Professional Documents
Culture Documents
Proposal 12.5 KW AFOHS
Proposal 12.5 KW AFOHS
Proposal 12.5 KW AFOHS
your
power &
profits.
P R OP OS A L FO R
SOL AR S YS T EM
TALK TO US
+92 213 5360583
sales@nizamenergy.com
Nizam Energy
Nizam Energy provides solar energy solutions for your home and business.
We offer comprehensive, complete solutions no one else can match –
including design, construction, operation, management and financing
services.
From starting our business in 2012, Nizam Energy has come a long way. Today, we are
considered the leading Solar Energy company in Pakistan. We are the only company in Pakistan
with experience in managing utility scale projects and insight into working within the confines of
regulatory policies and varying geographies, both in urban and rural settings.
Demand for clean energy around the world, and in Pakistan is growing extremely fast, and
organizations that are able to generate or effectively use clean energy sources could potentially
enjoy a powerful competitive advantage. At Nizam Energy, we are working on developing,
financing, constructing and operating medium and large-scale solar energy assets, providing
cheaper, more efficient and reliable clean energy alternatives.
Projects Executed in
Gilgit–Baltistan, 5+ Districts
Head Office
www.nizamenergy.com
3
We would like to express our gratitude for considering Nizam Energy as your solar solution
provider.
Starting with just ten people in 2012, Nizam Energy now employs more than 200 people.
We believe our success is a result of the vision of our leadership, the quality of our team,
and an emphasis on creating long-term partnerships with our clients and suppliers. Every
day our teams work together to devise the most effective and efficient strategy to deliver a
project to the construction phase and into operation.
This is a proposal of a 13kW On-Grid system. A grid-tied system does not require any
batteries to function that can reduce capital investment and maintenance costs significantly.
This system is economical, reliable, and with warranties backed by Nizam Energy, we
guarantee the fastest returns on investment and peace of mind that every customer desires.
Furthermore, DISCOs are allowing net-metering on its network under license from National
Electric Power Regulatory Authority (NEPRA), and taking advantage of this option, one can
sell the excess generation from their solar system to the grid and have the units net-off in
the electricity bill. If export to the grid is more than the units imported, the bill can be reduced
to naught with excess unit carried over to the next month.
This document elaborates on the solution offered: bill of quantity, equipment and warranties,
options available, and financial analysis highlighting the savings and returns.
We look forward to answering any queries that you may have so that we can proceed with
the signing of the contract leading to a timely installation and a happy customer.
Best Regards,
Team Nizam Energy
sales@nizamenergy.com
www.nizamenergy.com
Quotation ( 12.5 KW On-Grid Solar System)
AFOHS MALIR, FALCON COMPLEX.
16-Nov-2021
Solar Panels
Teir 1, 12.5kWp
Tier – 1
** Additional 75,000 in shape of Demand Draft will be paid by customer to DISCO for Generation License
and new energy meter.
www.nizamenergy.com
Terms and Conditions
Item Conditions
Quotation
15 days.
Validity
Payment Terms 80% advance & remaining 20% after delivery of equipment’s.
Order
After receipt of advance payment.
Confirmation
Advance payment will be refunded if notified within 3 weeks of order
Refunds confirmation provided delivery to site has not been made. After 3 weeks no
refunds.
The following are not included and will be charged extra if required.
Exclusions Any kind of civil work.
Lightening arrestors for buildings taller than 15 meters for net-metering.
System delivery and installation outside Lahore/Karachi/Islamabad.
Payment & Other All payments to be made by crossed cheque in the name of Nizam Energy
Terms (Pvt) Ltd.
Warranties
Product Warranty
12 Years Product and 25 Years
Solar Modules Performance
Inverter 5 Years
Mounting Structure 2 Years
Balance of System 1 Year
www.nizamenergy.com
6
Client Checklist:
Signed Proposal
www.nizamenergy.com
7
ACKNOWLEDGEMENTS
I acknowledge and represent that i have read the terms and conditions of this proposal and i fully
understand what is stated herein. I expressly agree to all the terms and conditions set out herein
and to adhere to all payments obligations and other ancillary obligations. In signing this proposal i
www.nizamenergy.com
8
System Analysis
Conceptual Drawing
www.nizamenergy.com
9
For 25 Years*
UNITS GENERATED
YEAR
(KWH) Units Generated (kWh)
1 16,079
2 15,964 18,000
3 15,848
4 15,733
5 15,617
16,000
6 15,502
7 15,386
8 15,271
9 15,155 14,000
10 15,040
11 14,925
12 14,809
12,000
13 14,694
14 14,578
15 14,463
16 14,347 10,000
17 14,232
18 14,117
19 14,001 8,000
20 13,886
21 13,770
22 13,655
6,000
23 13,539
24 13,424
25 13,308
TOTAL 367,343*** 4,000
*** These energy numbers according to Karachi can be vary in other cities.
www.nizamenergy.com
10
Financial Analysis
Parameters
Current Unit Rate (PKR/kWh) 17.55
Unit price Annual Increment (%) 0.00%
Discount factor 10.00%
O+M Fraction of Epc (%) 2.000%
First Year O+M Cost 20,000
Annual Increment in O+M (%) 0%
Cost of project (Rs.) 1,000,000
First Year Energy Injected (kWh) 16,079
Cash Flow
UNIT INITIAL
UNITS REVENUE NET CASH CUMULATIVE
YEAR PRICE PROJECT O+M (PKR)
PRODUCED (PKR) FLOW (PKR) (PKR)
(PKR) COST (PKR)
www.nizamenergy.com
11
Financial Indicators
Payback
2500000
2000000
1500000
1000000
500000
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
-500000
-1000000
16.00
15.63
14.00
12.00
10.00
8.00 8.556
6.00
4.00
2.00
-
Current Rate LCOE
www.nizamenergy.com
12
Equipment
Solar Modules
Inverter
www.nizamenergy.com