03-Dec-22 09-Dec-22 68 Works) Hols - No B/O periods (was 310.C.ES.P672 ESA - GSE Wash Facility - Building drainage and watermain works C1) C11_6 d/w - 10h/d - With 21 08-Dec-22 03-Jan-23 10-Dec-22 05-Jan-23 2 HK Hols - No B/O periods 310.C.ES.P676 ESA - GSE Wash Facility - AS Cable ducts + drawpits (was C3) C11_6 d/w - 10h/d - With 14 24-Dec-22 11-Jan-23 28-Dec-22 13-Jan-23 2 HK Hols - No B/O periods 310.C.ES.P680 ESA - GSE Wash Facility - EL cable ducting + drawpits (was C11_6C3) d/w - 10h/d - With 14 24-Dec-22 11-Jan-23 28-Dec-22 13-Jan-23 2 HK Hols - No B/O periods Soft and Hard landscape & EVA Construction (was C11_6C3) d/w - 10h/d - With HK Hols 21- No B/O 0periods (was 29-Dec-22 C3) 26-Jan-23 31-Dec-22 28-Jan-23 2
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 200 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.ES.C200 ESA - GSE Wash Facility - Site Formation Works and Road Works for EVA C11_6 d/w - 10h/d - With 21 29-Dec-22 26-Jan-23 31-Dec-22 28-Jan-23 2 HK Hols - No B/O periods 310.C.ES.P684 ESA - GSE Wash Facility - Hard and soft landscape works (was C11_6C3) d/w - 10h/d - With 10 12-Jan-23 26-Jan-23 14-Jan-23 28-Jan-23 2 HK Hols - No B/O periods WSA - GSE Battery Charging B (was C3) 256 2 19-May-22 24-Mar-23 04-Jun-22 18-Aug-23 118 Procurement C01_7 d/w - 10h/d - No HK Hols212 - No B/O periods 0 (was19-May-22 C1) 16-Dec-22 04-Jun-22 28-Dec-22 12 Major Materials ABWF C01_7 d/w - 10h/d - No HK Hols121 - No B/O periods 0 (was21-Jun-22 C1) 19-Oct-22 18-Jul-22 15-Nov-22 27 310.P.WS.M010 GSE Battery Charging B (Procurement ABWF)- louvres,doors,raised floor panels,cat C01_7 d/w - 10h/d - No HK 4 21-Jun-22 24-Jun-22 18-Jul-22 21-Jul-22 27 ladder&Others-Place Order Hols - No B/O periods (was 310.P.WS.M026 GSE Battery Charging B (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 110 25-Jun-22 12-Oct-22 22-Jul-22 08-Nov-22 27 Hols - No B/O periods (was 310.P.WS.M034 GSE Battery Charging B (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 7 13-Oct-22 19-Oct-22 09-Nov-22 15-Nov-22 27 Hols - No B/O periods (was Major Materials MEP C1) C01_7 d/w - 10h/d - No HK Hols212 - No B/O periods 0 (was19-May-22 C1) 16-Dec-22 04-Jun-22 28-Dec-22 12 310.P.WS.M018 GSE Battery Charging B (Procurement Electrical & MVAC Materials) - AC, LV C01_7 d/w - 10h/d - No HK 50 19-May-22 07-Jul-22 28-Jun-22 16-Aug-22 40 switchboard & Others-Place Order for Material Hols - No B/O periods (was 310.P.WS.M014 GSE Battery Charging B (Procurement FS and P&D Materials) - NOVEC 1230, FA & C1) C01_7 d/w - 10h/d - No HK 180 23-May-22 18-Nov-22 04-Jun-22 30-Nov-22 12 Others-Place Order for Material Hols - No B/O periods (was 310.P.WS.M672 GSE Battery Charging B (Procurement FS and P&D Materials) - NOVEC 1230, C1) C01_7 d/w - 10h/d - No HK 180 06-Jun-22 02-Dec-22 18-Jun-22 14-Dec-22 12 FA&Others-Manufacturing of Material Hols - No B/O periods (was 310.P.WS.M676 GSE Battery Charging B (Procurement Electrical & MVAC Materials) - AC, LV C1) d/w - 10h/d - No HK C01_7 120 08-Jul-22 04-Nov-22 17-Aug-22 14-Dec-22 40 switchboard&Others-Manufacturing of Material Hols - No B/O periods (was 310.P.WS.M680 GSE Battery Charging B (Procurement MEP) - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 14 03-Dec-22 16-Dec-22 15-Dec-22 28-Dec-22 12 Hols - No B/O periods (was Initial Works C1) 24 0 04-Jul-22 31-Jul-22 04-Jul-22 25-Aug-22 22 310.C.WS.M010 GSE Battery Charging B - Site access WA 3310/12 C01_7 d/w - 10h/d - No HK 0 04-Jul-22* 04-Jul-22 0 Hols - No B/O periods (was 310.C.WS.M018 GSE Battery Charging B - Site survey, Hoarding C1) C11_6 d/w - 10h/d - With 4 04-Jul-22 07-Jul-22 28-Jul-22 01-Aug-22 21 HK Hols - No B/O periods 310.C.WS.M022 GSE Battery Charging B - Install monitoring point, UU detection/trial pit (was C03_7C3) d/w - 10h/d - With 10 08-Jul-22 17-Jul-22 02-Aug-22 11-Aug-22 25 HK Hols - No B/O periods 310.S.TC.N242 GSE Battery Charging B - Submit BA8 consent application (foundation works) C01_7 d/w - 10h/d - No HK 7 18-Jul-22 24-Jul-22 10-Aug-22 16-Aug-22 23 Hols - No B/O periods (was 310.C.WS.M038.B01 GSE Battery Charging B - Diversion of underground utilities (if any) C1) C01_7 d/w - 10h/d - No HK 14 18-Jul-22 31-Jul-22 12-Aug-22 25-Aug-22 25 Hols - No B/O periods (was Foundation Works C1) 41 0 25-Jul-22 10-Sep-22 17-Aug-22 05-Oct-22 19 310.C.WS.M029 GSE Battery Charging B - BA10 notice of commencement of works C01_7 d/w - 10h/d - No HK 7 25-Jul-22 31-Jul-22 17-Aug-22 23-Aug-22 23 Hols - No B/O periods (was 310.C.WS.M033 GSE Battery Charging B - SI works C1) C11_6 d/w - 10h/d - With 2 01-Aug-22 02-Aug-22 24-Aug-22 25-Aug-22 20 HK Hols - No B/O periods 310.C.WS.M037 GSE Battery Charging B - Open Cut Excavation to FL(1,326m3) (was C11_6C3) d/w - 10h/d - With 3 03-Aug-22 05-Aug-22 26-Aug-22 29-Aug-22 20 HK Hols - No B/O periods 310.C.WS.M041.B01 GSE Battery Charging B - Plate load test (was C11_6C3) d/w - 10h/d - With 9 06-Aug-22 16-Aug-22 30-Aug-22 08-Sep-22 20 HK Hols - No B/O periods 310.C.WS.M045 GSE Battery Charging B - Construction of footing + backfill to GL (352m3) (was C11_6C3) d/w - 10h/d - With 10 17-Aug-22 27-Aug-22 09-Sep-22 21-Sep-22 20 HK Hols - No B/O periods 310.C.WS.M049 GSE Battery Charging B - Submit BA14 - as-built record (footing) (was C01_7C3) d/w - 10h/d - No HK 14 28-Aug-22 10-Sep-22 22-Sep-22 05-Oct-22 25 Hols - No B/O periods (was RC Structural C1) 34 0 11-Sep-22 22-Oct-22 06-Oct-22 14-Nov-22 19 310.C.WS.M117 GSE Battery Charging B - Submit B10 notice of commencement of work (above ground C01_7 d/w - 10h/d - No HK 7 11-Sep-22 17-Sep-22 06-Oct-22 12-Oct-22 25 structure) Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 201 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.WS.M133 GSE Battery Charging B - GF construction of base slab, column and walls (400m3) C11_6 d/w - 10h/d - With 14 19-Sep-22 06-Oct-22 13-Oct-22 28-Oct-22 19 HK Hols - No B/O periods 310.C.WS.M145 GSE Battery Charging B - Construction of roof slab, RC beam (334m3) (was C11_6C3) d/w - 10h/d - With 14 07-Oct-22 22-Oct-22 29-Oct-22 14-Nov-22 19 HK Hols - No B/O periods ABWF (was C11_6C3) d/w - 10h/d - With HK Hols 62- No B/O 0periods (was 22-Oct-22 C3) 05-Jan-23 14-Nov-22 01-Feb-23 20 310.C.EX.W1496 GSE Battery Charging B - Structure completed and falsework removal C11_6 d/w - 10h/d - With 0 22-Oct-22 14-Nov-22 19 HK Hols - No B/O periods 310.C.EX.W1452 GSE Battery Charging B - Partition Wall & Door Subframe (was C11_6C3) d/w - 10h/d - With 38 24-Oct-22 06-Dec-22 16-Nov-22 30-Dec-22 20 HK Hols - No B/O periods 310.C.EX.W1456 GSE Battery Charging B - Plastering & Screeding (was C11_6C3) d/w - 10h/d - With 38 27-Oct-22 09-Dec-22 19-Nov-22 04-Jan-23 20 HK Hols - No B/O periods 310.C.EX.W1460 GSE Battery Charging B - Tiling & Stonework (was C11_6C3) d/w - 10h/d - With 38 31-Oct-22 13-Dec-22 23-Nov-22 07-Jan-23 20 HK Hols - No B/O periods 310.C.EX.W1464 GSE Battery Charging B - Suspended Ceiling Framework (was C11_6C3) d/w - 10h/d - With 38 03-Nov-22 16-Dec-22 26-Nov-22 11-Jan-23 20 HK Hols - No B/O periods 310.C.EX.W1468 GSE Battery Charging B - Sanitary Ware & Fixtures (was C11_6C3) d/w - 10h/d - With 38 07-Nov-22 20-Dec-22 30-Nov-22 14-Jan-23 20 HK Hols - No B/O periods 310.C.EX.W1472 GSE Battery Charging B - Fire Shutter, Door Sets & Ironmongery (was C11_6C3) d/w - 10h/d - With 38 10-Nov-22 23-Dec-22 03-Dec-22 18-Jan-23 20 HK Hols - No B/O periods 310.C.EX.W1476 GSE Battery Charging B - Glazing (was C11_6C3) d/w - 10h/d - With 38 14-Nov-22 28-Dec-22 07-Dec-22 21-Jan-23 20 HK Hols - No B/O periods 310.C.EX.W1480 GSE Battery Charging B - Ceiling Panels & Finishes (was C11_6C3) d/w - 10h/d - With 38 17-Nov-22 31-Dec-22 10-Dec-22 28-Jan-23 20 HK Hols - No B/O periods 310.C.EX.W1484 GSE Battery Charging B - Painting, Graphics & Signage (was C11_6C3) d/w - 10h/d - With 38 21-Nov-22 05-Jan-23 14-Dec-22 01-Feb-23 20 HK Hols - No B/O periods MEP Installation Works (was C11_6C3) d/w - 10h/d - With HK Hols 109- No B/O 2periods (was 10-Nov-22 C3) 22-Mar-23 06-Dec-22 21-Jul-23 96 Transformers (CLP) C11_6 d/w - 10h/d - With HK Hols 79- No B/O 2periods (was 14-Nov-22 C3) 18-Feb-23 06-Dec-22 01-Mar-23 9 310.C.EX.W1488 GSE Battery Charging B - Complete Transformer Room Structure C11_6 d/w - 10h/d - With 0 14-Nov-22 06-Dec-22 19 HK Hols - No B/O periods 310.C.EX.W1578.B01 GSE Battery Charging B - Builder Works in Transformer Room (was C11_6C3) d/w - 10h/d - With 12 14-Nov-22 26-Nov-22 06-Dec-22 19-Dec-22 19 HK Hols - No B/O periods 310.C.EX.W1412 GSE Battery Charging B - MEP Works in Transformer Room (was C11_6C3) d/w - 10h/d - With 12 03-Dec-22 16-Dec-22 14-Dec-22 28-Dec-22 9 HK Hols - No B/O periods 310.C.EX.W1416 GSE Battery Charging B - Inspection & Handover Transformer Room to CLP (was C11_6C3) d/w - 10h/d - With 6 17-Dec-22 23-Dec-22 29-Dec-22 05-Jan-23 9 HK Hols - No B/O periods 310.C.EX.W1420 GSE Battery Charging B - Transformer Installation by CLP (was C11_6C3) d/w - 10h/d - With 42 24-Dec-22 16-Feb-23 06-Jan-23 27-Feb-23 9 HK Hols - No B/O periods 310.C.EX.W1492 GSE Battery Charging B - Cable Laying by CLP (was C11_6C3) d/w - 10h/d - With 24 2 06-Jan-23 06-Feb-23 02-Feb-23 01-Mar-23 20 HK Hols - No B/O periods 310.C.EX.W1424 GSE Battery Charging B - Energization of Transformers (was C11_6C3) d/w - 10h/d - With 0 18-Feb-23 01-Mar-23 9 HK Hols - No B/O periods Plumbing & Drainage Installation (was C11_6C3) d/w - 10h/d - With HK Hols 96- No B/O 0periods (was 11-Nov-22 C3) 08-Mar-23 15-Mar-23 13-Jul-23 101 310.C.EX.W1428 GSE Battery Charging B - Plumbing & Drainage 1st Fix & Installation C11_6 d/w - 10h/d - With 45 11-Nov-22 04-Jan-23 15-Mar-23 11-May-23 101 HK Hols - No B/O periods 310.C.EX.W1432 GSE Battery Charging B - Plumbing & Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 45 09-Dec-22 04-Feb-23 17-Apr-23 09-Jun-23 101 HK Hols - No B/O periods 310.C.EX.W1436 GSE Battery Charging B - Water Pump Installation (was C11_6C3) d/w - 10h/d - With 35 16-Dec-22 31-Jan-23 28-Apr-23 09-Jun-23 105 HK Hols - No B/O periods 310.C.EX.W1448 GSE Battery Charging B - Plumbing & Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 01-Mar-23 08-Mar-23 06-Jul-23 13-Jul-23 101 HK Hols - No B/O periods Electrical Installation (was C11_6C3) d/w - 10h/d - With HK Hols 100- No B/O 0periods (was 21-Nov-22 C3) 22-Mar-23 14-Dec-22 13-Jul-23 89
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 202 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W1336 GSE Battery Charging B - Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 42 21-Nov-22 10-Jan-23 14-Dec-22 06-Feb-23 20 HK Hols - No B/O periods 310.C.EX.W1344 GSE Battery Charging B - Switchgear Installation (was C11_6C3) d/w - 10h/d - With 30 19-Dec-22 27-Jan-23 13-Jan-23 20-Feb-23 20 HK Hols - No B/O periods 310.C.EX.W1348 GSE Battery Charging B - Emergency Genset Installation (was C11_6C3) d/w - 10h/d - With 30 19-Dec-22 27-Jan-23 05-May-23 09-Jun-23 108 HK Hols - No B/O periods 310.C.EX.W1340 GSE Battery Charging B - Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 42 19-Dec-22 10-Feb-23 08-May-23 27-Jun-23 110 HK Hols - No B/O periods 310.C.EX.W1352 GSE Battery Charging B - Power On to All Floors (was C11_6C3) d/w - 10h/d - With 0 18-Feb-23 09-Jun-23 89 HK Hols - No B/O periods 310.C.EX.W1364 GSE Battery Charging B - Electrical Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 15-Mar-23 22-Mar-23 06-Jul-23 13-Jul-23 89 HK Hols - No B/O periods Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 103- No B/O 0periods (was 10-Nov-22 C3) 15-Mar-23 15-Mar-23 21-Jul-23 102 310.C.EX.W1368 GSE Battery Charging B - Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 42 10-Nov-22 29-Dec-22 15-Mar-23 08-May-23 102 HK Hols - No B/O periods 310.C.EX.W1376 GSE Battery Charging B - FS Pump Installation (was C11_6C3) d/w - 10h/d - With 30 19-Nov-22 23-Dec-22 13-May-23 17-Jun-23 140 HK Hols - No B/O periods 310.C.EX.W1372 GSE Battery Charging B - Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 42 08-Dec-22 31-Jan-23 17-Apr-23 06-Jun-23 102 HK Hols - No B/O periods 310.C.EX.W1388 GSE Battery Charging B - Fire Services Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 08-Mar-23 15-Mar-23 14-Jul-23 21-Jul-23 102 HK Hols - No B/O periods MVAC Installation (was C11_6C3) d/w - 10h/d - With HK Hols 79- No B/O 0periods (was 21-Nov-22 C3) 25-Feb-23 17-Apr-23 21-Jul-23 117 310.C.EX.W1392 GSE Battery Charging B - MVAC 1st Fix & Installation C11_6 d/w - 10h/d - With 42 21-Nov-22 10-Jan-23 17-Apr-23 06-Jun-23 117 HK Hols - No B/O periods 310.C.EX.W1396 GSE Battery Charging B - MVAC 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 42 19-Dec-22 10-Feb-23 16-May-23 06-Jul-23 117 HK Hols - No B/O periods 310.C.EX.W1408 GSE Battery Charging B - MVAC Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 18-Feb-23 25-Feb-23 14-Jul-23 21-Jul-23 117 HK Hols - No B/O periods External Works (was C3) 126 0 23-Oct-22 24-Mar-23 23-Nov-22 18-Aug-23 118 External Building Finishes 62 0 23-Oct-22 05-Jan-23 23-Nov-22 01-Feb-23 20 310.C.ES.P613.B01 GSE Battery Charging B - Roof Waterproofing & Roof Finishes C01_7 d/w - 10h/d - No HK 30 23-Oct-22 21-Nov-22 23-Nov-22 22-Dec-22 31 Hols - No B/O periods (was 310.C.ES.P612 GSE Battery Charging B - External building finishes C1) C11_6 d/w - 10h/d - With 30 30-Nov-22 05-Jan-23 23-Dec-22 01-Feb-23 20 HK Hols - No B/O periods Drainage and UU (was C11_6C3) d/w - 10h/d - With HK Hols 42- No B/O 0periods (was 10-Dec-22 C3) 02-Feb-23 05-Jan-23 25-Jul-23 140 310.C.ES.P592 GSE Battery Charging B - Building drainage and watermain works C11_6 d/w - 10h/d - With 21 10-Dec-22 05-Jan-23 05-Jan-23 01-Feb-23 20 HK Hols - No B/O periods 310.C.ES.P616 GSE Battery Charging B - CLP Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 16 16-Dec-22 05-Jan-23 11-Jan-23 01-Feb-23 20 HK Hols - No B/O periods 310.C.ES.P600 GSE Battery Charging B - EL cable ducting + drawpits (was C11_6C3) d/w - 10h/d - With 16 06-Jan-23 27-Jan-23 11-Feb-23 01-Mar-23 28 HK Hols - No B/O periods 310.C.ES.P596 GSE Battery Charging B - AS Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 21 06-Jan-23 02-Feb-23 30-Jun-23 25-Jul-23 140 HK Hols - No B/O periods Soft and Hard landscape & EVA Construction (was C11_6C3) d/w - 10h/d - With HK Hols 48- No B/O 0periods (was 28-Jan-23 C3) 24-Mar-23 23-Jun-23 18-Aug-23 118 310.C.WS.C110 GSE Battery Charging B - Site Formation Works and Road Works for EVA C11_6 d/w - 10h/d - With 48 28-Jan-23 24-Mar-23 23-Jun-23 18-Aug-23 118 HK Hols - No B/O periods 310.C.ES.P604 GSE Battery Charging B - Hard and soft landscape works (was C11_6C3) d/w - 10h/d - With 21 03-Feb-23 27-Feb-23 26-Jul-23 18-Aug-23 140 HK Hols - No B/O periods WSA - Maintenance Facilities Forecourt & Coach Staging A and Bus Stop (MFF and Bus Stop) (was C3) 410 0 04-Jul-22 15-Nov-23 09-May-23 16-Apr-24 122 Procurement C01_7 d/w - 10h/d - No HK Hols176 - No B/O periods 0 (was28-Dec-22 C1) 21-Jun-23 07-Jun-23 29-Nov-23 161 Major Materials C01_7 d/w - 10h/d - No HK Hols176 - No B/O periods 0 (was28-Dec-22 C1) 21-Jun-23 07-Jun-23 29-Nov-23 161
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 203 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.WS.M540 WSA - MFF and Bus Stop (Procurement) - 4500N Concrete Pipes, grating for U C01_7 d/w - 10h/d - No HK 28 28-Dec-22 24-Jan-23 07-Jun-23 04-Jul-23 161 channel&Catch pits & Others-Place Order Hols - No B/O periods (was 310.P.WS.M544 WSA - MFF and Bus Stop (Procurement) - pillar box, light post & Others-Place Order for C1) C01_7 d/w - 10h/d - No HK 28 28-Dec-22 24-Jan-23 07-Jun-23 04-Jul-23 161 Material Hols - No B/O periods (was 310.P.WS.M548 WSA - MFF and Bus Stop (Procurement) - 4500N Concrete Pipes, grating for U C1) C01_7 d/w - 10h/d - No HK 120 25-Jan-23 24-May-23 05-Jul-23 01-Nov-23 161 channel&Catch pits & Others-Manufacturing Hols - No B/O periods (was 310.P.WS.M552 WSA - MFF and Bus Stop (Procurement) - pillar box, light post & Others-Manufacturing of C1) C01_7 d/w - 10h/d - No HK 120 25-Jan-23 24-May-23 05-Jul-23 01-Nov-23 161 Material Hols - No B/O periods (was 310.P.WS.M556 WSA - MFF and Bus Stop (Procurement) - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 28 25-May-23 21-Jun-23 02-Nov-23 29-Nov-23 161 Hols - No B/O periods (was Initial Works C1) C11_6 d/w - 10h/d - With HK Hols 166- No B/O 0periods (was 04-Jul-22 C3) 18-Jan-23 30-Jun-23 07-Jul-23 135 310.C.WS.M009 WSA - MFF and Bus Stop - Site access WA3310/12 C11_6 d/w - 10h/d - With 0 04-Jul-22 30-Jun-23 295 HK Hols - No B/O periods 310.C.WS.M011 WSA - MFF and Bus Stop - Initial Works (hoarding, GI works, instrumentation, trial pits, (was C11_6C3) d/w - 10h/d - With 6 12-Jan-23 18-Jan-23 30-Jun-23 07-Jul-23 135 diversion if any) HK Hols - No B/O periods Bus Stop Structure (was C11_6C3) d/w - 10h/d - With HK Hols 68- No B/O 0periods (was 26-Jan-23 C3) 19-Apr-23 08-Jul-23 25-Sep-23 132 310.C.WS.M034 WSA - MFF and Bus Stop (Excavation) - open cut excavation to FL, plate load test (2 nos) C11_6 d/w - 10h/d - With 12 26-Jan-23 08-Feb-23 08-Jul-23 21-Jul-23 132 HK Hols - No B/O periods 310.C.WS.M042 WSA - MFF and Bus Stop (Structure) - Footings (Pillar Box/ Road lighting/ advertising (was C11_6C3) d/w - 10h/d - With 35 09-Feb-23 21-Mar-23 22-Jul-23 31-Aug-23 132 panel) + Submit BA14 HK Hols - No B/O periods 310.C.WS.M046 WSA - MFF and Bus Stop Structure) - Columns (concrete: 49m3),roof slab, drainage (was C11_6C3) d/w - 10h/d - With 21 22-Mar-23 19-Apr-23 01-Sep-23 25-Sep-23 132 downpipe and advert panels HK Hols - No B/O periods Drainage and Petrol Interceptor (was C3) 114 0 12-Jan-23 03-Jun-23 09-May-23 25-Sep-23 95 310.C.WS.M026 WSA - MFF and Bus Stop (Drainage) - Submit BA8 consent application C01_7 d/w - 10h/d - No HK 7 12-Jan-23 18-Jan-23 09-May-23 15-May-23 117 Hols - No B/O periods (was 310.C.WS.M030 WSA - MFF and Bus Stop (Drainage) - Submit BA10 - notice of commencement of work C1) C01_7 d/w - 10h/d - No HK 7 19-Jan-23 25-Jan-23 16-May-23 22-May-23 117 Hols - No B/O periods (was 310.C.WS.M050 WSA - MFF and Bus Stop (Drainage) - Trench excavation to invert level for drainage and C1) C11_6 d/w - 10h/d - With 30 26-Jan-23 01-Mar-23 23-May-23 28-Jun-23 95 manholes HK Hols - No B/O periods 310.C.WS.M054 WSA - MFF and Bus Stop (Drainage) - Drainage Works (DN450, DN375, DN300, DN225, (was C11_6C3) d/w - 10h/d - With 75 02-Mar-23 03-Jun-23 29-Jun-23 25-Sep-23 95 DN150), MH + mass concrete HK Hols - No B/O periods ABWF (was C11_6C3) d/w - 10h/d - With HK Hols 92- No B/O 0periods (was 03-Jun-23 C3) 21-Sep-23 25-Sep-23 14-Mar-24 142 310.C.EX.W2228 WSA - MFF and Bus Stop - Structure completed and falsework removal C11_6 d/w - 10h/d - With 0 03-Jun-23 25-Sep-23 95 HK Hols - No B/O periods 310.C.EX.W2204 WSA - MFF and Bus Stop - Wall finishes (was C11_6C3) d/w - 10h/d - With 48 05-Jun-23 01-Aug-23 23-Nov-23 20-Jan-24 142 HK Hols - No B/O periods 310.C.EX.W2208 WSA - MFF and Bus Stop - Floor finishes (was C11_6C3) d/w - 10h/d - With 48 16-Jun-23 12-Aug-23 05-Dec-23 01-Feb-24 142 HK Hols - No B/O periods 310.C.EX.W2212 WSA - MFF and Bus Stop - external finishes (was C11_6C3) d/w - 10h/d - With 48 29-Jun-23 24-Aug-23 16-Dec-23 15-Feb-24 142 HK Hols - No B/O periods 310.C.EX.W2224 WSA - MFF and Bus Stop - Painting, Graphics & Signage (was C11_6C3) d/w - 10h/d - With 48 28-Jul-23 21-Sep-23 17-Jan-24 14-Mar-24 142 HK Hols - No B/O periods MEP Installation Works (was C11_6C3) d/w - 10h/d - With HK Hols 112- No B/O 0periods (was 05-Jul-23 C3) 15-Nov-23 27-Oct-23 03-Apr-24 112 Drainage Installation C11_6 d/w - 10h/d - With HK Hols 100- No B/O 0periods (was 05-Jul-23 C3) 01-Nov-23 30-Nov-23 03-Apr-24 124 310.C.EX.W2180 WSA - MFF and Bus Stop - Drainage 1st Fix & Installation C11_6 d/w - 10h/d - With 48 05-Jul-23 29-Aug-23 30-Nov-23 27-Jan-24 124 HK Hols - No B/O periods 310.C.EX.W2184 WSA - MFF and Bus Stop - Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 48 02-Aug-23 26-Sep-23 30-Dec-23 27-Feb-24 124 HK Hols - No B/O periods 310.C.EX.W2200 WSA - MFF and Bus Stop - Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 6 26-Oct-23 01-Nov-23 25-Mar-24 03-Apr-24 124 HK Hols - No B/O periods Electrical Installation (was C11_6C3) d/w - 10h/d - With HK Hols 106- No B/O 0periods (was 05-Jul-23 C3) 08-Nov-23 27-Oct-23 04-Mar-24 95
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 204 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W2132 WSA - MFF and Bus Stop - Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 48 05-Jul-23 29-Aug-23 27-Oct-23 21-Dec-23 95 HK Hols - No B/O periods 310.C.EX.W2136 WSA - MFF and Bus Stop - Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 48 02-Aug-23 26-Sep-23 24-Nov-23 22-Jan-24 95 HK Hols - No B/O periods 310.C.EX.W2140 WSA - MFF and Bus Stop - Power On (was C11_6C3) d/w - 10h/d - With 0 26-Sep-23 22-Jan-24 95 HK Hols - No B/O periods 310.C.EX.W2152 WSA - MFF and Bus Stop - Electrical Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 6 02-Nov-23 08-Nov-23 27-Feb-24 04-Mar-24 95 HK Hols - No B/O periods Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 112- No B/O 0periods (was 05-Jul-23 C3) 15-Nov-23 27-Oct-23 11-Mar-24 95 310.C.EX.W2156 WSA - MFF and Bus Stop - Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 48 05-Jul-23 29-Aug-23 27-Oct-23 21-Dec-23 95 HK Hols - No B/O periods 310.C.EX.W2160 WSA - MFF and Bus Stop - Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 48 02-Aug-23 26-Sep-23 24-Nov-23 22-Jan-24 95 HK Hols - No B/O periods 310.C.EX.W2176 WSA - MFF and Bus Stop - Fire Services Preliminary Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 6 09-Nov-23 15-Nov-23 05-Mar-24 11-Mar-24 95 HK Hols - No B/O periods External Works (was C11_6C3) d/w - 10h/d - With HK Hols 116- No B/O 0periods (was 05-Jun-23 C3) 21-Oct-23 22-Dec-23 16-Apr-24 142 Drainage and UU C11_6 d/w - 10h/d - With HK Hols 42- No B/O 0periods (was 05-Jun-23 C3) 25-Jul-23 22-Dec-23 14-Mar-24 192 310.C.ES.P724 WSA - MFF and Bus Stop - Drainage and watermain works C11_6 d/w - 10h/d - With 24 05-Jun-23 04-Jul-23 22-Dec-23 22-Jan-24 167 HK Hols - No B/O periods 310.C.ES.P728 WSA - MFF and Bus Stop - Airport System Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 18 05-Jul-23 25-Jul-23 23-Jan-24 14-Feb-24 167 HK Hols - No B/O periods 310.C.ES.P732 WSA - MFF and Bus Stop - EL cable ducting + drawpits (was C11_6C3) d/w - 10h/d - With 18 05-Jul-23 25-Jul-23 23-Feb-24 14-Mar-24 192 HK Hols - No B/O periods Soft and Hard landscape & EVA Construction (was C11_6C3) d/w - 10h/d - With HK Hols 24- No B/O 0periods (was 22-Sep-23 C3) 21-Oct-23 15-Mar-24 16-Apr-24 142 310.C.ES.P736 WSA - MFF and Bus Stop - Hard and soft landscape works C11_6 d/w - 10h/d - With 21 22-Sep-23 18-Oct-23 19-Mar-24 16-Apr-24 145 HK Hols - No B/O periods 310.C.ES.C204 WSA - MFF and Bus Stop - Road Works for EVA (was C11_6C3) d/w - 10h/d - With 24 22-Sep-23 21-Oct-23 15-Mar-24 16-Apr-24 142 HK Hols - No B/O periods WSA - GSE Storage Area (was C3) 386 0 04-Jul-22 17-Oct-23 04-Jul-22 18-Apr-24 148 Procurement C01_7 d/w - 10h/d - No HK Hols148 - No B/O periods 0 (was28-Dec-22 C1) 24-May-23 27-Jun-23 21-Nov-23 181 Major Materials C01_7 d/w - 10h/d - No HK Hols148 - No B/O periods 0 (was28-Dec-22 C1) 24-May-23 27-Jun-23 21-Nov-23 181 310.P.WS.M636 WSA - GSE Storage Area (Procurement) - Concrete Pipes, grating for U channel&Catch C01_7 d/w - 10h/d - No HK 14 28-Dec-22 10-Jan-23 27-Jun-23 10-Jul-23 181 pits&Others-Place Order for Material Hols - No B/O periods (was 310.P.WS.M640 WSA - GSE Storage Area (Procurement) - pillar box, light post&Others-Place Order for C1) C01_7 d/w - 10h/d - No HK 14 28-Dec-22 10-Jan-23 27-Jun-23 10-Jul-23 181 Material Hols - No B/O periods (was 310.P.WS.M644 WSA - GSE Storage Area (Procurement) - Concrete Pipes, grating for U channel&Catch C1) C01_7 d/w - 10h/d - No HK 120 11-Jan-23 10-May-23 11-Jul-23 07-Nov-23 181 pits&Others-Manufacturing of Material Hols - No B/O periods (was 310.P.WS.M648 WSA - GSE Storage Area (Procurement) - pillar box, light post&Others-Manufacturing of C1) C01_7 d/w - 10h/d - No HK 120 11-Jan-23 10-May-23 11-Jul-23 07-Nov-23 181 Material Hols - No B/O periods (was 310.P.WS.M652 WSA - GSE Storage Area (Procurement) - Delivery of Material C1) C01_7 d/w - 10h/d - No HK 14 11-May-23 24-May-23 08-Nov-23 21-Nov-23 181 Hols - No B/O periods (was Initial Works C1) 187 0 04-Jul-22 15-Feb-23 04-Jul-22 16-Aug-23 148 310.C.WS.N101 WSA - GSE Storage Area - Site access WA3310/12 C11_6 d/w - 10h/d - With 0 04-Jul-22* 04-Jul-22 0 HK Hols - No B/O periods 310.C.WS.N117 WSA - GSE Storage Area - Obtained BA8 consent (was C01_7C3) d/w - 10h/d - No HK 0 17-Jul-22 09-Aug-23 388 Hols - No B/O periods (was 310.C.WS.N121 WSA - GSE Storage Area - Submit BA10 - notice of commencement of work C1) C01_7 d/w - 10h/d - No HK 0 17-Jul-22 09-Aug-23 388 Hols - No B/O periods (was 310.C.WS.N109 WSA - GSE Storage Area - Temporary drainage C1) C11_6 d/w - 10h/d - With 6 02-Feb-23 08-Feb-23 03-Aug-23 09-Aug-23 148 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 205 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.WS.N105 WSA - GSE Storage Area - Hoarding/trial pits for UU C11_6 d/w - 10h/d - With 6 02-Feb-23 08-Feb-23 03-Aug-23 09-Aug-23 148 HK Hols - No B/O periods 310.C.WS.N113 WSA - GSE Storage Area - Carry out GI works/install instrumentation,diversion of (was C11_6C3) d/w - 10h/d - With 6 02-Feb-23 08-Feb-23 03-Aug-23 09-Aug-23 148 underground utilities (if any) HK Hols - No B/O periods 310.C.WS.N125 WSA - GSE Storage Area - Site layout and formation works (was C11_6C3) d/w - 10h/d - With 6 09-Feb-23 15-Feb-23 10-Aug-23 16-Aug-23 148 HK Hols - No B/O periods Drainage and UU Works (was C11_6C3) d/w - 10h/d - With HK Hols 44- No B/O 0periods (was 16-Feb-23 C3) 12-Apr-23 17-Aug-23 18-Apr-24 303 310.C.WS.N133 WSA - GSE Storage Area (Drainage) - Trench excavation for U-channel, catch pit C11_6 d/w - 10h/d - With 30 16-Feb-23 22-Mar-23 17-Aug-23 20-Sep-23 148 HK Hols - No B/O periods 310.C.WS.N145 WSA - GSE Storage Area (Drainage) - excavate and pipe laying stormwater DN150, (was C11_6C3) d/w - 10h/d - With 30 16-Feb-23 22-Mar-23 17-Aug-23 20-Sep-23 148 DN225, DN300 + manholes (4nos) HK Hols - No B/O periods 310.C.WS.N149 WSA - GSE Storage Area (Drainage) - Submit BA14 and BD acknowledgement (was C11_6C3) d/w - 10h/d - With 14 23-Mar-23 12-Apr-23 02-Apr-24 18-Apr-24 303 HK Hols - No B/O periods Electrical Services and Light Post (was C11_6C3) d/w - 10h/d - With HK Hols 125- No B/O 0periods (was 23-Mar-23 C3) 24-Aug-23 21-Sep-23 22-Feb-24 148 310.C.WS.N161.B02 WSA - GSE Storage Area (Pillar Box) - Plate load test , construct Pillar Box and Road C11_6 d/w - 10h/d - With 50 23-Mar-23 25-May-23 21-Sep-23 21-Nov-23 148 Light Footings + submit BA14 HK Hols - No B/O periods 310.C.WS.N137 WSA - GSE Storage Area (Pillar Box) - Install Pillar Box and Electrical Services (was C11_6C3) d/w - 10h/d - With 30 27-May-23 03-Jul-23 22-Nov-23 28-Dec-23 148 HK Hols - No B/O periods 310.C.WS.N141 WSA - GSE Storage Area (Road Lights) - Cable drawpits &Install Road Light (10 nos) + (was C11_6C3) d/w - 10h/d - With 45 04-Jul-23 24-Aug-23 29-Dec-23 22-Feb-24 148 install electrical services HK Hols - No B/O periods Pavement and Landscaping (was C11_6C3) d/w - 10h/d - With HK Hols 44- No B/O 0periods (was 25-Aug-23 C3) 17-Oct-23 23-Feb-24 18-Apr-24 148 310.C.WS.N153 WSA - GSE Storage Area (Pavement) - backfill, paving, landscaping C11_6 d/w - 10h/d - With 30 25-Aug-23 28-Sep-23 23-Feb-24 28-Mar-24 148 HK Hols - No B/O periods 310.C.WS.N157 WSA - GSE Storage Area (Pavement) - Storage Area marking, signages (was C11_6C3) d/w - 10h/d - With 14 29-Sep-23 17-Oct-23 02-Apr-24 18-Apr-24 148 HK Hols - No B/O periods WSA - Gatehouse B (was C3) 418 2 03-Jun-22 27-Oct-23 04-Jul-22 18-Dec-23 44 Procurement C01_7 d/w - 10h/d - No HK Hols281 - No B/O periods 0 (was03-Jun-22 C1) 10-Mar-23 09-Jul-22 30-May-23 81 Major Materials ABWF C01_7 d/w - 10h/d - No HK Hols232 - No B/O periods 0 (was03-Jun-22 C1) 20-Jan-23 19-Oct-22 30-May-23 130 310.P.ES.P70.B02 WSA - Gatehouse B (Procurement ABWF) - Visual Prototypes drawing submission, C01_7 d/w - 10h/d - No HK 90 03-Jun-22 31-Aug-22 19-Oct-22 16-Jan-23 138 erection, testing and approval Hols - No B/O periods (was 310.P.ES.P48 WSA - Gatehouse B (Procurement ABWF)- louvres,doors,raised floor C1) C01_7 d/w - 10h/d - No HK 14 09-Sep-22 22-Sep-22 17-Jan-23 30-Jan-23 130 panels&Others-Place Order Hols - No B/O periods (was 310.P.ES.P66 WSA - Gatehouse B (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 120 23-Sep-22 20-Jan-23 31-Jan-23 30-May-23 130 Hols - No B/O periods (was 310.P.ES.P74 WSA - Gatehouse B (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 14 07-Jan-23 20-Jan-23 17-May-23 30-May-23 130 Hols - No B/O periods (was Major Materials MEP C1) C01_7 d/w - 10h/d - No HK Hols262 - No B/O periods 0 (was22-Jun-22 C1) 10-Mar-23 09-Jul-22 27-Mar-23 17 310.P.ES.P52 WSA - Gatehouse B (Procurement FS and P&D Materials) - sprinkler, FA&Others - Place C01_7 d/w - 10h/d - No HK 200 22-Jun-22 07-Jan-23 09-Jul-22 24-Jan-23 17 Order for Material Hols - No B/O periods (was 310.P.ES.P56 WSA - Gatehouse B (Procurement Electrical&MVAC)-AC/ vent fan,LV C1) C01_7 d/w - 10h/d - No HK 60 27-Jun-22 25-Aug-22 01-Sep-22 30-Oct-22 66 switchboard,genset&Others-Place Order Hols - No B/O periods (was 310.P.ES.P114 WSA - Gatehouse B (Procurement FS and P&D Materials) - sprinkler, C1) C01_7 d/w - 10h/d - No HK 220 06-Jul-22 10-Feb-23 23-Jul-22 27-Feb-23 17 FA&Others-Manufacturing Hols - No B/O periods (was 310.P.ES.P118 WSA - Gatehouse B (Procurement Electrical&MVAC)-AC/ vent fan,LV C1) C01_7 d/w - 10h/d - No HK 120 26-Aug-22 23-Dec-22 31-Oct-22 27-Feb-23 66 switchboard,genset&Other-Manufacturing Hols - No B/O periods (was 310.P.ES.P122 WSA - Gatehouse B (Procurement MEP) - Delivery of Materials C1) d/w - 10h/d - No HK C01_7 28 11-Feb-23 10-Mar-23 28-Feb-23 27-Mar-23 17 Hols - No B/O periods (was Initial Work and Site Preparation C1) 36 0 04-Jul-22 13-Aug-22 04-Jul-22 02-Sep-22 17 310.C.WS.S400 WSA - Gatehouse B - Site access WA3310/12 C01_7 d/w - 10h/d - No HK 0 04-Jul-22* 04-Jul-22 0 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 206 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.WS.S104 WSA - Gatehouse B - Hoarding C11_6 d/w - 10h/d - With 5 04-Jul-22 08-Jul-22 23-Jul-22 28-Jul-22 17 HK Hols - No B/O periods 310.C.WS.S108 WSA - Gatehouse B - Carry out site survey (was C11_6C3) d/w - 10h/d - With 1 08-Jul-22 08-Jul-22 28-Jul-22 28-Jul-22 17 HK Hols - No B/O periods 310.C.WS.S112 WSA - Gatehouse B - Install monitoring point (was C11_6C3) d/w - 10h/d - With 1 09-Jul-22 09-Jul-22 29-Jul-22 29-Jul-22 17 HK Hols - No B/O periods 310.C.WS.S116 WSA - Gatehouse B - UU detection and trial pit (was C11_6C3) d/w - 10h/d - With 6 11-Jul-22 16-Jul-22 30-Jul-22 05-Aug-22 17 HK Hols - No B/O periods 310.C.WS.S160.B01 WSA - Gatehouse B - Diversion of underground utilities (if any) (was C11_6C3) d/w - 10h/d - With 24 18-Jul-22 13-Aug-22 06-Aug-22 02-Sep-22 17 HK Hols - No B/O periods Structural Works (was C3) 172 0 18-Jul-22 11-Feb-23 19-Jul-22 13-Feb-23 1 310.C.WS.S118 WSA - Gatehouse B - Obtain BA8 consent C01_7 d/w - 10h/d - No HK 28 18-Jul-22 14-Aug-22 19-Jul-22 15-Aug-22 1 Hols - No B/O periods (was 310.C.WS.S120 WSA - Gatehouse B - BA10 notice of commencement of works C1) C01_7 d/w - 10h/d - No HK 7 15-Aug-22 21-Aug-22 16-Aug-22 22-Aug-22 1 Hols - No B/O periods (was 310.C.WS.S124 WSA - Gatehouse B - SI works and submit report to PM C1) C11_6 d/w - 10h/d - With 10 22-Aug-22 01-Sep-22 23-Aug-22 02-Sep-22 1 HK Hols - No B/O periods Gatehouse B (was C11_6C3) d/w - 10h/d - With HK Hols 132- No B/O 0periods (was 02-Sep-22 C3) 11-Feb-23 03-Sep-22 13-Feb-23 1 310.C.WS.S128 WSA - Gatehouse B - Open Cut Excavation to FL (assumed ex. GL + 6.75) (7,474m3) C11_6 d/w - 10h/d - With 5 02-Sep-22 07-Sep-22 03-Sep-22 08-Sep-22 1 HK Hols - No B/O periods 310.C.WS.S132 WSA - Gatehouse B - Plate load test (was C11_6C3) d/w - 10h/d - With 10 08-Sep-22 20-Sep-22 09-Sep-22 21-Sep-22 1 HK Hols - No B/O periods 310.C.WS.S136 WSA - Gatehouse B - Construction of footing; Vol. = 2,672 m3 (was C11_6C3) d/w - 10h/d - With 20 21-Sep-22 15-Oct-22 22-Sep-22 17-Oct-22 1 HK Hols - No B/O periods 310.C.WS.S140 WSA - Gatehouse B (GF) - Backfill, construct GF slab; Vol = 296 m3 (was C11_6C3) d/w - 10h/d - With 14 17-Oct-22 01-Nov-22 18-Oct-22 02-Nov-22 1 HK Hols - No B/O periods 310.C.WS.S144 WSA - Gatehouse B (1F) - columns, walls, beams and slab; Vol = 648 m3 (was C11_6C3) d/w - 10h/d - With 21 02-Nov-22 25-Nov-22 03-Nov-22 26-Nov-22 1 HK Hols - No B/O periods 310.C.WS.S148 WSA - Gatehouse B (RF) - columns, walls, beams and slab; Vol = 436 m3 (was C11_6C3) d/w - 10h/d - With 21 26-Nov-22 20-Dec-22 28-Nov-22 21-Dec-22 1 HK Hols - No B/O periods 310.C.WS.S156 WSA - Gatehouse B (1F) - Water Tanks (FS and Sprinkler);Vol = 137 m3 (was C11_6C3) d/w - 10h/d - With 27 09-Jan-23 11-Feb-23 10-Jan-23 13-Feb-23 1 HK Hols - No B/O periods ABWF (was C11_6C3) d/w - 10h/d - With HK Hols 128- No B/O 0periods (was 11-Feb-23 C3) 20-Jul-23 13-Feb-23 02-Aug-23 11 310.C.EX.W2128 WSA - Gatehouse B - Structure completed and falsework removal C11_6 d/w - 10h/d - With 0 11-Feb-23 13-Feb-23 1 HK Hols - No B/O periods 310.C.EX.W2084 WSA - Gatehouse B - Partition Wall & Door Subframe (was C11_6C3) d/w - 10h/d - With 75 13-Feb-23 16-May-23 25-Feb-23 30-May-23 11 HK Hols - No B/O periods 310.C.EX.W2088 WSA - Gatehouse B - Plastering & Screeding (was C11_6C3) d/w - 10h/d - With 75 21-Feb-23 24-May-23 06-Mar-23 07-Jun-23 11 HK Hols - No B/O periods 310.C.EX.W2092 WSA - Gatehouse B - Tiling & Stonework (was C11_6C3) d/w - 10h/d - With 75 01-Mar-23 02-Jun-23 14-Mar-23 15-Jun-23 11 HK Hols - No B/O periods 310.C.EX.W2096 WSA - Gatehouse B - Suspended Ceiling Framework (was C11_6C3) d/w - 10h/d - With 75 09-Mar-23 10-Jun-23 22-Mar-23 24-Jun-23 11 HK Hols - No B/O periods 310.C.EX.W2100 WSA - Gatehouse B - Sanitary Ware & Fixtures (was C11_6C3) d/w - 10h/d - With 75 17-Mar-23 19-Jun-23 30-Mar-23 04-Jul-23 11 HK Hols - No B/O periods 310.C.EX.W2104 WSA - Gatehouse B - Door Sets & Ironmongery (was C11_6C3) d/w - 10h/d - With 75 25-Mar-23 28-Jun-23 12-Apr-23 12-Jul-23 11 HK Hols - No B/O periods 310.C.EX.W2108 WSA - Gatehouse B - Glazing (was C11_6C3) d/w - 10h/d - With 75 03-Apr-23 07-Jul-23 20-Apr-23 20-Jul-23 11 HK Hols - No B/O periods 310.C.EX.W2112 WSA - Gatehouse B - Ceiling Panels & Finishes (was C11_6C3) d/w - 10h/d - With 75 15-Apr-23 15-Jul-23 28-Apr-23 28-Jul-23 11 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 207 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W2116 WSA - Gatehouse B - Painting, Graphics & Signage C11_6 d/w - 10h/d - With 75 20-Apr-23 20-Jul-23 04-May-23 02-Aug-23 11 HK Hols - No B/O periods MEP Installation Works (was C11_6C3) d/w - 10h/d - With HK Hols 210- No B/O 2periods (was 11-Feb-23 C3) 27-Oct-23 14-Mar-23 18-Dec-23 44 Transformers (CLP) C11_6 d/w - 10h/d - With HK Hols 140- No B/O 2periods (was 13-Mar-23 C3) 31-Aug-23 14-Mar-23 01-Sep-23 1 310.C.EX.W2120 WSA - Gatehouse B - Complete Transformer Room Structure C11_6 d/w - 10h/d - With 0 13-Mar-23 14-Mar-23 1 HK Hols - No B/O periods 310.C.EX.W2164.B01 WSA - Gatehouse B - Builder Works in Transformer Room (was C11_6C3) d/w - 10h/d - With 12 13-Mar-23 25-Mar-23 14-Mar-23 27-Mar-23 1 HK Hols - No B/O periods 310.C.EX.W2044 WSA - Gatehouse B - MEP Works in Transformer Room (was C11_6C3) d/w - 10h/d - With 36 27-Mar-23 12-May-23 28-Mar-23 13-May-23 1 HK Hols - No B/O periods 310.C.EX.W2048 WSA - Gatehouse B - Inspection & Handover Transformer Room to CLP (was C11_6C3) d/w - 10h/d - With 18 13-May-23 03-Jun-23 15-May-23 05-Jun-23 1 HK Hols - No B/O periods 310.C.EX.W2052 WSA - Gatehouse B - Transformer Installation by CLP (was C11_6C3) d/w - 10h/d - With 72 05-Jun-23 29-Aug-23 06-Jun-23 30-Aug-23 1 HK Hols - No B/O periods 310.C.EX.W2124 WSA - Gatehouse B - Cable Laying by CLP (was C11_6C3) d/w - 10h/d - With 24 2 21-Jul-23 17-Aug-23 03-Aug-23 30-Aug-23 11 HK Hols - No B/O periods 310.C.EX.W2056 WSA - Gatehouse B - Energization of Transformers (was C11_6C3) d/w - 10h/d - With 0 31-Aug-23 01-Sep-23 1 HK Hols - No B/O periods Plumbing & Drainage Installation (was C11_6C3) d/w - 10h/d - With HK Hols 130- No B/O 0periods (was 13-Mar-23 C3) 19-Aug-23 11-May-23 14-Oct-23 46 310.C.EX.W2060 WSA - Gatehouse B - Plumbing & Drainage 1st Fix & Installation C11_6 d/w - 10h/d - With 60 13-Mar-23 27-May-23 11-May-23 22-Jul-23 46 HK Hols - No B/O periods 310.C.EX.W2068 WSA - Gatehouse B - Water Pump Installation (was C11_6C3) d/w - 10h/d - With 48 22-Mar-23 22-May-23 24-Jun-23 19-Aug-23 74 HK Hols - No B/O periods 310.C.EX.W2064 WSA - Gatehouse B - Plumbing & Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 14-Apr-23 26-Jun-23 09-Jun-23 19-Aug-23 46 HK Hols - No B/O periods 310.C.EX.W2080 WSA - Gatehouse B - Plumbing & Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 12 07-Aug-23 19-Aug-23 29-Sep-23 14-Oct-23 46 HK Hols - No B/O periods Electrical Installation (was C11_6C3) d/w - 10h/d - With HK Hols 186- No B/O 0periods (was 13-Mar-23 C3) 27-Oct-23 27-May-23 28-Oct-23 1 310.C.EX.W1968 WSA - Gatehouse B - Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 60 13-Mar-23 27-May-23 27-May-23 07-Aug-23 59 HK Hols - No B/O periods 310.C.EX.W1976 WSA - Gatehouse B - Switchgear Installation (was C11_6C3) d/w - 10h/d - With 48 14-Apr-23 10-Jun-23 26-Jun-23 21-Aug-23 59 HK Hols - No B/O periods 310.C.EX.W1980 WSA - Gatehouse B - Emergency Genset Installation (was C11_6C3) d/w - 10h/d - With 48 14-Apr-23 10-Jun-23 08-Jul-23 01-Sep-23 69 HK Hols - No B/O periods 310.C.EX.W1972 WSA - Gatehouse B - Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 14-Apr-23 26-Jun-23 22-Jul-23 29-Sep-23 81 HK Hols - No B/O periods 310.C.EX.W1984 WSA - Gatehouse B - Power On to All Floors (was C11_6C3) d/w - 10h/d - With 0 31-Aug-23 01-Sep-23 1 HK Hols - No B/O periods 310.C.EX.W1996 WSA - Gatehouse B - Electrical Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 12 13-Oct-23 27-Oct-23 14-Oct-23 28-Oct-23 1 HK Hols - No B/O periods Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 130- No B/O 0periods (was 13-Mar-23 C3) 19-Aug-23 24-May-23 28-Oct-23 57 310.C.EX.W2000 WSA - Gatehouse B - Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 60 13-Mar-23 27-May-23 24-May-23 04-Aug-23 57 HK Hols - No B/O periods 310.C.EX.W2008 WSA - Gatehouse B - FS Pump Installation (was C11_6C3) d/w - 10h/d - With 48 14-Apr-23 10-Jun-23 08-Jul-23 01-Sep-23 69 HK Hols - No B/O periods 310.C.EX.W2004 WSA - Gatehouse B - Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 14-Apr-23 26-Jun-23 23-Jun-23 01-Sep-23 57 HK Hols - No B/O periods 310.C.EX.W2020 WSA - Gatehouse B - Fire Services Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 12 07-Aug-23 19-Aug-23 14-Oct-23 28-Oct-23 57 HK Hols - No B/O periods MVAC Installation (was C11_6C3) d/w - 10h/d - With HK Hols 130- No B/O 0periods (was 13-Mar-23 C3) 19-Aug-23 24-May-23 28-Oct-23 57
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 208 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W2024 WSA - Gatehouse B - MVAC 1st Fix & Installation C11_6 d/w - 10h/d - With 60 13-Mar-23 27-May-23 24-May-23 04-Aug-23 57 HK Hols - No B/O periods 310.C.EX.W2028 WSA - Gatehouse B - MVAC 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 14-Apr-23 26-Jun-23 23-Jun-23 01-Sep-23 57 HK Hols - No B/O periods 310.C.EX.W2040 WSA - Gatehouse B - MVAC Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 12 07-Aug-23 19-Aug-23 14-Oct-23 28-Oct-23 57 HK Hols - No B/O periods Lifts Installation Works (was C11_6C3) d/w - 10h/d - With HK Hols 138- No B/O 0periods (was 11-Feb-23 C3) 01-Aug-23 07-Jul-23 18-Dec-23 116 310.C.EX.W2436 WSA - Gatehouse B - Submit Form LE 2&3 C11_6 d/w - 10h/d - With 0 11-Feb-23 03-Aug-23 140 HK Hols - No B/O periods 310.C.EX.W2042 WSA - Gatehouse B - Builder Works in Lift Shaft / Lift Pit / Pulley Room (was C11_6C3) d/w - 10h/d - With 24 13-Feb-23 11-Mar-23 07-Jul-23 03-Aug-23 116 HK Hols - No B/O periods 310.C.EX.W2050 WSA - Gatehouse B - Lift Installation (incl. T&C) (was C11_6C3) d/w - 10h/d - With 90 13-Mar-23 04-Jul-23 04-Aug-23 20-Nov-23 116 HK Hols - No B/O periods 310.C.EX.W2054 WSA - Gatehouse B - Submit Form LE5 (was C11_6C3) d/w - 10h/d - With 0 04-Jul-23 20-Nov-23 116 HK Hols - No B/O periods 310.C.EX.W2058 WSA - Gatehouse B - Waiting for EMSD Inspection for Lift (was C11_6C3) d/w - 10h/d - With 11 05-Jul-23 17-Jul-23 21-Nov-23 02-Dec-23 116 HK Hols - No B/O periods 310.C.EX.W2062 WSA - Gatehouse B - EMSD Inspection (was C11_6C3) d/w - 10h/d - With 11 18-Jul-23 29-Jul-23 04-Dec-23 15-Dec-23 116 HK Hols - No B/O periods 310.C.EX.W2066 WSA - Gatehouse B - Waiting for Issue of Use Permit (was C11_6C3) d/w - 10h/d - With 2 31-Jul-23 01-Aug-23 16-Dec-23 18-Dec-23 116 HK Hols - No B/O periods 310.C.EX.W2070 WSA - Gatehouse B - Issue of Use Permit (was C11_6C3) d/w - 10h/d - With 0 01-Aug-23 18-Dec-23 116 HK Hols - No B/O periods External Works (was C11_6C3) d/w - 10h/d - With HK Hols 251- No B/O 0periods (was 21-Dec-22 C3) 27-Oct-23 23-May-23 28-Oct-23 1 External Building Finishes C11_6 d/w - 10h/d - With HK Hols 169- No B/O 0periods (was 21-Dec-22 C3) 20-Jul-23 23-May-23 02-Aug-23 11 310.C.WS.S152 WSA - Gatehouse B - Roof Waterproofing & Roof Finishes C11_6 d/w - 10h/d - With 21 21-Dec-22 16-Jan-23 23-May-23 16-Jun-23 121 HK Hols - No B/O periods 310.C.ES.P716 WSA - Gatehouse B - External building finishes (was C11_6C3) d/w - 10h/d - With 38 05-Jun-23 20-Jul-23 17-Jun-23 02-Aug-23 11 HK Hols - No B/O periods Drainage and UU (was C11_6C3) d/w - 10h/d - With HK Hols 62- No B/O 0periods (was 05-Jun-23 C3) 17-Aug-23 17-Jun-23 03-Oct-23 38 310.C.ES.P696 WSA - Gatehouse B - Building drainage and watermain works C11_6 d/w - 10h/d - With 38 05-Jun-23 20-Jul-23 17-Jun-23 02-Aug-23 11 HK Hols - No B/O periods 310.C.ES.P720 WSA - Gatehouse B - CLP Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 30 14-Jun-23 20-Jul-23 28-Jun-23 02-Aug-23 11 HK Hols - No B/O periods 310.C.ES.P700 WSA - Gatehouse B - AS Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 24 21-Jul-23 17-Aug-23 04-Sep-23 03-Oct-23 38 HK Hols - No B/O periods 310.C.ES.P704 WSA - Gatehouse B - EL cable ducting + drawpits (was C11_6C3) d/w - 10h/d - With 24 21-Jul-23 17-Aug-23 05-Aug-23 01-Sep-23 13 HK Hols - No B/O periods Soft and Hard landscape & EVA Construction (was C11_6C3) d/w - 10h/d - With HK Hols 58- No B/O 0periods (was 18-Aug-23 C3) 27-Oct-23 15-Sep-23 28-Oct-23 1 310.C.ES.P708 WSA - Gatehouse B - Hard and soft landscape works C11_6 d/w - 10h/d - With 21 18-Aug-23 11-Sep-23 04-Oct-23 28-Oct-23 38 HK Hols - No B/O periods 310.C.WS.C120 WSA - Gatehouse B - Site Formation Works and Road Works for EVA (was C11_6C3) d/w - 10h/d - With 35 14-Sep-23 27-Oct-23 15-Sep-23 28-Oct-23 1 HK Hols - No B/O periods WSA - Screening Facilities (was C3) 269 0 19-May-22 13-Apr-23 08-Jun-22 31-Aug-24 414 Procurement C01_7 d/w - 10h/d - No HK Hols191 - No B/O periods 0 (was19-May-22 C1) 25-Nov-22 08-Jun-22 15-Dec-22 20 Major Materials ABWF C01_7 d/w - 10h/d - No HK Hols104 - No B/O periods 0 (was05-Jul-22 C1) 16-Oct-22 05-Aug-22 16-Nov-22 31 310.P.ES.P90 WSA Screening Facilities (Procurement ABWF) - Place Order for Materials C01_7 d/w - 10h/d - No HK 7 05-Jul-22 11-Jul-22 05-Aug-22 11-Aug-22 31 Hols - No B/O periods (was 310.P.ES.P102 WSA Screening Facilities (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 90 12-Jul-22 09-Oct-22 12-Aug-22 09-Nov-22 31 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 209 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.ES.P110 WSA Screening Facilities (Procurement ABWF) - Delivery of Materials C01_7 d/w - 10h/d - No HK 7 10-Oct-22 16-Oct-22 10-Nov-22 16-Nov-22 31 Hols - No B/O periods (was Major Materials MEP C1) C01_7 d/w - 10h/d - No HK Hols191 - No B/O periods 0 (was19-May-22 C1) 25-Nov-22 08-Jun-22 15-Dec-22 20 310.P.ES.P94 WSA Screening Facilities (Procurement MEP) - Place Order for Material C01_7 d/w - 10h/d - No HK 120 19-May-22 15-Sep-22 08-Jun-22 05-Oct-22 20 Hols - No B/O periods (was 310.P.ES.P126 WSA Screening Facilities (Procurement MEP) - Manufacturing of Material C1) C01_7 d/w - 10h/d - No HK 170 02-Jun-22 18-Nov-22 22-Jun-22 08-Dec-22 20 Hols - No B/O periods (was 310.P.ES.P130 WSA Screening Facilities (Procurement MEP) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 7 19-Nov-22 25-Nov-22 09-Dec-22 15-Dec-22 20 Hols - No B/O periods (was Initial Work and Site Preparation C1) 25 0 04-Jul-22 01-Aug-22 04-Jul-22 19-Aug-22 16 310.C.WS.R010 WSA - Screening Facilities - Site access WA3310/12 C01_7 d/w - 10h/d - No HK 0 04-Jul-22* 04-Jul-22 0 Hols - No B/O periods (was 310.C.WS.R026 WSA - Screening Facilities - Hoarding C1) C03_7 d/w - 10h/d - With 3 04-Jul-22 06-Jul-22 22-Jul-22 24-Jul-22 18 HK Hols - No B/O periods 310.C.WS.R014 WSA - Screening Facilities - Carry out site survey C03_7 d/w - 10h/d - With 1 06-Jul-22 06-Jul-22 24-Jul-22 24-Jul-22 18 HK Hols - No B/O periods 310.C.WS.R018 WSA - Screening Facilities - Install monitoring point C03_7 d/w - 10h/d - With 1 07-Jul-22 07-Jul-22 25-Jul-22 25-Jul-22 18 HK Hols - No B/O periods 310.C.WS.R022 WSA - Screening Facilities - UU detection and trial pit C03_7 d/w - 10h/d - With 4 08-Jul-22 11-Jul-22 26-Jul-22 29-Jul-22 18 HK Hols - No B/O periods 310.C.WS.R046.B01 WSA - Screening Facilities - Diversion of underground utilities (if any) C03_7 d/w - 10h/d - With 21 12-Jul-22 01-Aug-22 30-Jul-22 19-Aug-22 18 HK Hols - No B/O periods Structural Works C11_6 d/w - 10h/d - With HK Hols 82- No B/O 0periods (was 04-Jul-22 C3) 10-Oct-22 06-Aug-22 28-Oct-22 16 310.C.WS.R030 WSA - Screening Facilities - Obtain BA8 consent C11_6 d/w - 10h/d - With 0 04-Jul-22 06-Aug-22 30 HK Hols - No B/O periods 310.C.WS.R034 WSA - Screening Facilities - BA10 notice of commencement of works (was C11_6C3) d/w - 10h/d - With 6 04-Jul-22 09-Jul-22 08-Aug-22 13-Aug-22 30 HK Hols - No B/O periods 310.C.WS.R038 WSA - Screening Facilities - SI works + Submit Report (was C11_6C3) d/w - 10h/d - With 5 12-Jul-22 16-Jul-22 15-Aug-22 19-Aug-22 29 HK Hols - No B/O periods 310.C.WS.R042 WSA - Screening Facilities - Open Cut Excavation to FL + Plate Load Test (was C11_6C3) d/w - 10h/d - With 11 02-Aug-22 13-Aug-22 20-Aug-22 01-Sep-22 16 HK Hols - No B/O periods 310.C.WS.R050 WSA - Screening Facilities - Construction of footing(621 m3), backfill, GF base slab (126 (was C11_6C3) d/w - 10h/d - With 28 15-Aug-22 16-Sep-22 02-Sep-22 07-Oct-22 16 M3) HK Hols - No B/O periods 310.C.WS.R058 WSA - Screening Facilities (RF) - columns, walls, beams and slab; Vol = 82 m3 (was C11_6C3) d/w - 10h/d - With 18 17-Sep-22 10-Oct-22 08-Oct-22 28-Oct-22 16 HK Hols - No B/O periods ABWF Works (was C11_6C3) d/w - 10h/d - With HK Hols 65- No B/O 0periods (was 11-Oct-22 C3) 24-Dec-22 17-Nov-22 31-Aug-24 499 310.C.WS.R062 WSA - Screening Facilities - Roof Waterproofing & Roof Finishes C11_6 d/w - 10h/d - With 14 11-Oct-22 26-Oct-22 16-Aug-24 31-Aug-24 550 HK Hols - No B/O periods 310.C.WS.R066 WSA - Screening Facilities - ABWF Internal Works (was C11_6C3) d/w - 10h/d - With 51 27-Oct-22 24-Dec-22 17-Nov-22 17-Jan-23 18 HK Hols - No B/O periods 310.C.WS.R068 WSA - Screening Facilities - ABWF External Works (was C11_6C3) d/w - 10h/d - With 51 27-Oct-22 24-Dec-22 28-Feb-23 03-May-23 101 HK Hols - No B/O periods MEP Works (was C11_6C3) d/w - 10h/d - With HK Hols 68- No B/O 0periods (was 26-Nov-22 C3) 18-Feb-23 16-Dec-22 10-Mar-23 17 310.C.WS.R078 WSA - Screening Facilities - Building Services Installations C11_6 d/w - 10h/d - With 52 26-Nov-22 31-Jan-23 16-Dec-22 20-Feb-23 17 HK Hols - No B/O periods 310.C.WS.R198 WSA - Screening Facilities - Power On Test (was C11_6C3) d/w - 10h/d - With 8 10-Feb-23 18-Feb-23 02-Mar-23 10-Mar-23 17 HK Hols - No B/O periods Fencing, Drainage and UU (was C11_6C3) d/w - 10h/d - With HK Hols 150- No B/O 0periods (was 11-Oct-22 C3) 13-Apr-23 29-Oct-22 03-May-23 16 310.C.WS.R102 WSA - Screening Facilities (Drainage) - Drainage (stormwater, rainwater, sewerage) C11_6 d/w - 10h/d - With 30 11-Oct-22 14-Nov-22 29-Oct-22 02-Dec-22 16 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 210 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.WS.R106 WSA - Screening Facilities (UU) - CLP, watermain, telecomm C11_6 d/w - 10h/d - With 90 15-Nov-22 04-Mar-23 03-Dec-22 23-Mar-23 16 HK Hols - No B/O periods 310.C.WS.R110 WSA - Screening Facilities (pavement) - pavement and landscaping (was C11_6C3) d/w - 10h/d - With 30 06-Mar-23 13-Apr-23 24-Mar-23 03-May-23 16 HK Hols - No B/O periods 310.C.WS.R190 WSA - Screening Facilities (Security Fence) - construction of security fence (was C11_6C3) d/w - 10h/d - With 30 06-Mar-23 13-Apr-23 24-Mar-23 03-May-23 16 HK Hols - No B/O periods AGL Vault D Annex (was C3) 592 0 07-Jun-21 A 02-Jun-23 28-Mar-22 14-Jul-24 331 Procurement C01_7 d/w - 10h/d - No HK Hols160 - No B/O periods 0 (was12-May-22 C1) 18-Oct-22 18-May-22 09-Dec-22 52 Major Materials ABWF C01_7 d/w - 10h/d - No HK Hols77 - No B/O periods 0 (was03-Aug-22 C1) 18-Oct-22 12-Sep-22 09-Dec-22 52 310.P.RC.D343.6.B01 AGL Vault D Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of C01_7 d/w - 10h/d - No HK 45 03-Aug-22 16-Sep-22 12-Sep-22 26-Oct-22 40 Metal Cover at G/F (1 set) Hols - No B/O periods (was 310.P.RC.D343 AGL Vault D Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of C1) C01_7 d/w - 10h/d - No HK 45 08-Aug-22 21-Sep-22 27-Sep-22 10-Nov-22 50 Louvre (Approx 6 nos) Hols - No B/O periods (was 310.P.RC.D343.4.B01 AGL Vault D Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of C1) C01_7 d/w - 10h/d - No HK 45 08-Aug-22 21-Sep-22 27-Sep-22 10-Nov-22 50 Cladding Hols - No B/O periods (was 310.P.RC.D343.2.B01 AGL Vault D Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of C1) C01_7 d/w - 10h/d - No HK 30 18-Aug-22 16-Sep-22 20-Sep-22 19-Oct-22 33 Drainage Channel at R/F Hols - No B/O periods (was 310.P.RC.D343.3.B01 AGL Vault D Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of C1) C01_7 d/w - 10h/d - No HK 30 18-Aug-22 16-Sep-22 27-Sep-22 26-Oct-22 40 Raised Floor at Communication Room Hols - No B/O periods (was 310.P.RC.D511 AGL Vault D Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of Fall C1) C01_7 d/w - 10h/d - No HK 45 18-Aug-22 01-Oct-22 17-Sep-22 31-Oct-22 30 Restraint System (1set) Hols - No B/O periods (was 310.P.RC.D339 AGL Vault D Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of cat C1) C01_7 d/w - 10h/d - No HK 30 28-Aug-22 26-Sep-22 12-Oct-22 10-Nov-22 45 ladder (1 no) Hols - No B/O periods (was 310.P.RC.D343.5.B01 AGL Vault D Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of Door C1) C01_7 d/w - 10h/d - No HK 45 04-Sep-22 18-Oct-22 26-Oct-22 09-Dec-22 52 with ironmongery (Approx 5 Nos) Hols - No B/O periods (was Major Materials MEP C1) C01_7 d/w - 10h/d - No HK Hols113 - No B/O periods 0 (was12-May-22 C1) 01-Sep-22 18-May-22 01-Sep-22 0 Electrical & MVAC Services C01_7 d/w - 10h/d - No HK Hols104 - No B/O periods 0 (was12-May-22 C1) 23-Aug-22 18-May-22 01-Sep-22 9 310.P.RC.D331 AGL Vault D Annex (Procurement Electrical & MVAC Materials) - AC/ ventilation fan, LV & C01_7 d/w - 10h/d - No HK 50 12-May-22 30-Jun-22 18-May-22 06-Jul-22 6 Others Place Order for Materials Hols - No B/O periods (was 310.P.RC.D519 AGL Vault D Annex (Procurement Electrical & MVAC Materials) - AC/ ventilation fan, LV C1) C01_7 d/w - 10h/d - No HK 90 19-May-22 16-Aug-22 25-May-22 22-Aug-22 6 &Others-Manufacturing of Materials Hols - No B/O periods (was 310.P.RC.D499 AGL Vault D Annex (Procurement Electrical & MVAC Materials) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 28 27-Jul-22 23-Aug-22 05-Aug-22 01-Sep-22 9 Hols - No B/O periods (was 310.P.RC.D351 AGL Vault D Annex (Procurement Electrical & MVAC Materials) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 14 10-Aug-22 23-Aug-22 16-Aug-22 29-Aug-22 6 (Long Lead Items) Hols - No B/O periods (was Plumbing & Drainage Services C1) C01_7 d/w - 10h/d - No HK Hols50 - No B/O periods 0 (was06-Jul-22 C1) 24-Aug-22 14-Jul-22 01-Sep-22 8 310.P.RC.D327 AGL Vault D Annex (Procurement Plumbing & Drainage Materials) - Pipes, valves & C01_7 d/w - 10h/d - No HK 3 06-Jul-22 08-Jul-22 14-Jul-22 16-Jul-22 8 Others - Place Order for Materials Hols - No B/O periods (was 310.P.RC.D515 AGL Vault D Annex (Procurement Plumbing & Drainage Materials) - Pipes, valves & C1) C01_7 d/w - 10h/d - No HK 40 09-Jul-22 17-Aug-22 17-Jul-22 25-Aug-22 8 Others - Manufacturing of Materials Hols - No B/O periods (was 310.P.RC.D575.B01 AGL Vault D Annex (Procurement Plumbing & Drainage Materials) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 7 18-Aug-22 24-Aug-22 26-Aug-22 01-Sep-22 8 (Long Lead Items) Hols - No B/O periods (was 310.P.RC.D571.B01 AGL Vault D Annex (Procurement Plumbing & Drainage Materials) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 7 18-Aug-22 24-Aug-22 26-Aug-22 01-Sep-22 8 Hols - No B/O periods (was Fire Services C1) C01_7 d/w - 10h/d - No HK Hols96 - No B/O periods 0 (was29-May-22 C1) 01-Sep-22 29-May-22 01-Sep-22 0 310.P.RC.D328 AGL Vault D Annex (Procurement FS Materials) - 1230 system, AC & Others - Place C01_7 d/w - 10h/d - No HK 60 29-May-22 27-Jul-22 29-May-22 27-Jul-22 0 Order for Materials Hols - No B/O periods (was 310.P.RC.D523 AGL Vault D Annex (Procurement FS Materials) - 1230 system, AC & Others - C1) C01_7 d/w - 10h/d - No HK 75 12-Jun-22 25-Aug-22 12-Jun-22 25-Aug-22 0 Manufacturing of Materials Hols - No B/O periods (was 310.P.RC.D563.B01 AGL Vault D Annex (Procurement FS Materials) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 28 05-Aug-22 01-Sep-22 05-Aug-22 01-Sep-22 0 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 211 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.RC.D567.B01 AGL Vault D Annex (Procurement FS Materials) - Delivery of Materials (Long Lead Items) C01_7 d/w - 10h/d - No HK 14 12-Aug-22 25-Aug-22 19-Aug-22 01-Sep-22 7 Hols - No B/O periods (was Construction C1) 506 0 07-Jun-21 A 15-Feb-23 28-Mar-22 13-Dec-23 247 Initial Works 278 0 07-Jun-21 A 21-Mar-22 A 28-Mar-22 28-Mar-22 310.D.RC.D379 AGL Vault D Annex (Work Permit) - Coordination with AA to grant Site Access + C01_7 d/w - 10h/d - No HK 117 07-Jun-21 A 01-Oct-21 A 28-Mar-22 28-Mar-22 preparation works Hols - No B/O periods (was 310.D.RC.D391 AGL Vault D Annex (Site Prep.) - Assumed site possession of the area C1) C11_6 d/w - 10h/d - With 0 25-Oct-21 A 28-Mar-22 HK Hols - No B/O periods 310.D.RC.D467.B01 AGL Vault D Annex (Site Prep.) - MS Instrumentation Submission and Acceptance (was C01_7C3) d/w - 10h/d - No HK 60 11-Nov-21 A 04-Dec-21 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.D.RC.D455.B01 AGL Vault D Annex (Site Prep.) - Site query (CFJV-SQ-00120) on existing UU - C1) C11_6 d/w - 10h/d - With 6 17-Nov-21 A 24-Nov-21 A 28-Mar-22 28-Mar-22 Submission HK Hols - No B/O periods 310.D.RC.D399 AGL Vault D Annex (Site Prep.) - carry out condition survey and report (was C11_6C3) d/w - 10h/d - With 10 19-Nov-21 A 19-Nov-21 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.D.RC.D411 AGL Vault D Annex (Site Prep.) - carry out trial pit (was C11_6C3) d/w - 10h/d - With 6 20-Nov-21 A 23-Nov-21 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.D.RC.D403 AGL Vault D Annex (Site Prep.) - carry out UU detection survey and report (was C11_6C3) d/w - 10h/d - With 8 20-Nov-21 A 09-Dec-21 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.D.RC.D459.B01 AGL Vault D Annex (Site Prep.) - Site query (CFJV-SQ-00120) on existing UU - Review & (was C11_6C3) d/w - 10h/d - With 14 25-Nov-21 A 21-Mar-22 A 28-Mar-22 28-Mar-22 Comments HK Hols - No B/O periods 310.D.RC.D407 AGL Vault D Annex (Site Prep.) - install Instrumentation (was C11_6C3) d/w - 10h/d - With 6 06-Dec-21 A 09-Dec-21 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods 310.D.RC.D415 AGL Vault D Annex (Site Prep.) - divert existing UU cables (was C11_6C3) d/w - 10h/d - With 14 21-Mar-22 A 21-Mar-22 A 28-Mar-22 28-Mar-22 HK Hols - No B/O periods Excavation (was C3) 91 0 20-Dec-21 A 18-Apr-22 28-Mar-22 18-Apr-22 0 310.D.RC.D414 AGL Vault D Annex - Submit BA8 consent application C01_7 d/w - 10h/d - No HK 7 20-Dec-21 A 07-Feb-22 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.D.RC.D416 AGL Vault D Annex - Submit BA10 notice to commencement of work C1) C01_7 d/w - 10h/d - No HK 7 11-Feb-22 A 16-Feb-22 A 28-Mar-22 28-Mar-22 Hols - No B/O periods (was 310.D.RC.D419 AGL Vault D Annex (Excavation) - open excavation to from +7.40mPD to +5.525mPD C1) C11_6 d/w - 10h/d - With 13 21-Mar-22 A 04-Apr-22 28-Mar-22 04-Apr-22 0 (Qty. 630m3) HK Hols - No B/O periods 310.D.RC.D423 AGL Vault D Annex (Foundation) - plate load test (Qty: 2 nos.) (was C01_7C3) d/w - 10h/d - No HK 14 05-Apr-22 18-Apr-22 05-Apr-22 18-Apr-22 0 Hols - No B/O periods (was Structure C1) C11_6 d/w - 10h/d - With HK Hols 90- No B/O 0periods (was 11-Mar-22 C3) A 04-Aug-22 19-Apr-22 04-Aug-22 0 Foundation C11_6 d/w - 10h/d - With HK Hols 16- No B/O 0periods (was 19-Apr-22 C3) 07-May-22 19-Apr-22 07-May-22 0 310.D.RC.D427 AGL Vault D Annex (Foundation) - construction of footing (600mm thk) (104m3) C11_6 d/w - 10h/d - With 16 19-Apr-22 07-May-22 19-Apr-22 07-May-22 0 HK Hols - No B/O periods Screen wall from footing to Ground Floor Slab (was C11_6C3) d/w - 10h/d - With HK Hols 18- No B/O 0periods (was 09-May-22 C3) 28-May-22 09-May-22 28-May-22 0 310.D.RC.D431 AGL Vault D Annex (Ground) - Upstand/screen wall & mass concrete fill for cable trench C11_6 d/w - 10h/d - With 18 09-May-22 28-May-22 09-May-22 28-May-22 0 & construct G/F slab (445m3) HK Hols - No B/O periods UG column/wall to Roof Slab Including parapet wall (was C11_6C3) d/w - 10h/d - With HK Hols 56- No B/O 0periods (was 11-Mar-22 C3) A 04-Aug-22 09-May-22 04-Aug-22 0 310.D.RC.D395 AGL Vault D Annex (Site Prep.) - erect hoarding C11_6 d/w - 10h/d - With 4 11-Mar-22 A 11-Mar-22 A 09-May-22 09-May-22 HK Hols - No B/O periods 310.D.RC.D435 AGL Vault D Annex (Ground ) - columns, walls from UG to roof (57m3) (was C11_6C3) d/w - 10h/d - With 28 30-May-22 02-Jul-22 30-May-22 02-Jul-22 0 HK Hols - No B/O periods 310.D.RC.D439 AGL Vault D Annex (Roof) - construction of beams and roof slab (159m3) (was C3) C11_6 d/w - 10h/d - With 21 04-Jul-22 27-Jul-22 04-Jul-22 27-Jul-22 0 HK Hols - No B/O periods 310.D.RC.D439.1.B01AGL Vault D Annex (Roof) - construction of parapet wall (13m3) (was C11_6C3) d/w - 10h/d - With 7 28-Jul-22 04-Aug-22 28-Jul-22 04-Aug-22 0 HK Hols - No B/O periods ABWF and MEP (was C3) 159 0 05-Aug-22 15-Feb-23 05-Aug-22 13-Dec-23 247 Internal Finishes 72 0 05-Aug-22 31-Oct-22 05-Aug-22 30-Nov-22 26
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 212 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.RC.D463.B01 AGL Vault D Annex (ABWF and MEP) - Curing and Removal of Falsework/Formworks C01_7 d/w - 10h/d - No HK 12 05-Aug-22 16-Aug-22 05-Aug-22 16-Aug-22 0 Hols - No B/O periods (was 310.D.RC.D447 AGL Vault D Annex (ABWF) - commencement C1) C11_6 d/w - 10h/d - With 0 17-Aug-22 17-Aug-22 0 HK Hols - No B/O periods 310.D.RC.D451 AGL Vault D Annex (ABWF) - Internal Works - Blockwall (was C11_6C3) d/w - 10h/d - With 10 17-Aug-22 27-Aug-22 17-Aug-22 27-Aug-22 0 HK Hols - No B/O periods 310.D.RC.D663.B01 AGL Vault D Annex (ABWF) - Internal Works - Wall & Ceiling Finishes (was C11_6C3) d/w - 10h/d - With 20 29-Aug-22 21-Sep-22 29-Aug-22 21-Sep-22 0 HK Hols - No B/O periods 310.D.RC.D667.B01 AGL Vault D Annex (ABWF) - Internal Works - Flooring (was C11_6C3) d/w - 10h/d - With 20 22-Sep-22 17-Oct-22 27-Oct-22 18-Nov-22 28 HK Hols - No B/O periods 310.D.RC.D668.B01 AGL Vault D Annex (ABWF) - Internal Works - Metal Works (was C11_6C3) d/w - 10h/d - With 10 20-Oct-22 31-Oct-22 19-Nov-22 30-Nov-22 26 HK Hols - No B/O periods MEP Installation Works (was C3) 135 0 02-Sep-22 15-Feb-23 02-Sep-22 13-Dec-23 247 Drainage Installation C11_6 d/w - 10h/d - With HK Hols 89- No B/O 0periods (was 02-Sep-22 C3) 17-Dec-22 02-Sep-22 17-Dec-22 0 310.D.RC.D475.100B02 AGL Vault D Annex - Drainage 1st Fix & Installation C11_6 d/w - 10h/d - With 60 02-Sep-22 14-Nov-22 02-Sep-22 14-Nov-22 0 HK Hols - No B/O periods 310.D.RC.D475.110B02 AGL Vault D Annex - Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 29-Sep-22 09-Dec-22 29-Sep-22 09-Dec-22 0 HK Hols - No B/O periods 310.D.RC.D475.120B02 AGL Vault D Annex - Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 10-Dec-22 17-Dec-22 10-Dec-22 17-Dec-22 0 HK Hols - No B/O periods Electrical Installation (was C3) 135 0 02-Sep-22 15-Feb-23 02-Sep-22 13-Dec-23 247 310.D.RC.D475 AGL Vault D Annex - Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 60 02-Sep-22 14-Nov-22 02-Sep-22 14-Nov-22 0 HK Hols - No B/O periods 310.D.RC.D475.140B02 AGL Vault D Annex - Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 12-Sep-22 22-Nov-22 12-Sep-22 22-Nov-22 0 HK Hols - No B/O periods 310.D.RC.D635.1B01AGL Vault D Annex - Access Date for Power Supply Installation by others (was C11_6C3) d/w - 10h/d - With 0 14-Nov-22 14-Nov-22 0 HK Hols - No B/O periods 310.D.RC.D475.150B02 AGL Vault D Annex - Electrical Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 23-Nov-22 30-Nov-22 23-Nov-22 30-Nov-22 0 HK Hols - No B/O periods 310.D.RC.D659.B01 AGL Vault D Annex (MEP) - Megger Test (was C11_6C3) d/w - 10h/d - With 15 01-Dec-22 17-Dec-22 01-Dec-22 17-Dec-22 0 HK Hols - No B/O periods 310.D.RC.D611 AGL Vault D Annex - Achieved KD-1 (Stage 1)/ Provide Access for Other Contractors to (was C01_7C3) d/w - 10h/d - No HK 0 17-Dec-22 17-Dec-22 0 Commence their follow-on works Hols - No B/O periods (was 310.D.RC.D635 AGL Vault D Annex - Latest Date for Power Supply by Others C1) C11_6 d/w - 10h/d - With 0 17-Dec-22 17-Dec-22 0 HK Hols - No B/O periods 310.D.RC.D627 AGL Vault D Annex - System Integration T&C (was C11_6C3) d/w - 10h/d - With 30 09-Jan-23 15-Feb-23 09-Nov-23 13-Dec-23 247 HK Hols - No B/O periods Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 89- No B/O 0periods (was 02-Sep-22 C3) 17-Dec-22 02-Sep-22 17-Dec-22 0 310.D.RC.D475.160B02 AGL Vault D Annex - Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 60 02-Sep-22 14-Nov-22 02-Sep-22 14-Nov-22 0 HK Hols - No B/O periods 310.D.RC.D475.170B02 AGL Vault D Annex - Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 29-Sep-22 09-Dec-22 29-Sep-22 09-Dec-22 0 HK Hols - No B/O periods 310.D.RC.D475.180B02 AGL Vault D Annex - Fire Service Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 10-Dec-22 17-Dec-22 10-Dec-22 17-Dec-22 0 HK Hols - No B/O periods MVAC Installation (was C11_6C3) d/w - 10h/d - With HK Hols 89- No B/O 0periods (was 02-Sep-22 C3) 17-Dec-22 02-Sep-22 17-Dec-22 0 310.D.RC.D475.190B02 AGL Vault D Annex - MVAC 1st Fix & Installation C11_6 d/w - 10h/d - With 60 02-Sep-22 14-Nov-22 02-Sep-22 14-Nov-22 0 HK Hols - No B/O periods 310.D.RC.D475.200B02 AGL Vault D Annex - MVAC 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 29-Sep-22 09-Dec-22 29-Sep-22 09-Dec-22 0 HK Hols - No B/O periods 310.D.RC.D475.210B02 AGL Vault D Annex - MVAC Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 7 10-Dec-22 17-Dec-22 10-Dec-22 17-Dec-22 0 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 213 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Roof Floor Finishes 72 0 05-Aug-22 31-Oct-22 12-Oct-22 30-Nov-22 26 310.D.RC.D442.B01 AGL Vault D Annex (Roof) - Curing and Removal of formworks C01_7 d/w - 10h/d - No HK 8 05-Aug-22 12-Aug-22 12-Oct-22 19-Oct-22 68 Hols - No B/O periods (was 310.D.RC.D443 AGL Vault D Annex (Roof) - Drainage channel, waterproofing and concrete paving, C1) C11_6 d/w - 10h/d - With 36 17-Sep-22 31-Oct-22 20-Oct-22 30-Nov-22 26 painting and fall restraint system HK Hols - No B/O periods External Wall Finishes (was C3) 76 0 05-Aug-22 04-Nov-22 28-Oct-22 17-Dec-22 37 310.D.RC.D603.37.B01AGL Vault D Annex (External Wall) - Curing and Removal of formworks C01_7 d/w - 10h/d - No HK 8 05-Aug-22 12-Aug-22 28-Oct-22 04-Nov-22 84 Hols - No B/O periods (was 310.D.RC.D603.05.B01AGL Vault D Annex (External Wall) - Erect Scaffolding for external Wall C1) C11_6 d/w - 10h/d - With 5 13-Aug-22 18-Aug-22 05-Nov-22 10-Nov-22 69 HK Hols - No B/O periods 310.D.RC.D603.17.B01AGL Vault D Annex (External Wall) - External rendering, Installation of cladding, cat (was C11_6C3) d/w - 10h/d - With 25 27-Sep-22 27-Oct-22 11-Nov-22 09-Dec-22 37 ladder, louvres HK Hols - No B/O periods 310.D.RC.D603.33.B01AGL Vault D Annex (External Wall) - Dismantle Scaffolding & Install door with (was C11_6C3) d/w - 10h/d - With 7 28-Oct-22 04-Nov-22 10-Dec-22 17-Dec-22 37 ironmongery HK Hols - No B/O periods External Works (was C11_6C3) d/w - 10h/d - With HK Hols 120- No B/O 0periods (was 19-Aug-22 C3) 11-Jan-23 28-Aug-23 13-Dec-23 274 310.D.RC.D515 AGL Vault D Annex (Drain/UU) - Drainage System + Watermain Works C11_6 d/w - 10h/d - With 30 19-Aug-22 23-Sep-22 28-Aug-23 03-Oct-23 304 HK Hols - No B/O periods 310.D.RC.D515.1.B01 AGL Vault D Annex (Drain/UU) - Cable & System Duct (was C11_6C3) d/w - 10h/d - With 30 24-Sep-22 31-Oct-22 04-Oct-23 08-Nov-23 304 HK Hols - No B/O periods 310.D.RC.D603 AGL Vault D Annex - External Works (was C11_6C3) d/w - 10h/d - With 60 01-Nov-22 11-Jan-23 04-Oct-23 13-Dec-23 274 HK Hols - No B/O periods Statutory Inspection (was C01_7C3) d/w - 10h/d - No HK Hols107 - No B/O periods 0 (was16-Feb-23 C1) 02-Jun-23 14-Dec-23 14-Jul-24 408 Fire Services Department (FSD) C01_7 d/w - 10h/d - No HK Hols77 - No B/O periods 0 (was16-Feb-23 C1) 03-May-23 14-Dec-23 28-Feb-24 301 310.D.RC.D539 AGL Vault D Annex - Submit FS Statutory Form Submissions for Inspection (FS314, C01_7 d/w - 10h/d - No HK 14 16-Feb-23 01-Mar-23 14-Dec-23 27-Dec-23 301 FS251, FS501) Hols - No B/O periods (was 310.D.RC.D543 AGL Vault D Annex - FS Inspection and defects rectification C1) C01_7 d/w - 10h/d - No HK 30 14-Mar-23 12-Apr-23 09-Jan-24 07-Feb-24 301 Hols - No B/O periods (was 310.D.RC.D547 AGL Vault D Annex - Obtain FS 172 Certificate C1) C01_7 d/w - 10h/d - No HK 21 13-Apr-23 03-May-23 08-Feb-24 28-Feb-24 301 Hols - No B/O periods (was Building Department (BD) C1) C01_7 d/w - 10h/d - No HK Hols30 - No B/O periods 0 (was04-May-23 C1) 02-Jun-23 29-Feb-24 14-Jul-24 408 310.D.RC.D551 AGL Vault D Annex - BD Inspection + Submit BA13 and Apply for OP to BD C01_7 d/w - 10h/d - No HK 30 04-May-23 02-Jun-23 29-Feb-24 29-Mar-24 301 Hols - No B/O periods (was 310.D.RC.D555 AGL Vault D Annex - BD issued OP certificate C1) C01_7 d/w - 10h/d - No HK 0 02-Jun-23 29-Mar-24 301 Hols - No B/O periods (was 310.D.RC.D559 AGL Vault D Annex - Achieved KD-10 (Section 3) C1) C01_7 d/w - 10h/d - No HK 0 02-Jun-23 14-Jul-24 408 Hols - No B/O periods (was AGL Vault C Annex C1) 661 0 07-Jun-21 A 24-Aug-23 19-Feb-22 14-Jul-24 262 Procurement C01_7 d/w - 10h/d - No HK Hols184 - No B/O periods 0 (was18-May-22 C1) 17-Nov-22 21-Jun-22 22-Aug-23 278 Major Materials ABWF C01_7 d/w - 10h/d - No HK Hols106 - No B/O periods 0 (was04-Aug-22 C1) 17-Nov-22 13-Aug-22 22-Aug-23 278 310.P.RC.D128.3B01 AGL Vault C Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of C01_7 d/w - 10h/d - No HK 45 04-Aug-22 17-Sep-22 13-Aug-22 26-Sep-22 9 Stainless Steel chequered plate at G/F Hols - No B/O periods (was 310.P.RC.D128 AGL Vault C Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of C1) C01_7 d/w - 10h/d - No HK 45 04-Oct-22 17-Nov-22 09-Jul-23 22-Aug-23 278 louvre (4 nos) Hols - No B/O periods (was 310.P.RC.D128.1B01 AGL Vault C Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of C1) C01_7 d/w - 10h/d - No HK 45 04-Oct-22 17-Nov-22 09-Jul-23 22-Aug-23 278 Cladding Hols - No B/O periods (was 310.P.RC.D128.2B01 AGL Vault C Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of door C1) C01_7 d/w - 10h/d - No HK 45 04-Oct-22 17-Nov-22 09-Jul-23 22-Aug-23 278 with ironmongery (Approx 4 Nos) Hols - No B/O periods (was 310.P.RC.D128.4B01 AGL Vault C Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of cat C1) C01_7 d/w - 10h/d - No HK 45 04-Oct-22 17-Nov-22 09-Jul-23 22-Aug-23 278 ladder (1 no) Hols - No B/O periods (was 310.P.RC.D527 AGL Vault C Annex (Procurement ABWF) -Place order, Manufacturing & Delivery of fall C1) C01_7 d/w - 10h/d - No HK 45 04-Oct-22 17-Nov-22 21-Nov-22 04-Jan-23 48 restraint system (1 set) Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 214 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 3310.P.RC.D112.B01 AGL Vault C Annex (Procurement ABWF) - Place order, Manufacturing & Delivery of C01_7 d/w - 10h/d - No HK 45 04-Oct-22 17-Nov-22 21-Nov-22 04-Jan-23 48 drainage channel Hols - No B/O periods (was Major Materials MEP C1) C01_7 d/w - 10h/d - No HK Hols163 - No B/O periods 0 (was18-May-22 C1) 27-Oct-22 21-Jun-22 31-Oct-22 4 Electrical & MVAC Services C01_7 d/w - 10h/d - No HK Hols103 - No B/O periods 0 (was18-May-22 C1) 28-Aug-22 21-Jul-22 31-Oct-22 64 310.P.RC.D120 AGL Vault C Annex (Procurement Electrical & MVAC Materials) - AC/ ventilation fan, LV & C01_7 d/w - 10h/d - No HK 40 18-May-22 26-Jun-22 21-Jul-22 29-Aug-22 64 Others Place Order Hols - No B/O periods (was 310.P.RC.D535 AGL Vault C Annex (Procurement Electrical & MVAC Materials) - AC/ ventilation fan, LV & C1) C01_7 d/w - 10h/d - No HK 95 18-May-22 20-Aug-22 21-Jul-22 23-Oct-22 64 Others-Manufacturing of material Hols - No B/O periods (was 310.P.RC.D507 AGL Vault C Annex (Procurement Electrical & MVAC Materials) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 28 31-Jul-22 27-Aug-22 04-Oct-22 31-Oct-22 65 Hols - No B/O periods (was 310.P.RC.D136 AGL Vault C Annex (Procurement Electrical & MVAC Materials) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 14 15-Aug-22 28-Aug-22 18-Oct-22 31-Oct-22 64 (Long Lead Items) Hols - No B/O periods (was Plumbing & Drainage Services C1) C01_7 d/w - 10h/d - No HK Hols108 - No B/O periods 0 (was06-Jul-22 C1) 21-Oct-22 16-Jul-22 31-Oct-22 10 310.P.RC.D116 AGL Vault C Annex (Procurement Plumbing & Drainage Materials) - Pipes, valves & C01_7 d/w - 10h/d - No HK 5 06-Jul-22 10-Jul-22 16-Jul-22 20-Jul-22 10 Others - Place Order for Materials Hols - No B/O periods (was 310.P.RC.D531 AGL Vault C Annex (Procurement Plumbing & Drainage Materials) - Pipes, valves & C1) C01_7 d/w - 10h/d - No HK 95 11-Jul-22 13-Oct-22 21-Jul-22 23-Oct-22 10 Others - Manufacturing of Materials Hols - No B/O periods (was 310.P.RC.D543.B01 AGL Vault C Annex (Procurement Plumbing & Drainage Materials) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 28 23-Sep-22 20-Oct-22 04-Oct-22 31-Oct-22 11 Hols - No B/O periods (was 310.P.RC.D547.B01 AGL Vault C Annex (Procurement Plumbing & Drainage Materials) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 14 08-Oct-22 21-Oct-22 18-Oct-22 31-Oct-22 10 (Long Lead Items) Hols - No B/O periods (was Fire Services C1) C01_7 d/w - 10h/d - No HK Hols133 - No B/O periods 0 (was17-Jun-22 C1) 27-Oct-22 21-Jun-22 31-Oct-22 4 310.P.RC.D503 AGL Vault C Annex (Procurement FS Materials) - 1230 system, AC & Others - Place C01_7 d/w - 10h/d - No HK 30 17-Jun-22 16-Jul-22 21-Jun-22 20-Jul-22 4 Order for Materials Hols - No B/O periods (was 310.P.RC.D539 AGL Vault C Annex (Procurement FS Materials) - 1230 system, AC & Others - C1) C01_7 d/w - 10h/d - No HK 95 17-Jul-22 19-Oct-22 21-Jul-22 23-Oct-22 4 Manufacturing of Materials Hols - No B/O periods (was 310.P.RC.D555.B01 AGL Vault C Annex (Procurement FS Materials) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 28 29-Sep-22 26-Oct-22 04-Oct-22 31-Oct-22 5 Hols - No B/O periods (was 310.P.RC.D559.B01 AGL Vault C Annex (Procurement FS Materials) - Delivery of Materials (Long Lead Items) C1) C01_7 d/w - 10h/d - No HK 14 14-Oct-22 27-Oct-22 18-Oct-22 31-Oct-22 4 Hols - No B/O periods (was Construction C1) 572 0 07-Jun-21 A 09-May-23 19-Feb-22 13-Dec-23 181 Initial Works 292 0 07-Jun-21 A 30-May-22 19-Feb-22 24-May-22 -5 310.C.RC.D018 AGL Vault C Annex - Coordination with AA/Other Contractor/AD to grant Site Access + C01_7 d/w - 10h/d - No HK 165 07-Jun-21 A 18-Nov-21 A 19-Feb-22 19-Feb-22 preparation works Hols - No B/O periods (was 310.C.RC.D078.B01 AGL Vault C Annex (Site Prep.) - Method statement for Installation and monitoring @ AGL C1) C01_7 d/w - 10h/d - No HK 49 16-Nov-21 A 05-Jan-22 A 24-Feb-22 24-Feb-22 Vault C & D Hols - No B/O periods (was 310.C.RC.D030 AGL Vault C Annex (Site Prep.) - carry out condition survey and report C1) C11_6 d/w - 10h/d - With 10 17-Nov-21 A 08-Dec-21 A 19-Feb-22 19-Feb-22 HK Hols - No B/O periods 310.C.RC.D082.B01 AGL Vault C Annex (Site Prep.) - Review and Acceptance 4th round (was C01_7C3) d/w - 10h/d - No HK 29 05-Jan-22 A 14-Feb-22 A 24-Feb-22 24-Feb-22 Hols - No B/O periods (was 310.C.RC.D086.B01 AGL Vault C Annex (Site Prep.) - Application of work permit C1) C01_7 d/w - 10h/d - No HK 21 05-Jan-22 A 14-Feb-22 A 24-Feb-22 24-Feb-22 Hols - No B/O periods (was 310.C.RC.D022 AGL Vault C Annex (Site Prep.) - site access C1) C11_6 d/w - 10h/d - With 0 28-Mar-22 19-Feb-22 -31 HK Hols - No B/O periods 310.C.RC.D038 AGL Vault C Annex (Site Prep.) - install Instrumentation (was C11_6C3) d/w - 10h/d - With 6 28-Mar-22 02-Apr-22 24-Feb-22 02-Mar-22 -27 HK Hols - No B/O periods 310.C.RC.D034 AGL Vault C Annex (Site Prep.) - carry out UU detection survey and report (was C11_6C3) d/w - 10h/d - With 10 28-Mar-22 08-Apr-22 19-Feb-22 02-Mar-22 -31 HK Hols - No B/O periods 310.C.RC.D042 AGL Vault C Annex (Site Prep.) - carry out trial pit (was C11_6C3) d/w - 10h/d - With 10 09-Apr-22 23-Apr-22 03-Mar-22 14-Mar-22 -31 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 215 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.D026 AGL Vault C Annex (Site Prep.) - erect hoarding C11_6 d/w - 10h/d - With 7 11-Apr-22 21-Apr-22 17-May-22 24-May-22 27 HK Hols - No B/O periods 310.C.RC.D046 AGL Vault C Annex (Site Prep.) - divert existing UU cables (if any) (was C11_6C3) d/w - 10h/d - With 30 25-Apr-22 30-May-22 15-Mar-22 22-Apr-22 -31 HK Hols - No B/O periods Excavation (was C3) 111 0 20-Jan-22 A 30-Jun-22 09-Apr-22 24-May-22 -31 310.D.RC.D619 AGL Vault C Annex - Submit BA8 consent application C01_7 d/w - 10h/d - No HK 7 20-Jan-22 A 02-Apr-22 09-Apr-22 15-Apr-22 13 Hols - No B/O periods (was 310.D.RC.D623 AGL Vault C Annex - Submit BA10 notice to commencement of work C1) C01_7 d/w - 10h/d - No HK 7 03-Apr-22 09-Apr-22 16-Apr-22 22-Apr-22 13 Hols - No B/O periods (was 310.C.RC.D050 AGL Vault C Annex (Excavation) - open excavation to from +7.40mPD to +5.525mPD C1) C11_6 d/w - 10h/d - With 14 31-May-22 16-Jun-22 23-Apr-22 10-May-22 -31 (Qty. 596m3) HK Hols - No B/O periods 310.C.RC.D054 AGL Vault C Annex (Foundation) - plate load test (Qty: 2 nos.) (was C01_7C3) d/w - 10h/d - No HK 14 17-Jun-22 30-Jun-22 11-May-22 24-May-22 -37 Hols - No B/O periods (was Structure C1) 89 0 02-Jul-22 17-Oct-22 25-May-22 07-Sep-22 -31 Foundation C11_6 d/w - 10h/d - With HK Hols 16- No B/O 0periods (was 02-Jul-22 C3) 20-Jul-22 25-May-22 13-Jun-22 -31 310.C.RC.D058 AGL Vault C Annex (Foundation) - Construction of footing (600mm thk) (104m3) C11_6 d/w - 10h/d - With 16 02-Jul-22 20-Jul-22 25-May-22 13-Jun-22 -31 HK Hols - No B/O periods Screen wall from footing to Ground Floor Slab (was C11_6C3) d/w - 10h/d - With HK Hols 46- No B/O 0periods (was 21-Jul-22 C3) 13-Sep-22 14-Jun-22 06-Aug-22 -31 310.C.RC.D062 AGL Vault C Annex (Ground) - construction of upstand/screen wall & column to ground C11_6 d/w - 10h/d - With 18 21-Jul-22 10-Aug-22 14-Jun-22 05-Jul-22 -31 floor with Backfill (62m3) HK Hols - No B/O periods 310.C.RC.D066 AGL Vault C Annex (Roof) - columns, walls to roof (37m3) (was C3) C11_6 d/w - 10h/d - With 28 11-Aug-22 13-Sep-22 06-Jul-22 06-Aug-22 -31 HK Hols - No B/O periods UG column/wall to Roof Slab Including parapet wall (was C3) 27 0 14-Sep-22 17-Oct-22 08-Aug-22 07-Sep-22 -31 310.C.RC.D070 AGL Vault C Annex (Roof) - construction of beams and roof slab (98m3) C11_6 d/w - 10h/d - With 21 14-Sep-22 10-Oct-22 08-Aug-22 31-Aug-22 -31 HK Hols - No B/O periods 310.C.RC.D071.B01 AGL Vault C Annex (Roof) - construction parapet roof parapet wall (6m3) (was C01_7C3) d/w - 10h/d - No HK 7 11-Oct-22 17-Oct-22 01-Sep-22 07-Sep-22 -40 Hols - No B/O periods (was ABWF, MEP and T&C C1) 171 0 11-Oct-22 09-May-23 08-Sep-22 13-Dec-23 181 Internal Finishes 77 0 18-Oct-22 17-Jan-23 08-Sep-22 18-Feb-23 25 310.C.RC.D072.B01 AGL Vault C Annex (ABWF/MEP) - curing and removal of falsework C01_7 d/w - 10h/d - No HK 19 18-Oct-22 05-Nov-22 08-Sep-22 26-Sep-22 -40 Hols - No B/O periods (was 310.C.RC.D080 AGL Vault C Annex (ABWF) - commencement C1) C11_6 d/w - 10h/d - With 0 07-Nov-22 27-Sep-22 -33 HK Hols - No B/O periods 310.C.RC.D084 AGL Vault C Annex (ABWF) - Internal Works - Blockwall (was C11_6C3) d/w - 10h/d - With 14 07-Nov-22 22-Nov-22 27-Sep-22 14-Oct-22 -33 HK Hols - No B/O periods 310.D.RC.D669.B01 AGL Vault C Annex (ABWF) - Internal Works - Wall & Ceiling Finishes (was C11_6C3) d/w - 10h/d - With 20 23-Nov-22 15-Dec-22 15-Oct-22 07-Nov-22 -33 HK Hols - No B/O periods 310.D.RC.D670.B01 AGL Vault C Annex (ABWF) - Internal Works - Flooring (was C11_6C3) d/w - 10h/d - With 20 16-Dec-22 10-Jan-23 30-Nov-22 22-Dec-22 -14 HK Hols - No B/O periods 310.D.RC.D671.B01 AGL Vault C Annex (ABWF) - Internal Works - Metal Works (was C11_6C3) d/w - 10h/d - With 6 11-Jan-23 17-Jan-23 13-Feb-23 18-Feb-23 25 HK Hols - No B/O periods MEP Installation Works (was C3) 120 0 09-Dec-22 09-May-23 01-Nov-22 13-Dec-23 181 Drainage Installation C11_6 d/w - 10h/d - With HK Hols 90- No B/O 0periods (was 09-Dec-22 C3) 29-Mar-23 01-Nov-22 18-Feb-23 -33 310.C.RC.D104.100B02 AGL Vault C Annex - Drainage 1st Fix & Installation C11_6 d/w - 10h/d - With 60 09-Dec-22 22-Feb-23 01-Nov-22 11-Jan-23 -33 HK Hols - No B/O periods 310.C.RC.D104.110B02 AGL Vault C Annex - Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 10-Jan-23 23-Mar-23 30-Nov-22 13-Feb-23 -33 HK Hols - No B/O periods 310.C.RC.D104.120B02 AGL Vault C Annex - Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 5 24-Mar-23 29-Mar-23 14-Feb-23 18-Feb-23 -33 HK Hols - No B/O periods Electrical Installation (was C3) 120 0 09-Dec-22 09-May-23 01-Nov-22 13-Dec-23 181
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 216 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.D104 AGL Vault C Annex - Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 60 09-Dec-22 22-Feb-23 01-Nov-22 11-Jan-23 -33 HK Hols - No B/O periods 310.C.RC.D104.140B02 AGL Vault C Annex - Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 21-Dec-22 06-Mar-23 12-Nov-22 26-Jan-23 -33 HK Hols - No B/O periods 310.C.RC.D104.B01 AGL Vault C Annex - Access Date for Power Supply Installation by Others (was C11_6C3) d/w - 10h/d - With 0 23-Feb-23 12-Jan-23 -33 HK Hols - No B/O periods 310.C.RC.D104.150B02 AGL Vault C Annex - Electrical Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 5 07-Mar-23 11-Mar-23 27-Jan-23 01-Feb-23 -33 HK Hols - No B/O periods 310.C.RC.D192.B01 AGL Vault C Annex (MEP) - Megger Test (was C11_6C3) d/w - 10h/d - With 15 13-Mar-23 29-Mar-23 02-Feb-23 18-Feb-23 -33 HK Hols - No B/O periods 310.C.RC.D184 AGL Vault C Annex - Achieved KD-2 (Stage 2) (was C01_7C3) d/w - 10h/d - No HK 0 29-Mar-23 18-Feb-23 -39 Hols - No B/O periods (was 310.D.RC.D655 AGL Vault C Annex - Latest Date for Power Supply by Others C1) C11_6 d/w - 10h/d - With 0 29-Mar-23 18-Feb-23 -33 HK Hols - No B/O periods 310.D.RC.D631 AGL Vault C Annex - System Integration T&C (was C11_6C3) d/w - 10h/d - With 30 30-Mar-23 09-May-23 09-Nov-23 13-Dec-23 181 HK Hols - No B/O periods Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 90- No B/O 0periods (was 09-Dec-22 C3) 29-Mar-23 01-Nov-22 18-Feb-23 -33 310.C.RC.D104.160B02 AGL Vault C Annex - Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 60 09-Dec-22 22-Feb-23 01-Nov-22 11-Jan-23 -33 HK Hols - No B/O periods 310.C.RC.D104.170B02 AGL Vault C Annex - Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 10-Jan-23 23-Mar-23 30-Nov-22 13-Feb-23 -33 HK Hols - No B/O periods 310.C.RC.D104.180B02 AGL Vault C Annex - Fire Service Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 5 24-Mar-23 29-Mar-23 14-Feb-23 18-Feb-23 -33 HK Hols - No B/O periods MVAC Installation (was C11_6C3) d/w - 10h/d - With HK Hols 90- No B/O 0periods (was 09-Dec-22 C3) 29-Mar-23 01-Nov-22 18-Feb-23 -33 310.C.RC.D104.190B02 AGL Vault C Annex - MVAC 1st Fix & Installation C11_6 d/w - 10h/d - With 60 09-Dec-22 22-Feb-23 01-Nov-22 11-Jan-23 -33 HK Hols - No B/O periods 310.C.RC.D104.200B02 AGL Vault C Annex - MVAC 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 10-Jan-23 23-Mar-23 30-Nov-22 13-Feb-23 -33 HK Hols - No B/O periods 310.C.RC.D104.210B02 AGL Vault C Annex - MVAC Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 5 24-Mar-23 29-Mar-23 14-Feb-23 18-Feb-23 -33 HK Hols - No B/O periods Roof Finishes (was C11_6C3) d/w - 10h/d - With HK Hols 63- No B/O 0periods (was 11-Oct-22 C3) 22-Dec-22 17-Dec-22 11-Feb-23 39 310.C.RC.D073.B01 AGL Vault C Annex (Roof) - Curing and removal of formworks C11_6 d/w - 10h/d - With 14 11-Oct-22 26-Oct-22 17-Dec-22 04-Jan-23 58 HK Hols - No B/O periods 310.C.RC.D074 AGL Vault C Annex (Roof) - waterproofing and roof finishes (drainage channel, (was C11_6C3) d/w - 10h/d - With 30 18-Nov-22 22-Dec-22 05-Jan-23 11-Feb-23 39 painting,paver, etc) HK Hols - No B/O periods External Wall Finishes (was C3) 57 0 18-Oct-22 22-Dec-22 08-Aug-23 26-Sep-23 225 310.C.RC.D188.B01 AGL Vault C Annex (External Wall) - Curing and removal of formworks C01_7 d/w - 10h/d - No HK 10 18-Oct-22 27-Oct-22 08-Aug-23 17-Aug-23 294 Hols - No B/O periods (was 310.C.RC.D189.B01 AGL Vault C Annex (External Wall) - Erect scaffolding for external wall C1) C11_6 d/w - 10h/d - With 4 28-Oct-22 01-Nov-22 18-Aug-23 22-Aug-23 239 HK Hols - No B/O periods 310.C.RC.D190.B01 AGL Vault C Annex (External Wall) - External rendering, Installation of cladding, cat (was C11_6C3) d/w - 10h/d - With 24 18-Nov-22 15-Dec-22 23-Aug-23 19-Sep-23 225 ladder, louvres HK Hols - No B/O periods 310.C.RC.D191.B01 AGL Vault C Annex (External Wall) - Dismantle Scaffolding & Install door with (was C11_6C3) d/w - 10h/d - With 6 16-Dec-22 22-Dec-22 20-Sep-23 26-Sep-23 225 ironmongery HK Hols - No B/O periods External Works (was C11_6C3) d/w - 10h/d - With HK Hols 108- No B/O 0periods (was 02-Nov-22 C3) 13-Mar-23 26-Aug-23 13-Dec-23 225 310.C.RC.D136 AGL Vault C Annex (Drain/UU) - Drainage System + Watermain Works C11_6 d/w - 10h/d - With 27 02-Nov-22 02-Dec-22 26-Aug-23 26-Sep-23 242 HK Hols - No B/O periods 310.C.RC.D137.B01 AGL Vault C Annex (Drain/UU) - Cable & System duct (was C11_6C3) d/w - 10h/d - With 27 23-Dec-22 28-Jan-23 27-Sep-23 31-Oct-23 225 HK Hols - No B/O periods 310.C.RC.D188 AGL Vault C Annex - External Works (was C11_6C3) d/w - 10h/d - With 50 11-Jan-23 13-Mar-23 16-Oct-23 13-Dec-23 225 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 217 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Statutory Inspection C01_7 d/w - 10h/d - No HK Hols107 - No B/O periods 0 (was10-May-23 C1) 24-Aug-23 14-Dec-23 14-Jul-24 325 Fire Services Department (FSD) C01_7 d/w - 10h/d - No HK Hols77 - No B/O periods 0 (was10-May-23 C1) 25-Jul-23 14-Dec-23 28-Feb-24 218 310.C.RC.D164 AGL Vault C Annex - Submit FS Statutory Form Submissions for Inspection (FS314, C01_7 d/w - 10h/d - No HK 14 10-May-23 23-May-23 14-Dec-23 27-Dec-23 218 FS251, FS501) Hols - No B/O periods (was 310.C.RC.D168 AGL Vault C Annex - FS Inspection and defects rectification C1) C01_7 d/w - 10h/d - No HK 30 05-Jun-23 04-Jul-23 09-Jan-24 07-Feb-24 218 Hols - No B/O periods (was 310.C.RC.D172 AGL Vault C Annex - Obtain FS 172 Certificate C1) C01_7 d/w - 10h/d - No HK 21 05-Jul-23 25-Jul-23 08-Feb-24 28-Feb-24 218 Hols - No B/O periods (was Building Department (BD) C1) C01_7 d/w - 10h/d - No HK Hols30 - No B/O periods 0 (was26-Jul-23 C1) 24-Aug-23 29-Feb-24 14-Jul-24 325 310.C.RC.D176 AGL Vault C Annex - BD Inspection + Submit BA13 and Apply for OP to BD C01_7 d/w - 10h/d - No HK 30 26-Jul-23 24-Aug-23 29-Feb-24 29-Mar-24 218 Hols - No B/O periods (was 310.C.RC.D180 AGL Vault C Annex - BD issued OP certificate C1) C01_7 d/w - 10h/d - No HK 0 24-Aug-23 29-Mar-24 218 Hols - No B/O periods (was 310.D.RC.D615 AGL Vault C Annex - Achieved KD-10 (Section 3) C1) C01_7 d/w - 10h/d - No HK 0 24-Aug-23 14-Jul-24 325 Hols - No B/O periods (was CC#08 ----- Testing and Commissioning ----- C1) 496 33 22-Jul-22 19-Mar-24 09-Sep-22 14-Jul-24 92 ESA - C&ED Operational Office and Kennel Area 283 0 27-Feb-23 07-Feb-24 13-Apr-23 17-Feb-24 7 Testing and Commissioning 283 0 27-Feb-23 07-Feb-24 13-Apr-23 17-Feb-24 7 Preliminary Testing and Commissioning C11_6 d/w - 10h/d - With HK Hols 51- No B/O 0periods (was 07-Sep-23 C3) 08-Nov-23 15-Sep-23 25-Jan-24 64 Preliminary T&C - Plumbing and Drainage C11_6 d/w - 10h/d - With HK Hols 28- No B/O 0periods (was 08-Sep-23 C3) 12-Oct-23 15-Sep-23 19-Oct-23 6 310.C.EX.W1604 C&ED Op. Office & Kennel Area - Plumbing & Drainage Preliminary Inspection & C11_6 d/w - 10h/d - With 18 08-Sep-23 28-Sep-23 15-Sep-23 07-Oct-23 6 Adjustment HK Hols - No B/O periods 310.C.EX.W1608 C&ED Op. Office & Kennel Area - Plumbing & Drainage Preliminary Testing & (was C11_6C3) d/w - 10h/d - With 18 20-Sep-23 12-Oct-23 27-Sep-23 19-Oct-23 6 Commissioning HK Hols - No B/O periods Preliminary T&C - Electrical (was C11_6C3) d/w - 10h/d - With HK Hols 28- No B/O 0periods (was 29-Sep-23 C3) 03-Nov-23 13-Oct-23 25-Jan-24 68 310.C.EX.W1520 C&ED Op. Office & Kennel Area - Electrical Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 18 29-Sep-23 21-Oct-23 13-Oct-23 03-Nov-23 10 HK Hols - No B/O periods 310.C.EX.W2481.B02 C&ED Op. Office & Kennel Area - Electrical Preliminary Inspection & Adjustment (was C11_6C3) d/w - 10h/d - With 18 29-Sep-23 21-Oct-23 21-Dec-23 13-Jan-24 68 (Non-FSI) HK Hols - No B/O periods 310.C.EX.W1524 C&ED Op. Office & Kennel Area - Electrical Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 18 13-Oct-23 03-Nov-23 26-Oct-23 15-Nov-23 10 HK Hols - No B/O periods 310.C.EX.W2486.B02 C&ED Op. Office & Kennel Area - Electrical Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 18 13-Oct-23 03-Nov-23 05-Jan-24 25-Jan-24 68 (Non-FSI) HK Hols - No B/O periods Preliminary T&C - Fire Services (was C11_6C3) d/w - 10h/d - With HK Hols 28- No B/O 0periods (was 06-Oct-23 C3) 08-Nov-23 20-Oct-23 22-Nov-23 12 310.C.EX.W1544 C&ED Op. Office & Kennel Area - Fire Services Preliminary Inspection & Adjustment (FSI) C11_6 d/w - 10h/d - With 18 06-Oct-23 27-Oct-23 20-Oct-23 10-Nov-23 12 HK Hols - No B/O periods 310.C.EX.W2480.B01 C&ED Op. Office & Kennel Area - Fire Services Preliminary Inspection & Adjustment (was C11_6C3) d/w - 10h/d - With 18 06-Oct-23 27-Oct-23 20-Oct-23 10-Nov-23 12 (Non-FSI) HK Hols - No B/O periods 310.C.EX.W1548 C&ED Op. Office & Kennel Area - Fire Services Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 18 18-Oct-23 08-Nov-23 02-Nov-23 22-Nov-23 12 (FSI) HK Hols - No B/O periods 310.C.EX.W2484.B01 C&ED Op. Office & Kennel Area - Fire Services Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 18 18-Oct-23 08-Nov-23 02-Nov-23 22-Nov-23 12 (Non-FSI) HK Hols - No B/O periods Preliminary T&C - MVAC (was C11_6C3) d/w - 10h/d - With HK Hols 28- No B/O 0periods (was 07-Sep-23 C3) 11-Oct-23 12-Oct-23 14-Nov-23 28 310.C.EX.W1564 C&ED Op. Office & Kennel Area - MVAC Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 18 07-Sep-23 27-Sep-23 12-Oct-23 02-Nov-23 28 HK Hols - No B/O periods 310.C.EX.W1568 C&ED Op. Office & Kennel Area - MVAC Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 18 19-Sep-23 11-Oct-23 25-Oct-23 14-Nov-23 28 HK Hols - No B/O periods Testing and Commissioning (was C01_7C3) d/w - 10h/d - No HK Hols62 - No B/O periods 0 (was16-Oct-23 C1) 17-Dec-23 27-Oct-23 25-Jan-24 39 310.T.EX.L496 Completion of CLP Cable Laying & Power Energization of PBA C01_7 d/w - 10h/d - No HK 0 16-Oct-23 27-Oct-23 11 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 218 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.EX.L276 C&ED Operational Office and Kennel Area - Ventilation System Test C01_7 d/w - 10h/d - No HK 21 19-Oct-23 08-Nov-23 22-Nov-23 12-Dec-23 34 Hols - No B/O periods (was 310.T.EX.L288 C&ED Operational Office and Kennel Area - Plumbing System Test C1) C01_7 d/w - 10h/d - No HK 21 20-Oct-23 09-Nov-23 28-Oct-23 17-Nov-23 8 Hols - No B/O periods (was 310.T.EX.L272 C&ED Operational Office and Kennel Area - FS System Test (FSI) C1) C01_7 d/w - 10h/d - No HK 21 18-Nov-23 08-Dec-23 30-Nov-23 20-Dec-23 12 Hols - No B/O periods (was 310.T.EX.L280.B01 C&ED Operational Office and Kennel Area - FS System Test (Non-FSI) C1) C01_7 d/w - 10h/d - No HK 21 18-Nov-23 08-Dec-23 05-Jan-24 25-Jan-24 48 Hols - No B/O periods (was 310.T.EX.L284 C&ED Operational Office and Kennel Area - Systems Integration Test C1) C01_7 d/w - 10h/d - No HK 30 18-Nov-23 17-Dec-23 13-Dec-23 11-Jan-24 25 Hols - No B/O periods (was Statutory Inspection C1) 283 0 27-Feb-23 07-Feb-24 13-Apr-23 17-Feb-24 7 Water Supply Department (WSD) C11_6 d/w - 10h/d - With HK Hols 237- No B/O 0periods (was 27-Feb-23 C3) 12-Dec-23 13-Apr-23 20-Dec-23 7 310.T.ES.T100 C&ED Operational Office and Kennel Area - Prepare for Plumbing Material for Submission C11_6 d/w - 10h/d - With 17 27-Feb-23 17-Mar-23 13-Apr-23 03-May-23 35 HK Hols - No B/O periods 310.T.ES.T105 C&ED Operational Office and Kennel Area - Submit all Plumbing Material for PM (was C11_6C3) d/w - 10h/d - With 0 18-Mar-23 04-May-23 35 Acceptance HK Hols - No B/O periods 310.T.ES.T110 C&ED Operational Office and Kennel Area - PM Acceptance (was C11_6C3) d/w - 10h/d - With 48 18-Mar-23 18-May-23 04-May-23 30-Jun-23 35 HK Hols - No B/O periods 310.T.ES.T115 C&ED Operational Office and Kennel Area - Form WWO 46 (Part1&2)&Annex Submission (was C11_6C3) d/w - 10h/d - With 0 19-May-23 03-Jul-23 35 for WSD Approval (Plumbing / FS / WP) HK Hols - No B/O periods 310.T.ES.T120 C&ED Operational Office and Kennel Area -Obtain Form WWO 46 (Part III)-WSD (was C11_6C3) d/w - 10h/d - With 4 19-May-23 23-May-23 03-Jul-23 06-Jul-23 35 Approval, Endorsed&Return to Licensed Plumber HK Hols - No B/O periods 310.T.ES.T125 C&ED Operational Office and Kennel Area - Form WWO 46 (Part IV) Submission for WSD (was C11_6C3) d/w - 10h/d - With 0 10-Nov-23 18-Nov-23 7 Inspection (Plumbing / FS / WP) HK Hols - No B/O periods 310.T.ES.T130 C&ED Operational Office and Kennel Area - WSD Inspection for Water Supply System (was C11_6C3) d/w - 10h/d - With 14 18-Nov-23 04-Dec-23 27-Nov-23 12-Dec-23 7 HK Hols - No B/O periods 310.T.ES.T135 C&ED Operational Office and Kennel Area - Obtain Form WWO 46 (Part V) (was C11_6C3) d/w - 10h/d - With 0 04-Dec-23 12-Dec-23 7 HK Hols - No B/O periods 310.T.ES.T140 C&ED Operational Office and Kennel Area - Form WWO 132 (Part II) Submission for (was C11_6C3) d/w - 10h/d - With 0 04-Dec-23 12-Dec-23 7 Water Supply Connection HK Hols - No B/O periods 310.T.ES.T145 C&ED Operational Office and Kennel Area - Final Water Supply Connection (was C11_6C3) d/w - 10h/d - With 7 05-Dec-23 12-Dec-23 13-Dec-23 20-Dec-23 7 HK Hols - No B/O periods 310.T.ES.T150 C&ED Operational Office and Kennel Area - Obtain Water Certificate (Form WWO 1005) (was C11_6C3) d/w - 10h/d - With 0 12-Dec-23 20-Dec-23 7 HK Hols - No B/O periods Fire Services Department (FSD) (was C11_6C3) d/w - 10h/d - With HK Hols 31- No B/O 0periods (was 09-Dec-23 C3) 17-Jan-24 21-Dec-23 25-Jan-24 7 310.T.ES.T155 C&ED Operational Office and Kennel Area - F.S. Inspection Plan (Form FSI / 314 C11_6 d/w - 10h/d - With 0 09-Dec-23 21-Dec-23 10 Submission) HK Hols - No B/O periods 310.T.ES.T160 C&ED Operational Office and Kennel Area - F.S. Inspection Application (Form FSI / 501 & (was C11_6C3) d/w - 10h/d - With 0 13-Dec-23 21-Dec-23 7 251 Submission) HK Hols - No B/O periods 310.T.ES.T165 C&ED Operational Office and Kennel Area - F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 27-Dec-23 03-Jan-24 05-Jan-24 11-Jan-24 7 HK Hols - No B/O periods 310.T.ES.T170 C&ED Operational Office and Kennel Area - FSD Comment (was C11_6C3) d/w - 10h/d - With 0 03-Jan-24 11-Jan-24 7 HK Hols - No B/O periods 310.T.ES.T175 C&ED Operational Office and Kennel Area - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 04-Jan-24 10-Jan-24 12-Jan-24 18-Jan-24 7 HK Hols - No B/O periods 310.T.ES.T180 C&ED Operational Office and Kennel Area - F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 11-Jan-24 17-Jan-24 19-Jan-24 25-Jan-24 7 HK Hols - No B/O periods 310.T.ES.T185 C&ED Operational Office and Kennel Area - Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 17-Jan-24 25-Jan-24 7 HK Hols - No B/O periods Building Department (BD) (was C3) 18 0 18-Jan-24 07-Feb-24 26-Jan-24 17-Feb-24 7
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 219 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.ES.T190 C&ED Operational Office and Kennel Area - BD Inspection Application for Occupation C11_6 d/w - 10h/d - With 0 18-Jan-24 26-Jan-24 7 Permit (Form BA13 Submission) HK Hols - No B/O periods 310.T.ES.T195 C&ED Operational Office and Kennel Area - BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 18-Jan-24 24-Jan-24 26-Jan-24 01-Feb-24 7 HK Hols - No B/O periods 310.T.ES.T200 C&ED Operational Office and Kennel Area - BD Comment (was C11_6C3) d/w - 10h/d - With 0 24-Jan-24 01-Feb-24 7 HK Hols - No B/O periods 310.T.ES.T205 C&ED Operational Office and Kennel Area - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 25-Jan-24 31-Jan-24 02-Feb-24 08-Feb-24 7 HK Hols - No B/O periods 310.T.ES.T210 C&ED Operational Office and Kennel Area - BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 01-Feb-24 07-Feb-24 09-Feb-24 17-Feb-24 7 HK Hols - No B/O periods 310.T.ES.M040 Achieved KD-G4 and Allow Other Contractor to Commence their works (was C01_7C3) d/w - 10h/d - No HK 0 07-Feb-24 17-Feb-24 10 Hols - No B/O periods (was 310.T.ES.T215 C&ED Operational Office and Kennel Area - Issue Occupation Permit (Form BD104) C1) C11_6 d/w - 10h/d - With 0 07-Feb-24 17-Feb-24 7 HK Hols - No B/O periods WSA - Comm. Equipment Building D (was C3) 192 0 11-Aug-22 31-Mar-23 09-Sep-22 13-Jul-24 379 Testing and Commissioning 192 0 11-Aug-22 31-Mar-23 09-Sep-22 13-Jul-24 379 Preliminary Testing and Commissioning C11_6 d/w - 10h/d - With HK Hols 28- No B/O 0periods (was 08-Dec-22 C3) 11-Jan-23 14-Dec-22 11-Mar-23 48 Preliminary T&C - Drainage C11_6 d/w - 10h/d - With HK Hols 18- No B/O 0periods (was 13-Dec-22 C3) 04-Jan-23 14-Dec-22 05-Jan-23 1 310.C.EX.W1768 WSA - Comm Eqpt Bldg D - Drainage Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 14 13-Dec-22 29-Dec-22 14-Dec-22 30-Dec-22 1 HK Hols - No B/O periods 310.C.EX.W1772 WSA - Comm Eqpt Bldg D - Drainage Preliminary Testing & Commissioning (was C3) C11_6 d/w - 10h/d - With 14 17-Dec-22 04-Jan-23 19-Dec-22 05-Jan-23 1 HK Hols - No B/O periods Preliminary T&C - Electrical (was C11_6C3) d/w - 10h/d - With HK Hols 22- No B/O 0periods (was 15-Dec-22 C3) 11-Jan-23 22-Dec-22 11-Mar-23 48 310.C.EX.W2482.B02 WSA - Comm Eqpt Bldg D - Electrical Preliminary Inspection & Adjustment (Non-FSI) C11_6 d/w - 10h/d - With 14 15-Dec-22 31-Dec-22 20-Feb-23 07-Mar-23 52 HK Hols - No B/O periods 310.C.EX.W1684 WSA - Comm Eqpt Bldg D - Electrical Preliminary Inspection & Adjustment (was C11_6C3) d/w - 10h/d - With 14 20-Dec-22 06-Jan-23 22-Dec-22 09-Jan-23 2 HK Hols - No B/O periods 310.C.EX.W2487.B02 WSA - Comm Eqpt Bldg D - Electrical Preliminary Testing & Commissioning (Non-FSI) (was C11_6C3) d/w - 10h/d - With 14 20-Dec-22 06-Jan-23 24-Feb-23 11-Mar-23 52 HK Hols - No B/O periods 310.C.EX.W1688 WSA - Comm Eqpt Bldg D - Electrical Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 14 24-Dec-22 11-Jan-23 28-Dec-22 13-Jan-23 2 HK Hols - No B/O periods Preliminary T&C - Fire Services (was C11_6C3) d/w - 10h/d - With HK Hols 18- No B/O 0periods (was 08-Dec-22 C3) 29-Dec-22 22-Dec-22 13-Jan-23 12 310.C.EX.W1708 WSA - Comm Eqpt Bldg D - Fire Services Preliminary Inspection & Adjustment (FSI) C11_6 d/w - 10h/d - With 14 08-Dec-22 23-Dec-22 22-Dec-22 09-Jan-23 12 HK Hols - No B/O periods 310.C.EX.W1709.B01 WSA - Comm Eqpt Bldg D - Fire Services Preliminary Inspection & Adjustment (Non-FSI) (was C11_6C3) d/w - 10h/d - With 14 08-Dec-22 23-Dec-22 22-Dec-22 09-Jan-23 12 HK Hols - No B/O periods 310.C.EX.W1712 WSA - Comm Eqpt Bldg D - Fire Services Preliminary Testing & Commissioning (FSI) (was C11_6C3) d/w - 10h/d - With 14 13-Dec-22 29-Dec-22 28-Dec-22 13-Jan-23 12 HK Hols - No B/O periods 310.C.EX.W1713.B01 WSA - Comm Eqpt Bldg D - Fire Services Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 14 13-Dec-22 29-Dec-22 28-Dec-22 13-Jan-23 12 (Non-FSI) HK Hols - No B/O periods Preliminary T&C - MVAC (was C11_6C3) d/w - 10h/d - With HK Hols 18- No B/O 0periods (was 08-Dec-22 C3) 29-Dec-22 06-Jan-23 30-Jan-23 23 310.C.EX.W1728 WSA - Comm Eqpt Bldg D - MVAC Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 14 08-Dec-22 23-Dec-22 06-Jan-23 21-Jan-23 23 HK Hols - No B/O periods 310.C.EX.W1732 WSA - Comm Eqpt Bldg D - MVAC Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 14 13-Dec-22 29-Dec-22 11-Jan-23 30-Jan-23 23 HK Hols - No B/O periods Testing and Commissioning (was C3) C01_7 d/w - 10h/d - No HK Hols26 - No B/O periods 0 (was06-Jan-23 C1) 31-Jan-23 20-Jan-23 12-Mar-23 40 310.T.EX.L296 WSA - Comm. Equipment Building D - Ventilation System Test C01_7 d/w - 10h/d - No HK 14 06-Jan-23 19-Jan-23 06-Feb-23 19-Feb-23 31 Hols - No B/O periods (was 310.T.EX.L292 WSA - Comm. Equipment Building D - FS System Test (FSI) C1) C01_7 d/w - 10h/d - No HK 14 18-Jan-23 31-Jan-23 20-Jan-23 02-Feb-23 2 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 220 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.EX.L304 WSA - Comm. Equipment Building D - Systems Integration Test C01_7 d/w - 10h/d - No HK 14 18-Jan-23 31-Jan-23 06-Feb-23 19-Feb-23 19 Hols - No B/O periods (was 310.T.EX.L300.B01 WSA - Comm. Equipment Building D - FS System Test (Non-FSI) C1) C01_7 d/w - 10h/d - No HK 14 18-Jan-23 31-Jan-23 27-Feb-23 12-Mar-23 40 Hols - No B/O periods (was Statutory Inspection C1) 192 0 11-Aug-22 31-Mar-23 09-Sep-22 13-Jul-24 379 Water Supply Department (WSD) C11_6 d/w - 10h/d - With HK Hols 142- No B/O 0periods (was 11-Aug-22 C3) 01-Feb-23 09-Sep-22 02-Feb-23 1 310.T.ES.T443.B01 WSA - Comm. Equipment Building D - Prepare for Plumbing Material for Submission C11_6 d/w - 10h/d - With 17 11-Aug-22 30-Aug-22 09-Sep-22 29-Sep-22 25 HK Hols - No B/O periods 310.T.ES.T447.B01 WSA - Comm. Equipment Building D - Submit all Plumbing Material for PM Acceptance (was C11_6C3) d/w - 10h/d - With 0 31-Aug-22 30-Sep-22 25 HK Hols - No B/O periods 310.T.ES.T451.B01 WSA - Comm. Equipment Building D - PM Acceptance (was C11_6C3) d/w - 10h/d - With 28 31-Aug-22 05-Oct-22 30-Sep-22 03-Nov-22 25 HK Hols - No B/O periods 310.T.ES.T455.B01 WSA - Comm. Equipment Building D - Form WWO 46 (Part I & Part II) & Annex (was C11_6C3) d/w - 10h/d - With 0 06-Oct-22 04-Nov-22 25 Submission for WSD Approval (Plumbing / FS / W HK Hols - No B/O periods 310.T.ES.T459.B01 WSA - Comm. Equipment Building D - Obtain Form WWO 46 (Part III) - WSD Approval, (was C11_6C3) d/w - 10h/d - With 4 06-Oct-22 10-Oct-22 04-Nov-22 08-Nov-22 25 Endorsed & Return to Licensed Plumber HK Hols - No B/O periods 310.T.ES.T419.B01 WSA - Comm. Equipment Building D - Form WWO 46 (Part IV) Submission for WSD (was C11_6C3) d/w - 10h/d - With 0 11-Jan-23 12-Jan-23 1 Inspection (Plumbing / FS / WP) HK Hols - No B/O periods 310.T.ES.T423.B01 WSA - Comm. Equipment Building D - WSD Inspection for Water Supply System (was C11_6C3) d/w - 10h/d - With 6 19-Jan-23 28-Jan-23 20-Jan-23 30-Jan-23 1 HK Hols - No B/O periods 310.T.ES.T427.B01 WSA - Comm. Equipment Building D - Obtain Form WWO 46 (Part V) (was C11_6C3) d/w - 10h/d - With 0 28-Jan-23 30-Jan-23 1 HK Hols - No B/O periods 310.T.ES.T431.B01 WSA - Comm. Equipment Building D - Form WWO 132 (Part II) Submission for Water (was C11_6C3) d/w - 10h/d - With 0 28-Jan-23 30-Jan-23 1 Supply Connection HK Hols - No B/O periods 310.T.ES.T435.B01 WSA - Comm. Equipment Building D - Final Water Supply Connection (was C11_6C3) d/w - 10h/d - With 3 30-Jan-23 01-Feb-23 31-Jan-23 02-Feb-23 1 HK Hols - No B/O periods 310.T.ES.T439.B01 WSA - Comm. Equipment Building D - Obtain Water Certificate (Form WWO 1005) (was C11_6C3) d/w - 10h/d - With 0 01-Feb-23 02-Feb-23 1 HK Hols - No B/O periods Fire Services Department (FSD) (was C11_6C3) d/w - 10h/d - With HK Hols 50- No B/O 0periods (was 09-Jan-23 C3) 10-Mar-23 03-Feb-23 11-Mar-23 1 310.T.WS.T455 WSA - Comm. Equipment Building D - F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 09-Jan-23 03-Feb-23 19 HK Hols - No B/O periods 310.T.WS.T460 WSA - Comm. Equipment Building D - F.S. Inspection Application (Form FSI / 501 & 251 (was C11_6C3) d/w - 10h/d - With 0 02-Feb-23 03-Feb-23 1 Submission) HK Hols - No B/O periods 310.T.WS.T465 WSA - Comm. Equipment Building D - F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 18-Feb-23 24-Feb-23 20-Feb-23 25-Feb-23 1 HK Hols - No B/O periods 310.T.WS.T470 WSA - Comm. Equipment Building D - FSD Comment (was C11_6C3) d/w - 10h/d - With 0 24-Feb-23 25-Feb-23 1 HK Hols - No B/O periods 310.T.WS.T475 WSA - Comm. Equipment Building D - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 25-Feb-23 03-Mar-23 27-Feb-23 04-Mar-23 1 HK Hols - No B/O periods 310.T.WS.T480 WSA - Comm. Equipment Building D - F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 04-Mar-23 10-Mar-23 06-Mar-23 11-Mar-23 1 HK Hols - No B/O periods 310.T.WS.T485 WSA - Comm. Equipment Building D - Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 10-Mar-23 11-Mar-23 1 HK Hols - No B/O periods Building Department (BD) (was C3) 18 0 11-Mar-23 31-Mar-23 13-Mar-23 13-Jul-24 379 310.T.WS.T490 WSA - Comm. Equipment Building D - BD Inspection Application for Occupation Permit C11_6 d/w - 10h/d - With 0 11-Mar-23 13-Mar-23 1 (Form BA13 Submission) HK Hols - No B/O periods 310.T.WS.T495 WSA - Comm. Equipment Building D - BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 11-Mar-23 17-Mar-23 13-Mar-23 18-Mar-23 1 HK Hols - No B/O periods 310.T.WS.T500 WSA - Comm. Equipment Building D - BD Comment (was C11_6C3) d/w - 10h/d - With 0 17-Mar-23 18-Mar-23 1 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 221 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.WS.T505 WSA - Comm. Equipment Building D - Rectification & Adjustment C11_6 d/w - 10h/d - With 6 18-Mar-23 24-Mar-23 20-Mar-23 25-Mar-23 1 HK Hols - No B/O periods 310.T.WS.T510 WSA - Comm. Equipment Building D - BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 25-Mar-23 31-Mar-23 27-Mar-23 01-Apr-23 1 HK Hols - No B/O periods 310.T.WS.M540 WSA - Comm Eqpt Bldg D (T&C) - Achieved MS 26 (was C01_7C3) d/w - 10h/d - No HK 0 31-Mar-23 02-Apr-23 2 Hols - No B/O periods (was 310.T.WS.M543 Achieved KD-10 Completion of Communication Equipment Bldg D incl T&C C1) C01_7 d/w - 10h/d - No HK 0 31-Mar-23 13-Jul-24 470 Hols - No B/O periods (was 310.T.WS.T515 WSA - Comm. Equipment Building D - Issue Occupation Permit (Form BD104) C1) C11_6 d/w - 10h/d - With 0 31-Mar-23 01-Apr-23 1 HK Hols - No B/O periods ESA - GSE Vehicle Wash Facility (was C3) 160 0 22-Aug-22 04-Mar-23 16-Sep-22 13-Jul-24 402 Testing and Commissioning 160 0 22-Aug-22 04-Mar-23 16-Sep-22 13-Jul-24 402 Preliminary Testing and Commissioning C11_6 d/w - 10h/d - With HK Hols 28- No B/O 0periods (was 10-Dec-22 C3) 13-Jan-23 10-Dec-22 13-Jan-23 0 Preliminary T&C - Plumbing and Drainage C11_6 d/w - 10h/d - With HK Hols 12- No B/O 0periods (was 10-Dec-22 C3) 23-Dec-22 10-Dec-22 23-Dec-22 0 310.C.EX.W1916 ESA - GSE Wash Facility - Plumbing & Drainage Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 8 10-Dec-22 19-Dec-22 10-Dec-22 19-Dec-22 0 HK Hols - No B/O periods 310.C.EX.W1920 ESA - GSE Wash Facility - Plumbing & Drainage Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 8 15-Dec-22 23-Dec-22 15-Dec-22 23-Dec-22 0 HK Hols - No B/O periods Preliminary T&C - Electrical (was C11_6C3) d/w - 10h/d - With HK Hols 16- No B/O 0periods (was 24-Dec-22 C3) 13-Jan-23 24-Dec-22 13-Jan-23 0 310.C.EX.W1848 ESA - GSE Wash Facility - Electrical Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 10 24-Dec-22 06-Jan-23 24-Dec-22 06-Jan-23 0 HK Hols - No B/O periods 310.C.EX.W1852 ESA - GSE Wash Facility - Electrical Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 10 03-Jan-23 13-Jan-23 03-Jan-23 13-Jan-23 0 HK Hols - No B/O periods Preliminary T&C - Fire Services (was C11_6C3) d/w - 10h/d - With HK Hols 16- No B/O 0periods (was 22-Dec-22 C3) 11-Jan-23 24-Dec-22 13-Jan-23 2 310.C.EX.W1872 ESA - GSE Wash Facility - Fire Services Preliminary Inspection & Adjustment (FSI) C11_6 d/w - 10h/d - With 10 22-Dec-22 04-Jan-23 24-Dec-22 06-Jan-23 2 HK Hols - No B/O periods 310.C.EX.W1873.B01 ESA - GSE Wash Facility - Fire Services Preliminary Inspection & Adjustment (Non-FSI) (was C11_6C3) d/w - 10h/d - With 10 22-Dec-22 04-Jan-23 24-Dec-22 06-Jan-23 2 HK Hols - No B/O periods 310.C.EX.W1876 ESA - GSE Wash Facility - Fire Services Preliminary Testing & Commissioning (FSI) (was C11_6C3) d/w - 10h/d - With 10 30-Dec-22 11-Jan-23 03-Jan-23 13-Jan-23 2 HK Hols - No B/O periods 310.C.EX.W1877.B01 ESA - GSE Wash Facility - Fire Services Preliminary Testing & Commissioning (Non-FSI) (was C11_6C3) d/w - 10h/d - With 10 30-Dec-22 11-Jan-23 03-Jan-23 13-Jan-23 2 HK Hols - No B/O periods Testing and Commissioning (was C01_7C3) d/w - 10h/d - No HK Hols30 - No B/O periods 0 (was31-Dec-22 C1) 29-Jan-23 31-Dec-22 15-Feb-23 17 310.T.EX.L328 ESA - GSE Vehicle Wash Facility - Plumbing System Test C01_7 d/w - 10h/d - No HK 7 31-Dec-22 06-Jan-23 31-Dec-22 06-Jan-23 0 Hols - No B/O periods (was 310.T.EX.L312 ESA - GSE Vehicle Wash Facility - FS System Test (FSI) C1) C01_7 d/w - 10h/d - No HK 10 20-Jan-23 29-Jan-23 20-Jan-23 29-Jan-23 0 Hols - No B/O periods (was 310.T.EX.L316.B01 ESA - GSE Vehicle Wash Facility - FS System Test (Non-FSI) C1) C01_7 d/w - 10h/d - No HK 10 20-Jan-23 29-Jan-23 06-Feb-23 15-Feb-23 17 Hols - No B/O periods (was Statutory Inspection C1) 160 0 22-Aug-22 04-Mar-23 16-Sep-22 13-Jul-24 402 Water Supply Department (WSD) C11_6 d/w - 10h/d - With HK Hols 130- No B/O 0periods (was 22-Aug-22 C3) 28-Jan-23 16-Sep-22 28-Jan-23 0 310.T.ES.T300 ESA - GSE Vehicle Wash Facility - Prepare for Plumbing Material for Submission C11_6 d/w - 10h/d - With 17 22-Aug-22 09-Sep-22 16-Sep-22 07-Oct-22 21 HK Hols - No B/O periods 310.T.ES.T305 ESA - GSE Vehicle Wash Facility - Submit all Plumbing Material for PM Acceptance (was C11_6C3) d/w - 10h/d - With 0 12-Sep-22 08-Oct-22 21 HK Hols - No B/O periods 310.T.ES.T310 ESA - GSE Vehicle Wash Facility - PM Acceptance (was C11_6C3) d/w - 10h/d - With 28 12-Sep-22 15-Oct-22 08-Oct-22 09-Nov-22 21 HK Hols - No B/O periods 310.T.ES.T315 ESA - GSE Vehicle Wash Facility - Form WWO 46 (Part I & Part II) & Annex Submission (was C11_6C3) d/w - 10h/d - With 0 17-Oct-22 10-Nov-22 21 for WSD Approval (Plumbing / FS / WP HK Hols - No B/O periods 310.T.ES.T320 ESA - GSE Vehicle Wash Facility - Obtain Form WWO 46 (Part III) - WSD Approval, (was C11_6C3) d/w - 10h/d - With 4 17-Oct-22 20-Oct-22 10-Nov-22 14-Nov-22 21 Endorsed & Return to Licensed Plumber HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 222 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.ES.T325 ESA - GSE Vehicle Wash Facility - Form WWO 46 (Part IV) Submission for WSD C11_6 d/w - 10h/d - With 0 07-Jan-23 07-Jan-23 0 Inspection (Plumbing / FS / WP) HK Hols - No B/O periods 310.T.ES.T330 ESA - GSE Vehicle Wash Facility - WSD Inspection for Water Supply System (was C11_6C3) d/w - 10h/d - With 6 16-Jan-23 21-Jan-23 16-Jan-23 21-Jan-23 0 HK Hols - No B/O periods 310.T.ES.T335 ESA - GSE Vehicle Wash Facility - Water supply available for water connection (by (was C11_6C3) d/w - 10h/d - With 0 21-Jan-23 21-Jan-23 0 others) & Obtain Form WWO 46 (Part V) HK Hols - No B/O periods 310.T.ES.T340 ESA - GSE Vehicle Wash Facility - Form WWO 132 (Part II) Submission for Water Supply (was C11_6C3) d/w - 10h/d - With 0 21-Jan-23 21-Jan-23 0 Connection HK Hols - No B/O periods 310.T.ES.T345 ESA - GSE Vehicle Wash Facility - Final Water Supply Connection (was C11_6C3) d/w - 10h/d - With 3 26-Jan-23 28-Jan-23 26-Jan-23 28-Jan-23 0 HK Hols - No B/O periods 310.T.ES.T350 ESA - GSE Vehicle Wash Facility - Obtain Water Certificate (Form WWO 1005) (was C11_6C3) d/w - 10h/d - With 0 28-Jan-23 28-Jan-23 0 HK Hols - No B/O periods Fire Services Department (FSD) (was C11_6C3) d/w - 10h/d - With HK Hols 35- No B/O 0periods (was 03-Jan-23 C3) 15-Feb-23 30-Jan-23 15-Feb-23 0 310.T.ES.T355 ESA - GSE Vehicle Wash Facility - F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 03-Jan-23 30-Jan-23 20 HK Hols - No B/O periods 310.T.ES.T360 ESA - GSE Vehicle Wash Facility - F.S. Inspection Application (Form FSI / 501 & 251 (was C11_6C3) d/w - 10h/d - With 0 30-Jan-23 30-Jan-23 0 Submission) HK Hols - No B/O periods 310.T.ES.T365 ESA - GSE Vehicle Wash Facility - F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 30-Jan-23 04-Feb-23 30-Jan-23 04-Feb-23 0 HK Hols - No B/O periods 310.T.ES.T370 ESA - GSE Vehicle Wash Facility - FSD Comment (was C11_6C3) d/w - 10h/d - With 0 04-Feb-23 04-Feb-23 0 HK Hols - No B/O periods 310.T.ES.T375 ESA - GSE Vehicle Wash Facility - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 3 06-Feb-23 08-Feb-23 06-Feb-23 08-Feb-23 0 HK Hols - No B/O periods 310.T.ES.T380 ESA - GSE Vehicle Wash Facility - F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 09-Feb-23 15-Feb-23 09-Feb-23 15-Feb-23 0 HK Hols - No B/O periods 310.T.ES.T385 ESA - GSE Vehicle Wash Facility - Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 15-Feb-23 15-Feb-23 0 HK Hols - No B/O periods Building Department (BD) (was C3) 15 0 16-Feb-23 04-Mar-23 16-Feb-23 13-Jul-24 402 310.T.ES.T390 ESA - GSE Vehicle Wash Facility - BD Inspection Application for Occupation Permit C11_6 d/w - 10h/d - With 0 16-Feb-23 16-Feb-23 0 (Form BA13 Submission) HK Hols - No B/O periods 310.T.ES.T395 ESA - GSE Vehicle Wash Facility - BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 16-Feb-23 22-Feb-23 16-Feb-23 22-Feb-23 0 HK Hols - No B/O periods 310.T.ES.T400 ESA - GSE Vehicle Wash Facility - BD Comment (was C11_6C3) d/w - 10h/d - With 0 22-Feb-23 22-Feb-23 0 HK Hols - No B/O periods 310.T.ES.T405 ESA - GSE Vehicle Wash Facility - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 3 23-Feb-23 25-Feb-23 23-Feb-23 25-Feb-23 0 HK Hols - No B/O periods 310.T.ES.T410 ESA - GSE Vehicle Wash Facility - BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 27-Feb-23 04-Mar-23 27-Feb-23 04-Mar-23 0 HK Hols - No B/O periods 310.T.ES.M650 ESA- GSE Vehicle Wash Facility (T&C) - Achieved Milestone 25 (was C01_7C3) d/w - 10h/d - No HK 0 04-Mar-23 05-Mar-23 1 Hols - No B/O periods (was 310.T.ES.M654 ESA - Achieved KD-10 (Section 3) - Others (Wash Facility) C1) C01_7 d/w - 10h/d - No HK 0 04-Mar-23 13-Jul-24 497 Hols - No B/O periods (was 310.T.ES.T415 ESA - GSE Vehicle Wash Facility - Issue Occupation Permit (Form BD104) C1) C11_6 d/w - 10h/d - With 0 04-Mar-23 04-Mar-23 0 HK Hols - No B/O periods WSA - GSE Battery Charging B (was C3) 267 0 22-Jul-22 14-Jun-23 19-Dec-22 13-Jul-24 321 Testing and Commissioning 267 0 22-Jul-22 14-Jun-23 19-Dec-22 13-Jul-24 321 Preliminary Testing and Commissioning C11_6 d/w - 10h/d - With HK Hols 41- No B/O 0periods (was 26-Jan-23 C3) 14-Mar-23 10-Jun-23 13-Jul-23 96 Preliminary T&C - Plumbing and Drainage C11_6 d/w - 10h/d - With HK Hols 20- No B/O 0periods (was 06-Feb-23 C3) 28-Feb-23 10-Jun-23 05-Jul-23 101 310.C.EX.W1440 GSE Battery Charging B - Plumbing & Drainage Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 14 06-Feb-23 21-Feb-23 10-Jun-23 27-Jun-23 101 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 223 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W1444 GSE Battery Charging B - Plumbing & Drainage Preliminary Testing & Commissioning C11_6 d/w - 10h/d - With 14 13-Feb-23 28-Feb-23 17-Jun-23 05-Jul-23 101 HK Hols - No B/O periods Preliminary T&C - Electrical (was C11_6C3) d/w - 10h/d - With HK Hols 20- No B/O 0periods (was 20-Feb-23 C3) 14-Mar-23 10-Jun-23 05-Jul-23 89 310.C.EX.W1356 GSE Battery Charging B - Electrical Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 14 20-Feb-23 07-Mar-23 10-Jun-23 27-Jun-23 89 HK Hols - No B/O periods 310.C.EX.W1360 GSE Battery Charging B - Electrical Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 14 27-Feb-23 14-Mar-23 17-Jun-23 05-Jul-23 89 HK Hols - No B/O periods Preliminary T&C - Fire Services (was C11_6C3) d/w - 10h/d - With HK Hols 20- No B/O 0periods (was 13-Feb-23 C3) 07-Mar-23 19-Jun-23 13-Jul-23 102 310.C.EX.W1380 GSE Battery Charging B - Fire Services Preliminary Inspection & Adjustment (FSI) C11_6 d/w - 10h/d - With 14 13-Feb-23 28-Feb-23 19-Jun-23 06-Jul-23 102 HK Hols - No B/O periods 310.C.EX.W1381.B01 GSE Battery Charging B - Fire Services Preliminary Inspection & Adjustment (Non-FSI) (was C11_6C3) d/w - 10h/d - With 14 13-Feb-23 28-Feb-23 19-Jun-23 06-Jul-23 102 HK Hols - No B/O periods 310.C.EX.W1384 GSE Battery Charging B - Fire Services Preliminary Testing & Commissioning (FSI) (was C11_6C3) d/w - 10h/d - With 14 20-Feb-23 07-Mar-23 27-Jun-23 13-Jul-23 102 HK Hols - No B/O periods 310.C.EX.W1385.B01 GSE Battery Charging B - Fire Services Preliminary Testing & Commissioning (Non-FSI) (was C11_6C3) d/w - 10h/d - With 14 20-Feb-23 07-Mar-23 27-Jun-23 13-Jul-23 102 HK Hols - No B/O periods Preliminary T&C - MVAC (was C11_6C3) d/w - 10h/d - With HK Hols 20- No B/O 0periods (was 26-Jan-23 C3) 17-Feb-23 19-Jun-23 13-Jul-23 117 310.C.EX.W1400 GSE Battery Charging B - MVAC Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 14 26-Jan-23 10-Feb-23 19-Jun-23 06-Jul-23 117 HK Hols - No B/O periods 310.C.EX.W1404 GSE Battery Charging B - MVAC Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 14 02-Feb-23 17-Feb-23 27-Jun-23 13-Jul-23 117 HK Hols - No B/O periods Testing and Commissioning (was C01_7C3) d/w - 10h/d - No HK Hols35 - No B/O periods 0 (was16-Mar-23 C1) 19-Apr-23 14-Jul-23 08-Sep-23 142 310.T.EX.L252 WSA - GSE Battery Charging B - FS System Test (FSI) C01_7 d/w - 10h/d - No HK 14 16-Mar-23 29-Mar-23 22-Jul-23 04-Aug-23 128 Hols - No B/O periods (was 310.T.EX.L260.B01 WSA - GSE Battery Charging B - FS System Test (Non-FSI) C1) C01_7 d/w - 10h/d - No HK 14 16-Mar-23 29-Mar-23 26-Aug-23 08-Sep-23 163 Hols - No B/O periods (was 310.T.EX.L256 WSA - GSE Battery Charging B - Ventilation System Test C1) C01_7 d/w - 10h/d - No HK 14 23-Mar-23 05-Apr-23 22-Jul-23 04-Aug-23 121 Hols - No B/O periods (was 310.T.EX.L268 WSA - GSE Battery Charging B - Plumbing System Test C1) C01_7 d/w - 10h/d - No HK 14 23-Mar-23 05-Apr-23 14-Jul-23 27-Jul-23 113 Hols - No B/O periods (was 310.T.EX.L264 WSA - GSE Battery Charging B - Systems Integration Test C1) C01_7 d/w - 10h/d - No HK 14 06-Apr-23 19-Apr-23 05-Aug-23 18-Aug-23 121 Hols - No B/O periods (was Statutory Inspection C1) 267 0 22-Jul-22 14-Jun-23 19-Dec-22 13-Jul-24 321 Water Supply Department (WSD) C11_6 d/w - 10h/d - With HK Hols 231- No B/O 0periods (was 22-Jul-22 C3) 02-May-23 19-Dec-22 18-Aug-23 90 310.T.WS.T625 WSA - GSE Battery Charging B - Prepare for Plumbing Material for Submission C11_6 d/w - 10h/d - With 17 22-Jul-22 10-Aug-22 19-Dec-22 09-Jan-23 125 HK Hols - No B/O periods 310.T.WS.T630 WSA - GSE Battery Charging B - Submit all Plumbing Material for PM Acceptance (was C11_6C3) d/w - 10h/d - With 0 11-Aug-22 10-Jan-23 125 HK Hols - No B/O periods 310.T.WS.T635 WSA - GSE Battery Charging B - PM Acceptance (was C11_6C3) d/w - 10h/d - With 48 11-Aug-22 08-Oct-22 10-Jan-23 09-Mar-23 125 HK Hols - No B/O periods 310.T.WS.T655 WSA - GSE Battery Charging B - Form WWO 46 (Part I & Part II) & Annex Submission for (was C11_6C3) d/w - 10h/d - With 0 10-Oct-22 10-Mar-23 125 WSD Approval (Plumbing / FS / WP) HK Hols - No B/O periods 310.T.WS.T660 WSA - GSE Battery Charging B - Obtain Form WWO 46 (Part III) - WSD Approval, (was C11_6C3) d/w - 10h/d - With 4 10-Oct-22 13-Oct-22 10-Mar-23 14-Mar-23 125 Endorsed & Return to Licensed Plumber HK Hols - No B/O periods 310.T.WS.T715 WSA - GSE Battery Charging B - Form WWO 46 (Part IV) Submission for WSD Inspection (was C11_6C3) d/w - 10h/d - With 0 06-Apr-23 28-Jul-23 90 (Plumbing / FS / WP) HK Hols - No B/O periods 310.T.WS.T720 WSA - GSE Battery Charging B - WSD Inspection for Water Supply System (was C11_6C3) d/w - 10h/d - With 6 18-Apr-23 24-Apr-23 05-Aug-23 11-Aug-23 90 HK Hols - No B/O periods 310.T.WS.T725 WSA - GSE Battery Charging B - Obtain Form WWO 46 (Part V) (was C11_6C3) d/w - 10h/d - With 0 24-Apr-23 11-Aug-23 90 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 224 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.WS.T730 WSA - GSE Battery Charging B - Form WWO 132 (Part II) Submission for Water Supply C11_6 d/w - 10h/d - With 0 24-Apr-23 11-Aug-23 90 Connection HK Hols - No B/O periods 310.T.WS.T735 WSA - GSE Battery Charging B - Final Water Supply Connection (was C11_6C3) d/w - 10h/d - With 6 25-Apr-23 02-May-23 12-Aug-23 18-Aug-23 90 HK Hols - No B/O periods 310.T.WS.T740 WSA - GSE Battery Charging B - Obtain Water Certificate (Form WWO 1005) (was C11_6C3) d/w - 10h/d - With 0 02-May-23 18-Aug-23 90 HK Hols - No B/O periods Fire Services Department (FSD) (was C11_6C3) d/w - 10h/d - With HK Hols 37- No B/O 0periods (was 06-Apr-23 C3) 23-May-23 19-Aug-23 08-Sep-23 90 310.T.WS.T745 WSA - GSE Battery Charging B - F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 06-Apr-23 19-Aug-23 109 HK Hols - No B/O periods 310.T.WS.T750 WSA - GSE Battery Charging B - F.S. Inspection Application (Form FSI / 501 & 251 (was C11_6C3) d/w - 10h/d - With 0 03-May-23 19-Aug-23 90 Submission) HK Hols - No B/O periods 310.T.WS.T755 WSA - GSE Battery Charging B - F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 03-May-23 09-May-23 19-Aug-23 25-Aug-23 90 HK Hols - No B/O periods 310.T.WS.T760 WSA - GSE Battery Charging B - FSD Comment (was C11_6C3) d/w - 10h/d - With 0 09-May-23 25-Aug-23 90 HK Hols - No B/O periods 310.T.WS.T765 WSA - GSE Battery Charging B - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 10-May-23 16-May-23 26-Aug-23 01-Sep-23 90 HK Hols - No B/O periods 310.T.WS.T770 WSA - GSE Battery Charging B - F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 17-May-23 23-May-23 02-Sep-23 08-Sep-23 90 HK Hols - No B/O periods 310.T.WS.T785 WSA - GSE Battery Charging B - Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 23-May-23 08-Sep-23 90 HK Hols - No B/O periods Building Department (BD) (was C3) 18 0 24-May-23 14-Jun-23 09-Sep-23 13-Jul-24 321 310.T.WS.T790 WSA - GSE Battery Charging B - BD Inspection Application for Occupation Permit (Form C11_6 d/w - 10h/d - With 0 24-May-23 09-Sep-23 90 BA13 Submission) HK Hols - No B/O periods 310.T.WS.T795 WSA - GSE Battery Charging B - BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 24-May-23 31-May-23 09-Sep-23 15-Sep-23 90 HK Hols - No B/O periods 310.T.WS.T815 WSA - GSE Battery Charging B - BD Comment (was C11_6C3) d/w - 10h/d - With 0 31-May-23 15-Sep-23 90 HK Hols - No B/O periods 310.T.WS.T820 WSA - GSE Battery Charging B - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 01-Jun-23 07-Jun-23 16-Sep-23 22-Sep-23 90 HK Hols - No B/O periods 310.T.WS.T830 WSA - GSE Battery Charging B - BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 08-Jun-23 14-Jun-23 23-Sep-23 29-Sep-23 90 HK Hols - No B/O periods 310.T.WS.M038 WSA - GSE Battery Charging B (T&C) - Achieved Milestone 27 (was C01_7C3) d/w - 10h/d - No HK 0 14-Jun-23 01-Oct-23 109 Hols - No B/O periods (was 310.T.WS.M042 WSA - GSE Battery Charging B (T&C) - Achieved KD-10 C1) C01_7 d/w - 10h/d - No HK 0 14-Jun-23 13-Jul-24 395 Hols - No B/O periods (was 310.T.WS.T835 WSA - GSE Battery Charging B - Issue Occupation Permit (Form BD104) C1) C11_6 d/w - 10h/d - With 0 14-Jun-23 29-Sep-23 90 HK Hols - No B/O periods WSA - Maintenance Facilities Forecourt & Coach Staging A and Bus Stop (MFF and Bus Stop) (was C3) 148 0 20-Sep-23 19-Mar-24 23-Jan-24 13-Jul-24 92 Testing and Commissioning 148 0 20-Sep-23 19-Mar-24 23-Jan-24 13-Jul-24 92 Preliminary Testing and Commissioning C11_6 d/w - 10h/d - With HK Hols 40- No B/O 0periods (was 20-Sep-23 C3) 08-Nov-23 23-Jan-24 23-Mar-24 112 Preliminary T&C - Drainage C11_6 d/w - 10h/d - With HK Hols 28- No B/O 0periods (was 20-Sep-23 C3) 25-Oct-23 21-Feb-24 23-Mar-24 124 310.C.EX.W2192 WSA - MFF and Bus Stop - Drainage Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 18 20-Sep-23 12-Oct-23 21-Feb-24 12-Mar-24 124 HK Hols - No B/O periods 310.C.EX.W2196 WSA - MFF and Bus Stop - Drainage Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 18 04-Oct-23 25-Oct-23 04-Mar-24 23-Mar-24 124 HK Hols - No B/O periods Preliminary T&C - Electrical (was C11_6C3) d/w - 10h/d - With HK Hols 28- No B/O 0periods (was 27-Sep-23 C3) 01-Nov-23 23-Jan-24 26-Feb-24 95 310.C.EX.W2144 WSA - MFF and Bus Stop - Electrical Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 18 27-Sep-23 19-Oct-23 23-Jan-24 14-Feb-24 95 HK Hols - No B/O periods 310.C.EX.W2148 WSA - MFF and Bus Stop - Electrical Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 18 11-Oct-23 01-Nov-23 03-Feb-24 26-Feb-24 95 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 225 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Preliminary T&C - Fire Services C11_6 d/w - 10h/d - With HK Hols 28- No B/O 0periods (was 06-Oct-23 C3) 08-Nov-23 30-Jan-24 04-Mar-24 95 310.C.EX.W2168 WSA - MFF and Bus Stop - Fire Services Preliminary Inspection & Adjustment (FSI) C11_6 d/w - 10h/d - With 18 06-Oct-23 27-Oct-23 30-Jan-24 21-Feb-24 95 HK Hols - No B/O periods 310.C.EX.W2172 WSA - MFF and Bus Stop - Fire Services Preliminary Testing & Commissioning (FSI) (was C11_6C3) d/w - 10h/d - With 18 18-Oct-23 08-Nov-23 10-Feb-24 04-Mar-24 95 HK Hols - No B/O periods Testing and Commissioning (was C01_7C3) d/w - 10h/d - No HK Hols73 - No B/O periods 0 (was09-Nov-23 C1) 20-Jan-24 12-Mar-24 16-May-24 117 310.T.EX.L468 WSA - MFF and Bus Stop - Electrical System Test C01_7 d/w - 10h/d - No HK 24 09-Nov-23 02-Dec-23 12-Mar-24 04-Apr-24 124 Hols - No B/O periods (was 310.T.EX.L464 WSA - MFF and Bus Stop - FS System Test (FSI) C1) C01_7 d/w - 10h/d - No HK 24 16-Nov-23 09-Dec-23 12-Mar-24 04-Apr-24 117 Hols - No B/O periods (was 310.T.EX.L476 WSA - MFF and Bus Stop - Systems Integration Test C1) C01_7 d/w - 10h/d - No HK 42 10-Dec-23 20-Jan-24 05-Apr-24 16-May-24 117 Hols - No B/O periods (was Statutory Inspection C1) 102 0 16-Nov-23 19-Mar-24 17-Apr-24 13-Jul-24 92 Fire Services Department (FSD) 102 0 16-Nov-23 19-Mar-24 17-Apr-24 13-Jul-24 92 310.T.WS.T948 WSA - MFF and Bus Stop - F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 16-Nov-23 17-Apr-24 122 HK Hols - No B/O periods 310.T.WS.T952 WSA - MFF and Bus Stop - F.S. Inspection Application (Form FSI / 501 & 251 (was C11_6C3) d/w - 10h/d - With 0 22-Jan-24 17-May-24 92 Submission) HK Hols - No B/O periods 310.T.WS.T956 WSA - MFF and Bus Stop - F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 12 05-Feb-24 20-Feb-24 31-May-24 14-Jun-24 92 HK Hols - No B/O periods 310.T.WS.T960 WSA - MFF and Bus Stop - FSD Comment (was C3) C11_6 d/w - 10h/d - With 0 20-Feb-24 14-Jun-24 92 HK Hols - No B/O periods 310.T.WS.T964 WSA - MFF and Bus Stop - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 12 21-Feb-24 05-Mar-24 15-Jun-24 28-Jun-24 92 HK Hols - No B/O periods 310.T.WS.T968 WSA - MFF and Bus Stop - F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 12 06-Mar-24 19-Mar-24 29-Jun-24 13-Jul-24 92 HK Hols - No B/O periods 310.T.WS.M022 WSA - Achieved KD-10 (Section 3) - Maintenance Facilities (was C01_7C3) d/w - 10h/d - No HK 0 19-Mar-24 13-Jul-24 116 Hols - No B/O periods (was 310.T.WS.T972 WSA - MFF and Bus Stop - Issue F.S. Certificate (Form FS172) C1) C11_6 d/w - 10h/d - With 0 19-Mar-24 13-Jul-24 92 HK Hols - No B/O periods WSA - GSE Storage Area (was C3) 70 0 18-Oct-23 11-Jan-24 19-Apr-24 14-Jul-24 148 Testing and Commissioning C11_6 d/w - 10h/d - With HK Hols 28- No B/O 0periods (was 18-Oct-23 C3) 20-Nov-23 19-Apr-24 23-May-24 148 310.T.WS.N101 WSA - GSE Storage Area - Testing and Commissioning C11_6 d/w - 10h/d - With 28 18-Oct-23 20-Nov-23 19-Apr-24 23-May-24 148 HK Hols - No B/O periods Inspection (was C3) 42 0 21-Nov-23 11-Jan-24 24-May-24 14-Jul-24 148 310.T.WS.N117 WSA - GSE Storage Area - Inspection and defects rectification C11_6 d/w - 10h/d - With 28 21-Nov-23 22-Dec-23 24-May-24 26-Jun-24 148 HK Hols - No B/O periods 310.T.WS.N105 WSA - GSE Storage Area - PM Acceptance (was C11_6C3) d/w - 10h/d - With 14 23-Dec-23 11-Jan-24 27-Jun-24 13-Jul-24 148 HK Hols - No B/O periods 310.T.WS.N109 WSA - GSE Storage Area - PM Issued Letter of Completion (was C11_6C3) d/w - 10h/d - With 0 11-Jan-24 13-Jul-24 148 HK Hols - No B/O periods 310.T.WS.N113 WSA - GSE Storage Area - completion of GSE Storage Area (KD-10) (was C01_7C3) d/w - 10h/d - No HK 0 11-Jan-24 14-Jul-24 185 Hols - No B/O periods (was WSA - Gatehouse B C1) 386 33 31-Oct-22 16-Feb-24 14-Feb-23 18-Feb-24 1 Testing and Commissioning 386 33 31-Oct-22 16-Feb-24 14-Feb-23 18-Feb-24 1 Preliminary Testing and Commissioning C11_6 d/w - 10h/d - With HK Hols 90- No B/O 0periods (was 27-Jun-23 C3) 12-Oct-23 21-Aug-23 25-Jan-24 86 Preliminary T&C - Plumbing and Drainage C11_6 d/w - 10h/d - With HK Hols 34- No B/O 0periods (was 27-Jun-23 C3) 05-Aug-23 21-Aug-23 28-Sep-23 46 310.C.EX.W2072 WSA - Gatehouse B - Plumbing & Drainage Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 24 27-Jun-23 25-Jul-23 21-Aug-23 16-Sep-23 46 HK Hols - No B/O periods 310.C.EX.W2076 WSA - Gatehouse B - Plumbing & Drainage Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 24 10-Jul-23 05-Aug-23 01-Sep-23 28-Sep-23 46 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 226 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Preliminary T&C - Electrical C11_6 d/w - 10h/d - With HK Hols 90- No B/O 0periods (was 27-Jun-23 C3) 12-Oct-23 02-Sep-23 25-Jan-24 86 310.C.EX.W2483.B02 WSA - Gatehouse B - Electrical Preliminary Inspection & Adjustment (non-FSI) C11_6 d/w - 10h/d - With 24 27-Jun-23 25-Jul-23 28-Nov-23 27-Dec-23 128 HK Hols - No B/O periods 310.C.EX.W2490.B02 WSA - Gatehouse B - Electrical Preliminary Testing & Commissioning (non-FSI) (was C11_6C3) d/w - 10h/d - With 24 26-Jul-23 22-Aug-23 28-Dec-23 25-Jan-24 128 HK Hols - No B/O periods 310.C.EX.W1988 WSA - Gatehouse B - Electrical Preliminary Inspection & Adjustment (was C11_6C3) d/w - 10h/d - With 24 01-Sep-23 28-Sep-23 02-Sep-23 29-Sep-23 1 HK Hols - No B/O periods 310.C.EX.W1992 WSA - Gatehouse B - Electrical Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 24 13-Sep-23 12-Oct-23 14-Sep-23 13-Oct-23 1 HK Hols - No B/O periods Preliminary T&C - Fire Services (was C11_6C3) d/w - 10h/d - With HK Hols 34- No B/O 0periods (was 27-Jun-23 C3) 05-Aug-23 02-Sep-23 13-Oct-23 57 310.C.EX.W2012 WSA - Gatehouse B - Fire Services Preliminary Inspection & Adjustment (FSI) C11_6 d/w - 10h/d - With 24 27-Jun-23 25-Jul-23 02-Sep-23 29-Sep-23 57 HK Hols - No B/O periods 310.C.EX.W2013.B01 WSA - Gatehouse B - Fire Services Preliminary Inspection & Adjustment (Non-FSI) (was C11_6C3) d/w - 10h/d - With 24 27-Jun-23 25-Jul-23 02-Sep-23 29-Sep-23 57 HK Hols - No B/O periods 310.C.EX.W2016 WSA - Gatehouse B - Fire Services Preliminary Testing & Commissioning (FSI) (was C11_6C3) d/w - 10h/d - With 24 10-Jul-23 05-Aug-23 14-Sep-23 13-Oct-23 57 HK Hols - No B/O periods 310.C.EX.W2017.B01 WSA - Gatehouse B - Fire Services Preliminary Testing & Commissioning (Non-FSI) (was C11_6C3) d/w - 10h/d - With 24 10-Jul-23 05-Aug-23 14-Sep-23 13-Oct-23 57 HK Hols - No B/O periods Preliminary T&C - MVAC (was C11_6C3) d/w - 10h/d - With HK Hols 34- No B/O 0periods (was 27-Jun-23 C3) 05-Aug-23 02-Sep-23 13-Oct-23 57 310.C.EX.W2032 WSA - Gatehouse B - MVAC Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 24 27-Jun-23 25-Jul-23 02-Sep-23 29-Sep-23 57 HK Hols - No B/O periods 310.C.EX.W2036 WSA - Gatehouse B - MVAC Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 24 10-Jul-23 05-Aug-23 14-Sep-23 13-Oct-23 57 HK Hols - No B/O periods Testing and Commissioning (was C01_7C3) d/w - 10h/d - No HK Hols120 - No B/O periods 11 (was20-Aug-23 C1) 17-Dec-23 16-Oct-23 25-Jan-24 39 310.T.EX.L336 WSA - Gatehouse B - Ventilation System Test C01_7 d/w - 10h/d - No HK 21 2 20-Aug-23 09-Sep-23 29-Oct-23 18-Nov-23 70 Hols - No B/O periods (was 310.T.EX.L348 WSA - Gatehouse B - Plumbing System Test C1) C01_7 d/w - 10h/d - No HK 21 2 20-Aug-23 09-Sep-23 16-Oct-23 05-Nov-23 57 Hols - No B/O periods (was 310.T.EX.L332 WSA - Gatehouse B - FS System Test (FSI) C1) C01_7 d/w - 10h/d - No HK 21 2 28-Oct-23 17-Nov-23 29-Oct-23 18-Nov-23 1 Hols - No B/O periods (was 310.T.EX.L340.B01 WSA - Gatehouse B - FS System Test (Non-FSI) C1) C01_7 d/w - 10h/d - No HK 21 2 28-Oct-23 17-Nov-23 05-Jan-24 25-Jan-24 69 Hols - No B/O periods (was 310.T.EX.L344 WSA - Gatehouse B - Systems Integration Test C1) C01_7 d/w - 10h/d - No HK 30 3 18-Nov-23 17-Dec-23 19-Nov-23 18-Dec-23 1 Hols - No B/O periods (was Statutory Inspection C1) 386 22 31-Oct-22 16-Feb-24 14-Feb-23 18-Feb-24 1 Water Supply Department (WSD) C11_6 d/w - 10h/d - With HK Hols 284- No B/O10 periods (was 31-Oct-22 C3) 13-Oct-23 14-Feb-23 04-Dec-23 43 310.T.WS.T600 WSA - Gatehouse B & Vehicle Search Bay and C&ED Control Kiosk - Prepare for C11_6 d/w - 10h/d - With 17 3 31-Oct-22 18-Nov-22 14-Feb-23 04-Mar-23 86 Plumbing Material for Submission HK Hols - No B/O periods 310.T.WS.T605 WSA - Gatehouse B & Vehicle Search Bay and C&ED Control Kiosk - Submit all (was C11_6C3) d/w - 10h/d - With 0 19-Nov-22 06-Mar-23 86 Plumbing Material for PM Acceptance HK Hols - No B/O periods 310.T.WS.T610 WSA - Gatehouse B & Vehicle Search Bay and C&ED Control Kiosk - PM Acceptance (was C11_6C3) d/w - 10h/d - With 48 4 19-Nov-22 16-Jan-23 06-Mar-23 05-May-23 86 HK Hols - No B/O periods 310.T.WS.T615 WSA-Gatehouse B&Vehicle Search Bay&C&ED Control Kiosk - Form WWO46(Part (was C11_6C3) d/w - 10h/d - With 0 17-Jan-23 06-May-23 86 I&II)&Submission for WSD App.(Plumbing/FS/WP) HK Hols - No B/O periods 310.T.WS.T620 WSA - Gatehouse B&Vehicle Search Bay&C&ED - Obtain Form WWO46(Part III)-WSD (was C11_6C3) d/w - 10h/d - With 4 1 17-Jan-23 20-Jan-23 06-May-23 10-May-23 86 Approval,Endorsed&Return to Licensed Plumber HK Hols - No B/O periods 310.T.WS.T775 WSA - Gatehouse B&Vehicle Search Bay&C&ED-Form WWO 46(Part IV)Submission for (was C11_6C3) d/w - 10h/d - With 0 13-Sep-23 06-Nov-23 43 WSD Inspection(Plumbing/FS/WP) HK Hols - No B/O periods 310.T.WS.T780 WSA - Gatehouse B & Vehicle Search Bay and C&ED Control Kiosk - WSD Inspection for (was C11_6C3) d/w - 10h/d - With 12 1 21-Sep-23 06-Oct-23 14-Nov-23 27-Nov-23 43 Water Supply System HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 227 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.WS.T800 WSA - Gatehouse B & Vehicle Search Bay and C&ED Control Kiosk - Obtain Form WWO C11_6 d/w - 10h/d - With 0 06-Oct-23 27-Nov-23 43 46 (Part V) HK Hols - No B/O periods 310.T.WS.T805 WSA - Gatehouse B&Vehicle Search Bay and C&ED Control Kiosk-Form WWO132(Part (was C11_6C3) d/w - 10h/d - With 0 06-Oct-23 27-Nov-23 43 II)Submission for Water Supply Connection HK Hols - No B/O periods 310.T.WS.T810 WSA - Gatehouse B & Vehicle Search Bay and C&ED Control Kiosk - Final Water Supply (was C11_6C3) d/w - 10h/d - With 6 1 07-Oct-23 13-Oct-23 28-Nov-23 04-Dec-23 43 Connection HK Hols - No B/O periods 310.T.WS.T825 WSA - Gatehouse B & Vehicle Search Bay and C&ED Control Kiosk - Obtain Water (was C11_6C3) d/w - 10h/d - With 0 13-Oct-23 04-Dec-23 43 Certificate (Form WWO 1005) HK Hols - No B/O periods Fire Services Department (FSD) (was C11_6C3) d/w - 10h/d - With HK Hols 187- No B/O 6periods (was 12-Jun-23 C3) 24-Jan-24 04-Oct-23 25-Jan-24 1 DG Application & Inspection C11_6 d/w - 10h/d - With HK Hols 52- No B/O 3periods (was 12-Jun-23 C3) 12-Aug-23 04-Oct-23 04-Dec-23 94 310.T.ES.P500 WSA - Gatehouse B - DG Inspection Application (Form Submission) C11_6 d/w - 10h/d - With 0 12-Jun-23 04-Oct-23 94 HK Hols - No B/O periods 310.T.ES.P504 WSA - Gatehouse B - DG 1st Inspection (was C11_6C3) d/w - 10h/d - With 7 1 12-Jul-23 19-Jul-23 02-Nov-23 09-Nov-23 94 HK Hols - No B/O periods 310.T.ES.P508 WSA - Gatehouse B - DG FSD Comment (was C11_6C3) d/w - 10h/d - With 0 19-Jul-23 09-Nov-23 94 HK Hols - No B/O periods 310.T.ES.P512 WSA - Gatehouse B - DG Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 14 1 20-Jul-23 04-Aug-23 10-Nov-23 25-Nov-23 94 HK Hols - No B/O periods 310.T.ES.P516 WSA - Gatehouse B - DG Re-inspection (was C11_6C3) d/w - 10h/d - With 7 1 05-Aug-23 12-Aug-23 27-Nov-23 04-Dec-23 94 HK Hols - No B/O periods 310.T.ES.P520 WSA - Gatehouse B - Issue DG Certificate (was C11_6C3) d/w - 10h/d - With 0 12-Aug-23 04-Dec-23 94 HK Hols - No B/O periods Fire Services Application & Inspection (was C11_6C3) d/w - 10h/d - With HK Hols 55- No B/O 3periods (was 18-Nov-23 C3) 24-Jan-24 05-Dec-23 25-Jan-24 1 310.T.WS.T840 WSA - Gatehouse B - F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 18-Nov-23 05-Dec-23 14 HK Hols - No B/O periods 310.T.WS.T845 WSA - Gatehouse B - F.S. Inspection Application (Form FSI / 501 & 251 Submission) (was C11_6C3) d/w - 10h/d - With 0 18-Nov-23 05-Dec-23 14 HK Hols - No B/O periods 310.T.WS.T850 WSA - Gatehouse B - F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 10 1 18-Dec-23 30-Dec-23 19-Dec-23 02-Jan-24 1 HK Hols - No B/O periods 310.T.WS.T855 WSA - Gatehouse B - FSD Comment (was C11_6C3) d/w - 10h/d - With 0 30-Dec-23 02-Jan-24 1 HK Hols - No B/O periods 310.T.WS.T860 WSA - Gatehouse B - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 10 1 02-Jan-24 12-Jan-24 03-Jan-24 13-Jan-24 1 HK Hols - No B/O periods 310.T.WS.T865 WSA - Gatehouse B - F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 10 1 13-Jan-24 24-Jan-24 15-Jan-24 25-Jan-24 1 HK Hols - No B/O periods 310.T.WS.T870 WSA - Gatehouse B - Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 24-Jan-24 25-Jan-24 1 HK Hols - No B/O periods Environmental Protection Department (EDP) (was C11_6C3) d/w - 10h/d - With HK Hols 48- No B/O 3periods (was 12-Jun-23 C3) 08-Aug-23 09-Oct-23 04-Dec-23 98 EPD Application & Inspection C11_6 d/w - 10h/d - With HK Hols 48- No B/O 3periods (was 12-Jun-23 C3) 08-Aug-23 09-Oct-23 04-Dec-23 98 310.T.ES.P596 WSA - Gatehouse B - EPD Inspection Application C11_6 d/w - 10h/d - With 0 12-Jun-23 09-Oct-23 98 HK Hols - No B/O periods 310.T.ES.P600 WSA - Gatehouse B - EPD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 1 12-Jul-23 18-Jul-23 07-Nov-23 13-Nov-23 98 HK Hols - No B/O periods 310.T.ES.P604 WSA - Gatehouse B - EPD Comment (was C11_6C3) d/w - 10h/d - With 0 18-Jul-23 13-Nov-23 98 HK Hols - No B/O periods 310.T.ES.P608 WSA - Gatehouse B - EPD Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 1 19-Jul-23 25-Jul-23 14-Nov-23 20-Nov-23 98 HK Hols - No B/O periods 310.T.ES.P612 WSA - Gatehouse B - EPD Re-inspection (was C11_6C3) d/w - 10h/d - With 12 1 26-Jul-23 08-Aug-23 21-Nov-23 04-Dec-23 98 HK Hols - No B/O periods 310.T.ES.P616 WSA - Gatehouse B - Issue License (was C11_6C3) d/w - 10h/d - With 0 08-Aug-23 04-Dec-23 98 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 228 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Building Department (BD) 18 3 25-Jan-24 16-Feb-24 26-Jan-24 18-Feb-24 1 310.T.WS.T875 BD Inspection Application for Occupation Permit (Form BA13 Submission) C11_6 d/w - 10h/d - With 0 25-Jan-24 26-Jan-24 1 HK Hols - No B/O periods 310.T.WS.T880 WSA - Gatehouse B - BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 1 25-Jan-24 31-Jan-24 26-Jan-24 01-Feb-24 1 HK Hols - No B/O periods 310.T.WS.T885 WSA - Gatehouse B - BD Comment (was C11_6C3) d/w - 10h/d - With 0 31-Jan-24 01-Feb-24 1 HK Hols - No B/O periods 310.T.WS.T890 WSA - Gatehouse B - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 1 01-Feb-24 07-Feb-24 02-Feb-24 08-Feb-24 1 HK Hols - No B/O periods 310.T.WS.T895 WSA - Gatehouse B - BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 1 08-Feb-24 16-Feb-24 09-Feb-24 17-Feb-24 1 HK Hols - No B/O periods 310.D.RC.D599 WSA - Gatehouse B - Achieved KD-G4(d) (was C01_7C3) d/w - 10h/d - No HK 0 16-Feb-24 17-Feb-24 1 Hols - No B/O periods (was 310.T.WS.M551 WSA - Gatehouse B - (T&C) - Achieved KD-10 C1) C01_7 d/w - 10h/d - No HK 0 16-Feb-24 17-Feb-24 1 Hols - No B/O periods (was 310.T.WS.T900 WSA - Gatehouse B - Issue Occupation Permit (Form BD104) C1) C11_6 d/w - 10h/d - With 0 16-Feb-24 17-Feb-24 1 HK Hols - No B/O periods 310.K.EX.A1040 PMS29 - Comp all works for Security Gatehouse B, obtain stat. apprv., consents, ready (was C01_7C3) d/w - 10h/d - No HK 0 16-Feb-24 18-Feb-24 2 for use [18 Feb 24] Hols - No B/O periods (was 310.D.RC.D651 WSA - Vehicle Traffic Control Kiosk, Vehicle Search Bay - Achieved KD-G4(d) C1) C01_7 d/w - 10h/d - No HK 0 16-Feb-24 18-Feb-24 2 Hols - No B/O periods (was 310.T.WS.M555 WSA - Vehicle Search Bay and C&ED Control Kiosk - (T&C) - Achieved KD-10 C1) C01_7 d/w - 10h/d - No HK 0 16-Feb-24 18-Feb-24 2 Hols - No B/O periods (was WSA - Screening Facilities C1) 237 0 31-Aug-22 19-Jun-23 22-Sep-22 17-Feb-24 199 Testing and Commissioning C01_7 d/w - 10h/d - No HK Hols28 - No B/O periods 0 (was18-Feb-23 C1) 18-Mar-23 01-Mar-23 29-Mar-23 11 310.K.EX.A1044 Completion of CLP Cabling & Energization (from GSE Battery Charing B) C01_7 d/w - 10h/d - No HK 0 18-Feb-23 01-Mar-23 11 Hols - No B/O periods (was 310.T.WS.T1642 WSA - Screening Facilities - Testing & Commissioning C1) C01_7 d/w - 10h/d - No HK 28 19-Feb-23 18-Mar-23 02-Mar-23 29-Mar-23 11 Hols - No B/O periods (was Statutory Inspection C1) 237 0 31-Aug-22 19-Jun-23 22-Sep-22 17-Feb-24 199 Water Supply Department (WSD) C11_6 d/w - 10h/d - With HK Hols 189- No B/O 0periods (was 31-Aug-22 C3) 21-Apr-23 22-Sep-22 03-May-23 9 310.T.WS.T1640 WSA - Screening Facilities - Prepare for Plumbing Material for Submission C11_6 d/w - 10h/d - With 17 31-Aug-22 20-Sep-22 22-Sep-22 13-Oct-22 18 HK Hols - No B/O periods 310.T.WS.T1644 WSA - Screening Facilities - Submit all Plumbing Material for PM Acceptance (was C11_6C3) d/w - 10h/d - With 0 21-Sep-22 14-Oct-22 18 HK Hols - No B/O periods 310.T.WS.T1648 WSA - Screening Facilities - PM Acceptance (was C11_6C3) d/w - 10h/d - With 48 21-Sep-22 17-Nov-22 14-Oct-22 08-Dec-22 18 HK Hols - No B/O periods 310.T.WS.T1652 WSA - Screening Facilities - Form WWO 46 (Part I & Part II) & Annex Submission for (was C11_6C3) d/w - 10h/d - With 0 18-Nov-22 09-Dec-22 18 WSD Approval (Plumbing / FS / WP) HK Hols - No B/O periods 310.T.WS.T1656 WSA - Screening Facilities - Obtain Form WWO 46 (Part III) - WSD Approval, Endorsed & (was C11_6C3) d/w - 10h/d - With 6 18-Nov-22 24-Nov-22 09-Dec-22 15-Dec-22 18 Return to Licensed Plumber HK Hols - No B/O periods 310.T.WS.T1660 WSA - Screening Facilities - Form WWO 46 (Part IV) Submission for WSD Inspection (was C11_6C3) d/w - 10h/d - With 0 20-Mar-23 30-Mar-23 9 (Plumbing / FS / WP) HK Hols - No B/O periods 310.T.WS.T1664 WSA - Screening Facilities - WSD Inspection for Water Supply System (was C11_6C3) d/w - 10h/d - With 12 28-Mar-23 14-Apr-23 12-Apr-23 25-Apr-23 9 HK Hols - No B/O periods 310.T.WS.T1668 WSA - Screening Facilities - Obtain Form WWO 46 (Part V) (was C11_6C3) d/w - 10h/d - With 0 14-Apr-23 25-Apr-23 9 HK Hols - No B/O periods 310.T.WS.T1672 WSA - Screening Facilities - Form WWO 132 (Part II) Submission for Water Supply (was C11_6C3) d/w - 10h/d - With 0 14-Apr-23 25-Apr-23 9 Connection HK Hols - No B/O periods 310.T.WS.T1676 WSA - Screening Facilities - Final Water Supply Connection (was C11_6C3) d/w - 10h/d - With 6 15-Apr-23 21-Apr-23 26-Apr-23 03-May-23 9 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 229 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.WS.T1680 WSA - Screening Facilities - Obtain Water Certificate (Form WWO 1005) C11_6 d/w - 10h/d - With 0 21-Apr-23 03-May-23 9 HK Hols - No B/O periods Fire Services Department (FSD) (was C11_6C3) d/w - 10h/d - With HK Hols 95- No B/O 0periods (was 01-Feb-23 C3) 29-May-23 15-Mar-23 08-Jun-23 9 DG Application & Inspection C11_6 d/w - 10h/d - With HK Hols 38- No B/O 0periods (was 01-Feb-23 C3) 16-Mar-23 15-Mar-23 03-May-23 36 310.T.ES.P524 WSA - Screening Facilities - DG Inspection Application (Form Submission) C11_6 d/w - 10h/d - With 0 01-Feb-23 15-Mar-23 36 HK Hols - No B/O periods 310.T.ES.P528 WSA - Screening Facilities - DG 1st Inspection (was C11_6C3) d/w - 10h/d - With 7 15-Feb-23 22-Feb-23 29-Mar-23 06-Apr-23 36 HK Hols - No B/O periods 310.T.ES.P532 WSA - Screening Facilities - DG FSD Comment (was C11_6C3) d/w - 10h/d - With 0 22-Feb-23 06-Apr-23 36 HK Hols - No B/O periods 310.T.ES.P536 WSA - Screening Facilities - DG Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 12 23-Feb-23 08-Mar-23 11-Apr-23 24-Apr-23 36 HK Hols - No B/O periods 310.T.ES.P540 WSA - Screening Facilities - DG Re-inspection (was C11_6C3) d/w - 10h/d - With 7 09-Mar-23 16-Mar-23 25-Apr-23 03-May-23 36 HK Hols - No B/O periods 310.T.ES.P544 WSA - Screening Facilities - Issue DG Certificate (was C11_6C3) d/w - 10h/d - With 0 16-Mar-23 03-May-23 36 HK Hols - No B/O periods Fire Services Application & Inspection (was C11_6C3) d/w - 10h/d - With HK Hols 37- No B/O 0periods (was 14-Apr-23 C3) 29-May-23 04-May-23 08-Jun-23 9 310.T.WS.T640 WSA - Screening Facilities - F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 14-Apr-23 04-May-23 16 HK Hols - No B/O periods 310.T.WS.T645 WSA - Screening Facilities - F.S. Inspection Application (Form FSI / 501 & 251 (was C11_6C3) d/w - 10h/d - With 0 22-Apr-23 04-May-23 9 Submission) HK Hols - No B/O periods 310.T.WS.T650 WSA - Screening Facilities - F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 08-May-23 13-May-23 18-May-23 24-May-23 9 HK Hols - No B/O periods 310.T.WS.T665 WSA - Screening Facilities - FSD Comment (was C11_6C3) d/w - 10h/d - With 0 13-May-23 24-May-23 9 HK Hols - No B/O periods 310.T.WS.T670 WSA - Screening Facilities - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 15-May-23 20-May-23 25-May-23 01-Jun-23 9 HK Hols - No B/O periods 310.T.WS.T675 WSA - Screening Facilities - F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 22-May-23 29-May-23 02-Jun-23 08-Jun-23 9 HK Hols - No B/O periods 310.T.WS.T680 WSA - Screening Facilities - Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 29-May-23 08-Jun-23 9 HK Hols - No B/O periods Environmental Protection Department (EDP) (was C11_6C3) d/w - 10h/d - With HK Hols 30- No B/O 0periods (was 01-Feb-23 C3) 07-Mar-23 24-Mar-23 03-May-23 44 EPD Application & Inspection C11_6 d/w - 10h/d - With HK Hols 30- No B/O 0periods (was 01-Feb-23 C3) 07-Mar-23 24-Mar-23 03-May-23 44 310.T.ES.P620 WSA - Screening Facilities - EPD Inspection Application C11_6 d/w - 10h/d - With 0 01-Feb-23 24-Mar-23 44 HK Hols - No B/O periods 310.T.ES.P624 WSA - Screening Facilities - EPD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 15-Feb-23 21-Feb-23 12-Apr-23 18-Apr-23 44 HK Hols - No B/O periods 310.T.ES.P628 WSA - Screening Facilities - EPD Comment (was C11_6C3) d/w - 10h/d - With 0 21-Feb-23 18-Apr-23 44 HK Hols - No B/O periods 310.T.ES.P632 WSA - Screening Facilities - EPD Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 22-Feb-23 28-Feb-23 19-Apr-23 25-Apr-23 44 HK Hols - No B/O periods 310.T.ES.P636 WSA - Screening Facilities - EPD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 01-Mar-23 07-Mar-23 26-Apr-23 03-May-23 44 HK Hols - No B/O periods 310.T.ES.P640 WSA - Screening Facilities - Issue License (was C11_6C3) d/w - 10h/d - With 0 07-Mar-23 03-May-23 44 HK Hols - No B/O periods Building Department (BD) (was C3) 18 0 30-May-23 19-Jun-23 09-Jun-23 17-Feb-24 199 310.T.WS.T685 WSA - Screening Facilities - BD Inspection Application for Occupation Permit (Form BA13 C11_6 d/w - 10h/d - With 0 30-May-23 09-Jun-23 9 Submission) HK Hols - No B/O periods 310.T.WS.T690 WSA - Screening Facilities - BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 30-May-23 05-Jun-23 09-Jun-23 15-Jun-23 9 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 230 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.WS.T695 WSA - Screening Facilities - BD Comment C11_6 d/w - 10h/d - With 0 05-Jun-23 15-Jun-23 9 HK Hols - No B/O periods 310.T.WS.T700 WSA - Screening Facilities - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 06-Jun-23 12-Jun-23 16-Jun-23 23-Jun-23 9 HK Hols - No B/O periods 310.T.WS.T705 WSA - Screening Facilities - BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 13-Jun-23 19-Jun-23 24-Jun-23 30-Jun-23 9 HK Hols - No B/O periods 310.T.WS.R046 WSA - Screening Facilities- Achieved Milestone 28 (was C11_6C3) d/w - 10h/d - With 0 19-Jun-23 30-Jun-23 9 HK Hols - No B/O periods 310.T.WS.R050 Achieved KD-10 (Section 3) - Screening Facilities (was C01_7C3) d/w - 10h/d - No HK 0 19-Jun-23 17-Feb-24 243 Hols - No B/O periods (was 310.T.WS.T710 Issue Occupation Permit (Form BD104) C1) C11_6 d/w - 10h/d - With 0 19-Jun-23 30-Jun-23 9 HK Hols - No B/O periods Option 3310/A1 - CAD Facilities (was C3) 756 29 07-Jun-21 A 17-Dec-23 27-Mar-22 18-Dec-23 1 CAD Glide Path Building C 697 3 07-Jun-21 A 07-Oct-23 14-Apr-22 07-Oct-23 0 Design and Submission - ELS C01_7 d/w - 10h/d - No HK Hols129 - No B/O periods 0 (was 01-Dec-21 C1) A 07-Jun-22 06-Jun-22 02-Aug-22 56 310.D.RC.P032 Glide Path Bldg C - Prepares ELS Design for Foundation Works C01_7 d/w - 10h/d - No HK 28 01-Dec-21 A 21-Dec-21 A 06-Jun-22 06-Jun-22 Hols - No B/O periods (was 310.D.RC.P574.B01 Glide Path Bldg C - ICE review and issue check certificate C1) C01_7 d/w - 10h/d - No HK 7 21-Dec-21 A 22-Dec-21 A 06-Jun-22 06-Jun-22 Hols - No B/O periods (was 310.D.RC.P578.B01 Glide Path Bldg C - Review by PM, AP, RSE, RGE C1) C01_7 d/w - 10h/d - No HK 28 23-Dec-21 A 20-Jan-22 A 06-Jun-22 06-Jun-22 Hols - No B/O periods (was 310.D.RC.P056 Glide Path Bldg C - BD review and approves design C1) C01_7 d/w - 10h/d - No HK 60 22-Jan-22 A 25-Apr-22 06-Jun-22 05-Jul-22 71 Hols - No B/O periods (was 310.D.RC.P084 Glide Path Bldg C - submit BA8 consent application (excavation + structure) C1) C01_7 d/w - 10h/d - No HK 28 11-May-22 07-Jun-22 06-Jul-22 02-Aug-22 56 Hols - No B/O periods (was ELS Design - UU Trench Below 2.5m C1) C01_7 d/w - 10h/d - No HK Hols242 - No B/O periods 0 (was02-Jun-22 C1) 29-Jan-23 21-Sep-22 20-May-23 111 310.D.RC.P538 ELS for UU Trench Below 2.5m - Prepares ELS Design for Foundation Works C01_7 d/w - 10h/d - No HK 28 02-Jun-22 29-Jun-22 21-Sep-22 18-Oct-22 111 Hols - No B/O periods (was 310.D.RC.P542 ELS for UU Trench Below 2.5m - ICE review and issue check certificate C1) C01_7 d/w - 10h/d - No HK 7 30-Jun-22 06-Jul-22 19-Oct-22 25-Oct-22 111 Hols - No B/O periods (was 310.D.RC.P546 ELS for UU Trench Below 2.5m - Review by PM, AP, RSE, RGE C1) C01_7 d/w - 10h/d - No HK 28 07-Jul-22 03-Aug-22 26-Oct-22 22-Nov-22 111 Hols - No B/O periods (was 310.D.RC.P550 ELS for UU Trench Below 2.5m - Review design by ICC, M&VC and issue check C1) C01_7 d/w - 10h/d - No HK 21 04-Aug-22 24-Aug-22 23-Nov-22 13-Dec-22 111 certificate Hols - No B/O periods (was 310.D.RC.P554 ELS for UU Trench Below 2.5m - address comment and resubmit 2nd Round C1) C01_7 d/w - 10h/d - No HK 21 25-Aug-22 14-Sep-22 14-Dec-22 03-Jan-23 111 Hols - No B/O periods (was 310.D.RC.P558 ELS for UU Trench Below 2.5m - Review by PM, AP, RSE, RGE 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 15-Sep-22 12-Oct-22 04-Jan-23 31-Jan-23 111 Hols - No B/O periods (was 310.D.RC.P570 ELS for UU Trench Below 2.5m - Review design by ICC, M&VC and issue check C1) C01_7 d/w - 10h/d - No HK 21 13-Oct-22 02-Nov-22 01-Feb-23 21-Feb-23 111 certificate 2nd Round Hols - No B/O periods (was 310.D.RC.P562 ELS for UU Trench Below 2.5m - BD review and approves design C1) C01_7 d/w - 10h/d - No HK 60 03-Nov-22 01-Jan-23 22-Feb-23 22-Apr-23 111 Hols - No B/O periods (was 310.D.RC.P566 ELS for UU Trench Below 2.5m - submit BA8 consent application (excavation + structure) C1) C01_7 d/w - 10h/d - No HK 28 02-Jan-23 29-Jan-23 23-Apr-23 20-May-23 111 Hols - No B/O periods (was Method Statement for Plate Load Test for Glide Path Building C C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was30-Oct-22 C1) 26-Dec-22 14-Nov-22 10-Jan-23 15 310.D.TX.A292 Method Statement for Plate Load Test for Glide Path Building C - prepare document C01_7 d/w - 10h/d - No HK 30 30-Oct-22 28-Nov-22 14-Nov-22 13-Dec-22 15 Hols - No B/O periods (was 310.D.TX.A296 Method Statement for Plate Load Test for Glide Path Building C - BD Acknowledgement C1) C01_7 d/w - 10h/d - No HK 28 29-Nov-22 26-Dec-22 14-Dec-22 10-Jan-23 15 Hols - No B/O periods (was CAD Glide Path Building C - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols210 - No B/O periods 0 (was 18-Mar-22 C1) A 21-Nov-22 09-Sep-22 06-May-23 166 CAD Glide Path Building C - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols210 - No B/O periods 0 (was 18-Mar-22 C1) A 21-Nov-22 09-Sep-22 06-May-23 166
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 231 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1024 CAD Glide Path Building C - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 21 18-Mar-22 A 23-Aug-22 09-Sep-22 05-Feb-23 166 Hols - No B/O periods (was 310.D.WS.L1588 CAD Glide Path Building C - MEP - Drawing Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 150 26-Apr-22 22-Sep-22 09-Oct-22 07-Mar-23 166 Round Hols - No B/O periods (was 310.D.WS.L1584 CAD Glide Path Building C - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 150 26-May-22 22-Oct-22 08-Nov-22 06-Apr-23 166 Hols - No B/O periods (was 310.D.WS.L1028 CAD Glide Path Building C - MEP - Drawing Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 150 25-Jun-22 21-Nov-22 08-Dec-22 06-May-23 166 Round Hols - No B/O periods (was CAD Glide Path Building C - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols119 - No B/O periods 0 (was12-Jul-22 C1) 07-Nov-22 13-Aug-22 09-Dec-22 32 CAD Glide Path Building C - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols91 - No B/O periods 0 (was12-Jul-22 C1) 10-Oct-22 13-Aug-22 11-Nov-22 32 310.D.WS.L1312 CAD Glide Path Building C - ABWF - prepare document C01_7 d/w - 10h/d - No HK 21 12-Jul-22 01-Aug-22 13-Aug-22 02-Sep-22 32 Hols - No B/O periods (was 310.D.WS.L1908 CAD Glide Path Building C - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 02-Aug-22 29-Aug-22 03-Sep-22 30-Sep-22 32 Hols - No B/O periods (was 310.D.WS.L1904 CAD Glide Path Building C - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 30-Aug-22 12-Sep-22 01-Oct-22 14-Oct-22 32 Hols - No B/O periods (was 310.D.WS.L1316 CAD Glide Path Building C - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 13-Sep-22 10-Oct-22 15-Oct-22 11-Nov-22 32 Hols - No B/O periods (was CAD Glide Path Building C - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was02-Aug-22 C1) 07-Nov-22 10-Sep-22 09-Dec-22 32 310.D.WS.L1328 CAD Glide Path Building C - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 21 02-Aug-22 22-Aug-22 10-Sep-22 30-Sep-22 39 Hols - No B/O periods (was 310.D.WS.L1916 CAD Glide Path Building C - ABWF - Material Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 28 23-Aug-22 19-Sep-22 01-Oct-22 28-Oct-22 39 Round Hols - No B/O periods (was 310.D.WS.L1912 CAD Glide Path Building C - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 20-Sep-22 03-Oct-22 29-Oct-22 11-Nov-22 39 Hols - No B/O periods (was 310.D.WS.L1332 CAD Glide Path Building C - ABWF - Material Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 11-Oct-22 07-Nov-22 12-Nov-22 09-Dec-22 32 Round Hols - No B/O periods (was Subletting & Procurement C1) C01_7 d/w - 10h/d - No HK Hols440 - No B/O periods 0 (was 30-Oct-21 C1) A 14-Apr-23 14-Apr-22 06-May-23 22 Subletting C01_7 d/w - 10h/d - No HK Hols181 - No B/O periods 0 (was 30-Oct-21 C1) A 29-Jul-22 14-Apr-22 09-Feb-23 195 310.P.EX.F120 Subletting - Optional Works MEP - Award sub-contract C01_7 d/w - 10h/d - No HK 90 30-Oct-21 A 18-Jan-22 A 13-Aug-22 13-Aug-22 Hols - No B/O periods (was 310.P.EX.F124 Subletting - Optional Works ABWF (Plastering) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 20-Apr-22 19-Jul-22 12-Aug-22 114 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F164.B01 Subletting - Optional Works ABWF (Painting) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 14-Jul-22 12-Aug-22 109 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F168.B01 Subletting - Optional Works ABWF (Door) - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 14-Jul-22 12-Aug-22 109 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F172.B01 Subletting-Optional Wk ABWF (Louver,Window,etc)-Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 14-Jul-22 12-Aug-22 109 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F176.B01 Subletting - Optional Works ABWF (Steel&Metal)- Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 03-Jan-22 A 25-Apr-22 14-Jul-22 12-Aug-22 109 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F165.B02 Provision of Record Plan for Demolition Works C1) C01_7 d/w - 10h/d - No HK 0 27-Mar-22 14-Apr-22 19 Hols - No B/O periods (was 310.P.EX.F164.B02 Subletting - Demolition Works - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 60 27-Mar-22 25-May-22 15-Apr-22 13-Jun-22 19 Approval,Tender&Award sub-contract Hols - No B/O periods (was 310.P.EX.F156 Subletting - Optional Works Earthwork - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 01-May-22 29-Jul-22 12-Nov-22 09-Feb-23 195 Approval,Tender&Award sub-contract Hols - No B/O periods (was Procurement C1) C01_7 d/w - 10h/d - No HK Hols277 - No B/O periods 0 (was12-Jul-22 C1) 14-Apr-23 03-Aug-22 06-May-23 22 Major Materials ABWF C01_7 d/w - 10h/d - No HK Hols148 - No B/O periods 0 (was08-Nov-22 C1) 04-Apr-23 10-Dec-22 06-May-23 32 310.P.RC.P222 Glide Path Bldg. C (Procurement ABWF) - louvres,doors,raised floors C01_7 d/w - 10h/d - No HK 14 08-Nov-22 21-Nov-22 10-Dec-22 23-Dec-22 32 panels&Others-Place Order Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 232 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.RC.P226 Glide Path Bldg. C (Procurement ABWF) - Manufacturing of Materials C01_7 d/w - 10h/d - No HK 120 22-Nov-22 21-Mar-23 24-Dec-22 22-Apr-23 32 Hols - No B/O periods (was 310.P.RC.P234 Glide Path Bldg. C (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 14 22-Mar-23 04-Apr-23 23-Apr-23 06-May-23 32 Hols - No B/O periods (was Major Materials MEP C1) C01_7 d/w - 10h/d - No HK Hols277 - No B/O periods 0 (was12-Jul-22 C1) 14-Apr-23 03-Aug-22 06-May-23 22 310.P.RC.P210 Glide Path Bldg. C (Procurement FS and P&D Major Equipment) -NOVEC 1230, FA& C01_7 d/w - 10h/d - No HK 140 12-Jul-22 28-Nov-22 03-Aug-22 20-Dec-22 22 Others-Place Order for Materials Hols - No B/O periods (was 310.P.RC.P214 Glide Path Bldg. C (Procurement Electrical & MVAC Major Equipment) -AC/fan, LV C1) C01_7 d/w - 10h/d - No HK 60 01-Aug-22 29-Sep-22 10-Nov-22 08-Jan-23 101 switchboard, genset&Others-Place Order Hols - No B/O periods (was 310.P.RC.P662 Glide Path Bldg. C (Procurement FS and P&D Major Equipment) - NOVEC 1230 system, C1) C01_7 d/w - 10h/d - No HK 240 11-Aug-22 07-Apr-23 02-Sep-22 29-Apr-23 22 FA& Others-Manufacturing of Materials Hols - No B/O periods (was 310.P.RC.P666 Glide Path Bldg. C (Procurement Electrical & MVAC Major Equipment) - AC/fan, LV C1) C01_7 d/w - 10h/d - No HK 120 31-Aug-22 28-Dec-22 10-Dec-22 08-Apr-23 101 switchboard, genset &Others Manufacting Hols - No B/O periods (was 310.P.RC.P670 Glide Path Bldg. C (Procurement MEP) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 28 18-Mar-23 14-Apr-23 09-Apr-23 06-May-23 22 Hols - No B/O periods (was Construction - Glide Path Bldg C C1) 632 3 07-Jun-21 A 21-Jul-23 26-May-22 20-Aug-23 25 Initial Works 298 0 07-Jun-21 A 07-Jun-22 26-May-22 02-Aug-22 47 310.C.RC.P002 Glide Path Bldg C - Site Access WA 3310/4 C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 26-May-22 Hols - No B/O periods (was 310.C.RC.P004 Glide Path Bldg C - Coordination meeting with AA/CAD to allow advance GI works, secure C1) C01_7 d/w - 10h/d - No HK 14 22-Jul-21 A 04-Aug-21 A 26-May-22 26-May-22 work permit Hols - No B/O periods (was 310.C.RC.P008 Glide Path Bldg C - Carry out detection to locate existing UU C1) C11_6 d/w - 10h/d - With 6 09-Dec-21 A 09-Dec-21 A 26-May-22 26-May-22 HK Hols - No B/O periods 310.C.RC.P012 Glide Path Bldg C - Carry out trial pits (was C11_6C3) d/w - 10h/d - With 12 28-Mar-22 11-Apr-22 26-May-22 09-Jun-22 46 HK Hols - No B/O periods 310.C.RC.P016 Glide Path Bldg C - Install instrumentations (Qty: 9 nos.) (was C11_6C3) d/w - 10h/d - With 7 12-Apr-22 22-Apr-22 10-Jun-22 17-Jun-22 46 HK Hols - No B/O periods 310.C.RC.P020 Glide Path Bldg C - Ground investigation (GI) (No. of rigs: 2 nos) + report (was C11_6C3) d/w - 10h/d - With 14 23-Apr-22 10-May-22 18-Jun-22 05-Jul-22 46 HK Hols - No B/O periods 310.C.RC.P024 Glide Path Bldg C - Submit report to PM for review and submit to BD including Form BA14 (was C01_7C3) d/w - 10h/d - No HK 28 11-May-22 07-Jun-22 06-Jul-22 02-Aug-22 56 for Completion Hols - No B/O periods (was Excavation Works C1) 113 0 19-Oct-22 05-Mar-23 20-Oct-22 06-Mar-23 1 310.C.RC.P025 Glide Path Bldg C - submit BA10 notice of commencement of work C01_7 d/w - 10h/d - No HK 7 19-Oct-22 25-Oct-22 20-Oct-22 26-Oct-22 1 Hols - No B/O periods (was 310.C.RC.P028 Glide Path Bldg C -Vertical elements for the water cut-off (assumed perimeter 82m @ C1) C03_7 d/w - 10h/d - With 20 26-Oct-22 14-Nov-22 27-Oct-22 15-Nov-22 1 600mm sheet pile) HK Hols - No B/O periods 310.C.RC.P032 Glide Path Bldg C - Install dewatering wells and observation wells C03_7 d/w - 10h/d - With 10 09-Nov-22 18-Nov-22 10-Nov-22 19-Nov-22 1 HK Hols - No B/O periods 310.C.RC.P036 Glide Path Bldg C - Pumping test C03_7 d/w - 10h/d - With 28 19-Nov-22 16-Dec-22 20-Nov-22 17-Dec-22 1 HK Hols - No B/O periods 310.C.RC.P040 Glide Path Bldg C - Submit pumping test report to AA for review/comments C03_7 d/w - 10h/d - With 14 17-Dec-22 02-Jan-23 18-Dec-22 03-Jan-23 1 HK Hols - No B/O periods 310.C.RC.P044 Glide Path Bldg C - Revise/amend pumping test report and submit to AA C03_7 d/w - 10h/d - With 7 03-Jan-23 09-Jan-23 04-Jan-23 10-Jan-23 1 HK Hols - No B/O periods 310.C.RC.P048 Glide Path Bldg C - AA submit final pumping test report to BD + BA8 consent application C01_7 d/w - 10h/d - No HK 28 10-Jan-23 06-Feb-23 11-Jan-23 07-Feb-23 1 (excavation) Hols - No B/O periods (was 310.C.RC.P052 Glide Path Bldg C - BD acknowledge and issue consent letter C1) C01_7 d/w - 10h/d - No HK 0 06-Feb-23 07-Feb-23 1 Hols - No B/O periods (was 310.C.RC.P056 Glide Path Bldg C - Submit BA10 notice of commencement of work C1) C03_7 d/w - 10h/d - With 7 07-Feb-23 13-Feb-23 08-Feb-23 14-Feb-23 1 HK Hols - No B/O periods
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 233 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.P060 Glide Path Bldg C - Excavation to FL (Soil: 3192 m3 @ 300m3/day C03_7 d/w - 10h/d - With 10 14-Feb-23 23-Feb-23 15-Feb-23 24-Feb-23 1 HK Hols - No B/O periods 310.C.RC.P064 Glide Path Bldg C - Plate load test (Qty: 1 no.) C03_7 d/w - 10h/d - With 10 24-Feb-23 05-Mar-23 25-Feb-23 06-Mar-23 1 HK Hols - No B/O periods Structural Works C03_7 d/w - 10h/d - With HK Hols 71- No B/O 0periods 06-Mar-23 21-May-23 07-Mar-23 27-Jul-23 64 310.C.RC.P068 Glide Path Bldg C - B1 Level - construction of footing (Concrete: 276 m3) C03_7 d/w - 10h/d - With 9 06-Mar-23 14-Mar-23 07-Mar-23 15-Mar-23 1 HK Hols - No B/O periods 310.C.RC.P072 Glide Path Bldg C - B1 Level - construction of screen walls , bearing walls (Concrete: 216 C03_7 d/w - 10h/d - With 14 15-Mar-23 28-Mar-23 16-Mar-23 29-Mar-23 1 m3) HK Hols - No B/O periods 310.C.RC.P076 Glide Path Bldg C - Ground Level - construction of beam and base slab (Concrete: 168 C03_7 d/w - 10h/d - With 18 29-Mar-23 20-Apr-23 30-Mar-23 21-Apr-23 1 m3) HK Hols - No B/O periods 310.C.RC.P080 Glide Path Bldg C - Construction of concrete stairs + B1 Level mass concrete (Concrete: C03_7 d/w - 10h/d - With 16 21-Apr-23 07-May-23 02-Jun-23 17-Jun-23 40 48 m3) HK Hols - No B/O periods 310.C.RC.P084 Glide Path Bldg C - Waterproofing - roofs (2 layers) and walls (Area: 936 m2) C03_7 d/w - 10h/d - With 30 21-Apr-23 21-May-23 27-Jun-23 27-Jul-23 64 HK Hols - No B/O periods ABWF Works C03_7 d/w - 10h/d - With HK Hols 48- No B/O 0periods 28-Apr-23 16-Jun-23 29-Apr-23 17-Jun-23 1 310.C.RC.P088 Glide Path Bldg C - Commence ABWF works C03_7 d/w - 10h/d - With 0 28-Apr-23 29-Apr-23 1 HK Hols - No B/O periods 310.C.RC.P092 Glide Path Bldg C - ABWF Internal Works C03_7 d/w - 10h/d - With 48 28-Apr-23 16-Jun-23 29-Apr-23 17-Jun-23 1 HK Hols - No B/O periods E&M Works C03_7 d/w - 10h/d - With HK Hols 42- No B/O 0periods 06-May-23 17-Jun-23 07-May-23 18-Jun-23 1 310.C.RC.P104 Glide Path Bldg C - Commence MEP works C03_7 d/w - 10h/d - With 0 06-May-23 07-May-23 1 HK Hols - No B/O periods Drainage Installation C03_7 d/w - 10h/d - With HK Hols 42- No B/O 0periods 06-May-23 17-Jun-23 07-May-23 18-Jun-23 1 310.C.RC.P108 Glide Path Bldg C - Drainage 1st Fix & Installation C03_7 d/w - 10h/d - With 30 06-May-23 05-Jun-23 07-May-23 06-Jun-23 1 HK Hols - No B/O periods 310.C.RC.P109.B01 Glide Path Bldg C - Drainage 2nd Fix & Installation C03_7 d/w - 10h/d - With 30 13-May-23 12-Jun-23 14-May-23 13-Jun-23 1 HK Hols - No B/O periods 310.C.RC.P110.B01 Glide Path Bldg C - Drainage Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 13-Jun-23 17-Jun-23 14-Jun-23 18-Jun-23 1 HK Hols - No B/O periods Electrical Installation C03_7 d/w - 10h/d - With HK Hols 42- No B/O 0periods 06-May-23 17-Jun-23 07-May-23 18-Jun-23 1 310.C.RC.P111.B01 Glide Path Bldg C - Electrical 1st Fix & Installation C03_7 d/w - 10h/d - With 30 06-May-23 05-Jun-23 07-May-23 06-Jun-23 1 HK Hols - No B/O periods 310.C.RC.P112.B01 Glide Path Bldg C - Electrical 2nd Fix & Installation C03_7 d/w - 10h/d - With 30 13-May-23 12-Jun-23 14-May-23 13-Jun-23 1 HK Hols - No B/O periods 310.C.RC.P113.B01 Glide Path Bldg C - Switchgear Installation C03_7 d/w - 10h/d - With 18 24-May-23 11-Jun-23 27-May-23 13-Jun-23 2 HK Hols - No B/O periods 310.C.RC.P114.B01 Glide Path Bldg C - Power On to All Floors C03_7 d/w - 10h/d - With 0 12-Jun-23 13-Jun-23 1 HK Hols - No B/O periods 310.C.RC.P115.B01 Glide Path Bldg C - Electrical Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 13-Jun-23 17-Jun-23 14-Jun-23 18-Jun-23 1 HK Hols - No B/O periods Fire Services Installation C03_7 d/w - 10h/d - With HK Hols 42- No B/O 0periods 06-May-23 17-Jun-23 07-May-23 18-Jun-23 1 310.C.RC.P116.B01 Glide Path Bldg C - Fire Services 1st Fix & Installation C03_7 d/w - 10h/d - With 30 06-May-23 05-Jun-23 07-May-23 06-Jun-23 1 HK Hols - No B/O periods 310.C.RC.P117.B01 Glide Path Bldg C - Fire Services 2nd Fix & Installation C03_7 d/w - 10h/d - With 30 13-May-23 12-Jun-23 14-May-23 13-Jun-23 1 HK Hols - No B/O periods 310.C.RC.P118.B01 Glide Path Bldg C - Fire Service Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 13-Jun-23 17-Jun-23 14-Jun-23 18-Jun-23 1 HK Hols - No B/O periods MVAC Installation C03_7 d/w - 10h/d - With HK Hols 42- No B/O 0periods 06-May-23 17-Jun-23 07-May-23 18-Jun-23 1 310.C.RC.P119.B01 Glide Path Bldg C - MVAC 1st Fix & Installation C03_7 d/w - 10h/d - With 30 06-May-23 05-Jun-23 07-May-23 06-Jun-23 1 HK Hols - No B/O periods
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 234 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.P120.B01 Glide Path Bldg C - MVAC 2nd Fix & Installation C03_7 d/w - 10h/d - With 30 13-May-23 12-Jun-23 14-May-23 13-Jun-23 1 HK Hols - No B/O periods 310.C.RC.P121.B01 Glide Path Bldg C - MVAC Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 13-Jun-23 17-Jun-23 14-Jun-23 18-Jun-23 1 HK Hols - No B/O periods Airport System C03_7 d/w - 10h/d - With HK Hols 60- No B/O 0periods 06-May-23 07-Jul-23 15-May-23 16-Jul-23 9 310.C.RC.P132 Glide Path Bldg C (Airport System) - VDC, BCS C03_7 d/w - 10h/d - With 60 06-May-23 07-Jul-23 15-May-23 16-Jul-23 9 HK Hols - No B/O periods External Works (Drainage and UU Works & EVA) 75 3 21-Apr-23 21-Jul-23 21-May-23 20-Aug-23 25 310.C.RC.P152 Glide Path Bldg C (Civil Works) - CLP ducting, sleeving, drawpits C03_7 d/w - 10h/d - With 30 21-Apr-23 21-May-23 27-May-23 26-Jun-23 34 HK Hols - No B/O periods 310.C.RC.P148 Glide Path Bldg C (Civil Works) - Building drainage, manholes, pipe laying and connect to C03_7 d/w - 10h/d - With 30 21-Apr-23 21-May-23 21-May-23 20-Jun-23 29 stormwater manhole HK Hols - No B/O periods 310.C.RC.P730 Glide Path Bldg C (Civil Works) - Comm ducting, sleeving, drawpits C03_7 d/w - 10h/d - With 30 21-Apr-23 21-May-23 27-May-23 26-Jun-23 34 HK Hols - No B/O periods 310.C.RC.P156 Glide Path Bldg C (Civil Works) - Watermain + connection C03_7 d/w - 10h/d - With 45 12-May-23 27-Jun-23 11-Jun-23 27-Jul-23 29 HK Hols - No B/O periods 310.C.RC.P734 Glide Path Bldg C (Civil Works) - CLP cable laying C03_7 d/w - 10h/d - With 30 3 22-May-23 21-Jun-23 27-Jun-23 27-Jul-23 34 HK Hols - No B/O periods 310.T.EX.L448 Glide Path Bldg C (Civil Works) - EVA works C01_7 d/w - 10h/d - No HK 24 28-Jun-23 21-Jul-23 28-Jul-23 20-Aug-23 30 Hols - No B/O periods (was Testing and Commissioning C1) 92 0 18-Jun-23 07-Oct-23 19-Jun-23 07-Oct-23 0 Testing and Commissioning C01_7 d/w - 10h/d - No HK Hols41 - No B/O periods 0 (was18-Jun-23 C1) 28-Jul-23 19-Jun-23 14-Sep-23 48 310.T.EX.L352 Glide Path Bldg C - Building Services System Test (Electrical, Ventilation, FS System, C01_7 d/w - 10h/d - No HK 21 18-Jun-23 08-Jul-23 19-Jun-23 09-Jul-23 1 Plumbing etc) Hols - No B/O periods (was 310.T.EX.L353.B01 Glide Path Bldg C - Fire Service T&C (Non-FSI) C1) C01_7 d/w - 10h/d - No HK 21 18-Jun-23 08-Jul-23 25-Aug-23 14-Sep-23 68 Hols - No B/O periods (was 310.C.ES.P780 Glide Path Bldg C - Airport System T&C - VDC, BCS C1) C01_7 d/w - 10h/d - No HK 21 08-Jul-23 28-Jul-23 17-Jul-23 06-Aug-23 9 Hols - No B/O periods (was Statutory Inspection C1) 76 0 10-Jul-23 07-Oct-23 10-Jul-23 07-Oct-23 0 Fire Services Department (FSD) C11_6 d/w - 10h/d - With HK Hols 58- No B/O 0periods (was 10-Jul-23 C3) 14-Sep-23 10-Jul-23 14-Sep-23 0 310.T.WS.T976 Glide Path Bldg C - F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 10-Jul-23 10-Jul-23 0 HK Hols - No B/O periods 310.T.WS.T980 Glide Path Bldg C - F.S. Inspection Application (Form FSI / 501 & 251 Submission) (was C11_6C3) d/w - 10h/d - With 0 07-Aug-23 07-Aug-23 0 HK Hols - No B/O periods 310.T.WS.T984 Glide Path Bldg C - F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 21-Aug-23 26-Aug-23 21-Aug-23 26-Aug-23 0 HK Hols - No B/O periods 310.T.WS.T988 Glide Path Bldg C - FSD Comment (was C11_6C3) d/w - 10h/d - With 0 26-Aug-23 26-Aug-23 0 HK Hols - No B/O periods 310.T.WS.T992 Glide Path Bldg C - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 10 28-Aug-23 07-Sep-23 28-Aug-23 07-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T996 Glide Path Bldg C - F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 08-Sep-23 14-Sep-23 08-Sep-23 14-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1000 Glide Path Bldg C - Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 14-Sep-23 14-Sep-23 0 HK Hols - No B/O periods Building Department (BD) (was C3) 18 0 15-Sep-23 07-Oct-23 15-Sep-23 07-Oct-23 0 310.T.WS.T1364 Glide Path Bldg C - BD Inspection Application for Occupation Permit (Form BA13 C11_6 d/w - 10h/d - With 0 15-Sep-23 15-Sep-23 0 Submission) HK Hols - No B/O periods 310.T.WS.T1368 Glide Path Bldg C - BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 15-Sep-23 21-Sep-23 15-Sep-23 21-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1372 Glide Path Bldg C - BD Comment (was C11_6C3) d/w - 10h/d - With 0 21-Sep-23 21-Sep-23 0 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 235 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.WS.T1376 Glide Path Bldg C - Rectification & Adjustment C11_6 d/w - 10h/d - With 6 22-Sep-23 28-Sep-23 22-Sep-23 28-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1380 Glide Path Bldg C - BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 29-Sep-23 07-Oct-23 29-Sep-23 07-Oct-23 0 HK Hols - No B/O periods 310.T.RC.P151 Glide Path Bldg C (T&C) - Achieved KD-G2(b) - CAD glide path antenna platform & (was C01_7C3) d/w - 10h/d - No HK 0 07-Oct-23 07-Oct-23 0 equipment Hols - No B/O periods (was 310.T.WS.T1384 Glide Path Bldg C - Issue Occupation Permit (Form BD104) C1) C11_6 d/w - 10h/d - With 0 07-Oct-23 07-Oct-23 0 HK Hols - No B/O periods Demolition of Old Glide Path Bldg. C (was C3) 211 0 26-May-22 07-Feb-23 30-Jun-22 14-Mar-23 30 Demolition Plan For Existing Facilities C01_7 d/w - 10h/d - No HK Hols156 - No B/O periods 0 (was26-May-22 C1) 28-Oct-22 30-Jun-22 02-Dec-22 35 310.D.G3.F240.B01 Demolition Plan for Demolish Existing Facilities - prepare design and submit with ICE C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 30-Jun-22 13-Jul-22 35 Hols - No B/O periods (was 310.D.G3.F244.B01 Demolition Plan for Demolish Existing Facilities - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 14-Jul-22 10-Aug-22 35 Hols - No B/O periods (was 310.D.G3.F248.B01 Demolition Plan for Demolish Existing Facilities - ICC, M&VC review design and issue C1) C01_7 d/w - 10h/d - No HK 21 07-Jul-22 27-Jul-22 11-Aug-22 31-Aug-22 35 check certificates Hols - No B/O periods (was 310.D.G3.F251.B01 Demolition Plan for Demolish Existing Facilities - address comments and resubmit with C1) C01_7 d/w - 10h/d - No HK 7 28-Jul-22 03-Aug-22 01-Sep-22 07-Sep-22 35 ICE 2nd Round Hols - No B/O periods (was 310.D.G3.F253.B01 Demolition Plan for Demolish Existing Facilities - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 21 04-Aug-22 24-Aug-22 08-Sep-22 28-Sep-22 35 Hols - No B/O periods (was 310.D.G3.F257.B01 Demolition Plan for Demolish Existing Facilities - ICC, M&VA review design and issue C1) C01_7 d/w - 10h/d - No HK 21 25-Aug-22 14-Sep-22 29-Sep-22 19-Oct-22 35 check certificates 2nd Round Hols - No B/O periods (was 310.D.G3.F263.B01 Demolition Plan for Demolish Existing Facilities - BD approve C1) C01_7 d/w - 10h/d - No HK 30 15-Sep-22 14-Oct-22 20-Oct-22 18-Nov-22 35 Hols - No B/O periods (was 310.D.G3.F267.B01 Demolition Plan for Demolish Existing Facilities - prepare and submit Form BA8 and grant C1) C01_7 d/w - 10h/d - No HK 7 15-Oct-22 21-Oct-22 19-Nov-22 25-Nov-22 35 consent Hols - No B/O periods (was 310.D.G3.F272.B01 Demolition Plan for Demolish Existing Facilities - prepare and submit Form BA10 to notify C1) C01_7 d/w - 10h/d - No HK 7 22-Oct-22 28-Oct-22 26-Nov-22 02-Dec-22 35 work commencement Hols - No B/O periods (was Demolition Works C1) 200 0 09-Jun-22 07-Feb-23 14-Sep-22 14-Mar-23 30 310.C.RC.P169 Ex. Glide Path Bldg C - submit Method Statement to Demolish Existing Facilities C11_6 d/w - 10h/d - With 21 09-Jun-22 04-Jul-22 14-Sep-22 10-Oct-22 81 HK Hols - No B/O periods 310.C.RC.P173 Ex. Glide Path Bldg C - PM review MS (was C11_6C3) d/w - 10h/d - With 28 05-Jul-22 05-Aug-22 11-Oct-22 11-Nov-22 81 HK Hols - No B/O periods 310.C.RC.P163 Ex. Glide Path Bldg C - Application of Work Permit for Demolition of Old Glide Path Bldg. (was C01_7C3) d/w - 10h/d - No HK 21 06-Aug-22 26-Aug-22 12-Nov-22 02-Dec-22 98 C Hols - No B/O periods (was 310.C.RC.P165 Ex. Glide Path Bldg C - Coordinate with CAD to decommission the existing facilities C1) C11_6 d/w - 10h/d - With 30 11-Aug-22 15-Sep-22 29-Oct-22 02-Dec-22 65 HK Hols - No B/O periods 310.C.RC.P161 Closure of Existing North Runway (was C01_7C3) d/w - 10h/d - No HK 0 01-Sep-22 03-Dec-22 93 Hols - No B/O periods (was 310.C.RC.P177 Ex. Glide Path Bldg C - Decommissioning C1) C11_6 d/w - 10h/d - With 7 29-Oct-22 05-Nov-22 03-Dec-22 10-Dec-22 30 HK Hols - No B/O periods 310.C.RC.P181 Ex. Glide Path Bldg C - removal of existing CAD facilities (was C11_6C3) d/w - 10h/d - With 30 07-Nov-22 10-Dec-22 12-Dec-22 17-Jan-23 30 HK Hols - No B/O periods 310.C.RC.P185 Ex. Glide Path Bldg C - demolish structure (was C11_6C3) d/w - 10h/d - With 45 12-Dec-22 07-Feb-23 18-Jan-23 14-Mar-23 30 HK Hols - No B/O periods CAD Glide Path Building D (was C3) 696 3 07-Jun-21 A 06-Oct-23 09-Jun-22 08-Oct-23 1 Design and Submission - ELS C01_7 d/w - 10h/d - No HK Hols186 - No B/O periods 0 (was 01-Dec-21 C1) A 07-Jun-22 09-Jun-22 19-Oct-22 134 310.D.RC.P56 Glide Path Bldg D - Prepare Design of ELS for Foundation Works C01_7 d/w - 10h/d - No HK 28 01-Dec-21 A 21-Dec-21 A 09-Jun-22 09-Jun-22 Hols - No B/O periods (was 310.D.RC.P60 Glide Path Bldg D - ICE review and issue check certificate C1) C01_7 d/w - 10h/d - No HK 7 22-Dec-21 A 23-Dec-21 A 09-Jun-22 09-Jun-22 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 236 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.RC.P64 Glide Path Bldg D - Review by PM, AP, RSE, RGE C01_7 d/w - 10h/d - No HK 28 23-Dec-21 A 20-Jan-22 A 09-Jun-22 09-Jun-22 Hols - No B/O periods (was 310.D.RC.P80 Glide Path Bldg D - BD review and approves design C1) C01_7 d/w - 10h/d - No HK 60 21-Jan-22 A 25-Apr-22 09-Jun-22 08-Jul-22 74 Hols - No B/O periods (was 310.D.RC.P534 Glide Path Bldg D - submit BA8 consent application (excavation + structure) C1) C01_7 d/w - 10h/d - No HK 28 11-May-22 07-Jun-22 22-Sep-22 19-Oct-22 134 Hols - No B/O periods (was Method Statement for Plate Load Test for Glide Path Building D C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was20-Oct-22 C1) 16-Dec-22 09-Nov-22 05-Jan-23 20 310.D.TX.A300 Method Statement for Plate Load Test for Glide Path Building D - prepare document C01_7 d/w - 10h/d - No HK 30 20-Oct-22 18-Nov-22 09-Nov-22 08-Dec-22 20 Hols - No B/O periods (was 310.D.TX.A304 Method Statement for Plate Load Test for Glide Path Building D - BD Acknowledgement C1) C01_7 d/w - 10h/d - No HK 28 19-Nov-22 16-Dec-22 09-Dec-22 05-Jan-23 20 Hols - No B/O periods (was CAD Glide Path Building D - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols227 - No B/O periods 0 (was 21-Mar-22 C1) A 01-Dec-22 26-Aug-22 02-May-23 152 CAD Glide Path Building D - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols227 - No B/O periods 0 (was 21-Mar-22 C1) A 01-Dec-22 26-Aug-22 02-May-23 152 310.D.WS.L1048 CAD Glide Path Building D - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 150 21-Mar-22 A 02-Sep-22 26-Aug-22 01-Feb-23 152 Hols - No B/O periods (was 310.D.WS.L1612 CAD Glide Path Building D - MEP - Drawing Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 160 26-Apr-22 02-Oct-22 25-Sep-22 03-Mar-23 152 Round Hols - No B/O periods (was 310.D.WS.L1608 CAD Glide Path Building D - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 160 26-May-22 01-Nov-22 25-Oct-22 02-Apr-23 152 Hols - No B/O periods (was 310.D.WS.L1052 CAD Glide Path Building D - MEP - Drawing Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 160 25-Jun-22 01-Dec-22 24-Nov-22 02-May-23 152 Round Hols - No B/O periods (was CAD Glide Path Building D - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols119 - No B/O periods 0 (was12-Jul-22 C1) 07-Nov-22 24-Jul-22 19-Nov-22 12 CAD Glide Path Building D - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols91 - No B/O periods 0 (was12-Jul-22 C1) 10-Oct-22 24-Jul-22 22-Oct-22 12 310.D.WS.L1336 CAD Glide Path Building D - ABWF - prepare document C01_7 d/w - 10h/d - No HK 21 12-Jul-22 01-Aug-22 24-Jul-22 13-Aug-22 12 Hols - No B/O periods (was 310.D.WS.L1924 CAD Glide Path Building D - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 02-Aug-22 29-Aug-22 14-Aug-22 10-Sep-22 12 Hols - No B/O periods (was 310.D.WS.L1920 CAD Glide Path Building D - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 30-Aug-22 12-Sep-22 11-Sep-22 24-Sep-22 12 Hols - No B/O periods (was 310.D.WS.L1340 CAD Glide Path Building D - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 13-Sep-22 10-Oct-22 25-Sep-22 22-Oct-22 12 Hols - No B/O periods (was CAD Glide Path Building D - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was02-Aug-22 C1) 07-Nov-22 21-Aug-22 19-Nov-22 12 310.D.WS.L1352 CAD Glide Path Building D - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 21 02-Aug-22 22-Aug-22 21-Aug-22 10-Sep-22 19 Hols - No B/O periods (was 310.D.WS.L1932 CAD Glide Path Building D - ABWF - Material Submission - PM review and accept 1st C1) C01_7 d/w - 10h/d - No HK 28 23-Aug-22 19-Sep-22 11-Sep-22 08-Oct-22 19 Round Hols - No B/O periods (was 310.D.WS.L1928 CAD Glide Path Building D - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 20-Sep-22 03-Oct-22 09-Oct-22 22-Oct-22 19 Hols - No B/O periods (was 310.D.WS.L1356 CAD Glide Path Building D - ABWF - Material Submission - PM review and accept 2nd C1) C01_7 d/w - 10h/d - No HK 28 11-Oct-22 07-Nov-22 23-Oct-22 19-Nov-22 12 Round Hols - No B/O periods (was Subletting & Procurement C1) C01_7 d/w - 10h/d - No HK Hols321 - No B/O periods 0 (was19-May-22 C1) 04-Apr-23 09-Jul-22 02-May-23 28 Major Materials ABWF C01_7 d/w - 10h/d - No HK Hols148 - No B/O periods 0 (was08-Nov-22 C1) 04-Apr-23 20-Nov-22 16-Apr-23 12 310.P.RC.P566 Glide Path Bldg. D (Procurement ABWF) - louvres, doors, raised floors panels & C01_7 d/w - 10h/d - No HK 14 08-Nov-22 21-Nov-22 20-Nov-22 03-Dec-22 12 Others-Place Order Hols - No B/O periods (was 310.P.RC.P570 Glide Path Bldg. D (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 120 22-Nov-22 21-Mar-23 04-Dec-22 02-Apr-23 12 Hols - No B/O periods (was 310.P.RC.P578 Glide Path Bldg. D (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 14 22-Mar-23 04-Apr-23 03-Apr-23 16-Apr-23 12 Hols - No B/O periods (was Major Materials MEP C1) C01_7 d/w - 10h/d - No HK Hols320 - No B/O periods 0 (was19-May-22 C1) 03-Apr-23 09-Jul-22 02-May-23 29 310.P.RC.P558 Glide Path Bldg. D (Procurement Electrical & MVAC Major Equipment) -AC/fan, LV C01_7 d/w - 10h/d - No HK 60 19-May-22 17-Jul-22 07-Oct-22 05-Dec-22 141 switchboard, genset &Others-Place Order Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 237 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.RC.P554 Glide Path Bldg. D (Procurement FS and P&D Major Equipment) -NOVEC 1230 system, C01_7 d/w - 10h/d - No HK 140 10-Jun-22 27-Oct-22 09-Jul-22 25-Nov-22 29 FA&Others-Place Order for Materials Hols - No B/O periods (was 310.P.RC.P674 Glide Path Bldg. D (Procurement FS and P&D Major Equipment) - NOVEC 1230 system, C1) C01_7 d/w - 10h/d - No HK 240 10-Jul-22 06-Mar-23 08-Aug-22 04-Apr-23 29 FA system & Others Hols - No B/O periods (was 310.P.RC.P678 Glide Path Bldg. D (Procurement Electrical & MVAC Major Equipment) -AC/fan units, LV C1) C01_7 d/w - 10h/d - No HK 120 18-Jul-22 14-Nov-22 06-Dec-22 04-Apr-23 141 switchboard, genset & Others Hols - No B/O periods (was 310.P.RC.P682 Glide Path Bldg. D (Procurement MEP) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 28 07-Mar-23 03-Apr-23 05-Apr-23 02-May-23 29 Hols - No B/O periods (was Construction - Glide Path Bldg D C1) 654 3 07-Jun-21 A 16-Aug-23 13-Aug-22 17-Aug-23 1 Initial Works 298 0 07-Jun-21 A 07-Jun-22 13-Aug-22 19-Oct-22 111 310.C.RC.P204 Glide Path Bldg D - Site Access WA 3310/3 C01_7 d/w - 10h/d - No HK 0 07-Jun-21 A 13-Aug-22 Hols - No B/O periods (was 310.C.RC.P206 Glide Path Bldg D - Coordination meeting with AA/CAD to allow advance GI works, secure C1) C01_7 d/w - 10h/d - No HK 30 22-Jul-21 A 20-Aug-21 A 13-Aug-22 13-Aug-22 work permit Hols - No B/O periods (was 310.C.RC.P212 Glide Path Bldg D - Carry out detection to locate existing UU C1) C11_6 d/w - 10h/d - With 6 04-Dec-21 A 16-Dec-21 A 13-Aug-22 13-Aug-22 HK Hols - No B/O periods 310.C.RC.P216 Glide Path Bldg D - Carry out trial pits (was C11_6C3) d/w - 10h/d - With 12 28-Mar-22 11-Apr-22 13-Aug-22 26-Aug-22 112 HK Hols - No B/O periods 310.C.RC.P220 Glide Path Bldg D - Install instrumentations (Qty: 9 nos.) (was C11_6C3) d/w - 10h/d - With 7 12-Apr-22 22-Apr-22 27-Aug-22 03-Sep-22 112 HK Hols - No B/O periods 310.C.RC.P224 Glide Path Bldg D - Ground investigation (GI) (No. of rigs: 2 nos) + report (was C11_6C3) d/w - 10h/d - With 14 23-Apr-22 10-May-22 05-Sep-22 21-Sep-22 112 HK Hols - No B/O periods 310.C.RC.P228 Glide Path Bldg D - Submit report to PM for review and submit to BD including Form BA14 (was C01_7C3) d/w - 10h/d - No HK 28 11-May-22 07-Jun-22 22-Sep-22 19-Oct-22 134 for Completion Hols - No B/O periods (was Excavation Works C1) 109 0 19-Oct-22 28-Feb-23 20-Oct-22 01-Mar-23 1 310.C.RC.P253 Glide Path Bldg D - submit BA10 notice of commencement of work C01_7 d/w - 10h/d - No HK 7 19-Oct-22 25-Oct-22 20-Oct-22 26-Oct-22 1 Hols - No B/O periods (was 310.C.RC.P256 Glide Path Bldg D -Vertical elements for the water cut-off (assumed perimeter 82m @ C1) C03_7 d/w - 10h/d - With 20 26-Oct-22 14-Nov-22 27-Oct-22 15-Nov-22 1 600mm sheet pile) HK Hols - No B/O periods 310.C.RC.P232 Glide Path Bldg D - Install dewatering wells and observation wells C03_7 d/w - 10h/d - With 12 09-Nov-22 20-Nov-22 10-Nov-22 21-Nov-22 1 HK Hols - No B/O periods 310.C.RC.P236 Glide Path Bldg D - Pumping test C03_7 d/w - 10h/d - With 21 21-Nov-22 11-Dec-22 22-Nov-22 12-Dec-22 1 HK Hols - No B/O periods 310.C.RC.P240 Glide Path Bldg D - Submit pumping test report to AA for review/comments C03_7 d/w - 10h/d - With 14 12-Dec-22 27-Dec-22 13-Dec-22 28-Dec-22 1 HK Hols - No B/O periods 310.C.RC.P244 Glide Path Bldg D - Revise/amend pumping test report and submit to AA C03_7 d/w - 10h/d - With 7 28-Dec-22 04-Jan-23 29-Dec-22 05-Jan-23 1 HK Hols - No B/O periods 310.C.RC.P268 Glide Path Bldg D - AA submit final pumping test report to BD + BA8 consent application C01_7 d/w - 10h/d - No HK 28 05-Jan-23 01-Feb-23 06-Jan-23 02-Feb-23 1 (excavation) Hols - No B/O periods (was 310.C.RC.P272 Glide Path Bldg D - BD acknowledge and issue consent letter C1) C01_7 d/w - 10h/d - No HK 0 01-Feb-23 02-Feb-23 1 Hols - No B/O periods (was 310.C.RC.P248 Glide Path Bldg D - Submit BA10 notice of commencement of work C1) C01_7 d/w - 10h/d - No HK 7 02-Feb-23 08-Feb-23 03-Feb-23 09-Feb-23 1 Hols - No B/O periods (was 310.C.RC.P252 Glide Path Bldg D - Excavation to FL (Soil: 3192 m3 @ 300m3/day) C1) C03_7 d/w - 10h/d - With 10 09-Feb-23 18-Feb-23 10-Feb-23 19-Feb-23 1 HK Hols - No B/O periods 310.C.RC.P260 Glide Path Bldg D - Plate load test (Qty: 1 no.) C03_7 d/w - 10h/d - With 10 19-Feb-23 28-Feb-23 20-Feb-23 01-Mar-23 1 HK Hols - No B/O periods Structural Works C03_7 d/w - 10h/d - With HK Hols 71- No B/O 0periods 01-Mar-23 16-May-23 02-Mar-23 24-Jul-23 66 310.C.RC.P264 Glide Path Bldg D - B1 Level - construction of footing (Concrete: 276 m3) C03_7 d/w - 10h/d - With 9 01-Mar-23 09-Mar-23 02-Mar-23 10-Mar-23 1 HK Hols - No B/O periods
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 238 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.P276 Glide Path Bldg D - B1 Level - construction of screen walls , bearing walls (Concrete: 216 C03_7 d/w - 10h/d - With 14 10-Mar-23 23-Mar-23 11-Mar-23 24-Mar-23 1 m3) HK Hols - No B/O periods 310.C.RC.P280 Glide Path Bldg D - Ground Level - construction of beam and base slab (Concrete: 168 C03_7 d/w - 10h/d - With 18 24-Mar-23 15-Apr-23 25-Mar-23 16-Apr-23 1 m3) HK Hols - No B/O periods 310.C.RC.P284 Glide Path Bldg D - Construction of concrete stairs + B1 Level mass concrete (Concrete: C03_7 d/w - 10h/d - With 16 16-Apr-23 02-May-23 09-Jul-23 24-Jul-23 80 48 m3) HK Hols - No B/O periods 310.C.RC.P288 Glide Path Bldg D - Waterproofing - roofs (2 layers) and walls (Area: 936 m2) C03_7 d/w - 10h/d - With 30 16-Apr-23 16-May-23 24-Jun-23 24-Jul-23 66 HK Hols - No B/O periods ABWF Works C03_7 d/w - 10h/d - With HK Hols 60- No B/O 0periods 23-Apr-23 24-Jun-23 25-Apr-23 26-Jun-23 2 310.C.RC.P292 Glide Path Bldg D - Commence ABWF works C03_7 d/w - 10h/d - With 0 23-Apr-23 25-Apr-23 2 HK Hols - No B/O periods 310.C.RC.P296 Glide Path Bldg D - ABWF Internal and External Works C03_7 d/w - 10h/d - With 60 23-Apr-23 24-Jun-23 25-Apr-23 26-Jun-23 2 HK Hols - No B/O periods E&M Works C03_7 d/w - 10h/d - With HK Hols 53- No B/O 0periods 30-Apr-23 24-Jun-23 03-May-23 26-Jun-23 2 310.C.RC.P308 Glide Path Bldg D - Commence MEP works C03_7 d/w - 10h/d - With 0 30-Apr-23 03-May-23 2 HK Hols - No B/O periods Drainage Installation C03_7 d/w - 10h/d - With HK Hols 53- No B/O 0periods 30-Apr-23 24-Jun-23 03-May-23 26-Jun-23 2 310.C.RC.P312 Glide Path Bldg D - Drainage 1st Fix & Installation C03_7 d/w - 10h/d - With 30 30-Apr-23 31-May-23 03-May-23 02-Jun-23 2 HK Hols - No B/O periods 310.C.RC.P313.B01 Glide Path Bldg D - Drainage 2nd Fix & Installation C03_7 d/w - 10h/d - With 30 19-May-23 18-Jun-23 21-May-23 20-Jun-23 2 HK Hols - No B/O periods 310.C.RC.P314.B01 Glide Path Bldg D - Drainage Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 19-Jun-23 24-Jun-23 21-Jun-23 26-Jun-23 2 HK Hols - No B/O periods Electrical Installation C03_7 d/w - 10h/d - With HK Hols 53- No B/O 0periods 30-Apr-23 24-Jun-23 03-May-23 26-Jun-23 2 310.C.RC.P315.B01 Glide Path Bldg D - Electrical 1st Fix & Installation C03_7 d/w - 10h/d - With 30 30-Apr-23 31-May-23 03-May-23 02-Jun-23 2 HK Hols - No B/O periods 310.C.RC.P316.B01 Glide Path Bldg D - Switchgear Installation C03_7 d/w - 10h/d - With 18 19-May-23 06-Jun-23 03-Jun-23 20-Jun-23 14 HK Hols - No B/O periods 310.C.RC.P317.B01 Glide Path Bldg D - Electrical 2nd Fix & Installation C03_7 d/w - 10h/d - With 30 19-May-23 18-Jun-23 21-May-23 20-Jun-23 2 HK Hols - No B/O periods 310.C.RC.P318.B01 Glide Path Bldg D - Power On to All Floors C03_7 d/w - 10h/d - With 0 18-Jun-23 20-Jun-23 2 HK Hols - No B/O periods 310.C.RC.P319.B01 Glide Path Bldg D - Electrical Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 19-Jun-23 24-Jun-23 21-Jun-23 26-Jun-23 2 HK Hols - No B/O periods Fire Services Installation C03_7 d/w - 10h/d - With HK Hols 53- No B/O 0periods 30-Apr-23 24-Jun-23 03-May-23 26-Jun-23 2 310.C.RC.P320.B01 Glide Path Bldg D - Fire Services 1st Fix & Installation C03_7 d/w - 10h/d - With 30 30-Apr-23 31-May-23 03-May-23 02-Jun-23 2 HK Hols - No B/O periods 310.C.RC.P321.B01 Glide Path Bldg D - Fire Services 2nd Fix & Installation C03_7 d/w - 10h/d - With 30 19-May-23 18-Jun-23 21-May-23 20-Jun-23 2 HK Hols - No B/O periods 310.C.RC.P322.B01 Glide Path Bldg D - Fire Service Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 19-Jun-23 24-Jun-23 21-Jun-23 26-Jun-23 2 HK Hols - No B/O periods MVAC Installation C03_7 d/w - 10h/d - With HK Hols 53- No B/O 0periods 30-Apr-23 24-Jun-23 03-May-23 26-Jun-23 2 310.C.RC.P323.B01 Glide Path Bldg D - MVAC 1st Fix & Installation C03_7 d/w - 10h/d - With 30 30-Apr-23 31-May-23 03-May-23 02-Jun-23 2 HK Hols - No B/O periods 310.C.RC.P324.B01 Glide Path Bldg D - MVAC 2nd Fix & Installation C03_7 d/w - 10h/d - With 30 19-May-23 18-Jun-23 21-May-23 20-Jun-23 2 HK Hols - No B/O periods 310.C.RC.P325.B01 Glide Path Bldg D - MVAC Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 19-Jun-23 24-Jun-23 21-Jun-23 26-Jun-23 2 HK Hols - No B/O periods Airport System - Glide Path Building D C03_7 d/w - 10h/d - With HK Hols 60- No B/O 0periods 30-Apr-23 02-Jul-23 27-May-23 27-Jul-23 25 310.C.RC.P336 Glide Path Bldg D (Airport System) - VDC, BCS C03_7 d/w - 10h/d - With 60 30-Apr-23 02-Jul-23 27-May-23 27-Jul-23 25 HK Hols - No B/O periods
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 239 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S External Works (Drainage and UU Works & EVA) 101 3 16-Apr-23 16-Aug-23 17-Apr-23 17-Aug-23 1 310.C.RC.P352 Glide Path Bldg D (Civil Works) - Building drainage, manholes, pipe laying and connect to C03_7 d/w - 10h/d - With 35 16-Apr-23 21-May-23 17-Apr-23 22-May-23 1 stormwater manhole HK Hols - No B/O periods 310.C.RC.P356 Glide Path Bldg D (Civil Works) - CLP ducting, sleeving, drawpits C03_7 d/w - 10h/d - With 30 21-Apr-23 21-May-23 22-Apr-23 22-May-23 1 HK Hols - No B/O periods 310.C.RC.P360 Glide Path Bldg D (Civil Works) - Watermain + connection C03_7 d/w - 10h/d - With 45 24-Apr-23 09-Jun-23 11-May-23 26-Jun-23 16 HK Hols - No B/O periods 310.C.RC.P738 Glide Path Bldg D (Civil Works) - AS and Comm ducting, sleeving, drawpits C03_7 d/w - 10h/d - With 30 22-May-23 21-Jun-23 23-May-23 23-Jun-23 1 HK Hols - No B/O periods 310.C.RC.P742 Glide Path Bldg D (Civil Works) - CLP cable laying C03_7 d/w - 10h/d - With 30 3 23-Jun-23 23-Jul-23 24-Jun-23 24-Jul-23 1 HK Hols - No B/O periods 310.T.EX.L452 Glide Path Bldg D (Civil Works) - EVA works C01_7 d/w - 10h/d - No HK 24 24-Jul-23 16-Aug-23 25-Jul-23 17-Aug-23 1 Hols - No B/O periods (was Testing and Commissioning C1) 86 0 25-Jun-23 06-Oct-23 27-Jun-23 08-Oct-23 1 Testing and Commissioning C01_7 d/w - 10h/d - No HK Hols29 - No B/O periods 0 (was25-Jun-23 C1) 23-Jul-23 27-Jun-23 14-Sep-23 53 310.T.EX.L432 Glide Path Bldg D - Building Services System Test (Electrical, Ventilation, FS System, C01_7 d/w - 10h/d - No HK 24 25-Jun-23 18-Jul-23 27-Jun-23 20-Jul-23 2 Plumbing etc) Hols - No B/O periods (was 310.T.EX.L433.B01 Glide Path Bldg D - Fire Service T&C (Non-FSI) C1) C01_7 d/w - 10h/d - No HK 24 25-Jun-23 18-Jul-23 22-Aug-23 14-Sep-23 58 Hols - No B/O periods (was 310.C.ES.P784 Glide Path Bldg D - Airport System T&C - VDC, BCS C1) C01_7 d/w - 10h/d - No HK 21 03-Jul-23 23-Jul-23 28-Jul-23 17-Aug-23 25 Hols - No B/O periods (was Statutory Inspection C1) 67 0 19-Jul-23 06-Oct-23 21-Jul-23 08-Oct-23 1 Fire Services Department (FSD) C11_6 d/w - 10h/d - With HK Hols 49- No B/O 0periods (was 19-Jul-23 C3) 13-Sep-23 21-Jul-23 14-Sep-23 1 310.T.WS.T1088 Glide Path Bldg D - F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 19-Jul-23 21-Jul-23 2 HK Hols - No B/O periods 310.T.WS.T1092 Glide Path Bldg D - F.S. Inspection Application (Form FSI / 501 & 251 Submission) (was C11_6C3) d/w - 10h/d - With 0 02-Aug-23 04-Aug-23 2 HK Hols - No B/O periods 310.T.WS.T1096 Glide Path Bldg D - F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 17-Aug-23 23-Aug-23 18-Aug-23 24-Aug-23 1 HK Hols - No B/O periods 310.T.WS.T1100 Glide Path Bldg D - FSD Comment (was C11_6C3) d/w - 10h/d - With 0 23-Aug-23 24-Aug-23 1 HK Hols - No B/O periods 310.T.WS.T1104 Glide Path Bldg D - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 12 24-Aug-23 06-Sep-23 25-Aug-23 07-Sep-23 1 HK Hols - No B/O periods 310.T.WS.T1108 Glide Path Bldg D - F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 07-Sep-23 13-Sep-23 08-Sep-23 14-Sep-23 1 HK Hols - No B/O periods 310.T.WS.T1112 Glide Path Bldg D - Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 13-Sep-23 14-Sep-23 1 HK Hols - No B/O periods Building Department (BD) (was C3) 18 0 14-Sep-23 06-Oct-23 15-Sep-23 08-Oct-23 1 310.T.WS.T1388 Glide Path Bldg D - BD Inspection Application for Occupation Permit (Form BA13 C11_6 d/w - 10h/d - With 0 14-Sep-23 15-Sep-23 1 Submission) HK Hols - No B/O periods 310.T.WS.T1392 Glide Path Bldg D - BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 14-Sep-23 20-Sep-23 15-Sep-23 21-Sep-23 1 HK Hols - No B/O periods 310.T.WS.T1396 Glide Path Bldg D - BD Comment (was C11_6C3) d/w - 10h/d - With 0 20-Sep-23 21-Sep-23 1 HK Hols - No B/O periods 310.T.WS.T1400 Glide Path Bldg D - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 21-Sep-23 27-Sep-23 22-Sep-23 28-Sep-23 1 HK Hols - No B/O periods 310.T.WS.T1404 Glide Path Bldg D - BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 28-Sep-23 06-Oct-23 29-Sep-23 07-Oct-23 1 HK Hols - No B/O periods 310.T.RC.P350 Glide Path Bldg D - Achieved KD-G2(b) - CAD glide path antenna platform & equipment (was C01_7C3) d/w - 10h/d - No HK 0 06-Oct-23 08-Oct-23 2 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 240 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.WS.T1408 Glide Path Bldg D - Issue Occupation Permit (Form BD104) C11_6 d/w - 10h/d - With 0 06-Oct-23 07-Oct-23 1 HK Hols - No B/O periods Demolition of Existing Glide Path Bldg. D (was C3) 211 0 26-May-22 07-Feb-23 13-Nov-22 26-Jul-23 137 Demolition Plan for Existing Facilities C01_7 d/w - 10h/d - No HK Hols156 - No B/O periods 0 (was26-May-22 C1) 28-Oct-22 13-Nov-22 17-Apr-23 171 310.D.G3.F239.B01 Demolition Plan for Demolish Existing Facilities - prepare design and submit with ICE C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 13-Nov-22 26-Nov-22 171 Hols - No B/O periods (was 310.D.G3.F241.B01 Demolition Plan for Demolish Existing Facilities - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 27-Nov-22 24-Dec-22 171 Hols - No B/O periods (was 310.D.G3.F243.B01 Demolition Plan for Demolish Existing Facilities - ICC, M&VC review design and issue C1) C01_7 d/w - 10h/d - No HK 21 07-Jul-22 27-Jul-22 25-Dec-22 14-Jan-23 171 check certificates Hols - No B/O periods (was 310.D.G3.F249.B01 Demolition Plan for Demolish Existing Facilities - address comments and resubmit with C1) C01_7 d/w - 10h/d - No HK 7 28-Jul-22 03-Aug-22 15-Jan-23 21-Jan-23 171 ICE 2nd Round Hols - No B/O periods (was 310.D.G3.F255.B01 Demolition Plan for Demolish Existing Facilities - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 21 04-Aug-22 24-Aug-22 22-Jan-23 11-Feb-23 171 Hols - No B/O periods (was 310.D.G3.F256.B01 Demolition Plan for Demolish Existing Facilities - ICC, M&VA review design and issue C1) C01_7 d/w - 10h/d - No HK 21 25-Aug-22 14-Sep-22 12-Feb-23 04-Mar-23 171 check certificates 2nd Round Hols - No B/O periods (was 310.D.G3.F261.B01 Demolition Plan for Demolish Existing Facilities - BD approve C1) C01_7 d/w - 10h/d - No HK 30 15-Sep-22 14-Oct-22 05-Mar-23 03-Apr-23 171 Hols - No B/O periods (was 310.D.G3.F265.B01 Demolition Plan for Demolish Existing Facilities - prepare and submit Form BA8 and grant C1) C01_7 d/w - 10h/d - No HK 7 15-Oct-22 21-Oct-22 04-Apr-23 10-Apr-23 171 consent Hols - No B/O periods (was 310.D.G3.F271.B01 Demolition Plan for Demolish Existing Facilities - prepare and submit Form BA10 to notify C1) C01_7 d/w - 10h/d - No HK 7 22-Oct-22 28-Oct-22 11-Apr-23 17-Apr-23 171 work commencement Hols - No B/O periods (was Demolition Works C1) 200 0 09-Jun-22 07-Feb-23 30-Jan-23 26-Jul-23 137 310.C.RC.P658 Ex. Glide Path Bldg D - submit Method Statement to Demolish Existing Facilities C11_6 d/w - 10h/d - With 21 09-Jun-22 04-Jul-22 30-Jan-23 22-Feb-23 192 HK Hols - No B/O periods 310.C.RC.P662 Ex. Glide Path Bldg D - PM review MS (was C11_6C3) d/w - 10h/d - With 28 05-Jul-22 05-Aug-22 23-Feb-23 27-Mar-23 192 HK Hols - No B/O periods 310.C.RC.P663 Ex. Glide Path Bldg D - Application of Work Permit for Demolition of Old Glide Path Bldg. (was C01_7C3) d/w - 10h/d - No HK 21 06-Aug-22 26-Aug-22 28-Mar-23 17-Apr-23 234 D. Hols - No B/O periods (was 310.C.RC.P678 Ex. Glide Path Bldg D - Coordinate with CAD to decommission the existing facilities C1) C11_6 d/w - 10h/d - With 30 11-Aug-22 15-Sep-22 09-Mar-23 17-Apr-23 172 HK Hols - No B/O periods 310.C.RC.P674 Closure of Existing North Runway (was C01_7C3) d/w - 10h/d - No HK 0 01-Sep-22 18-Apr-23 229 Hols - No B/O periods (was 310.C.RC.P666 Ex. Glide Path Bldg D - Decommissioning C1) C11_6 d/w - 10h/d - With 7 29-Oct-22 05-Nov-22 18-Apr-23 25-Apr-23 137 HK Hols - No B/O periods 310.C.RC.P670 Ex. Glide Path Bldg D - removal of existing CAD facilities (was C11_6C3) d/w - 10h/d - With 30 07-Nov-22 10-Dec-22 26-Apr-23 01-Jun-23 137 HK Hols - No B/O periods 310.C.RC.P682 Ex. Glide Path Bldg D - demolish structure (was C11_6C3) d/w - 10h/d - With 45 12-Dec-22 07-Feb-23 02-Jun-23 26-Jul-23 137 HK Hols - No B/O periods Localizer Building C (was C3) 409 3 26-May-22 07-Oct-23 14-Jun-22 07-Oct-23 0 Design and Submissions C01_7 d/w - 10h/d - No HK Hols35 - No B/O periods 0 (was18-Dec-22 C1) 21-Jan-23 22-Dec-22 25-Jan-23 4 310.D.RC.P530 Localizer Bldg C (BD) - submit BA8 consent application to BD C01_7 d/w - 10h/d - No HK 28 18-Dec-22 14-Jan-23 22-Dec-22 18-Jan-23 4 Hols - No B/O periods (was 310.C.RC.P686 Localizer Bldg C - submit BA10 notice of commencement of work C1) C01_7 d/w - 10h/d - No HK 7 15-Jan-23 21-Jan-23 19-Jan-23 25-Jan-23 4 Hols - No B/O periods (was Method Statement for Plate Load Test for Localizer Building C C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was30-Sep-22 C1) 26-Nov-22 25-Oct-22 21-Dec-22 25 310.D.TX.A308 Method Statement for Plate Load Test for Localizer Building C - prepare document C01_7 d/w - 10h/d - No HK 30 30-Sep-22 29-Oct-22 25-Oct-22 23-Nov-22 25 Hols - No B/O periods (was 310.D.TX.A312 Method Statement for Plate Load Test for Localizer Building C - BD Acknowledgement C1) C01_7 d/w - 10h/d - No HK 28 30-Oct-22 26-Nov-22 24-Nov-22 21-Dec-22 25 Hols - No B/O periods (was Procurement ABWF C1) C01_7 d/w - 10h/d - No HK Hols210 - No B/O periods 0 (was21-Aug-22 C1) 18-Mar-23 26-Sep-22 23-Apr-23 36
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 241 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.RC.P510 Localizer Bldg C (Procurement ABWF) - Material Submission of louvres,windows,metal C01_7 d/w - 10h/d - No HK 60 21-Aug-22 19-Oct-22 26-Sep-22 24-Nov-22 36 doors,handrails,ironmongeries&Others Hols - No B/O periods (was 310.P.RC.P518 Localizer Bldg C (Procurement ABWF) - PM reviews and accept materials C1) C01_7 d/w - 10h/d - No HK 30 20-Oct-22 18-Nov-22 25-Nov-22 24-Dec-22 36 Hols - No B/O periods (was 310.P.RC.P522 Localizer Bldg C (Procurement ABWF) - purchase and fabrication and delivery of major C1) C01_7 d/w - 10h/d - No HK 120 19-Nov-22 18-Mar-23 25-Dec-22 23-Apr-23 36 materials Hols - No B/O periods (was Procurement MEP C1) C01_7 d/w - 10h/d - No HK Hols210 - No B/O periods 0 (was30-Aug-22 C1) 27-Mar-23 04-Oct-22 01-May-23 35 310.P.RC.P694 Localizer Bldg C (Procurement MEP) - purchase and fabrication and delivery of major C01_7 d/w - 10h/d - No HK 210 30-Aug-22 27-Mar-23 04-Oct-22 01-May-23 35 materials Hols - No B/O periods (was Demolition Plan for Existing Facilities C1) C01_7 d/w - 10h/d - No HK Hols156 - No B/O periods 0 (was26-May-22 C1) 28-Oct-22 14-Jun-22 22-Mar-23 145 310.D.G3.F202 Demolition Plan for Demolish Existing Facilities - prepare design and submit with ICE C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 14-Jun-22 27-Jun-22 19 Hols - No B/O periods (was 310.D.G3.F206 Demolition Plan for Demolish Existing Facilities - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 01-Nov-22 28-Nov-22 145 Hols - No B/O periods (was 310.D.G3.F210 Demolition Plan for Demolish Existing Facilities - ICC, M&VC review design and issue C1) C01_7 d/w - 10h/d - No HK 21 07-Jul-22 27-Jul-22 29-Nov-22 19-Dec-22 145 check certificates Hols - No B/O periods (was 310.D.G3.F214 Demolition Plan for Demolish Existing Facilities - address comments and resubmit with C1) C01_7 d/w - 10h/d - No HK 7 28-Jul-22 03-Aug-22 20-Dec-22 26-Dec-22 145 ICE 2nd Round Hols - No B/O periods (was 310.D.G3.F218 Demolition Plan for Demolish Existing Facilities - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 21 04-Aug-22 24-Aug-22 27-Dec-22 16-Jan-23 145 Hols - No B/O periods (was 310.D.G3.F222 Demolition Plan for Demolish Existing Facilities - ICC, M&VA review design and issue C1) C01_7 d/w - 10h/d - No HK 21 25-Aug-22 14-Sep-22 17-Jan-23 06-Feb-23 145 check certificates 2nd Round Hols - No B/O periods (was 310.D.G3.F226 Demolition Plan for Demolish Existing Facilities - BD approve C1) C01_7 d/w - 10h/d - No HK 30 15-Sep-22 14-Oct-22 07-Feb-23 08-Mar-23 145 Hols - No B/O periods (was 310.D.G3.F230 Demolition Plan for Demolish Existing Facilities - prepare and submit Form BA8 and grant C1) C01_7 d/w - 10h/d - No HK 7 15-Oct-22 21-Oct-22 09-Mar-23 15-Mar-23 145 consent Hols - No B/O periods (was 310.D.G3.F234 Demolition Plan for Demolish Existing Facilities - prepare and submit Form BA10 to notify C1) C01_7 d/w - 10h/d - No HK 7 22-Oct-22 28-Oct-22 16-Mar-23 22-Mar-23 145 work commencement Hols - No B/O periods (was Construction C1) 302 3 07-Aug-22 12-Aug-23 11-Aug-22 17-Aug-23 4 Initial Works 111 0 07-Aug-22 17-Dec-22 11-Aug-22 21-Jan-23 28 310.C.RC.P638 Localizer Bldg C - Portion of Zone G4 area handed over C01_7 d/w - 10h/d - No HK 0 07-Aug-22 11-Aug-22 4 Hols - No B/O periods (was 310.C.RC.P642 Localizer Bldg C - Commencement of Work C1) C01_7 d/w - 10h/d - No HK 0 07-Aug-22 11-Aug-22 4 Hols - No B/O periods (was 310.C.RC.P646 Localizer Bldg C - Carry out GI works, Submit report to PM for review and submit to BD C1) C03_7 d/w - 10h/d - With 28 07-Aug-22 03-Sep-22 11-Aug-22 07-Sep-22 4 includin Form BA14 for Completion HK Hols - No B/O periods 310.C.RC.P654 Localizer Bldg C - install instrumentation C03_7 d/w - 10h/d - With 4 04-Sep-22 07-Sep-22 18-Jan-23 21-Jan-23 130 HK Hols - No B/O periods 310.C.RC.P650 Localizer Bldg C - Anticipated BD approval period (15 week) C01_7 d/w - 10h/d - No HK 105 04-Sep-22 17-Dec-22 08-Sep-22 21-Dec-22 4 Hols - No B/O periods (was Excavation C1) C03_7 d/w - 10h/d - With HK Hols 12- No B/O 0periods 26-Jan-23 06-Feb-23 26-Jan-23 06-Feb-23 0 310.C.RC.P602 Localizer Bldg C - Open cut excavation to founding level C03_7 d/w - 10h/d - With 3 26-Jan-23 28-Jan-23 26-Jan-23 28-Jan-23 0 HK Hols - No B/O periods 310.C.RC.P606 Localizer Bldg C - Plate load test and submit report C03_7 d/w - 10h/d - With 9 29-Jan-23 06-Feb-23 29-Jan-23 06-Feb-23 0 HK Hols - No B/O periods Structure C03_7 d/w - 10h/d - With HK Hols 42- No B/O 0periods 07-Feb-23 20-Mar-23 07-Feb-23 20-Mar-23 0 310.C.RC.P610 Localizer Bldg C - Construction of footing C03_7 d/w - 10h/d - With 8 07-Feb-23 14-Feb-23 07-Feb-23 14-Feb-23 0 HK Hols - No B/O periods 310.C.RC.P614 Localizer Bldg C - Construction of walls, columns C03_7 d/w - 10h/d - With 14 15-Feb-23 28-Feb-23 15-Feb-23 28-Feb-23 0 HK Hols - No B/O periods
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 242 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.P618 Localizer Bldg C - Construction of roof - beam and roof slab C03_7 d/w - 10h/d - With 20 01-Mar-23 20-Mar-23 01-Mar-23 20-Mar-23 0 HK Hols - No B/O periods ABWF / E&M C03_7 d/w - 10h/d - With HK Hols 60- No B/O 0periods 21-Mar-23 25-May-23 24-Mar-23 17-Jun-23 22 310.C.RC.P622 Localizer Bldg C - Roof Waterproofing & Roof Finishes C03_7 d/w - 10h/d - With 30 21-Mar-23 24-Apr-23 24-Mar-23 27-Apr-23 3 HK Hols - No B/O periods 310.C.RC.P626 Localizer Bldg C (ABWF) - Internal Works C03_7 d/w - 10h/d - With 30 06-Apr-23 10-May-23 24-Apr-23 24-May-23 14 HK Hols - No B/O periods 310.C.RC.P694 Localizer Bldg C (ABWF) - External Works C03_7 d/w - 10h/d - With 30 25-Apr-23 25-May-23 18-May-23 17-Jun-23 22 HK Hols - No B/O periods Drainage Installation C03_7 d/w - 10h/d - With HK Hols 30- No B/O 0periods 17-Apr-23 17-May-23 13-May-23 12-Jun-23 25 310.C.RC.P558 Localizer Bldg C - Drainage 1st Fix & Installation C03_7 d/w - 10h/d - With 18 17-Apr-23 05-May-23 13-May-23 31-May-23 25 HK Hols - No B/O periods 310.C.RC.P559.B01 Localizer Bldg C - Drainage 2nd Fix & Installation C03_7 d/w - 10h/d - With 18 24-Apr-23 12-May-23 20-May-23 07-Jun-23 25 HK Hols - No B/O periods 310.C.RC.P560.B01 Localizer Bldg C - Drainage Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 13-May-23 17-May-23 08-Jun-23 12-Jun-23 25 HK Hols - No B/O periods Electrical Installation C03_7 d/w - 10h/d - With HK Hols 30- No B/O 0periods 17-Apr-23 17-May-23 02-May-23 12-Jun-23 25 310.C.RC.P561.B01 Localizer Bldg C - Electrical 1st Fix & Installation C03_7 d/w - 10h/d - With 18 17-Apr-23 05-May-23 02-May-23 19-May-23 14 HK Hols - No B/O periods 310.C.RC.P563.B01 Localizer Bldg C - Electrical 2nd Fix & Installation C03_7 d/w - 10h/d - With 18 24-Apr-23 12-May-23 20-May-23 07-Jun-23 25 HK Hols - No B/O periods 310.C.RC.P562.B01 Localizer Bldg C - Switchgear Installation C03_7 d/w - 10h/d - With 10 02-May-23 11-May-23 29-May-23 07-Jun-23 26 HK Hols - No B/O periods 310.C.RC.P564.B01 Localizer Bldg C - Power On to All Floors C03_7 d/w - 10h/d - With 0 12-May-23 07-Jun-23 25 HK Hols - No B/O periods 310.C.RC.P565.B01 Localizer Bldg C - Electrical Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 13-May-23 17-May-23 08-Jun-23 12-Jun-23 25 HK Hols - No B/O periods Fire Services Installation C03_7 d/w - 10h/d - With HK Hols 30- No B/O 0periods 17-Apr-23 17-May-23 02-May-23 12-Jun-23 25 310.C.RC.P566.B01 Localizer Bldg C - Fire Services 1st Fix & Installation C03_7 d/w - 10h/d - With 18 17-Apr-23 05-May-23 02-May-23 19-May-23 14 HK Hols - No B/O periods 310.C.RC.P567.B01 Localizer Bldg C - Fire Services 2nd Fix & Installation C03_7 d/w - 10h/d - With 18 24-Apr-23 12-May-23 20-May-23 07-Jun-23 25 HK Hols - No B/O periods 310.C.RC.P568.B01 Localizer Bldg C - Fire Service Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 13-May-23 17-May-23 08-Jun-23 12-Jun-23 25 HK Hols - No B/O periods MVAC Installation C03_7 d/w - 10h/d - With HK Hols 30- No B/O 0periods 17-Apr-23 17-May-23 13-May-23 12-Jun-23 25 310.C.RC.P569.B01 Localizer Bldg C - MVAC 1st Fix & Installation C03_7 d/w - 10h/d - With 18 17-Apr-23 05-May-23 13-May-23 31-May-23 25 HK Hols - No B/O periods 310.C.RC.P570.B01 Localizer Bldg C - MVAC 2nd Fix & Installation C03_7 d/w - 10h/d - With 18 24-Apr-23 12-May-23 20-May-23 07-Jun-23 25 HK Hols - No B/O periods 310.C.RC.P571.B01 Localizer Bldg C - MVAC Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 13-May-23 17-May-23 08-Jun-23 12-Jun-23 25 HK Hols - No B/O periods Airport System C03_7 d/w - 10h/d - With HK Hols 60- No B/O 0periods 24-Mar-23 29-May-23 30-Apr-23 02-Jul-23 32 310.C.RC.P592 Localizer Bldg C (Airport System) - VDC, CCTV C03_7 d/w - 10h/d - With 60 24-Mar-23 29-May-23 30-Apr-23 02-Jul-23 32 HK Hols - No B/O periods External Works (Drainage and UU Works & EVA) 117 3 21-Mar-23 12-Aug-23 21-Mar-23 17-Aug-23 4 310.C.RC.P589 Localizer Bldg C (Bldg Drainage) - Drainage works, manholes C11_6 d/w - 10h/d - With 45 21-Mar-23 17-May-23 21-Mar-23 17-May-23 0 HK Hols - No B/O periods 310.C.RC.P593 Localizer Bldg C (UU) - Cable ducts, drawpits (Comms, AS) (was C11_6C3) d/w - 10h/d - With 21 18-May-23 12-Jun-23 18-May-23 12-Jun-23 0 HK Hols - No B/O periods 310.C.RC.P746 Localizer Bldg C (UU) - Cable ducts, drawpit (CLP) (was C11_6C3) d/w - 10h/d - With 21 18-May-23 12-Jun-23 23-May-23 16-Jun-23 4 HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 243 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.P750 Localizer Bldg C (UU) - cable laying (CLP) C11_6 d/w - 10h/d - With 30 3 13-Jun-23 19-Jul-23 17-Jun-23 24-Jul-23 4 HK Hols - No B/O periods 310.T.EX.L456 Localizer Bldg C - EVA works (was C01_7C3) d/w - 10h/d - No HK 24 20-Jul-23 12-Aug-23 25-Jul-23 17-Aug-23 5 Hols - No B/O periods (was Testing and Commissioning C1) 128 0 06-May-23 07-Oct-23 20-May-23 07-Oct-23 0 Testing and Commissioning C01_7 d/w - 10h/d - No HK Hols38 - No B/O periods 0 (was30-May-23 C1) 06-Jul-23 13-Jun-23 14-Sep-23 70 310.C.ES.P788 Localizer Bldg C - Airport System T&C - VDC, CCTV C01_7 d/w - 10h/d - No HK 21 30-May-23 19-Jun-23 28-Jul-23 17-Aug-23 59 Hols - No B/O periods (was 310.T.EX.L440 Localizer Bldg C - Building Services System Test (Electrical, Ventilation, FS System, C1) C01_7 d/w - 10h/d - No HK 24 13-Jun-23 06-Jul-23 13-Jun-23 06-Jul-23 0 Plumbing etc) Hols - No B/O periods (was 310.T.EX.L441.B01 Localizer Bldg C - Fire Service T&C (Non-FSI) C1) C01_7 d/w - 10h/d - No HK 24 13-Jun-23 06-Jul-23 22-Aug-23 14-Sep-23 70 Hols - No B/O periods (was Statutory Inspection C1) 128 0 06-May-23 07-Oct-23 20-May-23 07-Oct-23 0 Fire Services Department (FSD) C11_6 d/w - 10h/d - With HK Hols 110- No B/O 0periods (was 06-May-23 C3) 14-Sep-23 20-May-23 14-Sep-23 0 DG Application & Inspection C11_6 d/w - 10h/d - With HK Hols 38- No B/O 0periods (was 06-May-23 C3) 20-Jun-23 20-May-23 06-Jul-23 12 310.T.ES.P548 Localizer Bldg C - DG Inspection Application (Form Submission) C11_6 d/w - 10h/d - With 0 06-May-23 20-May-23 12 HK Hols - No B/O periods 310.T.ES.P552 Localizer Bldg C - DG 1st Inspection (was C11_6C3) d/w - 10h/d - With 7 20-May-23 29-May-23 05-Jun-23 12-Jun-23 12 HK Hols - No B/O periods 310.T.ES.P556 Localizer Bldg C - DG FSD Comment (was C11_6C3) d/w - 10h/d - With 0 29-May-23 12-Jun-23 12 HK Hols - No B/O periods 310.T.ES.P560 Localizer Bldg C - DG Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 12 30-May-23 12-Jun-23 13-Jun-23 27-Jun-23 12 HK Hols - No B/O periods 310.T.ES.P564 Localizer Bldg C - DG Re-inspection (was C11_6C3) d/w - 10h/d - With 7 13-Jun-23 20-Jun-23 28-Jun-23 06-Jul-23 12 HK Hols - No B/O periods 310.T.ES.P568 Localizer Bldg C - Issue DG Certificate (was C11_6C3) d/w - 10h/d - With 0 20-Jun-23 06-Jul-23 12 HK Hols - No B/O periods Fire Services Application & Inspection (was C11_6C3) d/w - 10h/d - With HK Hols 60- No B/O 0periods (was 07-Jul-23 C3) 14-Sep-23 07-Jul-23 14-Sep-23 0 310.T.WS.T1116 Localizer Bldg C - F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 07-Jul-23 07-Jul-23 0 HK Hols - No B/O periods 310.T.WS.T1120 Localizer Bldg C - F.S. Inspection Application (Form FSI / 501 & 251 Submission) (was C11_6C3) d/w - 10h/d - With 0 04-Aug-23 04-Aug-23 0 HK Hols - No B/O periods 310.T.WS.T1124 Localizer Bldg C - F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 18-Aug-23 24-Aug-23 18-Aug-23 24-Aug-23 0 HK Hols - No B/O periods 310.T.WS.T1128 Localizer Bldg C - FSD Comment (was C11_6C3) d/w - 10h/d - With 0 24-Aug-23 24-Aug-23 0 HK Hols - No B/O periods 310.T.WS.T1132 Localizer Bldg C - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 12 25-Aug-23 07-Sep-23 25-Aug-23 07-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1136 Localizer Bldg C - F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 08-Sep-23 14-Sep-23 08-Sep-23 14-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1140 Localizer Bldg C - Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 14-Sep-23 14-Sep-23 0 HK Hols - No B/O periods Environmental Protection Department (EDP) (was C11_6C3) d/w - 10h/d - With HK Hols 30- No B/O 0periods (was 06-May-23 C3) 10-Jun-23 31-May-23 06-Jul-23 20 EPD Application & Inspection C11_6 d/w - 10h/d - With HK Hols 30- No B/O 0periods (was 06-May-23 C3) 10-Jun-23 31-May-23 06-Jul-23 20 310.T.ES.P644 Localizer Bldg C - EPD Inspection Application C11_6 d/w - 10h/d - With 0 06-May-23 31-May-23 20 HK Hols - No B/O periods 310.T.ES.P648 Localizer Bldg C - EPD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 20-May-23 27-May-23 14-Jun-23 20-Jun-23 20 HK Hols - No B/O periods 310.T.ES.P652 Localizer Bldg C - EPD Comment (was C11_6C3) d/w - 10h/d - With 0 27-May-23 20-Jun-23 20 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 244 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.ES.P656 Localizer Bldg C - EPD Rectification & Adjustment C11_6 d/w - 10h/d - With 6 29-May-23 03-Jun-23 21-Jun-23 28-Jun-23 20 HK Hols - No B/O periods 310.T.ES.P660 Localizer Bldg C - EPD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 05-Jun-23 10-Jun-23 29-Jun-23 06-Jul-23 20 HK Hols - No B/O periods 310.T.ES.P664 Localizer Bldg C - Issue License (was C11_6C3) d/w - 10h/d - With 0 10-Jun-23 06-Jul-23 20 HK Hols - No B/O periods Building Department (BD) (was C3) 18 0 15-Sep-23 07-Oct-23 15-Sep-23 07-Oct-23 0 310.T.WS.T1412 Localizer Bldg C - BD Inspection Application for Occupation Permit (Form BA13 C11_6 d/w - 10h/d - With 0 15-Sep-23 15-Sep-23 0 Submission) HK Hols - No B/O periods 310.T.WS.T1416 Localizer Bldg C - BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 15-Sep-23 21-Sep-23 15-Sep-23 21-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1420 Localizer Bldg C - BD Comment (was C11_6C3) d/w - 10h/d - With 0 21-Sep-23 21-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1424 Localizer Bldg C - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 22-Sep-23 28-Sep-23 22-Sep-23 28-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1428 Localizer Bldg C - BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 29-Sep-23 07-Oct-23 29-Sep-23 07-Oct-23 0 HK Hols - No B/O periods 310.T.RC.P050 Localizer Bldg C - Achieved KD-G2 (was C01_7C3) d/w - 10h/d - No HK 0 07-Oct-23 07-Oct-23 0 Hols - No B/O periods (was 310.T.WS.T1432 Localizer Bldg C - Issue Occupation Permit (Form BD104) C1) C11_6 d/w - 10h/d - With 0 07-Oct-23 07-Oct-23 0 HK Hols - No B/O periods Demolition of Existing Localizer Building & Antenna Platforms (was C3) 174 0 09-Jun-22 04-Jan-23 27-Dec-22 02-Jun-23 119 310.C.RC.P698 Ex. Localizer Building - submit Method Statement to Demolish Existing facilities C11_6 d/w - 10h/d - With 21 09-Jun-22 04-Jul-22 27-Dec-22 20-Jan-23 167 HK Hols - No B/O periods 310.C.RC.P702 Ex. Localizer Building - PM review MS (was C11_6C3) d/w - 10h/d - With 28 05-Jul-22 05-Aug-22 21-Jan-23 25-Feb-23 167 HK Hols - No B/O periods 310.C.RC.P726 Ex. Localizer Building - Application of Work Permit for Demolition of Existing Building (was C11_6C3) d/w - 10h/d - With 21 06-Aug-22 30-Aug-22 27-Feb-23 22-Mar-23 167 HK Hols - No B/O periods 310.C.RC.P718 Ex. Localizer Building - Coordination decommissioning of facilities (was C11_6C3) d/w - 10h/d - With 30 11-Aug-22 15-Sep-22 16-Feb-23 22-Mar-23 154 HK Hols - No B/O periods 310.C.RC.P714 Closure of Existing North Runway (was C01_7C3) d/w - 10h/d - No HK 0 01-Sep-22* 23-Mar-23 203 Hols - No B/O periods (was 310.C.RC.P706 Ex. Localizer Building - Decommissioning C1) C11_6 d/w - 10h/d - With 7 29-Oct-22 05-Nov-22 23-Mar-23 30-Mar-23 119 HK Hols - No B/O periods 310.C.RC.P710 Ex. Localizer Building - removal of existing facilities (was C11_6C3) d/w - 10h/d - With 21 07-Nov-22 30-Nov-22 31-Mar-23 28-Apr-23 119 HK Hols - No B/O periods 310.C.RC.P722 Ex. Localizer Building - demolish structure (was C11_6C3) d/w - 10h/d - With 28 01-Dec-22 04-Jan-23 29-Apr-23 02-Jun-23 119 HK Hols - No B/O periods Localizer Building D (was C3) 185 0 26-May-22 04-Jan-23 14-Jun-22 26-Jan-23 16 Demolition Plan for Existing Factilities C01_7 d/w - 10h/d - No HK Hols156 - No B/O periods 0 (was26-May-22 C1) 28-Oct-22 14-Jun-22 16-Nov-22 19 310.D.G3.F238.B01 Demolition Plan for Demolish Existing Facilities - prepare design and submit with ICE C01_7 d/w - 10h/d - No HK 14 26-May-22 08-Jun-22 14-Jun-22 27-Jun-22 19 Hols - No B/O periods (was 310.D.G3.F242.B01 Demolition Plan for Demolish Existing Facilities - PM, AP, RSE reviewing C1) C01_7 d/w - 10h/d - No HK 28 09-Jun-22 06-Jul-22 28-Jun-22 25-Jul-22 19 Hols - No B/O periods (was 310.D.G3.F246.B01 Demolition Plan for Demolish Existing Facilities - ICC, M&VC review design and issue C1) C01_7 d/w - 10h/d - No HK 21 07-Jul-22 27-Jul-22 26-Jul-22 15-Aug-22 19 check certificates Hols - No B/O periods (was 310.D.G3.F250.B01 Demolition Plan for Demolish Existing Facilities - address comments and resubmit with C1) C01_7 d/w - 10h/d - No HK 7 28-Jul-22 03-Aug-22 16-Aug-22 22-Aug-22 19 ICE 2nd Round Hols - No B/O periods (was 310.D.G3.F254.B01 Demolition Plan for Demolish Existing Facilities - PM, AP, RSE reviewing 2nd Round C1) C01_7 d/w - 10h/d - No HK 21 04-Aug-22 24-Aug-22 23-Aug-22 12-Sep-22 19 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 245 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.G3.F258.B01 Demolition Plan for Demolish Existing Facilities - ICC, M&VA review design and issue C01_7 d/w - 10h/d - No HK 21 25-Aug-22 14-Sep-22 13-Sep-22 03-Oct-22 19 check certificates 2nd Round Hols - No B/O periods (was 310.D.G3.F262.B01 Demolition Plan for Demolish Existing Facilities - BD approve C1) C01_7 d/w - 10h/d - No HK 30 15-Sep-22 14-Oct-22 04-Oct-22 02-Nov-22 19 Hols - No B/O periods (was 310.D.G3.F266.B01 Demolition Plan for Demolish Existing Facilities - prepare and submit Form BA8 and grant C1) C01_7 d/w - 10h/d - No HK 7 15-Oct-22 21-Oct-22 03-Nov-22 09-Nov-22 19 consent Hols - No B/O periods (was 310.D.G3.F270.B01 Demolition Plan for Demolish Existing Facilities - prepare and submit Form BA10 to notify C1) C01_7 d/w - 10h/d - No HK 7 22-Oct-22 28-Oct-22 10-Nov-22 16-Nov-22 19 work commencement Hols - No B/O periods (was Demolition of Existing Localizer Building & Antenna Platforms C1) C11_6 d/w - 10h/d - With HK Hols 174- No B/O 0periods (was 09-Jun-22 C3) 04-Jan-23 24-Aug-22 26-Jan-23 16 310.C.RC.P754.B01 Ex. Localizer Building - submit Method Statement to Demolish Existing facilities C11_6 d/w - 10h/d - With 21 09-Jun-22 04-Jul-22 24-Aug-22 17-Sep-22 64 HK Hols - No B/O periods 310.C.RC.P758.B01 Ex. Localizer Building - PM review MS (was C11_6C3) d/w - 10h/d - With 28 05-Jul-22 05-Aug-22 19-Sep-22 22-Oct-22 64 HK Hols - No B/O periods 310.C.RC.P782.B01 Ex. Localizer Building - Application of Work Permit for Demolition of Existing Building (was C11_6C3) d/w - 10h/d - With 21 06-Aug-22 30-Aug-22 24-Oct-22 16-Nov-22 64 HK Hols - No B/O periods 310.C.RC.P774.B01 Ex. Localizer Building - Coordination decommissioning of facilities (was C11_6C3) d/w - 10h/d - With 30 11-Aug-22 15-Sep-22 13-Oct-22 16-Nov-22 51 HK Hols - No B/O periods 310.C.RC.P762.B01 Ex. Localizer Building - Decommissioning (was C11_6C3) d/w - 10h/d - With 7 29-Oct-22 05-Nov-22 17-Nov-22 24-Nov-22 16 HK Hols - No B/O periods 310.C.RC.P766.B01 Ex. Localizer Building - removal of existing facilities (was C11_6C3) d/w - 10h/d - With 21 07-Nov-22 30-Nov-22 25-Nov-22 19-Dec-22 16 HK Hols - No B/O periods 310.C.RC.P778.B01 Ex. Localizer Building - demolish structure (was C11_6C3) d/w - 10h/d - With 28 01-Dec-22 04-Jan-23 20-Dec-22 26-Jan-23 16 HK Hols - No B/O periods HKPF Building (HKPF Equipment Room C) (was C3) 379 0 02-Jul-22 07-Oct-23 21-Aug-22 07-Oct-23 0 Design C01_7 d/w - 10h/d - No HK Hols35 - No B/O periods 0 (was14-Feb-23 C1) 20-Mar-23 14-Feb-23 20-Mar-23 0 310.D.RC.S030 HKPF Bldg (BD) - submit BA8 consent application to BD C01_7 d/w - 10h/d - No HK 28 14-Feb-23 13-Mar-23 14-Feb-23 13-Mar-23 0 Hols - No B/O periods (was 310.C.RC.S014 HKPF Bldg (Excavation) - submit BA10 notice of commencement of work C1) C01_7 d/w - 10h/d - No HK 7 14-Mar-23 20-Mar-23 14-Mar-23 20-Mar-23 0 Hols - No B/O periods (was Method Statement for Plate Load Test for HKPF Building C1) C01_7 d/w - 10h/d - No HK Hols58 - No B/O periods 0 (was19-Nov-22 C1) 15-Jan-23 18-Dec-22 13-Feb-23 29 310.D.TX.A316 Method Statement for Plate Load Test for HKPF Building - prepare document C01_7 d/w - 10h/d - No HK 30 19-Nov-22 18-Dec-22 18-Dec-22 16-Jan-23 29 Hols - No B/O periods (was 310.D.TX.A320 Method Statement for Plate Load Test for HKPF Building - BD Acknowledgement C1) C01_7 d/w - 10h/d - No HK 28 19-Dec-22 15-Jan-23 17-Jan-23 13-Feb-23 29 Hols - No B/O periods (was HKPF - MEP Submission C1) C01_7 d/w - 10h/d - No HK Hols180 - No B/O periods 0 (was12-Jul-22 C1) 07-Jan-23 17-Dec-22 14-Jun-23 158 HKPF - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols180 - No B/O periods 0 (was12-Jul-22 C1) 07-Jan-23 17-Dec-22 14-Jun-23 158 310.D.WS.L1360 HKPF - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 90 12-Jul-22 09-Oct-22 17-Dec-22 16-Mar-23 158 Hols - No B/O periods (was 310.D.WS.L1636 HKPF - MEP - Drawing Submission - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 90 11-Aug-22 08-Nov-22 16-Jan-23 15-Apr-23 158 Hols - No B/O periods (was 310.D.WS.L1632 HKPF - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 90 10-Sep-22 08-Dec-22 15-Feb-23 15-May-23 158 Hols - No B/O periods (was 310.D.WS.L1364 HKPF - MEP - Drawing Submission - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 90 10-Oct-22 07-Jan-23 17-Mar-23 14-Jun-23 158 Hols - No B/O periods (was HKPF - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols119 - No B/O periods 0 (was02-Jul-22 C1) 28-Oct-22 14-Sep-22 10-Jan-23 74 HKPF - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols91 - No B/O periods 0 (was02-Jul-22 C1) 30-Sep-22 14-Sep-22 13-Dec-22 74 310.D.WS.L1384 HKPF - ABWF - prepare document C01_7 d/w - 10h/d - No HK 21 02-Jul-22 22-Jul-22 14-Sep-22 04-Oct-22 74 Hols - No B/O periods (was 310.D.WS.L1940 HKPF - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 23-Jul-22 19-Aug-22 05-Oct-22 01-Nov-22 74 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 246 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.D.WS.L1936 HKPF - ABWF - prepare resubmission C01_7 d/w - 10h/d - No HK 14 20-Aug-22 02-Sep-22 02-Nov-22 15-Nov-22 74 Hols - No B/O periods (was 310.D.WS.L1388 HKPF - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 03-Sep-22 30-Sep-22 16-Nov-22 13-Dec-22 74 Hols - No B/O periods (was HKPF - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was23-Jul-22 C1) 28-Oct-22 12-Oct-22 10-Jan-23 74 310.D.WS.L1392 HKPF - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 21 23-Jul-22 12-Aug-22 12-Oct-22 01-Nov-22 81 Hols - No B/O periods (was 310.D.WS.L1948 HKPF - ABWF - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 13-Aug-22 09-Sep-22 02-Nov-22 29-Nov-22 81 Hols - No B/O periods (was 310.D.WS.L1944 HKPF - ABWF - Material Submission - prepare document C1) C01_7 d/w - 10h/d - No HK 14 10-Sep-22 23-Sep-22 30-Nov-22 13-Dec-22 81 Hols - No B/O periods (was 310.D.WS.L1396 HKPF - ABWF - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 01-Oct-22 28-Oct-22 14-Dec-22 10-Jan-23 74 Hols - No B/O periods (was HKPF - Structural Steel Staircase C1) C01_7 d/w - 10h/d - No HK Hols84 - No B/O periods 0 (was12-Jul-22 C1) 03-Oct-22 25-Oct-22 16-Jan-23 105 HKPF - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was12-Jul-22 C1) 05-Sep-22 25-Oct-22 19-Dec-22 105 310.D.WS.L1544 HKPF - Structural Steel Staircase - prepare document C01_7 d/w - 10h/d - No HK 28 12-Jul-22 08-Aug-22 25-Oct-22 21-Nov-22 105 Hols - No B/O periods (was 310.D.WS.L1548 HKPF - Structural Steel Staircase - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 09-Aug-22 05-Sep-22 22-Nov-22 19-Dec-22 105 Hols - No B/O periods (was HKPF - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was09-Aug-22 C1) 03-Oct-22 22-Nov-22 16-Jan-23 105 310.D.WS.L1552 HKPF - Structural Steel Staircase - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 28 09-Aug-22 05-Sep-22 22-Nov-22 19-Dec-22 105 Hols - No B/O periods (was 310.D.WS.L1556 HKPF - Structural Steel Staircase - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 06-Sep-22 03-Oct-22 20-Dec-22 16-Jan-23 105 Hols - No B/O periods (was Procurement - MEP C1) C01_7 d/w - 10h/d - No HK Hols298 - No B/O periods 0 (was01-Aug-22 C1) 25-May-23 21-Aug-22 14-Jun-23 20 310.P.RC.S014 HKPF Bldg (Procurement Electrical & MVAC Major Equipment) - AC/fan units, LV C01_7 d/w - 10h/d - No HK 50 01-Aug-22 19-Sep-22 21-Aug-22 09-Oct-22 20 switchboard, genset & Others - Place Order Hols - No B/O periods (was 310.P.RC.S010 HKPF Bldg (Procurement FS and P&D Major Equipment) - NOVEC 1230 system, FA C1) C01_7 d/w - 10h/d - No HK 80 01-Aug-22 19-Oct-22 21-Aug-22 08-Nov-22 20 system&Others-Place Order Hols - No B/O periods (was 310.P.RC.S202 HKPF Bldg (Procurement MEP) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 240 31-Aug-22 27-Apr-23 20-Sep-22 17-May-23 20 Hols - No B/O periods (was 310.P.RC.S206 HKPF Bldg (Procurement MEP) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 28 28-Apr-23 25-May-23 18-May-23 14-Jun-23 20 Hols - No B/O periods (was Procurement - ABWF C1) C01_7 d/w - 10h/d - No HK Hols148 - No B/O periods 0 (was29-Oct-22 C1) 25-Mar-23 11-Jan-23 07-Jun-23 74 310.P.RC.S022 HKPF Bldg (Procurement ABWF) - louvres,doors,raised floors panels&Others-Place Order C01_7 d/w - 10h/d - No HK 14 29-Oct-22 11-Nov-22 11-Jan-23 24-Jan-23 74 Hols - No B/O periods (was 310.P.RC.S026 HKPF Bldg (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 120 12-Nov-22 11-Mar-23 25-Jan-23 24-May-23 74 Hols - No B/O periods (was 310.P.RC.S034 HKPF Bldg (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 14 12-Mar-23 25-Mar-23 25-May-23 07-Jun-23 74 Hols - No B/O periods (was Procurement - Structural Steel Staircase C1) C01_7 d/w - 10h/d - No HK Hols192 - No B/O periods 0 (was04-Oct-22 C1) 13-Apr-23 17-Jan-23 27-Jul-23 105 310.P.RC.S210 HKPF Bldg (Procurement Structural Steel Staircase) - Place Order for Materials C01_7 d/w - 10h/d - No HK 28 04-Oct-22 31-Oct-22 17-Jan-23 13-Feb-23 105 Hols - No B/O periods (was 310.P.RC.S214 HKPF Bldg (Procurement Structural Steel Staircase) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 150 01-Nov-22 30-Mar-23 14-Feb-23 13-Jul-23 105 Hols - No B/O periods (was 310.P.RC.S218 HKPF Bldg (Procurement Structural Steel Staircase) - Delivery of Materials C1) d/w - 10h/d - No HK C01_7 14 31-Mar-23 13-Apr-23 14-Jul-23 27-Jul-23 105 Hols - No B/O periods (was Construction C1) 273 0 05-Sep-22 08-Aug-23 05-Sep-22 20-Aug-23 10 Site Preparation and Establishment 130 0 05-Sep-22 13-Feb-23 05-Sep-22 13-Feb-23 0 310.C.RC.S046 HKPF Bldg - Portion of Zone G1 area handed over at +6.5mPD C01_7 d/w - 10h/d - No HK 0 05-Sep-22 05-Sep-22 0 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 247 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.S054 HKPF Bldg - Commencement of Work C01_7 d/w - 10h/d - No HK 0 06-Sep-22 06-Sep-22 0 Hols - No B/O periods (was 310.C.RC.S066 HKPF Bldg - install instrumentation C1) C03_7 d/w - 10h/d - With 4 06-Sep-22 09-Sep-22 21-Oct-22 24-Oct-22 42 HK Hols - No B/O periods 310.C.RC.S058 HKPF Bldg - Carry out GI works, Submit report to PM for review and submit to BD includin C03_7 d/w - 10h/d - With 18 06-Sep-22 24-Sep-22 06-Sep-22 24-Sep-22 0 Form BA14 for Completion HK Hols - No B/O periods 310.C.RC.S059 HKPF Bldg - PM review report C03_7 d/w - 10h/d - With 28 25-Sep-22 24-Oct-22 25-Sep-22 24-Oct-22 0 HK Hols - No B/O periods 310.C.RC.S062 HKPF Bldg - submit Geotechnical Assessment Report to BD C03_7 d/w - 10h/d - With 105 25-Oct-22 13-Feb-23 25-Oct-22 13-Feb-23 0 HK Hols - No B/O periods Structural Work C03_7 d/w - 10h/d - With HK Hols 88- No B/O 0periods 21-Mar-23 24-Jun-23 21-Mar-23 20-Aug-23 56 310.C.RC.S082 HKPF Bldg (Excavation) - Open cut excavation from +6.5mPD to + 6.30mPD C03_7 d/w - 10h/d - With 3 21-Mar-23 23-Mar-23 21-Mar-23 23-Mar-23 0 HK Hols - No B/O periods 310.C.RC.S086 HKPF Bldg (Footing) - Plate load test and submit report C03_7 d/w - 10h/d - With 10 24-Mar-23 02-Apr-23 24-Mar-23 02-Apr-23 0 HK Hols - No B/O periods 310.C.RC.S090 HKPF Bldg (Footing/Ground) - Construction of footing C03_7 d/w - 10h/d - With 9 03-Apr-23 16-Apr-23 03-Apr-23 16-Apr-23 0 HK Hols - No B/O periods 310.C.RC.S094 HKPF Bldg (First Floor) - Construction of walls, columns, beam, slab C03_7 d/w - 10h/d - With 21 17-Apr-23 08-May-23 17-Apr-23 08-May-23 0 HK Hols - No B/O periods 310.C.RC.S098 HKPF Bldg (Roof Floor) - Construction of walls, columns, beam, slab + plinth C03_7 d/w - 10h/d - With 21 09-May-23 30-May-23 09-May-23 30-May-23 0 HK Hols - No B/O periods 310.C.RC.S100 HKPF Bldg (Roof Floor) - Construction of roof - Waterproofing & Roof Finishes C03_7 d/w - 10h/d - With 14 31-May-23 13-Jun-23 02-Jun-23 15-Jun-23 2 HK Hols - No B/O periods 310.C.RC.S204 HKPF Bldg - Installation of Staircase C03_7 d/w - 10h/d - With 24 31-May-23 24-Jun-23 28-Jul-23 20-Aug-23 56 HK Hols - No B/O periods ABWF / E&M Works C03_7 d/w - 10h/d - With HK Hols 42- No B/O 0periods 31-May-23 13-Jul-23 08-Jun-23 16-Jul-23 3 310.C.RC.S108 HKPF Bldg - ABWF Internal Works C03_7 d/w - 10h/d - With 30 31-May-23 30-Jun-23 08-Jun-23 09-Jul-23 8 HK Hols - No B/O periods 310.C.RC.S112 HKPF Bldg - ABWF External Works C03_7 d/w - 10h/d - With 28 14-Jun-23 13-Jul-23 16-Jun-23 15-Jul-23 2 HK Hols - No B/O periods Drainage Installation C03_7 d/w - 10h/d - With HK Hols 30- No B/O 0periods 07-Jun-23 08-Jul-23 15-Jun-23 16-Jul-23 8 310.C.RC.S124 HKPF Bldg - Drainage 1st Fix & Installation C03_7 d/w - 10h/d - With 18 07-Jun-23 25-Jun-23 15-Jun-23 04-Jul-23 8 HK Hols - No B/O periods 310.C.RC.S125.B01 HKPF Bldg - Drainage 2nd Fix & Installation C03_7 d/w - 10h/d - With 18 14-Jun-23 03-Jul-23 23-Jun-23 11-Jul-23 8 HK Hols - No B/O periods 310.C.RC.S126.B01 HKPF Bldg - Drainage Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 04-Jul-23 08-Jul-23 12-Jul-23 16-Jul-23 8 HK Hols - No B/O periods Electrical Installation C03_7 d/w - 10h/d - With HK Hols 30- No B/O 0periods 07-Jun-23 08-Jul-23 15-Jun-23 16-Jul-23 8 310.C.RC.S127.B01 HKPF Bldg - Electrical 1st Fix & Installation C03_7 d/w - 10h/d - With 18 07-Jun-23 25-Jun-23 15-Jun-23 04-Jul-23 8 HK Hols - No B/O periods 310.C.RC.S129.B01 HKPF Bldg - Electrical 2nd Fix & Installation C03_7 d/w - 10h/d - With 18 14-Jun-23 03-Jul-23 23-Jun-23 11-Jul-23 8 HK Hols - No B/O periods 310.C.RC.S128.B01 HKPF Bldg - Switchgear Installation C03_7 d/w - 10h/d - With 10 21-Jun-23 02-Jul-23 02-Jul-23 11-Jul-23 9 HK Hols - No B/O periods 310.C.RC.S130.B01 HKPF Bldg - Power On to All Floors C03_7 d/w - 10h/d - With 0 03-Jul-23 11-Jul-23 8 HK Hols - No B/O periods 310.C.RC.S131.B01 HKPF Bldg - Electrical Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 04-Jul-23 08-Jul-23 12-Jul-23 16-Jul-23 8 HK Hols - No B/O periods Fire Services Installation C03_7 d/w - 10h/d - With HK Hols 30- No B/O 0periods 07-Jun-23 08-Jul-23 15-Jun-23 16-Jul-23 8 310.C.RC.S132.B01 HKPF Bldg - Fire Services 1st Fix & Installation C03_7 d/w - 10h/d - With 18 07-Jun-23 25-Jun-23 15-Jun-23 04-Jul-23 8 HK Hols - No B/O periods
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 248 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.S133.B01 HKPF Bldg - Fire Services 2nd Fix & Installation C03_7 d/w - 10h/d - With 18 14-Jun-23 03-Jul-23 23-Jun-23 11-Jul-23 8 HK Hols - No B/O periods 310.C.RC.S134.B01 HKPF Bldg - Fire Service Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 04-Jul-23 08-Jul-23 12-Jul-23 16-Jul-23 8 HK Hols - No B/O periods MVAC Installation C03_7 d/w - 10h/d - With HK Hols 30- No B/O 0periods 07-Jun-23 08-Jul-23 15-Jun-23 16-Jul-23 8 310.C.RC.S135.B01 HKPF Bldg - MVAC 1st Fix & Installation C03_7 d/w - 10h/d - With 18 07-Jun-23 25-Jun-23 15-Jun-23 04-Jul-23 8 HK Hols - No B/O periods 310.C.RC.S136.B01 HKPF Bldg - MVAC 2nd Fix & Installation C03_7 d/w - 10h/d - With 18 14-Jun-23 03-Jul-23 23-Jun-23 11-Jul-23 8 HK Hols - No B/O periods 310.C.RC.S137.B01 HKPF Bldg - MVAC Final Fix & Adjustment C03_7 d/w - 10h/d - With 5 04-Jul-23 08-Jul-23 12-Jul-23 16-Jul-23 8 HK Hols - No B/O periods Airport System C03_7 d/w - 10h/d - With HK Hols 30- No B/O 0periods 31-May-23 30-Jun-23 01-Jun-23 02-Jul-23 1 310.C.RC.P591 HKPF Bldg (Airport System) - VDC, CCTV C03_7 d/w - 10h/d - With 30 31-May-23 30-Jun-23 01-Jun-23 02-Jul-23 1 HK Hols - No B/O periods External Works (Drainage and UU Works & EVA) 76 0 09-May-23 08-Aug-23 09-May-23 20-Aug-23 10 310.C.RC.S185 HKPF Bldg (Civil) - Drainage (stormwater), manholes C11_6 d/w - 10h/d - With 28 09-May-23 10-Jun-23 09-May-23 10-Jun-23 0 HK Hols - No B/O periods 310.C.RC.S200 HKPF Bldg (Civil) - AS, power and Comms cable ducts and sleeve (was C11_6C3) d/w - 10h/d - With 28 12-Jun-23 15-Jul-23 12-Jun-23 15-Jul-23 0 HK Hols - No B/O periods 310.T.EX.L460 HKPF Bldg - EVA works (was C01_7C3) d/w - 10h/d - No HK 24 16-Jul-23 08-Aug-23 28-Jul-23 20-Aug-23 12 Hols - No B/O periods (was Testing and Commissioning C1) 82 0 01-Jul-23 07-Oct-23 03-Jul-23 07-Oct-23 0 Testing and Commissioning C01_7 d/w - 10h/d - No HK Hols36 - No B/O periods 0 (was01-Jul-23 C1) 05-Aug-23 03-Jul-23 14-Sep-23 40 310.C.ES.P792 HKPF Bldg - Airport System T&C - VDC, CCTV C01_7 d/w - 10h/d - No HK 21 01-Jul-23 21-Jul-23 03-Jul-23 23-Jul-23 2 Hols - No B/O periods (was 310.T.EX.L420.B01 HKPF Bldg - Fire Service T&C (Non-FSI) C1) C01_7 d/w - 10h/d - No HK 21 09-Jul-23 29-Jul-23 25-Aug-23 14-Sep-23 47 Hols - No B/O periods (was 310.T.EX.L416 HKPF Bldg - Building Services System Test (Electrical, Ventilation, FS System, Plumbing C1) C01_7 d/w - 10h/d - No HK 21 16-Jul-23 05-Aug-23 17-Jul-23 06-Aug-23 1 etc) Hols - No B/O periods (was Statutory Inspection C1) 65 0 22-Jul-23 07-Oct-23 24-Jul-23 07-Oct-23 0 Fire Services Department (FSD) C11_6 d/w - 10h/d - With HK Hols 47- No B/O 0periods (was 22-Jul-23 C3) 14-Sep-23 24-Jul-23 14-Sep-23 0 310.T.WS.T1060 HKPF Bldg - F.S. Inspection Plan (Form FSI / 314 Submission) C11_6 d/w - 10h/d - With 0 22-Jul-23 24-Jul-23 1 HK Hols - No B/O periods 310.T.WS.T1064 HKPF Bldg - F.S. Inspection Application (Form FSI / 501 & 251 Submission) (was C11_6C3) d/w - 10h/d - With 0 07-Aug-23 07-Aug-23 0 HK Hols - No B/O periods 310.T.WS.T1068 HKPF Bldg - F.S. 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 21-Aug-23 26-Aug-23 21-Aug-23 26-Aug-23 0 HK Hols - No B/O periods 310.T.WS.T1072 HKPF Bldg - FSD Comment (was C11_6C3) d/w - 10h/d - With 0 26-Aug-23 26-Aug-23 0 HK Hols - No B/O periods 310.T.WS.T1076 HKPF Bldg - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 10 28-Aug-23 07-Sep-23 28-Aug-23 07-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1080 HKPF Bldg - F.S. Re-inspection (was C11_6C3) d/w - 10h/d - With 6 08-Sep-23 14-Sep-23 08-Sep-23 14-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1084 HKPF Bldg - Issue F.S. Certificate (Form FS172) (was C11_6C3) d/w - 10h/d - With 0 14-Sep-23 14-Sep-23 0 HK Hols - No B/O periods Building Department (BD) (was C3) 18 0 15-Sep-23 07-Oct-23 15-Sep-23 07-Oct-23 0 310.T.WS.T1436 HKPF Bldg - BD Inspection Application for Occupation Permit (Form BA13 Submission) C11_6 d/w - 10h/d - With 0 15-Sep-23 15-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1440 HKPF Bldg - BD 1st Inspection (was C11_6C3) d/w - 10h/d - With 6 15-Sep-23 21-Sep-23 15-Sep-23 21-Sep-23 0 HK Hols - No B/O periods (was C3)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 249 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.T.WS.T1444 HKPF Bldg - BD Comment C11_6 d/w - 10h/d - With 0 21-Sep-23 21-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1448 HKPF Bldg - Rectification & Adjustment (was C11_6C3) d/w - 10h/d - With 6 22-Sep-23 28-Sep-23 22-Sep-23 28-Sep-23 0 HK Hols - No B/O periods 310.T.WS.T1452 HKPF Bldg - BD Re-inspection (was C11_6C3) d/w - 10h/d - With 6 29-Sep-23 07-Oct-23 29-Sep-23 07-Oct-23 0 HK Hols - No B/O periods 310.T.RC.S141 HKPF Bldg - Achieved KD-G2 (was C01_7C3) d/w - 10h/d - No HK 0 07-Oct-23 07-Oct-23 0 Hols - No B/O periods (was 310.T.WS.T1456 HKPF Bldg - Issue Occupation Permit (Form BD104) C1) C11_6 d/w - 10h/d - With 0 07-Oct-23 07-Oct-23 0 HK Hols - No B/O periods WSA - Vehicle Search Bay and C&ED Control Kiosk (was C3) 487 9 04-May-22 17-Dec-23 04-Jul-22 18-Dec-23 1 Design & Submission C01_7 d/w - 10h/d - No HK Hols117 - No B/O periods 0 (was04-May-22 C1) 28-Aug-22 15-Aug-22 08-May-23 253 WSA - Vehicle Search Bay, C&ED - MEP Submission C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was23-May-22 C1) 28-Aug-22 31-Jan-23 08-May-23 253 WSA - Vehicle Search Bay, C&ED - MEP - Drawing Submission C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was23-May-22 C1) 28-Aug-22 31-Jan-23 08-May-23 253 310.D.WS.L1952 WSA - Vehicle Search Bay, C&ED - MEP - Drawing Submission - prepare document C01_7 d/w - 10h/d - No HK 28 23-May-22 19-Jun-22 31-Jan-23 27-Feb-23 253 Hols - No B/O periods (was 310.D.WS.L1996 WSA - Vehicle Search Bay, C&ED - MEP - Drawing Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 20-Jun-22 17-Jul-22 28-Feb-23 27-Mar-23 253 1st Round Hols - No B/O periods (was 310.D.WS.L1992 WSA - Vehicle Search Bay, C&ED - MEP - Drawing Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 14 18-Jul-22 31-Jul-22 28-Mar-23 10-Apr-23 253 Hols - No B/O periods (was 310.D.WS.L1956 WSA - Vehicle Search Bay, C&ED - MEP - Drawing Submission - PM review and accept C1) d/w - 10h/d - No HK C01_7 28 01-Aug-22 28-Aug-22 11-Apr-23 08-May-23 253 2nd Round Hols - No B/O periods (was WSA - Vehicle Search Bay, C&ED - ABWF Submission C1) C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was04-May-22 C1) 09-Aug-22 15-Aug-22 20-Nov-22 103 WSA - Vehicle Search Bay, C&ED - ABWF - Drawing Submission C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was04-May-22 C1) 09-Aug-22 15-Aug-22 20-Nov-22 103 310.D.WS.L1976 WSA - Vehicle Search Bay, C&ED - ABWF - prepare document C01_7 d/w - 10h/d - No HK 21 04-May-22 24-May-22 15-Aug-22 04-Sep-22 103 Hols - No B/O periods (was 310.D.WS.L2020 WSA - Vehicle Search Bay, C&ED - ABWF - PM review and accept 1st Round C1) C01_7 d/w - 10h/d - No HK 28 25-May-22 21-Jun-22 05-Sep-22 02-Oct-22 103 Hols - No B/O periods (was 310.D.WS.L2016 WSA - Vehicle Search Bay, C&ED - ABWF - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 21 22-Jun-22 12-Jul-22 03-Oct-22 23-Oct-22 103 Hols - No B/O periods (was 310.D.WS.L1980 WSA - Vehicle Search Bay, C&ED - ABWF - PM review and accept 2nd Round C1) C01_7 d/w - 10h/d - No HK 28 13-Jul-22 09-Aug-22 24-Oct-22 20-Nov-22 103 Hols - No B/O periods (was WSA - Vehicle Search Bay, C&ED - ABWF - Material Submission C1) C01_7 d/w - 10h/d - No HK Hols98 - No B/O periods 0 (was04-May-22 C1) 09-Aug-22 15-Aug-22 20-Nov-22 103 310.D.WS.L1984 WSA - Vehicle Search Bay, C&ED - ABWF - Material Submission - prepare document C01_7 d/w - 10h/d - No HK 21 04-May-22 24-May-22 15-Aug-22 04-Sep-22 103 Hols - No B/O periods (was 310.D.WS.L2028 WSA - Vehicle Search Bay, C&ED - ABWF - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 25-May-22 21-Jun-22 05-Sep-22 02-Oct-22 103 1st Round Hols - No B/O periods (was 310.D.WS.L2024 WSA - Vehicle Search Bay, C&ED - ABWF - Material Submission - prepare resubmission C1) C01_7 d/w - 10h/d - No HK 21 22-Jun-22 12-Jul-22 03-Oct-22 23-Oct-22 103 Hols - No B/O periods (was 310.D.WS.L1988 WSA - Vehicle Search Bay, C&ED - ABWF - Material Submission - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 13-Jul-22 09-Aug-22 24-Oct-22 20-Nov-22 103 Hols - No B/O periods (was Procurement C1) C01_7 d/w - 10h/d - No HK Hols243 - No B/O periods 0 (was07-May-22 C1) 04-Jan-23 27-Oct-22 08-May-23 124 Major Materials ABWF C01_7 d/w - 10h/d - No HK Hols148 - No B/O periods 0 (was10-Aug-22 C1) 04-Jan-23 21-Nov-22 17-Apr-23 103 310.P.ES.P134 WSA - Vehicle Search Bay, C&ED (Procurement ABWF) - Place Order for Materials C01_7 d/w - 10h/d - No HK 14 10-Aug-22 23-Aug-22 21-Nov-22 04-Dec-22 103 Hols - No B/O periods (was 310.P.ES.P146 WSA - Vehicle Search Bay, C&ED (Procurement ABWF) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 120 24-Aug-22 21-Dec-22 05-Dec-22 03-Apr-23 103 Hols - No B/O periods (was 310.P.ES.P150 WSA - Vehicle Search Bay, C&ED (Procurement ABWF) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 14 22-Dec-22 04-Jan-23 04-Apr-23 17-Apr-23 103 Hols - No B/O periods (was Major Materials MEP C1) C01_7 d/w - 10h/d - No HK Hols194 - No B/O periods 0 (was07-May-22 C1) 16-Nov-22 27-Oct-22 08-May-23 173
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 250 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.P.ES.P138 WSA - Vehicle Search Bay, C&ED (Procurement MEP) - Place Order for Materials C01_7 d/w - 10h/d - No HK 60 07-May-22 05-Jul-22 27-Oct-22 25-Dec-22 173 Hols - No B/O periods (was 310.P.ES.P154 WSA - Vehicle Search Bay, C&ED (Procurement MEP) - Manufacturing of Materials C1) C01_7 d/w - 10h/d - No HK 150 06-Jun-22 02-Nov-22 26-Nov-22 24-Apr-23 173 Hols - No B/O periods (was 310.P.ES.P162 WSA - Vehicle Search Bay, C&ED (Procurement MEP) - Delivery of Materials C1) C01_7 d/w - 10h/d - No HK 14 03-Nov-22 16-Nov-22 25-Apr-23 08-May-23 173 Hols - No B/O periods (was Initial Work and Site Preparation C1) 12 0 04-Jul-22 16-Jul-22 04-Jul-22 22-Aug-22 31 310.C.WS.S404 WSA - Vehicle Search Bay, C&ED Ctrl Kiosk - Site access WA3310/12 C01_7 d/w - 10h/d - No HK 0 04-Jul-22* 04-Jul-22 0 Hols - No B/O periods (was 310.C.WS.S420 WSA - Vehicle Search Bay, C&ED Ctrl Kiosk - Hoarding C1) C11_6 d/w - 10h/d - With 5 04-Jul-22 08-Jul-22 09-Aug-22 13-Aug-22 31 HK Hols - No B/O periods 310.C.WS.S408 WSA - Vehicle Search Bay, C&ED Ctrl Kiosk - Carry out site survey (was C11_6C3) d/w - 10h/d - With 1 08-Jul-22 08-Jul-22 13-Aug-22 13-Aug-22 31 HK Hols - No B/O periods 310.C.WS.S412 WSA - Vehicle Search Bay, C&ED Ctrl Kiosk - Install monitoring point (was C11_6C3) d/w - 10h/d - With 1 09-Jul-22 09-Jul-22 15-Aug-22 15-Aug-22 31 HK Hols - No B/O periods 310.C.WS.S416 WSA - Vehicle Search Bay, C&ED Ctrl Kiosk - UU detection and trial pit (was C11_6C3) d/w - 10h/d - With 6 11-Jul-22 16-Jul-22 16-Aug-22 22-Aug-22 31 HK Hols - No B/O periods Structural Works (was C3) 96 0 18-Jul-22 09-Nov-22 19-Jul-22 04-Apr-23 120 310.C.WS.S432 WSA - Vehicle Search Bay & Traffic Control Kiosk - Obtain BA8 consent C01_7 d/w - 10h/d - No HK 28 18-Jul-22 14-Aug-22 19-Jul-22 15-Aug-22 1 Hols - No B/O periods (was 310.C.WS.S428 WSA - Vehicle Search Bay & Traffic Control Kiosk - BA10 notice of commencement of C1) C01_7 d/w - 10h/d - No HK 7 15-Aug-22 21-Aug-22 16-Aug-22 22-Aug-22 1 works Hols - No B/O periods (was 310.C.WS.S424 WSA - Vehicle Search Bay & Traffic Control Kiosk -- SI works and submit report to PM C1) C11_6 d/w - 10h/d - With 10 22-Aug-22 01-Sep-22 23-Aug-22 02-Sep-22 1 HK Hols - No B/O periods Vehicle Search Bay, C&ED Control Kiosk (was C11_6C3) d/w - 10h/d - With HK Hols 21- No B/O 0periods (was 17-Oct-22 C3) 09-Nov-22 11-Mar-23 04-Apr-23 120 310.C.WS.S468 WSA - Vehicle Search Bay/C&ED Kiosk - Foundation/footing C11_6 d/w - 10h/d - With 7 17-Oct-22 24-Oct-22 11-Mar-23 18-Mar-23 120 HK Hols - No B/O periods 310.C.WS.S472 WSA - Vehicle Search Bay/C&ED Kiosk - Structural Works (was C11_6C3) d/w - 10h/d - With 14 25-Oct-22 09-Nov-22 20-Mar-23 04-Apr-23 120 HK Hols - No B/O periods ABWF (was C11_6C3) d/w - 10h/d - With HK Hols 119- No B/O 0periods (was 11-Feb-23 C3) 10-Jul-23 04-Apr-23 07-Sep-23 51 310.C.EX.W2312 WSA - Vehicle Search Bay, C&ED - Structure completed C11_6 d/w - 10h/d - With 0 11-Feb-23 04-Apr-23 44 HK Hols - No B/O periods 310.C.EX.W2276 WSA - Vehicle Search Bay, C&ED - Partition Wall & Door Subframe (was C11_6C3) d/w - 10h/d - With 45 13-Feb-23 06-Apr-23 18-Apr-23 10-Jun-23 51 HK Hols - No B/O periods 310.C.EX.W2280 WSA - Vehicle Search Bay, C&ED - Plastering & Screeding (was C11_6C3) d/w - 10h/d - With 45 24-Feb-23 21-Apr-23 29-Apr-23 23-Jun-23 51 HK Hols - No B/O periods 310.C.EX.W2284 WSA - Vehicle Search Bay, C&ED - Tiling & Stonework (was C11_6C3) d/w - 10h/d - With 45 08-Mar-23 04-May-23 12-May-23 06-Jul-23 51 HK Hols - No B/O periods 310.C.EX.W2288 WSA - Vehicle Search Bay, C&ED - Suspended Ceiling Framework (was C11_6C3) d/w - 10h/d - With 45 20-Mar-23 16-May-23 24-May-23 18-Jul-23 51 HK Hols - No B/O periods 310.C.EX.W2292 WSA - Vehicle Search Bay, C&ED - Sanitary Ware & Fixtures (was C11_6C3) d/w - 10h/d - With 45 31-Mar-23 29-May-23 06-Jun-23 29-Jul-23 51 HK Hols - No B/O periods 310.C.EX.W2296 WSA - Vehicle Search Bay, C&ED - Door Sets & Ironmongery (was C11_6C3) d/w - 10h/d - With 45 17-Apr-23 09-Jun-23 17-Jun-23 10-Aug-23 51 HK Hols - No B/O periods 310.C.EX.W2300 WSA - Vehicle Search Bay, C&ED - Glazing (was C11_6C3) d/w - 10h/d - With 45 28-Apr-23 21-Jun-23 30-Jun-23 22-Aug-23 51 HK Hols - No B/O periods 310.C.EX.W2304 WSA - Vehicle Search Bay, C&ED - Ceiling Panels & Finishes (was C11_6C3) d/w - 10h/d - With 45 11-May-23 05-Jul-23 13-Jul-23 02-Sep-23 51 HK Hols - No B/O periods 310.C.EX.W2308 WSA - Vehicle Search Bay, C&ED - Painting, Graphics & Signage (was C11_6C3) d/w - 10h/d - With 45 16-May-23 10-Jul-23 18-Jul-23 07-Sep-23 51 HK Hols - No B/O periods MEP Installation Works (was C11_6C3) d/w - 10h/d - With HK Hols 130- No B/O 0periods (was 13-Mar-23 C3) 19-Aug-23 09-May-23 18-Nov-23 75
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 251 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S Plumbing & Drainage Installation C11_6 d/w - 10h/d - With HK Hols 130- No B/O 0periods (was 13-Mar-23 C3) 19-Aug-23 09-May-23 12-Oct-23 44 310.C.EX.W2368 WSA - Vehicle Search Bay, C&ED - Plumbing & Drainage 1st Fix & Installation C11_6 d/w - 10h/d - With 60 13-Mar-23 27-May-23 09-May-23 20-Jul-23 44 HK Hols - No B/O periods 310.C.EX.W2372 WSA - Vehicle Search Bay, C&ED - Plumbing & Drainage 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 14-Apr-23 26-Jun-23 07-Jun-23 17-Aug-23 44 HK Hols - No B/O periods 310.C.EX.W2380 WSA - Vehicle Search Bay, C&ED - Plumbing & Drainage Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 12 07-Aug-23 19-Aug-23 27-Sep-23 12-Oct-23 44 HK Hols - No B/O periods Electrical Installation (was C11_6C3) d/w - 10h/d - With HK Hols 130- No B/O 0periods (was 13-Mar-23 C3) 19-Aug-23 15-Jun-23 18-Nov-23 75 310.C.EX.W2384 WSA - Vehicle Search Bay, C&ED - Electrical 1st Fix & Installation C11_6 d/w - 10h/d - With 60 13-Mar-23 27-May-23 15-Jun-23 25-Aug-23 75 HK Hols - No B/O periods 310.C.EX.W2388 WSA - Vehicle Search Bay, C&ED - Electrical 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 14-Apr-23 26-Jun-23 15-Jul-23 22-Sep-23 75 HK Hols - No B/O periods 310.C.EX.W2404 WSA - Vehicle Search Bay, C&ED - Electrical Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 12 07-Aug-23 19-Aug-23 06-Nov-23 18-Nov-23 75 HK Hols - No B/O periods Fire Services Installation (was C11_6C3) d/w - 10h/d - With HK Hols 130- No B/O 0periods (was 13-Mar-23 C3) 19-Aug-23 20-May-23 25-Oct-23 54 310.C.EX.W2408 WSA - Vehicle Search Bay, C&ED - Fire Services 1st Fix & Installation C11_6 d/w - 10h/d - With 60 13-Mar-23 27-May-23 20-May-23 01-Aug-23 54 HK Hols - No B/O periods 310.C.EX.W2412 WSA - Vehicle Search Bay, C&ED - Fire Services 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 14-Apr-23 26-Jun-23 19-Jun-23 29-Aug-23 54 HK Hols - No B/O periods 310.C.EX.W2420 WSA - Vehicle Search Bay, C&ED - Fire Services Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 12 07-Aug-23 19-Aug-23 11-Oct-23 25-Oct-23 54 HK Hols - No B/O periods MVAC Installation (was C11_6C3) d/w - 10h/d - With HK Hols 130- No B/O 0periods (was 13-Mar-23 C3) 19-Aug-23 20-May-23 25-Oct-23 54 310.C.EX.W2424 WSA - Vehicle Search Bay, C&ED - MVAC 1st Fix & Installation C11_6 d/w - 10h/d - With 60 13-Mar-23 27-May-23 20-May-23 01-Aug-23 54 HK Hols - No B/O periods 310.C.EX.W2428 WSA - Vehicle Search Bay, C&ED - MVAC 2nd Fix & Installation (was C11_6C3) d/w - 10h/d - With 60 14-Apr-23 26-Jun-23 19-Jun-23 29-Aug-23 54 HK Hols - No B/O periods 310.C.EX.W2432 WSA - Vehicle Search Bay, C&ED - MVAC Final Fix & Adjustment (was C11_6C3) d/w - 10h/d - With 12 07-Aug-23 19-Aug-23 11-Oct-23 25-Oct-23 54 HK Hols - No B/O periods External Works (was C11_6C3) d/w - 10h/d - With HK Hols 120- No B/O 0periods (was 12-May-23 C3) 04-Oct-23 14-Jul-23 04-Dec-23 51 External Building Finishes C11_6 d/w - 10h/d - With HK Hols 99- No B/O 0periods (was 12-May-23 C3) 07-Sep-23 14-Jul-23 04-Dec-23 72 310.C.ES.P812 WSA - Vehicle Search Bay, C&ED - External building finishes C11_6 d/w - 10h/d - With 48 12-May-23 10-Jul-23 14-Jul-23 07-Sep-23 51 HK Hols - No B/O periods 310.C.ES.P808 WSA - Vehicle Search Bay, C&ED - Hard and soft landscape works (was C11_6C3) d/w - 10h/d - With 21 15-Aug-23 07-Sep-23 10-Nov-23 04-Dec-23 72 HK Hols - No B/O periods Drainage and UU (was C11_6C3) d/w - 10h/d - With HK Hols 78- No B/O 0periods (was 12-May-23 C3) 14-Aug-23 14-Jul-23 09-Nov-23 72 310.C.ES.P816 WSA - Vehicle Search Bay, C&ED - Building drainage and watermain works C11_6 d/w - 10h/d - With 48 12-May-23 10-Jul-23 14-Jul-23 07-Sep-23 51 HK Hols - No B/O periods 310.C.ES.P820 WSA - Vehicle Search Bay, C&ED - AS Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 24 11-Jul-23 07-Aug-23 12-Oct-23 09-Nov-23 78 HK Hols - No B/O periods 310.C.ES.P824 WSA - Vehicle Search Bay, C&ED - EL cable ducting + drawpits (was C11_6C3) d/w - 10h/d - With 24 11-Jul-23 07-Aug-23 08-Sep-23 07-Oct-23 51 HK Hols - No B/O periods 310.C.ES.P828 WSA - Vehicle Search Bay, C&ED - CLP Cable ducts + drawpits (was C11_6C3) d/w - 10h/d - With 30 11-Jul-23 14-Aug-23 05-Oct-23 09-Nov-23 72 HK Hols - No B/O periods EVA Construction (was C11_6C3) d/w - 10h/d - With HK Hols 48- No B/O 0periods (was 08-Aug-23 C3) 04-Oct-23 09-Oct-23 04-Dec-23 51 310.C.WS.C124 WSA - Vehicle Search Bay, C&ED - Site Formation Works and Road Works for EVA C11_6 d/w - 10h/d - With 48 08-Aug-23 04-Oct-23 09-Oct-23 04-Dec-23 51 HK Hols - No B/O periods Testing and Commissioning (was C3) 145 9 27-Jun-23 17-Dec-23 18-Aug-23 18-Dec-23 1 Preliminary Testing and Commissioning C11_6 d/w - 10h/d - With HK Hols 34- No B/O 0periods (was 27-Jun-23 C3) 05-Aug-23 18-Aug-23 04-Nov-23 75 Preliminary T&C - Plumbing and Drainage C11_6 d/w - 10h/d - With HK Hols 34- No B/O 0periods (was 27-Jun-23 C3) 05-Aug-23 18-Aug-23 26-Sep-23 44 310.C.EX.W2244 WSA - Vehicle Search Bay, C&ED - Plumbing & Drainage Preliminary Inspection & C11_6 d/w - 10h/d - With 24 27-Jun-23 25-Jul-23 18-Aug-23 14-Sep-23 44 Adjustment HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 252 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.EX.W2248 WSA - Vehicle Search Bay, C&ED - Plumbing & Drainage Preliminary Testing & C11_6 d/w - 10h/d - With 24 10-Jul-23 05-Aug-23 30-Aug-23 26-Sep-23 44 Commissioning HK Hols - No B/O periods Preliminary T&C - Electrical (was C11_6C3) d/w - 10h/d - With HK Hols 34- No B/O 0periods (was 27-Jun-23 C3) 05-Aug-23 23-Sep-23 04-Nov-23 75 310.C.EX.W2252 WSA - Vehicle Search Bay, C&ED - Electrical Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 24 27-Jun-23 25-Jul-23 23-Sep-23 24-Oct-23 75 HK Hols - No B/O periods 310.C.EX.W2256 WSA - Vehicle Search Bay, C&ED - Electrical Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 24 10-Jul-23 05-Aug-23 07-Oct-23 04-Nov-23 75 HK Hols - No B/O periods Preliminary T&C - Fire Services (was C11_6C3) d/w - 10h/d - With HK Hols 34- No B/O 0periods (was 27-Jun-23 C3) 05-Aug-23 30-Aug-23 10-Oct-23 54 310.C.EX.W2260 WSA - Vehicle Search Bay, C&ED - Fire Services Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 24 27-Jun-23 25-Jul-23 30-Aug-23 26-Sep-23 54 HK Hols - No B/O periods 310.C.EX.W2264 WSA - Vehicle Search Bay, C&ED - Fire Services Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 24 10-Jul-23 05-Aug-23 11-Sep-23 10-Oct-23 54 HK Hols - No B/O periods Preliminary T&C - MVAC (was C11_6C3) d/w - 10h/d - With HK Hols 34- No B/O 0periods (was 27-Jun-23 C3) 05-Aug-23 30-Aug-23 10-Oct-23 54 310.C.EX.W2268 WSA - Vehicle Search Bay, C&ED - MVAC Preliminary Inspection & Adjustment C11_6 d/w - 10h/d - With 24 27-Jun-23 25-Jul-23 30-Aug-23 26-Sep-23 54 HK Hols - No B/O periods 310.C.EX.W2272 WSA - Vehicle Search Bay, C&ED - MVAC Preliminary Testing & Commissioning (was C11_6C3) d/w - 10h/d - With 24 10-Jul-23 05-Aug-23 11-Sep-23 10-Oct-23 54 HK Hols - No B/O periods Testing and Commissioning (was C01_7C3) d/w - 10h/d - No HK Hols120 - No B/O periods 9 (was20-Aug-23 C1) 17-Dec-23 13-Oct-23 18-Dec-23 1 310.T.EX.L480 WSA - Vehicle Search Bay and C&ED Control Kiosk - FS System Test C01_7 d/w - 10h/d - No HK 24 2 20-Aug-23 12-Sep-23 26-Oct-23 18-Nov-23 67 Hols - No B/O periods (was 310.T.EX.L484 WSA - Vehicle Search Bay and C&ED Control Kiosk - Ventilation System Test C1) C01_7 d/w - 10h/d - No HK 24 2 20-Aug-23 12-Sep-23 26-Oct-23 18-Nov-23 67 Hols - No B/O periods (was 310.T.EX.L492 WSA - Vehicle Search Bay and C&ED Control Kiosk - Plumbing System Test C1) C01_7 d/w - 10h/d - No HK 24 2 20-Aug-23 12-Sep-23 13-Oct-23 05-Nov-23 54 Hols - No B/O periods (was 310.T.EX.L488 WSA - Vehicle Search Bay and C&ED Control Kiosk - Systems Integration Test C1) C01_7 d/w - 10h/d - No HK 30 3 18-Nov-23 17-Dec-23 19-Nov-23 18-Dec-23 1 Hols - No B/O periods (was HKO Facilities C1) 663 9 22-Jul-21 A 11-Oct-23 27-Mar-22 15-Oct-23 3 Subletting & Procurement C01_7 d/w - 10h/d - No HK Hols181 - No B/O periods 0 (was 30-Oct-21 C1) A 29-Jul-22 28-Jan-23 27-Apr-23 272 Subletting C01_7 d/w - 10h/d - No HK Hols181 - No B/O periods 0 (was 30-Oct-21 C1) A 29-Jul-22 28-Jan-23 27-Apr-23 272 310.P.EX.F128 Subletting - Optional Works MEP - Award sub-contract C01_7 d/w - 10h/d - No HK 90 30-Oct-21 A 18-Jan-22 A 27-Apr-23 27-Apr-23 Hols - No B/O periods (was 310.P.EX.F140 Subletting - Optional Works Earthwork - Stage 1&2 Preparation,Submission& C1) C01_7 d/w - 10h/d - No HK 90 01-May-22 29-Jul-22 28-Jan-23 27-Apr-23 272 Approval,Tender&Award sub-contract Hols - No B/O periods (was Submissions C1) 250 0 22-Jul-21 A 24-May-22 27-Mar-22 14-Jun-22 17 Coordination 195 0 22-Jul-21 A 29-Mar-22 27-Mar-22 29-Mar-22 0 310.C.RC.R002 HKO Anemometer - coordination with AA for site access and exemption C11_6 d/w - 10h/d - With 45 22-Jul-21 A 11-Sep-21 A 27-Mar-22 27-Mar-22 HK Hols - No B/O periods 310.C.RC.R002.1.B01 HKO Anemometer - coordination & confirmation of construction details with BD Approval (was C01_7C3) d/w - 10h/d - No HK 80 10-Nov-21 A 29-Mar-22 27-Mar-22 29-Mar-22 0 Hols - No B/O periods (was Method Statement Submission C1) C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was30-Mar-22 C1) 24-May-22 20-Apr-22 14-Jun-22 21 Method Statement - Cabling C01_7 d/w - 10h/d - No HK Hols56 - No B/O periods 0 (was30-Mar-22 C1) 24-May-22 20-Apr-22 14-Jun-22 21 310.D.RC.S031.B01 HKO Anemometer - Method Statement - Cabling Works - prepare document C01_7 d/w - 10h/d - No HK 28 30-Mar-22 26-Apr-22 20-Apr-22 17-May-22 21 Hols - No B/O periods (was 310.D.RC.S032.B01 HKO Anemometer - Method Statement - Cabling Works - PM review and accept C1) C01_7 d/w - 10h/d - No HK 28 27-Apr-22 24-May-22 18-May-22 14-Jun-22 21 Hols - No B/O periods (was BA Submission C1) C01_7 d/w - 10h/d - No HK Hols28 - No B/O periods 0 (was 16-Feb-22 C1) A 02-Apr-22 27-Mar-22 02-Apr-22 0 310.D.RC.S30 HKO Anemometer - submit BA8 consent application to BD C01_7 d/w - 10h/d - No HK 28 16-Feb-22 A 24-Mar-22 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.C.RC.S208 HKO Anemometer - submit BA10 notice of commencement of work C1) C01_7 d/w - 10h/d - No HK 7 27-Mar-22 02-Apr-22 27-Mar-22 02-Apr-22 0 Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 253 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S HKO Equipment (Anemometer) 633 3 11-Sep-21 A 07-Oct-23 27-Mar-22 14-Oct-23 6 HKO Area 279 2 11-Sep-21 A 31-Jul-22 27-Mar-22 31-Jul-22 0 Work Permit 244 0 11-Sep-21 A 18-Jun-22 27-Mar-22 09-Jul-22 17 310.C.RC.R042.B01 HKO Anemometer - Application of Work Permit (Cable detection on Footing footprint) C01_7 d/w - 10h/d - No HK 21 11-Sep-21 A 15-Oct-21 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.C.RC.R42 HKO Anemometer - Application of Work Permit (Cable Detection on cable drawpit / cable C1) C01_7 d/w - 10h/d - No HK 21 15-Dec-21 A 15-Jan-22 A 27-Mar-22 27-Mar-22 ducts) Hols - No B/O periods (was 310.C.RC.R043.B01 HKO Anemometer - Application of Work Permit (Cabling Works) C1) C11_6 d/w - 10h/d - With 21 25-May-22 18-Jun-22 15-Jun-22 09-Jul-22 17 HK Hols - No B/O periods Installation Works (was C3) 174 2 13-Sep-21 A 31-Jul-22 27-Mar-22 31-Jul-22 0 310.C.RC.R018 HKO Anemometer - Grant Site Access C11_6 d/w - 10h/d - With 0 13-Sep-21 A 27-Mar-22 HK Hols - No B/O periods Initial Works (was C3) 56 0 30-Dec-21 A 11-Apr-22 27-Mar-22 21-Apr-22 6 310.C.RC.R006.B01 HKO Anemometer - Cable Detection under Footing (NOTAM) C23_4d/w - NOTAM 3 30-Dec-21 A 30-Dec-21 A 27-Mar-22 27-Mar-22 (M,W,Th,Su-01:30-07:30) - 310.C.RC.R007.B01 HKO Anemometer - Trial pit at Anemometer 4 & 5 Footing (NOTAM) No HK d/w C01_7 Hols- -10h/d With B/O - No HK 4 19-Jan-22 A 20-Jan-22 A 27-Mar-22 27-Mar-22 Hols - No B/O periods (was 310.C.RC.R006 HKO Anemometer - Inspection of manhole condition survey and trial pit excavation C1) C11_6 d/w - 10h/d - With 16 24-Jan-22 A 11-Apr-22 02-Apr-22 21-Apr-22 6 HK Hols - No B/O periods 310.C.RC.R022.B01 HKO Anemometer - Installation of Settlement points (NOTAM) (was C3) - NOTAM C23_4d/w 8 21-Mar-22 A 25-Mar-22 A 27-Mar-22 27-Mar-22 (M,W,Th,Su-01:30-07:30) - HKO Anemometer Footing No HK Hols- -NOTAM C23_4d/w With B/O(M,W,Th,Su-01:30-07:30) 32 0 - No HK 03-Apr-22 Hols - With B/O07-Jul-22 Periods & Flight03-Apr-22 Checks 31-Jul-22 13 310.C.RC.R010 HKO Anemometer - Excavation and Construction of Footing for Anemometer 4&5 C23_4d/w - NOTAM 18 03-Apr-22 13-Jun-22 03-Apr-22 13-Jun-22 0 (NOTAM) (M,W,Th,Su-01:30-07:30) - 310.C.RC.R011.B01 HKO Anemometer - Footing - Submission of Form BA14 for Completion of Works No HK Hols- -NOTAM C23_4d/w With B/O 14 15-Jun-22 07-Jul-22 07-Jul-22 31-Jul-22 13 (M,W,Th,Su-01:30-07:30) - HKO Drawpit & Duct No HK Hols- -NOTAM C23_4d/w With B/O(M,W,Th,Su-01:30-07:30) 14 0 - No HK 15-Jun-22 Hols - With B/O07-Jul-22 Periods & Flight15-Jun-22 Checks 07-Jul-22 0 310.C.RC.R013 HKO Anemometer - Excavation and Construction of Temporary cable draw pit and cable C23_4d/w - NOTAM 14 15-Jun-22 07-Jul-22 15-Jun-22 07-Jul-22 0 duct for power and comms (NOTAM) (M,W,Th,Su-01:30-07:30) - HKO Pillar Box, Comms & Power Cabling No HK Hols- -NOTAM C23_4d/w With B/O(M,W,Th,Su-01:30-07:30) 10 2 - No HK 10-Jul-22 Hols - With B/O25-Jul-22 Periods & Flight10-Jul-22 Checks 25-Jul-22 0 310.C.RC.R013.B01 HKO Anemometer - Cabling works_Communication System (NOTAM) C23_4d/w - NOTAM 10 1 10-Jul-22 25-Jul-22 10-Jul-22 25-Jul-22 0 (M,W,Th,Su-01:30-07:30) - 310.C.RC.R015.B01 HKO Anemometer - Cabling works_Power System (NOTAM) No HK Hols- -NOTAM C23_4d/w With B/O 10 1 10-Jul-22 25-Jul-22 10-Jul-22 25-Jul-22 0 (M,W,Th,Su-01:30-07:30) - HKO Inspection & Handover No HK d/w C01_7 Hols- -10h/d With B/O - No HK Hols 7- No B/O periods 0 (was25-Jul-22 C1) 31-Jul-22 25-Jul-22 31-Jul-22 0 310.C.RC.R014 HKO Anemometer - Testing & Commissioning, Inspection & Handover with relevant C01_7 d/w - 10h/d - No HK 7 25-Jul-22 31-Jul-22 25-Jul-22 31-Jul-22 0 authorities Hols - No B/O periods (was 310.C.RC.R026 HKO Anemometer - Achieved KD-G1 C1) C01_7 d/w - 10h/d - No HK 0 31-Jul-22 31-Jul-22 0 Hols - No B/O periods (was Between ATCX & BATCX C1) C11_6 d/w - 10h/d - With HK Hols 35- No B/O 1periods (was 01-Aug-22 C3) 09-Sep-22 02-Sep-23 14-Oct-23 325 310.C.RC.R38 Between ATCX and BATCX - Cable Detection, Trial Pits C11_6 d/w - 10h/d - With 14 01-Aug-22 16-Aug-22 02-Sep-23 18-Sep-23 325 HK Hols - No B/O periods 310.C.RC.R46 Between ATCX and BATCX - Cabling Works_Power System (was C11_6C3) d/w - 10h/d - With 15 1 17-Aug-22 02-Sep-22 19-Sep-23 07-Oct-23 325 HK Hols - No B/O periods 310.C.RC.R47.B02 Between ATCX and BATCX - T&C and Inspection & handover with relevant authorities (was C11_6C3) d/w - 10h/d - With 6 03-Sep-22 09-Sep-22 09-Oct-23 14-Oct-23 325 HK Hols - No B/O periods HKO Anemometer Parallel Run & Remaining Works (was C3) 354 0 01-Aug-22 07-Oct-23 01-Aug-22 08-Oct-23 0 310.C.RC.R050.B01 HKO Anemometer - Installation of New HKO Equipment (by others) C01_7 d/w - 10h/d - No HK 28 01-Aug-22 28-Aug-22 01-Aug-22 28-Aug-22 0 Hols - No B/O periods (was 310.C.RC.R058.B01 HKO Anemometer - Construct New Glide Path Antenna Counterpoise, Submit BA14 and C1) C11_6 d/w - 10h/d - With 45 15-Aug-23 07-Oct-23 15-Aug-23 07-Oct-23 0 H/O inspection with relevant authorities HK Hols - No B/O periods (was C3) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 254 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.RC.R030.B01 HKO Anemometer - Complete Parallel Run with existing Anemometer (365 days) C01_7 d/w - 10h/d - No HK 0 28-Aug-23 28-Aug-23 0 Hols - No B/O periods (was 310.C.RC.R054.B01 HKO Anemometer - Remove Existing Anemometer C1) C11_6 d/w - 10h/d - With 12 29-Aug-23 11-Sep-23 29-Aug-23 11-Sep-23 0 HK Hols - No B/O periods 310.C.RC.R158.B01 HKO Anemometer - Achieved KD-G2 (was C01_7C3) d/w - 10h/d - No HK 0 07-Oct-23 08-Oct-23 1 Hols - No B/O periods (was HKO Equipment (Ceilometer) C1) 140 3 25-Apr-23 11-Oct-23 28-Apr-23 14-Oct-23 3 310.C.RC.R032 HKO Equipment (Ceilometer) - Footing C11_6 d/w - 10h/d - With 45 25-Apr-23 17-Jun-23 28-Apr-23 21-Jun-23 3 HK Hols - No B/O periods 310.C.RC.R012.B01 HKO Equipment (Ceilometer) - Footing - Submission of Form BA14 for Completion of (was C3) - NOTAM C23_4d/w 14 18-Jun-23 10-Jul-23 09-Aug-23 31-Aug-23 30 Works (M,W,Th,Su-01:30-07:30) - 310.C.RC.R040 HKO Equipment (Ceilometer) - Cable ducts & draw pit No HK d/w C11_6 Hols- -10h/d With B/O - With 30 19-Jun-23 25-Jul-23 23-Jun-23 28-Jul-23 3 HK Hols - No B/O periods 310.C.RC.R033 HKO Equipment (Ceilometer) - Cabling (was C11_6C3) d/w - 10h/d - With 30 3 26-Jul-23 29-Aug-23 29-Jul-23 01-Sep-23 3 HK Hols - No B/O periods 310.C.RC.R035 HKO Equipment (Ceilometer) - T&C and Inspection & handover with relevant authorities (was C11_6C3) d/w - 10h/d - With 35 30-Aug-23 11-Oct-23 02-Sep-23 14-Oct-23 3 HK Hols - No B/O periods HKO Equipment (Forward Scatterer, RVR Transmissometer, RVR Receivers) (was C3) 140 3 25-Apr-23 11-Oct-23 28-Apr-23 15-Oct-23 3 310.C.RC.R034 HKO Equipment (Forward Scatterer, RVR Transmissometer, RVR Receivers) - Footing C11_6 d/w - 10h/d - With 45 25-Apr-23 17-Jun-23 28-Apr-23 21-Jun-23 3 HK Hols - No B/O periods 310.C.RC.R035.B01 HKO Equipment (Forward Scatterer, RVR Transmissometer, RVR Receivers) - Footing - (was C3) - NOTAM C23_4d/w 14 18-Jun-23 10-Jul-23 20-Aug-23 11-Sep-23 36 Submission of Form BA14 for Comp of Wk (M,W,Th,Su-01:30-07:30) - 310.C.RC.R041 HKO Equipment (Forward Scatterer, RVR Transmissometer, RVR Receivers) - Cable No HK d/w C11_6 Hols- -10h/d With B/O - With 30 19-Jun-23 25-Jul-23 03-Jul-23 05-Aug-23 10 ducts & draw pits HK Hols - No B/O periods 310.C.RC.R037 HKO Equipment (Forward Scatterer, RVR Transmissometer, RVR Receivers) - cabling (was C11_6C3) d/w - 10h/d - With 30 3 26-Jul-23 29-Aug-23 07-Aug-23 09-Sep-23 10 HK Hols - No B/O periods 310.C.RC.R038 HKO Equipment (Forward Scatterer, RVR Transmissometer, RVR Receivers) - T&C & (was C11_6C3) d/w - 10h/d - With 28 30-Aug-23 03-Oct-23 11-Sep-23 14-Oct-23 10 handover inspect with relevant authorities HK Hols - No B/O periods 310.C.RC.R036 Achieved KD-G3 -Complete all civil works for CAD Facilities, HKO Facilities (was C01_7C3) d/w - 10h/d - No HK 0 11-Oct-23 15-Oct-23 4 Hols - No B/O periods (was CAD Facilities C1) C11_6 d/w - 10h/d - With HK Hols 52- No B/O 2periods (was 13-Jun-23 C3) 14-Aug-23 07-Aug-23 07-Oct-23 45 Antenna C11_6 d/w - 10h/d - With HK Hols 52- No B/O 2periods (was 13-Jun-23 C3) 14-Aug-23 07-Aug-23 07-Oct-23 45 310.C.RC.P594 Localizer Bldg C and D Antenna - foundation platform + duct C11_6 d/w - 10h/d - With 30 2 13-Jun-23 19-Jul-23 07-Aug-23 09-Sep-23 45 HK Hols - No B/O periods 310.C.RC.P595.B02 Localizer Bldg C and D Antenna - cabling works (was C11_6C3) d/w - 10h/d - With 12 20-Jul-23 02-Aug-23 11-Sep-23 23-Sep-23 45 HK Hols - No B/O periods 310.C.RC.P596 Localizer Bldg C and D Antenna - installation & function test & handover with relevant (was C11_6C3) d/w - 10h/d - With 10 03-Aug-23 14-Aug-23 25-Sep-23 07-Oct-23 45 authorities HK Hols - No B/O periods Appendix C2a - Communication Rooms (was C3) 354 0 20-Oct-22 27-Dec-23 28-Nov-22 31-Dec-23 3 Communication Room CR358 (New Air Traffic Control Tower) 187 0 20-Oct-22 08-Jun-23 28-Nov-22 23-Nov-23 139 310.C.TC.W104 CR358 - Application of Work Permit for Works at Communication Room C01_7 d/w - 10h/d - No HK 21 20-Oct-22 09-Nov-22 06-Apr-23 26-Apr-23 168 Hols - No B/O periods (was 310.C.TC.W100 CR358 - Access Date C1) C01_7 d/w - 10h/d - No HK 0 28-Nov-22* 28-Nov-22 0 Hols - No B/O periods (was 310.C.TC.W115 CR358 - Communication cabling works i.e. trunking and cable laying [NOTAM] C1) C23_4d/w - NOTAM 48 30-Nov-22 24-Apr-23 27-Apr-23 10-Aug-23 50 (M,W,Th,Su-01:30-07:30) - 310.C.TC.W118 CR358 - T&C - local connection test [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 14 26-Apr-23 08-Jun-23 20-Sep-23 23-Nov-23 72 (M,W,Th,Su-01:30-07:30) - Communication Room CR306 (Aircraft Fuel Dispenser Staging and Staff Facilities) No HK Hols - With B/O 137 0 08-Jan-23 28-Jun-23 27-Mar-23 25-Nov-23 125 310.C.TC.W150 CR306 - Application of Work Permit for Works at Communication Room C01_7 d/w - 10h/d - No HK 21 08-Jan-23 28-Jan-23 08-Aug-23 28-Aug-23 212 Hols - No B/O periods (was C1) Remaining Work Data Date: 27-Mar-22 Programme Rev. B02 Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 255 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone Programme for Contract 3310 - North Runway Modification Works (Rev. B02) Activity ID Activity Name Calendar OD TRA Start Finish Late Start Late Finish Total 2021 2022 2023 2024 Float J J AS OND J F A J J AS O ND J F A J J AS OND J F M AM J J A S 310.C.TC.W103 CR306 - Access Date C01_7 d/w - 10h/d - No HK 0 27-Mar-23* 27-Mar-23 0 Hols - No B/O periods (was 310.C.TC.W121 CR306 - cabling works i.e. trunking and cable laying (ACS, ALWS, CCTV, AANET, C1) C11_6 d/w - 10h/d - With 60 27-Mar-23 10-Jun-23 29-Aug-23 09-Nov-23 125 SCADA, VDC) HK Hols - No B/O periods 310.C.TC.W124 CR306 - T&C - local connection test and trouble shooting (was C11_6C3) d/w - 10h/d - With 14 12-Jun-23 28-Jun-23 10-Nov-23 25-Nov-23 125 HK Hols - No B/O periods Data Center (was C3) 115 0 09-Mar-23 29-Jul-23 01-May-23 25-Nov-23 99 310.C.TC.W154 Data Center - Application of Work Permit for Works C01_7 d/w - 10h/d - No HK 21 09-Mar-23 29-Mar-23 08-Aug-23 28-Aug-23 152 Hols - No B/O periods (was 310.C.TC.W106 Data Center - Access Date C1) C01_7 d/w - 10h/d - No HK 0 01-May-23* 01-May-23 0 Hols - No B/O periods (was 310.C.TC.W127 Data Center - cabling works i.e. trunking and cable laying (SCADA) C1) C11_6 d/w - 10h/d - With 60 02-May-23 13-Jul-23 29-Aug-23 09-Nov-23 99 HK Hols - No B/O periods 310.C.TC.W130 Data Center - T&C - local connection test and trouble shooting (was C11_6C3) d/w - 10h/d - With 14 14-Jul-23 29-Jul-23 10-Nov-23 25-Nov-23 99 HK Hols - No B/O periods Communication Room CR3088 (Electrical Substation 5) (was C3) 110 0 18-May-23 26-Sep-23 03-Jul-23 25-Nov-23 49 310.C.TC.W158 CR3088 - Application of Work Permit for Works at Communication Room C01_7 d/w - 10h/d - No HK 21 18-May-23 07-Jun-23 08-Aug-23 28-Aug-23 82 Hols - No B/O periods (was 310.C.TC.W109 CR3088 - Access Date C1) C01_7 d/w - 10h/d - No HK 0 03-Jul-23* 03-Jul-23 0 Hols - No B/O periods (was 310.C.TC.W133 CR3088 - cabling works i.e. trunking and cable laying (ALWS, CCTV, AANET, VDC) C1) C11_6 d/w - 10h/d - With 60 03-Jul-23 09-Sep-23 29-Aug-23 09-Nov-23 49 HK Hols - No B/O periods 310.C.TC.W136 CR3088 - T&C - local connection test and trouble shooting (was C11_6C3) d/w - 10h/d - With 14 11-Sep-23 26-Sep-23 10-Nov-23 25-Nov-23 49 HK Hols - No B/O periods Communication Room CR78 (Backup IAC) (was C3) 144 0 02-Jun-23 23-Nov-23 28-Jun-23 23-Nov-23 0 310.C.TC.W146 CR78 - Application of Work Permit for Works at Communication Room C01_7 d/w - 10h/d - No HK 21 02-Jun-23 22-Jun-23 28-Jun-23 18-Jul-23 26 Hols - No B/O periods (was 310.C.TC.W112 CR78 - Access Date C1) C01_7 d/w - 10h/d - No HK 0 17-Jul-23* 17-Jul-23 0 Hols - No B/O periods (was 310.C.TC.W139 CR78 - Communication cabling works i.e. trunking and cable laying [NOTAM] (SCADA) C1) C23_4d/w - NOTAM 36 19-Jul-23 18-Sep-23 19-Jul-23 18-Sep-23 0 (M,W,Th,Su-01:30-07:30) - 310.C.TC.W142 CR78 - T&C - local connection test and trouble shooting [NOTAM] No HK Hols- -NOTAM C23_4d/w With B/O 14 20-Sep-23 23-Nov-23 20-Sep-23 23-Nov-23 0 (M,W,Th,Su-01:30-07:30) - Testing and Commissioning - Integration Test of Communication Link No HK Hols - With B/O 37 0 13-Nov-23 27-Dec-23 25-Nov-23 31-Dec-23 3 310.T.TC.W013 Start after Completion of EVT cabling works (electrical and comms) C11_6 d/w - 10h/d - With 0 13-Nov-23 27-Nov-23 12 HK Hols - No B/O periods 310.T.TC.W010 Completion of Comms ducting works, cable laying, trunking and cable termination (was C11_6C3) d/w - 10h/d - With 0 23-Nov-23 25-Nov-23 3 HK Hols - No B/O periods 310.T.TC.W016 T&C - system integration test, connectivity test, packet loss test, function test and (was C11_6C3) d/w - 10h/d - With 21 23-Nov-23 16-Dec-23 27-Nov-23 20-Dec-23 3 Inspection HK Hols - No B/O periods 310.T.TC.W019 T&C - PM acceptance & handover inspection with relevant authorities (was C11_6C3) d/w - 10h/d - With 7 18-Dec-23 27-Dec-23 21-Dec-23 30-Dec-23 3 HK Hols - No B/O periods 310.T.TC.W022 Achieved KD-6 (Stage 6) - Complete cabling bet. comms rms in ATCT, Backup ATCT, (was C01_7C3) d/w - 10h/d - No HK 0 27-Dec-23 31-Dec-23 4 New ATCT through EVT + T&C Hols - No B/O periods (was C1)
Remaining Work Data Date: 27-Mar-22 Programme Rev. B02
Project ID: 3310-CWPG-B02 Date Revision Checked Approved Critical Remaining Work Printed: 03-May-22 09:45 Milestone Programme Layout: 3310 - PMP 29-Sep-21 A03 Submission - accepted on 12 Nov ... Crit Milestone Page 256 of 256 TASK filter: Non-LOE. 18-Feb-22 B01 Submission - not accepted Actual Work 03-May-22 B02 Submitted Actual Milestone