Professional Documents
Culture Documents
LWD-01a Phase 1 Road Lvls
LWD-01a Phase 1 Road Lvls
LWD-01a Phase 1 Road Lvls
00
MW
IDE D
RIVEW ENTR
AY
S 19
Y
C3
C9
S 18
S 29
S 17
9m
C10
ILLA
GE
S 27
ROA
5.50 PODIUM D
+91.70
S 26
MW
IDE D 3081 Sqm ENTRY
C5
RIVEW
S 25
AY +91.70
(.761Acres)
S 13 C68
C59
1 in 49
S 24
C16
C10
S 14
BADM
S 15
10925
INTO
S 16
17.15 x N COURT
S 12
1 FLOORS
C6
17
3286 SQ .80 M
FT
C67
S 23
+91.92
C58
(131 ECU)
S 11
TERRACE GREEN
C15
C48
C9
S 22
C26
C66
SWIMMING POOL
10.00 X 20.00
S 10
0.43 ACRES
C25
C47
C7
C57
C56
TREAD = 300 MM
MM
MANUFACTURE
S 21
RISER = 169
TO
BE AS PER
THE LIFT
DETAIL
UP
OPENING
7080
LIFT
10
W1
09
08
07
06
05
04
03
02
01
1st slab Lvl 99.70
0.5 acres
11
12
Lobby Lvl 92.55
13
FLAT
14
15
16
17
18
19
20
21
C46
DN
D3
1650 X 600
C45
1600x1600
C55
FHC
LIFT
C23
S 20
C54
0
9
FRD
C44
LOBBY
01
02
C7
ENTRANCE
C43
TOILET
1000X
1525
C42
D2
3340X4520
S 19
C65
C22
+19in170.92
2350 X 2080
MAID ROOM
C14
S 09
C9
C53
KID'S POOL
D1
INDICATE BEAM
C41
ABOVE LVL
C64
S 18
SIT-OUT AREA
4605X4620
BOTTOM SLAB
S 08
T-5
DOTTED LINE
LC3
C6
S 17
C40
LIFT
PER THE
1925X2550
Ground 95.00
Deck Lvl 97.50
+92.05M.
Finish L
LIFT
C10
G TO BE AS
S 07
C52
LC2
BEAM
+96.20
S+14
C13
ABOVE LVL
MANUF
1925X2550
INDICATE
LIFT
C39
METER ROOM
4755X4620
BOTTOM SLAB
C63
DOTTED LINE
UGWT
LC1
CENTRAL PARK
S 06
C5
Lvl 91.7
vl
C51
WIDE
C38
PASSAGE
TREAD = 300 MM
MM
1525 MM
RISER = 163
30705
8M CLUB DRIVE
C62
wc DECK
C21
S 05
04 03 02 01
7.20 X 5.52
C37
1 in 49
430 SQFT
C36
FILTERATION wc
C12
PANTRY
2.0 acres
PLANT
C35
02
01
2.60 X 3.90 2.70 X 3.85
shower
FRD
C20
107.74 SQFT 111.83 SQFT
wc
C33
C34
0
shower
WET
UP
FHC
wc
COLLECTION
chng rm
3200X1400
GARBAGE
ROOM
TREAD = 300 MM
MM
C4
shower
C19
RISER = 165
C32
chng rm
C31
shower
D1
benches
benches
C61
C30
benches
WATER PARTY
C18
benches
C3
C29
C17
C60
HANDI.
C50
+92.55
TOILET
2.30 X 1.95
C11
C2
2.10 M WIDE CORRIDOR
UP KIDS ROOM
8.85 X 5.00
476.19 SQFT
C49A
C49
E3
LIFT
2.75 x 2.00 m
C1A
C1
A
C4 W1 W1 W1
WATERBODY
1.8 M WIDE CORRIDOR
C3
C1 C10
MEETING ROOM
3050 X 3010
1 in 32.64
D1 LP 01 LP 02 LP 03 LP 04 LP 05 LP 06
S2
D
MAINTENANCE OFFICE
C13 5970X4570
ENTRANCE LOBBY C1A C11
2955X2720 C16
UP 6.00 X 6.00 TWO WHEELER PARKING AREA DOTTED LINE INDICATE ABOVE DOTTED LINE INDICATE BEAM D1 D2 D2
19585
LVL VOID BOTTOM SLAB ABOVE LVL F.TOILET M.TOILET 1895X1670
C12 STORE ROOM
549 SQFT 2500 X 1645
C15 1500 X 1570 1500 X 1570
E2 C14
V
D1 D1
V V
TOILET
+97.50
4390 X 3055 3915 X 3170
1st +91.70
slab Lvl 94.80
1000X
C18 C19
1525
D2
W1
DRIVEWAY 6M WIDE
WATERBODY 1.8 M WIDE CORRIDOR
C17
C20 C21 LIFT OPENING TO BE
AS PER THE LIFT
MANUFACTURE
D1 C22
C23 C26
M.
S+14
C29 C38 C42 C45 C48
D3
C41
FHC C34 C37 C39 C40
C43
C30 C36 DOTTED LINE INDICATE ABOVE
TREAD = 300 MM 1475X2400 LIFT
+97.625
TOS
+93.15
D1 WET C44 1600x1600 OPENING TO C47
CYBER COLLECTION BE AS PER
ROOM SIT-OUT AREA THE LIFT
W1
1249 850 11.25 X 5.50 01 MANUFACTURE
RWA OFFICE
3200X1400 02 4605X4620 DETAIL
3340X4520 D1 3915 X 4500
664.35 SQFT 03 METER ROOM
FHC C46
04
04 03 02 01 TREAD = 300 MM 4755X4620
1650 X 600
LP 14 LP 13 LP 12 LP 11 LP 10 LP 09 LP 08 LP 0709
TREAD = 300 MM
RISER = 153 MM
RISER = 163 MM D3 D1
FRD
C31 FRD TREAD = 300 MM
C53 ENTRANCE LOBBY RISER = 167 MM
C50 C51 C58
C52
C49 20 UP 21 UP
D1
C59
COOLER
WATER
+97.65 19 01 20 01
+97.50 18 GLASS DOOR 19 02
02
+97.65
FFL
17 03 18 03 C57
16 04 17 04
+94.70
05 05
14
SHRUBS
06 15 06
13 07 TREAD = 300 MM 14 07
500
SLOPE 1:10
12 08 RISER = 150 MM 13 08
11 09 C63 02 12 09
10 01 11 10
R4
1250 534 S 05
+93.35 1 in 49
C67
315 C49A C60 S 06 S 07 S 08 S 09 S 10 S 11 S 12
C64 C68
C62
C65
C66
S 01 S 02 S 03 C61 S 04
9570
1500MM WIDE RAMP
SLOPE 1:10.13
SLOPE 1:8.1
C32 C33 C55 C56
+97.625
TOS
+97.60 +97.50
+97.50
3020
E3
26590 34500 30705 7080 10905 34240
NO. DATE REVISION
A
R4 R3
0 0
B
+93.30
00 00 50 0 00 LANDSCAPE ARCHITECT
R4 0 4
14335
C
15445
S2
R
D
E2
shaheer
ASSOCIATES
19120
1 in 50
5.5M ROW +95.55
+95.55
landscape architecture
167/8,
Sarai Julena, Okhla Road, New Delhi - 110025
Phone : 26820142
1 in 70
+93.68
ARCHITECT
6M INTERNAL DRIVE
01
02
03
04
05
06
07
08
09
10
19
18
17
16
15
14
13
12
11
PROJECT
ASHIANA MALHAR
(MARUNJI, PUNE)
DRAWING
ROAD GRADING PLAN
PHASE 1
DATE 24.08.2022
LW-01a
DRAWN SHWETA