LWD-01a Phase 1 Road Lvls

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

6.

00
MW
IDE D
RIVEW ENTR
AY
S 19

Y
C3

C9
S 18
S 29

S 17

9m
C10

Ground Lvl 91.70


ROA
S 28

Finish Lvl 95.50 DV


C4

ILLA
GE
S 27

ROA
5.50 PODIUM D

+91.70
S 26

MW
IDE D 3081 Sqm ENTRY
C5

RIVEW
S 25

AY +91.70
(.761Acres)

S 13 C68
C59

1 in 49
S 24

C16
C10

S 14
BADM

S 15

10925
INTO

S 16
17.15 x N COURT

S 12
1 FLOORS
C6

17
3286 SQ .80 M
FT

C67
S 23

+91.92
C58
(131 ECU)

S 11
TERRACE GREEN

C15

C48
C9
S 22

C26

C66
SWIMMING POOL
10.00 X 20.00

S 10
0.43 ACRES

C25

C47
C7

Ground Lvl 91.70

C57

C56
TREAD = 300 MM
MM
MANUFACTURE
S 21

RISER = 169
TO
BE AS PER
THE LIFT

DETAIL

UP
OPENING

7080
LIFT

10

W1
09
08
07
06
05
04
03
02
01
1st slab Lvl 99.70
0.5 acres

11
12
Lobby Lvl 92.55

13

FLAT
14
15
16
17
18
19
20
21
C46
DN

D3
1650 X 600
C45

1600x1600

C55
FHC
LIFT
C23
S 20

C54
0
9

First Floor Lvl 95.75


.8
.7
96

FRD
C44

LOBBY

01
02
C7

ENTRANCE
C43
TOILET
1000X
1525
C42
D2

3340X4520
S 19

C65
C22

+19in170.92
2350 X 2080
MAID ROOM
C14

S 09
C9

C53
KID'S POOL

D1
INDICATE BEAM

C41
ABOVE LVL

C64
S 18

SIT-OUT AREA
4605X4620
BOTTOM SLAB

S 08
T-5

DOTTED LINE

LC3
C6
S 17

C40
LIFT
PER THE
1925X2550
Ground 95.00
Deck Lvl 97.50

LIFT OPENIN ACTURE DETAIL

+92.05M.
Finish L

LIFT
C10

G TO BE AS

S 07
C52
LC2

BEAM
+96.20

S+14

C13

ABOVE LVL
MANUF
1925X2550

INDICATE
LIFT

C39

METER ROOM
4755X4620

BOTTOM SLAB

C63
DOTTED LINE
UGWT

LC1
CENTRAL PARK

S 06
C5
Lvl 91.7
vl

C51
WIDE

C38
PASSAGE

TREAD = 300 MM
MM
1525 MM

RISER = 163

30705
8M CLUB DRIVE

C62
wc DECK

C21

S 05
04 03 02 01
7.20 X 5.52

C37

1 in 49
430 SQFT

C36
FILTERATION wc

C12
PANTRY

2.0 acres
PLANT

C35
02
01
2.60 X 3.90 2.70 X 3.85
shower

FRD
C20
107.74 SQFT 111.83 SQFT
wc

C33
C34
0
shower

WET

UP
FHC
wc

COLLECTION
chng rm

3200X1400
GARBAGE

ROOM

TREAD = 300 MM
MM
C4
shower

C19

RISER = 165

C32
chng rm

C31
shower

D1
benches
benches

change room (F)


427.22 SQFT
change room (m)
435.40 SQFT
75

C61
C30
benches

WATER PARTY

C18
benches

CHILLER 8.00 X 9.85


877.37 SQFT

C3

C29
C17

C60
HANDI.

C50

+92.55
TOILET
2.30 X 1.95

C11
C2
2.10 M WIDE CORRIDOR

1.80 M WIDE CORRIDOR


1145 SQ FT

UP KIDS ROOM
8.85 X 5.00
476.19 SQFT

C49A
C49
E3
LIFT
2.75 x 2.00 m

C1A
C1
A

C4 W1 W1 W1

WATERBODY
1.8 M WIDE CORRIDOR
C3

Lobby Lvl 94.65 C5 C6


C7
B

C1 C10
MEETING ROOM
3050 X 3010

Plinth Lvl 98.05


C2 C9
PANTRY

First Floor Lvl 97.70 4880 X 4160


C

1 in 32.64
D1 LP 01 LP 02 LP 03 LP 04 LP 05 LP 06
S2
D

MAINTENANCE OFFICE
C13 5970X4570
ENTRANCE LOBBY C1A C11
2955X2720 C16
UP 6.00 X 6.00 TWO WHEELER PARKING AREA DOTTED LINE INDICATE ABOVE DOTTED LINE INDICATE BEAM D1 D2 D2

19585
LVL VOID BOTTOM SLAB ABOVE LVL F.TOILET M.TOILET 1895X1670
C12 STORE ROOM
549 SQFT 2500 X 1645
C15 1500 X 1570 1500 X 1570
E2 C14

DOTTED LINE INDICATE


LC2

V
D1 D1
V V

Ground Lvl 91.70


T-4
LC1 LIFT LIFT LC3
BUILDING LINE ABOVE LVL 1925X2550 1925X2550 C25
MEETING ROOM ESTATE OFFICER
+97.50

TOILET

+97.50
4390 X 3055 3915 X 3170

1st +91.70
slab Lvl 94.80
1000X

C18 C19
1525
D2
W1
DRIVEWAY 6M WIDE
WATERBODY 1.8 M WIDE CORRIDOR
C17
C20 C21 LIFT OPENING TO BE
AS PER THE LIFT
MANUFACTURE
D1 C22

C23 C26
M.

2nd slab Lvl 97.8


M.S. GRILL DETAIL
1.525 MM WIDE PASSAGE M.S. GRILL MAID ROOM STORAGE
VOID ABOVE LVL 3450 X 2080 3855 X 1525
VOID ABOVE LVL

S+14
C29 C38 C42 C45 C48
D3
C41
FHC C34 C37 C39 C40
C43
C30 C36 DOTTED LINE INDICATE ABOVE
TREAD = 300 MM 1475X2400 LIFT
+97.625
TOS

GARBAGE RISER = 150 MM BEAM BOTTOM LVL SLAB LIFT

+93.15
D1 WET C44 1600x1600 OPENING TO C47
CYBER COLLECTION BE AS PER
ROOM SIT-OUT AREA THE LIFT
W1
1249 850 11.25 X 5.50 01 MANUFACTURE
RWA OFFICE
3200X1400 02 4605X4620 DETAIL
3340X4520 D1 3915 X 4500
664.35 SQFT 03 METER ROOM
FHC C46

04
04 03 02 01 TREAD = 300 MM 4755X4620
1650 X 600
LP 14 LP 13 LP 12 LP 11 LP 10 LP 09 LP 08 LP 0709
TREAD = 300 MM
RISER = 153 MM
RISER = 163 MM D3 D1
FRD
C31 FRD TREAD = 300 MM
C53 ENTRANCE LOBBY RISER = 167 MM
C50 C51 C58
C52
C49 20 UP 21 UP
D1
C59
COOLER
WATER

+97.65 19 01 20 01
+97.50 18 GLASS DOOR 19 02
02
+97.65
FFL

17 03 18 03 C57
16 04 17 04

6000MM WIDE RAMP


15 16

+94.70
05 05
14
SHRUBS

06 15 06
13 07 TREAD = 300 MM 14 07

500

SLOPE 1:10
12 08 RISER = 150 MM 13 08
11 09 C63 02 12 09
10 01 11 10

R4
1250 534 S 05

+93.35 1 in 49
C67
315 C49A C60 S 06 S 07 S 08 S 09 S 10 S 11 S 12
C64 C68
C62
C65
C66
S 01 S 02 S 03 C61 S 04

9570
1500MM WIDE RAMP

1475MM WIDE RAMP


W1 W1
C35
C54
OP 01 OP 02 OP 03 OP 04 OP 05 OP 06 OP 07 OP 08

SLOPE 1:10.13

SLOPE 1:8.1
C32 C33 C55 C56
+97.625
TOS

DOTTED LINE INDICATE RAILING AS PER


BUILDING LINE ABOVE LVL DETAIL. RL-2

6000MM WIDE RAMP


ABOVE +94.80LVL.
6M INTERNAL DRIVE FLAT
1 in 13.88 +95.585 1 in 49 +94.885 1 in 49 +94.255 +94.255 1 in 49 +94.035 1 in 49
+97.50

+97.60 +97.50
+97.50

3020
E3
26590 34500 30705 7080 10905 34240
NO. DATE REVISION
A

R4 R3
0 0
B

+93.30
00 00 50 0 00 LANDSCAPE ARCHITECT
R4 0 4
14335
C

15445

S2
R
D

E2

shaheer
ASSOCIATES

19120
1 in 50
5.5M ROW +95.55
+95.55
landscape architecture

167/8,
Sarai Julena, Okhla Road, New Delhi - 110025
Phone : 26820142
1 in 70

+93.68
ARCHITECT
6M INTERNAL DRIVE

01
02
03
04
05
06
07
08
09
10
19
18
17
16
15
14
13
12
11

PROJECT
ASHIANA MALHAR
(MARUNJI, PUNE)

DRAWING
ROAD GRADING PLAN
PHASE 1

N SCALE 1:400 DRG. NO.

DATE 24.08.2022
LW-01a

DRAWN SHWETA

You might also like