Weekly Report February 7-12, 2022
Weekly Report February 7-12, 2022
Anacleto
Date covered:
DATE HIGHLIGHTS ACTION PLAN
[Achievements / Challenges in your Department] [Fill up this portion w/ your recommended solution in
your challenges]
2/7/2022 1. Site Inspection
a. Barrier in dry mix toilet are in appropriate location due to after use of CR Relocate the barrier from front location to side
people have potential to bump from incoming material handling equipment location.
b. Barrier going to eye wash in production dry mix area can cause obstruction Recommendation: Removal of barrier.
in passage way in case of emergency Occur.
2. Meeting with maintenance department
3. Issuance of work permit and job site inspection
4. On board safety orientation for the new employee
5. Cascading of FDAS response, validation and resetting of FDAS panel
in case of fire alarm.
6. Preparation and review of all application documents for DOLE.
a. The fire hose cabinet cover with raw materials, critical when emergency Inform Arquin Malayas to remove the Rawmaterials
occur that cover firehose cabinet, explain the importance the
access of fire prevention device in case of
emergency. (status: close)
b. Ronnie Bilibli wearing damage safety shoes and not appropriate to use. Issued PPE assessment form justification for
replacement.
2. Go to DOLE regional office applied for DOLE permit to operate.
2/9/2022 1. Plant site inspection
a. Jetzmoey contractor repeatedly instructed to provide caution tape to Status: Done (close)
activity area to prevent incident of falling object to bypasser employee.
b. 2 employess Ronald Quizada and Marvin Palorina having use a Recommend for replacement
damage and unsafe safety shoes.
c. Sipter area employee working unsafe condition (Ergonomic hazards) Provision of flatform (Ms. Eloiza and NeiL to file job
due to no appropriate flat form provided.
order)
2. Organize the fire brigade team and ask the employee who willing to be
part of the team
3. Encoding of daily site inspection and observation report
4. Safety Induction to onboard employee.
2/10/202 1. Plant inspection
2
a. Daily Routine inspection of Eye wash to different area.
b. Daily inspection activities of Jetsmoey sprinkler contractor for safety
compliance.
2. Creation of module for 8hrs safety Mandatory training
3. Inspection of respirator complain from production coatings area.