Professional Documents
Culture Documents
Slab Culvert - Final
Slab Culvert - Final
777
300
30 60 148.5 D D
210 148.5
C C
30
A A
600 957
30
B
2.5 2.5
25 600 25
35 5 cm
40 40
90 90
PCC 10
Dry Stone Pitching 25
300
129.5 132 132 132 129.5
45 45 10 PCC
25 Stone Pitching
30
5 150
30 70
60 300 0.42
0.35
35 100 0.455
30 150 -0.45
2.07
130 10 PCC 2.845 37.554
55 50 25 Stone Pitching
180
90
115
10
10
PCC 180
200
Section - AA
X-Section area 3.105 m2
5 PCC capping
100 50 60
110
150 100 60
50 10 PCC
50 25 Stone Pitching
30
160 40
80 90
90
10
PCC 160 10
180 110
Section C-C Section D-D
X-Area 2.43 m2 X-Section 1.41
25
65 35
30 30
o o o o o o
10
m2
504.7658
90.85784
2564.28
132.3011
670.1438
306.9
2867.7
166.5
23.1
4.5
7331.049
B
877
30 400
60 148.5 D D
210 148.5
C C
30
A A
600
30
B
2.5 2.5
25 600 25
35 5
37 40
90 90
PCC 10
Dry Stone Pitching 25
540
129.5 132 132 132 129.5
45 45 10 PCC
25 Stone Pitching
40
5 150
30 70
60 400
60 100
30 200
130 10 PCC
80 50 20 Stone Pitching
180 40
90
115
10
10
PCC 180
200
Section - AA
X-Section area 3.68 m2
5 PCC capping
100 50 60
110
195 100
95 10 PCC
50 20 Stone Pitching
30
160
90 90
10 PCC
10
PCC 160 10 PCC
180
Section C-C Section D-D
X-Area 3.085 m2 X-Section
Ground level
Stone masonry
Stone Pitching
5 PCC capping
60
10 PCC
25 Stone Pitching
90
10
110
Section D-D
1.41 m2
1 Quantity Estimation for Culver of .6 m width and 10.6 m length
5 cm PCC(M15)
80
PCC 10 cm
Stone Pitching 20 cm
Section AA
All dimensions in cm
70 50
5 capping - M15
0.615
60 40
115 95
10 10
20 20 10 PCC
80 60
Section - CC Section DD
180
20
o o o o o
16 Ф @ 150 mm c/c
16 Ф @ 150 mm c/c
Slab Detail at Section A-A
25
55 35
30 20
o o o o o o
30
Partial Section of BB
Roadway
A
30 600 30 70.7
50
B B 70.7
301.4
201.4 60
100
D 70.7
50
D
C Plan
A
5 5
25 600 25
35 5 cm PCC Capping
20
60 40 Ground level
60 60
PCC 10
Dry Stone Pitching 20
Section BB
0.6 x 0.6 x 6 m culvert
Estimate
Description of work No Length Breadth Height Quantity No Total
S.No Earthwork in Excavation
1 for straight portion 1 6.6 3.875 1 25.58
a Wing walls 2 1 5.089 1 10.18
b Cutoff walls 2 3.014 0.5 0.6 1.81
c Total 37.56 11 413.1754
Backfilling with compaction 11.27 11 123.9526
2 Stone Masonry (1:3)
3 Cutoff 2 2.014 0.5 0.6 1.21 149.93
a Return walls 4 1 0.6 1.05 2.52
b Foundation - Abutment 2 6.6 0.6 1.25 9.90
c Total 13.63 11 149.9124
Dry Stone Pitching
4 in the drain 1 6.6 0.6 0.2 0.79
a trapezoidal section of drain 2 0.707 1.807 0.2 0.51
b approach 2 6.6 0.95 0.25 3.14
c Total 4.44 11 48.81822
Plain Cement Concrete (M15)
5 lining in the drain 1 6.6 0.6 0.1 0.40
a trapezoidal section of drain 2 0.707 1.307 0.1 0.18
Below the stone masonry foundation 2 6.6 0.8 0.1 1.06
b Capping of return wall 4 1 0.6 0.05 0.12
e PCC above foundation 2 6.6 0.6 0.05 0.40
f PCC below wing walls 4 1 0.7 0.1 0.28
g Total 2.43 11 26.76091
Wearing Coat - M25
6 wearing coat - approach slab 2 6.6 0.475 0.1 0.63 11
wearing coat over culvert 1 6.6 1.8 0.07 0.83
1.46 11 16.0446
Reinforced Cement Concrete with supply of
7 all materials
Slab 1 6.6 1.8 0.2 2.38 11 26.136
Kerb 2 1.8 0.275 0.35 0.35 11 3.8115
Total 2.72 11 29.9475
Pointing (1:3)
8 Wing walls 8 1 0.5 1 4.00
Foundation wall 4 6.6 0.6 1 15.84
Total 19.84 11 218.24
9
25 mm thick wooden planks 2 6.6 1 0.35 4.62 11 50.82
10 75 mm dia PVC pipe 1.5
1 Quantity Estimation for Culver of 1.0m width and 6.0 m length
5 cm PCC(M15)
10
Plain Cement Concrete (M15)
120 465
140
x-Area 1.725
PCC 10 cm
Stone Pitching 20 cm
Section AA
All dimensions in cm
60 60
5 capping - M15
95 50
20 165
115
10 10
20 70 20 10 PCC
240
20
o o o o o
16 Ф @ 150 mm c/c
16 Ф @ 150 mm c/c
25
55 35
30 20
o o o o o o
30
Partial Section of BB
Roadway
A
30 600 30 70.7
50
B B 70.7
341.4
C 100
100
D 70.7
50
D
C Plan
A
5 5
25 600 25
35 5 cm PCC Capping
20
70 70
PCC 10 0.69
Dry Stone Pitching 20
Section BB
Estimate 1 x 1 x 6 m road culvert
538
25 150
60 109 D D
154 109
C C
30
A A
600
30
B
2.5 2.5
25 600 25
35 5
25 40
90 90
PCC 10
Dry Stone Pitching 20
35 35 10 PCC
25 Stone Pitching
25 RCC
5 PCC 95
70
60 150 0.42
#VALUE!
#VALUE!
20 150 #VALUE!
1.26
90 10 PCC #VALUE!
65 30 20 Stone Pitching
120
20
120 110
90
10
10
PCC 140
160
Section - AA
X-Section area 2.625 m2
5 PCC capping
70 20 60
80
300 85 60
75 10 PCC
30 20 Stone Pitching
25
110
100 100 85
10 PCC
10
PCC 110 10 PCC
130 105
Section C-C Section D-D
X-Area 2.12 m2 X-Section
25
55 35
30 20
o o o o o o
10 Steel 832
878
cm PCC Capping
Ground level
Stone masonry
Stone Pitching
#VALUE!
5 PCC capping
#VALUE!
10 PCC
25 Stone Pitching
10
1.36 m2
3 247.139
3 74.14169
3 150.6312
3 17.14872
3 15.11166
3 6.3855
3 16.02975
3 229.224
3 13.86
3 2496
four steps
677
30 200
60 148.5 D D
210 148.5
C C
30
A A
600 957
30
B
2.5 2.5
25 600 25
35 5 cm
25 25
90 90
PCC 10
Dry Stone Pitching 25
200
129.5 132 132 132 129.5
67.5 67.5 10 PCC
5 PCC 15 Stone Pitching
25
200
60 30 70
340 200
60
30 100
250
60 130
30 10 PCC
70 30 160 25 Stone Pitching
190 20
90
80
10
10
PCC 210
230
Section - AA
X-Section area 4.79 m2
5 PCC capping
80 30 60
90 90
40 300 60
105
80 130 10 PCC
340 50 25 Stone Pitching
195 30
180
90 90 90
10 PCC
10
PCC 180 10
200 110
Section C-C Section D-D
X-Area 3.95 m2 X-Section 1.44
25
55 35
30 20
o o o o o o
Size of Culvert 6 x 2x 2.5
S.No Description of work No Length Breadth Height Quantity Unit
1 Earthwork in Excavation
a Abutment Walls 2 7.6 3.3 1 50.16
b Wing walls 4 3.1 2.55 1 31.62
c straight floor for pcc and stone pitching 1 6.6 2 0.35 4.62
trapezoidal section of drain 2 1.485 3.485 0.35 3.62
Total 90.02 m3 2
2 Backfilling with compaction 27.01 m3 2
3 Stone Masonry
a Cutoff 2 6.77 0.9 0.5 6.09
b Abutment Walls 2 6.6 4.79 1 63.23
c Wing walls 4 2.1 2.695 1 22.64
Total 91.96 m3 2
4 Dry Stone Pitching
a in the drain 1 6.6 2 0.25 3.30
b trapezoidal section of drain 2 1.485 3.485 0.25 2.59
c approach 2 6.6 2 0.15 3.96
Total 9.85 m3 2
5 Plain Cement Concrete (M15)
a lining in the drain 1 6.6 2 0.1 1.32
trapezoidal section of drain 2 1.485 3.485 0.1 1.04
b Below the stone masonry foundation -abutment 2 6.6 2.3 0.1 3.04
c Capping of return wall 4 2.1 0.6 0.05 0.25
d Capping of abutment 2 6.6 0.7 0.05 0.46
e PCC below wing walls 4 2.1 1.55 0.1 1.30
Total 7.41 m3 2
6 Wearing Course - M25
wearing coat - approach slab 2 6.6 1.013 0.1 1.34
wearing coat above RCC of culvert 1 6.6 3.4 0.075 1.68
Total 3.02 m3 2
7 Reinforced Cement Concrete with supply of
all materials
Slab 1 6.6 3.4 0.25 5.61
Kerb 2 3.4 0.275 0.35 0.65
Total 6.26 m3 2
8 Pointing (1:3)
Wing walls 8 2.7 2.675 1 57.78
Foundation wall 8 6.6 2.5 1 132.00
Total 189.78 2
9 Wooden Plank 2 6.6 1 0.35 4.62 2
10 Steel 1456 2
PCC Capping
5 PCC capping
10 PCC
25 Stone Pitching
10
m2
180.0453
54.01359
183.918
19.69523
14.81409
6.039
12.529
379.56
9.24
2912
B
1224.2
40 500
50 60 212.1 D D
300 212.1
C C
30
A A
600
30
B
2.5 2.5
25 600 25
35 5
40 40
120 120
PCC 10
Dry Stone Pitching 25
500
129.5 132 132 132 129.5
45 45 10 PCC
25 Stone Pitching
40
35 150
50 80
65 500 0.52
1.3
100 130 1.8
50 300 0.805
3.105
180 10 PCC 7.53
100 50 25 Stone Pitching
230 40
150
115
10
15
PCC 270
290
Section - AA
X-Section area 7.53 m2
5 PCC capping
100 40 60
100 100
50 300 100 40 60
25
55 35
30 20
o o o o o o
Ground level
Stone masonry
Stone Pitching
99.396
5 PCC capping
200
10 PCC
25 Stone Pitching
10
3.85 m2
Estimates for Culverts for Langar Khana Road - nahre Shahi
6x1x1 6x.6x.6Total
E/w 332.944 393.283 726.227
Backfill 99.8832 117.9849 217.8681
Steel