1X660MW, SAGARDIGHI THERMAL POWER EXTENSION
PROJECT (UNIT #5)
CUSTOMER'S CONSULTANT:
DEVELOPMENT CONSULTANT PRIVATE LIMITED
CONSULTING ENGINEERES
BLOCK DG4, SECTOR-II, SALT LAKE CITY,
KOLKATA, 700 091, INDIA
2 OF 15
TABLE OF CONTENT
TABLE OF CONTENT ................................................................................................................... 3
DESIGN PHILOSOPHY ................................................................................................................. 4
SIGN CONVENTION .................................................................................................................... 4
LOAD DESCRIPTION ................................................................................................................... 4
LOADS ........................................................................................................................................ 5
LOAD COMBINATIONS ........................................................................................................... 5
LOAD VALUES ........................................................................................................................ 6
FOUNDATION DESIGN ............................................................................................................. 11
FOUNDATION FOR PEDESTAL (W1) (W2) (W3) (W4) ......................................................... 11
............................................................................................................................................. 12
PEDESTAL DESIGN.................................................................................................................... 14
PEDESTAL DESIGN CALCULATION NOTATIONS ................................................................... 14
PEDESTAL DESIGN CALCULATION ........................................................................................ 15
3 OF 15
DESIGN PHILOSOPHY
INTRODUCTION
The design of Pile caps is performed using In-House developed software. The Pile caps are
checked for Maximum Pile Compression, Uplift, lateral shear. Further, pile caps are checked for
bending moments, one-way shear and punching shear. The Pile cap is checked for various load
combinations of Dead, Stator lifting load and wind loads.
SIGN CONVENTION
LOAD DESCRIPTION
Sl No. Load Load type Load description
1 DL_E Erection Dead load of Tower in erection.
2 WLX_E Erection Wind load in x dir at time of erection.
3 WLY_E Erection Wind load in y dir at time of erection.
4 WLD_E Erection Wind load in diagonal dir at time of erection.
5 VL_L Lifting Vertical load during lifting of stator.
6 HL_L Lifting Horizontal load at the time of lifting stator.
7 WLX_L Lifting Wind load in x dir at time of lifting stator.
8 WLY_L Lifting Wind load in y dir at time of lifting stator.
9 WLD_L Lifting Wind load in diagonal dir at time of lifting stator.
10 DL_S Stand by Dead load of fully erected tower.
11 WLX_S Stand by Wind load on tower in x direction during stand by.
12 WLY_S Stand by Wind load on tower in y direction during stand by.
13 WLD_S Stand by Wind load on tower in diagonal direction during stand by.
4 OF 15
LOADS
LOAD COMBINATIONS
5 OF 15
124 VL_L-1HL_L
125 VL_L-1HL_L-1WLX_L
126 VL_L-1HL_L-1WLY_L
127 VL_L-1HL_L-1WLD_L
128 DL_S-1WLX_S
129 DL_S-1WLY_S
130 DL_S-1WLD_S
131 .9DL_S-1WLX_S
132 .9DL_S-1WLY_S
133 .9DL_S-1WLD_S
Pedestal Load Vertical Horizontal Horizontal Moment Moment Load Load case Name
Case Force shear shear about about factor
No. (P) along axis along axis axis X axis Z
[MT] Z (Hz) X (Hx) (Mx) (Mz)
[MT] [MT] [MT-m] [MT-m]
6 OF 15
114 30.00 1.75 -1.75 38.75 -38.75 1.50 DL_S+1WLD_S
7 OF 15
113 30.00 0.00 -2.25 0.00 -45.50 1.50 DL_S+1WLY_S
8 OF 15
112 30.00 1.25 0.00 20.00 0.00 1.50 DL_S+1WLX_S
9 OF 15
111 30.00 0.00 0.00 0.00 0.00 1.50 DL_S
10 OF 15
FOUNDATION DESIGN
FOUNDATION FOR PEDESTAL (W1) (W2) (W3) (W4)
PILE DETAILS
Number of Piles 9 CGz of Pile group 0m
Diameter of Piles 600 mm CGx of Pile group 0m
2
Compressive capacity of piles 187.5 T SUM[(Xi-Xcg)2] of Pile group 19.440 m
2
Tensile capacity of piles 43.75 T SUM[(Zi-Zcg)2] of Pile group 19.440 m
Shear capacity of piles 12.5 T
Mz due to [Mz+(P+W ped)*ex ] 281.72 Ton-m Mx due to [Mx+(P+W ped)*ez] -281.72 Ton-m
Eccentricity between Pilecap and Pile group 0.00 mm Eccentricity between Pilecap and Pile group 0.00 mm
Mz due to pilecap and pile group eccentricity 0.00 Ton-m Mx due to pilecap and pile group eccentricity 0.00 Ton-m
Total Mz 281.72 Ton-m Total Mx -281.72 Ton-m
11 OF 15
Load factor for Limit State design 1.2 Along Axis -----> Z-Z X-X
Ultimate sagging(+)
Moment,Mup(Tm/width) 21.74 21.52
Along Axis -----> Z-Z X-X Effective Depth (for + M), d (m) 1.4625 1.4625
Ultimate Shear force (In sagging zone)(T/width) 0.00 0.00 Mup/bd2 (N/mm2) 0.10 0.10
Nominal shear stress (N/mm2) 0.00 0.00 Tensile steel required at bottom (% 0.02 0.02
Max allowable shear stress (N/mm2) 0.32 0.32 Provide bars of dia (mm) 25 25
Ultimate Shear force (In hogging zone)(T) 39.32 38.35 at c/c distance (mm) 175 175
Nominal shear stress (N/mm2) 0.27 0.26 Tensile steel provided at bottom (% 0.19 0.19
Max allowable shear stress (N/mm2) 0.32 0.32 Ultimate hogging(-)
Stirrup Diameter (mm) NA Moment,Mun(Tm/meter width) -22.12 -22.12
Stirrup spacing (N/mm2) NA NA Mun/bd2 (N/mm2) 0.10 0.10
Stress in stirrup (N/mm2) NA NA Tensile steel required at top (%) 0.02 0.02
Total Stirrup stress (N/mm2) NA Provide bars of dia (mm) 25 25
Permissible Stirrup stress (N/mm2) NA at c/c distance (mm) 175 175
Tensile steel provided at top (%) 0.19 0.19
Effective Depth (for - M), d (m) 1.463 1.463
P UNCH I NG SH EAR FO R P EDESTALS
Pedestal ID Ultimate Design Area for resisting Punching Shear Allowable punching
W1 94.82 Ton 6.09 m2 0.16 N/mm2 1.25 N/mm2
W2 157.42 Ton 6.09 m2 0.26 N/mm2 1.25 N/mm2
W3 94.82 Ton 6.09 m2 0.16 N/mm2 1.25 N/mm2
W4 32.21 Ton 6.09 m2 0.05 N/mm2 1.25 N/mm2
12 OF 15
FACTOR OF SAFETY FOR ALL LOAD CASES (Permissible/Actual)
Pile Reaction ALONG Z-Z ALONG X-X
Compressi pt at Shear pt at Shear
Load case pt at top pt at top Punching
on Tension Shear bottom stress bottom stress
101 8.18 N/a 28.13 20.69 N/A 5.39 47.76 N/A 13.31 42.48
102 8.18 N/a 28.13 47.76 N/A 13.31 20.62 N/A 5.28 42.48
103 6.75 N/a 19.89 21.31 N/A 5.57 21.24 N/A 5.45 30.22
104 8.35 N/a 28.13 31.05 N/A 8.21 71.65 N/A 20.74 60.75
105 8.35 N/a 28.13 71.65 N/A 20.74 30.94 N/A 8.04 60.75
106 6.87 N/a 19.89 31.98 N/A 8.48 31.88 N/A 8.30 43.81
107 1.46 N/a 11.36 7.85 6.57 1.10 7.76 6.56 1.07 4.19
108 1.40 N/a 9.87 8.08 7.93 1.22 9.71 8.22 1.34 5.01
109 1.39 N/a 9.87 9.82 8.22 1.38 7.74 7.88 1.17 4.97
110 1.36 N/a 8.84 8.18 7.95 1.23 8.09 7.95 1.20 4.83
111 5.73 N/a N/a 47.76 N/A 7.85 47.76 N/A 7.85 118.24
112 5.42 N/a 22.50 15.79 N/A 3.36 47.76 N/A 7.85 40.07
113 4.19 N/a 12.50 47.76 N/A 7.85 8.62 13.59 1.92 22.18
114 3.26 8.40 11.36 9.93 16.91 2.21 9.88 16.98 2.18 14.21
115 5.64 N/a 22.50 23.70 N/A 5.17 71.66 N/A 12.57 69.21
116 4.32 N/a 12.50 71.66 N/A 12.57 12.94 20.41 2.93 35.88
117 3.33 6.69 11.36 14.91 25.38 3.37 14.84 25.50 3.32 22.37
118 8.18 N/a 28.13 20.62 N/A 5.28 47.76 N/A 13.31 42.48
119 8.18 N/a 28.13 47.76 N/A 13.31 20.69 N/A 5.39 42.48
120 6.75 N/a 19.89 21.24 N/A 5.45 21.31 N/A 5.57 30.22
121 8.35 N/a 28.13 30.94 N/A 8.04 71.65 N/A 20.74 60.75
122 8.35 N/a 28.13 71.65 N/A 20.74 31.05 N/A 8.21 60.75
123 6.87 N/a 19.89 31.88 N/A 8.30 31.98 N/A 8.48 43.81
124 1.46 N/a 11.36 7.76 6.56 1.07 7.85 6.57 1.10 4.19
125 1.40 N/a 9.87 7.99 7.93 1.19 9.82 8.22 1.38 5.01
126 1.39 N/a 9.87 9.71 8.22 1.34 7.81 7.88 1.20 4.97
127 1.36 N/a 8.84 8.09 7.95 1.20 8.18 7.95 1.23 4.83
128 5.42 N/a 22.50 15.70 N/A 3.29 47.76 N/A 7.85 40.07
129 4.19 N/a 12.50 47.76 N/A 7.85 8.66 13.53 1.95 22.18
130 3.26 8.40 11.36 9.88 16.98 2.18 9.93 16.91 2.21 14.21
131 5.64 N/a 22.50 23.57 N/A 5.06 71.66 N/A 12.57 69.21
132 4.32 N/a 12.50 71.66 N/A 12.57 13.01 20.32 2.96 35.88
133 3.33 6.69 11.36 14.84 25.50 3.32 14.91 25.38 3.37 22.37
13 OF 15
PEDESTAL DESIGN
PEDESTAL DESIGN CALCULATION NOTATIONS
SHEAR
Vu Design Shear Force (T) Vc Section shear capacity (T)
τv Actual Shear Stress (N/mm 2 ) V us Additional shear (T)
τc max Max shear stress (N/mm 2 ) V uc Additional shear capacity (T)
τc Shear stress capacity (N/mm 2 )
14 OF 15
design values are
PEDESTAL DESIGN CALCULATION same for all pedestals
Ped Lp Wz Wx φl Nt pt φs Sv
W1 0.48 1.2 1.2 16 24 0.33 8 200
LC LF P Mx Mz Hz Hx
114 1.5 30.00 38.75 -38.75 1.75 -1.75
Lep Maex Maez Masx Masz Muz Mux Muz1 Mux1 Puz α DIF Acd pmin
0.96 1.23 1.23 0.00 0.00 59.39 59.39 138.76 138.76 1800.86 1 0.86 450.0 0.03
Ped Lp Wz Wx φl Nt pt φs Sv
W2 0.48 1.2 1.2 16 24 0.33 8 200
LC LF P Mx Mz Hz Hx
114 1.5 30.00 38.75 -38.75 1.75 -1.75
Lep Maex Maez Masx Masz Muz Mux Muz1 Mux1 Puz α DIF Acd pmin
0.96 1.23 1.23 0.00 0.00 59.39 59.39 138.76 138.76 1800.86 1 0.86 450.0 0.03
Ped Lp Wz Wx φl Nt pt φs Sv
W3 0.48 1.2 1.2 16 24 0.33 8 200
LC LF P Mx Mz Hz Hx
114 1.5 30.00 38.75 -38.75 1.75 -1.75
Lep Maex Maez Masx Masz Muz Mux Muz1 Mux1 Puz α DIF Acd pmin
0.96 1.23 1.23 0.00 0.00 59.39 59.39 138.76 138.76 1800.86 1 0.86 450.0 0.03
Ped Lp Wz Wx φl Nt pt φs Sv
W4 0.48 1.2 1.2 16 24 0.33 8 200
LC LF P Mx Mz Hz Hx
114 1.5 30.00 38.75 -38.75 1.75 -1.75
Lep Maex Maez Masx Masz Muz Mux Muz1 Mux1 Puz α DIF Acd pmin
0.96 1.23 1.23 0.00 0.00 59.39 59.39 138.76 138.76 1800.86 1 0.86 450.0 0.03
15 OF 15
CONFIDENTIAL - RESTRICTED USE
THIS DOCUMENT IS THE PROPERTY OF THE COMPANY AND CONTAINS CONFIDENTIAL
PROPRIETARY INFORMATION WHICH MUST NEITHER BE MADE AVAILABLE NOR DISCLOSED TO
OR DISCUSSED WITH ANYONE OUTSIDE OF THE COMPANY, ITS DIVISIONS AND
WHOLLY-OWNED AFFILIATES NOR USED FOR ANY PURPOSE EXCEPT AS AUTHORIZED BY THE
COMPANY UNDER DULY-EXECUTED AGREEMENTS PERMITTING SUCH DISCLOSURE OR USE,
AND THE DOCUMENT SHOULD BE SAFEGUARDED TO PREVENT SUCH UNAUTHORIZED
AVAILABILITY, DISCLOSURE, OR DISCUSSION.
FOR COMMENTS/APPROVAL
L I
I O
A G
F PRELIMINARY
L I
I O
A G
F india private limited